1 2004 Specifications CSJ , ETC. SPECIAL SPECIFICATION 8398 LIGHTNING PROTECTION SYSTEM 1. Description. This Special Specification governs the design and installation of Lightning Protection System (LPS) for structures, buildings and building site components. 2. Materials. Furnish new or used material in accordance with the details shown on the plans, the requirements of this Item, and the pertinent requirements of the following Items, references and standards, except for measurement and payment: Item 416, Drilled Shaft Foundations Item 618, Conduit Item 620, Electrical Conductors Item 624, Ground Boxes Item 628, Electrical Services Item 650, Overhead Sign Supports TXDOT Traffic Engineering Standard Sheets ED-03 Electrical Details A. Components. LPS Components shall comply with the requirements of the following: National Fire Protections Association (NFPA) 70, National Electrical Code (NEC): Latest edition at the time of construction. NFPA 780 Standard for Installation of Lightning Protections Systems: Latest edition at the time of construction. Lightning Protection Institute Standard of Practice for the Design-Installation and Inspection of Lightning Protection Systems LPI-175: Latest Edition at the time of construction. Institute of Electrical and Electronic Engineers Standard Underwriters Laboratory Standard UL
2 Roof- Mounting Air Terminals: NFPA Class 1, aluminum, solid, unless otherwise indicated. Ground Rods, Ground Loop Conductors, and Concrete-Encased Electrodes shall comply with the plans, specifications, and applicable portions of the standards listed in this specification. B. Products. Provide products that meet this specification. The following list of manufacturers is provided for information only to assist in establishing a product level of quality. Other manufacturer s products may also be submitted provided that the product is of equal or better value and performance as approved by the Engineer. A-C Lightning Security, Inc. Automatic Lightning Protection Erico International Corporation Harger Lightning Protection, Inc. Independent Protection Company, Inc. Robbins Lightning, Inc. Thompson Lightning Protection, Inc. C. LPS Product Submittals. Submit the following product data, shop drawings and qualifications: 1. Product Data: For air terminals and mounting accessories, conductors, connections, ground electrode system, and other necessary components. 2. Shop Drawings: Detail LPS, including air-terminal locations, conductor routing and connections, and bonding and grounding provisions. Include indications for use of raceway and data on how concealment requirements will be met. Provide design analysis data to demonstrate design compliance with the plans specifications, applicable chapters of NFPA 780 and all other requirements in this specification. 3. Qualification Data: Provide Qualification data for firms and persons that will perform the installation and quality control. Data shall demonstrate capabilities and experience. Include data on listing or certification by Nationally Recognized Testing Laboratory (NRTL) or trade association
3 D. Governing Requirements. In the case where a conflict exists, the more restrictive requirement shall govern. The Engineer shall make a determination regarding the conflicting requirements. The determination of requirements by the Engineer shall govern. 3. Construction. Install LPS components and systems according to approved shop drawings, plans, specifications and the standards listed in this specification: A. Install LPS strike termination devices. Shop drawings shall provide the final location, mounting or attachment, type and size required by the approved shop drawing. B. Install LPS roof cross-run and down conductors of the type and size required. Install conductors with direct paths from air terminals to ground connections. Avoid sharp bends and narrow loops. Conductor location, mounting or attachment, type and size as required by the plans and approved shop drawings. C. Conceal following conductors: System conductors. Down conductors. Interior conductors Conductors within normal view from exterior locations at grade within 20 feet of building. D. Install LPS ground terminals shall be of the type and size shown on the plans and approved shop drawings, including but not limited to ground rods, encased ground electrodes, ground rings, ground radials, and ground plates to form an integrated earth grounding electrode system (GES). GES shall comply with NEC, NFPA 780, LPI-175 and IEEE Std E. Install LPS ground test well of the type and size shown on the plans and approved shop drawing. F. Install a LPS Master Ground Bus Bar (MGBB) of the type and size as shown on the plans and as approved on the shop drawings. Provide ground bonding connection from electrical service/ and feeder panel to GES as required by NEC Article 250 & and NFPA 780. Placement and location of the MGBB shall be as required by the appliances and equipment to be installed in the protected structure
4 G. Install approved exothermic-welded connections for all conductor splices and connections between conductors and other components. LPS cable connections shall be of the type, location and size shown on the plans and as approved on the shop drawings. H. Install components that intrinsically provide corrosion protection. 1. Do not combine materials that can form electrolytic couple that will accelerate corrosion in presence of moisture unless moisture is permanently excluded from junction of such materials. 2. Use conductors with protective coatings where conditions would cause deterioration or corrosion of conductors. I. LPS Coordination. 1. Coordinate installation of LPS with installation of other building systems and components, including electrical wiring, supporting structures and building materials, metal bodies requiring bonding to lightning protection components, and building finishes. 2. Coordinate installation of air terminals attached to roof systems with roofing/building manufacturer, fabricator and installer. J. LPS Quality Control. 1. LPS Installer Qualifications: Engage experienced installer who is NRTL listed or who is certified by LPI as Master Installer and Designer. 2. LPS Listing and Labeling: As defined in NFPA 780, Article 2-2, Definitions. All components shall Labeled and Listed as required by NFPA LPS Quality Control Field Inspections: Provide reports indicating compliance with plans & specification requirements. 4. LPS UL Inspection: Apply for inspection by UL as required to obtain UL Master Label for system. 5. LPS UL Master Label: Provide UL Master Label. 6. LPS: Provide as-built drawings of Lightning Protection System
5 4. Measurement. This Item will be measured by the lump sum of Lightning Protection System complete in all respects including furnishing, installation, testing, and affixing a UL Master Label. 5. Payment. The work performed and materials furnished in accordance with this Item and measured as provided under Measurement will be paid for at the unit price bid for Lightning Protection System of the type and size specified and the installation method specified as applicable. This price is full compensation for furnishing and installing the Lightning Protection System, including but not limited to, strike termination devices, conductors, ground electrode system, master ground bus bar, bonding to metal objects, all connections, conduit, hanging, strapping, drilling, tunneling, excavating, and furnishing and placing backfill; replacing pavement structure, sod, riprap, curbs, or other surface, marking location of conduit (when required), furnishing and installing fittings, junction boxes, and expansion joints; and equipment, labor, tools and incidentals. Unless otherwise shown on the plans, no payment will be allowed under this Item for conduit used on or in walls or foundations
SECTION WIREWAYS FOR RADIOLOGY EQUIPMENT
PART 1 - GENERAL 1.1 DESCRIPTION SECTION 26 05 36 WIREWAYS FOR RADIOLOGY EQUIPMENT SPEC WRITER NOTE: Delete between //----// if not applicable to project. Also, delete any other item or paragraph not applicable
More informationSECTION STEEL LIGHTING STANDARDS. 1. Electrical conduit and fittings; Section
02760-1 of 5 SECTION 02760 STEEL LIGHTING STANDARDS 02760.01 GENERAL A. Description Steel lighting standards shall include, but not necessarily be limited to, furnishing and installing steel lighting poles,
More informationCONTINUING EDUC ATION
3 CONTINUING EDUC ATION FOR WISCONSIN ELECTRICIANS 2017 NEC Article 250 2 Hours WISCONSIN CONTRACTORS INSTITUTE N16 W23217 Stone Ridge Drive Suite 290 Waukesha, WI 53188 262-409-4282 www.wcitraining.com
More informationSECTION CABLE TRAYS
SECTION 16139 CABLE TRAYS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification Sections,
More informationWisconsin Contractors Institute Continuing Education
IMPORTANT NOTE: You should have received an email from us with a link and password to take your final exam online. Please check your email for this link. Be sure to check your spam folder as well. If you
More informationSECTION SWINGING AUTOMATIC ENTRANCES IN-GROUND, AUTOMATIC SWING DOOR OPERATOR CONVERTER ADAPTED TO BROOKFIELD NB-500 EXTREME DUTY OPERATOR
SECTION 084229.33 SWINGING AUTOMATIC ENTRANCES IN-GROUND, AUTOMATIC SWING DOOR OPERATOR CONVERTER ADAPTED TO BROOKFIELD NB-500 EXTREME DUTY OPERATOR PART 1-GENERAL 1.01 DESCRIPTION A. This section describes
More information2/15/2015. Current will always try to return to its source. In order for there to be current, there must be a complete circuit
Current will always try to return to its source In order for there to be current, there must be a complete circuit Current will take as many paths or circuits available to it to return to the source The
More informationFoundation Specifications
Installation Instructions Bulletin 237746 Foundation Specifications for High-Wind 4.5-Meter Earth Station Antennas Revision C 1.0 INTRODUCTION 1.1 This document specifies typical foundation characteristics,
More informationSECTION SWINGING AUTOMATIC ENTRANCES
SECTION 084229.33 SWINGING AUTOMATIC ENTRANCES IN-GROUND, AUTOMATIC SWING DOOR OPERATOR CONVERTER ADAPTED TO IR/DOR-O-MATIC SENIOR SWING & ASTRO SWING OPERATOR PART 1-GENERAL 1.01 DESCRIPTION A. This section
More informationSPECIAL SPECIFICATION 1118 Data Fiber Optic Transceiver
2004 Specifications CSJ 0050-09-071, 0027-13-205, 0271-14-228, 0500-03-042, 0050-09-070, 0050-09-069 etc, 0050-08-086, 0050-08-087 & 0500-03-577 SPECIAL SPECIFICATION 1118 Data Fiber Optic Transceiver
More informationCHAPTER 29 PROJECT COMPLETION DOCUMENTS
CHAPTER 29 PROJECT COMPLETION DOCUMENTS PROJECT COMPLETION Upon completion of traffic control signal system and lighting projects, there are forms and checklists to ensure that the project is closed out
More informationMECKLENBURG COUNTY. Land Use and Environmental Service Agency Code Enforcement 9/8/10 ELECTRICAL CONSISTENCY MEETING. Code Consistency Questions
conduit? 9/8/10 ELECTRICAL CONSISTENCY MEETING Code Consistency Questions 1. Can branch circuits of different services be installed in the same Yes, see 300.3(C)(1) for conductors of different systems
More informationSECTION PANELBOARDS
PART 1 - GENERAL 1.1 DESCRIPTION SECTION 26 24 16 PANELBOARDS SPEC WRITER NOTE: Delete between // --- // if not applicable to project. Also, delete any other item or paragraph not applicable in the section
More informationRADIO AND TELEVISION SATELLITE EQUIPMENT
ARTICLE 810 RADIO AND TELEVISION SATELLITE EQUIPMENT Introduction to Article 810 Radio and Television Satellite Equipment This article covers transmitter and receiver (antenna) equipment and the wiring
More informationSt. Monica Food Pantry
St. Monica Food Pantry 26 5113-1 ELECTRICAL WORK DIVISION 26 SECTION 265113 INTERIOR LIGHTING FIXTURES PART 1. GENERAL 1.1 WORK INCLUDES A. Extent, location, and details of interior lighting fixture work
More informationB. Manufacturers: Square-D, G.E. or Westinghosue.
SECTION 16470 - PANELBOARDS PART 1 - GENERAL 1.01 RELATED DOCUMENTS A. General: Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification
More informationA. Deviation from this standard must be approved by the Project Architect.
September 2012, rev. 00 26 5600 Exterior Lighting PART 1. GENERAL 1.01 Related Documents A. Deviation from this standard must be approved by the Project Architect. B. Drawings and general provisions of
More informationSECTION CABLE TRAYS FOR COMMUNICATIONS SYSTEMS
SECTION 270536 - CABLE TRAYS FOR COMMUNICATIONS SYSTEMS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division
More informationSECTION TRAFFIC SIGNAGE
SECTION 10 14 53 TRAFFIC SIGNAGE PART 1 - GENERAL 1.01 SECTION INCLUDES A. Furnishing and installing roadside traffic signage. B. Providing additional traffic signs as required in Sections 01 55 28 Controlling
More informationArticle 250 Grounding & Bonding
Article 250 Grounding & Bonding AMERICAN ELECTRICAL INSTITUTE N16 W23217 Stone Ridge Dr. Waukesha, WI 53188 855-780-5046 www.aeitraining.com DISCLAIMER NOTE: This course is APPROVED for continuing education
More informationSPECIAL SPECIFICATION 1789 Fiber Optic RS-232 Data Modem
1993 Specifications CSJ 2266-02-095 SPECIAL SPECIFICATION 1789 Fiber Optic RS-232 Data Modem 1. Description. This Item shall govern for the furnishing and installation of Fiber Optic RS- 232 Data Modem
More informationPage Electric Utility Service Specifications
T Y P I C A L U N D E R G R O U N D S E R V I C E R E Q U I R E M E N T S 200 Amps Maximum - UG-1 Sheet 1 of 3 87 T Y P I C A L U N D E R G R O U N D S E R V I C E R E Q U I R E M E N T S 200 Amps Maximum
More informationAmerican Electrical Institute
American Electrical Institute Oregon Electricians Continuing Education Grounding & Bonding (Article 250) 4 Hours American Electrical Institute PO Box 31131 Spokane, WA 99223 www.aeitraining.com Article
More informationItem 550 Chain Link Fence
Item Chain Link Fence 1. DESCRIPTION 2. MATERIALS Furnish, install, remove, repair, or replace chain link fence and gates. Furnish certification from the chain link fence materials manufacturer stating
More information1.1 RELATED DOCUMENTS
SECTION 050505 -BEVEL RAIL ENDS PART 1- GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the contract, including General and Supplementary Conditions and Division 01 Specification Sections
More informationSECTION BUILDING WIRE AND CABLE
SECTION 260519 PART 1 GENERAL 1.1 SUMMARY A. Section Includes: 1. Building wire and cable. 2. Wiring connectors and connections. B. RELATED SECTIONS 1. Section 26 05 53 Electrical Identification. 2. Section
More informationSPECIAL SPECIFICATION 6734 RS-232 Optical Modem
2004 Specifications CSJ 0924-06-244 SPECIAL SPECIFICATION 6734 RS-232 Optical Modem 1. Description. This Item shall govern for the furnishing and installation of Fiber Optic RS- 232 Data Modem (OTR) in
More informationSECTION 58 PRECAST CONCRETE BOX CULVERT. This work consists of furnishing and installing Pre-cast Concrete Box Culverts.
SECTION 58 PRECAST CONCRETE BOX CULVERT 58.1 DESCRIPTION A. General This work consists of furnishing and installing Pre-cast Concrete Box Culverts. B. Related Work Section 51 Section 52 Section 53 Section
More informationUFGS (November 2008) UNIFIED FACILITIES GUIDE SPECIFICATIONS
USACE / NAVFAC / AFCESA / NASA UFGS-27 05 28.36 40 (August 2011) ----------------------------------- Preparing Activity: NASA Superseding UFGS-27 05 28.36 40 (November 2008) UNIFIED FACILITIES GUIDE SPECIFICATIONS
More information1995 Metric CSJ SPECIAL SPECIFICATION ITEM Multimode Video Fiber Optic Transmission Equipment
1995 Metric CSJ 3483-01-010 SPECIAL SPECIFICATION ITEM 6329 Multimode Video Fiber Optic Transmission Equipment 1.0 Description. This Item shall govern for the furnishing and installation of Video Fiber
More informationSPECIFICATIONS FOR THE INSTALLATION OF CONDUIT SYSTEMS IN RESIDENTIAL SUBDIVISIONS. Notification of Completed Conduit Sections
SPECIFICATIONS FOR THE INSTALLATION OF CONDUIT SYSTEMS IN RESIDENTIAL SUBDIVISIONS Section 1 Definitions 2 Scope of Work 3 Extent of Work 4 Inspection and Performance of Work 5 Trenching 6 Duct Installation
More informationChapter 1. Applied Grounding and Bonding. Applied Grounding and Bonding 9/18/2011. Introduction. Introduction. Paul Dobrowsky Member NEC Panel 5
Applied Grounding and Bonding Paul Dobrowsky Member NEC Panel 5 1 Introduction This presentation is a representative sample from the following Chapters of Applied Grounding and Bonding. Chapter 1, Introduction
More informationSECTION LOW PRESSURE DUCTWORK
SECTION 15841 LOW PRESSURE DUCTWORK PART 1 GENERAL 1.01 SUMMARY A. Related Sections: 1. 07270 - Firestopping and Fire and Smoke Barrier Caulking. 2. 15260 - Vibration Isolation. 3. 15280 - Thermal Insulation
More informationSPECIAL SPECIFICATION 1806 Spread Spectrum Wireless Modem
1993 Specifications CSJ s 0902-48-442 & 0902-48-432 SPECIAL SPECIFICATION 1806 Spread Spectrum Wireless Modem 1. General. This Item shall govern for the furnishing and installation of Spread Spectrum Wireless
More informationNOTICE OF RULE MAKING PROCEEDINGS AND PUBLIC HEARING
1 1 1 1 1 NOTICE OF RULE MAKING PROCEEDINGS AND PUBLIC HEARING NORTH CAROLINA BUILDING CODE COUNCIL Notice of Rule-making Proceedings is hereby given by NC Building Code Council in accordance with G.S.
More information.2 Accompany all submissions with a transmittal letter, in duplicate, containing:.4 Specification Section number for each submittal
City of Winnipeg Brady Road Landfill Site Section 01300 New Entrance and Scale Facility Page 1 of 4 SUBMITTALS 1. SHOP DRAWINGS 1.1 General.1 Arrange for the preparation of clearly identified Shop Drawings
More informationSHEET METAL FLASHING AND TRIM Christ on the Mountain
SECTION 076200 - SHEET METAL FLASHING AND TRIM PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. Compatibly with the bumping of flashings and trim as identified in the Membrane Roofing Section 075000.
More informationResidential Construction Checklist Single and Two Family Construction
DATE: _ Building Inspection Submittal Requirements Residential Construction Checklist Single and Two Family Construction Submit a City of Big Spring Permit Application, checklist, and 3 complete hard copy
More informationSECTION STRUCTURAL STEEL FRAMING PART 1 - GENERAL 1.1 RELATED DOCUMENTS
SECTION 05 12 00 - STRUCTURAL STEEL FRAMING PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification
More informationTENANT IMPROVEMENT 16 FEBRUARY WEST 27TH STREET, 4TH FLOOR 100% CD OWNER/BID ADD 1-03/08/2018
SECTION 055000 - PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply
More informationSECTION CABLE TRAYS FOR ELECTRONIC SAFETY AND SECURITY
SECTION 26 05 36 CABLE TRAYS FOR ELECTRONIC SAFETY AND SECURITY PART 1 -GENERAL 1.1 SUMMARY A. Section includes cable tray. 1.2 REFERENCES A. ASTM A 123 Standard Specification for Zinc (Hot-Dip Galvanized)
More informationUNIFIED FACILITIES GUIDE SPECIFICATIONS
USACE / NAVFAC / AFCEC / NASA UFGS-27 05 28.36 40 (May 2017) --------------------------------- Preparing Activity: NASA Superseding UFGS-27 05 28.36 40 (August 2014) UNIFIED FACILITIES GUIDE SPECIFICATIONS
More informationSPECIAL SPECIFICATION 1533 Drop/Insert Multiplexor/Demultiplexor
1993 Specifications CSJ 0177-11-131 SPECIAL SPECIFICATION 1533 Drop/Insert Multiplexor/Demultiplexor 1. Description. This Item shall govern for for the furnishing and installation of intelligent drop/insert
More information1993 Specifications CSJ SPECIAL SPECIFICATION ITEM Drop/Insert Multiplexor/Demultiplexor
1993 Specifications CSJ 0008-12-071 SPECIAL SPECIFICATION ITEM 6550 Drop/Insert Multiplexor/Demultiplexor 1.0 Description. This Item shall govern for the furnishing and installation of intelligent drop/insert
More informationSPECIAL PROVISION Description of Project, Scope of Contract and Sequence of Work
2004 Specifications CSJ 0110-04-166 SPECIAL PROVISION 000--363 Description of Project, Scope of Contract and Sequence of Work 1. General. The work to be performed on this project consists of furnishing,
More informationDOCUMENT ADDENDUM NO. 4. Issued to all Bidders: Date: October 14, Contract Name: Electrical Installation. Contract Number: C8410
DOCUMENT 009104 - ADDENDUM NO. 4 Issued to all Bidders: Date: October 14, 2015 Contract Name: Electrical Installation Contract Number: C8410 This addendum forms a part of the Bid described above. The original
More informationSTANDARD SPECIFICATIONS SECTION SUBMITTAL PROCEDURES
STANDARD SPECIFICATIONS SECTION 01330 SUBMITTAL PROCEDURES PART 1 GENERAL 1.1 DESCRIPTION A. Section includes general requirements and procedures related to preparation and transmittal of Submittals to
More informationLOW PRESSURE STEEL DUCTWORK Mechanical Systems Insulation Outlets (HVAC) Testing and Balancing.
SECTION 15841 LOW PRESSURE STEEL DUCTWORK PART 1 GENERAL 1.01 SUMMARY A. Related Sections: 1. 15180 - Mechanical Systems Insulation. 2. 15940 - Outlets (HVAC). 3. 15991 - Testing and Balancing. 1.02 SUBMITTALS
More informationOutdoor Installation 2: Lightning Protection and Grounding
Outdoor Installation 2: Lightning Protection and Grounding Training materials for wireless trainers This one hour talk covers lightning protection, grounding techniques and problems, and electrolytic incompatibility.
More informationSECTION OVERCURRENT PROTECTIVE DEVICE COORDINATION STUDY
PART 1 - GENERAL 1.1 DESCRIPTION SECTION 26 05 73 OVERCURRENT PROTECTIVE DEVICE COORDINATION STUDY SPEC WRITER NOTE: Delete between // -- // if not applicable to project. Also, delete any other item or
More informationA. Product Data: For each electrical identification product indicated.
SECTION 16075 - ELECTRICAL IDENTIFICATION PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification
More informationSECTION TRACER WIRE FOR NONMETALLIC PIPE
PART 1 GENERAL 1.1 DESCRIPTION A. The CONTRACTOR shall furnish and install a conductive tracer wire with all buried plastic water mains, services and appurtenances in accordance with the Water Utilities
More informationSECTION STRUCTURAL STEEL. A. PART A and DIVISION 1 of PART B are hereby made a part of this SECTION.
SECTION 051200 PART 1 GENERAL 1.01 GENERAL REQUIREMENTS A. PART A and DIVISION 1 of PART B are hereby made a part of this SECTION. B. Examine all conditions as they exist at the project prior to submitting
More informationBrown University Revised 2/1/2006 Facilities Design & Construction Requirements SECTION 16461C - DRY TYPE TRANSFORMERS
SECTION 16461C - DRY TYPE TRANSFORMERS PART 1 - GENERAL 1.1 This section includes design and performance requirements for dry-type transformers rated for use on secondary distribution systems rated 600
More informationCHAPTER 1123 SATELLITE EARTH STATIONS PURPOSE AND INTENT
CHAPTER 1123 SATELLITE EARTH STATIONS 1123.01 PURPOSE AND INTENT Satellite earth stations, except those described in Section 1123.08, shall require a permit approved by the Director of Safety and Service.
More informationTABLE OF CONTENTS. 1.0 Scope. 2.0 References. 3.0 Definitions. 4.0 Submission and Design Requirements. 5.0 Materials 5.1 General 5.
1.0 Scope 2.0 References 3.0 Definitions 4.0 Submission and Design Requirements 5.0 Materials 5.1 General 5.2 Marking 6.0 Equipment 7.0 Production 7.1 Steel Octagonal Poles 7.2 Base Plate 7.3 Top Cap 7.4
More informationB. Division-16 Basic Materials and Methods section apply to work specified in this section.
Section 16745 PREMISE CABLING SYSTEMS PART ONE GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of Contract, including General and Supplementary Conditions and Division-1 Specification
More informationSECTION ARCHITECTURAL WOODWORK
SECTION 06 40 00 - ARCHITECTURAL WOODWORK Specifier s Note: This guide allows the specifier to see how the Evo-Lite LumiSheet product may be integrated into a standard specification for architectural woodwork.
More informationSPECIAL SPECIFICATION Inch LED Traffic Signal Lamp Unit
1993 Specifications SPECIAL SPECIFICATION 1201 12 Inch LED Traffic Signal Lamp Unit 1. Description. This specification describes the minimum acceptable design and performance requirements for a twelve
More informationAGUB Instrument and Meter Enclosures Explosionproof, Dust-Ignitionproof Furnished with aluminum body and solid or window cover.
AGUB Instrument and Meter Enclosures Furnished with aluminum body and solid or window cover. Class I, Division 1 and, Groups B, C, D Application To pull or splice wires and/or to mount and enclose electrical
More informationHilti, Inc. November Dallas Parkway, Suite 1000 Plano, Texas Toll Free Website Guide Specification
Hilti, Inc. November 2015 7250 Dallas Parkway, Suite 1000 Plano, Texas 75024 Toll Free 800-879-8000 Website www.us.hilti.com Guide Specification Specifier Notes: This guide specification is written in
More information1995 Metric CSJ SPECIAL SPECIFICATION ITEM Drop/Insert Multiplexor/Demultiplexor
1995 Metric CSJ 3256-02-049 1.0 Description SPECIAL SPECIFICATION ITEM 6093 Drop/Insert Multiplexor/Demultiplexor This Item shall govern for the furnishing and installation of intelligent drop/insert multiplexor/demultiplexors
More informationSECTION EQUIPMENT WIRING
PART 1 - GENERAL 1.01 RELATED DOCUMENTS: SECTION 26 27 17 EQUIPMENT WIRING A. The Conditions of the Contract and applicable requirements of Divisions 0 and 1 and Section 26 00 01, Electrical General Provisions,
More informationRegal Series Recessed Flatwalls
Regal Series Recessed Flatwalls General Specifications The Amico Regal Series Recessed Flatwall shall be manufactured by Amico Corporation, in accordance with job specific shop drawings and documents.
More informationSECTION CHAIN LINK FENCING AND GATES AND SOFTBALL BACKSTOP
1 1 1 0 1 0 1 0 1 SECTION 1 1 CHAIN LINK FENCING AND GATES AND SOFTBALL BACKSTOP BASED ON DFD MASTER SPECIFICATION DATED /01/ P A R T 1 - G E N E R A L SCOPE The work under this section shall consist of
More informationSECTION DISTRIBUTION SWITCHBOARDS
PART 1 - GENERAL 1.1 DESCRIPTION SECTION 26 24 13 DISTRIBUTION SWITCHBOARDS SPEC WRITER NOTE: Delete between // -- // if not applicable to project. Also delete any other item or paragraph not applicable
More informationMPA Project No. M495-C1 Refrigerated Container Storage Improvements Project Location: Conley Terminal, Boston, MA
MPA Project No. M495-C1 Refrigerated Container Storage Improvements Project Location: Conley Terminal, Boston, MA RESPONSES TO QUESTIONS and/or RFI s Date: 12/7/2017 The attention of Contractors submitting
More informationDIVISION PAVEMENT MARKINGS AND MARKERS
DIVISION 61 66 PAVEMENT MARKINGS AND MARKERS 66.01 SCOPE: The purpose of these specifications is to describe the minimum requirements of the City of Chesapeake for pavement markings and shall be in addition
More informationSECTION FINISH HARDWARE
SECTION 08710 PART I - GENERAL 1.01 DESCRIPTION A. Scope: Work under this Section shall include all materials and installation necessary to provide Finish Hardware as shown and detailed on the Drawings
More informationPORT OF ST. HELENS SCAPPOOSE INDUSTRIAL AIRPARK PARALLEL TAXIWAY B RELOCATON AIP PROJECT ADDENDUM NO. 1
PORT OF ST. HELENS SCAPPOOSE INDUSTRIAL AIRPARK PARALLEL TAXIWAY B RELOCATON AIP PROJECT 3-41-0056-024-2018 ADDENDUM NO. 1 Addendum No. 1 hereby amends the contract documents and drawings for the Scappoose
More information1995 Metric CSJ SPECIAL SPECIFICATION ITEM Add/Drop Multiplexor/Demultiplexor
1995 Metric CSJ 0113-13-109 SPECIAL SPECIFICATION ITEM 6225 Add/Drop Multiplexor/Demultiplexor 1.0 Description. This Item shall govern for the furnishing and installation of intelligent Add/Drop Multiplexor/Demultiplexor
More informationSPECIAL SPECIFICATION 6609 Fiber Optic Color Video and Data Transmission Equipment
1995 Metric CSJ's 1047-03-056 & 0008-08-066 SPECIAL SPECIFICATION 6609 Fiber Optic Color Video and Data Transmission Equipment 1. Description. This Item shall govern for the furnishing and installation
More informationStandard Specifications
Standard Specifications PART 1.00 GENERAL 1.01 DECRIPTION SECTION 02620 PRECAST REINFORCED CONCRETE SANITARY MANHOLES A. Work included: The Contractor shall furnish all labor, materials, equipment, and
More informationSECTION DISTRIBUTION SWITCHBOARDS
PART 1 - GENERAL 1.1 DESCRIPTION SECTION 26 24 11 SPEC WRITER NOTES: Use this section only for NCA projects. Delete between // -- // if not applicable to project. Also delete any other item or paragraph
More informationKANSAS DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION TO THE STANDARD SPECIFICATIONS, 1990 EDITION
Sheet 1 of 5 KANSAS DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION TO THE STANDARD SPECIFICATIONS, 1990 EDITION NOTE: This special provision is generally written in the imperative mood. The subject, "the
More information2. Wood grounds, nailers, blocking, miscellaneous framing, sleepers, etc.
06100 - ROUGH CARPENTRY PART 1 - GENERAL 1.1 STIPULATIONS A. The specifications sections " General Conditions of the Construction Contract ", "Special Conditions", and "Division 1 - General Requirements"
More informationFTTH ENGINEERING AND INSTALLATION INTRODUCTION
1 FTTH ENGINEERING AND INSTALLATION INTRODUCTION GROUNDING FTTH SYSTEMS AT THE HOME. By Dean Mischke, P.E., V.P. Grounding and bonding. Why are we worried about such an old school concept in the modern
More informationSECTION ELECTRICAL IDENTIFICATION
SECTION 16075 ELECTRICAL IDENTIFICATION PART 1 - GENERAL 1.01 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification
More informationFirst Revision No. 141-NFPA [ Global Input ]
of 161 2/8/2018, 2:49 PM First Revision No. 141-NFPA 780-2017 [ Global Input ] In Annex L text, tables and formulas replace all symbols with lower case italics r and upper case subscripts with lower case
More informationSPECIAL PROVISION TO SPECIAL SPECIFICATION Reflectorized Pavement Markings with Retroreflective Requirements
2004 Specifications CSJ 0072-05-084, etc. & 0017-04-039, etc. SPECIAL PROVISION TO SPECIAL SPECIFICATION 6110---022 Reflectorized Pavement Markings with Retroreflective Requirements For this project, Special
More informationEast Central College
SECTION 013300 - SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification
More informationFacility Services Subgroup Preface for Divisions 21` through 28
Facility Services Subgroup Preface for Divisions 21` through 28 1.1 EXECUTIVE SUMMARY A. This document provides standards for the Consultants and Contractors producing mechanical and electrical design
More informationA. Action Submittals: Written and graphic information that requires Architect's responsive action.
SECTION 01330 - SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 1 Specification
More informationB. Bidders shall acknowledge receipt of this Addendum in writing on his Proposal Form.
McKee and Associates Architecture and Interior Design Addendum No. THREE Date: 12.11.17 Project: A NEW BUILDING FOR THE GREATER LIMESTONE COUNTY CHAMBER OF COMMERCE ATHENS, ALABAMA A3.1 GENERAL PROJECT
More informationSOLAR PV MICROINVERTER/ACM STANDARD PLAN - COMPREHENSIVE Microinverter and ACM Systems for One- and Two- Family Dwellings
SOLAR MICROINVERTER/M STANDARD PLAN - COMPREHENSIVE Microinverter and M Systems for One- and Two- Family Dwellings SCOPE: Use this plan ONLY for systems using utility-interactive Microinverters or Modules
More informationMISSISSIPPI STATE UNIVERSITY Office of Planning Design and Construction Administration
SECTION 01 340 - SHOP DRAWINGS, PRODUCT DATA AND SAMPLES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other
More informationDESIGN CHECKLIST INTRODUCTION
INTRODUCTION 1 The checklist is intended to serve as a convenient guide in design development as well as the final checking of plans and specifications for construction projects. Its main usefulness for
More information.1 Comply with the General Conditions of the Contract, Supplementary General Conditions and the requirements of Division 1.
PAGE 1 PART 1 GENERAL 1.1 REFERENCE.1 Comply with the General Conditions of the Contract, Supplementary General Conditions and the requirements of Division 1. 1.2 RELATED WORK SPECIFIED ELSEWHERE.1 Installation
More informationSPECIAL SPECIFICATION 6574 Low Power Wireless Modem
2004 Specifications CSJ 1068-04-126, etc. SPECIAL SPECIFICATION 6574 Low Power Wireless Modem 1. Description. This work shall consist of furnishing and supplying a Low Power Wireless Modem at the locations
More informationCITY OF TOMBALL. Section FIRE HYDRANTS 1.01 SECTION INCLUDES. A. Fire hydrants. B. Adjustment of fire hydrants and gate valves.
Section 02520 PART 1 G E N E R A L 1.01 SECTION INCLUDES A. Fire hydrants. B. Adjustment of fire hydrants and gate valves. 1.02 MEASUREMENT AND PAYMENT A. Unit Prices. 1. Payment is on a unit price basis
More informationSECTION LIGHTING
SECTION 16500 - LIGHTING PART 1 - GENERAL 1.01 RELATED DOCUMENTS A. General: Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification
More informationVPN: ISBXLR. Copyright Black Box Corporation. All rights reserved Park Drive Lawrence, PA Fax
VPN: ISBXLR Copyright 2003. Black Box Corporation. All rights reserved. 1000 Park Drive Lawrence, PA 15055-1018 724-746-5500 Fax 724-746-0746 JULY 2003 RM649-R2 RM657 RM664 RM861 RM650 RM658-R2 RM665-R2
More informationPALM SQUARE SHOPPING CENTER TENANT SIGN CRITERIA
PALM SQUARE SHOPPING CENTER TENANT SIGN CRITERIA Approved: PC Reso No. 430 (05) September 12, 2005 Amended: PC Reso No. 583 (08) March 12, 2008 Palm Square Shopping Center Page 1 PALM SQUARE SHOPPING CENTER
More informationGUIDELINE SPECIFICATIONS
GUIDELINE SPECIFICATIONS GORDON MILLENNIUM DECORATIVE METAL COLUMN COVERS DIVISION 05 7500 or DIVISION 09 2000 Note To Specifier: Column Covers are a finished, decorative product and should be installed
More information2. All work and materials shall be in full accordance with Local and State ordinance and with any prevailing rules and regulations.
General Conditions: 1. Deliver all food service equipment as specified herein, including that which is reasonably inferred, with all related items necessary to complete work shown on contract drawings
More informationGrounding for Power Quality
Presents Grounding for Power Quality Grounding for Power Quality NEC 250.53 states that ground resistance should be less than 25 ohms. Is this true? Grounding for Power Quality No! NEC 250.53 states
More informationSECTION TRANSFORMERS
SECTION 16460 - TRANSFORMERS PART 1 - GENERAL 1.01 RELATED DOCUMENTS A. General: Drawings and general provisions of the Contract, including General and Supplementary Conditions and Specification Section
More informationChapter 25. Lighting Plans
Chapter 25 Lighting Plans The following are changes, additions or deletions to the January 2014, Topic #625-000-008, Plans Preparation Manual (PPM), for use on Turnpike projects only. 25.1 General Replace
More informationGENERAL SUBSCRIBER SERVICES TARIFF Pembroke Telephone Company, Inc. Third Revised Contents Sheet 1 Cancels Second Revised Contents Sheet 1
GENERAL SUBSCRIBER SERVICES TARIFF Pembroke Telephone Company, Inc. Section N Third Revised Contents Sheet 1 Cancels Second Revised Contents Sheet 1 N. CONNECTION WITH CERTAIN FACILITIES AND/OR EQUIPMENT
More informationADDENDUM #2 September 12, 2018
Physical Plant Services Project Management 1000 Rim Drive Phone: (970) 247-7523 Fax: (970) 247-7555 Project No. 2007-130P18 Whalen Gymnasium Expansion and Renovation for Exercise Science Request for Qualifications
More information