1 The EU Network Code on Requirements for Generators A Summary Tanguy Hubert, PhD thubert@epri.com PDU Fall Advisory Meeting Hollywood, FL; September 20, 2016

2 Existing interconnection requirements in Europe were drawn up nationally, in response to local needs Example: Grid support functions currently required in Germany, France, Spain and Italy for inverter-based generators connected to low voltage (LV) networks Germany France Italy Spain Europe 16A Europe >16A LOW VOLTAGE VDE AR N 4105:2011 Arrêté 04/23/2008 EN 50438:2013* CLC/TS :2015 CEI 0-21:2014 UNE IN:2014 Arrêté 02/15/2010 (applicable 11/2016) (non-binding) National Standard Ministerial decrees National Standard National Standard European Standard CENELEC Specification LV: 1kV LV: 50V-1kV LV: 1kV LV: 1kV LV: 1kV LV: 1kV Remote ON/OFF >100kW, optional >6kW all Remote control of P >100kW >6kW >100kW all Active P(f) at overfrequency all >5MW all >100kW for mainland all all Power Minimum capability to uphold P Control in-feed with falling frequency all all P(f) at underfrequency P(U) optional optional cos j fix all >3kW all all all Reactive Power Control Grid Fault Response cos j (P) >3.68kVA >3kW all all cos j (V) all Q fix all all Q (V) optional >6kW >100kW all all Q (P) all LVRT >6kW all all HVRT all LFRT 47.5Hz 47.0Hz, >5MW 47.5Hz 47.5Hz 47.5Hz 47.5Hz HFRT 51.5Hz 52.0Hz, >5MW 51.5Hz 51.5Hz 51.5Hz 51.5Hz Reactive current support Notes: all indicates requirement is applicable to all generator sizes. *EN 50438:2013 has been transposed as national standard in the four countries considered: Germany (DIN EN 50438), France (NF EN 50438), Italy (CEI EN 50438) and Spain (UNE EN 50438). Frequencies indicate the frequency thresholds beyond which disconnection is permitted. 2

3 Increasingly interconnected networks create need for unified grid-connection rules across Europe Initial efforts focused on harmonizing norms and technical specifications through European standardization committees (CEN, CENELEC). Starting 2009: efforts were extended to develop EU-wide binding rules governing the way power generators gain access to the grid. May 2016: EU Network Code on Requirements for Generators released. Policy decision to develop unified EU Network Code Entry into force : EU Network Code officially published Application: EU Network Code becomes effective Grid Code Development Grid Code Implementation 2009 May 2016 May

4 EU Network Code is binding and supersedes any other legislation or standard Code was published as EU Regulation 2016/631 (April 2016) Supersedes any existing or new national legislation concerned with grid connection requirements for power generators, Prevails over any existing or new standard. RULE-MAKING (BINDING) CA Rule 21, EU Grid Code EUROPE EU commission, national governments & regulatory agencies Rule-making informs standardization U.S. Federal & State agencies (FERC, Energy & Public utilities commissions..) Regulations, decrees, orders ( grid/network codes ) STANDARDIZATION (VOLUNTARY) Standard, industry and professional organizations Norms, standards, specifications HI Rule 14H Distribution and Transmission Operators Interconnection requirements & procedures IEEE 1547, VDE AR N 4105, EN Standardization informs rule-making

5 EU Network Code is applicable in 40+ European countries ENTSO-E Synchronous Areas Great Britain Ireland Baltic Continental Europe Nordic Non-EU countries expected to adopt NC-RfG rules EEA Agreement (binding) Energy Community Treaty (binding) Switzerland (voluntary) 5

6 Requirements are categorized by generator types Generator types A, B, C, D are defined according to: voltage level at the connection point, maximum active power capacity of generator. EU Network Code defines maximum capacity thresholds for each area: 6

7 TSOs can customize definitions of generator types based on local needs TSOs are to set generator capacity thresholds for their own control area within the limits set by the EU Network Code. 7

8 Non-Exhaustive Requirements recognize local differences Different network characteristics across countries (topology, dynamic system response, stability) prevent use of single European settings. A non-exhaustive requirement does not provide for a full harmonization of the parameters specifying that requirement: common methodology describing how parameters shall be set binding ranges, within which parameter values must be chosen System operators are responsible for customizing non-exhaustive requirements for their own control area by May Entry into force Application EU Network Code Implementation May 2016 Year 1 Year 2 Year 3 Local specifications of non-exhaustive requirements May 2018 Manufacturer product development May

9 Example of Non-Exhaustive Requirement: Voltage Ride Through (for Types B, C, D) Each TSO is to specify a voltage-against-time profile at the connection point for fault conditions consistent with profile below M1 and M2 must stay within the binding ranges defined in the Code. 9

10 Grid Support Functions Required in EU Network Code for Inverter-Based Generators Active Power Control Reactive Power control Grid Fault Response Scope of application A B C D Decision-maker responsible for fully specifying the requirement ( primary, secondary) Relevant System Operator Relevant Transmission System Operator Power Generating Facility Owner NC-RfG References ENTSO-E Guidelines Remote ON/OFF P P P P 13(6) 14(2), Remote control of P P P P (C/D only) 15(2)(a-b) P(f) at overfrequency P P P P 13(2) 3-1 Minimum capability to uphold P in-feed with P P P P 13(4-5) 3-3 falling frequency P(f) at underfrequency P P 15(2)(c) 3-4 P(f), combined mode P P 15(2)(d) over/under frequency cos j fix P P 21(3)(d)(vi) Q fix P P 21(3)(d)(v) 21(3)(d)(iiiv) Q=f(U) P P LVRT P P P 14(3), 16(3) 3-5, 3-9 LFRT & HFRT P P P P 13(1)(a) Post-fault active power P P P 20(3) 3-10, 3-12 recovery Reactive current support P P P 20(2)(b-c) 3-13 Synthetic inertia P P 21(2) 10

11 Other topics addressed in EU Network Code Communications ON/OFF commands (all types) Setpoints: P (B,C,D), Q and cos j (C,D) System operator has freedom to require additional data exchange. Simulation models Scope: Types C and D only. System operator may require models reflecting transient, steady-state, and/or dynamic behavior including voltage control, generator protection and converter sub-models. Storage systems All inverter functions required are fully applicable to inverter-based storage systems acting as generators (i.e. discharging) Storage systems acting as loads (i.e. charging) must be capable of disconnecting their load (i.e. stop charging) in case of underfrequency 11

12 References EPRI, Advanced Functions for Smart Inverters: Towards a Unified Regulatory Framework in Europe, October 2016 EPRI s summary and analysis of the new EU Network Code on Requirements for Generators. EU Regulation 2016/631 establishing a network code on requirements for grid connection of generators, April 2016 Final version of the EU Network Code as published in the official journal of the European Union. ENTSO-E, Implementation Guideline, October Companion document to the Network Code developed by ENTSO-E to inform DSOs and TSOs on specific implementation aspects. 12

13 Together Shaping the Future of Electricity Tanguy Hubert, PhD Aminul Huque, PhD

SELECTING NATIONAL MW BOUNDARIES

SELECTING NATIONAL MW BOUNDARIES SELECTING NATIONAL MW BOUNDARIES ENTSO-E guidance document for national implementation for network codes on grid connection 16 November 2016 Table of Contents DESCRIPTION...2 Codes(s) and Article(s)...2

More information

ENTSO-E Draft Network Code on High Voltage Direct Current Connections and DCconnected

ENTSO-E Draft Network Code on High Voltage Direct Current Connections and DCconnected ENTSO-E Draft Network Code on High Voltage Direct Current Connections and DCconnected Power Park Modules 30 April 2014 Notice This document reflects the work done by ENTSO-E in line with ACER s framework

More information

Parameters related to voltage issues

Parameters related to voltage issues Parameters related to voltage issues EN-E guidance document for national implementation for network codes on grid connection 16 November 2016 EN-E AISBL Avenue de Cortenbergh 100 1000 Brussels Belgium

More information

DRAFT PROPOSAL FOR STORAGE CONNECTION REQUIREMENTS

DRAFT PROPOSAL FOR STORAGE CONNECTION REQUIREMENTS DRAFT PROPOSAL FOR STORAGE CONNECTION REQUIREMENTS December 2017 Contents 1 Background and reading instructions... 2 2 Definitions and applicability... 2 3 SPM categories types... 3 4 SPM Type A... 4 4.1

More information

Parameters related to frequency stability

Parameters related to frequency stability Parameters related to frequency stability EN-E guidance document for national implementation for network codes on grid connection 16 November 2016 EN-E AISBL Avenue de Cortenbergh 100 1000 Brussels Belgium

More information

DRAFT PROPOSAL FOR NC HVDC REQUIREMENTS OF GENERAL APPLICATION

DRAFT PROPOSAL FOR NC HVDC REQUIREMENTS OF GENERAL APPLICATION DRAFT PROPOSAL FOR NC REQUIREMENTS OF GENERAL APPLICATION December 2017 TABLE OF CONTENTS Table of Contents... 2 Introduction... 6 1. Scope of application... 8 2. TITLE II: General s for connections...

More information

Grid codes and wind farm interconnections CNY Engineering Expo. Syracuse, NY November 13, 2017

Grid codes and wind farm interconnections CNY Engineering Expo. Syracuse, NY November 13, 2017 Grid codes and wind farm interconnections CNY Engineering Expo Syracuse, NY November 13, 2017 Purposes of grid codes Grid codes are designed to ensure stable operating conditions and to coordinate the

More information

FREQUENTLY ASKED QUESTIONS

FREQUENTLY ASKED QUESTIONS NETWORK CODE FOR REQUIREMENTS FOR GRID CONNECTION APPLICABLE TO ALL GENERATORS FREQUENTLY ASKED QUESTIONS 24 JANUARY 2012 Disclaimer: This document is not legally binding. It only aims at clarifying the

More information

Automatic connection/reconnection and admissible rate of change of active power

Automatic connection/reconnection and admissible rate of change of active power Automatic connection/reconnection and admissible rate of change of active power ENTSO-E guidance document for national implementation of conditions for automatic connection / reconnection after incidental

More information

Deleted: 9 4 anuary ... [1] Deleted: much more. Formatted ... [2] Formatted Table. Formatted: Indent: Left: 0.06 cm

Deleted: 9 4 anuary ... [1] Deleted: much more. Formatted ... [2] Formatted Table. Formatted: Indent: Left: 0.06 cm (Comparison based on GB Grid Code Issue 4 Revision 13 only and ENSTO - E RFG Internal Version dated 6 June 01) (Note Does not include other Industry Codes) Table compares the GB Grid Code with the ENTSO-E

More information

FREQUENCY and VOLTAGE, ranges and durations

FREQUENCY and VOLTAGE, ranges and durations Eurelectric 10 September 2013 Proposals to amend the Draft RfG Code This paper includes informal proposals to amend the RfG Code regarding some critical requirements taking into account the content of

More information

Requirements for Generators European Network Code High Level Implementation Issues

Requirements for Generators European Network Code High Level Implementation Issues Requirements for Generators European Network Code High Level Implementation Issues Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be

More information

Target Mchunu and Themba Khoza Eskom Transmission Division, System Operator Grid Code Management

Target Mchunu and Themba Khoza Eskom Transmission Division, System Operator Grid Code Management GRID CONNECTION CODE FOR RENEWABLE POWER PLANTS (RPPs) CONNECTED TO THE ELECTRICITY TRANSMISSION SYSTEM (TS) OR THE DISTRIBUTION SYSTEM (DS) IN SOUTH AFRICA Target Mchunu and Themba Khoza Eskom Transmission

More information

IEEE Major Revision of Interconnection Standard

IEEE Major Revision of Interconnection Standard IEEE 1547-2018 - Major Revision of Interconnection Standard NRECA & APA s Emerging Priorities in Energy Research Day, Anchorage, AK Charlie Vartanian PE Secretary, IEEE 1547 Working Group October 31, 2018

More information

INITIAL RfG FREQUENCY PARAMETER SELECTION. BASED ON DRAFT RfG VALUES. Requirement Range Suggested GB Value Comments

INITIAL RfG FREQUENCY PARAMETER SELECTION. BASED ON DRAFT RfG VALUES. Requirement Range Suggested GB Value Comments INITIAL RfG FREQUENCY PARAMETER SELECTION BASED ON DRAFT RfG VALUES Issue Article Level of Difficulty (1-5) Type A 1. 13.1(a) Frequency Ranges Requirement Range Suggested GB Value Comments 47 47.5Hz 47.5

More information

Max voltage in 400 kv Networks

Max voltage in 400 kv Networks Max voltage in 400 kv Networks ENTSO-E GC ESC, 08, Brussels 1 Summary NEED TO WITHSTAND WIDE VOLTAGE RANGE 3 EXISTING CONNECTION RULES 4 KEMA REPORT ON RFG 5 STUDIES ABOUT TOV 6 REFERENCE TO EU NC REGULATIONS

More information

DRAFT PROPOSAL FOR NC RFG REQUIREMENTS OF GENERAL APPLICATION

DRAFT PROPOSAL FOR NC RFG REQUIREMENTS OF GENERAL APPLICATION DRAFT PROPOSAL FOR NC RFG REQUIREMENTS OF GENERAL APPLICATION September 2017 Contents 1 Introduction... 3 2 Proposal for determination of significance [Art 5]... 4 2.1 Conditions for the choice of the

More information

Constant Terminal Voltage. Working Group 1 29 st January 2014

Constant Terminal Voltage. Working Group 1 29 st January 2014 Constant Terminal Voltage Working Group 1 29 st January 2014 Overview Objectives of Working Group ENTSO-E RfG Implications Options Summary Discussion 2 Objectives of Work Group National Grid in consultation

More information

FNN comments on NC HVDC submitted to ENTSO E

FNN comments on NC HVDC submitted to ENTSO E the term HV is not defined > A further definition should be applied since the term is used all through the code A lot of terms from the Network Code RfG are used and should be checked regarding consistency

More information

INCIDENTS CLASSIFICATION SCALE METHODOLOGY

INCIDENTS CLASSIFICATION SCALE METHODOLOGY 8 May 2014 WORKING GROUP INCIDENT CLASSIFICATION UNDER SYSTEM OPERATIONS COMMITTEE Contents Revisions... 5 References and Related documents... 5 Change request... 5 1. Overview... 6 1.1 Objectives and

More information

TECHNICAL OVERVIEW OF IMPACTING REQUIREMENTS FOR THE CATEGORIZATION OF THE POWER GENERATING MODULES

TECHNICAL OVERVIEW OF IMPACTING REQUIREMENTS FOR THE CATEGORIZATION OF THE POWER GENERATING MODULES TECHNICAL OVERVIEW OF IMPACTING REQUIREMENTS FOR THE CATEGORIZATION OF THE POWER GENERATING MODULES Task Force Implementation Network Codes 27/01/2017 Contents 1 Introduction... 2 2 Proposal for determination

More information

PROPOSAL FOR NC RFG REQUIREMENTS OF GENERAL APPLICATION

PROPOSAL FOR NC RFG REQUIREMENTS OF GENERAL APPLICATION PROPOSAL FOR NC RFG REQUIREMENTS OF GENERAL APPLICATION proposal following Art. 7(4) of the NC RfG 17 May 2018 Contents 1 Introduction... 3 2 Proposal for determination of significance [Art 5]... 5 2.1

More information

each time the Frequency is above 51Hz. Continuous operation is required

each time the Frequency is above 51Hz. Continuous operation is required GC0101 EXTRACT OF EUROPEAN CONNECTION CONDITIONS LEGAL TEXT DATED 08/01/2018. ECC.6 ECC.6.1 ECC.6.1.1 ECC.6.1.2 ECC.6.1.2.1 ECC.6.1.2.1.1 ECC.6.1.2.1.2 ECC.6.1.2.1.3 TECHNICAL, DESIGN AND OPERATIONAL CRITERIA

More information

HVDC systems default parameters

HVDC systems default parameters ENTS-E guidance document for national implementation for network codes on grid connection 4. June 2018 ENTS-E AISBL Avenue Cortenbergh 100 1000 Brussels Belgium Tel +32 2 741 09 50 Fax +32 2 741 09 51

More information

BED INTERCONNECTION TECHNICAL REQUIREMENTS

BED INTERCONNECTION TECHNICAL REQUIREMENTS BED INTERCONNECTION TECHNICAL REQUIREMENTS By Enis Šehović, P.E. 2/11/2016 Revised 5/19/2016 A. TABLE OF CONTENTS B. Interconnection Processes... 2 1. Vermont Public Service Board (PSB) Rule 5.500... 2

More information

5 Summary LOW VOLTAGE RIDE THROUGH WITH HIGH CURRENT INJECTION. Motivation. Future Requirements. Test results for symmetrical failures

5 Summary LOW VOLTAGE RIDE THROUGH WITH HIGH CURRENT INJECTION. Motivation. Future Requirements. Test results for symmetrical failures LOW VOLTAGE RIDE THROUGH WITH HIGH CURRENT INJECTION 1 2 3 4 Motivation Future Requirements Test results for symmetrical failures Test results for asymmetrical failures 5 Summary 1 DYNAMIC VOLTAGE CONTROL:

More information

TABLE 1 COMPARISION OF ENTSO-E RfG TO GB GRID CODE

TABLE 1 COMPARISION OF ENTSO-E RfG TO GB GRID CODE TABLE 1 Comparison to ENTSO-E RfG (Comparison based on Issue 5 Revision 11 only and ENSTO - E RFG Version dated 14 January 2014) (Note Does not include other Industry Codes) Table 1 compares the ENTSO-E

More information

PROPOSAL FOR NC RFG REQUIREMENTS OF GENERAL APPLICATION

PROPOSAL FOR NC RFG REQUIREMENTS OF GENERAL APPLICATION PROPOSAL FOR NC RFG REQUIREMENTS OF GENERAL APPLICATION Public consultation 15 March 23 April 2018 Contents 1 Introduction... 3 2 Proposal for determination of significance [Art 5]... 5 2.1 Conditions

More information

RENEWABLE ENERGY SUB-CODE for Distribution Network connected Variable Renewable Energy Power Plants in Ghana

RENEWABLE ENERGY SUB-CODE for Distribution Network connected Variable Renewable Energy Power Plants in Ghana RENEWABLE ENERGY SUB-CODE for Distribution Network connected Variable Renewable Energy Power Plants in Ghana JANUARY 2015 i Table of Content PART A: 1 1 Introduction 1 1.1 Scope 1 1.2 Status 1 1.3 Terms

More information

WFPS1 WIND FARM POWER STATION GRID CODE PROVISIONS

WFPS1 WIND FARM POWER STATION GRID CODE PROVISIONS WFPS1 WIND FARM POWER STATION GRID CODE PROVISIONS WFPS1.1 INTRODUCTION 2 WFPS1.2 OBJECTIVE 2 WFPS1.3 SCOPE 3 WFPS1.4 FAULT RIDE THROUGH REQUIREMENTS 4 WFPS1.5 FREQUENCY REQUIREMENTS 5 WFPS1.6 VOLTAGE

More information

E N G I N E E R I N G M A N U A L

E N G I N E E R I N G M A N U A L 1 1 1.0 PURPOSE The purpose of this document is to define policy and provide engineering guidelines for the AP operating companies (Monongahela Power Company, The Potomac Edison Company, and West Penn

More information

Revised IEEE 1547 Standard for Interconnecting Distributed Energy Resources with Electric Power Systems- National Grid Solar Program

Revised IEEE 1547 Standard for Interconnecting Distributed Energy Resources with Electric Power Systems- National Grid Solar Program 1 Revised IEEE 1547 Standard for Interconnecting Distributed Energy Resources with Electric Power Systems- National Grid Solar Program Babak Enayati, PhD, PE Lead Engineer, National Grid Waltham, MA Email:

More information

Inverter-Based Resource Disturbance Analysis

Inverter-Based Resource Disturbance Analysis Inverter-Based Resource Disturbance Analysis Key Findings and Recommendations Informational Webinar February 15, 2018 August 16, 2016 Blue Cut Fire Disturbance Key Findings and Recommendations 2 Western

More information

Public Consultation on the Regulatory Framework for Small Scale Grid Connected Solar PV Systems Standards Technical Standards

Public Consultation on the Regulatory Framework for Small Scale Grid Connected Solar PV Systems Standards Technical Standards Consultation Paper: 1/2017 (i) Public Consultation on the Regulatory Framework for Small Scale Grid Connected Solar PV Systems Standards Technical Standards Issued on 19 January 2017 Contents 1. Introduction

More information

Network Code for HVDC Connections and DC-connected Power Park Modules Requirement Outlines

Network Code for HVDC Connections and DC-connected Power Park Modules Requirement Outlines Network Code for HVDC Connections and DC-connected Power Park Modules Requirement Outlines 30 April 2014 Disclaimer: This document is not legally binding. It only aims at clarifying the content of the

More information

DP&L s Technical Requirements for Interconnection and Parallel Operation of Distributed Generation

DP&L s Technical Requirements for Interconnection and Parallel Operation of Distributed Generation DP&L s Technical Requirements for Interconnection and Parallel Operation of Distributed Generation Technical Requirements for Interconnection and Parallel Operation of Distributed Generation Single Phase

More information

Renewable Interconnection Standard & Experimental Tests. Yahia Baghzouz UNLV Las Vegas, NV, USA

Renewable Interconnection Standard & Experimental Tests. Yahia Baghzouz UNLV Las Vegas, NV, USA Renewable Interconnection Standard & Experimental Tests Yahia Baghzouz UNLV Las Vegas, NV, USA Overview IEEE Std 1547 Voltage limitations Frequency limitations Harmonic limitations Expansion of IEEE Std

More information

Wind Requirements and Testing for Steady-State Voltage and Frequency Control

Wind Requirements and Testing for Steady-State Voltage and Frequency Control 1 Wind Requirements and Testing for Steady-State Voltage and Frequency Control IEEE PES General Meeting, Boston: July 18, 2016 Steven Saylors, P.E. Senior Specialist Vestas Wind Systems 2 Voltage Control

More information

CONTROLLABILITY OF WIND POWER PLANTS CAPABILITIES REGARDING VOLTAGE CONTROL AND DATA EXCHANGE

CONTROLLABILITY OF WIND POWER PLANTS CAPABILITIES REGARDING VOLTAGE CONTROL AND DATA EXCHANGE CONTROLLABILITY OF WIND POWER PLANTS CAPABILITIES REGARDING VOLTAGE CONTROL AND DATA EXCHANGE Konstantinos PIERROS Nuno TAVEIRA Eike ERDMANN ENERCON GmbH UK ENERCON GmbH Germany ENERCON GmbH Germany Konstantinos.Pierros@enercon.de

More information

Grid Converters for Photovoltaic

Grid Converters for Photovoltaic Grid Converters for Photovoltaic and Wind Power Systems by R. Teodorescu, M. Liserre and P. Rodriguez ISBN: 978 0 470 05751 3 Copyright Wiley 2011 Chapter 3 Grid Requirements for PV Grid connection requirements

More information

Technical information Grid Support Utility Interactive Inverters for Sunny Central-US and Sunny Central Storage-US

Technical information Grid Support Utility Interactive Inverters for Sunny Central-US and Sunny Central Storage-US Technical information Grid Support Utility Interactive Inverters for Sunny Central-US and Sunny Central Storage-US ENGLISH SC-US-GridServices-TI-en-10 Version 1.0 Table of Contents SMA Solar Technology

More information

GRID CODE COMPATIBLE PROTECTION SCHEME FOR SMART GRIDS

GRID CODE COMPATIBLE PROTECTION SCHEME FOR SMART GRIDS GRID CODE COMPATIBLE PROTECTION SCHEME FOR SMART GRIDS Hannu LAAKSONEN ABB Oy Finland hannu.laaksonen@fi.abb.com ABSTRACT Medium-voltage (MV) network short-circuit protection operation time delays have

More information

Design, Control and Application of Modular Multilevel Converters for HVDC Transmission Systems by Kamran Sharifabadi, Lennart Harnefors, Hans-Peter

Design, Control and Application of Modular Multilevel Converters for HVDC Transmission Systems by Kamran Sharifabadi, Lennart Harnefors, Hans-Peter 1 Design, Control and Application of Modular Multilevel Converters for HVDC Transmission Systems by Kamran Sharifabadi, Lennart Harnefors, Hans-Peter Nee, Staffan Norrga, Remus Teodorescu ISBN-10: 1118851560

More information

Work process proposal adaptation FTR. UG Belgian Grid 09/09/2013 Elia

Work process proposal adaptation FTR. UG Belgian Grid 09/09/2013 Elia Work process proposal adaptation FTR UG Belgian Grid 09/09/2013 Elia Doelstelling Actualiseren van het Federaal Technisch Reglement Integratie (daar waar nodig) van de ENTSO-E codes in het Federaal Technisch

More information

Testing Advanced Photovoltaic Inverters Conforming to IEEE Standard 1547 Amendment 1

Testing Advanced Photovoltaic Inverters Conforming to IEEE Standard 1547 Amendment 1 > REPLACE THIS LINE WITH YOUR PAPER IDENTIFICATION NUMBER (DOUBLE-CLICK HERE TO EDIT) < Testing Advanced Photovoltaic Inverters Conforming to IEEE Standard 547 Amendment Anderson Hoke, Student Member,

More information

Phase-phase/phase-neutral: 24/13.8 kv star, 13.8 kv delta, 12/6.9 kv star.

Phase-phase/phase-neutral: 24/13.8 kv star, 13.8 kv delta, 12/6.9 kv star. Summary Of Interconnection Technical Guidelines for Renewable Energy Systems 0-100 kw under Standard Offer Contract (Extract from JPS Guide to Interconnection of Distributed Generation) This document is

More information

Harmonizing the Changing Resource Mix Keeping the Grid Together

Harmonizing the Changing Resource Mix Keeping the Grid Together Harmonizing the Changing Resource Mix Keeping the Grid Together Robert W. Cummings Senior Director of Engineering and Reliability Initiatives i-pcgrid March 30, 2017 NERC-IEEE Memorandum of Understanding

More information

Conext CL-60 Inverter Active and Reactive Power Control and LVRT

Conext CL-60 Inverter Active and Reactive Power Control and LVRT Conext CL-60 Inverter Active and Reactive Power Control and LVRT http://solar.schneider-electric.com 976-0381-01-01/B March 2017 Application Note EXCLUSION FOR DOCUMENTATION UNLESS SPECIFICALLY AGREED

More information

Identification number : Jean-Louis MARTINAUD. 1, Place Samuel de Champlain PARIS LA DEFENSE Cedex. Address

Identification number : Jean-Louis MARTINAUD. 1, Place Samuel de Champlain PARIS LA DEFENSE Cedex. Address Identification number : 90947457424-20 GDF SUEZ answers to ACER consultation paper on «PC-07- draft framework guidelines on interoperability rules and data exchange for the European gas transmission networks»

More information

NORTH CAROLINA INTERCONNECTION REQUEST. Utility: Designated Contact Person: Address: Telephone Number: Address:

NORTH CAROLINA INTERCONNECTION REQUEST. Utility: Designated Contact Person: Address: Telephone Number:  Address: NORTH CAROLINA INTERCONNECTION REQUEST Utility: Designated Contact Person: Address: Telephone Number: Fax: E-Mail Address: An is considered complete when it provides all applicable and correct information

More information

5 Summary test results and additional findings

5 Summary test results and additional findings LOW VOLTAGE RIDE THROUGH WITH HIGH CURRENT INJECTION 1 2 3 4 Motivation Future Requirements Test results for symmetrical failures Test results for asymmetrical failures 5 Summary test results and additional

More information

ISO INTERNATIONAL STANDARD. Nomenclature Specification for a nomenclature system for medical devices for the purpose of regulatory data exchange

ISO INTERNATIONAL STANDARD. Nomenclature Specification for a nomenclature system for medical devices for the purpose of regulatory data exchange INTERNATIONAL STANDARD ISO 15225 First edition 2000-09-15 Nomenclature Specification for a nomenclature system for medical devices for the purpose of regulatory data exchange Nomenclature Spécifications

More information

Annex 2 - Proposed Grid Code Legal Text

Annex 2 - Proposed Grid Code Legal Text Annex 2 - Proposed Grid Code Legal Text FAULT RIDE THROUGH LEGAL TEXT This section contains the proposed legal text to give effect to the proposals. The proposed new text is in red and is based on Grid

More information

1200 MW Fault Induced Solar Photovoltaic Resource Interruption Disturbance Report

1200 MW Fault Induced Solar Photovoltaic Resource Interruption Disturbance Report 1200 MW Fault Induced Solar Photovoltaic Resource Interruption Disturbance Report Rich Bauer Associate Director Reliability Risk Management / Event Analysis Mid C Seminar July 19, 2017 Western Interconnection

More information

Southern Company Interconnection Requirements for Inverter-Based Generation

Southern Company Interconnection Requirements for Inverter-Based Generation Southern Company Interconnection Requirements for Inverter-Based Generation September 19, 2016 Page 1 of 16 All inverter-based generation connected to Southern Companies transmission system (Point of Interconnection

More information

03 / Data Sheet. PIKO-Inverter

03 / Data Sheet. PIKO-Inverter 03 / 2013 EN Data Sheet PIKO-Inverter 3.0 3.6 4.2 5.5 7.0 8.3 10.1 Table of content 4 Overview technical data Inverter single-phase 5 Inverter PIKO 3.0 5 Inverter PIKO 3.6 Inverter three-phase 6 Inverter

More information

ISO Rules Part 500 Facilities Division 502 Technical Requirements Section Aggregated Generating Facilities Technical Requirements

ISO Rules Part 500 Facilities Division 502 Technical Requirements Section Aggregated Generating Facilities Technical Requirements Division 502 Technical Applicability 1(1) Section 502.1 applies to: Expedited Filing Draft August 22, 2017 the legal owner of an aggregated generating facility directly connected to the transmission system

More information

PRC Generator Relay Loadability. Guidelines and Technical Basis Draft 4: (June 10, 2013) Page 1 of 75

PRC Generator Relay Loadability. Guidelines and Technical Basis Draft 4: (June 10, 2013) Page 1 of 75 PRC-025-1 Introduction The document, Power Plant and Transmission System Protection Coordination, published by the NERC System Protection and Control Subcommittee (SPCS) provides extensive general discussion

More information

IDAHO PURPA GENERATOR INTERCONNECTION REQUEST (Application Form)

IDAHO PURPA GENERATOR INTERCONNECTION REQUEST (Application Form) IDAHO PURPA GENERATOR INTERCONNECTION REQUEST (Application Form) Transmission Provider: IDAHO POWER COMPANY Designated Contact Person: Jeremiah Creason Address: 1221 W. Idaho Street, Boise ID 83702 Telephone

More information

Intermittent Renewable Resources (Wind and PV) Distribution Connection Code (DCC) At Medium Voltage (MV)

Intermittent Renewable Resources (Wind and PV) Distribution Connection Code (DCC) At Medium Voltage (MV) Intermittent Renewable Resources (Wind and PV) Distribution Connection Code (DCC) At Medium Voltage (MV) IRR-DCC-MV 1. Introduction 1 IRR-DCC-MV 2. Scope 1 IRR-DCC-MV 2.1. General 1 IRR-DCC-MV 2.2. Affected

More information

INTERCONNECTION REQUEST FOR A LARGE GENERATING FACILITY

INTERCONNECTION REQUEST FOR A LARGE GENERATING FACILITY INTERCONNECTION REQUEST FOR A LARGE GENERATING FACILITY Internal Use Only Date Received Time Received Received By: 1. The undersigned Interconnection Customer submits this request to interconnect its Large

More information

Implementation of Revised IEEE Standard 1547

Implementation of Revised IEEE Standard 1547 MAY 31, 2017 HOLYOKE, MASSACHUSETTS Implementation of Revised IEEE Standard 1547 Presentation to ISO-TO Operations Committee David Forrest Key Points As New England adds significant amounts of Distributed

More information

Wind Power Facility Technical Requirements CHANGE HISTORY

Wind Power Facility Technical Requirements CHANGE HISTORY CHANGE HISTORY DATE VERSION DETAIL CHANGED BY November 15, 2004 Page 2 of 24 TABLE OF CONTENTS LIST OF TABLES...5 LIST OF FIGURES...5 1.0 INTRODUCTION...6 1.1 Purpose of the Wind Power Facility Technical

More information

Connection Impact Assessment Application

Connection Impact Assessment Application Connection Impact Assessment Application This form is for generators applying for Connection Impact Assessment (CIA) and for generators with a project size >10 kw. Please return the completed form by email,

More information

Transmission Interconnection Requirements for Inverter-Based Generation

Transmission Interconnection Requirements for Inverter-Based Generation Transmission Requirements for Inverter-Based Generation June 25, 2018 Page 1 Overview: Every generator interconnecting to the transmission system must adhere to all applicable Federal and State jurisdictional

More information

GENERATOR INTERCONNECTION APPLICATION Category 5 For All Projects with Aggregate Generator Output of More Than 2 MW

GENERATOR INTERCONNECTION APPLICATION Category 5 For All Projects with Aggregate Generator Output of More Than 2 MW GENERATOR INTERCONNECTION APPLICATION Category 5 For All Projects with Aggregate Generator Output of More Than 2 MW ELECTRIC UTILITY CONTACT INFORMATION Consumers Energy Interconnection Coordinator 1945

More information

Technical information SUNNY TRIPOWER CORE1-US

Technical information SUNNY TRIPOWER CORE1-US Technical information SUNNY TRIPOWER CORE1-US Grid Support Utility Interactive Inverters ENGLISH STP50-US-40-GridServices-TI-en-10 Version 1.0 Table of Contents SMA Solar Technology America LLC Table of

More information

Requirements for Offshore Grid Connections. in the. Grid of TenneT TSO GmbH

Requirements for Offshore Grid Connections. in the. Grid of TenneT TSO GmbH Requirements for Offshore Grid Connections in the Grid of TenneT TSO GmbH Bernecker Straße 70, 95448 Bayreuth Updated: 5th October 2010 1/10 Requirements for Offshore Grid Connections in the Grid of TenneT

More information

PRODUCED BY THE OPERATIONS DIRECTORATE OF ENERGY NETWORKS ASSOCIATION

PRODUCED BY THE OPERATIONS DIRECTORATE OF ENERGY NETWORKS ASSOCIATION PRODUCED BY THE OPERATIONS DIRECTORATE OF ENERGY NETWORKS ASSOCIATION Engineering Recommendation G99 Issue 1 2017 Draft in Progress - This version uses track changes to note changes made following the

More information

Considerations and Recommendations for the Harmonisation of Under Frequency Loadshedding Schemes in Multi Zone Meshed Grids

Considerations and Recommendations for the Harmonisation of Under Frequency Loadshedding Schemes in Multi Zone Meshed Grids 21, rue d Artois, F-75008 PARIS http : //www.cigre.org INNOVATION FOR SECURE AND EFFICIENT TRANSMISSION GRIDS CIGRÉ Belgium Conference Crowne-Plaza Le Palace Brussels, Belgium March 12-14, 2014 Considerations

More information

IEEE Std Bulk System Opportunities from New Distributed Energy Resource Interconnection and Interoperability Standards

IEEE Std Bulk System Opportunities from New Distributed Energy Resource Interconnection and Interoperability Standards IEEE Std 1547-2018 Bulk System Opportunities from New Distributed Energy Resource Interconnection and Interoperability Standards Clayton Stice, ERCOT Jens C. Boemer, EPRI (on behalf of SCC21) NERC SPIDER

More information

Technical information SUNNY BOY 3.0-US / 3.8-US / 5.0-US / 6.0-US / 7.0-US / 7.7-US

Technical information SUNNY BOY 3.0-US / 3.8-US / 5.0-US / 6.0-US / 7.0-US / 7.7-US Technical information SUNNY BOY 3.0-US / 3.8-US / 5.0-US / 6.0-US / 7.0-US / 7.7-US Grid Support Utility Interactive Inverters ENGLISH SBxx-1XP-US-40-GridServices-TI-en-15 Version 1.5 Table of Contents

More information

Voltage Control and Power System Stability Enhancement using UPFC

Voltage Control and Power System Stability Enhancement using UPFC International Conference on Renewable Energies and Power Quality (ICREPQ 14) Cordoba (Spain), 8 th to 10 th April, 2014 Renewable Energy and Power Quality Journal (RE&PQJ) ISSN 2172-038 X, No.12, April

More information

Load-Frequency Control and Reserves Network Code. David Bunney JESG 19 March 2013

Load-Frequency Control and Reserves Network Code. David Bunney JESG 19 March 2013 Load-Frequency Control and Reserves Network Code David Bunney JESG 19 March 2013 Agenda Overview and Timescales Stakeholder Engagement Overview of the Code More detailed discussion on Frequency Quality

More information

LFC/AGC Nordic and European perspective. Exchange of balancing services international workshop Jan 2011 Whitley Gjerde

LFC/AGC Nordic and European perspective. Exchange of balancing services international workshop Jan 2011 Whitley Gjerde LFC/AGC Nordic and European perspective Exchange of balancing services international workshop 26-27 Jan 2011 Whitley Gjerde Contents Nordic Frequency quality Nordic reserve dimensioning project Nordic

More information

1

1 Guidelines and Technical Basis Introduction The document, Power Plant and Transmission System Protection Coordination, published by the NERC System Protection and Control Subcommittee (SPCS) provides extensive

More information

Performance of Distributed Energy Resources During and After System Disturbance Voltage and Frequency Ride-Through Requirements

Performance of Distributed Energy Resources During and After System Disturbance Voltage and Frequency Ride-Through Requirements Performance of Distributed Energy Resources During and After System Disturbance Voltage and Frequency Ride-Through Requirements A report by the Integration of Variable Generation Task Force (Task 1-7)

More information

From: Roger Clayton Re: Notes from FERC DER Technical Conference, April Panel 4 Collection and availability of data on DER installations

From: Roger Clayton Re: Notes from FERC DER Technical Conference, April Panel 4 Collection and availability of data on DER installations Memorandum From: Roger Clayton Re: Notes from FERC DER Technical Conference, April 11 2018 Panel 4 Collection and availability of data on DER installations Q1 Type of information? Q2 Current data & sharing?

More information

DNVGL-ST-0125 Edition March 2016

DNVGL-ST-0125 Edition March 2016 STANDARD DNVGL-ST-0125 Edition March 2016 Grid code compliance The electronic pdf version of this document found through http://www.dnvgl.com is the officially binding version. The documents are available

More information

Stability Enhancement for Transmission Lines using Static Synchronous Series Compensator

Stability Enhancement for Transmission Lines using Static Synchronous Series Compensator Stability Enhancement for Transmission Lines using Static Synchronous Series Compensator Ishwar Lal Yadav Department of Electrical Engineering Rungta College of Engineering and Technology Bhilai, India

More information

Communication systems for meters and remote reading of meters - Part 4: Wireless meter readout (Radio meter reading for operation in SRD bands)

Communication systems for meters and remote reading of meters - Part 4: Wireless meter readout (Radio meter reading for operation in SRD bands) Irish Standard Communication systems for meters and remote reading of meters - Part 4: Wireless meter readout (Radio meter reading for operation in SRD bands) CEN 2013 No copying without NSAI permission

More information

Highgate Converter Overview. Prepared by Joshua Burroughs & Jeff Carrara IEEE PES

Highgate Converter Overview. Prepared by Joshua Burroughs & Jeff Carrara IEEE PES Highgate Converter Overview Prepared by Joshua Burroughs & Jeff Carrara IEEE PES Highgate Converter Abstract Introduction to HVDC Background on Highgate Operation and Control schemes of Highgate 22 Why

More information

OPERATING, METERING, AND EQUIPMENT PROTECTION REQUIREMENTS FOR PARALLEL OPERATION OF LARGE-SIZE GENERATING FACILITIES GREATER THAN 2,000 KILOWATTS

OPERATING, METERING, AND EQUIPMENT PROTECTION REQUIREMENTS FOR PARALLEL OPERATION OF LARGE-SIZE GENERATING FACILITIES GREATER THAN 2,000 KILOWATTS OPERATING, METERING, AND EQUIPMENT PROTECTION REQUIREMENTS FOR PARALLEL OPERATION OF LARGE-SIZE GENERATING FACILITIES GREATER THAN 2,000 KILOWATTS CONNECTED TO THE DISTRIBUTION SYSTEM ORANGE AND ROCKLAND

More information

Owner/Customer Name: Mailing Address: City: County: State: Zip Code: Phone Number: Representative: Address: Fax Number:

Owner/Customer Name: Mailing Address: City: County: State: Zip Code: Phone Number: Representative:  Address: Fax Number: Interconnection of a Customer-Owned Renewable Generation System of Greater than 100 KW and Less than or Equal to 1 MW to the LCEC Electric Grid Tier 3 Application and Compliance Form Instructions: Complete

More information

CHARACTERISTIC NUMBERS OF PRIMARY CONTROL IN THE ISOLATED ESTONIAN POWER SYSTEM

CHARACTERISTIC NUMBERS OF PRIMARY CONTROL IN THE ISOLATED ESTONIAN POWER SYSTEM Oil Shale, 2011, Vol. 28, No. 1S, pp. 214 222 ISSN 0208-189X doi: 10.3176/oil.2011.1S.13 2011 Estonian Academy Publishers CHARACTERISTIC NUMBERS OF PRIMARY CONTROL IN THE ISOLATED ESTONIAN POWER SYSTEM

More information

PC-07- PUBLIC CONSULTATION ON DRAFT FRAMEWORK GUIDELINES ON INTEROPERABILITY RULES AND DATA EXCHANGE FOR THE EUROPEAN GAS TRANSMISSION NETWORKS

PC-07- PUBLIC CONSULTATION ON DRAFT FRAMEWORK GUIDELINES ON INTEROPERABILITY RULES AND DATA EXCHANGE FOR THE EUROPEAN GAS TRANSMISSION NETWORKS 16 March 2012 PC-07- PUBLIC CONSULTATION ON DRAFT FRAMEWORK GUIDELINES ON INTEROPERABILITY RULES AND DATA EXCHANGE FOR THE EUROPEAN GAS TRANSMISSION NETWORKS QUESTIONNAIRE Please provide the Agency with

More information

Conext CL125 Inverter - Active and Reactive Power Control and LVRT/HVRT

Conext CL125 Inverter - Active and Reactive Power Control and LVRT/HVRT Conext CL125 Inverter - Active and Reactive Power Control and LVRT/HVRT http://solar.schneider-electric.com 976-0406-01-01/A May 2018 Application Note EXCLUSION FOR DOCUMENTATION UNLESS SPECIFICALLY AGREED

More information

GIE response to public consultation Interoperability NC of ENTSOG

GIE response to public consultation Interoperability NC of ENTSOG Ref 13GIE052 April 2013 GIE response to public consultation Interoperability NC of ENTSOG Who is GIE? Gas Infrastructure Europe (GIE) is an association representing the sole interest of the infrastructure

More information

PRC Generator Relay Loadability. Guidelines and Technical Basis Draft 5: (August 2, 2013) Page 1 of 76

PRC Generator Relay Loadability. Guidelines and Technical Basis Draft 5: (August 2, 2013) Page 1 of 76 PRC-025-1 Introduction The document, Power Plant and Transmission System Protection Coordination, published by the NERC System Protection and Control Subcommittee (SPCS) provides extensive general discussion

More information

INTERIM ARRANGEMENTS FOR GRID TIED DISTRIBUTED ENERGY RESOURCES. Technical Requirements for Grid-Tied DERs

INTERIM ARRANGEMENTS FOR GRID TIED DISTRIBUTED ENERGY RESOURCES. Technical Requirements for Grid-Tied DERs INTERIM ARRANGEMENTS FOR GRID TIED DISTRIBUTED ENERGY RESOURCES Technical Requirements for Grid-Tied DERs Projects Division 6/29/2017 Contents 1 Definitions and Acronyms... 1 2 Technical Interconnection

More information

Annex: HVDC Code comments

Annex: HVDC Code comments EnergyVille Thor Park 8300 Poort Genk 8300 3600 Genk Annex: HVDC Code comments Dr. Geraint Chaffey, Dr. Willem Leterme, Firew Dejene, Mian Wang, Alejandro Bayo Salas, Thomas Roose, Ozgur Can Sakinci, prof.

More information

Mid-term Adequacy Forecast July 2016

Mid-term Adequacy Forecast July 2016 Mid-term Adequacy Forecast 2016 6 July 2016 EU security of supply: the view from the Slovak Presidency Launch of ENTSO-E Mid-term Adequacy Forecast 2016 (MAF 2016) Brussels, 6 June 2016 Current situation

More information

Fault Ride Through Technical Assessment Report Template

Fault Ride Through Technical Assessment Report Template Fault Ride Through Technical Assessment Report Template Notes: 1. This template is intended to provide guidelines into the minimum content and scope of the technical studies required to demonstrate compliance

More information

RfG Implementation Fault Ride Through

RfG Implementation Fault Ride Through RfG Implementation Fault Ride Through Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight line. Antony

More information

The updated EU energy efficiency standardisation of HV and MV transformers

The updated EU energy efficiency standardisation of HV and MV transformers INTERNATIONAL ENERGY EFFICIENT TRANSFORMERS WORKSHOP 2013 13TH NOVEMBER 2013 BANGKOK, THAILAND HELD IN CONJUNCTION WITH THE 42 ND MEETING OF THE APEC EGEE&C The updated EU energy efficiency standardisation

More information

Revision Control. 0 18/07/2012 Initial Document Creation. STAKEHOLDERS The following positions shall be consulted if an update or review is required:

Revision Control. 0 18/07/2012 Initial Document Creation. STAKEHOLDERS The following positions shall be consulted if an update or review is required: Standard: Technical Requirements for Bumpless Transfer of Customer Load between Embedded Generators and the Distribution Network Standard Number: HPC-9OJ-13-0001-2012 * Shall be the Process Owner and is

More information

DER Ride-Through Performance Categories and Trip Settings Presentation at PJM Ride-Through Workshop, Philadelphia, PA, October 1-2, 2018

DER Ride-Through Performance Categories and Trip Settings Presentation at PJM Ride-Through Workshop, Philadelphia, PA, October 1-2, 2018 DER Ride-Through Performance Categories and Trip Settings Presentation at PJM Ride-Through Workshop, Philadelphia, PA, October 1-2, 2018 Dr. Jens C. Boemer, Principal Technical Leader, EPRI Reigh Walling,

More information

P5 Policy 5: Emergency Operations

P5 Policy 5: Emergency Operations RG CE OH Policy 5: Emergency Operations V 3.1 Page 1 of 18 P5 Policy 5: Emergency Operations Document Control Version Number: V 3.1 Approved By: RG CE Plenary Date Approved: 43 rd RG CE Plenary Meeting

More information

Key DRAFT EUROPEAN CONNECTION CONDITIONS LEGAL TEXT DATED 13/12/17

Key DRAFT EUROPEAN CONNECTION CONDITIONS LEGAL TEXT DATED 13/12/17 Key DRAFT EUROPEAN CONNECTION CONDITIONS LEGAL TEXT DATED 13/12/17 Formatted: Highlight 1) Blue Text From Grid Code 2) Black Text Changes / Additional words 3) Orange/ Brown text From RfG 4) Purple From

More information

Fundamentals of AC Power Measurements

Fundamentals of AC Power Measurements Fundamentals of AC Power Measurements Application Note Power analysis involves some measurements, terms and calculations that may be new and possibly confusing to engineers and technicians who are new

More information