2 N O : SEPT DRAWING INDEX SHEET N O DRAWING N O DRAWING CONTENT /15 Cover Page.. /15 Drawing Index /15 Location /15 Site analysis.. /15 Site Photos /15 Proposed master plan /15 3D Models MARKET /15 Architectural Drawings /15 Elevations /15 Elevations /15 Section /15 Structural drawings_roof /15 Structural drawings_foundation. TOILETS /15 Architectural Drawings /15 Area Schedule. SIGNED & STAMPED:
3 Latitude Longitude Elevation SITE LOCATION N O : SHEET N O : 03/15
4 New market to be built Proposed new (2 No.) toilets SITE ANALYSIS N O : SHEET N O : 04/15
5 SITE PHOTOS N O : SHEET N O : /15
6 RWP RWP RWP RWP Service gate to fabricator's detail. Service gates to fabricator's detail. Proposed building to be positioned on the center of the existing plot as measured on the ground. ROOF: Eve overhang=600mm, Pitch=30degrees to details. Service gate to fabricator's detail. PROPOSED MASTERPLAN N O : SHEET N O : 06/15
7 - GARBAHAREY DISTRICT - 3D MODELS NO: SHEET NO: O DRAWING N : 07/15
8 A B C D 2,100 1,600 2,100 2,800 2,000 2,800 2, E-01 8,000 GATE 1, , ,2 7, GATE 1,600 E , S-01 E-03 23, X R.C. columns, for structure; see S.E. details. 3, 3, 3, 2, 3, 3, 3, 2,700 2,700 2,700 1,600 2,700 2,700 2,700 mm steps. SERVICE GATES: 1600mm wide M.S. gates primed and painted to fabricator's details. 2,9 3, GATE 3, 2,000 3, 3, 2,9 mm steps. MARKET HALL Smooth F.F. COUNTERTOPS: R.C. countertops with plastered finish to approval. for structure; see S.E. details. S- 22,600 3, GATE 2,000 10,800 E- FLOORPLAN LAYOUT FLOOR LAYOUT_MARKET N O : SHEET N O : 08/15
9 1, , ,100 D C B A 2,800 2,000 2,800 Gauge 28 prepainted blue colour iron resincot roofing sheets nailed on sawn hardwood structure; see S.E. details. Roof pitch=30degrees. R.C. columns; see S.E. details. P.V.C. rainwater gutters and downpipes fixed to approval. 2,100 1,600 2, 0 P.C. ventblocks fixed to approval. E-01 Front Elevation , 3, 3, 2, 3, 3, 3, Gauge 28 prepainted blue colour iron resincot roofing sheets nailed on sawn hardwood structure; see S.E. details. Roof pitch=30degrees. R.C. columns; see S.E. details. 2,700 1,600 2, P.C. ventblocks fixed to approval. P.V.C. rainwater gutters and downpipes fixed to approval. E- Side Elevation 01 ELEVATIONS N O : SHEET N O : 09/15
10 1,9 2, , , 3, 3, 2, 3, 3, 3, Gauge 28 prepainted blue colour iron resincot roofing sheets nailed on sawn hardwood structure; see S.E. details. Roof pitch=30degrees. P.C. ventblocks fixed to approval. 2,700 2, mm thick concrete hollow-blocks walls with plaster and paint finish to approval. 1600mm wide M.S. service gates primed and painted to fabricator's details. E-03 Side Elevation mm steps. A B C D 2,800 2,000 2,800 Gauge 28 prepainted blue colour iron resincot roofing sheets nailed on sawn hardwood structure; see S.E. details. Roof pitch=30degrees. R.C. columns; see S.E. details. P.V.C. rainwater gutters and downpipes fixed to approval. 2, 1,600 2, 0 mm thick concrete hollow-blocks walls with plaster and paint finish to approval. E-04 Rear Elevation ELEVATIONS N O : SHEET N O : 10/15
11 1,000 2,100 2, ,000 2, A B C D 2,800 2,000 2,800 Gauge 28 prepainted blue colour iron resincot roofing sheets nailed on sawn hardwood structure; see S.E. details. Roof pitch=30degrees. R.C. ring-beam; see S.E. details. P.V.C. rainwater gutters and downpipes fixed to approval. R.C. columns; see S.E. details. SERVICE GATES: 1600mm wide M.S. gates primed and painted to fabricator's details , mm thick concrete hollow-blocks walls with plaster and paint finish to approval. X25mm hardwood facia-board painted to approval. P.C. ventblocks fixed to approval. R.C. countertops with plastered finish to approval. for structure; see S.E. details. mm thick R.C. slab with B.R.C. mesh and D.P.M. cast on well compacted hardcore infill with anti-termite treatment and blinding layer; see S.E. details. S-01 Lateral Section R.C. strip footing with mm thick masonry foundation walling; see S.E. details HANGING FIXTURES: 15mm diameter 0X1100mm height M.S. hanging structures fixed appropriately into concrete countertops, primed and painted to fabricator's details. R.C. columns; see S.E. details. P.V.C. rainwater gutters and downpipes fixed to approval. R.C. countertops with plastered finish to approval. for structure; see S.E. details , 3, 3, 2, 3, 3, 3, Gauge 28 prepainted blue colour iron resincot roofing sheets nailed on sawn hardwood structure; see S.E. details. Roof pitch=30degrees. 3, 1,600 3, 2,000 3, 3, 7 mm thick concrete hollow-blocks walls with plaster and paint finish to approval. R.C. ring-beam; see S.E. details. X25mm hardwood facia-board painted to approval. P.C. ventblocks fixed to approval. mm thick R.C. slab with B.R.C. mesh and D.P.M. cast on well compacted hardcore infill with anti-termite treatment and blinding layer; see S.E. details. S- Longitudinal Section R.C. strip footing with mm thick masonry foundation walling; see S.E. details. SECTION N O : SHEET N O : 11/15
12 1,125 1, 1, 1, 1, 1, 1,131 1, , NAILING AREA 2/xmm OR mm THICK COLLAR PLATE EACH FACE mm DIA. M.S HOLD DOWN 0 C/C DETAIL `B' ( 1:20) 2/mm THICK COLLAR PLATES (E.F.) RING BEAM NAILING AREA DETAIL `C' ( 1:20) xmm TRUSS MEMBER mm THICK COLLAR PLATE xmm TRUSS MEMBER XMM TIMBER RAFTER TYPICAL NAILING PATTERN ( 1:20) 2 No. 8mm Dia. Bolt X165X3 ANGLE CLEAT BOLTED TO THE 100X TIMBER RAFTER EF. 25 xmm TRUSS MEMBER B mm THICK COLLAR PLATE 1,125 1, 1, 1,238 1,680 1,680 1,680 1,680 1,680 1,680 1,680 1,680 1,680 1,240 1, 1, 1,125 FILLET WELD MM DIA. CIRCULAR SECTION WELDED TO THE XX3.0MM RHS 25 B 25 xmm TRUSS MEMBER SECTION A-A 1:10 SEC. B-B ( 1:20) A 20 C TRUSS T1 = 1:25 STRUCTURAL DETAILS N O : SHEET N O : 12/15
13 28 0 (23) 23R10-SA Cover: Bot:75 mm R10-SA m m T H IC K H A R D C O R E C O M P A C T E D IN L A Y E R S 01 Sides: mm Top: mm Cols:30 mm 8Y12-- B2 BR C M ESH 42 4Y SECTION: col1 DET ON SITE 8Y B1 125 COUNTER TOP DETAILS 2Y12 304Y SECTION A-A HODAN DISTRICT SIGALE MARKET Bot:75 mm 01 Sides: mm Top: mm Cols:30 mm Cover: 2Y12 243Y10-07 B1 5 0 m m B L IN D IN G RING BEAM SECTION 600 T O B E D E T E R M IN E D O N S IT E 3 Y a EXTERNAL WALL STRIP FOOTING 6Y B1 1 2 COUNTER TOP DETAILS m m T H IC K H A R D C O R E C O M P A C T E D IN L A Y E R S DET ON SITE 18Y Y col1 TYPICAL BASE AND COLUMN 0 ( 2 )( 2 ) 6Y TYPICAL BASE AND COLUMN Y B RING BEAM LAYOUT SECTION A-A HODAN DISTRICT SIGALE MARKET 304Y Y12 4Y R10-SA RING BEAM SECTION RING BEAM SECTION R10-SA col BR C M ESH m m T H IC K H A R D C O R E C O M P A C T E D IN L A Y E R S 243Y10-07 B1 Cover: 5 0 m m B L IN D IN G 8Y B (23) 23R10-SA- 4Y16- DP BR SECTION: c 8Y B BR C M ESH 42 STRUCTURAL DETAILS NO: SHEET NO: col1 TYPICAL BASE AND COLUMN DET ON SITE EXTERNAL WALL STRIP FOOTING EXTERNAL WALL STRIP FOOTING BR C M ESH m m T H IC K H A R D C O R E C O M P A C T E D IN L A Y E R S TYPICAL BASE AND COLUMN 0 23R10-SA- TYPICAL BASE AND COLUMN 0 0 ( 2 )( 2 ) 6Y8-6Y T1 6Y T1 BASE PLAN 4Y8-07 T (2) 4Y (2) 6Y B 6Y Y A SC 133 ENTRANCE STEPS DE 3Y B2 6Y8--2 T1 6Y B1 6Y Y8--2 D P C M ESH 42 E SHEET - GARBAHAREY DISTRICT Y DUST Sides: mm Top: mm Cols:30 mm 0 FOUNDATIONS LAYOUT Bot:75 mm 01 3 Y a m m T H IC K H A R D C O R E C O M P A C T E D IN L A Y E R S 2800 SECTION: col1 BR C M ESH BRC MESH 2 DET ON SITE BRC MESH 42 BRC MESH BASE PLAN T O B E D E T E R M IN E D O N S IT E 0 42 BRC MESH FOUNDATION LAYOUT (23) SECTION: col D RING BEAM LAYOUT 23R10-SA- 0 2Y12 8Y12-- B2 RING (23) Y O DRAWING N : 13/15 8Y12-- B2 col1 25 6Y8--2 C 6Y8--2 B1 6Y T1 6Y T1 BASE PLAN 4Y8-07 T (2) 4Y (2) A 3 3Y B2 6Y8--2 T1 6Y B1 6Y Y8--2 6Y B 6Y Y A SC 133 ENTRANCE STEPS DETAILS 5Y10-- 5Y10-23R10 0 BR C M ESH 42 BR C M ESH 42 D m m T H IC K H A R D C O R E C O M P A C T E D IN L A Y E R S BR C M ESH m m T H IC K H A R D C O R E C O M P A C T E D IN L A Y E R S A
14 1,900 2,133 1,000 4, ,100 3, 4,3 6 3, ,800 1,000 1, mm diameter P.V.C. vent pipe with fly screen mesh top. CD- Parapet Coping Detail w.h.b w.h.b D1 D1 Ladies Gents w2 w ,000 1,900 1, FLOOR LAYOUT 2 number 1000litres P.V.C. cold water storage tanks on structural bearers to approval. Toilets fitted with wash-pipes, toilet paper holders,electric air hand dryers and mirrors above all W.H.B.s to fitting specialist's details. mm thick R.C. slab above laterine pit; see S.E. details. 600X600mm fly tight manhole cover. Ground level. LATERINE PIT: 3x3x4m deep pit. Lining of edges up to bottom of pit if in loose formation or in areas with ground water. 1, , LADIES GENTS mm thick concrete coping on parapet wall to detail. mm thick waterproofed R.C. roof-slab,for structure; see S.E. details. P.C. ventblocks fixed to approval. Aluminium windows to fabricator's details. 0mm height concrete hollow-blocks partition walls with plaster and paint finish to approval. Ceramic sanitary fittings to approval. mm thick R.C. slab with B.R.C. mesh and D.P.M. cast on well compacted hardcore with anti-termite treatment and blinding layer; see S.E. details. R.C. foundation with mm thick masonry foundation walling; see S.E. details. SECTIONAL ELEVATION T-T D ,460 DUMPING PIT (FLOOR PLAN) VRC slab 800 1,6 Pit Masonry walling G.l 2,000 1,900 1, ELEVATION T1 ELEVATION T2 ELEVATION T3 DUMPING PIT (SECTION) N O : SHEET N O : 14/15
15 FLOOR AREA SCHEDULES MARKET SPACE USE FLOOR AREA (M 2 ) REMARKS MARKET HALL REHABILITATION. LADIES 4 NEW CONSTRUCTION. GENTS 4 TOTAL FLOOR AREA: 187.4M 2 AREA SCHEDULE N O : SHEET N O : 15/15
ROOM smooth cement f.f FLOOR LAYOUT
3,300 3,600 4,100 2,159 1,000 1,241 ROOM smooth cement f.f 168 900 1,091 1,000 1,241 4,400 FLOOR LAYOUT FLOOR LAYOUT CARTAKERS ROOM 2,159 1,000 1,241 SOUTH ELEVATION EAST ELEVATION 1,241 1,000 1,091 900
More informationTypical Drawings for Schools
0.85 1.7 0.85 3 3 0.6 3 3 0.85 1.7 0.85 0.3 4 4 1 1 2 2 0.425 0.425 0.425 0.425 1.2 2.4 1.2 0.6 0.6 4 4 1 1 3 3 0.4 0.6 0.3 0.3 3 3 4 4 0.4 4 4 1 1 2 2 Detail of (W 1.2 x 0.4 m) Detail of (W0.6 x 0.4 m)
More informationPROPOSED REHABILATION FOR DEYNILE POLICE STATION CENTER PROPOSED REHABILATATION POLICE STATION CENTER IN -DEYNILE- DISTRICT PROJECT: IMPLEMENTED BY:
PROJECT: PROPOSED REHABILATATION CENTER IN -DEYNILE- DISTRICT IMPLEMENTED BY: CLIENT: PROPOSED REHABILATION FOR DEYNILE CENTER PROPOSED REHABILATION CENTER IN - DEYNILE DISTRICT - MAY 2018 DRAWING INDEX
More informationGSPublisherVersion PROPOSED REHABILATATION DR.AYUB FOOTBALL STADIUM IN - BAIDOA -
GSPublisherVersion 0.0.00.00 PROPOSED REHILTTION DR.YU FOOTLL STDIUM IN - IDO - PROPOSED REHILITTION DR.YU FOOTLL STDIUM IN - IDO - 0. 0. 0. 04. SHEET N O 0/4 0/4 0/4 04/4 DRWING N O June 08 DRWING INDEX
More informationGROUND FLOOR PLAN S.F. 2 Bedroom - 1Bath 2 Storey (First Floor Only) FIRST FLOOR PLAN S.F. 2 Bedroom - 1Bath 2 Storey (First Floor Only)
3 5' ' 5' ' -0" High Wall -6" W W bedroom x ' carpet fl. fin. W bedroom ' x ' carpet fl. fin. W ' D3 5' 6' 5' D W3-8" x 8'-8" D4 ceramic tile fin. kitchen '- 8' x 8'-8" ceramic tile fin. D3 4 bath 5' -8"
More informationDESCRIPTION QTY UNIT RATE AMOUNT ELEMENT NO.1 SUBSTRUCTURES. Excavations
ELEMENT NO.1 SUBSTRUCTURES Excavations B Clear site of all shrubs and undergrowth including grubbing up of roots and dispose off as directed. Excavate oversite average 150mm deep and cart away as directed
More informationEast African Roofing Systems Ltd.
East African Roofing Systems Ltd. Iron Sheet Super Tiger sheets are made from pre-painted galvanized iron sheets and combines increased longevity with low maintenance costs. Super Tigersheets are suitable
More informationbedroom CROSS SECTION FLOOR PLAN S.F. 1 Bedroom Flat kitchen 6'-8" x 8' bath bedroom 10' X 10' FLOOR PLAN AND CROSS SECTION 1BF / 01 Gr. Lev.
0'42 3 0'- 8' 2' 2' 2-8" 0' '- 2' '- See Roof Framing Plan And Roof Anchorage Details W2 W 8" 6'-8" kitchen 6'-8" x 8' bath 6'-8"x -8" D3 2'- 2'- 2'-8" D D2 0' X 0' W 0' 0'-8" ' Steel Framed Window Gr.
More informationMH Table of Contents Standard Title/Scope Page Table of Contents SCE Public
MH Table of Contents Standard Title/Scope MH 300 MH 310 MH 318 MH 320 MH 325 MH 330 MH 335 MH 340 MH 350 Manholes Requirements MH 300.1 Manholes Requirements...........................................
More informationManholes Table of Contents
Standard MH 300 Title Manholes Requirements MH 300.1 Manholes Requirements Manholes Table of Contents Underground Structures Standards MH 310 MH 318 MH 320 MH 325 MH 330 MH 335 MH 340 MH 350 Precast Tub-Type
More information24 X32 3 CAR GARAGE POLE BARN STYLE FRAME
24 X32 3 CAR GARAGE POLE BARN STYLE FRAME 3 ENTRY DOOR 2 WINDOWS, 1 @ EA. END 1-16 X8 GARAGE DOOR 1-9 X8 GARAGE DOOR 4 CONCRETE SLAB 10 WALLS 4/12 PITCH METAL ROOF METAL SIDING INDEX PAGE DESCRIPTION 1
More informationHOME STRENGTHENING GUIDE HOW TO ECONOMICALLY STRENGTHEN YOUR HOUSE AGAINST EARTHQUAKES AND HURRICANES
HOME STRENGTHENING GUIDE HOW TO ECONOMICALLY STRENGTHEN YOUR HOUSE AGAINST EARTHQUAKES AND HURRICANES Grenville W Phillips II BSc, BEng, MASc, MURP, CEng, FIStructE, FCIHT, MAPM, MCSCE, MBAPE Chartered
More informationSubstation 33/11kV. General Notes. Drawn by: Hewa Qader Mustafa. Soran Rostam Aziz. C-For footings = 75 mm. B-For beams & columns = 40 mm.
General Notes Unless otherwise noted, All the dimensions are given in meter. Do not scale from these drawings. These drawings are proposed drawings. All structural drawings should be read in conjunction
More informationA1-1 D O R S E T A V E N U E SITE PLAN SITE PLAN
-2,000 MORNING PATIO ±0 D O R S E T A V E N U E -2,800 SITE PLAN SCALE 1:200 CHECK ALL DIMENSIONS AND LEVELS ON SITE PRIOR TO CONSTRUCTION, REPORT ANY DISCREPANCIES TO THE ER SK 21.03.2014 SITE PLAN 21.03.14
More informationCarpentry. EXAM INFORMATION Items. Points. Prerequisites. Course Length. Career Cluster EXAM BLUEPRINT. 1- Materials, Fasteners & Adhesives 10%
EXAM INFORMATION Items 73 Points 73 Prerequisites NONE Course Length DESCRIPTION This is the first in a sequence of courses that prepares individuals to layout, fabricate, erect, install, and repair wooden
More informationMSD STANDARD DRAWINGS LOUISVILLE AND JEFFERSON COUNTY METROPOLITAN SEWER DISTRICT 700 WEST LIBERTY STREET LOUISVILLE, KENTUCKY
MSD M etr o p olitan S e w e r Di s t r ict STANDARD DRAWINGS LOUISVILLE AND JEFFERSON COUNTY METROPOLITAN SEWER DISTRICT 700 WEST LIBERTY STREET LOUISVILLE, KENTUCKY 40203-1911 STANDARD DRAWINGS DIVISION
More informationLAND PORTS AUTHORITY OF INDIA
LAND PORTS AUTHORITY OF INDIA DEPARTMENT OF BORDER MANAGEMENT MINISTRY OF HOME AFFAIRS, GOVERNMENT OF INDIA TENDER DOCUMENTS FOR DEVELOPMENT OF INTEGRATED CHECK POST SUPPLY AND FIXING SIGNAGE, AT JOGBANI
More informationINSTALLATION GUIDE. Outback. Flat Attached BEFORE YOU START ADDITIONAL MATERIALS TOOLS REQUIRED. VERAnDAHS PATIOS CARPORTS
INSTALLATION GUIDE Outback VERAnDAHS PATIOS CARPORTS Flat Attached BEFORE YOU START It is important to check your Local Government Authority requirements before the installation of your new Stratco Outback
More informationWHY YOU SHOULD USE TUFFLOOR. components
Tuffloor DESIGN GUIDE WHY YOU SHOULD USE TUFFLOOR Strong and Easily Installed Tuffloor is a steel floor framing system designed for strength and ease of installation, and is an easy and economical alternative
More informationPONDICHERRY UNIVERSITY ENGINEERING WING SCHEDULE OF WORK
PONDICHERRY UNIVERSITY ENGINEERING WING SCHEDULE OF WORK Name of work: Annual Maintenance and Special repairs of Hostels, Thiruvalluvar Stadium, Vice-Chancellor s Official Residence, Department of Physical
More informationDUTCH GABLE FREESTANDING CARPORT
DUTCH GABLE FREESTANDING CARPORT STRATCO OUTBACK ASSEMBLY INSTRUCTIONS. Your complete guide to building a FREESTANDING Outback DUTCH GABLE CARPORT BEFORE YOU START Carefully read these instructions. If
More information2D Drawings Levels of Detail Specification
2D Drawings Levels of Detail Specification March 2018 2D Measured Building Survey Level of detail Level of detail should be chosen based on the intention that the final drawings will be used for. It should
More informationOUTBACK FLAT ATTACHED VERANDAH PATIO CARPORT - INSTALLATION GUIDE BEFORE YOU START TOOLS REQUIRED ADDITIONAL MATERIALS
BEFORE YOU START It is important to check your Local Government Authority requirements before the installation of your new Stratco Outback Flat Verandah. It is the builder s responsibility to ensure any
More informationNepal Housing Reconstruction Programme
Nepal Housing Reconstruction BUILDING DESIGN Submitted By Nepal Housing Reconstruction September, 2016 MODEL SMC None TECHNICAL DETAIL (Progressive Expansion Provision) Build Change FRONT ELEVATION RIGHT
More informationAcceptable Standards of Domestic Construction
Truss or Rafter Roof Batten Triple grip fastener (for roof trusses) Foil lined Insulation blanket Top plate Sprocket Brick tie Top plate strapping at 1200mm max. cts. Note: Holding down straps should be
More informationClopay Models 835/837 Sliding Door System Installation Guide
Clopay Models 835/837 Sliding Door System Installation Guide The aim of this instruction is to guide you through the process of construction and fitting of Sliding Doors. Due to the number of sizes available
More informationHow-To-build guide carport
How-To-build guide carport What you can build using this guide This guide will show you how to build a free-standing, open-sided single carport. Before you begin building Contact your local territorial
More informationTAGA BLOWHOLES P R O P O S E D T O I L E T B L O C K & V I E W I N G P L A T F O R M GEF CLIMATE RESILIENCE PROJECT TAGA, SAVAI'I, SAMOA
TAGA BLOWHOLES P R O P O S E D T O I L E T B L O C K & V I E W I N G P L A T F O R M GEF CLIMATE RESILIENCE PROJECT, SAMOA Sheet Number A000 A00 A00 A0 A0 A00 A0 A50 A50 A50 H0 H0 H0 Sheet List Sheet Name
More informationCURVED ROOF ASSEMBLY INSTRUCTIONS ATTACHED VERANDAH. Your supplementary guide to building an ATTACHED CURVED ROOF VERANDAH or PATIO BEFORE YOU START
ROOF ATTACHED VERANDAH ASSEMBLY INSTRUCTIONS Your supplementary guide to building an ATTACHED ROOF VERANDAH or PATIO This set of instructions should be used in conjunction with the Stratco instruction
More informationTENDER ISSUE GH GUARD HUT PLAN SCALE 1:25. Guard Hut RL = Driveway NOTES KEY FOR WALL REFERENCE KEY FOR FLOOR FINISHES
800 00 NOTES. Confirm all dimensions on site prior to construction. Whole of exterior and interior of new building to be painted as per rchitects. ll floor tiles to be laid as per rchitects Planter Sliding
More informationManhole or Catch Basin Type A & B Cone Sections Precast - Design F Manhole or Catch Basin Cover (Reducer Cone Section Precast) Design D
MINNESOTA DEPARTMENT OF TRANSPORTATION DEVELOPED BY: Design Standards ISSUED BY: Office of Program Management and Technical Support, Design Support Section TRANSMITTAL LETTER NO. (14-02) MANUAL: Standard
More informationDOCUMENT LIST OF DRAWINGS, TABLES AND SCHEDULES
DOCUMENT 00 0115 LIST OF DRAWINGS, TABLES AND SCHEDULES DRAWINGS GENERAL A0.0 COVER SHEET ADDENDUM #2 revised A0.01 TITLE SHEET ADDENDUM #2 revised CIVIL C1.0 TOPO C2.0 DEMOLITION C3.0 TEMPORARY STREET
More informationSHED PACK Step 1: Choose your shed type.
SHED PACK Step 1: Choose your shed type. Industrial Shed Open FarmShed Shed Pack / Types of Sheds Drawing # S0104.A001 Hanger Shed =DISCLAIMER= Please read and agree to Purlin Brackets Terms and Conditions
More informationGable HomeshedsTM INSTALLATION BEFORE YOU START TOOLS REQUIRED GUIDE LARGE SPAN. Council Approval. Before Starting
INSTALLATION GUIDE Gable HomeshedsTM LARGE SPAN BEFORE YOU START Council Approval It is important to contact your local council before building your Stratco Gable Homeshed. You will have already received
More informationSCHEDULE OF RATES FOR EXTERNAL REDECORATION AND PRE-DECORATION REPAIRS
SCHEDULE OF RATES FOR EXTERNAL REDECORATION AND PRE-DECORATION REPAIRS GROUNDWORKS...6 Steps... 6 Metal Stairs, Walkways and Balustrades... 6 Balustrades and Handrails - Sundry Repairs... 6 Miscellaneous
More informationBUILDING PLANS. BUILDING DEPARTMENT
BUILDING PLANS BUILDING DEPARTMENT 952-446-1660 www.cityofminnetrista.com This handout is intended only as a guide and is based in part on the 2015 Minnesota Residential Code, Minnetrista City ordinances,
More informationSHEET 1 OF 1 SCALE A1 A3 1: 200. SITE LAYOUT Scale 1:200 GLP TOTTENHAM ROAD
CLASSROOMS EXSISTING CONCRETE PATH EXSISTING FENCE 10785 2975 240 2,975 GRAVEL 1,350 3,000 PROPOSED PAVILION STRUCTURE 15000 EXSISTING VEGETATION PROPOSED RAIN GARDEN PROPOSED WATER TANK SERVICES JUNCTION
More informationInternal joint strap bedded in silicone mastic supplied by the manufacturer and secured with stainless steel bolts with coated heads.
CI/SfB (52.5) lh4 Oct 2012 Arundel Range DATA SHEET Description This extruded aluminium gutter faithfully reproduces the shape of the Moulded 46 Ogee gutter which in cast iron was used on many traditional
More informationPINEHAVEN SHEDS Assembly Instructions FOR LEAN-TO SHEDS
PINEHAVEN SHEDS Assembly Instructions FOR LEAN-TO SHEDS GARDEN PRODUCTS www.pinehavensheds.co.nz 5/16 hex drive bit, By asking about our products at your nearest DIY or gardening store www.pinehavensheds.co.nz
More informationStrands & Standards CARPENTRY 2
Strands & Standards CARPENTRY 2 COURSE DESCRIPTION This is the second in a sequence of courses that prepares individuals to layout, fabricate, erect, install, and repair wooden structures and fixtures
More informationSafety Glasses Safety Gloves Ladders Measuring Tape Spirit Level String Line. Tin-Snips Rivet Gun Caulking Gun Silicone Socket Set
BEFORE YOU START Carefully read these instructions and refer to them constantly during each stage of construction. If you do not have all the necessary tools or information, contact Stratco for advice.
More informationAFU 'A'AU WATERFALL P R O P O S E D T O I L E T B L O C K & G A T E GEF CLIMATE RESILIENCE PROJECT VAILOA, PALAULI, SAVAI'I, SAMOA
AFU 'A'AU WATERFALL P R O P O S E D T O I L E T B L O C K & G A T E GEF CLIMATE RESILIENCE PROJECT VAILOA, PALAULI,, SAMOA Sheet Number A000 A00 A00 A00 A0 A0 A00 A0 A50 A50 A50 H0 H0 H0 Sheet List Sheet
More informationWALL TO FABRICATED FLOOR
WALL TO FABRICATED FLOOR PERIMETER WALL IS HELD IN PLACE BY WOODEN STRIP SCREED OPTIONAL NSF COVED FLOOR IS SHOWN PARTITION WALL IS HELD IN PLACE BY WOODEN STRIP SCREED OPTIONAL NSF COVED FLOOR IS SHOWN
More informationSHED PACK. Sheds are commonly constructed using portal frames.
SHED PACK Sheds are commonly constructed using portal frames. This pack relates to purchasing portal frame purlin bracket sets. Ruest our free generic engineered and certified shed plans. SHED PACK Step
More informationF-5-1a. Concrete Bollards (Detail 1 of 2) WEIGHT: 166kg. WEIGHT: 227kg. WEIGHT: 113kg. WEIGHT: 212kg
Contents F-5-1a Concrete Bollards F-5-1b Concrete Bollards F-5-2 Concrete Bollards with City Logo F-5-3 Cast Iron Bollards F-5-4 Decorative Steel Bollard F-5-5 Swivel P Gate Steel Bollard F-5-6 Steel Bollard
More informationDrawing Title - MS Base frame Size - 20' x 10' x 8.5'
Plan of MS Base frame (size 0' x 0' x.5') SIDE VIEW ELEVATION Material of MS Base frame (50mm x 65mm x.5mm thick) & RHS (Rolled Hollow Section) --- 0mm x 0mmx.5mm thick Drawing Title - MS Base frame Size
More informationHall of Waters List of Historic Drawings
List of Historic Drawings The following represents the historic drawings of the PROJECT PWA PROJECT NUMBER JOB NUMBER SHEET NUMBER SHEET TITLE DATE NOTES 1935 Drawing Piping Layout at Tank Room for Mineral
More informationTRADITIONAL GABLE ATTACHED PATIO AND CARPORT. Your complete guide to building an ATTACHED Outback TRADITIONAL GABLE PATIO or CARPORT
TRADITIONAL GABLE ATTACHED PATIO AND CARPORT STRATCO OUTBACK ASSEMBLY INSTRUCTIONS. Your complete guide to building an ATTACHED Outback TRADITIONAL GABLE PATIO or CARPORT BEFORE YOU START Carefully read
More informationINSTALLATION GUIDE. Flat Roof Homesheds TM. Onto Concrete BEFORE YOU START TOOLS REQUIRED
INSTALLATION GUIDE Flat Roof Homesheds TM Onto Concrete BEFORE YOU START It is important to check your Local Government Authority requirements before the installation of your new Stratco Flat Roof Homeshed.
More informationOutback Gable CLEARSPAN ATTACHED
It is important to check your Local Government Authority requirements before the installation of your new Stratco Outback Flat Verandah. It is the builderʼs responsibility to ensure any existing structure
More informationCarpentry Level 1, 2014
A Correlation of Carpentry Level 1, Utah Core Curriculum for Resource Title: Carpentry Publisher: Pearson Education publishing as Prentice Hall ISBN: SE: 9780133403800 Media (text, software, internet,
More informationCONCRETE MANHOLES.
CONCRETE CONCRETE SHAW PIPE produces circular, precast, concrete manholes in diameters 1050mmØ through 3000mmØ. Precast, concrete manholes are most frequently used for pipeline and sewer entry and are
More information1.1 SUMMARY. A. This Section includes the following: 1. Loose steel lintels. 2. Shelf angles. 3. Metal floor plate. 4. Pipe bollards.
PART 1 - GENERAL 1.1 SUMMARY A. This Section includes the following: 1. Loose steel lintels. 2. Shelf angles. 3. Metal floor plate. 4. Pipe bollards. B. See Division 5 Section "Pipe and Tube Railings"
More informationTECHNICAL DRAWING GUIDE
Budapest University of Technology & Economics (BME) Faculty of Architecture Department of Building Constructions 2017 + TECHNICAL DRAWING GUIDE Edited by Dr Zsuzsanna Fülöp and Aryan Choroomi based on
More informationDESIGN GUIDELINES (SD) COUNTY OF ALAMEDA PUBLIC WORKS AGENCY 399 ELMHURST STREET HAYWARD, CA
DESIGN GUIDELINES (SD) COUNTY OF ALAMEDA PUBLIC WORKS AGENCY 399 ELMHURST STREET HAYWARD, CA 94544-1395 PUBLIC WORKS DESIGN GUIDELINES TABLE OF CONTENTS SD-100 SERIES SPECIAL DRAWINGS SD-100 8/1991 SILT
More informationBUILDING PLANS. BUILDING INSPECTIONS DEPARTMENT
BUILDING PLANS BUILDING INSPECTIONS DEPARTMENT 507-537-6773 www.ci.marshall.mn.us This handout is intended only as a guide to the subject matter covered herein and is based in part on the 2015 Minnesota
More informationCore Curriculum Carpentry 1 Carpentry 2 Carpentry 3
A Correlation of Core Curriculum Carpentry 1 Carpentry 3 To the Carpentry II Course Standards and Objectives to the Content Standards Resource Title: Core Curriculum: Introductory Craft Skills, Fifth Edition
More informationTELESCOPIC GATE MANUFACTURING AND INSTALLATION MANUAL.
TELESCOPIC GATE MANUFACTURING AND INSTALLATION MANUAL. Telescopic gates have been manufactured for many years essentially in the same way they are largely today. In recent years hardware suppliers have
More informationTechnical Data Sheet Pergolas and Carports
Recommended Practice / March 2006 Introduction This data sheet contains Timber Queensland s recommendations for attached and detached timber pergolas and carports with relatively flat skillion roofs and
More informationCOMPILATION OF TENDER DOCUMENTS
COMPILATION OF TENDER DOCUMENTS Arc. Ibrahim A. Haruna, FNIA, PNIA, mni. -the familiar question!- Mr. Architect, after these your beautiful drawings, what next? ARCHITECT S PROCEDURE: -drawing board to
More informationTimber to Timber - Timber to Concrete - Timber to Steel
01/2017 TIMBER CONNECTORS NOT TO BE USED IN EXTERIOR SITUATIONS Stainless Steel alternatives are available where stated Timber to Timber - Timber to Concrete - Timber to Steel MiTek manufactures and markets
More information-SQA-SCOTTISH QUALIFICATIONS AUTHORITY. Hanover House 24 Douglas Street GLASGOW G2 7NG NATIONAL CERTIFICATE MODULE DESCRIPTOR
-SQA-SCOTTISH QUALIFICATIONS AUTHORITY Hanover House 24 Douglas Street GLASGOW G2 7NG NATIONAL CERTIFICATE MODULE DESCRIPTOR -Module Number- 0065213 -Session-1986-87 -Superclass- -Title- TM STRUCTURAL
More informationNEW equinox INSTALLATION GUIDE Issue
NEW equinox INSTALLATION GUIDE Issue 1 CONTENTS If in doubt at any stage 1. Preparing the ring beam 2 2. Installing the framework 3 3. Insulation and waterproofing 7 4. Tile application: Steel tiles 9
More informationNORMAL WEIGHT CONCRETE TOTAL-LEWIS-DECK GYPSUM BOARD 2 OR 3-PLY COMPOSITE TOTALJOIST TOP CHORD CONNECTION
GENERAL DETAILS 100 TYPICAL FLOOR CONSTRUCTION NORMAL WEIGHT CONCRETE WELDED WIRE MESH FIBERGLASS BATT INSULATION (OPTIONAL) 18 GAUGE TIE WIRE 7/8" RESILIENT CHANNEL NOTE: CEILING MAY ALSO BE SUSPENDED
More informationResidential Room Addition / Remodel Submittal Requirement Checklist
City of Elko Building Department 1753 College Avenue Elko, Nevada 89801 (775) 777-7220 fax (775) 777-7229 Residential Room Addition / Remodel Submittal Requirement Checklist TWO COMPLETE SETS OF PROPERLY
More informationPipe Product Catalog Table of Contents
Pipe Product Catalog Table of Contents Section A: Drawing #: Page Description A1 Reinforced Concrete Pipe A3 Storm Manhole Sizing Chart (48" - 96") A3.1 Storm Manhole Sizing Chart (108" - 144") A4 48"
More informationBarrier posts of steel tube Ø 76 mm, Ø 89 mm, 70 x 70 mm
of steel tube Ø 76 mm, Ø 89 mm, 70 x 70 mm Steel tube Ø 76, Ø 89, 70 x 70 mm with welded steel cap approx. 900 mm above ground, total length 1400 mm hot-dip galvanized and yellow coated with black stripes
More information6ft 5 (1.96m) Wide Victorian Greenhouse Specification
6ft 5 (1.96m) Wide Victorian Greenhouse Specification Cedar Alton uses only the finest Western Red Cedar (Thuja Plicata) for the framework and cladding sourced entirely from sustainable forests. Famed
More informationPROGRAMMING SCHEMATIC DESIGN DESIGN DEVELOPMENT CONSTRUCTION DOCUMENTS. room) Scalable bubble diagrams schedules describing programmatic
GENERAL SITE PROGRAMMING SCHEMATIC DESIGN DESIGN DEVELOPMENT CONSTRUCTION DOCUMENTS Scope of work narrative Building code review Description of construction Documentation on drawings as List of applicable
More informationLog Siding J Block. Outlet J Block 4 3/4 x 7. Fixture J Block 7 x 7
Log Siding J Block Two sizes with pre-cut openings make installation of electrical outlets, light fixtures, dryer vents easier. 1 1/2 inch thick J block works well for 2 x 6 or 2 x 8 log siding profiles.
More information2. Remove from the Standard Plate manual: Standard Plate Index, Sheets 1-4 of 4, Numerical Index of Standard Plates (August 31, 2012)
MINNESOTA DEPARTMENT OF TRANSPORTATION DEVELOPED BY: Design Standards ISSUED BY: Office of Program Management & Technical Support, Design Support Section TRANSMITTAL LETTER NO. (12-04) MANUAL: Standard
More informationPAST EXAM PAPER & MEMO N3 ABOUT THE QUESTION PAPERS:
EKURHULENI TECH COLLEGE. No. 3 Mogale Square, Krugersdorp. Website: www. ekurhulenitech.co.za Email: info@ekurhulenitech.co.za TEL: 011 040 7343 CELL: 073 770 3028/060 715 4529 PAST EXAM PAPER & MEMO N3
More information3 Basic Code Enforcement, Part 3
Study Session 3 Basic Code Enforcement, Part 3 Technical Aspects of Code Enforcement OBJECTIVE: To become familiar with the technical aspects of code enforcement: first, by learning to recognize the basic
More informationC.00. Ullrich Aluminium Co. Ltd. Ulltraclad Aluminium Cladding September Wall Batten Elevation. Horizontal battens between verticals at soffit
Horizontal battens between verticals at soffit 2 C.04 600 600 600 600 Cavity batten at 600 mm centres 1 C.03 Batten fixing points 1 C.04 1 C.07 1 C.12 1 C.13 1 C.14 Meter Box Window 1 C.08 1 C.09 800 800
More informationADMINISTRATION DEPARTMENT Plant Management Division. An Inventory of Its State Office Building Drawings
MINNESOTA HISTORICAL SOCIETY Minnesota State Archives ADMINISTRATION DEPARTMENT Plant Management Division An Inventory of Its State Office Building Drawings OVERVIEW OF THE RECORDS Agency: Minnesota. Dept.
More informationIBS SCORING IN MALAYSIA
IBS SCORING IN MALAYSIA HOW CAN CIDB AND INDUSTRY PLAYERS WORK HAND IN HAND TO PROMOTE USAGE OF IBS IBS SCORING SYSTEM & CASE STUDY 1 CONTENT : 1) IBS SCORING SYSTEM 2) CASE STUDY 1 RESIDENTIAL 3) CASE
More informationWINTER 15 EXAMINATIONS Subject Code: Model Answer- Building Drawing Page No- 01 /15
Subject Code: 17309 Model Answer- Building Drawing Page No- 01 /15 Important Instruction to Examiners:- 1) The answers should be examined by key words & not as word to word as given in the model answers
More informationOhlson Project Property Owner: Kathy Ohlson Property Address: Deer Lake Rd. Derwood MD 20855
Ohlson Project Property Owner: Kathy Ohlson Property Address: 16116 Deer Lake Rd. Derwood MD 20855 Trademark LLC Prepared By: Travis Murphy Drawing Index 1. Cover 2. Rear Elevation 3. Top View 4. Dimensions
More informationChapter 17 - Porch Trim
Chapter 17 - Porch Trim Contents Chapter 17 - Porch Trim... 17-1 Timing & Prerequisites... 17-2 Trim on Porch Beams (Volunteer)... 17-4 Smart Trim on the Bottom of the Beam... 17-4 Smart Trim on the Inside
More informationSingle-Family Dwelling Submittal Requirements
Single-Family Dwelling Submittal Requirements The purpose of this guideline is to assist our customers in preparing for plan submittal. The items listed must be included before your plans can be accepted
More informationMODERN PERGOLA INSTALLATION GUIDE. When only the best will do.
MODERN PERGOLA INSTALLATION GUIDE When only the best will do. TOOLS LIST Drill(s) 3/8" Magnetic Driver (s) 12" Drill Extension #2 Square Drive bit for Drill or Driver Level Tape Measure Hammer Drill if
More informationINSTALLATION GUIDE. Outback Clearspan Gable BEFORE YOU START ADDITIONAL MATERIALS ADDITIONAL MATERIALS WITH COOLDEK ROOFING
INSTALLATION GUIDE Outback Clearspan Gable WITH COOLDEK ROOFING BEFORE YOU START It is important to check your Local Government Authority requirements before the installation of your new Stratco Outback
More informationTraining Manual The Installation of Siphonic Pipework
Training Manual The Installation of Siphonic Pipework The Engineered Rainwater Solution Training Manual: The Installation of Siphonic Pipework o Overview of Principals of Siphonic Drainage o Interpreting
More informationCITY OF VISTA STANDARD DRAWINGS
CITY OF VISTA STANDARD DRAWINGS May, 2015 THIS SHEET INTENTIONALLY LEFT BLANK TABLE OF CONTENTS MODIFICATIONS Modifications to San Diego Regional Standard Drawings DRAINAGE STRUCTURES DRN 01 Corrugated
More informationSUBJECT: Standard Plates 4132, 4155, Drainage Structures and Castings Info
MINNESOTA DEPARTMENT OF TRANSPORTATION DEVELOPED BY: Design Standards ISSUED BY: Office of Project Management and Technical Support, Design Support Section TRANSMITTAL LETTER NO. (18-01) MANUAL: Standard
More informationBUILDERS RESPONSIBILITY
BUILDERS RESPONSIBILITY August 2015 Key Builder Responsibilities Before roof tiles can be loaded onto the roof frame, the following must be completed unless otherwise specified in the roof contract: 1.
More information3.1 General Provisions
WOOD FRAME CONSTRUCTION MANUAL 107 3.1 General Provisions 3.1.1 Prescriptive Requirements The provisions of this Chapter establish a specific set of resistance requirements for buildings meeting the scope
More informationINSTALL IN 2 DAYS. *Assumes 3-man fitting team. equinox. Tiled roof system. Installation guide ISSUE 1
INSTALL IN 2 DAYS *Assumes 3-man fitting team equinox Tiled roof system Installation guide ISSUE 1 Equinox tiled roof system Installation guide Contents Pre-installation checks 1. Installing the framework
More informationCalculations per ABS Code along with ASME Sec. VIII Div.1 XXXX
Calculations per ABS Code along with ASME Sec. VIII Div.1 XXXX Grouping of Boilers and Pressure Vessels: PART 4 CHAPTER 4 SECTOIN 1 Table #2 and #3 >> Group II PART 4 CHAPTER 4 SECTOIN 1 Appendix 1 Rules
More informationNorth East Toilet Cubicles Ltd.
200 200 850 120 1170 850 2400 1180 1180 North East Toilet Cubicles Ltd. Tel: 01429 277500 Fax: 01429 868590 Email: info@netoiletcubicles.co.uk Urinal Duct Panel System The following drawings are provided
More informationLEADERS IN STEEL DISTRIBUTION AND VALUE-ADDED PROCESSING WORLD CLASS PROCESSING FACILITIES
LEADERS IN STEEL DISTRIBUTION AND VALUE-ADDED PROCESSING Established in 1921, Horan Steel is a privately owned company that has an excellent reputation as an extremely reliable, robust and well established
More informationSUPPLEMENT 2 TO SECTIONS 14 & 15
assurance. SUPPLEMENT 2 TO SECTIONS 14 & 15 DESIGN SERIES ELEVATIONS SUPPLEMENT - 2 CABINET DESIGN SERIES - CDS THE FOLLOWING CASEWORK ILLUSTRATIONS ARE ADOPTED AS DESIGN STANDARDS AND PROVIDED TO ASSIST
More informationCITY OF VISTA STANDARD DRAWINGS
CITY OF VISTA STANDARD DRAWINGS May, 2015 THIS SHEET INTENTIONALLY LEFT BLANK TABLE OF CONTENTS MODIFICATIONS Modifications to San Diego Regional Standard Drawings DRAINAGE STRUCTURES DRN 01 Corrugated
More informationQuestions. Paul Ross Wallach V7198. Published by Hearlihy P.O. Box 1747 Pittsburg, KS
Questions for Blueprint-Reading Exams Paul Ross Wallach Published by Hearlihy P.O. Box 1747 Pittsburg, KS 66762 866-622-1003 www.hearlihy.com 81861 V7198 Copyright 2007 by Hearlihy. Except for making transparencies
More informationHow to make a Wendy house Part One: The Floor and the Frame
How to make a Wendy house Part One: The Floor and the Frame The Wendy House. This wendy house is basically a playhouse with a few feminine touches added. A wendy house can give children hours of enjoyment.
More informationGarage Design Guide. October 2018
Garage Design Guide October 2018 The Corporation of the Township of Hamilton 8235 Majestic Hills Drive, P.O. Box 1060, Cobourg Ontario K9A 4W5 Tel: 905-342-2810 Fax: 905-342-2818 Email: Tim Jeronimus (Chief
More informationSigma Fasteners, Inc. Section 7
DESCRIPTION PAGE s Wedge s 7-1 Drop-In s 7-2 Single Expansion s 7-2 Machine Screw s 7-2 Lag Shields 7-3 Lead Wood Screw s 7-3 Hammer Drive s 7-4 Hollow Wall Fasteners 7-5 Toggle Bolts 7-6 Toggle Wings
More informationStreet Design. MALL seating. Mall bench product details. Mall technical specification. Mall accessories. Mall material finishes
Street Design established in 1986 UK street furniture designers & manufacturers, Leicestershire LE12 8LD Contact us MALL seating As UK based, designers and manufacturers, Street Design can manufacture
More informationS.NO Description Quantity Rate Amount
INTERIOR WORKS NANDIMANDALAM BRANCH S.NO Description Quantity Rate Amount 1 Full height partition with laminate finish and glass. Providing & fixing partly glazed partly paneled Dry Wall Partition with