1 COUNTY OF SAN MATEO PLANNING AND BUILDING DEPARTMENT Item #0 / PLN DATE: March 28, 2012 TO: FROM: SUBJECT: Planning Commission Planning Staff EXECUTIVE SUMMARY: Consideration of a Coastal Development Permit to co-locate 4G wireless broadband network facilities for the Bay Area Wireless Enhanced Broadband System emergency response network at three existing public safety antenna sites in the unincorporated Coastside area of San Mateo County. This project is appealable to the California Coastal Commission. PROPOSAL In an effort to improve first responder communications, the Federal government has awarded grant funds to San Mateo County to construct the County s portion of the Bay Area Wireless Enhanced Broadband System (BayWEB). The County s Information Services Department (ISD) has taken the lead role in implementation of this project within the County. The BayWEB has been developed by a collaborative public-private partnership to build and operate a 4G wireless broadband network across the Bay Area. The system will support data interoperability, allowing Bay Area emergency responders to connect on a common dedicated data network for the first time. In a disaster situation, BayWEB will enable emergency responders to have broadband access to mission-critical information and improve the delivery of health and safety services to County residents. ISD is proposing to co-locate at the following three locations: A. Pescadero Located at the County s old quarry site off of Bean Hollow Road, the Pescadero site serves as a major southern/coastal site for San Mateo County s Public Safety Radio System. Currently at this site there is equipment and antennas at the UHF band (for San Mateo County s Public Safety Radio System), at the VHF band (for San Mateo County s FireNet System) and the 700 MHz band (for San Mateo County s P-25 Interoperable Radio System). ISD proposes to place two equipment cabinets on a raised metal platform adjacent to the existing equipment building. The new equipment cabinets will be connected to the adjacent 40-foot tall monopole via a cable bridge. On the monopole both existing 3-foot diameter microwave dishes will be replaced with 6-foot diameter dishes at the same location. At the top of the monopole, a new mini-pole with three panel antennas will be attached. B. Pigeon Point located on private property, at 400 Pigeon Point Road, this site provides radio coverage to the southern-most area of the San Mateo County Coast. Currently at this site there is equipment and antennas at the UHF band (for San Mateo County s Public

2 Safety Radio System), at the VHF band (for San Mateo County s FireNet System), at the 700 MHz band (for San Mateo County s P-25 Interoperable Radio System) and a cellphone Carrier (AT&T). The project involves the placement of two equipment cabinets on a new concrete pad adjacent to the existing antenna tower (within the existing fenced lease area). The project will replace the existing 6-foot diameter microwave dish with one of similar size and add three panel antennas to the top of the lattice tower. C. North Peak (Montara Mountain) Located on Montara Mountain, the North Peak Site offers the most radio coverage to the Central and Northern Coastal areas of San Mateo County. Currently at this site there are equipment and antennas at the UHF band (for San Mateo County s Public Safety Radio System), at the VHF band (for San Mateo County s FireNet System) and the 700 MHz band (for San Mateo County s P-25 Interoperable Radio System), as well as State and Federal Agencies such as Caltrans, the California Highway Patrol (CHP), and the Golden Gate National Recreation Area (GGNRA). The project proposes placing two equipment cabinets within the existing equipment compound and attaching three panel antennas and a 2-foot diameter microwave dish to the larger of the two existing towers on-site. Three existing 6-foot diameter microwave dishes on the smaller tower will also be replaced in their existing locations. RECOMMENDATION Approve the Coastal Development Permit, County File Number PLN , by adopting the required findings and conditions of approval. SUMMARY As a County agency, the Information Services Department is exempt from local building and zoning regulations (Government Code 53091); however, a Coastal Development Permit, in compliance with Local Coastal Program Policy 2.1, must be approved by the Planning Commission before construction can begin. After reviewing the project, staff has concluded that the project qualifies for a Categorical Exemption from further CEQA review. Upon approval, staff will file the required exemption form with the County Recorder s Office. The proposed work by the Information Services Department will greatly enhance public safety by improving first responder communications. Staff has reviewed this project and determined that the impacts will be minimal as all three sites are already developed with communication facilities. Only at Site A (Old County Quarry, Pescadero) will open land be developed. The amount of land to be disturbed is very small (approximately 64 sq. ft.) and immediately adjacent to an existing structure. As conditioned by staff, this project will comply with the County s Local Coastal Program and minimize impacts to coastal resources. MS:pac MJSW0162_WPU.DOCX - 2 -

3 COUNTY OF SAN MATEO PLANNING AND BUILDING DEPARTMENT DATE: March 28, 2012 TO: FROM: SUBJECT: Planning Commission Planning Staff Consideration of a Coastal Development Permit, pursuant to Section of the County Zoning Regulations, to co-locate 4G wireless broadband network facilities for the Bay Area Wireless Enhanced Broadband System emergency response network at three existing public safety antenna sites in the unincorporated Coastside area of San Mateo County. This project is appealable to the California Coastal Commission. County File Number: PLN (SMCo. ISD Communications) PROPOSAL In an effort to improve first responder communications, the Federal government has awarded grant funds to San Mateo County to construct the County s portion of the Bay Area Wireless Enhanced Broadband System (BayWEB). The County s Information Services Department (ISD) has taken the lead role in implementation of this project within the County. The BayWEB has been developed by a collaborative public-private partnership to build and operate a 4G wireless broadband network across the Bay Area. The system will support data interoperability, allowing Bay Area emergency responders to connect on a common dedicated data network for the first time. In a disaster situation, BayWEB will enable emergency responders to have broadband access to mission-critical information and improve the delivery of health and safety services to County residents. ISD is proposing to co-locate at the following three locations: A. Pescadero Located at the County s old quarry site off of Bean Hollow Road, the Pescadero site serves as a major southern/coastal site for San Mateo County s Public Safety Radio System. Currently at this site there is equipment and antennas at the UHF band (for San Mateo County s Public Safety Radio System), at the VHF band (for San Mateo County s FireNet System) and the 700 MHz band (for San Mateo County s P-25 Interoperable Radio System). ISD proposes to place two equipment cabinets on a raised metal platform adjacent to the existing equipment building. The new equipment cabinets will be connected to the adjacent 40-foot tall monopole via a cable bridge. On the monopole both existing 3-foot diameter microwave dishes will be replaced with 6-foot diameter dishes at the same location. At the top of the monopole, a new mini-pole with three panel antennas will be attached.

4 B. Pigeon Point located on private property, at 400 Pigeon Point Road, this site provides radio coverage to the southern-most area of the San Mateo County Coast. Currently at this site there is equipment and antennas at the UHF band (for San Mateo County s Public Safety Radio System), at the VHF band (for San Mateo County s FireNet System), at the 700 MHz band (for San Mateo County s P-25 Interoperable Radio System) and a cellphone Carrier (AT&T). The project involves the placement of two equipment cabinets on a new concrete pad adjacent to the existing antenna tower (within the existing fenced lease area). The project will replace the existing 6-foot diameter microwave dish with one of similar size and add three panel antennas to the top of the lattice tower. C. North Peak (Montara Mountain) Located on Montara Mountain, the North Peak Site offers the most radio coverage to the Central and Northern Coastal areas of San Mateo County. Currently at this site there are equipment and antennas at the UHF band (for San Mateo County s Public Safety Radio System), at the VHF band (for San Mateo County s FireNet System) and the 700 MHz band (for San Mateo County s P-25 Interoperable Radio System), as well as State and Federal Agencies such as Caltrans, the California Highway Patrol (CHP), and the Golden Gate National Recreation Area (GGNRA). The project proposes placing two equipment cabinets within the existing equipment compound and attaching three panel antennas and a 2-foot diameter microwave dish to the larger of the two existing towers on-site. Three existing 6-foot diameter microwave dishes on the smaller tower will also be replaced in their existing locations. RECOMMENDATION Approve the Coastal Development Permit, County File Number PLN , by adopting the required findings and conditions of approval. BACKGROUND Report Prepared By: Michael Schaller, Senior Planner, Telephone 650/ Applicant: San Mateo County Information Services Department - Communications Owners: Site A: San Mateo County Site B: Allan Bernardi Site C: S.F. Public Utilities Commission Locations: Site A: 910 Bean Hollow Road, Pescadero Site B: 440 Pigeon Point Road, Pescadero Site C: 3601 Whiting Ridge Road, Montara APNs: Site A: Site B: Site C: Existing Zoning: Site A: RM-CZ (Resource Management Coastal Zone) Site B: PAD (Planned Agricultural Development) Site C: RM-CZ (Resource Management Coastal Zone) - 2 -

5 General Plan Designation: Site A: Open Space Site B: Agriculture Site C: Open Space Existing Land Use: Site A: Open Space (old County Quarry) Site B: Rural Residential and Open Space/Grazing Site C: Open Space and Recreation (McNee Ranch State Park) Flood Zone: All three project sites are located in areas of minimal flooding (Zone C), per the County FEMA flood maps. Environmental Evaluation: Categorically Exempt under Section (New construction and/or locating of small equipment and structures) of the California Environmental Quality Act. Setting: Site A: The project site is a flat, disturbed grassland area located on a gently sloping ridge top within the County s Pescadero Corporation Yard. There is an existing County Communications antenna tower and equipment building on the project site. The new equipment cabinets will be placed immediately adjacent to the equipment building. The site is surrounded to the west by open grassland, farmland and Highway 1; to the north by the old County Quarry, and a CDF fire station; to the south and east by open grassland. Water resources near the site include a 1-acre pond that is approximately 550 feet northeast of the project site and down slope. Butano Creek is approximately 2,000 feet east of the site. Site B: The project site is located approximately 1-mile east of Cabrillo Highway (Highway 1) and approximately 4.15 miles south of the Town of Pescadero. The eastern property lines abut Peninsula Open Space Trust lands. The parcel is not located in any scenic corridors. The parcel is improved with a single-family residence, barn (storage and horse stables), other storage structures, and an existing cellular facility and Sheriff repeater. The proposed project will be constructed immediately adjacent to an existing equipment shelter and antenna tower. The project will occupy previously disturbed land. Site C: This project site is located on the north peak of Montara Mountain. The site contains an existing concrete block equipment building and two lattice steel towers. The project will place additional equipment racks within the equipment building and on the towers. No new ground disturbance will occur. DISCUSSION A. KEY ISSUES 1. Conformance with the County General Plan and Zoning Regulations Pursuant to Section of the California Government Code, projects undertaken by a County Department are exempt from review under the County s General Plan and Zoning Regulations

6 2. Conformance with San Mateo County Local Coastal Program (LCP) A Coastal Development Permit is required pursuant to San Mateo County Local Coastal Program Policy 2.1, which mandates compliance with the California Coastal Act for any government agency wishing to undertake development in the Coastal Zone. Development includes changes in the density or intensity of use of land, as well as the construction, reconstruction, demolition, or alteration of the size of any structure, including any facility of any private, public, or municipal utility. Summarized below are the following sections of the LCP that are relevant to this project: a. Agriculture Component Policy 5.10 (Conversion of Land Suitable for Agriculture Designated as Agriculture) prohibits conversion of lands suitable for agriculture unless the following can be demonstrated: (1) all agriculturally unsuitable lands have been developed or are not developable, (2) continued or renewed agricultural use of the soils is not feasible, (3) clearly defined buffer areas are developed between agriculture and non-agriculture uses, and (4) the productivity of any adjacent agricultural lands is not diminished. Site B is on a parcel zoned Planned Agricultural Development. The entire parcel has been designated as lands suitable for agriculture. As proposed, the project will utilize already converted soils: the new equipment cabinets will be placed within the existing equipment enclosure on the project site. No additional soil conversion will be required to complete this project. The existing equipment enclosure is buffered from potential agriculture by the existing farm buildings. Due to the project s location on the parcel, it is not likely that this facility would have significant agricultural impacts on adjacent lands, were those lands in agricultural production. Sites A and C are not on lands designated suitable for agriculture. b. Sensitive Habitats Component Policy 7.1 Definition of Sensitive Habitats. This policy defines sensitive habitats as any area in which plant or animal life or their habitats are either rare or especially valuable. As mentioned above, there is a pond approximately 550 feet to the northeast and down slope of Site A. The pond provides potential habitat for California red-legged frog (CRLF) and San Francisco garter snake (SFGS). Site A is potentially within the typical upland refugia zone for both species. Sites B and C are within areas that contain no habitat or vegetation. Policy 7.3 Protection of Sensitive Habitats. This policy requires that development in areas adjacent to sensitive habitats be sited and designed to prevent impacts that could significantly degrade these resources. The proposed equipment at Site A will not impact primary sensitive habitat. The area immediately - 4 -

7 around the existing equipment shelter is characterized by open grassland that is frequently mowed by the County to reduce fuel loads and reduce fire hazard at the site. While primary habitat for the two species will not be impacted, there is still the potential for individual frogs or snakes to be negatively impacted if they are in the immediate project area during construction activities. To mitigate against such impact, staff is recommending that the applicant conduct preconstruction surveys, retain a biological monitor during construction, and erect a frog/snake exclusion fence around the project site prior to construction. These measures have been included as Conditions of Approval Nos. 7 9 in Attachment A. c. Visual Resources Policy Development on Skylines and Ridgelines. This policy prohibits the location of development, in whole or in part, on a skyline or ridgeline, or where it will project above a skyline or ridgeline, unless there is no other developable building site on the parcel. At Site A, the existing monopole that the applicant wishes to co-locate onto sits at the top of a hill and projects above the skyline. This location allows the emergency communications equipment to have a clear line of site throughout the Pescadero area, thus achieving its goal. The additional panel antennas will have a minimal new impact in relation to the already existing visual impact, particularly when the new antennas have been painted a light grey to match the existing equipment, as is conditioned in Attachment A. At Site B, while the project location is on a skyline, it is not visible from any adjacent public road or viewing area because of distance and differences in elevation. Additionally, surrounding agricultural buildings and trees break up the view of the monopole on which the new equipment will be placed. Site C does not project above a skyline or ridgeline and is extremely difficult to see from adjacent public roads due to distance. B. ENVIRONMENTAL REVIEW Categorically Exempt under Section (New construction and/or locating of small equipment and structures) of the California Environmental Quality Act. C. REVIEWING AGENCIES California Coastal Commission ATTACHMENTS A. Recommended Findings and Conditions of Approval B. Location Maps C. Site Plans D. Elevations MS:pac MJSW00163_WPU.DOCX - 5 -

8 Attachment A County of San Mateo Planning and Building Department RECOMMENDED FINDINGS AND CONDITIONS OF APPROVAL Permit or Project File Number: PLN Hearing Date: March 28, 2012 Prepared By: Michael Schaller, Senior Planner For Adoption By: Planning Commission RECOMMENDED FINDINGS Regarding the Environmental Review, Find: 1. That the project is categorically exempt pursuant to Section 15303, Class 3 of the California Environmental Quality Act related to new construction and/or locating of small equipment and structures. Regarding the Coastal Development Permit, Find: 2. That the project, as described in the application and accompanying materials required by Zoning Regulations Section and as conditioned in accordance with Section , conforms with the plans, policies, requirements and standards of the San Mateo County Local Coastal Program as discussed in the staff report under Section A.2, including protection of biological resources. 3. That the project conforms to the specific findings required by policies of the San Mateo County Local Coastal Program as discussed in the staff report under Section A.2, the applicant has agreed to implement the mitigation measures identified in this report in order to minimize any potential impact to biological resources to a less than significant level. RECOMMENDED CONDITIONS OF APPROVAL 1. The approval applies only to the proposal as described in this report and materials approved by the Planning Commission on March 28, Minor modifications to the project may be approved by the Community Development Director if they are consistent with the intent of, and in substantial conformance with, this approval. 2. The applicant shall implement construction best management practices (BMPs) as necessary. Said practices shall conform to the San Mateo Countywide Stormwater Pollution Prevention Program General Construction and Site Supervision Guidelines and include, but not be limited to: - 6 -

9 a. Using filtration materials on storm drain covers to remove sediment from dewatering effluent. b. Stabilizing all denuded areas and maintaining erosion control measures continuously between October 15 and April 15. c. Removing spoils promptly, and avoiding stockpiling of fill materials when rain is forecast. If rain threatens, stockpiled soils and other materials shall be covered with a tarp or other waterproof material. d. Storing, handling, and disposing of construction materials and wastes so as to avoid their entry to a local storm drain system or water body. e. Avoiding cleaning, fueling or maintaining vehicles on-site, except in an area designated to contain and treat runoff. f. The applicant is responsible for ensuring that all contractors minimize the transport and discharge of pollutants from the project site into existing drainage systems and water bodies and adhere to the above referenced practices. The contractor shall train and provide instruction to all employees and subcontractors regarding the construction best management practices (as listed above). 3. This permit shall be valid for one year. Any extension of this permit shall require submittal of an application for permit extension and payment of applicable permit extension fees 60 days prior to expiration. 4. The applicant shall implement erosion control and containment BMPs (e.g., installation of sandbags, silt fencing, and/or natural fiber tightly woven straw wattles, street sweeping) to prevent delivery of pollutants into off-site drainages. 5. At Site A, the applicant shall time their project to occur during the dry season (June 15 to October 15). This will reduce the potential for CRLF to be occupying the project area during construction. 6. At Site A, the applicant shall have a qualified biologist present worker awareness training for construction personnel describing the species, their protected status, their ecology, and measures to be taken to avoid impacts prior to any construction. 7. At Site A, prior to the beginning of construction, the applicant s biologist shall conduct surveys for special status semi-aquatic species and other wildlife. If sensitive semi-aquatic species (CRLF, SFGS) are observed near the project area, the appropriate agencies, Department of Fish and Game (DFG) and United States Fish and Wildlife Service (USFWS), will be notified immediately

10 8. At Site A, the applicant shall have a qualified biologist on the site to monitor construction activities. The monitoring biologist shall inspect the work area for wildlife each day prior to the start of construction activities. Work will not take place in any area in which CRLF or SFGS are present. If these species are detected within the active work area, maintenance activities shall stop until a permitted biologist relocates the animal or it leaves on its own. The monitoring biologist shall inspect beneath all vehicles that have been parked for more than 15 minutes before they leave the project sites. 9. At Site A, prior to the start of construction, Wildlife Exclusion Fencing (WEF) for California red-legged frogs and San Francisco garter snakes will be installed around the area of construction. The exact location of the fencing will be determined by the applicant s biologist based on habitat suitability. The fencing will be maintained throughout the duration of the work activities, regularly inspected, and completely removed following project completion. 10. The applicant shall paint all equipment cabinets and cable trays a light earthtone color to match surrounding vegetation. All antennas shall be painted a light grey color to match existing antennas on-site and blend in with the background sky. MS:pac MJSW0163_WPU.DOCX - 8 -

11 U NNAMED STATE HIGHWAY 1 PROJECT SITE UNNAMED UNNA MED 8TH 11TH 14TH 16TH 5TH SIERRA 3RD 7TH EAST KANOFF 4TH ,100 2,200 3,300 4,400 Feet 6TH AUDUBON ACACIA CEDAR UNNAMED JORDAN NIZONI BIRCH ELM DATE IVY FIR HARTE BUENA VISTA GRANT ALAMO JORDAN UNNA ME D Vicinity Map San Mateo County Planning Commission Meeting L:\_PlanningLayer\GIS\VicinityMap\pln mxd ba Owner/Applicant: BAY WEB - SITE C Attachment: B

12 San Mateo County Planning Commission Meeting Owner/Applicant: BAY WEB - SITE C Attachment: C

13 San Mateo County Planning Commission Meeting Owner/Applicant: BAY WEB - SITE C Attachment: C

14 San Mateo County Planning Commission Meeting Owner/Applicant: BAY WEB - SITE C Attachment: D

15 O RESERVOIR P ESCADERO CREEK R-1/S-10/DR/CD R-1/S-7/DR/CD HILL PROJECT SITE RM-CZ/CD ARTICHOKE ALLEY BEAN HOLLOW PAD/CD ,425 1,900 Feet Vicinity Map San Mateo County Planning Commission Meeting L:\_PlanningLayer\GIS\VicinityMap\pln mxd ba Owner/Applicant: BAY WEB - SITE A Attachment: B

16 San Mateo County Planning Commission Meeting Owner/Applicant: BAY WEB - SITE A Attachment: C

17 San Mateo County Planning Commission Meeting Owner/Applicant: BAY WEB - SITE A Attachment: C

18 San Mateo County Planning Commission Meeting Owner/Applicant: BAY WEB - SITE A Attachment: D

19 PROJECT SITE LIGHTHOUSE VIEW OCEAN VIEW PAD/CD PIGEON POINT STATE HIGHWAY ,040 1,560 2,080 Feet Vicinity Map San Mateo County Planning Commission Meeting L:\_PlanningLayer\GIS\VicinityMap\pln mxd ba Owner/Applicant: BAY WEB - SITE B Attachment: B

20 San Mateo County Planning Commission Meeting Owner/Applicant: BAY WEB - SITE B Attachment: C

21 San Mateo County Planning Commission Meeting Owner/Applicant: BAY WEB - SITE B Attachment: C

22 San Mateo County Planning Commission Meeting Owner/Applicant: BAY WEB - SITE B Attachment: C

Proposed Action Hutch Mountain Communications Site Coconino National Forest June 2016

Proposed Action Hutch Mountain Communications Site Coconino National Forest June 2016 Proposed Action Hutch Mountain Communications Site Coconino National Forest June 2016 PURPOSE AND NEED The proposed Hutch Mountain Communications Site project is part of a broader wireless industry strategy

More information

WIRELESS TELECOMMUNICATION FACILITIES. Chapter 15

WIRELESS TELECOMMUNICATION FACILITIES. Chapter 15 Title 9 Land Management Code WIRELESS TELECOMMUNICATION FACILITIES Chapter 15 9-15-1: PURPOSE: 9-15-2: DEFINITIONS: 9-15-3: APPLICABILITY: 9-15-4: MASTER PLAN REQUIRED: 9-15-5: ALLOWABLE USES: 9-15-6:

More information

City of San José, California CITY COUNCIL POLICY

City of San José, California CITY COUNCIL POLICY City of San José, California CITY COUNCIL POLICY TITLE 1 1 of 6 EFFECTIVE DATE 1/22/91 REVISED DATE 9/16/03 APPROVED BY Council Action - January 22, 1991; August 11, 1992; August 20, 1996 (9d); September

More information

Frequently Asked Questions about Wireless Facilities on Wooden Utility Poles and Streetlight Poles

Frequently Asked Questions about Wireless Facilities on Wooden Utility Poles and Streetlight Poles City Hall 10300 Torre Avenue Cupertino, CA 95014-3255 PH: (408) 777-3354 FX: (408) 777-3333 PUBLIC WORKS DEPARTMENT Frequently Asked Questions about Wireless Facilities on 1. What is a small cell facility?

More information

David J. Gellner, AICP, Principal Planner

David J. Gellner, AICP, Principal Planner Staff Report PLANNING DIVISION COMMUNITY & ECONOMIC DEVELOPMENT To: From: Salt Lake City Planning Commission David J. Gellner, AICP, Principal Planner - 801-535-6107 - david.gellner@slcgov.com Date: October

More information

Application Submittal Checklist for a BASIC USE PERMIT (BUP) Planning & Development Department Planning Division

Application Submittal Checklist for a BASIC USE PERMIT (BUP) Planning & Development Department Planning Division Application Submittal Checklist for a BASIC USE PERMIT (BUP) APPLICABILITY. This checklist should be used when submitting an application for a Basic Use Permit. When is a Basic Use Permit required? Section

More information

Sec Radio, television, satellite dish and communications antennas and towers.

Sec Radio, television, satellite dish and communications antennas and towers. Se 2106. - Radio, television, satellite dish and communications antennas and towers. (a) (b) (c) (d) No guy wires or other accessories associated with any antenna or tower shall cross, encroach, or otherwise

More information

SECTION 35 ANTENNAS AND TOWERS

SECTION 35 ANTENNAS AND TOWERS SECTION 35 ANTENNAS AND TOWERS Section: 515-35-1 Purpose and Intent 515-35-2 General Standards 515-35-3 Certification, Inspection and Maintenance 515-35-4 Tower Design 515-35-5 Co-Location Requirement

More information

CHAPTER 11 PRELIMINARY SITE PLAN APPROVAL PROCESS

CHAPTER 11 PRELIMINARY SITE PLAN APPROVAL PROCESS CHAPTER 11 PRELIMINARY SITE PLAN APPROVAL PROCESS 11.01.00 Preliminary Site Plan Approval 11.01.01 Intent and Purpose 11.01.02 Review 11.01.03 Application 11.01.04 Development Site to be Unified 11.01.05

More information

COUNTY OF CLEVELAND, NORTH CAROLINA AGENDA FOR THE PLANNING BOARD MEETING. July 31, :00 PM. Commissioners Chamber

COUNTY OF CLEVELAND, NORTH CAROLINA AGENDA FOR THE PLANNING BOARD MEETING. July 31, :00 PM. Commissioners Chamber COUNTY OF CLEVELAND, NORTH CAROLINA AGENDA FOR THE PLANNING BOARD MEETING July 31, 2018 6:00 PM Commissioners Chamber Call to order and Establishment of a Quorum Invocation and Pledge of Allegiance Approval

More information

# Insite RE Inc./ Verizon Wireless Special Use Permit Project Review for Planning and Zoning Commission

# Insite RE Inc./ Verizon Wireless Special Use Permit Project Review for Planning and Zoning Commission #2015-52 Insite RE Inc./ Verizon Wireless Special Use Permit Project Review for Planning and Zoning Commission Meeting Date: October 21, 2015 Request: Location: A Special Use Permit for a wireless communication

More information

Town of Skowhegan Application For Development Review

Town of Skowhegan Application For Development Review Town of Skowhegan Application For Development Review Return to: Skowhegan Planning Office 225 Water St., Skowhegan, ME 04976 (207) 474-6904 skowcodesec@skowhegan.org To be filled in by Staff: Project Name:

More information

Section 1. Introduction

Section 1. Introduction Overview of Manual Acknowledgements i x Section 1. Introduction 1.0 Overview of Section 1 1-1 1.1 The GESC and DESC Permits 1-2 1.2 Reasons for the GESC and DESC Permits 1-2 1.3 Legislative Mandate 1-3

More information

SUMMIT COUNTY PLANNING AND ENGINEERING DEPARTMENT

SUMMIT COUNTY PLANNING AND ENGINEERING DEPARTMENT SUMMIT COUNTY PLANNING AND ENGINEERING DEPARTMENT SINGLE-FAMILY SITE PLAN INFORMATION PACKET GENERAL INFORMATION This information packet explains how your application for a single-family site plan will

More information

Article 4 PROCEDURES for PLOT PLAN and SITE PLAN REVIEW

Article 4 PROCEDURES for PLOT PLAN and SITE PLAN REVIEW Article 4 PROCEDURES for PLOT PLAN and SITE PLAN REVIEW Section 4.01 Purpose It is the intent of this Article to specify standards, application and data requirements, and the review process which shall

More information

Site Plan Review Application. Interest in the Property (e.g. fee simple, land option, etc.)

Site Plan Review Application. Interest in the Property (e.g. fee simple, land option, etc.) 1. Identification CITY OF FENTON 301 South Leroy Street Fenton, Michigan 48430-2196 (810) 629-2261 FAX (810) 629-2004 Site Plan Review Application Project Name Applicant Name Address City/State/Zip Phone

More information

RESIDENTIAL DEMOLITION PERMIT APPLICANT CHECKLIST

RESIDENTIAL DEMOLITION PERMIT APPLICANT CHECKLIST RESIDENTIAL DEMOLITION PERMIT APPLICANT CHECKLIST The purpose of this form is to inform applicants of: 1) the requirements for building permits and stormwater permits for residential demolition projects;

More information

MERA NEXT GENERATION SYSTEM SUMMARY PROJECT DESCRIPTION IN ADVANCE OF CEQA SUBSEQUENT ENVIRONMENTAL IMPACT REPORT (SEIR)

MERA NEXT GENERATION SYSTEM SUMMARY PROJECT DESCRIPTION IN ADVANCE OF CEQA SUBSEQUENT ENVIRONMENTAL IMPACT REPORT (SEIR) PROJECT SPONSOR AND LEAD AGENCY MERA NEXT GENERATION SYSTEM SUMMARY PROJECT DESCRIPTION IN ADVANCE OF CEQA SUBSEQUENT ENVIRONMENTAL IMPACT REPORT (SEIR) The Marin Emergency Radio Authority (MERA) is a

More information

Modify Section , Major Impact Services and Utilities, of Chapter (Civic Use Types):

Modify Section , Major Impact Services and Utilities, of Chapter (Civic Use Types): ORDINANCE NO. AN ORDINANCE CHANGING THE ZONING CODE FOR MENDOCINO COUNTY The Board of Supervisors of the County of Mendocino, State of California, ordains as follows: Pursuant to Division I of Title 20,

More information

Conceptual, Preliminary and Final Site Plan Review in Holladay City

Conceptual, Preliminary and Final Site Plan Review in Holladay City Conceptual, Preliminary and Final Site Plan Review in Holladay City The City of Holladay incorporated in December, 1999 and adopted its own zoning ordinance in May, 2000. All land use decisions are made

More information

Site Plan/Building Permit Review

Site Plan/Building Permit Review Part 6 Site Plan/Building Permit Review 1.6.01 When Site Plan Review Applies 1.6.02 Optional Pre- Application Site Plan/Building Permit Review (hereafter referred to as Site Plan Review) shall be required

More information

ARTICLE 25 WIRELESS COMMUNICATIONS TOWERS AND ANTENNAS Updated

ARTICLE 25 WIRELESS COMMUNICATIONS TOWERS AND ANTENNAS Updated Allendale Township Zoning Ordinance Article 25 ARTICLE 25 WIRELESS COMMUNICATIONS TOWERS AND ANTENNAS Updated 8-14-2017 Section 25.01 GENERAL PROVISIONS A. Purpose. It is the intent of this Article to

More information

LARAMIE COUNTY PLANNING & DEVELOPMENT OFFICE 3966 Archer Pkwy Cheyenne, WY Phone (307) Fax (307)

LARAMIE COUNTY PLANNING & DEVELOPMENT OFFICE 3966 Archer Pkwy Cheyenne, WY Phone (307) Fax (307) 3966 Archer Pkwy Cheyenne, WY 82009 planning@laramiecounty.com Phone (307) 633-4303 Fax (307) 633-4616 SITE PLAN REVIEW PROCESS 1. Pre-Application Meeting: The applicant shall meet with a Laramie County

More information

SUBMITTAL REQUIREMENTS FOR USE PROCESS III OR PROCESS IV

SUBMITTAL REQUIREMENTS FOR USE PROCESS III OR PROCESS IV COMMUNITY DEVELOPMENT DEPARTMENT 33325 8 th Avenue South Federal Way WA 98003 253-835-2607; Fax 253-835-2609 www.cityoffederalway.com SUBMITTAL REQUIREMENTS FOR USE PROCESS III OR PROCESS IV USE PROCESS

More information

Bald Eagle Annual Report February 1, 2016

Bald Eagle Annual Report February 1, 2016 Bald Eagle Annual Report 2015 February 1, 2016 This page intentionally blank. PROJECT SUMMARY Project Title: Bald Eagle HCP Monitoring Subject Area: Habitat Conservation Plan (HCP) monitoring Date initiated:

More information

WIRELESS TELECOMMUNICATIONS ORDINANCE. This Ordinance shall be known as The Wireless Telecommunications Ordinance of Polk County, North Carolina.

WIRELESS TELECOMMUNICATIONS ORDINANCE. This Ordinance shall be known as The Wireless Telecommunications Ordinance of Polk County, North Carolina. WIRELESS TELECOMMUNICATIONS ORDINANCE ARTICLE I Section 101. Title. This Ordinance shall be known as The Wireless Telecommunications Ordinance of Polk County, North Carolina. Section 102. Authority and

More information

SITE PLAN, SUBDIVISION & EXTERIOR DESIGN REVIEW PROCESS

SITE PLAN, SUBDIVISION & EXTERIOR DESIGN REVIEW PROCESS INCORPORATED VILLAGE OF ROCKVILLE CENTRE BUILDING DEPARTMENT SITE PLAN, SUBDIVISION & EXTERIOR DESIGN REVIEW PROCESS Presubmission - Prior to a formal submission, the applicant should meet in person with

More information

APPLICATION FOR SITE PREPARATION PERMIT

APPLICATION FOR SITE PREPARATION PERMIT Engineering Division 550 Landa Street New Braunfels, Texas 78130 (830) 221-4020 1. Subdivision/Plat Name: Location Description/ Nearest Intersection: Acreage: APPLICATION FOR SITE PREPARATION PERMIT No.

More information

Town of Apex, North Carolina

Town of Apex, North Carolina POND DRAINAGE PLAN APPLICATION Town of Apex, North Carolina POND DRAINAGE PLAN APPLICATION: Applications are due by 12:00 pm on the first business day of each month. Please see the Minor Site Plan Schedule

More information

CHAPTER TELECOMMUNICATIONS FACILITIES

CHAPTER TELECOMMUNICATIONS FACILITIES Telecommunications Facilities CITY OF CITRUS HEIGHTS MUNICIPAL CODE - TITLE 106 - ZONING CODE CHAPTER 106.44 - TELECOMMUNICATIONS FACILITIES Sections: 106.44.010 - Purpose 106.44.020 - Definitions 106.44.030

More information

City of Laguna Hills Application for a Conditional Use Permit Project Information and Justification

City of Laguna Hills Application for a Conditional Use Permit Project Information and Justification Authorized Agent for Verizon Wireless City of Laguna Hills Application for a Conditional Use Permit Project Information and Justification With current efforts underway to establish the required infrastructure

More information

TOWN OF DOUGLAS EARTH REMOVAL SPECIAL PERMIT APPLICATION FORM Pursuant to Section 6.1 of the Douglas Zoning Bylaw

TOWN OF DOUGLAS EARTH REMOVAL SPECIAL PERMIT APPLICATION FORM Pursuant to Section 6.1 of the Douglas Zoning Bylaw I. Owner Information II. Applicant Information III. Representative Information IV. Operator Information er.doc Page 1 of 5 Douglas Planning Board V. Site Information Assessors Map Assessors Parcel Deed

More information

Grading, Erosion and Sediment Control (GESC) Checklist

Grading, Erosion and Sediment Control (GESC) Checklist Development Services Department 100 N. Wilcox Street, Castle Rock CO 80104 Planner of the Day 303-660-1393 Grading, Erosion and Sediment Control (GESC) Checklist A complete Grading, Erosion and Sediment

More information

PRELIMINARY PLAT CHECK LIST

PRELIMINARY PLAT CHECK LIST Name of Proposed Subdivision: The following items must be included with the initial submittal of a Preliminary Plat: Application, filled out completely Project Narrative Pre-application Conference Report

More information

SECTION DEWATERING PART 1 - GENERAL 1.1 RELATED DOCUMENTS

SECTION DEWATERING PART 1 - GENERAL 1.1 RELATED DOCUMENTS SECTION 312319 - DEWATERING PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections,

More information

3.0 AFFECTED ENVIRONMENT

3.0 AFFECTED ENVIRONMENT 3.0 AFFECTED ENVIRONMENT 3.1 Visual Resources This section provides a discussion of the existing visual resources in the vicinity of the Imperial Valley Solar Energy Center South project site that could

More information

Radiocommunication Facility Review Protocol

Radiocommunication Facility Review Protocol Radiocommunication Facility Review Protocol 1.0 PURPOSE 1.1 The purpose of this protocol is to outline the guidelines and review process through which Radiocommunication Facilities are evaluated within

More information

PLANNING AND DEVELOPMENT

PLANNING AND DEVELOPMENT OVERVIEW Effective January 1, 1992 all applications for multi-family residential and all non-residential building permits require site plan approval before permit issuance. All new developments and existing

More information

SECTION 2 GENERAL REQUIREMENTS

SECTION 2 GENERAL REQUIREMENTS SECTION 2 GENERAL REQUIREMENTS 2-1 ENGINEER REQUIRED: All plans and specifications for Improvements which are to be accepted for maintenance by the County and private, on-site drainage and grading shall

More information

CITY OF OLIVETTE SITE PLAN AND COMMUNITY DESIGN REVIEW INFORMATION PACKET

CITY OF OLIVETTE SITE PLAN AND COMMUNITY DESIGN REVIEW INFORMATION PACKET CITY OF OLIVETTE SITE PLAN AND COMMUNITY DESIGN REVIEW INFORMATION PACKET THE FOLLOWING PACKET CONTAINS: PETITION FOR NONRESIDENTIAL DEVELOPMENT SITE PLAN AND COMMUNITY DESIGN REVIEW SCHEDULE OF DATES

More information

Radio Frequency Engineering Report. Proposed Raymond, ME Cellular Facility

Radio Frequency Engineering Report. Proposed Raymond, ME Cellular Facility Radio Frequency Engineering Report Proposed, ME Cellular Facility (Site No.: 3462 ) May 12, 2010 C Squared Systems, LLC 920 Candia Road Manchester, NH 03109 Phone: (603) 657-9702 Fax: (603) 657-9707 Support@csquaredsystems.com

More information

Mailing Address: Fax number: City: State: Zip: Property Owner: City: State: Zip: City: State: Zip:

Mailing Address: Fax number: City: State: Zip:   Property Owner: City: State: Zip:   City: State: Zip: / Department of Community Development ARCHITECTURAL REVIEW APPLICATION 73-510 Fred Waring Drive Palm Desert California 92260 (760) 346-0611 Fax (760) 776-6417 Applicant: Telephone: Mailing Address: Fax

More information

County of Orange Proposed Wireless Communications Facilities Within County Highways Ordinance Draft September 30, 2015

County of Orange Proposed Wireless Communications Facilities Within County Highways Ordinance Draft September 30, 2015 County of Orange Proposed Wireless Communications Facilities Within County Highways Ordinance Draft September 30, 2015 (New language is underlined, deleted language is struck) Title 6, Division 6, Article,

More information

A. Dewatering observation wells are part of dewatering allowance.

A. Dewatering observation wells are part of dewatering allowance. SECTION 312319 - DEWATERING PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections,

More information

DEVELOPMENT PERMIT / SPECIAL USE PERMIT or MAJOR MODIFICATION TO ABOVE APPLICATION SUBMITTAL INSTRUCTIONS

DEVELOPMENT PERMIT / SPECIAL USE PERMIT or MAJOR MODIFICATION TO ABOVE APPLICATION SUBMITTAL INSTRUCTIONS DEVELOPMENT PERMIT / SPECIAL USE PERMIT or MAJOR MODIFICATION TO ABOVE APPLICATION SUBMITTAL INSTRUCTIONS This application package is to be submitted in person at the Community Development Department public

More information

PLANNING DIVISION COMMUNITY & NEIGHBORHOODS DEPARTMENT

PLANNING DIVISION COMMUNITY & NEIGHBORHOODS DEPARTMENT Staff Report PLANNING DIVISION COMMUNITY & NEIGHBORHOODS DEPARTMENT To: Salt Lake City Administrative Hearing Officer From: Casey Stewart; 801-535-6260 Date: Re: September 22, 2017 (for September 28 Administrative

More information

HAMILTON TOWNSHIP Department of Planning and Zoning Application for a Commercial / Industrial Site Plan Review

HAMILTON TOWNSHIP Department of Planning and Zoning Application for a Commercial / Industrial Site Plan Review HAMILTON TOWNSHIP Department of Planning and Zoning Application for a Commercial / Industrial Site Plan Review Date: Application is hereby made for a Site Plan Review for a commercial or industrial use.

More information

City of Massillon Site Plan Checklist

City of Massillon Site Plan Checklist City of Massillon Site Plan Checklist The following information MUST be included with all Site Plans submitted for review and processing in order to constitute a complete Site Plan Package. Incomplete

More information

Applying for a Site Development Review

Applying for a Site Development Review Guide What is it? Applying for a Who approves it? ensures that new buildings or land uses are compatible with their sites and with the surrounding environment, other development, and traffic circulation.

More information

Planning Permit Application LAND USE PRELIMINARY APPLICATION (LUP)

Planning Permit Application LAND USE PRELIMINARY APPLICATION (LUP) Planning Permit Application LAND USE PRELIMINARY APPLICATION (LUP) 415 W 6 th ST ~ Vancouver, WA 98660 PO Box 1995 ~ Vancouver, WA 98668 Phone (360) 487-7800 www.cityofvancouver.us Type Of Work Type I

More information

CITY OF PINE CITY SMALL WIRELESS FACILITY DESIGN GUIDELINES

CITY OF PINE CITY SMALL WIRELESS FACILITY DESIGN GUIDELINES CITY OF PINE CITY SMALL WIRELESS FACILITY DESIGN GUIDELINES I. PURPOSE AND COMPLIANCE In implementing City Code, Chapter 8, Section 815, the City Council of the City of Pine City (the City ) finds that

More information

MILL HILL ARTS VILLAGE

MILL HILL ARTS VILLAGE OWNER CIVIL ENGINEER MACON-BIBB URBAN DEVELOPMENT AUTHORITY ALEX MORRISON, EXECUTIVE DIRECTOR 200 CHERRY STREET, SUITE 300 MACON, GA 31201 OFFICE PHONE : (478) 803-2402 TRIPLE POINT ENGINEERING DAN WALLACE,

More information

C. CEQA Determination: Categorically exempt pursuant to Section of the CEQA Guidelines ( Existing Facilities ).

C. CEQA Determination: Categorically exempt pursuant to Section of the CEQA Guidelines ( Existing Facilities ). Z O N I N G A D J U S T M E N T S B O A R D S t a f f R e p o r t FOR BOARD ACTION FEBRUARY 17, 2011 1760 Solano Avenue Use Permit Modification #09-70000017 to modify the T-Mobile wireless telecommunication

More information

CASE NUMBER: 17SN0738 APPLICANT: Chesterfield Department of Emergency Communications CHESTERFIELD COUNTY, VIRGINIA MATOACA DISTRICT

CASE NUMBER: 17SN0738 APPLICANT: Chesterfield Department of Emergency Communications CHESTERFIELD COUNTY, VIRGINIA MATOACA DISTRICT CASE NUMBER: 17SN0738 APPLICANT: Chesterfield Department of Emergency Communications CHESTERFIELD COUNTY, VIRGINIA MATOACA DISTRICT ADDENDUM Board of Supervisors Hearing: APRIL 26, 2017 Board of Supervisors

More information

CITY OF EL MIRAGE DEVELOPMENT APPLICATION PROCESS

CITY OF EL MIRAGE DEVELOPMENT APPLICATION PROCESS DEVELOPMENT APPLICATION PROCESS Development Applications are reviewed by the El Mirage Technical Advisory Committee (TAC) to ensure Building, Engineering and Zoning compliance before scheduling public

More information

DESIGN REVIEW PROCESS AND APPLICATION

DESIGN REVIEW PROCESS AND APPLICATION DESIGN REVIEW PROCESS AND APPLICATION Design review is the first step in the process of any construction project requiring permits. The Community Redevelopment Agency (CRA) Board is responsible for ensuring

More information

WIRELESS TELECOMMUNICATIONS ORDINANCE. This Ordinance shall be known as The Wireless Telecommunications Ordinance of Polk County, North Carolina.

WIRELESS TELECOMMUNICATIONS ORDINANCE. This Ordinance shall be known as The Wireless Telecommunications Ordinance of Polk County, North Carolina. WIRELESS TELECOMMUNICATIONS ORDINANCE ARTICLE I Section 101. Title. This Ordinance shall be known as The Wireless Telecommunications Ordinance of Polk County, North Carolina. Section 102. Authority and

More information

PROJECT DESCRIPTION AT&T Proposed Telecommunications Facility 2700 Watt Avenue APN#

PROJECT DESCRIPTION AT&T Proposed Telecommunications Facility 2700 Watt Avenue APN# PROJECT DESCRIPTION AT&T Proposed Telecommunications Facility 2700 Watt Avenue APN# 269-0090-051 Proposed Use AT&T is currently deploying the infrastructure of its wireless communications network in California.

More information

EXHIBIT 2 Page 1 of 5 Reasonable Necessity for Eminent Domain Action Tuttle Property Final Report PREPARED JANUARY 2018 FOR BROWARD COUNTY, FLORIDA MissionCriticalPartners.com State College Office 690

More information

DEVELOPMENT REVIEW COMMENTS LAND DISTURBANCE PERMIT (LDP) CLEARING CLEARING & GRUBBING GRADING. Date Reviewed by. Project Name

DEVELOPMENT REVIEW COMMENTS LAND DISTURBANCE PERMIT (LDP) CLEARING CLEARING & GRUBBING GRADING. Date Reviewed by. Project Name GWINNETT COUNTY Department of Planning and Development One Justice Square 446 West Crogan Street Suite 150 1 st Floor Lawrenceville, GA 30046 Phone: 678.518.6000 Fax: 678.518.6240 www.gwinnettcounty.com

More information

Application for Site Plan Review

Application for Site Plan Review Application for Site Plan Review 3275 Central Blvd., Hudsonville, Michigan 49426-1450, 616.669.0200 fax 616.669.2330 It is STRONGLY recommended that any application that must go before the Planning Commission

More information

CITY OF EL MIRAGE DEVELOPMENT APPLICATION PROCESS

CITY OF EL MIRAGE DEVELOPMENT APPLICATION PROCESS DEVELOPMENT APPLICATION PROCESS I. Technical Advisory Committee (TAC) 1. Submit TAC Review Application (See Page 3 for TAC Review Application Requirements) 2. Review of TAC Review Application by Technical

More information

Humboldt Bay Piling Removal

Humboldt Bay Piling Removal REQUEST FOR PROPOSALS Humboldt Bay Piling Removal Invitation for Proposals The Humboldt Bay Harbor, Recreation & Conservation District (District) is requesting proposals from qualified individuals/firms

More information

ADMINISTRATIVE REVIEW OF TELECOMMUNICATION TOWERS, ANTENNAS AND TRANSMISSION BASE SITES APPLICATION

ADMINISTRATIVE REVIEW OF TELECOMMUNICATION TOWERS, ANTENNAS AND TRANSMISSION BASE SITES APPLICATION For reasonable accommodations or alternative formats please contact 311 at 612-673-3000. People who are deaf or hard of hearing can use a relay service to call 311 at 612-673-3000. TTY users call 612-673-2157

More information

Operating Standards Attachment to Development Application

Operating Standards Attachment to Development Application Planning & Development Services 2255 W Berry Ave. Littleton, CO 80120 Phone: 303-795-3748 Mon-Fri: 8am-5pm www.littletongov.org Operating Standards Attachment to Development Application 1 SKETCH PLANS

More information

INFORMATION SHEET. : Properties Subject to the Slope and Seismic Hazard Zone Protection Act (SSPA) Ordinance

INFORMATION SHEET. : Properties Subject to the Slope and Seismic Hazard Zone Protection Act (SSPA) Ordinance City and County of San Francisco Department of Building Inspection London N. Breed, Mayor Tom C. Hui, S.E., C.B.O., Director INFORMATION SHEET. S-19 DATE : October 2, 2018 CATEGORY SUBJECT : Structural

More information

SECTION DEWATERING TANKAGE PART 1 - GENERAL 1.1 RELATED DOCUMENTS

SECTION DEWATERING TANKAGE PART 1 - GENERAL 1.1 RELATED DOCUMENTS SECTION 31 23 19 - DEWATERING TANKAGE PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification

More information

MULTIPLE-FAMILY DESIGN REVIEW SUBMITTAL CHECKLIST

MULTIPLE-FAMILY DESIGN REVIEW SUBMITTAL CHECKLIST MULTIPLE-FAMILY DESIGN REVIEW SUBMITTAL CHECKLIST This application lists the content and format of the submittal requirements to initiate the Design Review process. An incomplete application will not be

More information

EFFECTIVE AUGUST XX, 2016 UNLESS APPEALED PRIOR TO THAT DATE

EFFECTIVE AUGUST XX, 2016 UNLESS APPEALED PRIOR TO THAT DATE Attachment 1 DRAFT WALNUT CREEK PLANNING COMMISSION RESOLUTION NO.XXXX CONDITIONAL USE PERMIT CONDITIONAL USE PERMIT APPLICATION NO. Y15-190 T-MOBILE MONOPOLE ANTENNA MODIFICATION APN 180-250-003 EFFECTIVE

More information

City of Santa Paula Planning Department

City of Santa Paula Planning Department City of Santa Paula Planning Department INSTRUCTIONS FOR SUBMITTING APPLICATIONS DESIGN REVIEW, PLANNED DEVELOPMENT PERMITS, CONDITIONAL USE PERMITS AND VARIANCES A. ITEMS / DOCUMENTS REQUIRED FOR SUBMITTAL:

More information

SUBMITTAL REQUIREMENTS RCV D REJECT PENDING

SUBMITTAL REQUIREMENTS RCV D REJECT PENDING 1 of 5 SUBMITTAL REQUIREMENTS RCV D REJECT PENDING 1. General Information. 1.1 Applicant s name, address and contact numbers. 1.2 Project name, type, address and legal description of the property. 1.3

More information

ARTICLE 3: WATERSHED MANAGEMENT PERMIT REQUIREMENTS AND SUBMITTALS

ARTICLE 3: WATERSHED MANAGEMENT PERMIT REQUIREMENTS AND SUBMITTALS ARTICLE 3: WATERSHED MANAGEMENT PERMIT REQUIREMENTS AND SUBMITTALS Introduction This section provides guidance on the submittal requirements for a development to obtain a Watershed Management Permit from

More information

Subdivision Application Checklist

Subdivision Application Checklist City of Portsmouth, New Hampshire Subdivision Application Checklist This subdivision application checklist is a tool designed to assist the applicant in the planning process and for preparing the application

More information

Minor Site Plan Application and Checklist Land Disturbing Activities

Minor Site Plan Application and Checklist Land Disturbing Activities Minor Site Plan Application and Checklist Land Disturbing Activities INSTRUCTIONS: Please provide the requested information below. The Development Services Department reviews each site plan submittal based

More information

PLANNING DEPARTMENT SUBMITTAL REQUIREMENTS FOR CONDITIONAL USE PERMITS CLASS 4 DEVELOPMENT REVIEW PROCESS. A. Written Material

PLANNING DEPARTMENT SUBMITTAL REQUIREMENTS FOR CONDITIONAL USE PERMITS CLASS 4 DEVELOPMENT REVIEW PROCESS. A. Written Material PLANNING DEPARTMENT 970.668.4200 0037 Peak One Dr. PO Box 5660 www.summitcountyco.gov Frisco, CO 80443 SUBMITTAL REQUIREMENTS FOR CONDITIONAL USE PERMITS CLASS 4 DEVELOPMENT REVIEW PROCESS Per the provisions

More information

IX. RECOMMENDED CONDITIONS OF APPROVAL:

IX. RECOMMENDED CONDITIONS OF APPROVAL: Storey County Planning Commission March 3, 2011 SUP Case No. 2011-010 (Taormina Amateur Radio Towers) Revised List of Recommended Conditions of Approval Proposed Amendments: The following replaces Section

More information

2. As such, Proponents of Antenna Systems do not require permitting of any kind from the Town.

2. As such, Proponents of Antenna Systems do not require permitting of any kind from the Town. Subject: Antenna Systems Policy Number: Date Developed: 2008/09 Date Approved: April 8, 2009 Lead Department: Planning and Development Date Modified: (if applicable) November 26, 2014 A. PROTOCOL STATEMENT:

More information

b. Building Areas or Building Pads having an average grade steeper than 5% (some elevation information may be required to verify grade).

b. Building Areas or Building Pads having an average grade steeper than 5% (some elevation information may be required to verify grade). Snyderville Basin G. Site Plan Requirements: Three (3) copies of a site plan, a minimum size of 11" x 17" (must be legible) and a maximum size of 36" x 48" shall be submitted with all building permit applications

More information

Amendments to the Wichita-Sedgwick County of the Unified Zoning Code Required by K.S.A & FCC Declaratory Ruling

Amendments to the Wichita-Sedgwick County of the Unified Zoning Code Required by K.S.A & FCC Declaratory Ruling Amendments to the Wichita-Sedgwick County of the Unified Zoning Code Required by K.S.A. 66-2019 & FCC Declaratory Ruling Section II-B.14.p. and Section II-B.14.q. p. Wireless Communication means wireless

More information

Minor Site Plan Review Process

Minor Site Plan Review Process Minor Site Plan Review Process Pre-Application Conference Community Meeting (optional) Submit Application Determination of Completeness Staff Report (optional) Technical Review Committee Decision Notice

More information

NONURBAN LAND USE SECTION 3 NATURAL AREAS PIKE NATIONAL FOREST

NONURBAN LAND USE SECTION 3 NATURAL AREAS PIKE NATIONAL FOREST The Douglas County Comprehensive Master Plan enhances the quality of life for residents by protecting the natural landscape, rural areas, and historic sites of the County. Specific nonurban subarea policies

More information

Community & Economic Development Department Planning Division Frederick Street PO Box 8805 Moreno Valley, CA SUBMITAL REQUIREMENTS

Community & Economic Development Department Planning Division Frederick Street PO Box 8805 Moreno Valley, CA SUBMITAL REQUIREMENTS Community & Economic Development Department Planning Division 14177 Frederick Street PO Box 8805 Moreno Valley, CA 92552-0805 (951) 413-3206 Fax (951) 413-3210 SECOND UNITS Completed and Signed Project

More information

Collaboration and Planning to Implement the South San Diego Bay Restoration and Enhancement Project

Collaboration and Planning to Implement the South San Diego Bay Restoration and Enhancement Project Collaboration and Planning to Implement the South San Diego Bay Restoration and Enhancement Project Carolyn Lieberman Coastal Program Coordinator for Southern California U.S. Fish and Wildlife Service

More information

Town of Rotterdam Office of the Planning Commission

Town of Rotterdam Office of the Planning Commission Town of Rotterdam Office of the Planning Commission SITE PLAN/SPECIAL USE PERMIT APPLICATION AND PROCEDURES Site Plan: Application $150 Final Site Plan $150 Application Fees Special Use Permit (IF REQUIRED):

More information

Permit Application. General Information

Permit Application. General Information Town of Permit Application Application Date: / /20 Permit Type Requested: [ ] New Construction [ ] Expansion [ ] Accessory Building [ ] Reconstruction [ ] Earth Moving [ ] Dock/Deck [ ] Fence [ ] Foundation

More information

City of Palmetto Florida

City of Palmetto Florida Date Submitted: City of Palmetto Florida General Development/ Construction/ Final Site Plan Application For Planned Developments nly) PRJECT NAME: TYPE F APPRVAL DESIRED: See fee schedule below) Small

More information

SITE PLAN Application Packet (Required For All Non-Residential Development Projects)

SITE PLAN Application Packet (Required For All Non-Residential Development Projects) SITE PLAN Application Packet (Required For All Non-Residential Development Projects) Community Development Department 90 North Main Street, Tooele, UT 84074 (435) 843-2130 Fax (435) 843-2139 Dear Applicant,

More information

Notice of Decision. [2] The subject property is on Plan Blk 1 Lot 51A, located at Avenue NW, within the PU Public Utility Zone.

Notice of Decision. [2] The subject property is on Plan Blk 1 Lot 51A, located at Avenue NW, within the PU Public Utility Zone. 10019 103 Avenue NW Edmonton, AB T5J 0G9 P: 780-496-6079 F: 780-577-3537 sdab@edmonton.ca edmontonsdab.ca Date: November 2, 2018 Project Number: 286136272-001 File Number: SDAB-D-18-181 Notice of Decision

More information

Verizon Wireless Proposed Base Station (Site No Lake Cachuma ) 2680 Highway 154 Santa Barbara County, California

Verizon Wireless Proposed Base Station (Site No Lake Cachuma ) 2680 Highway 154 Santa Barbara County, California Statement of Hammett & Edison, Inc., Consulting Engineers The firm of Hammett & Edison, Inc., Consulting Engineers, has been retained on behalf of Verizon Wireless, a personal wireless telecommunications

More information

Joint Application Village / AT&T

Joint Application Village / AT&T Joint Application Village / AT&T Telecommunications Monopole / Ground Facilities 347 Ivy Court Z o n i ng B o a r d o f A p p e a l s April 1 1, 20 1 6 Overview of Presentation Existing method of cellular

More information

Wireless Telecommunications Facilities Meeting. Neighborhood Leaders Meeting May 8, 2014

Wireless Telecommunications Facilities Meeting. Neighborhood Leaders Meeting May 8, 2014 Wireless Telecommunications Facilities Meeting Neighborhood Leaders Meeting May 8, 2014 Agenda Welcome and Introductions Project Overview Process and Schedule Wireless Concepts and Terminology Overview

More information

Cat Island Chain Restoration Project Brown County Port & Resource Recovery Department

Cat Island Chain Restoration Project Brown County Port & Resource Recovery Department Cat Island Chain Restoration Project Brown County Port & Resource Recovery Department February 2, 2015 Fox River and Lower Green Bay Cat Island Chain - 1938 Cat Island Brown County Aerial Photography,

More information

Checklist for Tentative Subdivision Map

Checklist for Tentative Subdivision Map Checklist for Tentative Subdivision Map All submittal information shall be provided to the Community Development Department. All submittal information shall be presented along with the Uniform Application,

More information

Hillside & Foothills Development Application

Hillside & Foothills Development Application Hillside & Foothills Development Application This box for office use only File #: Cross Referenced File(s): Fee: Zone(s): Are Pre-Application materials attached? Yes No This application is a request to

More information

COUNCIL ACTION FORM WIRELESS COMMUNICATIONS FACILITIES TEXT AMENDMENT

COUNCIL ACTION FORM WIRELESS COMMUNICATIONS FACILITIES TEXT AMENDMENT ITEM # 28 _ DATE: 03/06/18 COUNCIL ACTION FORM SUBJECT: WIRELESS COMMUNICATIONS FACILITIES TEXT AMENDMENT BACKGROUND: The operation of wireless communication facilities are licensed and regulated by the

More information

AT&T Mobility Proposed Base Station (Site No. CN4779A) 1101 Keaveny Court Walnut Creek, California

AT&T Mobility Proposed Base Station (Site No. CN4779A) 1101 Keaveny Court Walnut Creek, California Statement of Hammett & Edison, Inc., Consulting Engineers The firm of Hammett & Edison, Inc., Consulting Engineers, has been retained on behalf of AT&T Mobility, a personal wireless telecommunications

More information

BEFORE THE BOARD OF COUNTY COMMISSIONERS OF DESCHUTES COUNTY, OREGON * * * *

BEFORE THE BOARD OF COUNTY COMMISSIONERS OF DESCHUTES COUNTY, OREGON * * * * REVIEWED LEGAL COUNSEL For Recording Stamp Only BEFORE THE BOARD OF COUNTY COMMISSIONERS OF DESCHUTES COUNTY, OREGON An Ordinance Amending Deschutes County Code Title 18 to Provide a Definition of Agricultural

More information

TELECOMMUNICATION ANTENNA / TOWER SITING PROTOCOL

TELECOMMUNICATION ANTENNA / TOWER SITING PROTOCOL TELECOMMUNICATION ANTENNA / TOWER SITING PROTOCOL Innovation, Science and Economic Development Canada (Formally known as Industry Canada) Local Land Use Authority Consultation Adopted by City Council on

More information

RE: 13UN034 City of Iqaluit New Landfill and Waste Transfer Station NIRB Screening

RE: 13UN034 City of Iqaluit New Landfill and Waste Transfer Station NIRB Screening Environmental Protection Operations Directorate Prairie & Northern Region 5019 52 nd Street, 4 th Floor File: 6200 000 001/009 P.O. Box 2310 NIRB File: 13UN034 Yellowknife, NT X1A 2P7 January 10, 2019

More information

CITY OF BROOKLYN PARK COMMUNICATIONS TECHNOLOGY SITE APPLICATION / MODIFICATION REQUEST FORM

CITY OF BROOKLYN PARK COMMUNICATIONS TECHNOLOGY SITE APPLICATION / MODIFICATION REQUEST FORM City of Brooklyn Park 5200 85 th Avenue N. Brooklyn Park, MN 55443-1825 Permit #: CITY OF BROOKLYN PARK COMMUNICATIONS TECHNOLOGY SITE APPLICATION / MODIFICATION REQUEST FORM Site Name & Address: (existing

More information