Required Tools. Installation of Hook Plates & Discs. Professional Installation Guidelines for Engineered Wood & Hardwood with LocPlate Products
|
|
- Lucy Howard
- 5 years ago
- Views:
Transcription
1 Professional Installation Guidelines for Engineered Wood & Hardwood with LocPlate Products Required Tools Utility Knife Chalk Line Measuring Tape Conventional cutting tools for Engineered Wood and Solid Hardwood TacFast Disc Locker TacFast Slip Sheet General Conditions and Preparation Use only TacFast-approved surfaces and tools. General conditions for the installation of Engineered Wood and Solid Hardwood apply. Always use a 6 mil Polyethylene sheeting as a moisture barrier for under the Hook Plates for all wood TacFast installations. Store Hook Plates & Discs for 48 hours in the room to be installed. Keep room temperature between 5 C and 25 C during that time and during the installation. After installation, the temperature of the Hook Plates should not fall below 5 C and should not exceed 5 C. After installation, the temperature of the room/floor should not fall below 65 F (8 C). Floor temperature should not exceed 85 F (29 C). This must be considered when installing over radiant floor heating. Floors must be smooth and level with a tolerance of /4" over 0'. High and low spots should be identified using a straight edge. High spots should be sanded or ground down as necessary and low spots should be filled using a levelling compound. Sweep the floor before starting the installation. Installation of Hook Plates & Discs If the installation will be using fleece as an underlayment, roll out the fleece prior to the installation of the Hook Plates and Discs but over top of the 6 mil polyethylene sheeting. Roll out the 6 mil Polyethylene Sheeting across the floor. Where multiple sheets of the polyethylene are required, ensure that the sheets overlap one another by a minimum of 2'. 2 Trim the overlaps on the first Hook Plate. Starting in the corner of the room, Place the cut edges towards the two edges of the installation starting point (walls or installation edge). Remove all Hook Plate overlaps against the installation edge. The overlaps must always face in the same direction as the first Hook Plate that was installed. Lay the Hook Plates against the installation edge. Note: If the installation edge is a wall, a gap between the wall and the Hook Plates is allowable so long as it does not exceed /4". 4 Once 4 Hook Plates have been laid, a circular void is created. The Hook Plates will be locked together using the Disc.
2 5 The Disc is inserted, by hand, into the circular void, which is the space created when 4 Hook Plates come together. Insert the Disc into the corresponding holes and twist clockwise into the pre-locking position. 6 The Discs are then locked into position using the TacFast Disc Locker. 7 Trim/cut both Hook Plates and Discs where necessary. To cut: Score the Hook Plate or Disc with the knife, then flex it in the direction of the score to split it. 8 If there is an underlayment attached to the Hook Plate and/or Disc such as foam or fleece, use the knife to cut the through the underlayment after you have cut the Hook Plate. Notes: If the installation of the Hook Plates and Discs is interrupted for a period of time (e.g. the installation is scheduled during the evening hours and has not been completed prior to business opening the following morning), install the Discs along the last completed row of the Hook Plates. Temporarily cover the exposed Hook Plates with a suitable material (e.g. cardboard that is taped to the concrete floor on one side and to the wood surface on the other side). When the installation is resumed, remove both the material covering the exposed Hook Plates and the Discs that were temporarily installed. Continue with the installation. Do not expose Hook Plates and Discs to mechanical abrasion such as but not limited to dragging furniture, cuts and improper protection when using heavy machinery or moving heavy rolling stock as damage or destruction of hooks can occur. Storing the Hook Plates and Discs Storage Requirements It is imperative that TacFast Hook Plates and Discs be stored according to the specifications outlined below in order to avoid damage. General Conditions The Hook Plate boxes must sit on a flat surface that fully supports the under surface of the box. If stacked on a skid or pallet, a plywood board or oriented strand board (OSB) of at least 5/8 thickness and of an appropriate size (ie. protruding on every side of the Hook Plate boxes by at least ), must be placed on the upper surface of the skid and on the top layer of Hook Plate boxes on the skid. Hook Plate boxes must always be stored horizontally (flat). Do not expose to substances which destroy or change the properties and/or form of the LocPlate products such as hydrochloric acid, petrol (gasoline), nitric acid, ethylether, chloroform, carbon disulphide, carbon tetrachloride, methylene (di)chloride, trichloroethylene, etc. Environmental Conditions The maximum storage temperature should not exceed 50 C (20 F) longer than 50 hours and not 5 C (00 F) for periods longer than weeks (500 hrs). The minimum storage temperature should not be lower than 0 C (50 F). Hook Plates and Discs must be acclimatized prior to installation. Do not store outside. Do not expose the packaging to moisture. Do not expose Hook Plates and Discs to direct sunlight for any period longer than necessary, more specifically not longer than 0 minutes. Stacking Height Do not stack higher than 0 boxes stack height. For every 0 boxes, a plywood board or oriented strand board (OSB) of at least 5/8 thickness of appropriate size (fully supporting the boxes on top and protruding on every side of the boxes by ) has to be inserted Disc boxes must be stored so that the Disc boxes are lying down.
3 Helpful Tips Detailed instructions on how to lock a Disc 4 Hook Plates together create a circular void Place the Disc into the circular void Proper position is defined as the mushrooms on the Disc being partially rotated under the white plastic parts of the Hook Plates. Line up the mushrooms on the Disc into the slots in the Hook Plates. This must be done by hand prior to using the Disc Locker. This procedure is considered to be putting the Disc in the prelocked position. Disc in pre-lock position prior to using the Disc Locker. Note that all 4 mushrooms must be in position and be partially turned. This ensures that when the Disc Locker is used, all 4 of the mushrooms will lock. If they are not all properly placed at this point, they will not lock when the Disc Locker is applied. Disc Locker Pin locations Close-up of the pre-locked Hook Plate and Disc. Once the Disc is in the pre-locked position, the Disc Locker can be placed into the Disc by lining up the pins on the Disc Locker with the slots. Disc Locker is turned to lock the Disc into the Hook Plates. Locked Hook Plates and Disc.
4 Trimming Discs to provide a /2 Disc or a /4 Disc Some of the Discs will have raised guidelines on the underside of the Disc. These guidelines have taken into account the slight turn that will take place when the Discs have been locked. Align a straight edge to the raised lines. Score and snap as necessary. If the Discs do not have the raised lines on the underside, follow the guidelines below to cut into required size: For half a Disc: Place 2 Hook Plates together (as if to install the Hook Plates) Install a Disc between the 2 Hook Plates and lock it into position. Once Disc is locked, score the Disc using the underlap edge of the 2 Hook Plates as a guide. A straight edge aligned along the underlap edge of the Hook Plates can also be used as a guide. Unlock and remove the scored Disc Bend and snap Disc into 2 pieces. Note: Once a single Disc has been cut, one of the pieces can be used as a template for cutting additional Discs (if required). For a quarter Disc: Place 4 Hook Plates together (as if to install the Hook Plates) Install a Disc and lock it into position. Once Disc is locked, score the Disc, in both directions, using the underlap edges of the Hook Plates as a guide. A straight edge aligned along the underlap edges of the Hook Plates can also be used as a guide. Unlock and remove the scored Disc Bend and snap Disc along the score lines so as to break the Discs into 4 pieces. Note: Once a single Disc has been cut, one of the pieces can be used as a template for cutting additional Discs (if required). Notes: It is important that the Discs be aligned to the underlap edges not the overlap edges. If aligned to the overlap edges, the Discs will be too large. It is necessary to twist and lock the Discs into the Hook Plates to ensure that the trims are made in the right place (taking into account the slight turn when locking the Disc occurs).
5 Installation of Engineered Wood and Solid Hardwood Important Information: Only TacFast-approved surfaces may be installed. Use conventional methods for determining starting point of wood installation. Use conventional tools and methods for cutting boards. Follow manufacturers guidelines for perimeter spacing. Determine starting point and install first row of boards. To install first plank, place the plank on the LocPlate substrate engaging the hooks and loops to create the mechanical bond which will hold the plank in place. 2 To install the second plank, position the slip sheet at the end of the previously installed plank. Place the slip sheet over the hook plates and then position the plank into place by inserting the tongue and groove (T&G) feature. Once the plank is in place, remove the slip sheet by sliding it out from underneath the plank ensuring that you are pressing firmly on top of the plank. 4 Continue to install boards along the length of the row. 5 After completing the first row, continue to install the next rows of boards using the slip sheet and inserting the T&G's where applicable. 6 Cut and trim boards as necessary using conventional cutting tools.
6 Notes:. There is always more hook and loop movement in the first two rows. This should stabilize after additional rows have been installed. If at the end of the installation there is still looseness between the first two rows of boards, use traditional methods to wedge the rows of boards together. 2. Use conventional transition strips ensuring that they are screwed down in the traditional manner.. Any wood product installed on TacFast LocPlate Products will increase the height of the installation by 0.4" (0.4 cm). This figure includes the loop, hook plate subfloor and vapour barrier sheet. Removal of Engineered Wood & Solid Hardwood Important Information: As hook and loop engagement is releasable, Engineered Wood and Solid Hardwood can be removed at any time after the initial installation. A single board, multiple boards or the entire installation can be removed depending on whether the replacement is for the entire installation or just to replace a single damaged piece. Boards must be removed using the slip sheet to disengage the mechanical bond. Without disengagement, the boards can not be removed. Any method of removal that does not use the slip sheet may damage the hooks. Removal of Board at Interior of Installation 2 To remove a damaged piece(s) at the interior of an installation, use conventional repair methods for boards. That is, set depth on a saw and cut through the middle of the board along the length. Make multiple cuts so as to remove enough of the wood so that a slip sheet can be eased under one side of the board. Once the board has been sufficiently cut, slide a slip sheet under one side of the board. This will disengage the mechanical bond and allow the board piece to be removed. Slide the slip sheet under the second half of the board to disengage the mechanical bond and remove the balance of the board. To remove any additional boards, cut where necessary and always use the slip sheet to break the mechanical bond so that the board can be removed 4 Once removal of all the boards has been completed, vacuum area to remove excess saw dust and wood remnants. 5 6 To re-install boards, use a bead of glue along the edge of the already installed piece to which you will be butting up the new piece to be installed. Position the slip sheet to allow for positioning of the board and install board. Where necessary, cut/trim boards to fit and remove any tongues that may impede the ability to install the new piece. Removal of Boards Beginning at Edge of Installation To remove boards beginning at the edge of an installation, remove quarter round and slide slip sheet under the board to disengage the mechanical bond. 2 Once the mechanical bond has been broken, lift the first piece out. Continue to slide the slip sheet under every board that needs to be removed until removal of boards has been completed. Note: If removing the entire installation, an installer will find it easer to slide the slip sheet under the installed boards if he/she is working in the same direction as the overlaps on the hook plates. This will ensure that the slip sheet slides under the boards rather than sliding under the hook plates (between the overlap and underlap edges).
TRIVERSA TRIVERSA ID. Triversa Triversa ID Installation Instructions. Remove the wall base and doorway trim. Always undercut wood door casings
INSTALL ON ALL GRADE LEVELS Above Grade On Grade Below Grade by CONGOLEUM TRIVERSA TRIVERSA ID Triversa Triversa ID Installation Instructions GENERAL INFORMATION ATTENTION! READ BEFORE INSTALLING! Handle
More informationAquaGuard - Water Resistant Flooring Installation guidelines
AquaGuard - Water Resistant Flooring Installation guidelines Before You Start: Please read all the instructions before you begin the installation. Improper installation will void the warranty. Important
More informationInstallation Manual 0318
Installation Manual 0318 DOUBLE 7 CEDAR SHINGLE INSTALLATION GUIDE General Information CAUTION: REMEMBER THAT POLYMER UNDERGOES EXPANSION / CONTRACTION DUE TO VARIATIONS IN TEMPERATURE. THE FOLLOWING INSTRUCTIONS
More informationLUXURY VINYL FLOORING INSTALL INSTRUCTIONS
PLEASE READ ALL INSTRUCTIONS CAREFULLY BEFORE YOU BEGIN INSTALLATION. IMPROPER INSTALLATION WILL VOID WARRANTY. Installation Preparation: The information on this sheet provides general guidelines. All
More informationManufacturer 12mm Laminate Flooring Installation Guidelines
Manufacturer 12mm Laminate Flooring Installation Guidelines IMPORTANT Do not open immediately. Before opening, acclimatize planks for 48 hours by laying each box horizontally and individually in the center
More informationExtra Wide Heavy Duty Plastic Lockers Series Locker Installation Instructions
Locker Installation Instructions Thank you for selecting Extra Wide Heavy Duty Plastic Lockers. We are confident that the quality and construction of the lockers will prove to be a good investment. These
More informationINSTALLATION LAMTON INSTALLATION INSTRUCTIONS. Lamton Laminate Flooring with Underlay Attached Glueless Installation. Tools and Accessories
Lamton quality laminate flooring is manufactured to exacting standards for long life and lasting beauty. Following these simple procedures for installation and it will ensure many years of pride and satisfaction.
More informationEngineered Hardwood Flooring Installation Instructions
Engineered Hardwood Flooring Installation Instructions 1 Important Information before You Begin 1.1 Installer/Owner Responsibility Carefully inspect all materials before installation. Materials installed
More informationLoose Lay Luxury Vinyl Plank
Loose Lay Luxury Vinyl Plank FLEX COLLECTION Installation & maintenance * PLEASE READ CAREFULLY * Installation, maintenance & warranty guideline for loose lay luxury vinyl products. Adherence to This guideline
More informationFor ANGLE-DROP Styles
For ANGLE-DROP Styles BEFORE INSTALLATION: 1. READ THESE DETAILED INSTALLATION INSTRUCTIONS. 2. Material and tool requirements: - Estimate square footage and add 10%. - Select underlayment (over concrete
More informationWall Installations. Chapter 16 Wall Installations 16. 1
16 Wall Installations Chapter 16 Wall Installations 16. 1 Alterna Premium Groutable Tile Create decorative backsplashes, accent walls, or other focal points with any size Alterna 16" x 16", 8" x 16", 8"
More informationTORLYS LEATHER PLANK INSTALLATION INSTRUCTIONS
ENGLISH INSTRUCTIONS TORLYS LEATHER PLANK INSTALLATION INSTRUCTIONS Dear Customer, You have chosen a high quality TORLYS Leather floor, well suited for all residential application except bathrooms and
More informationInstallation Instructions for Viking Hearth Engineered Wood Flooring
Installation Instructions for Viking Hearth Engineered Wood Flooring 4.16.15 PLEASE READ THESE INSTRUCTIONS IN THEIR ENTIERTY BEFORE BEGINNING THE INSTALLATION. Installer s / Owners Responsibility As a
More informationWall Panel Installation Instructions
Panel Installation Instructions Demolition - Common Tools Needed Reciprocating Saw Allen Wrench Set Hole Saw Set Pry Bar Dust Pan and Brush Putty Knife / Scraper Hex Bit Socket Set All Necessary Safety
More informationEnglish Professional Installation Guidelines
Professional Installation Guidelines General Installation Instructions NOTE: After proper acclimation, open cartons just prior to installation. NOTE: Mannington Laminate Flooring is intended to be installed
More informationINSTALLATION. GlUElEss CliCK BamBoo installation GUidE. Introduction. Tips for a successful installation
GlUElEss CliCK BamBoo installation GUidE Introduction Thank you for purchasing a Yanchi Bamboo Floor! Our flooring combines superior technology and the highest quality materials available so that your
More informationIMPORTANT NOTES ABOUT YOUR FLOORING PLEASE READ BEFORE INSTALLING INSTALLATION & MAINTENANCE FOR ENGINNERED HERRINGBONE
IMPORTANT NOTES ABOUT YOUR FLOORING PLEASE READ BEFORE INSTALLING INSTALLATION & MAINTENANCE FOR ENGINNERED HERRINGBONE ACCLIMATIZATION AND STORAGE Your new flooring has to be acclimatized before installation,
More informationGeneral Installation Instructions
General Installation Instructions Good web sites to check out that may assist you are: For gluing engineered boards over timber chipboard/particle board/ yellow tongue: https://www.youtube.com/watch?v=bpyfr373tl8
More informationWOOD INSTALLATION GUIDE
WOOD INSTALLATION GUIDE WOOD INSTALLATION DEFINITION FLOOR PREPARATION UNDERLAYMENT INSTALLATION MOULDINGS TOOLS NEEDED WHAT IS WOOD FLOORING? WOOD COMES IN A VARIETY OF SIZES, COLORS, SHADES AND INSTALLATION
More informationGalaxy SPC RIGID-CORE UNICLIC HYBRID PLANK. Installation Guidelines
Galaxy SPC RIGID-CORE UNICLIC HYBRID PLANK Installation Guidelines ** Read all instructions carefully before installing. Incorrect installation will invalidate and void warranty. ** The planks you are
More informationV3 Engineered Flooring- Installation Instructions
V3 Engineered Flooring- Installation Instructions Installation Options V3 Engineered Flooring is designed to be installed several ways. 1. Straight Nail down 2. Straight Glue down 3. Glue and Nail down
More informationInstallation Guide. When purchasing Aboeda flooring, add 5%-15% to actual square footage needed for cutting allowance.
Installer/Owner Responsibility Aboeda strives to offer its customers high quality hardwood flooring. Please carefully read this installation guide to ensure satisfactory results from your floor. Carefully
More informationInstallation Instructions
Installation Instructions Follow these simple instructions to install your OneDayCab! IMPORTANT: Unpack and check shipment for damage. Verify color, size and parts before demolition. Installation of interiors
More informationZenterra TM Installation Guide
Zenterra TM Installation Guide Installing the foam padding Please review this installation guide before you begin installing the floor. If you have any questions, please call us at 800-428-5306 any time
More informationExterra Installation Guide
Exterra Installation Guide Installing the foam padding Please review this installation guide before you begin installing the floor. If you have any questions, please call us at 800-428-5306 any time Monday
More informationGambrel Barn Construction Manual 8x8 through 16x24 Units
Gambrel Barn Construction Manual 8x8 through 16x24 Units Tools Needed: Cordless drill (12V or higher) #2 square drive bit Hammer 6 step ladder Tape measure Square utility knife w/ blade & hook blade Little
More informationINSTALLATION GUIDE FOR MAZAMA MULBERRYWOOD HARDWOOD FLOORING
INSTALLATION GUIDE FOR MAZAMA MULBERRYWOOD HARDWOOD FLOORING READ COMPLETELY BEFORE STARTING INSTALLATION. Congratulations on choosing Mulberrywood flooring. Please take time to read the following procedures
More informationINSTALLATION INSTRUCTION - INSTRUCCIONES DE INSTALACIÓN FOR CLAD CASEMENT & AWNING WINDOW VENTANA DE DOS HOJAS CON REVESTIMIENTO
2008 Pella Corporation Part Number: 801P0101 INSTALLATION INSTRUCTION - INSTRUCCIONES DE INSTALACIÓN FOR CLAD CASEMENT & AWNING WINDOW VENTANA DE DOS HOJAS CON REVESTIMIENTO Corner Corner Top Fin Corner
More informationMLCS Instructions for Bowl and Tray Template Kit #9176/#9179
MLCS Instructions for Bowl and Tray Template Kit #9176/#9179 Tools Needed: Router 1-1/2 h.p. Minimum recommended with a 1/2 collet Forstner bit 3/4-2 recommended depending on template used Drill Press
More informationInstallation Instructions Palladium Wall Panels - Demountable Factory Finished Edges and Field Cut Edges
Please read all instructions before installing Palladium Wall Panel System. 1. Before installation: a. Acclimate Palladium Panels, reveals, adhesives and wall substrates to room temperature 24 hours before
More informationINSTALLATION GUIDE. Preparation
INSTALLATION GUIDE The investment that flooring represents in the home is an important one and customers want their flooring to last. In light of this fact, the importance of product quality and the quality
More informationSINCE 1995 HYBRID / LOFT / MANOR LINE INSTALLATION GUIDE
HYBRID / LOFT / MANOR LINE INSTALLATION GUIDE We strive to offer our customers the highest quality bamboo flooring. Please carefully read this installation guide to ensure satisfactory results from your
More information12ft Octagon (Precut) Creekside Gazebo Assembly Manual
12ft Octagon (Precut) Creekside Gazebo Assembly Manual Aug 1st, 2008 Revision #9 In Florida, additional hardware may be required that is not included in kit due to hurricane winds. Please check with local
More information3 Simple Steps to a Beautiful Tile Surface. Tec Skill Set How-To Project Guide Floor Tile 1. PREPARE THE SURFACE 2. SET THE TILE. Reverso en español
Reverso en español Tec Skill Set How-To Project Guide Floor Tile 3 Simple Steps to a Beautiful Tile Surface 1. PREPARE THE SURFACE 2. SET THE TILE 3. Grout AND CAULK H.B. Fuller Construction Products Inc.
More informationINSTALLATION GUIDE. Preparation The environment
INSTALLATION GUIDE PG-MODEL HARDWOOD FLOORING The investment that ing represents in the home is an important one and customers want their ing to last. In light of this fact, the importance of product quality
More informationINSTALLATION GUIDE SOLID HARDWOOD FLOORING
Laurentian Hardwood Canadian Heritage Series INSTALLATION GUIDE SOLID HARDWOOD FLOORING The investment that flooring represents in the home is an important one. Customers want their flooring to last. In
More informationInstallation Instructions for Engineered Wood Flooring
Installation Instructions for Engineered Wood Flooring PLEASE READ THESE INSTRUCTIONS IN THEIR ENTIERTY BEFORE BEGINNING THE INSTALLATION. Installer s / Owners Responsibility As a natural product, hardwood
More informationCONTENTS. Transitions Board and Batten Vertical Installation... 10,11
INSTALLATION MANUAL CONTENTS Important Notes... 2-4 Weather Protective Barriers... 2 Storage and Transportation... 2 Tools and Equipment... 2 Fastener Choices... 3 Wall Preparation... 3,4 Flashing... 4
More informationFITTING INSTRUCTIONS FOR OFD SOLID OAK FLOORING
FITTING INSTRUCTIONS FOR OFD SOLID OAK FLOORING SECTION 1 Installers Responsibility Pre-Installation SECTION 2 Glue Down (Solid & Engineered Flooring) SECTION 3 Secret Nailing (Solid & Engineered Flooring)
More informationRepairs. Chapter 10 Repairs 10. 1
10 Repairs Chapter 10 Repairs 10. 1 Repairs As an installer, you will probably be called upon to repair damage to a resilient floor. Here are some of the most common problems and the recommended repairs
More informationInstallation Instructions for Bifold Doors (JII103)
Thank you for selecting JELD-WEN products. Attached are JELD-WEN s recommended installation instructions for premium composite, hollow and solid core molded Bifold Doors. Bifolds are designed for fast
More informationRemoving and Replacing the Y-truck
Service Documentation Removing and Replacing the Y-truck To remove and replace the Y-truck you will need the following tools: 4mm Allen wrench 12mm stamped flat wrench #2 Phillips screwdriver (magnetic
More informationInstallation Instructions FOR INTERLOCKING ENGINEERED HARDWOOD (P.1)
Installation Instructions FOR INTERLOCKING ENGINEERED HARDWOOD (P.1) Glue or Floating Installation: INTERLOCKING ENGINEERED WOODS can be installed over most sub-fl oors, and are engineered to be very dimensionally
More informationKraus Engineered Luxury Vinyl Plank 5G Insta-Loc Click Installation Instructions
Kraus Engineered Luxury Vinyl Plank 5G Insta-Loc Click Installation Instructions GENERAL GUIDELINES All instructions and recommendations are based on the most recent information available. They should
More informationPrior to installation, the installer assumes all responsibility for final inspection and quality of the product
Mae Terra Hardwood Installation Instructions ¾ Solid Nail Down Protect your investment. Review and adhere to the flooring installation instructions. Please note that these are instructions for the experienced
More informationDuChâteau Vinyl DeLuxe Grand Collection LuxCor Click Installation Instructions
DuChâteau Vinyl DeLuxe Grand Collection LuxCor Click Installation Instructions General Information Intended for indoor residential and commercial use only, DuChâteau Vinyl DeLuxe Grand Collection - Luxcor
More informationINSTALLATION GUIDE. Preparation. Subfloor Preparation. Installation of Vapour Barrier Paper (asphalt-free) Model repair and maintenance kit
INSTALLATION GUIDE pg and model solid ing The investment that ing represents in the home is an important one and customers want their ing to last. In light of this fact, the importance of product quality
More informationInstallation Guidelines
Installation Guidelines Tando Building Products provides these instructions as general guidelines only. Tando Building Products neither installs exterior cladding nor has any control over any installation.
More informationSLIM TRIM MOULDING INSTALLATION METHODS
Slim Trim as a reducer Use SlimTrack (Metal Track) for up to 4 mm floors. Up to 4 mm Floors 3/8 *If the flooring manufacturer suggests/permits the use of underlayments you may need to shim the track to
More informationINSTALLATION. Installation Guide. Installing Bamboo Flooring on Top of a Wood Subfloor
READ COMPLETELY BEFORE STARTING INSTALLATION. Congratulations on choosing Yanchi bamboo flooring. Please take time to read the following procedures before you begin installation. With the correct installation
More informationInstallation Manual. Solid Plastic Toilet Partitions. IN CANADA & AREAS OTHER THAN U.S.A.: IN THE U.S.A.:
Installation Manual Solid Plastic Toilet Partitions Toilet Partitions & Lockers IN THE U.S.A.: Hadrian Inc., 7420 Clover Avenue, Mentor, OH 44060 Telephone: 440-942-9118 Fax: 440-942-9618 U.S. toll free
More informationInstallation Instructions Split Shake, Staggered Shake, Shingle, Perfection Shingle, and Shapes
Installation Instructions Split Shake, Staggered Shake, Shingle, Perfection Shingle, and Shapes General Guidelines These instructions show one type of installation and are intended for the professional
More informationInstallation Instructions Stainless Steel Wall Panels
Please read all instructions before installing wall panels. Always plan before you place! 1. Before installation: a. Acclimate Stain Steel Panels, Trim, adhesives and wall substrates to room temperature
More informationChapter 14. Wall Sheetrock
Chapter 14. Wall Sheetrock 14.1 PREPARATION 14.2 PLANNING 14.3 GENERAL INSTALLATION RULES 14.4 INSTALLING WALL SHEETROCK 14.5 FINISHING AND CLEANUP Tools needed by volunteers: Nail apron Tape measure Utility
More informationInstallation Manual SOLID CORE SIDING
Installation Manual SOLID CORE SIDING SOLID CORE SIDING Installation Information contained in this manual can be viewed in video form at: www.youtube.com/epbc CONTENTS Important Notes...2-4 Weather Protective
More informationTrendwood Flooring Installation Instructions
Trendwood Flooring Installation Instructions READ ALL OF THESE INSTRUCTIONS THOROUGHLY BEFORE BEGINNING INSTALLATION. Flooring Installation Instructions PRIOR TO INSTALLATION It is the installer's responsibility
More informationInstallation Guidelines
Installation Guidelines Exteria Building Products provides these instructions as general guidelines only. Exteria Building Products neither installs siding nor has any control over any installation. The
More informationINSTALLATION INSTRUCTIONS IMPERVIA SLIDING PATIO DOOR WITH FINS
2008 Pella Corporation Part Number: 803V0101 INSTALLATION INSTRUCTIONS IMPERVIA SLIDING PATIO DOOR WITH FINS Installation Instructions for Typical Wood Frame Construction. These instructions were developed
More information2.9 WINDOW & DOOR BUCKS
2.9 WINDOW & DOOR BUCKS Bucks provide attachment surfaces for windows and doors while holding back concrete from these openings during concrete placement. Mark the center and edges of openings as you place
More informationLUX INSTALLATION GUIDE. LUX Panel V Groove Installation. Installation Guide. February
LUX Panel V Groove Installation Installation Guide February 2017 www.luxpanel.ca LUX Panel V Groove Installation LUX panel steel cladding is designed to be installed vertically, horizontally, diagonally
More informationINSTALLATION INSTRUCTIONS of Chevron and Herringbone Engineered Hardwood Flooring
INSTALLATION INSTRUCTIONS of Chevron and Herringbone Engineered Hardwood Flooring www.tomson-floors.com TABLE OF CONTENTS 3 USING THE PRODUCT 3 YOUR RESPONSIBILITIES 4 PRE-INSTALLATION INSPECTION 5 BASIC
More informationLifestyle Laminates Uniclic Floating Floor
Lifestyle Laminates Uniclic Floating Floor Thank you for choosing Wellmade Laminate Flooring, featuring the glue-less Uniclic floating installation system. You have selected one of the highest quality
More informationEngineered Strand Uniclic Floating Installation
Engineered Strand Uniclic Floating Installation Introduction Thank you for choosing our Engineered Strand Bamboo Flooring! You have selected one of the highest quality engineered floors available. Our
More informationInstall Windsor Corners
Install Windsor Corners Tools and Supplies You'll Need 1. Exterior Grade Screws use screws that are long enough to go through the FauxPanel and firmly attach to the wall behind the FauxPanel. We recommend
More information1INSTALLATION GUIDE: ENGINEERED WOOD FLOORING
1INSTALLATION GUIDE: ENGINEERED WOOD FLOORING INSTALLATION GUIDELINES FOR ENGINEERED WOOD FLOORING These guidelines are designed to complement the current South African Flooring Standards. Engineered wood
More informationExtendable Large Dovetail Jig
Extendable Large Dovetail Jig Instruction Manual Part # 3458 CAUTION: Please read, understand, and follow all manufacturers instructions, guidelines and owners manuals that come with your power tools.
More informationCurium 19.4H Installation Instructions & Parts List
Curium 19.4H Installation Instructions & Parts List Illustration Curium 19.4H Right Hand Page 1 of 21 30/06/2016 Revision 1.0 IMPORTANT This shower screen / enclosure must be installed by suitably qualified
More informationPanel Installation Instructions
EXTREMELY IMPORTANT INFORMATION PLEASE READ ENTIRE PACKET! Warranty Is Void If Panels Not Installed According to Instructions 1. WARNINGS & SPECIAL NOTES 1.1 Keep panels 24 from Heaters and shield Radiant
More information¾ Solid Installation Instructions
¾ Solid Installation Instructions Thank you for choosing STRAVAGANZA products! Hardwood flooring is a natural product; therefore defects in the flooring can occur in the manufacturing process or naturally
More informationSilverware Chest Plan
Silverware Chest Plan 05L14.01 Introduction 1. Measure the space required for your cutlery before beginning this project to be sure that it will fit in the drawers and top compartment. The best way to
More information3.1 Continuous top and bottom lock 3.2 Engineered nailing hem 3.3 Temperature markings
AOBP recommends 2-1/2 ring shank nails be used. Installation over foam will require longer fasteners to assure a penetration of at least 3/4 into a structural member (stude or nail base). Corner accessories
More informationLaminate Floor Installation Guide
Laminate Floor Installation Guide Introduction This guide will take you through the necessary steps to install your Bel-Air Laminate Flooring. Make sure to carefully read through this guide so that you
More informationInstallation Instructions for. Before You Begin TOOLS REQUIRED
Composite Railing System STEP-BY-STEP Installation Instructions for Spectrum Composite Railing Virtually maintenance free 20-year warranty EverNew Spectrum Railing system is designed to work with a number
More informationFlashing Materials. Rough Opening Preparation
Installation Instructions for CertainTeed New Construction Windows Handling vinyl windows CAUTION: Always store vinyl windows and doors in an upright position on a slight angle. Never lay them flat or
More informationINSTALLATION INSTRUCTIONS
Part I INSTALLATION AND CARE: Product Description: Engineered T&G hardwood flooring planks ore designed for use in multiple locations. Acceptable location includes basements, ground floors or high-rise
More informationPlexidor Pet Door Wall Kit Instruction for All Sizes Plexidor : S, M, L, XL; BiteGuard KennelPlex TM 1113,1418, 1419 & 1825 and Plexidor Electronic LG
Plexidor Pet Door Wall Kit Instruction for All Sizes Plexidor : S, M, L, XL; BiteGuard KennelPlex TM 1113,1418, 1419 & 1825 and Plexidor Electronic LG Congratulations on your purchase of the Plexidor Pet
More informationCurium 19H Installation Instructions & Parts List
Curium 19H Installation Instructions & Parts List Illustration Curium 19H Right Hand Page 1 of 15 01/07/2016 Revision 2.1 IMPORTANT This shower screen / enclosure must be installed by suitably qualified
More informationLaying instructions Installation of multilayer Herringbone / Basket-weave with tongue and groove joint.
Laying instructions Installation of multilayer Herringbone / Basket-weave with tongue and groove joint. Preparation Store the boards in their packaging and open them as you need them. Read the instructions
More informationINSTALLATION GUIDE.
INSTALLATION GUIDE Hardwood floors are a product of nature and therefore not entirely free of typical timber features such as grain variation and knots. Every piece of wood has different grain, colour
More informationINSTALLATION INSTRUCTIONS IMPERVIA (Vent and Fixed) AWNING, CASEMENT, and LARGE AWNING WINDOW WITH FINS
2012 Pella Corporation Part Number: 80WH0101 INSTALLATION INSTRUCTIONS IMPERVIA (Vent and Fixed) AWNING, CASEMENT, and LARGE AWNING WINDOW WITH FINS Installation Instructions for Typical Wood Frame Construction.
More informationNail-Down Installation Instructions Prefinished 3/4 and 5/8 solid
Nail-Down Installation Instructions Prefinished 3/4 and 5/8 solid Thank you for choosing 3 4 or 5 8 Exotic Hardwood Flooring. Protect your investment; review and adhere to the flooring installation instructions.
More informationPlease read and understand all instructions before beginning. These instructions cover impact and non-impact aluminum French Door 650/750.
The performance and proper operation of a door is only as good as the installation. By following these instructions, the probability of a good installation greatly increases. Please read and understand
More informationRoll Out Vinyl Installation Guide
Sub-floor Requirements The contractor performing the installation of the performance vinyl flooring must ensure the proper quality of the sub-floor. The sub-floor must be clean, smooth, permanently dry,
More informationWoodWORKS Channeled Plank
CEILING&WALL SYSTEMS Between us, ideas become reality WoodWORKS Channeled Plank Assembly and Installation Instructions 1. General 1.1 Product Description WoodWorks Channeled acoustical ceiling and wall
More informationInsolroll Clutch Operated Shades Installation Instructions Installation Instructions
All clutch operated shades are shipped fully assembled and ready for installation. Mounting screws are not provided. Screws for chain guide installation to meet the child safety standards are provided.
More informationSIDING-MASTER VINYL SIDING ATTACHMENT & ALIGNMENT SYSTEM & OVERHANG ATTACHMENT & ALIGNMENT SYSTEM INSTALLATION INSTRUCTIONS
Patent Pending SIDING-MASTER & OVERHANG ATTACHMENT & ALIGNMENT SYSTEM INSTALLATION INSTRUCTIONS Overview... SIDING-MASTER Strip Diagram... How to cut strips for length... Accessory Diagrams... How to (and
More informationRadon 07 Installation Instructions & Parts List
Radon 07 Installation Instructions & Parts List Illustration Radon 07, H1 Handle Right Hand: Open Out 14/06/2016 Revision 1.1 Page 1 of 21 IMPORTANT This shower screen / enclosure must be installed by
More informationCOMPOSITE SIDING INSTALLATION GUIDE
CENTURY HOME LIVING COMPOSITE SIDING INSTALLATION GUIDE Read all instructions prior to installing any siding product. Failure to install and finish this product in accordance with all local building codes,
More informationBest Barns USA. the Brookhaven 10' x 16' Assembly Book. revised March 23, 2016
Best Barns USA Assembly Book revised March 23, 2016 the Brookhaven 10' x 16' Manufactured by Reynolds Building Systems, Inc. 205 Arlington Drive Greenville, PA 16125 724-646-3775 This manual is copyrighted.
More informationHeatBoard Joisted Floor System
Design HeatBoard Joisted Floor System The Floor Heating Warehouse Underfloor Heating using Heatboard Slotted and Turning Boards is intended for installation on standard wood joist floors of a max. 600mm
More information- Before You Begin - Standard Apex / Tall Apex Shed Kit Instructions IMPORTANT!
Customer Service: (801)754-3334 810 W Utah Ave #8 Payson, Utah 84651 email: apexshedcompany@gmail.com Standard Apex / Tall Apex Shed Kit Instructions Tools Needed: Framing Hammer Tape Measure (25 ft.)
More informationInstallation Instructions Palladium Square Edge Panels
Please read all instructions before installing wall panels Important 1. Before installation: a. Acclimate Palladium Panels, Trim, adhesives and wall substrates to room temperature 24 hours before installation.
More informationSIDE FOLDING POST ADJUSTMENTS
SIDE FOLDING POST ADJUSTMENTS TABLE OF CONTENTS WARNINGS AND SAFETY INFORMATION 3 TOOLS REQUIRED 4 GENERAL NOTES 5 POST IDENTIFICATION 6 POST TO CURTAIN CONNECTIONS 8 P01/P03 LOCK PLATE HEIGHT ADJUSTMENT
More informationXL JOINERY LTD LA PORTE VISTA MODULAR 3 ASSEMBLY INSTRUCTIONS
XL JOINERY LTD LA PORTE VISTA MODULAR 3 2090mm High x 4687mm Wide ASSEMBLY INSTRUCTIONS READ AND UNDERSTAND THESE INSTRUCTIONS FULLY PRIOR TO STARTING INSTALLATION. IT IS STRONGLY RECOMMENDED THAT A COMPETENT
More informationPanel Installation Instructions
EXTREMELY IMPORTANT INFORMATION PLEASE READ ENTIRE PACKET! Warranty Is Void If Panels Not Installed According to Instructions 1. WARNINGS & SPECIAL NOTES 1.1 Keep panels 24 from Heaters and shield Radiant
More informationFraming & Electrical Rough-in for Recess Mount IS Panel System
Framing & Electrical Rough-in for Recess Mount IS Panel System Overview Careful pre-planning and design lay-out are critical to successfully installing a Recess Mount IS (Infra- Sauna) Panel System. The
More informationZip Block MODEL ZB INSTALLATION INSTRUCTIONS
Zip Block MODEL ZB 100-400 INSTALLATION INSTRUCTIONS 12BT EXPOSED SURFACE SEAL WIDTH Zip Block SEAL 3/4" ± 1/8" [19.05mm ± 3.18mm] BLOCKOUT EDGE 3 1/2" [88.90mm] MAXIMUM BLOCKOUT NOMINAL JOINT WIDTH EPOXY
More informationDubnium 11 Installation Instructions & Parts List
Dubnium 11 Installation Instructions & Parts List Illustration Dubnium, H1 Handle Right Hand: Open Out Page 1 of 25 IMPORTANT This shower screen / enclosure must be installed by suitably qualified individuals.
More informationThe Festival Assembly Instructions
The Festival Assembly Instructions Toll Free: 866.768.8465 Hours: 9-5 Monday-Friday EST www.homeplacestructures.com Package ships as shown CONTACT INFORMATION: HomePlace Structures 301 Commerce Drive New
More informationCellular Shades SLUMBERSHADE. with energy saving blackout sidetracks. Installation & Care Instructions
Cellular Shades SLUMBERSHADE with energy saving blackout sidetracks Installation & Care Instructions 152725 B 9/14/2017 GETTING STARTED A few simple tools are required: - Measuring tape - Power drill,
More information