Installation of MagFloor 100
|
|
- Elmer Arnold
- 6 years ago
- Views:
Transcription
1 Installation of MagFloor 100 Prior to any placement of MagFloor panels, ensure the joists are sound, secure, level and clean from any loose dust or debris. This will ensure good adhesion between the underside of panel and top of joist using the structural glue adhesive. Ensure safety is maintained at all times prior to the first run of panels being laid. It is recommended to place a stringline from the start point to the other side of the floor to ensure the panels will be laid in a straight line, and square to any adjoining walls. For ease of installation, and safety, we recommend that flooring panels be laid out, as a walk way platform. Ensure they are laid outside the installation zone. The floor is now ready for commencing installation.
2 All associated screws and glues will be available from the distributor. We recommend on the following fixings for use with the MagFloor system. Fuller Max Bond Pro: Is used to adhere the box spline joiners inside the main panel. Fuller Max Bond Pro Cleaner: This is used to clean the gun applicator Fuller Max Bond: A 5mm bead (min) is applied to the top of the joists. Ensure the surface is free of coatings and loose material that may inhibit bond. Fasteners: Collated screw strips are highly recommended for accurate and fast installation mm class 3 galv or powder coated coarse thread screws. Using a Makita screw gun or similar, ensure the depth gauge of the screw is 1-2mm below the surface of the panel. These screws are used to join box Spline into the main panel. Screw off at 200mm apart around the Perimeter of the panel. The large x mm class 3 galv or powder coated Batten screw is used to secure the flooring panel to the joists. Follow the fixing guidelines for placement of screws.
3 A 5mm bead (min) is applied to the top of the joists. Ensure the surface is free of coatings and loose material that may inhibit bond. Have the first panel already in a vertical position to be lowered onto the joist. This will avoid the adhesive from skinning over. Once a bead has been applied to each joist, slowly lower the panel down into position. Secure the panel down with the large batten bugle screws. Next step is to install a box joiner. It is recommended to have joiners pre-cut and ready to install. Whilst only long joiners will be sent to site, the installer is required to cut joiners to suit the shorter end of the panel. Cut enough lengths to get started. Place a 5mm bead of Max Bond Pro on the bottom lip of the floor panel, and a bead along the top of the joiner. Carefully align the joiner with the rebate opening in the floor panel and tap in. If a tight fit, we advise the use of a rubber mallet and gently tap the joiner into position. Once complete, you are ready to install the next panel across and so on. Once 2 panels are installed and secured down, using the collated screw gun, screw the box joiner to the panel.
4 Once an entire run is installed, you are ready to install the longer box joiners. Go through and install along entire run, this will speed the process with main panel. The next row is now ready for a repeat process. Applying adhesive to the joist. If a good sized off cut has occurred from the first run, it can be used to start the next row, ensuring the floor panels are laid in a stretcher bond fashion, this way the floor creates a strong interlocking surface, but also minimises the waste of material.
5 As each run is installed, there will be a requirement to cut panels to fit either at the end of a run or as to approach a wall, corner or edge of floor joists. Because MagFloor is easy to cut, all you require is a circular saw blade with a standard timber carbide blade. If a long rip cut is required, use either the saw s guide or secure a straight edge to the panel with clamps at each end for a straight and uniformed clean cut.
6 Once the floor is complete, sweep out any debris And dust. If the floor has been applied in a wet area or balcony application, the surface will need to be water proofed prior to tile installation. We recommend to seek further advise and follow the instructions of the product to choose to apply to the floor. If the panels are installed in an enclosed situation, the floor at the end of construction is ready for it s coverings, whether it be carpet, floating timber floors or tiles. Ensure all surfaces are clean prior to applying any further adhesives, to maximise bonding to the MagRoc sheeting. If any penetrations are required through the panel, using a hole saw drill set you will be easily able to cut through. Ensure you do not cut through the floor joist below and cause any structural damage to the supporting structure below. A pilot hole is recommended if it is unknown where joist locations are below.
7 When MagFloor is being used on a project and load bearing walls are being applied above, it is recommended that a 70x45mm CCA timber be inserted into the side of the panel. This most times will occur around the perimeter of the building where a wall frame will be constructed above and roof load applied. Please seek further advise from the project engineer to determine what loads are being applied to the floor from upper wall and roof loads. Any internal, non load bearing walls can be directly placed on top of the MagFloor without any concerns. Wall frames can be secured down by using either 100mm batten bugle screws or 100mm roofing screws. The project engineer will be able to determine joist spacing, and any special tie down fixings by cross referencing to load and span tables associated with MagFloor test results. The use of MagFloor in your project will ensure you a very strong and highly thermally efficient floor. Compared to AAC or concrete floors, Magfloor places less stress on lower wall frames, but maximises the latest in innovative thermal technology! MagFloor It doesn't disappoint.
Installation Instructions Palladium Wall Panels - Demountable Factory Finished Edges and Field Cut Edges
Please read all instructions before installing Palladium Wall Panel System. 1. Before installation: a. Acclimate Palladium Panels, reveals, adhesives and wall substrates to room temperature 24 hours before
More informationGeneral Installation Guidelines
g e n e r a l i n s t a l l a t i o n g u i d e l i n e s General Installation Guidelines Although Nutec Building Planks do not contain asbestos fibres, it is nevertheless recommended that when working
More informationTOLL FREE:(888) FAX:(941) ASSEMBLY of ProTEC CONCRETE STRUCTURAL INSULATED PANEL
ASSEMBLY of ProTEC CONCRETE STRUCTURAL INSULATED PANEL The ProTEC panels are manufactured with grooves on all four sides to accept the steel components. This grooving applies to the regular panel whose
More informationOffice Installation Guidelines
UH Structures Inc. dba Ebtech Industrial 2241 Industrial Drive Connellsville, PA 15425-6181 Telephone: 724-628-6100 Fax: 1-412-774-2429 www.ebtechindustrial.com Office Installation Guidelines INTRODUCTION
More informationInstallation Guide. Please read before installing SIPs Kit. 1 Method Statement for the erection of a SIPS Industries Kit Materials...
30a Renewable Chase Bibra Lake WA 6163 Tel: (08) 9494 2211 Fax: (08) 9494 2202 Email: info@sipsindustries.com.au Web: www.sipsindustries.com.au Installation Guide Please read before installing SIPs Kit.
More informationDECKING INSTALLATION GUIDE
STAIR TREAD INSTALLATION GUIDE Step 7: Install the Remaining Treads Repeat steps 2 to 6 for the remaining stair treads. Step 8: Install the Fascia 1. Measure the riser height. 2. Rip the fascia to the
More informationINSTALLATION INSTRUCTIONS MILLENNIUM DECKING Before Installing Millennium Decking, please read these instructions in their entirety.
INSTALLATION INSTRUCTIONS MILLENNIUM DECKING Before Installing Millennium Decking, please read these instructions in their entirety. Safety PRE-INSTALLATION Compliance with all applicable local, state
More informationCXT PRO RAILING INSTALLATION INSTRUCTIONS For Installations Using Aluminum and Glass Balusters Sold Separately
CXT PRO RAILING INSTALLATION INSTRUCTIONS For Installations Using Aluminum and Glass Balusters Sold Separately CCRR-0171 PFS AA-652 Drill/power screwdriver Assorted drill bits Hammer Miter or circular
More informationDESIGN TO BUILD = BUILD TO DESIGN
DESIGN TO BUILD = BUILD TO DESIGN The following represents five days of work from demolition through layout of new flooring and wall frame and cabinetry Paul C. King, RA Associate Professor Department
More informationINSTALLATION INSTRUCTIONS
Tools required for the installation. A. Core Drill 87mm Drill bit B. Tape measure C. Spirit Level D. Marking pen E. Caulking gun F. Cutting Pliers G. Cordless Drill and Philips head bit, 5mm Drill bit.
More informationInstallation Guide. Evolve bi-fold. 8. Door restrictor- optional p9. 1. Before you start p2. 9. Adjustment. 2. Measuring and surveying p2
Evolve bi-fold Installation Guide 1. Before you start p2 8. Door restrictor- optional p9 2. Measuring and surveying p2 3. Configuration details p4 4. Installation p5 5. Glazing p5 6. Glazing packer details
More informationInstallation Guide 1
1 2 Contents Before you begin Storage & preparation Tools & materials you may need Getting started Sink & cooktop cut-outs Cabinet Joins for 20mm benchtops Joining & installation of 20mm benchtops Joining
More informationUCO Vistabord Fixing Manual
UCO Vistabord Fixing Manual UCO Multiflex UCO Flexabord Fibre Cement Board WALLS & CEILINGS Ceiling soffit using Vistabord at Suria KLCC, Malaysia. UAC BERHAD (5149-H) his sign endorses that the product
More informationTREX TRANSCEND RAILING
RAILING NOTES:» RAILINGS ARE DESIGNED TO BE INSTALLED OVER THE DECKING FRAME OR ON INSIDE OF RIM JOIST. NOTCHING OF PRESSURE-TREATED POSTS OR POSTS INSTALLED ON OUTSIDE OF RIM JOIST IS NOT ALLOWED.» All
More informationWOODWORKS. Linear Solid Panels. Installation Instructions CEILING SYSTEMS. 1. General
CEILING SYSTEMS Between us, ideas become reality WOODWORKS Installation Instructions Linear Solid Panels 1. General 1.1 Product Description WoodWorks Linear features a solid wood ceiling system in 1' x
More informationUPPER FLOORS TIMBER AND CONCRETE
UPPER FLOORS TIMBER AND CONCRETE FUNCTIONS OF AN UPPER FLOOR Functions: Support imposed loads Not deflect under load Strength and stability Provide restraint for external walls Fire resistance (30 minutes)
More informationB A T H R O O M G L A S S
mistley B A T H R O O M G L A S S vaug16 Page 2 Thank you for purchasing this Trinity shower screen. Please study these instructions carefully before assembly and installation and check all supplied parts
More information3 Simple Steps to a Beautiful Tile Surface. Tec Skill Set How-To Project Guide Floor Tile 1. PREPARE THE SURFACE 2. SET THE TILE. Reverso en español
Reverso en español Tec Skill Set How-To Project Guide Floor Tile 3 Simple Steps to a Beautiful Tile Surface 1. PREPARE THE SURFACE 2. SET THE TILE 3. Grout AND CAULK H.B. Fuller Construction Products Inc.
More informationAQUAGARD EPDM FLAT ROOFING SYSTEMS INSTALLATION GUIDE THE MECHANICALLY FIXED SYSTEM
AQUAGARD EPDM FLAT ROOFING SYSTEMS INSTALLATION GUIDE THE MECHANICALLY FIXED SYSTEM The following guide covers the technique for the Mechanically Fixed System. This system is best employed when an overlay
More informationRepairs. Chapter 10 Repairs 10. 1
10 Repairs Chapter 10 Repairs 10. 1 Repairs As an installer, you will probably be called upon to repair damage to a resilient floor. Here are some of the most common problems and the recommended repairs
More informationLife* Installation Instructions & User Care Instructions. (381kg) (60stone) (840lbs) (254kg) (40stone) (560lbs) (100kg) (220lb) (15stone)
Installation Instructions & User Care Instructions Trimmable Formers (381kg) (60stone) (840lbs) (254kg) (40stone) (560lbs) (100kg) (220lb) (15stone) i Installer- please read all instructions carefully
More informationWOOD COUNTERTOP INSTALLATION INSTRUCTIONS
1209 Logan Circle, Atlanta, Georgia 30318 www.craft-art.com (404)352-5625 WOOD COUNTERTOP INSTALLATION INSTRUCTIONS Required Tools and Supplies Cordless Drill Belt Sander with 60 and 80 grit belts. Shur-form
More informationINSTALLATION INSTRUCTIONS
Tools required for the installation. A. Core Drill 87mm Drill bit B. Tape measure C. Spirit Level D. Marking pen E. Caulking gun F. Cutting Pliers G. Cordless Drill and Philips head bit, 5mm Drill bit.
More informationSteelChief Installation Instructions for pre-assembled panel form sheds GABLE ROOF
SteelChief Installation Instructions for pre-assembled panel form sheds GABLE ROOF Please read fully before commencing work...any queries will be promptly answered, contact theboss@steelchief.com.aui MPORTANT
More informationCurium 19H Installation Instructions & Parts List
Curium 19H Installation Instructions & Parts List Illustration Curium 19H Right Hand Page 1 of 15 01/07/2016 Revision 2.1 IMPORTANT This shower screen / enclosure must be installed by suitably qualified
More informationSite Installation Guide
Site Installation Guide Site Checklist Stop and read this now. Tick box when checked. Floor Joist Layout If a floor joist design/layout was done, was a site copy of the layout provided with the joists,
More informationSlipGrip Data Sheet & Installation Guide
SlipGrip Data Sheet & Installation Guide Stair Treads Landing Covers Flat Sheets 9/2015 SlipGrip Technical Data Description SlipGrip products are high performance safety stair treads, landing covers and
More informationEngineered Hardwood Flooring Installation Instructions
Engineered Hardwood Flooring Installation Instructions 1 Important Information before You Begin 1.1 Installer/Owner Responsibility Carefully inspect all materials before installation. Materials installed
More informationSecuAnch Roof Anchor System
Height Safety Products Email: marketing@fallprotec.com SecuAnch Roof Anchor System 1 Presentation The SecuAnch lifeline is designed to be permanently installed on buildings and other structures where maintenance
More information2. Sanding the Modules Sand the entire surface of each cyc module with 60-grit sandpaper. This will provide for better paint adhesion.
ASSEMBLY INSTRUCTIONS SYSTEM 4 BI (Built-In) Congratulations on your decision to use the world s most advanced and user-friendly cyclorama system. We have taken a great deal of care to create and ship
More informationVinyl Gazebo Instructions
P a g e 1 Vinyl Gazebo Instructions 10 Vinyl Gazebo Shown Thank you for the purchase of your New Gazebo. Depending on the size of your Gazebo, installation can usually be completed in 1 to 2 days. These
More informationINSTALLATION GUIDE SLIMLINE ROOF LANTERN 4 PANE CONFIGURATION
INSTALLATION GUIDE SLIMLINE ROOF LANTERN 4 PANE CONFIGURATION SLIMLINE STEP-BY-STEP INSTALLATION GUIDE Thank you for choosing Roof Maker, we hope you are delighted with your new rooflight. Our roof lanterns
More informationinstallation care & maintenance instructions lifecycledecking.com 25-year limited residential warranty 20-year limited commercial warranty
installation care & maintenance instructions lifecycledecking.com 25-year limited residential warranty 20-year limited commercial warranty Installation Instructions As with any building project, use proper
More informationHandrail H Series. Product Installation. Instructions. Installation Instructions For. Wall Mounted and Freestanding Round Handrails
Product Installation Installation Instructions For Instructions Handrail H Series Installation Instructions for Wall Mounted and Freestanding Round Handrails Step Nosing F Series Concrete and Timber Step
More informationBuild your own Drawer unit. D3 / D4
Page1 Build your own Drawer unit. D3 / D4 1: Introduction. This guide will give you the plans, materials and how to information to build your own drawer unit. The dimensions given will fit a D3 or D4,
More informationFITTING INSTRUCTIONS FOR OFD SOLID OAK FLOORING
FITTING INSTRUCTIONS FOR OFD SOLID OAK FLOORING SECTION 1 Installers Responsibility Pre-Installation SECTION 2 Glue Down (Solid & Engineered Flooring) SECTION 3 Secret Nailing (Solid & Engineered Flooring)
More informationRAILING R A IL ING 51
RAILING RAILING 5 TREX TRANSCEND RAILING NOTES:» TREX TRANSCEND RAILINGS ARE DESIGNED TO BE INSTALLED OVER THE DECKING FRAME OR ON INSIDE OF RIM JOIST. NOTCHING OF PRESSURE-TREATED POSTS OR POSTS INSTALLED
More informationAquaGuard - Water Resistant Flooring Installation guidelines
AquaGuard - Water Resistant Flooring Installation guidelines Before You Start: Please read all the instructions before you begin the installation. Improper installation will void the warranty. Important
More informationSteel Sound Enclosure
Steel Sound Enclosure INSTALLATION MANUAL List of tools recommended for use during installation: vise grips c clamp ladder electric drill drill bits / taps as req d screw drivers hammer rubber mallet pipe
More informationSLIM TRIM MOULDING INSTALLATION METHODS
Slim Trim as a reducer Use SlimTrack (Metal Track) for up to 4 mm floors. Up to 4 mm Floors 3/8 *If the flooring manufacturer suggests/permits the use of underlayments you may need to shim the track to
More informationHOW TO INSTALL HORIZONTAL ROD RAILING TREX SIGNATURE STANDARD
HOW TO INSTALL HORIZONTAL ROD RAILING NOTES:» Adjust drill power to lowest setting that will drive screw. DO NOT OVER TORQUE 6 STAINLESS STEEL STAINLESS FASTENERS.» NEVER use impact tools on 6 Stainless
More informationPRO CYC PRO CYC, INC. SYSTEM SUPER 1.5 EZ
ASSEMBLY INSTRUCTIONS SYSTEM SUPER 1.5 EZ Congratulations on your decision to use the world s most advanced and user-friendly cyclorama system. We have taken a great deal of care to create and ship your
More information2. Sanding the Modules Sand the entire surface of each cyc module with 60-grit sandpaper. This will provide for better paint adhesion.
ASSEMBLY INSTRUCTIONS SYSTEM SUPER 2.5 EZ Congratulations on your decision to use the world s most advanced and user-friendly cyclorama system. We have taken a great deal of care to create and ship your
More informationSCULL HANDLES AND GRIPS INSTRUCTION BOOKLET
SCULL HANDLES AND GRIPS INSTRUCTION BOOKLET Contents Section I: Scull Grip Replacement: Fixed Handle or 10 cm Length Adjustment System Refer to this section if you need to replace the grips on your fixed
More informationAssembly Instructions
10' and 12' Octagon Cedar Gazebo Assembly Instructions Toll Free: 866.768.8465 Hours: 9-5 Monday-Friday EST www.homeplacestructures.com Package ships as shown revised 06/20/09 Cedar Gazebo Assembly Instructions
More informationCurium 19.4H Installation Instructions & Parts List
Curium 19.4H Installation Instructions & Parts List Illustration Curium 19.4H Right Hand Page 1 of 21 30/06/2016 Revision 1.0 IMPORTANT This shower screen / enclosure must be installed by suitably qualified
More informationWoodWORKS Channeled Plank
CEILING&WALL SYSTEMS Between us, ideas become reality WoodWORKS Channeled Plank Assembly and Installation Instructions 1. General 1.1 Product Description WoodWorks Channeled acoustical ceiling and wall
More informationInstallation Manual. This installation is for the Odyssey H1800 Series Ventilation System.
Installation Manual This installation is for the Odyssey H1800 Series Ventilation System. This installation is limited to roofs with pitches between 3 and 35. This instruction assumes that there is a power
More informationInstallation Guide. Step-by-Step Guide
Installation Guide Step-by-Step Guide Thank you for choosing one of our quality products. We are the industry leaders in designer panel fencing. This product will provide you with years of trouble free
More informationPotting Store Assembly Instructions
Before assembly We recommend that time is taken to read the instructions before starting assembly, then follow the easy step by step guide. The instruction sheet is only a guide to the assembly. Certain
More informationPristine Precise Perfection
Pristine Precise Perfection EB TY Premium Hidden Deck Fastening System For Premium Timber Deck Applications Stainless Steel Reinforced EB- GUIDE EB-TY Premium Hidden Deck-Fastening System Optimise Your
More informationMETALWORKS TARTAN PANELS General Installation Instructions
CEILING SYSTEMS METALWORKS TARTAN PANELS General Installation Instructions 1. GENERAL 1.1. Product Description MetalWorks Tartan system is a combination of metal ceiling panels available in a range of
More informationinstallation guide TASMANIAN HARDWOOD OVERLAY FLOORING
TASMANIAN HARDWOOD OVERLAY FLOORING installation guide These instructions apply to quality Tasmanian strip flooring used as an overlay on a structural substrate in residential applications. nail glue SHEET
More informationDura-Lock Roof System
DLR-14 Dura-Lock Roof System Assembly and Installation Instructions Read the instructions before starting the job. They explain the steps required to produce a finished product that will meet factory specifications.
More informationMach Wall Installation Instructions
Mach Wall Installation Instructions Planning the Job Since Mach Wall is an innovative product that accomplishes 3 tasks at the same time (frame, insulate and drywall) and it replaces traditional framing,
More informationPRO CYCTM PRO CYC, INC. SYSTEM 1.5 FS
ASSEMBLY INSTRUCTIONS Congratulations on your decision to use the world s most advanced and user-friendly cyclorama system. We have taken a great deal of care to create and ship your cyc, so please take
More informationAlmost Heaven Saunas THE AUTHENTIC SAUNA EXPERIENCE. Patterson Sauna Installation & Owner s Manual
Almost Heaven Saunas THE AUTHENTIC SAUNA EXPERIENCE Patterson Sauna Installation & Owner s Manual Read this entire manual through to the end before proceeding with the assembly. ELECTRICAL REQUIREMENTS
More informationSHADOWBOX INSTALLATION FOR: Standard 6 H x 8 W Shadowbox Fence 5 x 5 Routed Posts Dog Ear or Straight-Edge Pickets 1.75 x 3.5 Rail
SHADOWBOX INSTALLATION FOR: Standard 6 H x 8 W Shadowbox Fence 5 x 5 Routed Posts Dog Ear or Straight-Edge Pickets 1.75 x 3.5 Rail Storage and Handling Fence Preparation and Layout Locate and Set Posts
More informationMAGNUM BOARD INTERIOR INSTALLATION GUIDELINES
TECHNICAL BULLETIN No.: 090509-1405 Subject: Issue Date: September 4, 2009 Issue No.: II MAGNUM BOARD INTERIOR INSTALLATION GUIDELINES 1. CUTTING MAGNUM BOARD You can easily cut Magnum Board with carbide
More informationJOIST DETAILS Plate nail, 16d (0.15" x 1 ") at 1 on-center Blocking panel: 1 1 8" TJ Rim Board, 1 1 TimberStrand SL or TJI joist Toe nail, 10d (0.11" x ") at on-center A1 CS BEAM DETAILS L1 eb stiffener
More informationCOMPOSITE SIDING INSTALLATION GUIDE
CENTURY HOME LIVING COMPOSITE SIDING INSTALLATION GUIDE Read all instructions prior to installing any siding product. Failure to install and finish this product in accordance with all local building codes,
More informationRadon 07 Installation Instructions & Parts List
Radon 07 Installation Instructions & Parts List Illustration Radon 07, H1 Handle Right Hand: Open Out 14/06/2016 Revision 1.1 Page 1 of 21 IMPORTANT This shower screen / enclosure must be installed by
More informationrondo exangle drywall finishing sections
rondo exangle drywall finishing sections SUMMARY The EXANGLE range of building board finishing profiles are designed to give plasterers a clean, defined edge on straight or curved details for internal
More informationInstallation Guide. Bi-fold Doors
Installation Guide Bi-fold Doors Installation Guide Components box 1. 6. 2. 3. 7. 5. 4. 8. Contents 1. Fixing plugs 2. Wedge gasket 3. Bottom trolley 4. Top trolley 5. Magnetic keep (x 2 if door height
More informationInstallation Instructions for Viking Hearth Engineered Wood Flooring
Installation Instructions for Viking Hearth Engineered Wood Flooring 4.16.15 PLEASE READ THESE INSTRUCTIONS IN THEIR ENTIERTY BEFORE BEGINNING THE INSTALLATION. Installer s / Owners Responsibility As a
More informationInstallation Site Preparation - Site Preparation
S c u l p t u r e s Bespoke Single Door / Bespoke Frameless Hinged Door + Inline Panel Instruction Manual Truelife Consumer Guarantee Please make sure the purchaser/end user completes and returns the Guarantee
More informationOUTLOK Portable Dance Floor laying instructions *Pictures show Florlok but instructions written for Outlok
*Pictures show Florlok but instructions written for Outlok The OUTLOK portable dance floor consists of FULL and HALF panels which are set up in a brickwork fashion which in turn gives the floor its strength
More informationInstallation Instructions for. Before You Begin TOOLS REQUIRED
Composite Railing System STEP-BY-STEP Installation Instructions for Spectrum Composite Railing Virtually maintenance free 20-year warranty EverNew Spectrum Railing system is designed to work with a number
More informationZenterra TM Installation Guide
Zenterra TM Installation Guide Installing the foam padding Please review this installation guide before you begin installing the floor. If you have any questions, please call us at 800-428-5306 any time
More informationDubnium 11 Installation Instructions & Parts List
Dubnium 11 Installation Instructions & Parts List Illustration Dubnium, H1 Handle Right Hand: Open Out Page 1 of 25 IMPORTANT This shower screen / enclosure must be installed by suitably qualified individuals.
More informationwoodworkersjournal.com MATERIAL LIST
MATERIAL LIST T x W x L 1 Legs (2) 1 1 2" x 3 1 2" x 36 7 16" 2 End Uprights (2) 1 1 2" x 3 1 2" x 32 1 2" 3 Stringers (4) 1 1 2" x 3 1 2" x 42" 4 Top Cladding, Long (2) 3/4" x 7 1 4" x 65 3 4" 5 Side
More informationINSTALLATION INSTRUCTIONS
INSTALLATION INSTRUCTIONS 5-in x 84-in x 3/8-in 12.7 cm x 213.36 cm x 9.525 mm 10 planks 29 sq.ft. IMPORTANT INFORMATION Open cartons 2-3 days prior to the install and allow material to adjust to the relative
More informationSolara Adjustable Patio Cover Installation Instructions
Solara Adjustable Patio Cover Installation Instructions We divided the installation instructions in 6 major sections. Reference your project to the drawings below, this way you ll know you are on the right
More informationINSTALLATION INSTRUCTIONS
INSTALLATION INSTRUCTIONS 5-in x 84-in x 3/8-in 12.7 cm x 213.36 cm x 9.525 mm 10 planks 29 sq.ft. IMPORTANT INFORMATION Open cartons 2 3 days prior to the install and allow material to adjust to the relative
More informationChief s Shop: Simple Woodworking Bench
Chief s Shop: Simple Woodworking Bench Be sure to read the instructions and review the illustrations and accompanying video for this project BEFORE you start. Follow ALL SAFETY GUIDELINES AND RECOMMENDATIONS
More informationWHY YOU SHOULD USE TUFFLOOR. components
Tuffloor DESIGN GUIDE WHY YOU SHOULD USE TUFFLOOR Strong and Easily Installed Tuffloor is a steel floor framing system designed for strength and ease of installation, and is an easy and economical alternative
More informationNEW equinox INSTALLATION GUIDE Issue
NEW equinox INSTALLATION GUIDE Issue 1 CONTENTS If in doubt at any stage 1. Preparing the ring beam 2 2. Installing the framework 3 3. Insulation and waterproofing 7 4. Tile application: Steel tiles 9
More informationGallium 03 Installation Instructions & Parts List
Gallium 03 Installation Instructions & Parts List Illustration Gallium 03, H1 Handle Left Hand: Open Out 04/05/2016 Revision 1.1 Page 1 of 19 IMPORTANT This shower screen / enclosure must be installed
More informationNewTech - CleverDeck Composite Decking Installation Guidelines
NewTech - CleverDeck Composite Decking Installation Guidelines Composite decking has unique characteristics and requires specific fixing requirements that differ from timber. We strongly recommend that
More informationContents. Stage 1. Preparation of the aperture 9. Interior finishing 25
Installation Manual Pitchglaze Roof Window Contents Contents and introduction 2 Delivery 3 Pre Installation 4 Installation 8 Stage 1. Preparation of the aperture 9 Stage 2. Fitting the Pitchglaze 11 Stage
More informationLaminate Cabinet Installation Instructions
Laminate Cabinet Installation Instructions www.easygaragestorage.com/installation How To Use These Instructions Thank you for your purchase! Please read each step of this manual thoroughly to ensure proper
More informationDURACRYL WALL INDEX INTRODUCTION TOOLS AND MATERIALS REQUIRED FLAT SHOWER WALL SIDE CONTOUR SHOWER WALL CORNER CONTOUR SHOWER WALL FLAT BATH WALL
DURACRYL WALL FLAT SHOWER WALL SIDE CONTOUR SHOWER WALL CORNER CONTOUR SHOWER WALL FLAT BATH WALL INSTALLATION GUIDE INDEX PAGES Introduction 1 Tools and materials 1 Construction requirements - timber
More informationLOG CABIN 70 ASSEMBLY INSTRUCTIONS
LOG CABIN 70 ASSEMBLY INSTRUCTIONS 400 mm x 400 mm Canopy 500 mm Veranda depth 500 mm Wall thickness 45 mm Nordic region spruce wall logs 45 mm x 35 mm Dimensions of base 3900 mm x 5400 mm including terrace
More informationINSTALLATION INSTRUCTIONS. Level Rail With Cap: Page 2 Level Rail Without Cap: Page 8 Stair Rail: Page 12
INSTALLATION INSTRUCTIONS Level Rail With Cap: Page 2 Level Rail Without Cap: Page 8 Stair Rail: Page 12 LEVEL RAIL WITH CAP The testing was performed in accordance with procedures and methods referenced
More informationHOW TO INSTALL HORIZONTAL ROD RAILING TREX SIGNATURE STANDARD
HOW TO INSTALL HORIZONTAL ROD RAILING NOTES:» Adjust drill power to lowest setting that will drive screw. DO NOT OVER TORQUE 36 STAINLESS STEEL STAINLESS FASTENERS.» NEVER use impact tools on 36 Stainless
More informationSauna & Steam. Traditional Sauna Installation Instruction Manual
Traditional Sauna Installation Instruction Manual Oceanic Ltd, Pountney Street, Wolverhampton, WV2 4HX Phone: 01902 450 550 sales@oceanic-saunas.co.uk www.oceanic-saunas.co.uk Contents 1.Introduction................................................
More informationBalustrade Systems / Installation Instructions
A. PARTS AND SUPPLIES NEEDED FOR INSTALLATION Hardware included for each 10 section of rail: 2 3 x 1-1/2 L-brackets 4 1-3/4 x 3/16 Blue hex-head screws for anchoring the L-brackets to the newel cap, column
More informationInstallation Instructions for easy to install Texture Plus faux wall panels
Installation Instructions for easy to install Texture Plus faux wall panels Questions? Web chat, phone or email us. Easy Instructions For Use We make easy to install faux wall panels that look amazingly
More informationDURACRYL WALL INDEX INTRODUCTION. TOOLS AND MATERIALS REQUIRED. FLAT SHOWER WALL SIDE CONTOUR SHOWER WALL CORNER CONTOUR SHOWER WALL FLAT BATH WALL
DURACRYL WALL FLAT SHOWER WALL SIDE CONTOUR SHOWER WALL CORNER CONTOUR SHOWER WALL FLAT BATH WALL INSTALLATION GUIDE INDEX PAGES Introduction 1 Tools and materials 1-2 Construction requirements - timber
More informationMUSTEE FIBERGLASS SHOWERWALL
MUSTEE FIBERGLASS SHOWERWALL Before you assemble and install your MODEL 736 three-piece Molded Fiberglass Shower Wall unit you will have to prepare the rough-in area, determine which side wall will have
More information8x12 SpaceMaker Garden Shed Assembly Manual
8x12 SpaceMaker Garden Shed Assembly Manual Version #6 Revised June / 2007 Thank you for purchasing a 8x12 SpaceMaker Garden Shed. Please take the time to identify all the parts prior to assembly. Safety
More informationIMPORTANT: Read all sections before you start
1 IMPORTANT: Read all sections before you start For the most up to date information please visit our website @ www.newtechwood.com Prior to installing the railing, please consult local zoning laws in regards
More informationINSTALLATION INSTRUCTIONS PRAVOL DURA-SHIELD COMPOSITE DECK RAILINGS
INSTALLATION INSTRUCTIONS PRAVOL DURA-SHIELD COMPOSITE DECK RAILINGS Important: Read all sections before you start Prior to installing railing, please consult local zoning laws in regards to load requirements
More informationLiniar Window. installation guide
Liniar Window installation guide This installation guide is designed to show you the best way to fit Liniar windows, and covers all styles of window made from Liniar s lead-free 70mm PVCu profile. Not
More informationWalk-in Configurations
Walk-in Configurations Includes Wall-to-Open, Corners, and Corner Rounder Bars INSTALLATION INSTRUCTIONS Tools needed: Tape measure, level, pencil, #2 Phillips head screw driver or power drill with a 6"
More informationBefore you Begin... 3 Storage and preparation... 3 Tools & Materials You may Need... 4
Installation Guide Installation Guide Contents INTRODUCTION... 2 Before you Begin... 3 Storage and preparation... 3 Tools & Materials You may Need... 4 Adhering your Think Solid benchtop to your cabinets
More informationExterra Installation Guide
Exterra Installation Guide Installing the foam padding Please review this installation guide before you begin installing the floor. If you have any questions, please call us at 800-428-5306 any time Monday
More informationInstallation Instructions
Installation Instructions The instructions below are recommendations from Deziner Panels on how to install our Recycled Timber mosaic tiles and interlocking panels. Deziner Panels would like to recommend
More informationIndustrial Contractors Supplies, Inc.
Industrial Contractors Supplies, Inc. - Dust Director Division - 15061 Route 30, N. Huntingdon, PA 15642 Phone: 412. 824. 6933 Fax: 412. 824. 4704 www.dustdirector.com 5" & 7" SURFACE DUST GUARDS MANUAL
More informationTYPHOON ASSEMBLY AND INSTALLATION INSTRUCTIONS
TYPHOON ASSEMBLY AND INSTALLATION INSTRUCTIONS CORPORATE HEADQUARTERS WESTERN SALES AND MANUFACTURING PLANT P.O. Box 400 1017 SW Berg Parkway Canby, Oregon 97013 Phone: (503) 266-2231 Fax: (503) 266-4334
More information