1 6 th International Conference on Large Power Transformers- Modern Trends Benefits of SFRA - Case Studies B B Ahir Gujarat Energy Transmission Corporation Limited 1
2 Outline Condition Monitoring in GETCO Why SFRA? Case study (1):SFRA - How it helped to find a fault in winding Case study (2): SFRA - How it helped to find a fault in core Case study (3): SFRA - How it helped to find a fault in core Conclusion 2
3 Condition Monitoring in GETCO Transformer Technology / Tool Online Offline Insulation Resistance and Polarisation Index Routine Low Voltage tests Capacitance & Tan δ measurements Infrared Thermograph (Bushing) Measurement of Moisture in Oil DGA SFRA Acoustic Partial Discharge Measurement moisture content in active parts of Transformer 3
4 Why SFRA? To assess mechanical integrity of a transformer To detect core displacement and winding deformation due to : Large electromagnetic forces from fault current Transformer transportation and relocation Winding shrinkage causing release of clamping structure To detect broken or loosened clamping structure Hoop Buckling Shorted turns and open winding 4
5 Case study (1): Location : 220 kv Kapadwanj S/s Rating : 220/66kV, 100 MVA Date : OSR relay operated due to LV side Isolator support insulator flash over Initially SFRA along with Low Voltage Test and DGA 5
6 Case study (1): APPLIED VOLTAGE LV MAGNETIC BALANCE ( Post fault Abnormal ) Tap 1 Tap 17 r - n y - n b - n r-n y-n b-n r n 255 V y n 251 V b n 256 V DGA Results ( Post Tripping ) H2 O2 N2 CH4 C2H2 C2H4 C2H6 CO CO Nature of incipient fault Major Key Gas Minor Key Gas Arcing C 2 H 2, H 2 CH 4, C 2 H 4 Low voltage magnetic balance test found abnormal in R phase and DGA indicates arcing
7 Case study (1): HV N at Tap No.1 ( Post fault - Abnormal) 500Hz to 2MHz with +/- 3 db: Tap and Main winding HV R Phase HV R phase shifted -3dB with reference to other phase in main and tap winding portion 7
8 Case study (1): LV N at Tap No.17 ( Post fault - Abnormal) 500Hz to 2MHz with +/- 3 db: Tap and Main winding LV R Phase 20Hz 10KHz Core deformation/open ckt./ Shorted turns / residual magnetism LV R phase shifted widely with reference to other phase in main and tap winding portion. It seems like open circuit. 8
9 Case study (1): Analysis SFRA LV R phase found abnormal defect in tapped winding ( 500Hz to 2 MHz) and open winding ( 5Hz to 100kHz ) with +/- 3 db variation. Problem reflected in low voltage magnetic balance and DGA ( Arcing ) also. Based on above abnormal results, decided to internal inspection of this transformer. 9
10 Case study (1): Internal Inspection LV R phase connecting leads of preselector switch of OLTC and its fixing assembly burnt. Burned connecting leads Burnt link and fixing assembly replaced Re-insulation of leads Drying process with oil filtration Take SFRA and other supporting test 10
11 Case study (1): HV N at Tap No.1 ( Normal After rectification ) HV R Phase All phases are identical after rectification of problem 11
12 Case study (1): LV N at Tap No.17 ( Normal After rectification) LV R Phase All phases are identical after rectification of problem 12
13 Case study (1): LV MAGNETIC BALANCE ( Normal After rectification ) APPLIED VOLTAGE Tap 1 Tap 17 r - n y - n b - n r-n y-n b-n r n 255 V y n 252 V b n 255 V Low voltage test found normal after rectification
14 Case study (1): Cause of failure The heavy fault current due to flash over of LV side isolator support insulator caused R phase pre-selector switch LV connection two nos. of leads between position 3 & 12 to burn. SFRA plays a role fault with other test. as a supporting test to confirm the 14
15 Case study (2): Location : 220kV Khanpur Substation Rating : 220/66kV, 100 MVA Date : High key gases in routine DGA test Low voltage test - 15
16 Case study (2): DGA Results ( on , Normal ) H2 O2 N2 CH4 C2H2 C2H4 C2H6 CO CO Nil DGA Results ( on , Abnormal ) H2 O2 N2 CH4 C2H2 C2H4 C2H6 CO CO < Nature of incipient fault Major Key Gas Minor Key Gas Thermal Fault - Over heated oil CH 4, C 2 H 4 C 2 H 6, H 2 DGA indicates thermal fault as per high key gases method 16
17 Case study (2): Low voltage Test CURRENT MEASURED MAGNETIZING CURRENT ( Post fault - Normal) HV WINDING LV WINDING R 3.2 ma 29.3 ma Y 2.6 ma 26.3 ma B 4.1 ma 35.2 ma MAGNETIC BALANCE ( Post fault - Normal ) APPLIED VOLTAGE R - N Y - N B - N r-n y-n b-n R - N 255 V Y - N 252 V B - N 256 V Low voltage test found normal after fault
18 Case study (2): Low voltage Test CURRENT MEASURED SHORT CIRCUIT CURRENT ( Post fault - Normal ) HV WINDING LV WINDING R 3.54 A A Y 3.55 A A B 3.48 A A Low voltage test found normal after fault
19 Case study (2): HV - N ( Post fault - Abnormal) 20Hz 10KHz Core deformation/open ckt./ Shorted turns / residual magnetism HV B Phase B phase curve differ in core area in compare with other two phases which shows core related issue 19
20 Case study (2): HV - N ( LV Shorted ) ( Post fault - Abnormal ) HV B Phase LV short curve nullify effect of core, winding part seems identical and normal 20
21 Case study (2): LV N ( Post fault - Abnormal) 20Hz 10KHz Core deformation/open ckt./ Shorted turns / residual magnetism LV B Phase B phase curve differ in core dominated area, which shows problem in core area 21
22 Case study (2): Analysis SFRA showed abnormality in the core. IR between core, frame and earth was measured. Core to Frame : 2000MΩ Frame to Earth : 8000MΩ Core to Earth : 0.03MΩ As the Core to Earth insulation found quite low, internal inspection carried out but nothing seen abnormal. Further investigation was done by inserting a GI wire between core and bottom of the tank and along the core nut found under the B phase core limb which was touching core and bottom. 22
23 Case study (2): Schematic Diagram 23
24 Case study (2): Analysis After removing the nut, again IR between core, frame and earth was measured. Core to Frame : 2000MΩ Frame to Earth : 8000MΩ Core to Earth : 2000MΩ Normally core earthing provided on top of the tank. The nut was providing another earthing and it caused thermal fault due to circulating current between core and earth. 24
25 Case study (2): HV - N ( Normal After rectification) After attending the problem all phase curves found identical 25
26 Case study (2): HV - N ( LV Shorted ) ( Normal After rectification ) After attending the problem all phase curves found identical 26
27 Case study (2): LV N ( Normal After rectification) After attending the problem all phase curves found identical 27
28 Case study (2): Conclusion A metallic nut below the core at bottom of the tank was found out with the help of SFRA which created parallel path to earth and led to thermal fault. Such kind of unbelievable fault can be identified by SFRA. In this case SFRA played a vital role as a supporting tool with DGA to detect the faulty area and to reach up to the root cause of the fault. 28
29 Case study (3): Location : 66kV Chhala Substation Rating : 66/11.55kV, 10 MVA Date : Tripped on differential relay due to failure of 66kV class Y phase bushing with reflected of 11kV feeder 29
30 Case study (3): Low voltage Test CURRENT MEASURED MAGNETIZING CURRENT ( Post fault - Abnormal ) HV WINDING LV WINDING R 1.8 ma ma Y 13.5 ma 133 ma B 1.8 ma 135 ma MAGNETIC BALANCE ( Post fault - Abnormal ) APPLIED VOLTAGE R - Y Y - B B - R r-n y-n b-n R Y 433 V Y B 431 V B - R 437 V Low voltage test found abnormal after fault 30
31 Case study (3): HV PH PH ( Post fault - Abnormal ) 20Hz 10KHz Core deformation/open ckt./ Shorted turns / residual magnetism R-Y Y-B B-R All three phases response are differ in core related area as mentioned frequency 31
32 Case study (3): HV PH PH ( LV Shorted ) ( Post fault Normal ) In LV short condition core area nullify and winding area curves are identical in all phases 32
33 Case study (3): LV PH N ( Post fault - Abnormal ) 20Hz 10KHz Core deformation/open ckt./ Shorted turns / residual magnetism R Y B All three phases response are differ in core related area as mentioned frequency 33
34 Case study (2): Analysis SFRA and low voltage revealed problem inside core area. Internal inspection carried out by removing top plate of transformer. 2 Nos. of bolts clamping the top channel with tank were loose and top yoke channel got lifted upwards by about 25mm which caused a little core deformation. 34
35 Case study (2): Internal Inspection Yoke Bolt Yoke Channel After attending the problem, SFRA was taken. 35
36 Case study (3): HV PH PH ( Normal After rectification ) All three phases response are identical in core dominated area after rectification of fault 36
37 Case study (3): HV PH PH ( LV Shorted ) ( Normal After rectification ) This response was identical from initially as problem was in core area after rectification of fault 37
38 Case study (3): LV PH N ( Normal After rectification ) All three phases response are identical now in core area after rectification of fault 38
39 Case study (3): Low voltage Test CURRENT MEASURED MAGNETIZING CURRENT ( Normal After rectification) HV WINDING LV WINDING R 2.4 ma 56.2 ma Y 1.9 ma 28.5 ma B 2.2 ma 55.6 ma MAGNETIC BALANCE ( Normal After rectification) APPLIED VOLTAGE R - Y Y - B B - R r-n y-n b-n R Y 442 V Y B 450 V B - R 445 V Low voltage test found normal after rectification of fault 39
40 Case study (3): Cause of Failure Heavy reflected fault caused axial and radial forces exerted on transformer active part. Core structure got disturbed and it was reflected in SFRA plot. 40
41 Conclusion SFRA responses clearly indicate faulty conditions of transformer and it helped for root cause analysis. SFRA helps to detect fault by just compare with different phase with different task without having a initial results of same transformer or same design transformer. SFRA plays vital role as supporting test for final conclusion as its deliver diversity of information in only one test. SFRA is very useful tool to detect heavy through fault current leads to mechanical deformation of core or winding, internal connections and contacts inside transformer. GETCO has adopted such diagnosis tool while fault as well as in routine practice while shifting of transformer. 41
42 Thanks 42
Chapter 7 Conclusion 7.1 General
Chapter 7 7.1 General The mechanical integrity of a transformer winding is challenged by several mechanisms. Many dielectric failures in transformers are direct results of reduced mechanical strength due
More informationREPORT ON INVESTIGATION OF FAILURE OF 100 MVA, 220/66-33/11 KV POWER TRANSFORMER AT 220KV GEETA COLONY SUBSTATION OF DELHI TRANSCO LTD.
REPORT ON INVESTIGATION OF FAILURE OF 100 MVA, 220/66-33/11 KV POWER TRANSFORMER AT 220KV GEETA COLONY SUBSTATION OF DELHI TRANSCO LTD. (DTL) 1.0 Introduction: 1.1 DTL vide letter No. F.DTL/206/2015-16/Mgr(T)O&M-E-2/22
More informationEffective Maintenance Test Techniques and Diagnostic Measurements to Improve the Performance and Reliability of Power System Transformers
Effective Maintenance Test Techniques and Diagnostic Measurements to Improve the Performance and Reliability of Power System Transformers Alexander Dierks, Herman Viljoen, Alectrix (Pty) Ltd, South Africa
More informationCASE STUDY- FAULT IN POWER TRANSFORMER AT LOKTAK POWER STATION. - S K Mishra & S K Das NHPC Ltd O&M Division
CASE STUDY- FAULT IN POWER TRANSFORMER AT LOKTAK POWER STATION - S K Mishra & S K Das NHPC Ltd O&M Division 1 PRESENTATION COVERS Introduction DESCRIPTION OF EVENTS INITIAL RESPONSE DETAILED INSPECTION
More informationEffective maintenance test techniques for power transformers
Effective maintenance test techniques for power transformers by Alexander Dierks, Herman Viljoen, Alectrix, South Africa, and Dr. Michael Krüger, Omicron Electronics, Austria Due to ever-increasing pressure
More informationOperational Management of Grid Transformers An Experience of POWERGRID
Operational Management of Grid Transformers An Experience of POWERGRID 1.0 Introduction P.N. Dixit, GM; S. Victor, AGM; V.K. Bhaskar, CM; Gunjan Agrawal, Manager Operation Services Department Power Grid
More informationInnovative Test Techniques and Diagnostic Measurements to Improve the Performance and Reliability of Power System Transformers
Innovative Test Techniques and Diagnostic Measurements to Improve the Performance and Reliability of Power System Transformers Dr. Michael Krüger, Alexander Kraetge, OMICRON electronics GmbH, Austria Alexander
More informationRESIDUAL LIFE ASSESSMENT OF GENERATOR TRANSFORMERS IN OLD HYDRO POWER PLANTS
RESIDUAL LIFE ASSESSMENT OF GENERATOR TRANSFORMERS IN OLD HYDRO POWER PLANTS Authored by: Sanjay Srivastava, Chief Engineer (HE&RM), Rakesh Kumar, Director (HE&RM), R.K. Jayaswal, Dy. Director (HE&RM)
More informationHOW TO SAFE GUARD THE TRANSFORMER..???
CPRI HOW TO SAFE GUARD THE TRANSFORMER..??? CPRI Efficient and Effective network planning, Design and Forecasting Highly Reliable and Stable Protection system and co-ordination Measures to mitigate various
More informationUnderstanding and Extracting Valuable Information from Basic and Advanced Power Transformer Testing Techniques
Understanding and Extracting Valuable Information from Basic and Advanced Power Transformer Testing Techniques Charles Sweetser, Services Manager, PRIM Engineering, Waltham, Mass. Topics of Discussion
More informationTesTIng of Power. Transformers are the largest, most. feature. By brandon dupuis
feature By brandon dupuis An Introduction to Electrical diagnostic TesTIng of Power Transformers 38 Transformers are the largest, most expensive, and highly critical components of most utility substations.
More informationVariation in SFRA plot due to design and external parameter
Chapter 6 Variation in SFRA plot due to design and external parameter 6.1 Introduction As the experience grows with Sweep Frequency Response Analysis in world, it is useful to discuss the measurements
More informationTransformers handling and transport
Special tests (Credit: http://www.breakbulk.com/wp-content/uploads/2015/02/20141117160247x.jpg) Transformers handling and transport Damages that may arise and how to find them Table of contents summary
More informationReport on investigation of failure of 315 MVA Auto transformer at 400 kv Bawana Substation of Delhi Transco Ltd.(DTL)
Report on investigation of failure of 315 MVA Auto transformer at 400 kv Bawana Substation of Delhi Transco Ltd.(DTL) 1.0 Introduction: 1.1 DTL vide letter No. F.DTL/206/F.06/2015-16/Mgr(Bawana)/353 dated
More informationEFFECETIVE TRANSFORMER CONDITION ASSESSMENT
EFFECETIVE TRANSFORMER CONDITION ASSESSMENT Luwendran Moodley, Doble Engineering Africa Abstract. This paper details a novel approach to transformer condition assessment. This method has proven itself
More informationUnderstanding the Value of Electrical Testing for Power Transformers. Charles Sweetser - OMICRON
Understanding the Value of Electrical Testing for Power Transformers Charles Sweetser - OMICRON Transformers Diagnostic Testing - OVERALL DGA Oil Screen Power Factor / Capacitance Exciting Current Transformer
More informationCHAPTER 3 REVIEW OF POWER TRANSFORMER PROTECTION SCHEMES
CHAPTER 3 REVIEW OF POWER TRANSFORMER PROTECTION SCHEMES 3.1. Introduction Power Transformer is the nerve centre of any power distribution system. The capacity of power transformers is generally decided
More informationUnderstanding the Value of Electrical Testing for Power Transformers. Charles Sweetser, OMICRON electronics Corp. USA
Understanding the Value of Electrical Testing for Power Transformers Charles Sweetser, OMICRON electronics Corp. USA Understanding the Value of Electrical Testing for Power Transformers Charles Sweetser,
More informationFault Detection in Transformer Using Frequency (Sweep) Response Analysis
Fault Detection in Transformer Using Frequency (Sweep) Response Analysis Miss. Kajal R. Pachbhai PG Student at Ballarpur Institute of Technology, Ballarpur-442701 India kajalpachbhai86@gmail.com Mr. Sagar
More informationMatz Ohlen Director Transformer Test Systems. Megger Sweden
Matz Ohlen Director Transformer Test Systems Megger Sweden Frequency response analysis of power transformers Measuring and analyzing data as function of frequency, variable frequency diagnostics Impedance
More informationSAMPLE. Determining the health of your power transformer begins with Transformer Clinic s SAMPLE testing programs.
Keep Powering On SAMPLE Determining the health of your power transformer begins with Transformer Clinic s SAMPLE testing programs. Overheating, arcing, partial discharge, and other active or slow-evolving
More informationCondition Assessment of High Voltage Insulation in Power System Equipment. R.E. James and Q. Su. The Institution of Engineering and Technology
Condition Assessment of High Voltage Insulation in Power System Equipment R.E. James and Q. Su The Institution of Engineering and Technology Contents Preface xi 1 Introduction 1 1.1 Interconnection of
More informationAdvanced Diagnostic Testing Services. Provides detailed and reliable results
Advanced Diagnostic Testing Services Provides detailed and reliable results Advanced Diagnostic Testing Services from the world s leading manufacturer of power transformers ABB leadership begins with our
More informationSubstation Preventive Maintenance
Substation Preventive Maintenance PROVINCIAL ELECTRICITY AUTHORITY 1 Presentation Contents 1) A kind of substation 2) Electrical equipment details of AIS substation 3) Electrical equipment details of GIS
More informationInvestigating Mechanical Integrity in Power Transformer Using Sweep Frequency Response Analysis (SFRA)
Investigating Mechanical Integrity in Power Transformer Using Sweep Frequency Response Analysis (SFRA) Priti G 1*, Sindekar AS 2 P.G. Scholar, Department of Electrical Engineering, Government College of
More informationAfrica Utility Week Focus Day Substation Condition Monitoring Benefits of Ultrasound
Africa Utility Week Focus Day 2014 Substation Condition Monitoring Benefits of Ultrasound Agenda Review - Substation Condition Monitoring Electrical discharge Types and origin In switchgear Results/consequences
More informationVallabh Vidyanagar, Anand, INDIA
IOSR Journal of Electrical and Electronics Engineering (IOSR-JEEE) e-issn: 2278-1676,p-ISSN: 2320-3331, Volume 9, Issue 1 Ver. V (Feb. 2014), PP 01-06 Interpretation of Sweep Frequency Response Analysis
More informationPOWER TRANSFORMER SPECIFICATION, DESIGN, QUALITY CONTROL AND TESTING 18 MARCH 2009
POWER TRANSFORMER SPECIFICATION, DESIGN, QUALITY CONTROL AND TESTING 18 MARCH 2009 Nkosinathi Buthelezi Senior Consultant: Power Transformers and Reactors Presentation Content Standardization of Power
More informationPD Solutions. On-Line PD Measurement Devices
On-Line PD Measurement Devices 1. Longshot Device (see Figure 1) The measurement system applied is based around the wideband (0-400 MHz) HVPD- Longshot partial discharge test unit which utilizes a high-speed
More informationIN ELECTRICAL ENGINEERING - I C M E T CRAIOVA
Taking into account that power transformer is the major item of equipment in power systems, its correct operation is vital to system operation. It is well known that transformer failures are sometimes
More informationPRE COMMISSIONING TESTS ON EQUIPMENT AT 33/11 KV SUB STATIONS. IR Values are to be read on the megger by meggering the Power transformer
PRE COMMISSIONING TESTS ON EQUIPMENT AT 33/11 KV SUB STATIONS TESTS ON TRANSFORMERS 1. IR Values This is measured to measure the Insulation Resistance of the whole transformer. a) For 33/11 KV Power Transformer
More informationEPS AUSTRALIA SERVICES HV TESTING & COMMISSIONING CAPABILITY
EPS AUSTRALIA SERVICES HV TESTING & COMMISSIONING CAPABILITY EPS AUSTRALIA SERVICES COMPANY OVERVIEW EPS is a recognised company specialising in Electrical, Instrumentation, Structural, Mechanical and
More informationABB Power Products Service
Raben Naidoo, Technology days, May 21-22th, 2014, Cape Town, South Africa, Enhanced availability of transformers via transformer remote monitoring - TEC ABB Power Products Service Why a session on availability?
More informationFushun Power Supply Company, Liaoning Electric Power Company Limited, State Grid, China
2nd International Conference on Automation, Mechanical Control and Computational Engineering (AMCCE 2017) Harm and Preventive Measures of Transformer Outlet Short Circuit Hua Zhang1, Qinghao Wang 1, Guobin
More informationSERVICE OFFERINGS FOR POWER SYSTEM STUDY & CONDITION MONITORING FOR STATIC EQUIPMENT
SERVICE OFFERINGS FOR POWER SYSTEM STUDY & CONDITION MONITORING FOR STATIC EQUIPMENT Page TABLE OF CONTENTS POWER SYSTEM STUDY: 5 DATA COLLECTION AND NETWORK MODELLING 5 LOAD FLOW STUDY 5 SHORT CIRCUIT
More informationINTERPRETATION METHODOLOGY TO IDENTIFY FAULT LOCATION IN A POWER TRANSFORMER
Volume: 03 Issue: 07 July16 www.irjet.net p-issn: 2395-0072 INTERPRETATION METHODOLOGY TO IDENTIFY FAULT LOCATION IN A POWER TRANSFORMER Sameer S. Patel 1, 1 Student, Electrical Dept, Rajasthan Institute
More informationOMICRON Seminar on Substation Testing and Diagnosis. October 23, 2017 Dubai, United Arab Emirates. October 24, 2017 Abu Dhabi, United Arab Emirates
OMICRON Seminar on Substation Testing and Diagnosis October 23, 2017 Dubai, United Arab Emirates October 24, 2017 Abu Dhabi, United Arab Emirates Time Optimized Substation Asset Testing and Diagnosis Agenda
More informationTECHIMP Power Transformer Monitoring
TECHIMP Power Transformer Monitoring Kontakt: Martin Hesse Techimp Germany GmbH i.g. E-Mail: mhesse@techimp.com Tel.: +49 5724 391 007 Mobil: +49 170 2364 735 PD Monitoring of Power Transformers Power
More informationTraining Fees 3,300$ per participant including Materials/Handouts, Tea/Coffee Refreshments & International Buffet Lunch.
Training Title POWER TRANSFORMERS Training Duration 5 days Training Venue and Dates Power transformers 5 20-24 May $3,300 Abu Dhabi In any of the 5 star hotel. The exact venue will be informed soon. Training
More informationTRANSFORMER TECHNOLOGY GPT
Core-Form TRANSFORMER TECHNOLOGY GlobalPT Corporation performs research and engineering developments and co-ordination of works of technical partners in the field of technological progress and commercial
More informationTECHIMP Technologies & Services for Diagnostics and Monitoring of High Voltage Assets
TECHIMP Technologies & Services for Diagnostics and Monitoring of High Voltage Assets Who we are TECHIMP is one of the leading providers of Condition Assessment Services Data Acquisition and Test Equipment
More informationFRAX Series Sweep Frequency Response Analyzers
FRAX Series Highest dynamic range and accuracy in the industry Fulfills international standards for SFRA measurements Advanced analysis and decision support built into the software. FRAX 150 with built
More informationProblems connected with Commissioning of Power Transformers
Problems connected with Commissioning of Power Transformers ABSTRACT P Ramachandran ABB India Ltd, Vadodara, India While commissioning large Power Transformers, certain abnormal phenomena were noticed.
More informationTransformer Shunt Fault Detection using Two Techniques
Transformer Shunt Fault Detection using Two Techniques Swathy Sasikumar 1, Dr. V. A. Kulkarni 2 P.G. Student, Department of Electrical Engineering, Government College of Engineering, Aurangabad, Maharashtra,
More informationUsing the Frequency Response Analysis (FRA) In Transformers Internal Fault Detection
Using the Frequency Response Analysis (FRA) In Transformers Internal Fault Detection JALAL ABDALLAH Department of Engineering Tafila Technical University P.O. Box: 851229, code 11185-Amman JORDAN e-mail:
More informationApplication of Polarisation Depolarisation Current (PDC) technique on fault and trouble analysis of stator insulation
CIGRE SC A1 & D1 JOINT COLLOQUIUM October 24, 2007 Application of Polarisation Depolarisation Current (PDC) technique on fault and trouble analysis of stator insulation S. A. BHUMIWAT Independent Consultant
More informationPDS100 Application Note: The use of High Frequency Current Transformer as sensor for Transformer diagnostics
PDS100 Application Note: The use of High Frequency Current Transformer as sensor for Transformer diagnostics CASE STUDY 1 (Doble Client Conference 2011, ACCA committee meeting) Dissolved Gas Analysis (DGA)
More informationKNOW MORE ABOUT THE TRANSFORMERS. Glossary Transformers
KNOW MORE ABOUT THE TRANSFORMERS Glossary Transformers Ambient temperature The existing temperature of the atmosphere surrounding a transformer installation. Ampere The practical unit of electric current.
More informationA Literature Survey on Frequency Response Analysis for Detection of Transformer Winding Fault
IJSRD - International Journal for Scientific Research & Development Vol. 3, Issue 07, 2015 ISSN (online): 2321-0613 A Literature Survey on Frequency Response Analysis for Detection of Transformer Winding
More informationTransformer Winding Design. The Design and Performance of Circular Disc, Helical and Layer Windings for Power Transformer Applications
The Design and Performance of Circular Disc, Helical and Layer Windings for Power Transformer Applications Minnesota Power Systems Conference November 3 5, 2009 Earl Brown Heritage Center University of
More informationIJSRD - International Journal for Scientific Research & Development Vol. 2, Issue 04, 2014 ISSN (online):
IJSRD - International Journal for Scientific Research & Development Vol. 2, Issue 04, 2014 ISSN (online): 2321-0613 Conditioning Monitoring of Transformer Using Sweep Frequency Response for Winding Deformation
More informationBest Practice Reducing The Risk of Arc Flash Cross Over
Best Practice Reducing The Risk of Arc Flash Cross Over 1 2 Electrical Systems Are Critical 3 Why Do We Complete Electrical Maintenance Energized?? 4 Which Bulb Is Not Working?? 5 Functioning Correctly
More informationPhase Shifting Transformers. Presented by
Phase Shifting Transformers Presented by Phase Shifting Transformers (PST s) (a.k.a. Phase Angle Regulators) VS φ S P V V S = X L L X L sin( φ φ ) L S VL φ L PST s are power flow control devices between
More informationTransformer condition assessment with an integrated test van
Transformer condition assessment with an integrated test van 1 2012 SebaKMT Measuring and locating techniques MADE in GERMANY 2 Testing and Standards for Power Transformers CIGRE CIGRE Brochure 342 (SFRA-FRAX)
More informationTap Changer Condition Assessment Using Dynamic Resistance Measurement
Available online at www.sciencedirect.com ScienceDirect Procedia Engineering 00 (2017) 000 000 www.elsevier.com/locate/procedia 4th International Colloquium "Transformer Research and Asset Management Tap
More informationWelcome to the Session on. HT Distribution Network
Welcome to the Session on HT Distribution Network Learning Objective By the end of this session you will be able to: Explain the HT distribution network breakdown maintenance - possible faults, identification
More informationAcoustic Emission in power transformers. Ajusco 15, Colonia Portales, Delegación Benito Juárez, C.P , México, D.F.
Acoustic Emission in power transformers 1 More expensive equipment in the substation Many years of operation First indication of a problem: Dissolved Gases Begin investigation to determine the origin of
More informationSGMF(T) series. Onsite Mobile AC High Voltage Test System. Applications:
SGMF(T) series Onsite Mobile AC High Voltage Test System On-site AC high voltage test systems are used for voltage withstanding test, partial discharge measurement, tan delta measurement on those instrument
More informationOnsite Mobile AC High Voltage Test System
TSGMF(T) series Onsite Mobile AC High Voltage Test System Onsite mobile AC high voltage test systems are used for withstand voltage testing, partial discharge measurement, tan delta measurement to instrument
More informationFederal Power Transformers LLC based in Abu Dhabi, UAE
www.fpt.ae Federal Power Transformers LLC based in Abu Dhabi, UAE CONTENTS The Company...03 Design Process...05 Manufacturing...07 Testing...11 Quality...13 After Sales Support & Other Services...15 Satisfied
More informationnical catalogue Tech
Technical catalogue About Etra 33 has been acting as transformer manufacturer over more than 75 years. Specializing in the manufacturing of power transformers rating up to 500 MVA and 420 kv the company
More informationFIELD ELECTRICAL TESTING SPX TRANSFORMER SOLUTIONS, INC.
Regional Technical Seminar FIELD ELECTRICAL TESTING SPX TRANSFORMER SOLUTIONS, INC. Field Electrical Testing Applications Key Purposes of Field Electrical Testing: Receiving inspection Acceptance testing/commissioning
More informationWe can classify test failure modes in power transformers according to transformer components
ON-SITE TESTS We can classify test failure modes in power transformers according to transformer components ABSTRACT To prevent unexpected outages it is necessary to implement a field test programme. It
More informationDEFERRING REPLACEMENT OF A 600 MVA, 345GRD Y/138GRD Y/ 13.8 kv SHELL TYPE WESTINGHOUSE AUTOTRANSFORMER
DEFERRING REPLACEMENT OF A 600 MVA, 345GRD Y/138GRD Y/ 13.8 kv SHELL TYPE WESTINGHOUSE AUTOTRANSFORMER JESSE M LOPEZ CPS ENERGY USA EMILIO MORALES CRUZ QUALITROL USA SUMMARY Power transformers are essential
More informationAutotransformer Condition Monitoring Systems
Autotransformer Condition Monitoring Systems The Bidders shall offer separately the following systems of par.1 Integrated Condition Monitoring System and par.2 UHF PD Monitoring System. Two systems following
More informationThe Weidmann Conference The Aging of America s Transformers
The Weidmann Conference 2006 The Aging of America s Transformers by Jon L. Giesecke, Director, (610) 518-1615 jlgassociatesllc@yahoo.com How Old is Old? The aging of the electrical infrastructure in the
More informationSubject: Computer Aided Electrical drawing (CAED) Subject Code: 10EE65
Subject: Computer Aided Electrical drawing (CAED) Subject Code: 10EE65 Syllabus Covered Part-B 3. Electrical machine assembly drawing using design data or sketches or both (a) Transformers- sectional views
More informationField Experience with Sweep Frequency Response Analysis for Power Transformer Diagnosis
Field Experience with Sweep Frequency Response Analysis for Power Transformer Diagnosis Ambuj Kumar, Sunil Kumar Singh, Shrikant Singh Abstract Sweep frequency response analysis has been turning out a
More informationEXPERIENCE WITH DETECTION AND IDENTIFICATION OF WINDING BUCKLING IN POWER TRANSFORMERS. Victor V. Sokolov and Boris V. Vanin ZTZ-Service Company
EXPERENCE WTH DETECTON AND DENTFCATON OF WNDNG BUCKLNG N POWER TRANSFORMERS Victor V. Sokolov and Boris V. Vanin ZTZ-Service Company ABSTRACT The paper summarizes experience with identification of buckling
More informationTransformer Protection
Transformer Protection Nature of transformer faults TXs, being static, totally enclosed and oil immersed develop faults only rarely but consequences large. Three main classes of faults. 1) Faults in Auxiliary
More informationCHAPTER 2 ELECTROMAGNETIC FORCE AND DEFORMATION
18 CHAPTER 2 ELECTROMAGNETIC FORCE AND DEFORMATION 2.1 INTRODUCTION Transformers are subjected to a variety of electrical, mechanical and thermal stresses during normal life time and they fail when these
More informationMV, HV AND EHV SWITCHGEAR TESTING & COMMISSIONING
Training Title MV, HV AND EHV SWITCHGEAR TESTING & COMMISSIONING Training Duration 5 days Training Date MV, HV and EHV Switchgear Testing & Commissioning 5 21 25 Sep $3,750 Dubai, UAE In any of the 5 star
More informationTesting and Diagnostic of Power Transformers & Distribution Transformers
Testing and Diagnostic of Power Transformers & Distribution Transformers APT Power Technology Co., Ltd. Xi an FOREWORD Transformers play an very important role in power transmission and distribution system.
More informationDATA SHEET FOR LIGHTING TRANSFORMER APPD. BY VDV PROJECT NO
PART - A : SPECIFIC REQUIREMENTS THIS DATA SHEET IS APPLICABLE FOR IN BOILER A CLIMATIC CONDITIONS PACKAGE 1 DESIGN AMBIENT TEMPERATURE 45 C 2 ALTITUDE ( ABOVE MSL ) 6.71 MTRS. 3 RELATIVE HUMIDITY 74 %
More informationPomona, CA May 24 & 25, LTC Applications - Location, Series & Preventative Auto Transformers
Pomona, CA May 24 & 25, 2016 LTC Applications - Location, Series & Preventative Auto s siemens.com/answers Introduction Tap changer at active part Example of 3-phase tapchanger Page 2 Winding Configurations
More informationA Novel Technique to Precise the Diagnosis of Power Transformer Internal Faults
A Novel Technique to Precise the Diagnosis of Power Transformer Internal Faults U. Mohan Rao 1 & D.Vijay Kumar 2 1 Department of Electrical Engineering, National Institute of Technology, Hamirpur, H.P,
More informationTechnical Questionnaire 9.101/6 Transformer Test System. Personal Data. Application. Test of. Delivery scope
Date: Page: 1 / 10 Personal Data Name: Company / institution: Phone: E-mail: Fax: Application Quotation number: (will be filled in by HIGHVOLT) Test field, stationary research institute mobile on-site
More informationEI HIGH VOLTAGE INSULATION TESTING POLICY
Network(s): Summary: ENGINEERING INSTRUCTION EI 09-0001 HIGH VOLTAGE INSULATION TESTING POLICY EPN, LPN, SPN This engineering instruction details the policy for the on-site insulation testing of new and
More informationDistribution Equipments - Technology and Applications. Training Module for DISTRIBUTION TRANSFORMER
Distribution Equipments - Technology and Applications Training Module for DISTRIBUTION TRANSFORMER Transformer specification Transformer design Manufacturing / quality control Testing in the Works Transportation
More informationPower Measurements and Basic Electrical Diagnostic Tests
Power Measurements and Basic Electrical Diagnostic Tests Instrument Basics Burden VA Sources V and I Meters V and I KVL and KCL Kelvin Connection KVL and KCL Kelvin Connection 4-Wire Technique Exclude
More informationTransformer Protection
Transformer Protection Transformer Protection Outline Fuses Protection Example Overcurrent Protection Differential Relaying Current Matching Phase Shift Compensation Tap Changing Under Load Magnetizing
More informationPOWER TRANSFORMER. Failure Analysis & Troubleshooting. H.H. Sheik Sultan Tower (0) Floor Corniche Street Abu Dhabi U.A.E
POWER TRANSFORMER Failure Analysis & Troubleshooting H.H. Sheik Sultan Tower (0) Floor Corniche Street Abu Dhabi U.A.E www.ictd.ae ictd@ictd.ae Course Introduction: Electricity is high-grade energy. Working
More informationSPAD 346 C Stabilized differential relay
SPAD 346 C Stabilized differential relay Stabilized Differential Relay Type SPAD 346 C Features Integrated three-phase differential relay, three-phase overcurrent relay and multiconfigurable earth-fault
More informationON-LINE PARTIAL DISCHARGE DETECTION ON TRANSFORMERS
ON-LINE PARTIAL DISCHARGE DETECTION ON TRANSFORMERS Pantelis D. AGORIS 1, Sander MEIJER 1, Edward GULSKI 1, Johan J. SMIT 1, A. Jos L.M. KANTERS 2 1 Delft University of Technology - The Netherlands 2 TenneT
More informationStabilized Differential Relay SPAD 346. Product Guide
Issued: July 1998 Status: Updated Version: D/21.03.2006 Data subject to change without notice Features Integrated three-phase differential relay, three-phase overcurrent relay and multiconfigurable earth-fault
More informationCase Studies of Electric Power Equipment Diagnostics Using Acoustic Emission
17th World Conference on Nondestructive Testing, 25-28 Oct 2008, Shanghai, China Case Studies of Electric Power Equipment Diagnostics Using Acoustic Emission Oswaldo G. SANTOS FILHO 1, Sergio L. ZAGHETTO
More informationPower Transformer Condition Assessment Based on Standard Diagnosis
Power Transformer Condition Assessment Based on Standard Cattareeya Suwanasri Abstract The diagnostic techniques of electrical and insulating oil testing are proposed to assess the internal condition of
More informationEE223D: Distribution Power Transformer
EE223D: Distribution Power Transformer Aug 07-09, 2018 / Dubai EE223 Rev.001 CMCT COURSE OUTLINE Page 1 of 5 Training Description: This intensive course is designed to provide participants with the skills
More informationImportance of Transformer Demagnetization
Available online at www.sciencedirect.com ScienceDirect Procedia Engineering 00 (2017) 000 000 www.elsevier.com/locate/procedia 4th International Colloquium "Transformer Research and Asset Management Importance
More informationPower transformers for Network, Rectifiers, Furnace
E N G L I S H OTN, OTR, OTF Transformers Power transformers for Network, Rectifiers, Furnace TTR TTO OTN, OTR, OTF reactors TTH OTN, OTR, OTF Transformers Technology Design Our designers experience combined
More information10. DISTURBANCE VOLTAGE WITHSTAND CAPABILITY
9. INTRODUCTION Control Cabling The protection and control equipment in power plants and substations is influenced by various of environmental conditions. One of the most significant environmental factor
More informationSpecialists in HV and MV test and diagnostics. Testing in Substations
Specialists in HV and MV test and diagnostics Testing in Substations Testing in Substations Testing in Substations At 4fores we specialize in the diagnosis and measurement of all types of existing technologies
More informationAssesment of health of transformer: a survey
Volume 114 No. 7 2017, 281-291 ISSN: 1311-8080 (printed version); ISSN: 1314-3395 (on-line version) url: http://www.ijpam.eu ijpam.eu Assesment of health of transformer: a survey Ravi Kumar Jalli 1 Saptarshi
More informationTECHNIQUES AND STANDARD
TRANSFORMER TESTING TECHNIQUES AND STANDARD DEVELOPMENT BY DIEGO M. ROBALINO, PhD, PMP, MEGGER-AVO Training Institute Transformer manufacturers and field operators have always benefitted when new technologies
More informationECP HV INSULATION TESTING
Document Number: ECP 11-0006 Network(s): Summary: All ENGINEERING COMMISSIONING PROCEDURE ECP 11-0006 HV INSULATION TESTING This standard details the policy for the on-site insulation testing of new and
More informationAdvanced Test Equipment Rentals ATEC (2832)
Established 1981 Advanced Test Equipment Rentals www.atecorp.com 800-404-ATEC (2832) Smallest and most rugged FRA instrument in the industry Highest possible repeatability by using reliable cable practice
More informationCHAPTER 3 SHORT CIRCUIT WITHSTAND CAPABILITY OF POWER TRANSFORMERS
38 CHAPTER 3 SHORT CIRCUIT WITHSTAND CAPABILITY OF POWER TRANSFORMERS 3.1 INTRODUCTION Addition of more generating capacity and interconnections to meet the ever increasing power demand are resulted in
More informationField Measurement of Transmission Cable Dissipation Factor
Workshop 2000, Alexandria, Virginia, 13 & 14 September 2000 paper No.: 1 Field Measurement of Transmission Cable Dissipation Factor John H. Cooper, Power Delivery Consultants, Inc. Abstract This presentation
More informationFRAX Series Sweep Frequency Response Analyzers
FRAX Series Highest dynamic range and accuracy in the industry Fulfills international standards for SFRA measurements Advanced analysis and decision support built into the software Imports data from other
More informationThe NOVA Recloser shall be designed and tested in accordance with the following standards as applicable:
Reclosers NOVA Three-Phase Recloser Functional Specification Guide Functional specification for NOVA three-phase recloser 1. Scope This specification describes the features and ratings of the NOVA recloser.
More information