1 TReX Questions (dlvc) 1. Will the dlvc Prototype have to broadcast on all 64 specified channels simultaneously or is the intent to provide a frequency agile solution? a. The radio will not need to broadcast simultaneously across all channels but should be able to broadcast on any of them. For clarity, an RF radio is not part of the demonstration. 2. We assume that intent is for the prototype to use Ethernet/IP to represent the physical layers and attenuated coax for the radio frequency links. i.e. no over-the-air transmission required. Is this a valid assumption? a. No over-the-air transmission is required. For clarity, this is not a radio datalink demonstration, but a distributed processing architecture. Thus, we are not prescribing a design. 3. We assume the entire prototype will become government property following the demonstration. Is this a valid assumption? a. In accordance with paragraph 5.3, the Government desires government purpose rights, but will evaluate proposals that do not provide government purpose rights. 4. We assume the mobility or aircraft node will interface to the live training systems via 1550 databus or similar? Is this a valid assumption? a. We are not specifying a databus, though MIL-STD 1553 is a commonly used solution and a solution easily transferrable across all platforms is desirable. 5. Can the existing P-5 system support the 5G-ATW waveform? No. If so, may the selected vendor secure a P-5 system as government furnished equipment for the demonstration? a. No, but it should not be necessary. Paragraph 4.2 that states that the datalink may be simulated. 6. Relative to the requirement in 3e and 3g for 4 independent levels of security, does the Government expect the actual levels along with associated hardware (e.g. cross domain solution) and encryption to be active in the demonstration OR may be the vendor demonstrate 4 independent data channels to which various security apparatus may be independently applied in the operational environment. a. The vendor may demonstrate 4 independent data channels to which various security apparatus may be independently applied in the operational environment. To clarify, no actual classified data will be used in the demonstration. 7. We assume the demonstration prototype will not be required to connect to any existing government networks (i.e. no Authority to Connect or other Information Assurance approvals required). Is this a valid assumption? a. Yes 1

2 8. We assume the ground based computation node will be fed from existing models. i.e. there is no desire on the part of the Government to develop new models as part of the dvlc effort. Is this a valid assumption? a. The Government is not furnishing models. Part of the RFS is to determine how to structure models for dlvc architecture. 9. Is it permissible for a large defense corporation who would otherwise be excluded to participate in OTA via partnership or subcontracting with a qualifying entity? a. Traditional defense contractors are not excluded from participating in this action. Please refer to Paragraph 5.6 for eligibility requirements/guidance. 10. Will the government consider a request for extension to respond to the RFS? a. Amendment 1 extends the due date to 29 June Under this effort, does the government desire to modify the existing SLATE architecture to look at other alternatives? a. SLATE and dlvc are separate but SLATE could inform dlvc. Modifications to SLATE architecture are acceptable. 12. In paragraph 4.2 it references "the live system will be represented by a training pod form factor". Does the government intend to supply a P5 pod(s) (modified or other) for this effort or is it expected that these will be emulations? a. The hardware must be able to fit in a P5 pod, but will not be installed in a pod for the demonstration 13. Will the government supply a 5G-ATW emulation supporting DIS communications or other? No. If so, will the emulation support varying the bandwidth and support interference injection? a. DIS is available in the public domain. The Government does not require the use of 5G-ATW and vendors are free to use any waveform they feel would meet the requirements. 14. Does the government intend to simulate 100 live training systems? a. The prototype demonstration should simulate ~100 live training systems. 15. Will the government supply a Joint Terminal Attack Controller simulation to participate in the architecture demonstration? a. No 16. What is the source of the full-motion video (UAV, JTAC)? a. This requirement has been removed in amendment Do we need to demonstrate an accredited Cross Domain Solution? a. An accredited solution is desired, however the Government will entertain non-accredited solutions provided a path to NSA accreditation can be shown. 18. Do we need to demonstrate an NSA approved encryption? a. An NSA approved solution is desired, however the Government will entertain non-accredited solutions provided a path to NSA accreditation can be shown. 2

3 19. Can cost share of the total cost of the project be substantiated with assets a vendor can bring to bear to support this effort? (r.e. section 5.6 check box 3) a. Assets, properly valuated and displayed, may be utilized to meet the costsharing requirements. 20. What if a vendor can't check any boxes per section 5.6, will our submittal still be considered? a. In order to meet the eligibility requirements under 10 USC 2371b, one of the boxes must be able to be checked. 21. What is the source of the training pod form factor? Gov t provided? Purchased? a. The form factor will simply be dimensions that the components must fit in. 22. Will the training pod form factor have any installed hardware/software systems? a. No, but all components (including power supply and cooling) must fit in the form factor. 23. Is there a requirement for any user interface or for a display output at the ground computational node? a. User interface will not be evaluated in the demonstration. However, the Government will need to be able to monitor the training scenario progress during the demonstration. 24. Is the selected contractor expected to provide the computational equipment for the training pod form factor or will this be provided by the government as the expected or fielded form factor equipment? a. No equipment will be furnished by the Government. 25. Is the technical solution required to demonstrate multiple models for currently fielded radar systems, countermeasures systems, simulator systems and radar warning receivers? Or only to demonstrate multiple instances of a single type of each system? a. Multiple models is desired since it is more representative of combat and large force exercises. 26. Is the weather data (cloud ceiling/winds/gusts) expected to be transmitted to the aircraft node? Yes. Or is it only transmitted between the ground node and multiple simulators and constructive entities? No. 27. Is the ground node expected to be located at multiple ground locations across ranges? Or co-located with a central processing center? a. Either would suffice and inform later decisions. 28. The RFS states The 5G-ATW data link (or similar) may be simulated with a network cable connecting the physical layers. Does this mean an actual 5G- ATW data link waveform is not required to demonstrate the prototype? Yes. Or does this mean only the radio data link can be simulated with a network cable and actual 5G-ATW data link waveform and data packets must be transmitted between the prototype nodes? No. If so, how do we obtain a 5G- 3

4 ATW waveform and data packet format for development and testing? Simulate? a. If 5G-ATW were proposed, the vendor would need to simulate. 29. Can we get a complete list of variables, entity states, and events intended to be passed over the datalink? a. Events are listed in section 3.0. After considering this question, two additional parameters were added: IFF and IR sensor status and tracks 30. Establishes models and simulation at the ground node and aircraft node in order to reduce the data volume on a connecting datalink - what does Establish mean? Instantiate in a format consumable by multiple, unique weapon system OFPs? a. To clarify, we are not demonstrating the ability to interface with an OFP. The demonstration should focus on distributed processing architecture of ground and air data that is capable of being passed via a datalink. However, an architecture that can easily interface with multiple, unique, OFPs will reduce integration risk in the future. 31. What government organization is requesting development of a dlvc Prototype? a. Air Force Life Cycle Management Center, Simulators Division (AFLCMC/WNS) 32. Which government organization is the OPR for the dlvc Prototype? Who has primary mission need and responsibility for this prototype? a. Air Force Life Cycle Management Center, Simulators Division (AFLCMC/WNS) is OPR to meet a broad operational training infrastructure need across all Mobility and Combat Air Force systems 33. Which government organization will be the primary Point of Contact and liaison during the prototype development process? a. Air Force Life Cycle Management Center, Simulators Division (AFLCMC/WNS) 34. Is the dlvc Prototype supported by an approved Initial Capabilities Document (Joint or Service? or is it codified in a Joint Concept Implementation Plan? a. dlvc supports requirements in the Integrating Architecture for Air & Space Live, Virtual, and Constructive Environments (IA-ASLVCE) and Live Mission Operations Capability (LMOC) ICDs 35. Is the material solution for the cross data solution for four multiple, independent levels of security available? Or is the task in the prototype development to interface with or accommodate an existing cross data solution? a. There are COTS, NSA-accredited CDSs available publicly. An accredited solution is desired, however the Government will entertain non-accredited solutions provided a path to NSA accreditation can be shown. 4

5 36. Will encryption devices and COMSEC accounts be provided by the government? a. The Government will not furnish any equipment. For clarity, no actual COMSEC will be used in the demonstration, just a demonstration of encryption. We are interested in ideas from vendors who may not yet have all the appropriate security clearances to expand the potential offerors. 37. Can work on this project be performed at a Contractor owned facility if the facility meets the security requirements? a. Yes. For clarity, no classified information will be used in the demonstration. We are interested in ideas from vendors who may not yet have all the appropriate security clearances to expand the potential offerors. 38. Will the 5thGen Advanced Training Waveform (5G-ATW) ICD be made available for level of effort calculations? a. 5G-ATW is not required for the demonstration, though it can be simulated. A preliminary system spec will be available through TReX upon award. 39. Is the contractor responsible for making changes to the 5G-ATW transmission protocol during testing or suggest changes the 5G-ATW based on the testing results? a. 5G-ATW is not required for the demonstration, however if the vendor chooses to use it, improvements are encouraged. 40. Will Compressed DIS protocol standards be made available to bidders for level of effort calculations? a. Compressed DIS (cdis) standards are in development for 5G-ATW. cdis is an architecture for 5G-ATW and, as such, is not a requirement for the demonstration. DIS standards are available through IEEE. 41. In 3.0 Technical Overview and Objectives what is the meaning of the reference signature as described in 3.2.C ii, iv and vii? a. How the entity can be detected across the electromagnetic spectrum 42. Will Simulated Tactical Data Link, specifically Link-16 for initial integration, be transmitted via cdis (IAW SISO-STD-002)? Or will the Simulated TDL, Link- 16, be transmitted using a Ground-based Link-16 Terminal? a. Combat datalinks such as L-16, MADL, or IFDL will not be broadcast on the training datalink and therefore are not required for the prototype. 43. What is the system composition (high level) of the Mobility Racks and Tactical Aircraft Pods? Is this Government Furnished Equipment (GFE)? a. No pods or racks will be supplied for the demonstration. The solution should fit inside the form factor of a P5 pod. 44. a. If the Tactical Aircraft Pods are GFE, will the pod specific power and interface hardware to the simulator environment such as the IRIG GPS timing interfaces be supplied as well? 5

6 a. Nod pod will be supplied. While timing information will be critical to synchronizing models, the method of synchronization (ie, IRIG, GPS, etc) is not specified. 45. b. There is a mention that, The live training systems will also be sending data about their performance, weapons, and status to the synthetic entities. Does this imply that these components, the Mobility Rack and/or Tactical Aircraft Pod, will be transmitting cdis PDUs (i.e. Entity State, Entity Electromagnetic, Transmitter, etc.)? a. Live aircraft will send the information in 3.2.a, however the information is not required to be transmitted via cdis PDUs. 46. c. DIS typically transmits Entity State PDUs at intervals that requires dead reckoning on the receiving systems. With this in mind, will the Mobility Rack or Tactical Aircraft Pod need to have an on-board system to perform dead reckoning? Or is the intent to have high-frequency interval to alleviate those needs? a. This is the heart of the demonstration. How do we provide a quality, usable model through a limited data stream? 47. There are references to environmental models (i.e. Clouds) on both Live and Simulator Objectives. Is there an expectation to have Simulated Weather affect Live Entities? Yes. Also, is there an expectation to have Live Weather affect Simulated Entities? Yes. 48. What component(s) of the system is responsible for modeling munitions fired from Live Weapons Systems? (Assumption: Live Entities are not shooting live munitions in dlvc Environment) a. Either, but vendors should consider both shooter and target dynamics. Live entities will not shoot live munitions for the demonstration. 49. Is there any expectation to virtually relocate Live Weapon Systems? No. For example, Fighters flying in range in Montana, but simulated targets, terrain, (and potentially weather) for another country? 50. For the prototype phase, are there pre-selected platforms that should be used/focused for prototype support? (i.e. particular threat aircraft, missiles, etc. and specific friendly counter systems) a. No. Any (preferably all) USAF mobility, fighter, or strike aircraft that can execute the missions in 3.1. will work. Any modern air, ground, and surface threats will meet the intent. 51. Our understanding is that 5G-ATW supports only ~1Mbps. Do we assume correctly that for the high data bandwidth (Section 3.3.d.ii) and dynamic bandwidth (Section 3.3.d.iii) scenarios we should demonstrate with a datalink that is similar to 5G-ATW, but not with 5G-ATW, itself? a. Yes. Similar to, but with the data bandwidth specified in Section 3.3.d.iii. 52. Section 4.2 (Phase 2 description) states that a training pod form factor stimulated by live aircraft emulation is to be used for the simulation; can this 6

7 hardware be emulated using another means (simulation of the waveform/hardware) and not a training pod form factor? a. The pod form factor will not be the stimulation. The prototype must fit in a pod form factor and will be stimulated by an aircraft emulation. 53. Who will be providing the desktop flight simulators that will be simulating constructive entities and computer generated forces, GFE or CFE? CFE. 54. What are the emulation tools that will be provided if the above will be GFE? N/A. 55. Are there any security considerations that need to be designed into the architecture/scenario? a. For the demonstration, no classified data will be used, however the objectives in 3.3 e & g should be demonstrated. 56. Section 4.3 states that training pod node and ground node will be delivered to the government at the conclusion of this demonstration; is this a negotiable item if proprietary hardware/software is used for the demonstration? a. Section 4.3 states the Government s desire, but a proprietary solution is negotiable (see section 5.3). 57. Can you provide a ROM value to help us size our 1/3 cost share to meet the OTA requirement? a. No. The solutions provided from vendors will help us to formulate this in follow on efforts. 58. Given the USG will be providing responses to questions from interested parties, and those responses may impact the solution for a given contractor, will the USG provide for an extension to proposal and price submittal in order to to allow review and incorporation of Govt responses to Questions a. Yes, the deadline has been extended to 29 June. 59. Will training applications (e.g., constructive weapons, threats, and targets) be provided as GFE? No. 60. Does the USG intend to demonstrate this capability with high fidelity models (ideally GFI), or are functionally representative models sufficient to demonstrate the dlvc architecture? a. Functionally representative models will be sufficient 61. What % of each of the scenarios provided in the RFS are % Live / % Virtual / % Const. a. Each scenario will be a mix of live, virtual, and constructive entities with the ability to integrate any percentage of the various entities. I.E. One scenario may have 4 live blue air plus 4 virtual blue air, plus 8 constructive blue air, against 31 constructive red air and one virtual red air while another could have an 8-ship strike package, all live, with all constructive threats and no virtual players. The prototype should be able to handle any mix. 62. When will the USG provide the cdis specification 7

8 a. Compressed DIS (cdis) standards are in development for 5G-ATW. cdis is an architecture for 5G-ATW and, as such, is not a requirement for the demonstration. DIS standards are available through IEEE. 63. Will the USG provide a cdis implementation? a. No. Compressed DIS (cdis) standards are in development for 5G-ATW. cdis is an architecture for 5G-ATW and, as such, is not a requirement for the demonstration. DIS standards are available through IEEE. 64. Is there one or more fixed scenarios and one or more performance metrics that will be used to evaluate the value of each proposed architecture? If so, can it be provided? a. The scenarios in 3.1 will be evaluated. The Government will focus on the ability to transmit the information in 3.2 and meet the capabilities of Will the performance of the dlvc architecture be evaluated with consideration for asymmetrical access to information driven by the multiple independent levels of security? a. Yes. 66. Will the characterization or mathematical model of the 5GATW radio network be available at contract award a. The Government is not requiring the use of 5G-ATW and vendors are free to use any waveform they feel would meet the requirements. A preliminary system spec is available through TReX and will be provided to the awardee. 67. Are the entities listed in above the maximum number of entities expected? a. No. These could be considered the maximum aircraft involved in the primary mission. However, on any given mission, there will also be additional ground entities, threats, targets, and potentially other aircraft (ie, the DCA mission in 3.1.c. would likely have high value aircraft and/or ground components being protected) 68. Will the Government provide the desktop simulators and automated Computer Generated Forces as GFE? No. 69. Will the government provide a Compressed Distributed Interactive Simulation (C-DIS) simulator for the prototype demonstration? a. No. Compressed DIS (cdis) standards are in development for 5G-ATW. cdis is an architecture for 5G-ATW and, as such, is not a requirement for the demonstration. DIS standards are available through IEEE. 70. Can we have access to the full cdis specification? a. No. Compressed DIS (cdis) standards are in development for 5G-ATW. cdis is an architecture for 5G-ATW and, as such, is not a requirement for the demonstration. DIS standards are available through IEEE. 71. Section 3.3.c of the RFS mentions an aircraft node with P5 pod form and later in describing the demonstration, it mentions, The live systems will be represented by a training pod form factor stimulated by a live aircraft 8

9 emulation. could you give more details on what you mean by that? For example: 72. a. Would you like us to use an existing, unmodified P5 pod? No. 73. b. Would it be acceptable to use the P5 housing with new components inside? It would be acceptable, but Government will not provide a pod and, as such, this option is not expected. 74. c. Is it necessary for the P5 housing to be part of the demonstration or would it be acceptable to demonstrate the architecture with hardware that could operate within the space, power, and cooling constraints (but without the P5 housing actually being present)? a. Yes, and this is the expected approach. Note that if additional power/cooling is needed from the standard P5 pod, it could be added or could replace P5 components. 75. In Section 3.1, where the RFS describes the Air mobility and combat scenarios, it appears that the highest entity count is for the Offensive Counter Air scenario, which has a total of 96 live and synthetic entities. Previously, in Section 2 it mentioned that during a training exercise, ~100 live training systems and 1000 total entities might be involved. Would a solution that meets your latency requirements for the scenarios in section 3.1 be a success for you? Or are you looking for a demonstration that works for 100 live and 1000 total entities? a. The Government is looking for a demonstration that works for roughly 100 live and 1000 total entities, to include those in the scenarios of 3.1. These could be considered the maximum aircraft involved in the primary mission. However, on any given mission, there will also be additional ground entities, threats, targets, and potentially other aircraft (ie, the DCA mission in 3.1.c. would likely have high value aircraft and/or ground components being protected) 76. Data generation: Which sensors are you looking to be modeled (and for what platforms) by the live aircraft emulation and displayed in the virtual visual system depiction? a. To clarify: The virtual vision system referenced in 3.2.b.viii. would be the indications shown to the simulator aircrew based on the data sent over the link (i.e. whether targets can be detected, tracked, targeted, etc, display of environmental conditions, location of targets, etc). If depicting a cockpit view, the cockpit should display indications on all of the sensors indicated in 3.2 and could be of any appropriate USAF aircraft, though more than one aircraft may be required since no aircraft performs all of the missions. 77. Data generation: Would a low fidelity model that generates representative data volume be sufficient? Yes. 78. Can we have access to the 5G-ATW specification? 9

10 a. 5G-ATW is not required for the demonstration, though it can be simulated. A preliminary system spec is available through TReX and will be provided to the awardee. 79. Would a solution that uses 5G-ATW as the data link be preferable to one that used a similar data link? No. 80. Is it a requirement to demonstrate how the platform node would tap into the mission busses on the platform? No. 81. Given the breadth and diversity of topic areas, can an organization submit more than one submission to the request for solutions? a. Respondents to the Request for Solutions should submit only a single response which provides an all-encompassing solution. 82. The NAICS code posted with the FBO notice for the Distributed LVC Prototype Project (Solicitation Number: TREX-18-dLVC) is Other Commercial and Service Industry Machinery Manufacturing. That NAICS code has a size standard of 1,000 employees. Under section 5.6 (Nontraditional business status) of the RFS below, do we use that NAICS code for the SB determination or is there a different NAICs used for TReX efforts? a. NAICS code utilized on FBO was purely for dissemination purposes and has no bearing on nontraditional business status. NAICS code should be ignored for responses purposes. 10

Modification of the Entity State PDU for Use in the End-to-End Test

Modification of the Entity State PDU for Use in the End-to-End Test Modification of the Entity State PDU for Use in the End-to-End Test MAJ Terry Schmidt, U.S. Army schmidt@jads.kirtland.af.mil (505) 846-1015 Gary Marchand, SAIC marchand@jads.kirtland.af.mil (505) 845-1165

More information

Central T&E Investment Program. Net-centric Weapons Test and Evaluation Environment (NCWTEE)

Central T&E Investment Program. Net-centric Weapons Test and Evaluation Environment (NCWTEE) Central T&E Investment Program Net-centric Weapons Test and Evaluation Environment (NCWTEE) International Test and Evaluation Association System-of-Systems Engineering Workshop Jason Lucas 96 TW/TSSQ 850-882-8028

More information

Distributed Virtual Environments!

Distributed Virtual Environments! Distributed Virtual Environments! Introduction! Richard M. Fujimoto! Professor!! Computational Science and Engineering Division! College of Computing! Georgia Institute of Technology! Atlanta, GA 30332-0765,

More information

Copyright 2016 Rockwell Collins, Inc. All rights reserved. LVC for Autonomous Aircraft Systems Testing

Copyright 2016 Rockwell Collins, Inc. All rights reserved. LVC for Autonomous Aircraft Systems Testing LVC for Autonomous Aircraft Systems Testing Challenges - T&E of Autonomous A/C Regulatory Restrictions Desired test or demonstration context may not be available Flight Test Complexity More complex than

More information

Amendment 0002 Special Notice N SN-0006 Future X-Band Radar (FXR) Industry Day

Amendment 0002 Special Notice N SN-0006 Future X-Band Radar (FXR) Industry Day Amendment 0002 Special Notice N00014-17-SN-0006 Future X-Band Radar (FXR) Industry Day The purposes of Amendment 0002 to Special Notice N00014-17-SN-0006 are as follows: 1. Revise Paragraph Number 5 entitled,

More information

NET SENTRIC SURVEILLANCE BAA Questions and Answers 2 April 2007

NET SENTRIC SURVEILLANCE BAA Questions and Answers 2 April 2007 NET SENTRIC SURVEILLANCE Questions and Answers 2 April 2007 Question #1: Should we consider only active RF sensing (radar) or also passive (for detection/localization of RF sources, or using transmitters

More information

TACTICAL DATA LINK FROM LINK 1 TO LINK 22

TACTICAL DATA LINK FROM LINK 1 TO LINK 22 Anca STOICA 1 Diana MILITARU 2 Dan MOLDOVEANU 3 Alina POPA 4 TACTICAL DATA LINK FROM LINK 1 TO LINK 22 1 Scientific research assistant, Lt. Eng.Military Equipment and Technologies Research Agency 16 Aeroportului

More information

Test & Evaluation (T&E)/Science & Technology (S&T) Program

Test & Evaluation (T&E)/Science & Technology (S&T) Program Test & Evaluation (T&E)/Science & Technology (S&T) Program New Simulation Techniques for Warfighter Systems T&E Gil Torres October 4, 2017. Approved for public release: distribution unlimited. C4I & Software

More information

U.S. ARMY RESEARCH, DEVELOPMENT AND ENGINEERING COMMAND

U.S. ARMY RESEARCH, DEVELOPMENT AND ENGINEERING COMMAND U.S. ARMY RESEARCH, DEVELOPMENT AND ENGINEERING COMMAND Army RDTE Opportunities Michael Codega Soldier Protection & Survivability Directorate Natick Soldier Research, Development & Engineering Center 29

More information

Office of Naval Research. BAA , Undersea Cooperative Cueing and Intervention (UC2I) Amendment 3

Office of Naval Research. BAA , Undersea Cooperative Cueing and Intervention (UC2I) Amendment 3 Office of Naval Research BAA 07-028, Undersea Cooperative Cueing and Intervention (UC2I) Amendment 3 The following questions and answers are provided for all potential respondents in the interest of procurement

More information

Framework and the Live, Virtual, and Constructive Continuum. Paul Lawrence Hamilton Director, Modeling and Simulation

Framework and the Live, Virtual, and Constructive Continuum. Paul Lawrence Hamilton Director, Modeling and Simulation The T-BORG T Framework and the Live, Virtual, and Constructive Continuum Paul Lawrence Hamilton Director, Modeling and Simulation July 17, 2013 2007 ORION International Technologies, Inc. The Great Nebula

More information

Page 1 of 5 Buyers: Login Register Vendors: Login Register Accessibility Scenario-Based Assessment of High Frequency (HF), High Band Width Communications Solicitation Number: W911NF18R-DHS_HF Agency: Department

More information

Future Attribute Screening Technology (FAST) Demonstration Laboratory

Future Attribute Screening Technology (FAST) Demonstration Laboratory BROAD AGENCY ANNOUCEMENT (BAA) HSARPA BAA 07-03A Future Attribute Screening Technology (FAST) Demonstration Laboratory 1. Section I entitled, GENERAL INFORMATION is modified as follows: a. Paragraph 5

More information

Warfighter Information Network Solicitation #: W15P7T-13-R0059 DRS Network and Imaging Systems

Warfighter Information Network Solicitation #: W15P7T-13-R0059 DRS Network and Imaging Systems Warfighter Information Network Solicitation #: W15P7T-13-R0059 DRS Network and Imaging Systems May 17, 2013 AirSystems_Tiered Testing_White Paper_MicrositeVersion_v2.docx DRAFT-12/8/2015 2:05 PM DRS Tactical

More information

Other Transaction Authority (OTA)

Other Transaction Authority (OTA) Other Transaction Authority (OTA) Col Christopher Wegner SMC/PK 15 March 2017 Overview OTA Legal Basis Appropriate Use SMC Space Enterprise Consortium Q&A Special Topic. 2 Other Transactions Authority

More information

Technical Exploitation Support Request for Information (RFI)

Technical Exploitation Support Request for Information (RFI) Technical Exploitation Support Request for Information (RFI) This announcement constitutes a Sources Sought, Request for Information (RFI) ONLY. The Virginia Contracting Activity (VaCA) solely for information,

More information

RDT&E BUDGET ITEM JUSTIFICATION SHEET (R-2 Exhibit)

RDT&E BUDGET ITEM JUSTIFICATION SHEET (R-2 Exhibit) , R-1 #49 COST (In Millions) FY 2000 FY2001 FY2002 FY2003 FY2004 FY2005 FY2006 FY2007 Cost To Complete Total Cost Total Program Element (PE) Cost 21.845 27.937 41.497 31.896 45.700 57.500 60.200 72.600

More information

The MARS Helicopter and Lessons for SATCOM Testing

The MARS Helicopter and Lessons for SATCOM Testing The MARS Helicopter and Lessons for SATCOM Testing Innovation: Kratos Defense Byline NASA engineers dreamed up an ingenious solution to this problem: pair the rover with a flying scout that can peer over

More information

The LVCx Framework. The LVCx Framework An Advanced Framework for Live, Virtual and Constructive Experimentation

The LVCx Framework. The LVCx Framework An Advanced Framework for Live, Virtual and Constructive Experimentation An Advanced Framework for Live, Virtual and Constructive Experimentation An Advanced Framework for Live, Virtual and Constructive Experimentation The CSIR has a proud track record spanning more than ten

More information

A Translation of the Contracting Alphabet: From BAAs to OTAs

A Translation of the Contracting Alphabet: From BAAs to OTAs A Translation of the Contracting Alphabet: From BAAs to OTAs February 18, 2016 Rebecca Willsey Chief, Contracting Policy Branch Air Force Research Lab, Rome NY Distribution Statement A: Cleared for Public

More information

Pilot Training with the Full Capability of an Integrated LVC Training System

Pilot Training with the Full Capability of an Integrated LVC Training System Pilot Training with the Full Capability of an Integrated LVC Training System Military Flight Training USA - Conference 7 Dec 2017 Mike Lewis Your worldwide training partner of choice OVERVIEW What is L-V-C

More information

National Data Links: Waveform Design and its role in Modern Electronic Warfare operations

National Data Links: Waveform Design and its role in Modern Electronic Warfare operations National Data Links: Waveform Design and its role in Modern Electronic Warfare operations Hatim M. Behairy, Ph.D. Associate Research Professor Coordinator: Information and Communication Sector Director:

More information

STE Standards and Architecture Framework TCM ITE

STE Standards and Architecture Framework TCM ITE STE Framework TCM ITE 18 Sep 17 Further dissemination only as directed by TCM ITE, 410 Kearney Ave., Fort Leavenworth, KS 66027 or higher authority. This dissemination was made on 8 SEP 17. 1 Open Standards

More information

MANPADS VIRTUAL REALITY SIMULATOR

MANPADS VIRTUAL REALITY SIMULATOR MANPADS VIRTUAL REALITY SIMULATOR SQN LDR Faisal Rashid Pakistan Air Force Adviser: DrAmela Sadagic 2 nd Reader: Erik Johnson 1 AGENDA Problem Space Problem Statement Background Research Questions Approach

More information

Integrated Multi-Sensor Testing of EW/Radar Platforms Dr. Bob Andrews

Integrated Multi-Sensor Testing of EW/Radar Platforms Dr. Bob Andrews Integrated Multi-Sensor Testing of EW/Radar Platforms Dr. Bob Andrews 27-05-08 1 Summary and Overview o Legacy defensive aids and their testability o Modern DASS sensor fusion o Requirement for multi-sensor,

More information

REQUEST FOR INFORMATION (RFI) United States Marine Corps Experimental Forward Operating Base (ExFOB) 2014

REQUEST FOR INFORMATION (RFI) United States Marine Corps Experimental Forward Operating Base (ExFOB) 2014 REQUEST FOR INFORMATION (RFI) United States Marine Corps Experimental Forward Operating Base (ExFOB) 2014 OVERVIEW: This announcement constitutes a Request for Information (RFI) notice for planning purposes.

More information

REPORT DOCUMENTATION PAGE

REPORT DOCUMENTATION PAGE REPORT DOCUMENTATION PAGE Form Approved OMB NO. 0704-0188 The public reporting burden for this collection of information is estimated to average 1 hour per response, including the time for reviewing instructions,

More information

Design and research of hardware-in-the loop platform of infrared seeker based on Lab-VIEW

Design and research of hardware-in-the loop platform of infrared seeker based on Lab-VIEW Advanced Materials Research Online: 2014-05-23 ISSN: 1662-8985, Vols. 926-930, pp 3497-3500 doi:10.4028/www.scientific.net/amr.926-930.3497 2014 Trans Tech Publications, Switzerland Design and research

More information

Channel Simulators to Test RF Communication Links for Targets, UAVs and Ranges

Channel Simulators to Test RF Communication Links for Targets, UAVs and Ranges Channel Simulators to Test RF Communication Links for Targets, UAVs and Ranges RT Logic, Steve Williams 47 th Annual Targets, UAVs and Range Operations Symposium & Exhibition 22 October, 2009 Colorado

More information

MC108A-2 RF MULTI-COUPLER USER S GUIDE

MC108A-2 RF MULTI-COUPLER USER S GUIDE MC108A-2 RF MULTI-COUPLER USER S GUIDE Systems Engineering & Management Company 1430 Vantage Court Vista, California 92081 PROPRIETARY INFORMATION THE INFORMATION CONTAINED IN THIS DOCUMENT CONSTITUTES

More information

ONR BAA Affordable Electronically Scanned Array Technology for Next Generation Naval Platforms. Questions & Answers 3/21/07

ONR BAA Affordable Electronically Scanned Array Technology for Next Generation Naval Platforms. Questions & Answers 3/21/07 ONR BAA 07-010 Affordable Electronically Scanned Array Technology for Next Generation Naval Platforms Questions & Answers 3/21/07 NOTE: Questions and Answers in this document are considered. Final Versions

More information

THE PERFORMANCE EVALUATION OF AN OFDM-BASED IP TRANSCEIVER AT EGLIN AFB

THE PERFORMANCE EVALUATION OF AN OFDM-BASED IP TRANSCEIVER AT EGLIN AFB THE PERFORMANCE EVALUATION OF AN OFDM-BASED IP TRANSCEIVER AT EGLIN AFB Alfredo Berard, Chief Scientist 46 TSS Eglin AFB, FL USA Paul Cook, Director of RF Products Teletronics Technology Corporation Newtown,

More information

Evolution of Software-Only-Simulation at NASA IV&V

Evolution of Software-Only-Simulation at NASA IV&V Evolution of Software-Only-Simulation at NASA IV&V http://www.nasa.gov/centers/ivv/jstar/itc.html Justin McCarty Justin.McCarty@TMCTechnologies.com Justin Morris Justin.R.Morris@Nasa.gov Scott Zemerick

More information

Linking Emergency Response Teams and the Military using VMF/ Tactical Data Links

Linking Emergency Response Teams and the Military using VMF/ Tactical Data Links Linking Emergency Response Teams and the Military using VMF/188-220 Tactical Data Links Chris Beattie Software Systems Engineer Aeronix/Symetrics International Data Link Symposium Washington DC, United

More information

Leveraging Digital RF Memory Electronic Jammers for Modern Deceptive Electronic Attack Systems

Leveraging Digital RF Memory Electronic Jammers for Modern Deceptive Electronic Attack Systems White Paper Leveraging Digital RF Memory Electronic Jammers for Modern Deceptive Electronic Attack Systems by Tony Girard Mercury systems MaRCH 2015 White Paper Today s advanced Electronic Attack (EA)

More information

The Standards Community: The New Way of Doing Business

The Standards Community: The New Way of Doing Business The Engineering Society for Advancing Mobility in Land, Sea, Air and Space The Standards Community: The New Way of Doing Business Douglas A. Gregory Chair of SAE Aerospace Avionic Systems Division Chief

More information

ALR-400 RADAR WARNING RECEIVER

ALR-400 RADAR WARNING RECEIVER AIBORNE DEFENSE SYSTEMS RADAR WARNING RECEIVER Defense and security systems in five continents indracompany.com RADAR WARNING RECEIVER Technical description leading edge field proven wideband digital reception

More information

Progress Update. RT Logic, Steve Williams. Operations Symposium & Exhibition 20 October, 2010

Progress Update. RT Logic, Steve Williams. Operations Symposium & Exhibition 20 October, 2010 Testing the Test Range without Flights Progress Update RT Logic, Steve Williams 48 th Annual Targets, UAVs and Range Operations Symposium & Exhibition 20 October, 2010 Colorado Springs, CO (719) 598-2801

More information

A Review of Vulnerabilities of ADS-B

A Review of Vulnerabilities of ADS-B A Review of Vulnerabilities of ADS-B S. Sudha Rani 1, R. Hemalatha 2 Post Graduate Student, Dept. of ECE, Osmania University, 1 Asst. Professor, Dept. of ECE, Osmania University 2 Email: ssrani.me.ou@gmail.com

More information

TECHNOLOGY COMMONALITY FOR SIMULATION TRAINING OF AIR COMBAT OFFICERS AND NAVAL HELICOPTER CONTROL OFFICERS

TECHNOLOGY COMMONALITY FOR SIMULATION TRAINING OF AIR COMBAT OFFICERS AND NAVAL HELICOPTER CONTROL OFFICERS TECHNOLOGY COMMONALITY FOR SIMULATION TRAINING OF AIR COMBAT OFFICERS AND NAVAL HELICOPTER CONTROL OFFICERS Peter Freed Managing Director, Cirrus Real Time Processing Systems Pty Ltd ( Cirrus ). Email:

More information

Jager UAVs to Locate GPS Interference

Jager UAVs to Locate GPS Interference JIFX 16-1 2-6 November 2015 Camp Roberts, CA Jager UAVs to Locate GPS Interference Stanford GPS Research Laboratory and the Stanford Intelligent Systems Lab Principal Investigator: Sherman Lo, PhD Area

More information

Keysight Technologies Virtual Flight Testing of Radar System Performance Using SystemVue and STK

Keysight Technologies Virtual Flight Testing of Radar System Performance Using SystemVue and STK Keysight Technologies Virtual Flight Testing of Radar System Performance Using SystemVue and STK White Paper Abstract Keysight SystemVue (electronic system simulation) and AGI STK (inertial and environmental

More information

Air Force Research Laboratory

Air Force Research Laboratory Air Force Research Laboratory AFRL Sensors Directorate Overview 24 July 2012 Integrity Service Excellence Dr Kenneth L Schepler Senior International Focal Point Sensors Directorate Air Force Research Laboratory

More information

Application. Design and Installation Variants

Application. Design and Installation Variants Application The airborne defense suite (ADS) Talisman is intended for aircraft protection against: all types of guided Air-to-Air (AAM) and Surface-to-Air (SAM) missiles fitted with active (semi-active)

More information

Networked Targeting Technology

Networked Targeting Technology Networked Targeting Technology Stephen Welby Next Generation Time Critical Targeting Future Battlespace Dominance Requires the Ability to Hold Opposing Forces at Risk: At Any Time In Any Weather Fixed,

More information

MAPLESIM: Tailored solutions for networking legacy flight simulators an HLA based approach

MAPLESIM: Tailored solutions for networking legacy flight simulators an HLA based approach MAPLESIM: Tailored solutions for networking legacy flight simulators an HLA based approach A.J.J. Lemmers and P.J. Kuiper Nationaal Lucht- en Ruimtevaartlaboratorium National Aerospace Laboratory NLR MAPLESIM:

More information

Company Profile Amertec Systems is a leading private manufacturer of electronic systems for the defense sector, having more than 20 years of experienc

Company Profile Amertec Systems is a leading private manufacturer of electronic systems for the defense sector, having more than 20 years of experienc Company Profile Amertec Systems is a leading private manufacturer of electronic systems for the defense sector, having more than 20 years of experience in system engineering, mechanical and electronic

More information

GSS8000. Highlights of the GSS8000 series. Multiple Signals Combined. Comprehensive Modelling. Unmatched Pedigree and Support

GSS8000. Highlights of the GSS8000 series. Multiple Signals Combined. Comprehensive Modelling. Unmatched Pedigree and Support GSS8000 SERIES GSS8000 Highlights of the GSS8000 series The GSS8000 series has been designed to meet all the demanding requirements of research and development teams involved in satellite navigation and

More information

Silent Sentry. Lockheed Martin Mission Systems. Jonathan Baniak Dr. Gregory Baker Ann Marie Cunningham Lorraine Martin.

Silent Sentry. Lockheed Martin Mission Systems. Jonathan Baniak Dr. Gregory Baker Ann Marie Cunningham Lorraine Martin. Silent Sentry Passive Surveillance Lockheed Martin Mission Systems Jonathan Baniak Dr. Gregory Baker Ann Marie Cunningham Lorraine Martin June 7, 1999 6/7/99 1 Contact: Lorraine Martin Telephone: (301)

More information

Drones for Telecommunications

Drones for Telecommunications April 6, 2017 Drones for Telecommunications How AT&T uses drones to support and enhance its network Art Pregler AT&T UAS Program Director 2017 AT&T Intellectual Property. All rights reserved. AT&T, Globe

More information

Report to Congress regarding the Terrorism Information Awareness Program

Report to Congress regarding the Terrorism Information Awareness Program Report to Congress regarding the Terrorism Information Awareness Program In response to Consolidated Appropriations Resolution, 2003, Pub. L. No. 108-7, Division M, 111(b) Executive Summary May 20, 2003

More information

By Gokula Krishnan S. Generated by Foxit PDF Creator Foxit Software For evaluation only.

By Gokula Krishnan S. Generated by Foxit PDF Creator Foxit Software   For evaluation only. By Gokula Krishnan S Generated by Foxit PDF Creator Foxit Software RAdio Detection And Ranging By US Navy in 1940 RDF (Range and Direction Finding ) in the United Kingdom In the 1960s Solid State delays

More information

Embedded Training and LVC

Embedded Training and LVC UNCLASSIFIED Nationaal Lucht- en Ruimtevaartlaboratorium National Aerospace Laboratory NLR Executive summary Embedded Training and LVC Problem area Embedded Training (ET) provides many benefits for education

More information

39N6E KASTA-2E2 Low-Altitude 3D All-Round Surveillance Radar

39N6E KASTA-2E2 Low-Altitude 3D All-Round Surveillance Radar 39N6E KASTA-2E2 Low-Altitude 3D All-Round Surveillance Radar The Kasta-2E2 low-altitude 3D all-round surveillance radar is designed to control airspace and to perform automatic detection, range/azimuth/altitude

More information

Foundations Required for Novel Compute (FRANC) BAA Frequently Asked Questions (FAQ) Updated: October 24, 2017

Foundations Required for Novel Compute (FRANC) BAA Frequently Asked Questions (FAQ) Updated: October 24, 2017 1. TA-1 Objective Q: Within the BAA, the 48 th month objective for TA-1a/b is listed as functional prototype. What form of prototype is expected? Should an operating system and runtime be provided as part

More information

UNCLASSIFIED. UNCLASSIFIED R-1 Line Item #13 Page 1 of 11

UNCLASSIFIED. UNCLASSIFIED R-1 Line Item #13 Page 1 of 11 Exhibit R-2, PB 2010 Air Force RDT&E Budget Item Justification DATE: May 2009 Applied Research COST ($ in Millions) FY 2008 Actual FY 2009 FY 2010 FY 2011 FY 2012 FY 2013 FY 2014 FY 2015 Cost To Complete

More information

Introduction to Electronic Defence EEE5106S

Introduction to Electronic Defence EEE5106S Introduction to Electronic Defence EEE5106S P.F. Potgieter and J.D. Vlok September 29, 2011 Contents 1 Introduction 2 2 Lecturer Information 2 3 Course Objectives and Study Themes 3 3.1 Theme 1: The History

More information

Live Virtual Constructive Technologies for Test (LVCT)

Live Virtual Constructive Technologies for Test (LVCT) Test and Evaluation/Science and Technology Program Live Virtual Constructive Technologies for Test (LVCT) Mark Phillips, Thomas Treakle, Ed Powell, & Gil Torres 33 rd Annual International Test and Evaluation

More information

Special Notice # N R-S002 - Frequently Asked Questions #1

Special Notice # N R-S002 - Frequently Asked Questions #1 Special Notice # N00014-19-R-S002 - Frequently Asked Questions #1 General and Contracting Questions 1. Q: Would you please describe CONOPS more? A: The CONOPS described in the Special Notice and at the

More information

Other Transaction Agreements. Chemical Biological Defense Acquisition Initiatives Forum

Other Transaction Agreements. Chemical Biological Defense Acquisition Initiatives Forum Other Transaction Agreements Chemical Biological Defense Acquisition Initiatives Forum John M. Eilenberger Jr. Chief of the Contracting Office U.S. Army Contracting Command - New Jersey Other Transaction

More information

Multiplayer Computer Games: A Team Performance Assessment Research and Development Tool

Multiplayer Computer Games: A Team Performance Assessment Research and Development Tool Multiplayer Computer Games: A Team Performance Assessment Research and Development Tool Elizabeth Biddle, Ph.D. Michael Keller The Boeing Company Training Systems and Services Outline Objective Background

More information

Correlated, Real Time Multi-spectral Sensor Test and Evaluation (T&E) in an Installed Systems Test Facility (ISTF) Using High Performance Computing

Correlated, Real Time Multi-spectral Sensor Test and Evaluation (T&E) in an Installed Systems Test Facility (ISTF) Using High Performance Computing Correlated, Real Time Multi-spectral Sensor Test and Evaluation (T&E) in an Installed Systems Test Facility (ISTF) Using High Performance Computing John Kriz 1, Tom Joyner 1, Ted Wilson 1, and Greg McGraner

More information

FREQUENCY SHIELDING EFFECTIVENESS TEST REPORT TEST REPORT NUMBER TR-TRU-PROTECT-M

FREQUENCY SHIELDING EFFECTIVENESS TEST REPORT TEST REPORT NUMBER TR-TRU-PROTECT-M SRG Shielding Resources Group, Inc. RADIO FREQUENCY SHIELDING EFFECTIVENESS TEST REPORT TEST REPORT NUMBER TR-TRU-PROTECT-M Submitted To: Tru-Protect 7012 Cedar Avenue Lubbock, Texas 79404 Prepared For:

More information

Addressing the Challenges of Radar and EW System Design and Test using a Model-Based Platform

Addressing the Challenges of Radar and EW System Design and Test using a Model-Based Platform Addressing the Challenges of Radar and EW System Design and Test using a Model-Based Platform By Dingqing Lu, Agilent Technologies Radar systems have come a long way since their introduction in the Today

More information

NIST Activities in Wireless Coexistence

NIST Activities in Wireless Coexistence NIST Activities in Wireless Coexistence Communications Technology Laboratory National Institute of Standards and Technology Bill Young 1, Jason Coder 2, Dan Kuester, and Yao Ma 1 william.young@nist.gov,

More information

DARPA/MTO BAA HR001117S0043 Frequently Asked Questions Updated October 3, 2017

DARPA/MTO BAA HR001117S0043 Frequently Asked Questions Updated October 3, 2017 DARPA/MTO BAA HR001117S0043 Frequently Asked Questions Updated October 3, 2017 Q1: Can a TA1 solution rely on intimate protocol or waveform knowledge, e.g. how to demodulate the signal? A1: Per the BAA,

More information

The C2/C4ISR Systems Market

The C2/C4ISR Systems Market 4.4 Global C2/C4ISR Systems Land Based Submarket Table 4.4 Global C2/C4ISR Systems Land Based Submarket Forecast 213-2 ($bn, AGR, CAGR, Cumulative) 212 213 214 21 216 217 218 219 22 221 222 2 213- Sales

More information

BATS WIRELESS. Electronically Steered Antenna (ESA) Omni Antenna. Sector Antenna. High Gain High Mobility Hi Reliability

BATS WIRELESS. Electronically Steered Antenna (ESA) Omni Antenna. Sector Antenna. High Gain High Mobility Hi Reliability BATS WIRELESS High Gain High Mobility Hi Reliability Omni Antenna Omni antennas have been predominately used in mobile communications for their ease of use. Ease of use has provided no protection from

More information

Spectrum Collaboration Challenge

Spectrum Collaboration Challenge Spectrum Collaboration Challenge Frequently Asked Questions (FAQ) November 22, 2017 Defense Advanced Research Projects Agency 675 North Randolph Street Arlington, VA 22203 Revision Summary Section Revision

More information

How to Test A-GPS Capable Cellular Devices and Why Testing is Required

How to Test A-GPS Capable Cellular Devices and Why Testing is Required How to Test A-GPS Capable Cellular Devices and Why Testing is Required Presented by: Agilent Technologies Page 1 Agenda Introduction to A-GPS Why Test A-GPS Performance? Types of A-GPS Testing Page 2 Origins

More information

Advanced Fusion Avionics Suite

Advanced Fusion Avionics Suite Advanced Fusion Avionics Suite Full Spherical Coverage by Distributed Aperture System (DAS) Electro-Optical Targeting System (EOTS) Radar Warning System 360 o Coverage Fwd Band 3 / 4 Fwd Band 2 Band 3

More information

Ultra Electronics Integrated Sonar Suite

Ultra Electronics Integrated Sonar Suite Sonar Systems Crown Copyright Ultra Electronics Integrated Sonar Suite COMPREHENSIVE NETWORK CENTRIC WARFARE SYSTEM COMPRISING: HULL-MOUNT SONAR VARIABLE DEPTH SONAR TORPEDO DEFENCE INNOVATION PERFORMANCE

More information

This section applies to the requirements for the performance of power system studies by both the Design Engineer and the Contractor.

This section applies to the requirements for the performance of power system studies by both the Design Engineer and the Contractor. Basis of Design This section applies to the requirements for the performance of power system studies by both the Design Engineer and the Contractor. Background Information A Short Circuit and Coordination

More information

FIBER OPTIC ANTENNA LINK OFW-5800/GPS. Compatible with a Wide Range of GPS Receivers Architectures. Logistically Supported with COTS Hardware

FIBER OPTIC ANTENNA LINK OFW-5800/GPS. Compatible with a Wide Range of GPS Receivers Architectures. Logistically Supported with COTS Hardware FIBER OPTIC ANTENNA LINK OFW-5800/GPS Compatible with a Wide Range of GPS Receivers Architectures Designed to Operate within the Naval Electromagnetic Environment Designed and Manufactured to Meet Naval

More information

INTEGRATING THE BATTLESPACE WITH SOFTWARE-BASED COMMUNICATIONS

INTEGRATING THE BATTLESPACE WITH SOFTWARE-BASED COMMUNICATIONS BOEING LIMITED INTEGRATING THE BATTLESPACE WITH SOFTWARE-BASED COMMUNICATIONS Alejandro M. Lopez Director Communication Systems Boeing Integrated Defense Systems OMG SBC Workshop August 18, 2005 03SB1003O.1

More information

Disruption Opportunity Special Notice DARPA-SN Imaging Through Almost Anything, Anywhere (ITA3)

Disruption Opportunity Special Notice DARPA-SN Imaging Through Almost Anything, Anywhere (ITA3) Disruption Opportunity Special Notice DARPA-SN-17-72 Imaging Through Almost Anything, Anywhere (ITA3) I. Opportunity Description The Defense Advanced Research Projects Agency (DARPA) Defense Sciences Office

More information

RIGEL RESM AND RECM SYSTEMS

RIGEL RESM AND RECM SYSTEMS DEFENSE AND SECURITY RIGEL RESM AND RECM SYSTEMS Defense and security in five continents indracompany.com RIGEL RESM RECM SYSTEMS RIGEL RESM AND RECM SYSTEMS RIGEL RESM System The Naval Radar RESM and

More information

DRS Electronic Warfare Operational Awareness Simulation/Support and Diagnostics

DRS Electronic Warfare Operational Awareness Simulation/Support and Diagnostics DRS Electronic Warfare Operational Awareness Mission Scenario Generation and Simulation Author: Dr. Bruce Holley BSc MSc PhD CEng CPhys MInstP MIET Eur Ing Head of Air Systems LOB, DRS (UK) DRS ELECTRONIC

More information

AFRL. Technology Directorates AFRL

AFRL. Technology Directorates AFRL Sensors Directorate and ATR Overview for Integrated Fusion, Performance Prediction, and Sensor Management for ATE MURI 21 July 2006 Lori Westerkamp Sensor ATR Technology Division Sensors Directorate Air

More information

UAV CRAFT CRAFT CUSTOMIZABLE SIMULATOR

UAV CRAFT CRAFT CUSTOMIZABLE SIMULATOR CRAFT UAV CRAFT CUSTOMIZABLE SIMULATOR Customizable, modular UAV simulator designed to adapt, evolve, and deliver. The UAV CRAFT customizable Unmanned Aircraft Vehicle (UAV) simulator s design is based

More information

DEFENSE and SECURITY RIGEL ES AND. Defense and security in five continents. indracompany.com

DEFENSE and SECURITY RIGEL ES AND. Defense and security in five continents. indracompany.com DEFENSE and SECURITY RIGEL ES AND EA Systems Defense and security in five continents indracompany.com RIGEL ES EA Systems RIGEL ES AND EA Systems RIGEL ES System The Naval Radar ES and EA systems provide

More information

ONR Special Notice N R-SN01

ONR Special Notice N R-SN01 Special Notice N00014-17-R-SN01 Special Program Announcement for 2017 Office of Naval Research Swampworks Research Opportunity: Carbon Nanotube (CNT) Electrical Cabling I. INTRODUCTION This announcement

More information

Beyond Smart Weapons 38 th Annual Air Armament Symposium

Beyond Smart Weapons 38 th Annual Air Armament Symposium Beyond Smart Weapons 38 th Annual Air Armament Symposium Dr. John Beach Wilcox, SES! Director! AFRL Munitions Directorate! Eglin AFB, FL! PlaLorms Evolving & Arming the Combat Aircraft Gen 1 - WWI Gen

More information

BROAD AGENCY ANNOUNCEMENT FY12 TECHNOLOGY DEMONSTRATION MISSIONS PROGRAM OFFICE OF THE CHIEF TECHNOLOGIST PROPOSALS DUE.

BROAD AGENCY ANNOUNCEMENT FY12 TECHNOLOGY DEMONSTRATION MISSIONS PROGRAM OFFICE OF THE CHIEF TECHNOLOGIST PROPOSALS DUE. OMB Approval Number 2700-0085 Broad Agency Announcement NNM12ZZP03K BROAD AGENCY ANNOUNCEMENT FY12 TECHNOLOGY DEMONSTRATION MISSIONS PROGRAM OFFICE OF THE CHIEF TECHNOLOGIST PROPOSALS DUE April 30, 2012

More information

Microwave Remote Sensing

Microwave Remote Sensing Provide copy on a CD of the UCAR multi-media tutorial to all in class. Assign Ch-7 and Ch-9 (for two weeks) as reading material for this class. HW#4 (Due in two weeks) Problems 1,2,3 and 4 (Chapter 7)

More information

CRAFT UAV CRAFT CUSTOMIZABLE SIMULATOR

CRAFT UAV CRAFT CUSTOMIZABLE SIMULATOR CRAFT UAV CRAFT CUSTOMIZABLE SIMULATOR Customizable, modular UAV simulator designed to adapt, evolve, and deliver. The UAV CRAFT customizable Unmanned Aircraft Vehicle (UAV) simulator s design is based

More information

MSPO 2017: POLISH RADAR CAPABILITIES

MSPO 2017: POLISH RADAR CAPABILITIES aut. Maksymilian Dura 08.09.2017 MSPO 2017: POLISH RADAR CAPABILITIES MSPO International Defence Industry Exhibition organized in Kielce is yet another occasion for the PIT-RADWAR company to show that

More information

Accurate Automation Corporation. developing emerging technologies

Accurate Automation Corporation. developing emerging technologies Accurate Automation Corporation developing emerging technologies Unmanned Systems for the Maritime Applications Accurate Automation Corporation (AAC) serves as a showcase for the Small Business Innovation

More information

GUIDED WEAPONS RADAR TESTING

GUIDED WEAPONS RADAR TESTING GUIDED WEAPONS RADAR TESTING by Richard H. Bryan ABSTRACT An overview of non-destructive real-time testing of missiles is discussed in this paper. This testing has become known as hardware-in-the-loop

More information

TrakSat: Localization-Capable CubeSats Symstemics / TrakSat: Localization-Capable CubeSats Symstemics /

TrakSat: Localization-Capable CubeSats Symstemics / TrakSat: Localization-Capable CubeSats Symstemics / Short description: Unique location-determining service (using individualized per-cubesat pseudorandomized number (PRN) code modulated L band carrier signals) provides SOF-controllable independent (from

More information

WOLF - Wireless robust Link for urban Forces operations

WOLF - Wireless robust Link for urban Forces operations Executive summary - rev B - 01/05/2011 WOLF - Wireless robust Link for urban Forces operations The WOLF project, funded under the 2nd call for proposals of Joint Investment Program on Force Protection

More information

UNCLASSIFIED. UNCLASSIFIED Office of Secretary Of Defense Page 1 of 5 R-1 Line #102

UNCLASSIFIED. UNCLASSIFIED Office of Secretary Of Defense Page 1 of 5 R-1 Line #102 Exhibit R-2, RDT&E Budget Item Justification: PB 2015 Office of Secretary Of Defense Date: March 2014 0400: Research, Development, Test & Evaluation, Defense-Wide / BA 4: Advanced Component Development

More information

Transponder Based Ranging

Transponder Based Ranging Transponder Based Ranging Transponderbasierte Abstandsmessung Gerrit Kalverkamp, Bernhard Schaffer Technische Universität München Outline Secondary radar principle Looking around corners: Diffraction of

More information

GNSS applications in Flight Test Instrumentation Systems. R. Urli

GNSS applications in Flight Test Instrumentation Systems. R. Urli GNSS applications in Flight Test Instrumentation Systems R. Urli 19.06.2008 Wi\EC-STD-d\24.03.2004 Contents Flight Test and FT Instrumentation Time Need for time IRIG-B Time distribution Time synchronisation

More information

Wide-area Motion Imagery for Multi-INT Situational Awareness

Wide-area Motion Imagery for Multi-INT Situational Awareness Wide-area Motion Imagery for Multi-INT Situational Awareness Bernard V. Brower Jason Baker Brian Wenink Harris Corporation TABLE OF CONTENTS ABSTRACT... 3 INTRODUCTION WAMI HISTORY... 4 WAMI Capabilities

More information

Radio Bridge User Guide. Document: DOC-VS-RB-UG-C-0

Radio Bridge User Guide. Document: DOC-VS-RB-UG-C-0 Advanced Simulation Technology inc. 500A Huntmar Park Drive Herndon, Virginia 20170 USA Tel. (703) 471-2104 Fax. (703) 471-2108 www.asti-usa.com Radio Bridge User Guide Document: DOC-VS-RB-UG-C-0 Advanced

More information

ROM/UDF CPU I/O I/O I/O RAM

ROM/UDF CPU I/O I/O I/O RAM DATA BUSSES INTRODUCTION The avionics systems on aircraft frequently contain general purpose computer components which perform certain processing functions, then relay this information to other systems.

More information

Phone: Fax: Mentor Radio, LLC. Airport Wireless Integrated Connectivity System (AWICS)

Phone: Fax: Mentor Radio, LLC. Airport Wireless Integrated Connectivity System (AWICS) Mentor Radio, LLC Airport Wireless Integrated Connectivity System (AWICS) AIRPORT UPGRADE PROPOSAL Revised 2/12 Page 1 OVERVIEW Airport communications systems have grown from voice radios to encompass

More information

MSc(CompSc) List of courses offered in

MSc(CompSc) List of courses offered in Office of the MSc Programme in Computer Science Department of Computer Science The University of Hong Kong Pokfulam Road, Hong Kong. Tel: (+852) 3917 1828 Fax: (+852) 2547 4442 Email: msccs@cs.hku.hk (The

More information

Mission Solution 300

Mission Solution 300 Mission Solution 300 Standard configuration for point defence Member of the Thales Mission Solution family Standard configuration of integrated sensors, effectors, CMS, communication system and navigation

More information