1 Detail of (W 1.2 x 0.4 m) Detail of (W0.6 x 0.4 m) Finishing Level 88mm 88mm 72mm 72mm 60mm 60mm 60mm 60mm Detail of (W 1.7 x 1.2 m) 0.8 Detail of (W 1.7 x 2.4 m) 76mm 76mm Section (1-1) Section (2-2) Section (3-3) Section (4-4) Sheet Title: Detail of PVC Windows 7
2 Two layer of flint coat over cement plastering Plain concrete Type (B) Plain concrete Type (B) P.V.C pipe 4" Water Drinking Bench Sheet Title: Water Drinking Bench
3 D-B 400 Square pipe 3"x3" thickness 2mm h1 Square steel pipe 3"x3" thickness 3mm Base Plate 150 X 150mm with 6 mm thick h1 Square steel pipe 3"x3" thickness 3mm H Foundation h1 Base Plate 150 X 150mm with 6 mm thick Square steel pipe 3"x3" thickness 3mm Holes dia.1.5" h1 150 SIDE VIEW 150 D-A Rectangular steel Pipe 2"*2"*2mm thick Rectangular steel Pipe 2"*1.5"*2mm thick Corrugate sheet 0.8 mm Rectangularsteel Pipe 2"*1.5"*2mm thick every 5m D-B Sheet Title: Sun Shade Detail
4 30.0m 2.5m 1.0m 28.0m 1.0m 10.0m 1.0m 2.2m 12.0m 9.0m Volleyball Pole 18.0m 9.0m 12.0m 2.2m 1.0m 1.5m 4.0m 20.0m 12.0m 9.0m Basketball Frame Oil Paint Width 5cm 1.5m 2.5m Line of Expansion Joint at Yard Floor Line of Fair Face Concrete 4.0m Sheet Title: Basketball Play yard
5 1.2m 0.3m 0.45m 0.6m 1.8m 0.6m Angle Line 1.5''*1.5'' Bolt and Screw each 10cm 1.2m 0.5m 1.8m 0.6m Metal Frame 0.1m 1.5m 2.2m Wooden Block in side Steel Frame Basket ball Steel Frame 0.2m Hooks Steel Pipe 3" Diameter 0.1m 0.1m 0.1m 1.1m 2.5m 3.1m 2.9m 0.4m Steel Pipe 6'' Angle Line 1.5''*1.5'' 3.5m Stand 0.2m 0.3m Basket Ball Steel Frame 16mm Diameter Steel Bar 0.6m G.S.P 4", L = 1m Volleyball Pole Side view Front View 16mm Diameter 50cm length both direction 0.2m Steel Pipe Plate size (5*400*400) mm Welded at the Base on 0.05m Cover Under the Plate 1.0m 1.1m 0.1m 0.1m 0.3m Sheet Title: Basketball Play yard Detail
6 Frame Shaded Glass 6mm 0.70 PVC Panel Frame 2.00 PVC Sheet PVC Panel Frame 1.00 Detail of PVC Doors Sheet Title: Detail of PVC Doors
7 15 width ( W ) 15 Double face iron sheet gage 18(1.41mm) square pipe (40 x 40x 2)mm (leaf frame) height ( H ) Angle Iron (1'' x 1'') Steel bar (1 x 1) square pipe (40 x 40x 2)mm (Partitions every 20 cm) Spreader L-section ( 3/4" x 3/4" ) Spreader L-section ( 3/4" x 3/4" ) F.F.L rough slab Isometric of the frame (for double face door) Angle Iron (1'' x 1'') Elevation of the frame (for double face door) Leaf detail for double face door 1 12 L-section (1" x 1") for the side in witch the hinge will be welded Styropore Leaf Finish floor Angle Iron (1.5''x1.5'') Iron plate 2mm thick Steel bar 4No.(1 x 1) Cross section at frame door (for double face) Detail for external doors only Detail of Double Face Steel Door Sheet Title: Detail of Double Face Steel Door
8 0.07 5cm Wood same as the Frame Fine Timber 1"x1" rounded Wood same as the Frame 2cm 0.06 Detail ( FR) Detail ( FR) Pine Timiber 3"x6" Steel Frame For Bracing Fllat Bar 3cmm x 3mm Frame Wood 1 Finished Thickness 4.0cm Best type Plywood Both Sides 4mm Thick Malayzian Plywood Facing 0.40cm 2.1 Wooden (5cmx3.2cm) Lock Block (15cmx25cm) Door Panel Hanging Stile (7cmx3.2cm) Lock Stile (7cmx3.2cm) Bottom Rail Pannel Wood 10cmx3.2cm Skelton Framed Flush door Detail of Wooden Doors Sheet Title: Detail of Wooden Doors
9 Welded 0.50 Flat Bar 1"X3mm Square Pipe 2"x2" Square Steel Pipe 1"X1"X2mm Detail of Hand Rail Plain Concrete Square Steel Pipe Hand rail "2X" Angle Line 2"x2" Concrete with BRC Masonry Wall 20cm width Crushed Stone Details & Section Plain Concrete Crushed Stone BRC. 15x15x4mm 0.15 Detail of Concrete with BRC for Play Yard and Walkways 0.1 Sheet Title: Handrail and BRC Cocrete Detail
10 Hollow square steel pipe 2"x 2" Hollow square steel pipe 2"x 2" cm 30cm ''X2'' Steel S. Pipe 2.5''X2.5'' Steel S. Pipe 60cm Square steel pipe 3"x1.5mm 3.60m 30cm 30cm 5cm Steel Stair Square steel pipe 3"x1.5mm Sheet Title: Stair Hand rail and steel ladder details
11 Slope Mosaic Tile 80 x 80 x 4 cm 10cm clean river sand 5cm Cork insulating Sheet (polyethylene sheet) 2 opposite Layers of prime coat Slope Drain pipe PVC Pipe Ø100 mm Sheet Title: Roof Deatail
12 c/c 4Ø16mm c/c 4Ø16mm c/c(top & Bottom) c/c(top & Bottom) RC Foundation 0.10 Lean Concrete 0.25 Sub base Layer (Class C) 0.80 Foundation and Column for Main Gate Sheet Title: Main Gate Column and Footing 1
13 Solid Plastered Block Wall 20cm Variable 20cm P.V.C. Pipe 4'', 6'' Diam. Steel Base Steel Cover 20cm min. 10cm H. Variable A A Variable Concrete 1:2:4 min. 10cm P.V.C. Pipe 4'', 6'' Diam. Floor 20cm Solid Plastered Block Wall 10cm crushed stone 10cm Section A-A Typical Manhole 10cm 15cm 10cm Typical Detail of Manhole Sheet Title: Typical Detail of Manhole
Substation 33/11kV. General Notes. Drawn by: Hewa Qader Mustafa. Soran Rostam Aziz. C-For footings = 75 mm. B-For beams & columns = 40 mm.
General Notes Unless otherwise noted, All the dimensions are given in meter. Do not scale from these drawings. These drawings are proposed drawings. All structural drawings should be read in conjunction
More informationROOM smooth cement f.f FLOOR LAYOUT
3,300 3,600 4,100 2,159 1,000 1,241 ROOM smooth cement f.f 168 900 1,091 1,000 1,241 4,400 FLOOR LAYOUT FLOOR LAYOUT CARTAKERS ROOM 2,159 1,000 1,241 SOUTH ELEVATION EAST ELEVATION 1,241 1,000 1,091 900
More informationPROJECT: PROPOSED GARBAHAREY MEAT MARKET - GARBAHAREY DISTRICT - CONSULTANTS: GARBAHAREY MEAT MARKET GOVERNMENT. - GARBAHAREY DISTRICT -
: - GARBAHAREY DISTRICT - CONSULTANTS: GARBAHAREY GOVERNMENT. - GARBAHAREY DISTRICT - N O : SEPT. 2016 DRAWING INDEX SHEET N O DRAWING N O DRAWING CONTENT 01. 01/15 Cover Page.. /15 Drawing Index. 03.
More informationStandard program overview Steel smoke-proof doors
Smoke-proof doors Standard program overview Steel smoke-proof doors Pos. Product 1 RS-1 Steel door (thin rebated) Smoke-proof door in accordance EN 1634-3 / DIN 18095 Dimensions W 625-1350 H 1750-2500
More informationJoshua Woodsman
CONSTRUCTION GUIDE of one of our design Please Note This electronic document is protected by the identifier against unauthorized dissemination on the Internet. Before building any structure make sure you
More information28.00 Rmt sqm sqm
SEALED BID FORMAT FOR THE INTERIOR FURNISHING WORKS AT SBI CHALAKUDY BRANCH. Sl No. Description of item Quantity Unit Rate Amount 1 Counter Table :- The width and height of the table is 100cm and 75cm
More informationChapter 17 - Porch Trim
Chapter 17 - Porch Trim Contents Chapter 17 - Porch Trim... 17-1 Timing & Prerequisites... 17-2 Trim on Porch Beams (Volunteer)... 17-4 Smart Trim on the Bottom of the Beam... 17-4 Smart Trim on the Inside
More informationPONDICHERRY UNIVERSITY ENGINEERING WING SCHEDULE OF WORK
PONDICHERRY UNIVERSITY ENGINEERING WING SCHEDULE OF WORK Name of work: Annual Maintenance and Special repairs of Hostels, Thiruvalluvar Stadium, Vice-Chancellor s Official Residence, Department of Physical
More informationInstallation Instructions
TEL: 09 579-8895 FAX: 09 579-2933 EMAIL: sales@nzfiredoors.co.nz NZ Fire Doors Ltd, 89 Gavin Street, Ellerslie, PO Box 12709, Penrose 1642, Auckland, New Zealand. www.nzfiredoors.co.nz Installation Instructions
More informationbedroom CROSS SECTION FLOOR PLAN S.F. 1 Bedroom Flat kitchen 6'-8" x 8' bath bedroom 10' X 10' FLOOR PLAN AND CROSS SECTION 1BF / 01 Gr. Lev.
0'42 3 0'- 8' 2' 2' 2-8" 0' '- 2' '- See Roof Framing Plan And Roof Anchorage Details W2 W 8" 6'-8" kitchen 6'-8" x 8' bath 6'-8"x -8" D3 2'- 2'- 2'-8" D D2 0' X 0' W 0' 0'-8" ' Steel Framed Window Gr.
More informationSigma Fasteners, Inc. Section 7
DESCRIPTION PAGE s Wedge s 7-1 Drop-In s 7-2 Single Expansion s 7-2 Machine Screw s 7-2 Lag Shields 7-3 Lead Wood Screw s 7-3 Hammer Drive s 7-4 Hollow Wall Fasteners 7-5 Toggle Bolts 7-6 Toggle Wings
More informationINSTALLATION INSTRUCTIONS and OPERATIONS & MAINTENANCE MANUAL for SUPER SIMPLEX DISAPPEARING STAIRWAYS
INSTALLATION INSTRUCTIONS and OPERATIONS & MAINTENANCE MANUAL for SUPER SIMPLEX DISAPPEARING STAIRWAYS Precision Ladders, LLC P. O. Box 2279 Morristown, TN 37816-2279 Phone: (423) 586-2265 Fax: (423) 586-2091
More informationGROUND FLOOR PLAN S.F. 2 Bedroom - 1Bath 2 Storey (First Floor Only) FIRST FLOOR PLAN S.F. 2 Bedroom - 1Bath 2 Storey (First Floor Only)
3 5' ' 5' ' -0" High Wall -6" W W bedroom x ' carpet fl. fin. W bedroom ' x ' carpet fl. fin. W ' D3 5' 6' 5' D W3-8" x 8'-8" D4 ceramic tile fin. kitchen '- 8' x 8'-8" ceramic tile fin. D3 4 bath 5' -8"
More informationB. Shop Drawings: Include elevations, door edge details, frame profiles, metal thicknesses, preparations for hardware, and other details.
SECTION 081113 - HOLLOW METAL DOORS AND FRAMES PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. Standard hollow metal doors and frames. 1.2 SUBMITTALS A. Product Data: For each type of product indicated.
More informationFIRE RATED DOOR AND FRAME GENERAL REQUIREMENTS
FIRE RATED DOOR AND FRAME GENERAL REQUIREMENTS These requirements apply to all fire rated doors, frames, and windows. Requirements for the installation of these assemblies are included in the Standard
More informationResidential & Industrial Fence
Residential & Industrial Fence Assembly Instructions CONTENTS 02: OVERVIEW & CONTENTS 03: PRODUCT SPECIFICATIONS 04: GETTING STARTED 05: WALL ATTACHMENT & LINE POST ASSEMBLY 06: CORNER POST ASSEMBLY 07:
More informationFootball Goals 7,32x2,44 m
Football Goals 7,32x2,44 m 120x100 mm Professional aluminum football goals 7,32x2,44 m Made of special oval aluminum profile 120x100 mm with double reinforcing ribs. The main frame of the goal powder coated
More informationMANHOLES PART I: GENERAL. A. Precast Concrete Manholes
MANHOLES PART I: GENERAL A. Precast Concrete Manholes 1) Manholes shall be made of precast concrete sections of which the top section shall be eccentric or flat slab top. The bottom section shall be a
More informationStainless SHS stanchions with glass infill and offset handrail
Stainless SHS stanchions with glass infill and offset handrail design elements C4 Min 180 100 40 Min 1000mm 100 100 Stainless SHS stanchions with glass infill and offset handrail C4 design Stainless steel
More informationGSPublisherVersion PROPOSED REHABILATATION DR.AYUB FOOTBALL STADIUM IN - BAIDOA -
GSPublisherVersion 0.0.00.00 PROPOSED REHILTTION DR.YU FOOTLL STDIUM IN - IDO - PROPOSED REHILITTION DR.YU FOOTLL STDIUM IN - IDO - 0. 0. 0. 04. SHEET N O 0/4 0/4 0/4 04/4 DRWING N O June 08 DRWING INDEX
More informationThis specification describes the minimum requirements for structural steel drawings.
1/7 1.0 PURPOSE This specification describes the minimum requirements for structural steel drawings. 2.0 GENERAL As stated in specification SPEC-0800, drawings are intended to be Design drawings. Sufficient
More informationEast African Roofing Systems Ltd.
East African Roofing Systems Ltd. Iron Sheet Super Tiger sheets are made from pre-painted galvanized iron sheets and combines increased longevity with low maintenance costs. Super Tigersheets are suitable
More informationTABLE OF CONTENTS. Impregnated... 1 NORDIC FENCE Fynbo FSC Certified... 1
TABLE OF CONTENTS Impregnated... NORDIC FENCE Fynbo FSC Certified... Iron... NORDIC FENCE Lightweight model, GENERAL... NORDIC FENCE Lightweight model, with a grid filled... NORDIC FENCE Lightweight model,
More informationAccessories and workbenches
Workbenches To complete the Elabo furnishing systems, we also provide workbenches and organisable steel plate base cabinets. Steel cabinets, shelves and shelf trolleys are available for storage of materials
More informationFIRE RATED DOOR AND FRAME GENERAL REQUIREMENTS
` FIRE RATED DOOR AND FRAME GENERAL REQUIREMENTS These requirements apply to all fire rated doors, frames, and windows. Requirements for the installation of these assemblies are included in the Standard
More informationNepal Housing Reconstruction Programme
Nepal Housing Reconstruction BUILDING DESIGN Submitted By Nepal Housing Reconstruction September, 2016 MODEL SMC None TECHNICAL DETAIL (Progressive Expansion Provision) Build Change FRONT ELEVATION RIGHT
More informationWHY YOU SHOULD USE TUFFLOOR. components
Tuffloor DESIGN GUIDE WHY YOU SHOULD USE TUFFLOOR Strong and Easily Installed Tuffloor is a steel floor framing system designed for strength and ease of installation, and is an easy and economical alternative
More informationWOODEN AND FABRICATION WORK
112 :: Certificate in Construction Supervision (CIVIL) 15 WOODEN AND FABRICATION WORK 15.1 INTRODUCTION In the construction work of building, after making the structure work, doors/ windows are used for
More informationProducts for fixing to Steelwork and Decking
Products 8.0 Beam Clamp - Single Support 8.1 Universal Joint for any variable Angle Adjustment 8.2 Beam Clamp TCS for Header Rails 8.3 Beam Clip for Cross Support/ Dimensioning of Bolts 8.4 Beam Clip for
More informationAPPENDIX FENCE GENERAL NOTES
APPENDIX FENCE GENERAL NOTES 1. Fabric: 9 gage, 2" mesh, knuckle top and bottom, placed on the outside of posts, single fabric width for the entire height. 2. All fencing to be standard galvanized finish.
More informationBeit Hanina School. Remarks: Work Plan. Basement floor Plan. Scale: 1:50 Sheet name: A1
0 Work Plan Basement floor Plan Scale: :0 A 0 Work Plan Ground floor Plan Scale: :0 A 0 Work Plan First floor Plan Scale: :0 A 0 Work Plan Second floor Plan Scale: :0 A 0 Work Plan Third floor Plan Scale:
More informationWALL TO FABRICATED FLOOR
WALL TO FABRICATED FLOOR PERIMETER WALL IS HELD IN PLACE BY WOODEN STRIP SCREED OPTIONAL NSF COVED FLOOR IS SHOWN PARTITION WALL IS HELD IN PLACE BY WOODEN STRIP SCREED OPTIONAL NSF COVED FLOOR IS SHOWN
More informationExtension Standard building 03/15
Extension Standard building 03/15 8 Wide Evolution Extension Assembly Instructions Contents: Introduction Base Preparation Overview Base Assembly Side Assembly Front Assembly Extension Installation Rear
More informationAUXILIARY FRAMING AND ACCESSORIES
CUSTOM CABINETS & RACKS STRUT AND ACCESSO- RIES JUNCTION KITS ANGLE AND BRACE KITS SPLICE KITS BRACE KITS INSTALLATION KITS WALL ANGLE KITS RUBBER END CAPS SUPPORT INSTALLATION AND SUPPORT KITS STANCHION
More informationDESCRIPTION QTY UNIT RATE AMOUNT ELEMENT NO.1 SUBSTRUCTURES. Excavations
ELEMENT NO.1 SUBSTRUCTURES Excavations B Clear site of all shrubs and undergrowth including grubbing up of roots and dispose off as directed. Excavate oversite average 150mm deep and cart away as directed
More informationGrade 8 Enriched Math Catapult Project 2012 Step by Step Instructions to building a catapult
Grade 8 Enriched Math Catapult Project 2012 Step by Step Instructions to building a catapult Grade 8 Enriched Math Project INSTRUCTION SHEET FOR CATAPULT Procedures, materials and tools: below is a step-bystep
More informationIIHS Side Impact Outrigger
IIHS Side Impact Outrigger Assembly Procedure Base Assembly (14.3 lbs) The base assembly consists of a ¼ thick steel plate, a ¼ thick piece of polyethylene, and mounting fixtures for the upper and lower
More informationB. Shop Drawings: Include elevations, door edge details, frame profiles, metal thicknesses, preparations for hardware, and other details.
SECTION 081113 - HOLLOW METAL DOORS AND FRAMES PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. Standard hollow metal doors and frames. 1.2 SUBMITTALS A. Product Data: For each type of product indicated.
More informationGROWING BETTER THROUGH DESIGN. 6ft Lean-To LEAN-TO. Assembly Instructions 04/02
GROWING BETTER THROUGH DESIGN 6ft Lean-To LEAN-TO Assembly Instructions 04/02 6ft Lean-To Greenhouse Base Plan Introduction/Tools/Contents / / Contents This is a copy of our Lean-To greenhouse base plan.
More informationSECTION BULLET- RESISTANT DOORS
1 SECTION 08 3950 BULLET- RESISTANT DOORS PART 1- GENERAL 1.01 SUMMARY A. This Section Includes: 1. Bullet- resistant steel door and frame systems. 2. Door hardware for bullet- resistant steel door and
More informationNew Product Release: October 2014 Boone Racks
New Product Release: October 2014 Boone Racks Double Fido Fountain Mounting: Surface NOTE: THESE ROUGH-IN DIMENSIONS MAY VARY ½: (13 mm) PLUS OR MINUS NOTE: All dimensions subject to manufacturing variance
More informationHow To Build An. Attic Ladder. ALL DAY FENCING construction guide. Complies with the Timber Framing Code of NSW and the Building Code of Australia
How To Build An Attic Ladder ALL DAY FENCING construction guide. Complies with the Timber Framing Code of NSW and the Building Code of Australia CONSTRUCTION GUIDES How To Build An Attic Ladder Need more
More informationSafety Glasses Safety Gloves Ladders Measuring Tape Spirit Level String Line. Tin-Snips Rivet Gun Caulking Gun Silicone Socket Set
BEFORE YOU START Carefully read these instructions and refer to them constantly during each stage of construction. If you do not have all the necessary tools or information, contact Stratco for advice.
More informationINSTALLATION SHOP DRAWINGS FOR MINNEAPOLIS, MN
MINNEAPOLIS, MN 2-0- 2-- General Notes Abbreviations Deviations from Architectural Specifications Deviations from Architectural Drawings ALUM. = ALUMINUM B.O. = BY OTHERS CONT. = CONTINUOUS. = CLEARANCE
More informationSalter Industries Spiral Stair
Salter Industries Spiral Stair The Leader in Spiral Staircases Continuous Sleeve Stair Installation Instructions TOOLS NEEDED: 1. Electric drill with hex chuck and Phillips bit 2. Drill bits 1/8", 1/4",
More informationSolid Core Wood Door / Steel Frame Packages
Solid Core Wood Door / Steel Frame Packages No Label - Interior Packages Machined for one (1) cylindrical lock and three (3) hinges at Republic locations 1-3/4 Solid Core Birch 1-3/4 Solid Core Oak 3/0
More informationKentucky 4H Wood Science Plans Notebook. Plans Level 3
Kentucky 4H Wood Science Plans Notebook Plans Level 3 MATERIALS: 2 pieces wood 3/4 x 10 x 4 1 piece wood 3/4 x 12 x 4 2 pieces wood 3/4 x 3 x 2 5 1/2" 2 pieces wood 3/4 x 3 x 1 8 1 piece wood 2 x 4 x
More informationAluminum Railing Installation. Glass Railing Spindle Railings Intimacy Railings and Panels
Aluminum Railing Installation Glass Railing Spindle Railings Intimacy Railings and Panels This information in this manual will help you to Better understand our product line. Give you guidelines for an
More informationMH Table of Contents Standard Title/Scope Page Table of Contents SCE Public
MH Table of Contents Standard Title/Scope MH 300 MH 310 MH 318 MH 320 MH 325 MH 330 MH 335 MH 340 MH 350 Manholes Requirements MH 300.1 Manholes Requirements...........................................
More informationInstallation Instructions
AMPCO Stainless Steel and Baked Enamel Toilet Partitions AMPCO Florida 11400 NW 36 th Avenue Miami, FL 33167 T. 305.821.5700 florida@ampco.com AMPCO Texas 201 Railroad Avenue Sanger, TX 76266 T. 940.458.7401
More informationDetermine the proper ground fixing stair position, by using, as a reference, the landing tread [Fig. 7].
METAL SPIRAL STAIR MOUNTING INSTRUCTIONS - ENGLISH - PRELIMINARY OPERATIONS Prior to fitting your staircase, please check the packaging content. You then place all components onto a wide surface in order
More informationSECTION HOLLOW METAL DOORS AND FRAMES
SECTION 081113 HOLLOW METAL DOORS AND FRAMES PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. Standard hollow metal doors and frames. 1.2 SUBMITTALS A. Product Data: Include construction details, material
More informationTECHNICAL DRAWING. SECTION A: will consist of (30) questions drawn from the general principles, techniques and uses of plane and solid geometry.
TECHNICAL DRAWING EXAMINATION SCHEME There will be three papers, Papers1, 2 and 3 all of which must be taken. Papers 1 and 2 will be a composite paper to be taken at one sitting. PAPER 1: will consist
More informationTable of Contents F Series Frames
Table of Contents F Series Frames How to Order Frames... F 1 F Series Spec Sheet... F 2 F Series Profiles 1 of 6... F 3 F Series Profiles 2 of 6... F 4 F Series Profiles 3 of 6... F 5 F Series Profiles
More informationDowntown Rack. Custom logo option available
Custom logo option available Downtown Rack The Downtown Rack uses thick, square-tube construction that can t be cut with a pipe cutter. The extended width of the Downtown Rack makes for easy bike parking
More informationTECHNICAL DRAWING GUIDE
Budapest University of Technology & Economics (BME) Faculty of Architecture Department of Building Constructions 2017 + TECHNICAL DRAWING GUIDE Edited by Dr Zsuzsanna Fülöp and Aryan Choroomi based on
More informationAdjustable Countertop Installation
Adjustable Countertop Installation Applies to Models: A1, A2, A3, A4, A5, & A6 Required Tools: Stud Finder, Level 1/4 deep well socket, Screwdrivers, Tape Measure, Drill and Drill Bits Language of origin:
More informationA-SL-1 A-SL-1 HAND RAIL STAIRS STRUCTURE/ ARCH SLIDE FOUNDATION 12" ROUND PIER 20" SQUARE PIER CAP DRILL AND EPOXY BOLTS *SEE FOUNDATION DETAILS
2X2 SQUARE TUBING /" WALL ON STRUCTURAL FRAME /8" WALL RAFTERS & INFILL NO. ISSUE HOUSE # GALVANIZED STEEL STAIRS SLIDE 2 GA SS POLISHED FINSHED LASER CUT FOUNDATION 2" ROUND PIER 20" SQUARE PIER CAP DRILL
More informationDura-Lock Roof System
DLR-14 Dura-Lock Roof System Assembly and Installation Instructions Read the instructions before starting the job. They explain the steps required to produce a finished product that will meet factory specifications.
More informationINSTALLATION MANUAL. 2. Check with local utility companies for locations of underground cables or pipe lines.
INSTALLATION MANUAL Install our maintenance free fencing system yourself! About 90% of our residential clientele install our fencing systems themselves. Why hire and pay someone to install it when you
More informationFix Out Carpentry. Carpentry - Residential Construction. Product Code: 5594
E PL SA M Fix Out Carpentry Carpentry - Residential Construction Product Code: 5594 Publishing details: Second Edition 2012 TAFE NSW Training and Education Support, Industry Skills Unit Orange and Granville
More informationSwerve Rack CUSTOM RACKS AVAILABLE
CUSTOM RACKS AVAILABLE Swerve Rack The design of the Swerve mirrors the bike frame, thus providing superior bike support while making it easy to secure both the bike frame and wheel with a standard u-lock.
More informationResidential & Industrial Fence
Page Residential & Industrial Fence Assembly Instructions Congratulations on the purchase of your new Fence System. Your fence has been designed to give you years of trouble free service with only minimal
More informationInstallation Guide. Capped Cellular PVC Fencing. Table of Contents. Storage and Handling Tools Needed Fence Layout and Locating Posts
Capped Cellular PVC Fencing Installation Guide Table of Contents Storage and Handling Tools Needed Fence Layout and Locating Posts Installation instructions 4 x 4 Over Sleeve Post - 3.5 Rail Privacy Shadowbox
More informationKWS Handrail Systems. Architectural Hardware
KWS Handrail Systems Architectural Hardware Technical Information KWS Handrail-Systems - the flexible solution System for handrails in stainless steel and timber Completely pre-assembled or single components
More informationWALCOOM. Walcoom Corporation POST ANCHOR.
WALCOOM Walcoom Corporation Walcoom is a corporate that specialized in producing and selling various wire mesh and relative accessories. The production base of Walcoom Corp. is located in Anping county,
More informationCarpentry. EXAM INFORMATION Items. Points. Prerequisites. Course Length. Career Cluster EXAM BLUEPRINT. 1- Materials, Fasteners & Adhesives 10%
EXAM INFORMATION Items 73 Points 73 Prerequisites NONE Course Length DESCRIPTION This is the first in a sequence of courses that prepares individuals to layout, fabricate, erect, install, and repair wooden
More informationPROPOSED REHABILATION FOR DEYNILE POLICE STATION CENTER PROPOSED REHABILATATION POLICE STATION CENTER IN -DEYNILE- DISTRICT PROJECT: IMPLEMENTED BY:
PROJECT: PROPOSED REHABILATATION CENTER IN -DEYNILE- DISTRICT IMPLEMENTED BY: CLIENT: PROPOSED REHABILATION FOR DEYNILE CENTER PROPOSED REHABILATION CENTER IN - DEYNILE DISTRICT - MAY 2018 DRAWING INDEX
More informationLE7000 Provincial Built-in (Zero Clearance) Kit Instructions.
LE7000 Provincial Built-in (Zero Clearance) Kit Instructions. LE7000 Provincial ZC Kit contains: Part No. Quantity Description Picture 503259 4 Self Threading Screw 13mm 503459 6 Self Threading Screw Timbertites
More informationNRS Installation Manual
NRS Installation Manual Chair Mount Type Standard / EU Spec. KAZE (AY-KFPLU AY-NRS1 is shown.) OTO (AY-OLL AY-NRS1 is shown.) Separate Type (AY-NRS2B-W is shown.) Installer: Read through this installation
More informationDry Toilet, Version 2.0 June 17, 2015
Dry Toilet, Version 2.0 June 17, 2015 Concrete Base When forming the concrete base, make sure it is same or slightly larger dimensions than the wooden base described below. The urine drain pipe is accommodated
More informationHow To Build Decorative. Timber Awnings
How To Build Decorative Timber Awnings How to build a timber awning FOREWORD Timber awnings are a visually pleasing form of window shading. Properly built timber awnings can add value to your property
More information1.1 SUMMARY. A. This Section includes the following: 1. Loose steel lintels. 2. Shelf angles. 3. Metal floor plate. 4. Pipe bollards.
PART 1 - GENERAL 1.1 SUMMARY A. This Section includes the following: 1. Loose steel lintels. 2. Shelf angles. 3. Metal floor plate. 4. Pipe bollards. B. See Division 5 Section "Pipe and Tube Railings"
More informationFRP GATES MM08 FRP GATES Rev. 3 COMPOSITE SOLUTION PAGE 1
FRP GATES MM08 08.02.2016 Rev. 3 FRP GATES COMPOSITE SOLUTION PAGE 1 SUMMARY 1. USES AND CHARACTERISTICS... 3 2. EMPLOYMENT FIELDS... 4 3. MATERIALS... 5 3.1 TABLE OF PROFILES AND STRUCTURAL ACCESSORIES...
More informationPage 1 of Ch 6. A Lecture note on Building Technology By Kishor Thapa
CHAPTER-6 Doors and windows 6.1 Doors: frames, shutters and their fixing details The function of a door is to give access to building and to different parts of the building and to deny the access whenever
More informationInstallation and user manual EFIT 850 sensor
Installation and user manual EFIT 850 sensor GB-DAS 1 Table of content 1 Sensors and control zones 3 1.1 Sensor types and function 3 1.2 Control zones 4 1.3 Assign sensors to control zones 5 2 Placing
More informationAssembly Instructions
18' W x 10' H or 12' H Peak Style Frame Assembly Assembly Instructions Before you start: 2+ individuals recommended for assembly, approximate time 3 hours. Recommended tools: Power Drill, Safety Glasses,
More informationHOME STRENGTHENING GUIDE HOW TO ECONOMICALLY STRENGTHEN YOUR HOUSE AGAINST EARTHQUAKES AND HURRICANES
HOME STRENGTHENING GUIDE HOW TO ECONOMICALLY STRENGTHEN YOUR HOUSE AGAINST EARTHQUAKES AND HURRICANES Grenville W Phillips II BSc, BEng, MASc, MURP, CEng, FIStructE, FCIHT, MAPM, MCSCE, MBAPE Chartered
More informationASSEMBLY GUIDE. Barcelona Pergola. 12 X16 (365CMx487CM) VER /01/19
ASSEMBLY GUIDE Barcelona Pergola 12 X16 (365CMx487CM) VER 1.9 04/01/19 GETTING STARTED First off, allow us to say thank you for the investment you have made in our fine pergola. This pergola is designed
More informationManholes Table of Contents
Standard MH 300 Title Manholes Requirements MH 300.1 Manholes Requirements Manholes Table of Contents Underground Structures Standards MH 310 MH 318 MH 320 MH 325 MH 330 MH 335 MH 340 MH 350 Precast Tub-Type
More informationSCHEDULE OF RATES FOR EXTERNAL REDECORATION AND PRE-DECORATION REPAIRS
SCHEDULE OF RATES FOR EXTERNAL REDECORATION AND PRE-DECORATION REPAIRS GROUNDWORKS...6 Steps... 6 Metal Stairs, Walkways and Balustrades... 6 Balustrades and Handrails - Sundry Repairs... 6 Miscellaneous
More informationCrowdTuff Flat Top Pedestrian Barrier Fencing
Product outline As part of our CrowdTuff powder coated tubular steel fencing range we manufacture a Flat Top style for pedestrian barrier and safety fencing applications. This range of tubular fencing
More informationWAL-MART SUPERCENTER # ; Milwaukie, OR: SPECIFICATIONS. Revisions to Specification Fence
MILWAUKIE OR #3144-00 ADDENDUM #5 NARRATIVE: 11-08-12 WAL-MART SUPERCENTER #3144-00; Milwaukie, OR: SPECIFICATIONS SPECIFICATIONS Revisions to Specification 02822 Fence Spec division 02822 has been revised
More informationWARNING. Not suitable for children under 36 months Contents
For domestic and family use only Children of any age should not be left to play unsupervised Retain Instructions for future reference WARNING. Not suitable for children under 36 months Contents Length
More informationFast and flexible use Powerful results
Fast and flexible use Powerful results CORDLESS DRILLS AND BITS DRILL BIT GUIDE Turbo Stone Brad Point Bit Flat Wood Bit Lewis Auger Bit HSS-G Super-Pro Twist Drill Multimat Allmat Ceramic Master Concrete
More informationWardrobe 3 doors / / /03. Assembly Instructions - Please keep for future reference / / /03
Wardrobe 3 doors Assembly Instructions - Please keep for future reference 208-9058/01 208-1749/02 208-1749/03 208-8494/01 208-1749/02 208-6471/03 Dimensions Width - 153.8 cm Depth - 58.2 cm Height - 216.6
More informationDIY Stevenson Screen Part 1
DIY Stevenson Screen Part 1 Getting The Stevenson Screen Legs Ready 4 inch 10 cm 8 inch 20 cm First Part Screw holes 6 inch 15. m 2nd Part Screw holes 16 inch 40 cm 12 inch 30 cm Each Timber is 34 mm X
More informationE-02 Elev. DS5 E-03. Elev. DS5. S-02 Section DS E-03. Elev.
10.06 39 2.61 6.43 63 30 9 61 30 1.70 5.70 30 43 32 30 8.48 6.10 1.83 35 20 30 5.49 30 1.83 35 20 30 2.74 1.14 1.22 68 31 1.22 30 35 20 Entrance 02 A: 7.51 m2 R 16.62 Toilet 03 A: 1.81 m2 Exhibition Space
More informationCity of Manteca Boarding Requirements
City of Manteca Boarding Requirements There should be no boarding above the first floor unless entry is possible without use of a ladder, and the opening is large enough for a person to easily pass through.
More informationRoof-Top Applications
Roof-Top Non-Penetrating Flat Roof Mounts Pre galvanized mast, base and Rubber Mat Designed for DSS support 103489 103490 103491 103492 103493 FRM Non-Penetrating Roof Mount (1.25" O.D. Tubing, 60" Overall
More informationSolid Pine Shoe Rack And Mirror
Solid Pine Shoe Rack And Mirror Assembly Instructions - Please keep for future reference 346/0348 imensions Width - 50cm epth - 37cm Height - 161cm Important - Please read these instructions fully before
More informationtable of contents Sliding Door Accessories Page Latches & Snuggers Stay Rollers Brackets & Stops
table of contents Square Track & Accessories Pages 4-7 Square Track Options Page 4 Light Duty Track Page 4 Square Track Brackets Page 5 Square Track Accessories Page 5 Square Track Trolleys Page 6-7 Offset
More informationExtension Standard building 10/14
Standard building Extension 10/14 8 Wide Victorian Cedar Greenhouse Extension Assembly Instructions Contents: Introduction Base Preparation Overview Base Assembly Side Assembly Frame Assembly Door Installation
More informationCabonyx Installation Manual
Cabonyx Installation Manual Content Deck-Nyx and Plan-Nyx Installation Page 1 Flooring Products Page 1 Accessories Page 1 Installation Tools Page 2 Preparing Sub-structure Page 2 Installation Page 4 Cautions
More informationPost & Rail Crossbuck
Post & Rail Crossbuck 1. Getting Started 6. Crossbuck Be sure to call underground prior to digging Assemble gates (if necessary) and decide where they will be located Stake out the fence line Space and
More informationSTATE WHEN ORDERING HI =...
STATE WHEN ORDERING HI =... mm Surface treatment of outer walls and night closing doors Stainless steel cladding Special anodized... RAL... Special powder coating...... Surface treatment of door leaves
More informationTYPICAL STANDOFF GLASS RAIL ELEVATION TYPICAL SECTION RS0B20 WITH RECTANGULAR BACK PLATE TYPICAL STAIRS
Revisions By: CRL SRS STANDOFF RAILING SYSTEM CRL GLASS RAIL S RS0B20 w/ RECTANGULAR BACK PLATE CRL'S GLASS RAIL S CAN BE USED FOR MOUNTING GLASS PANELS UP TO 3/4" (19 MM) IN THICKNESS. THE 4" X 8" (102
More informationPole Mount Installation Manual
Pole Mount Installation Manual Thank You for Choosing AIMS Power! 1. AIMS Power is a leading supplier of solar products, specializing in PV mounting systems. We ensure our products are manufactured to
More informationCURVED ROOF ASSEMBLY INSTRUCTIONS ATTACHED VERANDAH. Your supplementary guide to building an ATTACHED CURVED ROOF VERANDAH or PATIO BEFORE YOU START
ROOF ATTACHED VERANDAH ASSEMBLY INSTRUCTIONS Your supplementary guide to building an ATTACHED ROOF VERANDAH or PATIO This set of instructions should be used in conjunction with the Stratco instruction
More informationVCL Aluminium Fitting Instructions
VCL Aluminium Fitting Instructions Assembly Do not attempt to use this loft ladder until it has been properly installed and stages 1-3 have been completed. It is recommended that the installation is carried
More information