1 1894 IEEE TRANSACTIONS ON POWER SYSTEMS, VOL. 21, NO. 4, NOVEMBER 2006 On Power System Controlled Separation M. M. Adibi, Fellow, IEEE, R. J. Kafka, Fellow, IEEE, Sandeep Maram, Student Member, IEEE, and Lamine M. Mili, Senior Member, IEEE Abstract This paper describes verification of five conjectures related to power system controlled separation. It attempts to verify that the location of uncontrolled separation (loss of synchronism or out-of-step operation) is independent of the location and severity (short-circuit duty or duration) of the initial faults, that the location depends on the prevailing network configuration and load level, and that it takes place one operation at a time (cascades). Verification of these conjectures would allow controlled separation during a disturbance in real-time, using the present communication and protection systems, and results in a minimal load and generation imbalance. Two actual power systems were used, a 50-bus system to establish the procedure for controlled separation and a 640-bus interconnection to apply the procedure. Data representing static and dynamic behavior of the two power systems were obtained from the operating utilities, and the many required simulations were conducted using EPRI Power System Analysis Package (including IPFLOW and ETMSP programs). Index Terms Controlled separation, graceful degradation, out-of-step blocking, system separation, transfer tripping. I. BACKGROUND MOST POWER system faults occur on high- and extrahigh-voltage transmission lines due to their vulnerability arising from their exposed lengths. The majority of these faults, such as those caused by lightning, are temporary and of short duration. These faults are cleared by rapidly opening and reclosing circuit breakers at both ends of lines, leaving the power system in an unfaulted condition. However, during the short fault duration, the electrical output of generators decreases, while the mechanical input to the generators remains practically constant. The effect of the torque imbalance is for the groups of coherent generators to accelerate at different rates and to swing with respect to one another. If not quickly corrected, they may lose synchronism, splitting the system into an imbalance load and generation parts, and consequently result in blackouts. The recent major power disturbances have shown that the initial and temporary system faults have been cleared in milliseconds, and the uncontrolled system separation into unbalanced load and generation parts has occurred in seconds [1]. Therefore, it appears that between the clearance of the initial fault and formation of uncontrolled separation, there is ample time Manuscript received September 6, 2005; revised May 8, This work was supported by the National Science Foundation under Small Business Innovative Research Grant DMI Paper no. TPWRS M. M. Adibi is with IRD Corporation, Bethesda, MD USA ( madibird@aol.com). R. J. Kafka is with Pepco Holdings, Inc., Bethesda, MD USA ( rikafka@pepcoholdings.com). S. Maram and L. M. Mili are with Virginia Polytechnic Institute and State University, Blacksburg, VA USA ( maram@vt.edu; lmili@vt.edu). Color versions of Figs. 4 6 and 8 15 are available online at ieee.org. Digital Object Identifier /TPWRS for real-time controlled separation using the present protective and communication systems. The past controlled separations have been developed for elongated and isolated power systems, splitting the system along predetermined boundaries. They have been planned for a forecasted load condition. Then in response to the resulting load and generation imbalance in the separated parts, they have invariably resorted to undesirable load shedding and generation curtailment [2] [6]. In recent years, there have been several response-driven types of studies addressing the controlled islanding. Their approaches are based on availability of real-time system-wide phasor measurements, accurate and extensive power system modeling, highly efficient computing, pattern recognition, ordered binary decision diagrams, and other real-time analytical tools to predict the instability of the power system and to determine the locations, timing, and the need for system separation. The prediction of online real-time transient stability may well be a long-term solution [7] [11]. It is believed that the simplicity in detection, control, and the use of existing protective and communication systems makes the approach described in this paper very attractive. This event-driven approach, after the initial fault, blocks the system separation where load and generation is unbalanced undesirable and transfers the separation to where it is balanced desirable [12]. The approach is based on verification of the following five conjectures. 1) The location of loss of synchronization (i.e., the out-of-step operation) causing uncontrolled separation is independent of the locations and severity (duration) of the initial faults. This implies that for many likely initial faults, there would be only a few locations where out-of-step operation could take place. 2) The location of the out-of-step operation depends on the current system topology and the prevailing operating condition. It infers that under a prevailing network configuration and load level, only a few out-of-step relays need to be armed for possible out-of-step blocking and transfer tripping operations. 3) The out-of-step operations take place one operation at a time (cascading). It suggests that the loss of synchronism does not occur in several locations simultaneously and that the time interval between successive occurrences allows blocking and transfer of the loss of synchronism to a desirable location. 4) During normal operation, at any given time, there are several locations that can split the power system into separate and desirable parts. Usually these locations are identified by light power flow lines /$ IEEE

2 ADIBI et al.: POWER SYSTEM CONTROLLED SEPARATION ) The location(s) to which transfer tripping is (are) made will have a minimal imbalance in load and generation, resulting in the least disruption of service. Verification of the above conjectures together with the current knowledge of the system configuration and load condition would allow arming certain relays for out-of-step blocking and transfer-tripping. Then within a second or two after a possible initial fault, the controlled separation could take place. The arming of specific relays will be updated from time to time or in response to significant changes occurring in the system configuration and load condition. In order to verify the above conjectures, the out-of-step operations have to be monitored at several likely locations for many possible initial faults. This required that the relay characteristics and the apparent impedance representations be modified by expressing the relay tripping zone and the apparent impedance in per unit on the basis of the impedance of the individual line that is being protected. This process had to be further simplified by monitoring the distance between the apparent impedance position and the center of the relay tripping zone, both in the plane. Without these modifications and simplifications, it would have been difficult to conduct the many required simulations efficiently. In Section II, a reduced 50-bus system is used to establish the procedure for verifying the five conjectures. Sections II-A to II-D include identification of locations for the possible initial faults locations for the likely system separations, timings for typical fault clearing, out-of-step blocking and transfer-tripping procedure, and the coherent generators dynamic response to the three-phase faults. In Section II-E, representation and simplification of relay tripping zones and apparent impedances are described. In Section III, the procedure developed in Section II is applied to a 640-bus interconnection, to verify the five conjectures. In Section III-A, the desirability/undesirability criteria for location of system separation is discussed. Sections III-Bto III-G simulate and demonstrate: sequential (cascading) operation of out-of-step relays, the effect of out-of-step blocking and subsequent tripping, the independence of out-of-step location vis-à-vis the initial fault intensity (duration) and location, and the dependence of out-of-step operation on peak- and light-load conditions. In Section III-H, the out-of-step blocking and transfer-tripping procedure is demonstrated. The discussion of the results and concluding remarks are in Section IV. II. PROCEDURE A. Reduced 50-Bus System Fig. 1 shows the reduced 50-bus system [13]. It is actually an interconnection of two systems, one represented by buses 109 and 135 through 142, operating at nominal 230 kv, whereas the other system operates at a nominal 110 kv. The two systems are interconnected by a two-winding transformer between buses 109 and 108 and a three-winding transformer between buses 135 and 127. Two 30-MVAr synchronous condensers are connected to the tertiary winding of this transformer. The 110-kV transmission loop encircles a metropolitan area, and the major part of the system load is concentrated here. Two of the steam Fig. 1. Reduced 50-bus system. TABLE I REDUCED 50-BUS SYSTEM DYNAMIC DATA plants are located near this load center, but the high-head longconduit hydro plants are remote. The 50-bus system is loosely connected, and as such, it is prone to transient instability and uncontrolled separation. In this type of system, out-of-step operation where the system separation may take place is readily identifiable by simulation and actual instability experience. Using network reduction and dynamic equivalent techniques, the 50-bus system was reduced to 30 buses, three steam-electric stations, six hydro-electric plants, and one synchronous condenser. The initial fault locations where judiciously selected. Eight three-phase faults were placed on the system as indicated by X on the one-line diagram. The locations where out-of-step operations were suspected and monitored are indicated by M1, M2, M3, and M4. The dynamic data used for the generators, governors, and excitation systems are listed in Table I. B. Initial Fault Clearing In general, on high- and extra-high-voltage transmission lines, high-speed fault clearing is used [13], [14]. High-speed fault clearing requires simultaneous tripping and then simultaneous reclosing of circuit breakers at both ends of a line such as the line in Fig. 1, for which high-speed relays and communication are used. These relays also distinguish whether the system fault is internal or external to the line. The fault clearing time is the sum of fault detection time of 1/4 to 1 cycle (on the basis of 60 Hz), signal transmission time of 1/4 to 1 cycle, and the circuit breakers interruption (opening) time of 1 1/2 to 2 cycles. Thus, depending on the line voltage level and the type of relay and breaker used, the duration of the initial fault is within two to four cycles (typically, the higher the voltage level, the faster the relay/breaker and shorter the fault duration). The breakers are then simultaneously reclosed (one time) about 10 to 15 cycles later. The lengthy interval between the opening and reclosing of the circuit breakers is to allow time

3 1896 IEEE TRANSACTIONS ON POWER SYSTEMS, VOL. 21, NO. 4, NOVEMBER 2006 Fig. 2. Swing blocking relaying. Fig. 3. Ohm unit relay. for de-ionization of the arc at fault location and to prevent restriking (typically, the higher the voltage level, the longer the reclosing interval). C. Out-of-Step Blocking and Transfer Tripping Following clearance of a fault, external to a given line, the line s apparent impedance (bus voltage over line current) gradually moves toward the relay s out-of-step tripping zone [15] [17]. For example, in Fig. 1, the out-of-step relay indicated by M2 on line is such a location. By detecting that the out-of-step relay operation may occur at an undesirable location, ample time is available to block the relay from operation and transfer the tripping to a desirable location [18], [19]. Microprocessor-based relaying schemes with fiber-optic communication and electronic relays offer more options for out-of-step blocking and transfer tripping; however, the ohm unit relay of Figs. 2 and 3 that are in general industry use will be described here. The ohm units that are also called angle-impedance relays are used as blinders to control the angle range of tripping out-of-step or swing conditions. As shown in Fig. 2, the angular range covered by the distance relay element may be narrowed to any desired extent. The fault-impedance locus is the shaded area between the two lines at angles 75 (line-impedance angle) and 60. The apparent impedance path or swing-impedance locus is drawn intersecting the line-impedance and indicating the various swing angles. The distance relays without blinders would trip during swing in the range from 90 to 240, whereas with the blinders, the range is limited to 135 to 195. These blinders respond to impedances at angles 75 and 60, which are selected to make the characteristics of ohm relay unit parallel to the boundaries of the line s fault area. Their ohm settings are adjusted to place the characteristic close to the boundaries. During out-of-step conditions or heavy swing, a distance relay may trip, depending on whether the prevailing swingimpedance locus passes through the tripping area. That is, the relay tripping is a function of 1) relay characteristics and position of its tripping area; 2) position of the relay in the network with respect to the operating generators. It is, however, desirable to control the locations where such relay tripping occurs. This requires that during out-of-step conditions, those relays that may trip at undesirable locations be blocked and those relays that may not trip at the desirable locations be allowed to tripped. The out-of-step blocking can be accomplished by the use of an additional blinder as shown in Fig. 3. The apparent impedance passes across the parallel blinders from normal operating conditions to tripping areas gradually (i.e., a low rate of change of impedance) for the out-of-step condition and instantaneously (i.e., a high rate of change of impedance) for a fault condition. If the elapsed time, between the crossing of the outer blinder and the inner blinder (the shaded area), is equal to or greater than the pick-up time of the auxiliary relay associated with the out-of-step relay, then the auxiliary relay operates, blocking the tripping operation. The pick-up time of the blocking relay is about 1/4 to 1 cycle, signal transmission time for the transfer to the desirable location is also 1/4 to 1 cycle, and the simultaneous circuit breakers opening time at the transferred to locations is about 1 1/2 to 2 cycles. Thus, within two to four cycles following the apparent impedance crossing, the shaded area between the outer and the inner blinders, the out-of-step blocking, and transfer tripping can be accomplished. D. Generators Transient Response Fig. 4 shows responses (swing curves) of several generating plants after placing a three-phase fault adjacent to Bus 139 on one of the two parallel lines to Bus 140. It can be seen that the initial fault has been placed on the system at 0.1 s after the start of simulation, cleared at 0.2 s by opening the two breakers at both ends of the faulted line, and reclosed the two breakers at 0.5 s later. During the 0.1 s (six cycles) of the initial fault duration, the electrical and mechanical torque imbalance has caused the two groups of coherent generators to accelerate at different rates, swinging with respect to one another [15], [20] [22]. It should be noted that following the placement of a number of initial faults, as indicated by X in Fig. 1, the two generating plants, Gen 138 Hydro and Gen 142 Hydro, have consistently

4 ADIBI et al.: POWER SYSTEM CONTROLLED SEPARATION 1897 Fig. 4. The 50-bus transient test results. Fig. 5. Apparent impedance for line had a higher accelerating rates than the other coherent group. Subsequently, the two groups may lose synchronism at line, splitting the system into two parts, with unbalanced load and generation that could lead to a blackout. E. Relay and Apparent Impedance Representations In Fig. 1, let line be represented by bus voltages Ei and Ej, current Iij, and the line impedance Zij, all in per unit on 100 MVA base and line s nominal kv level. The apparent impedance Zi at i-bus is determined from or (1) Under normal operating conditions, Zi is much greater than the line impedance Zij. During swing conditions, path described by Zi can come into the vicinity of the relay tripping zone and may enter the tripping area, when, and consequently open the unfaulted line. In order to monitor the out-of-step operations for a set of possible three-phase initial fault locations (eight locations as selected and indicated by X in Fig. 1), at a set of likely out-of-step relay locations (four locations indicated by M1, M2, M3, and M4 in Fig. 1), the 32 transient stability simulations required that the relay characteristics and the apparent impedance representation be simplified by expressing the apparent impedance and the relay tripping zone in per unit on the basis of individual line impedance, as follows: or (2) Thus, Zo position in the plane can be compared with line impedance Zij, approximately equal to 1.0 at all relay locations without representing each relay separately, as illustrated in Fig. 5. Although this approach is less accurate than full representation of the relay tripping zone, it does simplify the verification effort. Fig. 5 shows movements of Zo in the plane at bus 136 for line due to the three-phase fault adjacent to Bus 127 on one of the two parallel lines , as indicated by X in Fig. 1. After clearance of the initial fault, the ap- Fig. 6. Apparent impedance for line parent impedance at the out-of-step relay location M2 gradually varies in magnitude and angle, so that it gradually moves toward its tripping zone that is close to the line impedance. In this case, it can be seen that the apparent impedance has not entered the out-of-step relay s tripping zone (shown as a circle), and consequently, line does not trip due to the out-of-step operation. In Fig. 6, the process has been further simplified by showing the magnitude of apparent impedance Zo against time, under the same condition. When an imminent tripping by the out-of-step relay is detected, i.e., when, and the rate of change of impedance is greater than the preset value in Fig. 3, time is available to quickly block the relay (when armed) from operation and transfer the tripping to a desirable locations by means of the communication channel as described above [12], [13]. III. APPLICATION A. 640-Bus Interconnection The 640-bus interconnection in contrast to the 50-bus system is an all-thermal power system, with relatively short intertie paths. The 640-bus interconnection is composed of several

5 1898 IEEE TRANSACTIONS ON POWER SYSTEMS, VOL. 21, NO. 4, NOVEMBER 2006 TABLE II 640-BUS SYSTEM DYNAMIC DATA power systems that over the years have been independently developed and are very closely net. They have later on been interconnected by relatively short tie-lines. The 640-bus interconnection is fairly stable and unlike the 50-bus system has seldom experienced instability or uncontrolled separation. Experience with blackouts of 1965, 1967, 1977, and 2003 has shown that in this type of system, the out-of-step operation that separates the interconnection has taken place at the tie-lines between the individual systems and/or with the other interconnections [1], [23], [24], [29]. The 640-bus system is a MW interconnection composed of four power systems tied together with relatively short 500- and 345-kV transmission lines. It consists of 92 generators in 24 power plants. Using the network reduction and dynamic equivalent techniques, the interconnection was reduced to 517 buses and 38 generators of cross-compound, tandem, and combustion turbine types. The dynamic data used in the EPRI ETMSP for the generators, excitation systems, and governor systems are listed in Table II. Due to space limitation, the static data and the one-line diagram for the 640-bus interconnection are not included in this paper. During different power system operating conditions such as the peak-load and light-load or the heavy interchange of power, the four power systems each were either generation rich or load rich. Accordingly, the tie-line flows also were different in different simulation cases. Fig. 7 shows the four power systems E, F, G, and H with the four ties e-f, e-g, g-h, and f-h and the four out-of-step monitoring points M1, M2, M3, and M4. Many cases were simulated to illustrate different types of power system disturbance using EPRI IPFlow and ETMSP programs. Attempts were made to verify the five conjectures regarding the effects of cascading, relay-blocking, fault-intensity, fault-location, load-levels, and network-configuration on the out-of-step blocking and transfer tripping that is the basis for controlled separation. It is shown that for a given power system configuration and load level, the out-of-step location for the initial faults on any part of the power system can be determined. For instance, the unfaulted e-f tie-line in Fig. 7 is such a location. The undesirability of such a location for system separation depends on whether the power flow, across the out-of-step location (e.g., from e-bus to f-bus), is appreciably greater than the frequency regulation, of generators on the receiving F-System. In the event that is substantially greater than, then the blinder relay (ohm unit, angle impedance, or digital equivalent) is armed for out-of-step blocking and transfer tripping to Fig. 7. The 640-bus interconnection. those locations that meet the, criterion. Otherwise, a desirable system separation would be allowed to take place and subsequently resynchronized, resulting in no or insignificant disturbance. Given a system configuration and a load level, a set of line outages needs to be selected that results in system separation with the least between the two separated parts. If necessary, this minimal can further be reduced by rescheduling the area generation in the separated parts [7], [25], [26]. In their daily normal operation, utilities often reschedule area generation to provide sufficient area spinning and effective (dynamic) reserve to overcome loss of a significant area generation. Typically, the area spinning reserves (area generation capacity less output) are distributed in proportion to the area generators frequency response rates to maximize the area regulation [20], [27], [28]. B. Cascading The purpose of this simulation was to show that out-of-step relay operations occur sequentially (cascading) and not simultaneously. The distinction between the two types of operation is whether control actions can take place in the time interval between successive out-of-step operations. In Fig. 8, a three-phase fault was placed adjacent to Bus 64 on one of the 230-kV, 20-mile-long double circuit line The line s parameters are listed in Table III. Bus 64 has a relatively high short-circuit duty being the system bus for the Power Plant 65 (450-MVA generators and the 500-MVA step-up transformers) in the E-System. It can be seen that fault had been placed at and cleared at, i.e., a fault duration of nine cycles on 60-Hz basis. The breakers at both ends of the single circuit have opened and successfully reclosed at, i.e., for a 15-cycle reclosing duration. As shown, the apparent impedance at e-bus of the e-f tie-line has entered the relay tripping zone at and for the g-bus of the g-h tie-line at or about 35 cycles later. Consequently, there

6 ADIBI et al.: POWER SYSTEM CONTROLLED SEPARATION 1899 Fig. 8. Tie-lines e-f and g-h cascading. Fig. 9. Tie-line e-f is blocked. TABLE III THREE-PHASE INITIAL FAULT LOCATIONS TABLLE IV INITIAL OPERATING CONDITIONS FOR THE CASCADING CASE Fig. 10. Fault intensity (duration). D. Fault Intensity (Duration) has been ample time available in the interval for relay blocking and transfer-tripping (i.e., the required two to four cycles). The simulation also confirms that under several system faults, there were only two coherent groups of generators within the 38 generators in the interconnection. Table IV lists the tie-lines power flow and parameters for the cascading case. C. Out-of-Step Blocking Fig. 9 illustrates the effect of blocking the e-f tie-line from tripping under the same initial operating condition and fault procedure as in the previous (cascading) case. At, the apparent impedance for the e-f tie-line enters the relay tripping zone. The relay, having been armed, recognizes the out-of-step operation and blocks the relay from tripping. Subsequent to the out-of-step blocking of the e-f tie-line, the g-h tie-line, having not been armed, trips at time or about five cycles later than in the cascading case, as expected. Fig. 10 shows that two three-phase faults have been placed adjacent to Bus 64 on one of the two parallel lines to Bus 132, one fault with nine cycles and the second with 12 cycles fault clearing times. Examination of the logarithms of the apparent impedance paths for the four tie-lines e-f, g-h, e-g, and f-g monitored at M1, M2, M3, and M4 show that only the e-f tie-line is susceptible to out-of-step operation. This simulation case shows that location of out-of-step operation, i.e., the uncontrolled power system separation, is independent of the intensity (duration) of the initial faults. E. Initial Fault Locations One of the conjectures to be verified was to demonstrate that the location of the out-of-step operation is independent of the locations of the initial faults. Fig. 11 shows the apparent impedance paths of the g-h tie-line under two identical three-phase faults, one adjacent to Bus 64 on one of the double circuit line to Bus 132 as described in Section III-B and the other adjacent to Bus 47 on one of the 230-kV 30-mile-long double

7 1900 IEEE TRANSACTIONS ON POWER SYSTEMS, VOL. 21, NO. 4, NOVEMBER 2006 Fig. 11. Fault location. Fig. 13. Change in network configuration. TABLE VI INITIAL OPERATING CONDITION FOR THE SECOND LIGHT-LOAD CASE for the light-load condition. Under peak-load, g-h tie-line trips, whereas under light-load condition, it does not. Fig. 12. Peak and light load conditions. TABLE V INITIAL OPERATING CONDITION FOR THE LIGHT-LOAD CASE circuit line The line s parameters are listed in Table III. Bus 47 is the system bus for Power Plant 48 (1260-MVA generators and the 1465-MVA step-up transformers), also in the E-System. It can be seen that under the same initial fault duration, but in two different locations, g-h tie-line is subject to out-of-step operations within four cycles of each other. F. Load Condition Fig. 12 shows that the out-of-step operation depends on power system load levels. This can be seen by comparison of the apparent impedance for g-h tie-line, under peak-load and lightload conditions without changing the number of generators or the network configuration. Table IV lists the system load of MW for the peak-load, and Table V lists MW G. Network Configuration In Fig. 13, two light-load operating conditions with different configurations are compared. In the first case, the number of generators is 38, the same as in the peak-load configuration of Table IV, but load and generation have been reduced to 80%. In the second case as listed in Table VI, all the 12 peaking steam units and combustion turbine units have been shut down, but the load level has been kept to the same level as that of the first case. The logarithm of the apparent impedance path for the e-f tie-line for the second case with 24-generator configuration is quite different from the first case with 38-generator configuration, showing that out-of-step operation also depends on the network or generation configuration. H. Out-of-Step Blocking and Transfer Tripping Figs. 14 and 15 illustrate the out-of-step blocking and transfer tripping. Under this operating condition, the E-System and G-System of Fig. 7 are by about 10% generation rich as compared with the F-System and H-System. The differences in the tie-line flows can be seen by comparing Tables IV and VII. In Fig. 14, a three-phase nine-cycle initial fault is placed adjacent to the Bus 64 on one of the two parallel lines to Bus 132, as discussed earlier. The apparent impedance Zo for the e-f tie-line has moved and gradually entered the relay tripping zone at. If not blocked, as seen in earlier cases, the g-h tie-line will follow and trips about 35 cycles later. This is undesirable as it would separate the interconnection into two unbalanced parts. The E-System and G-System parts being generation rich will accelerate, and the F-System and H-System part being load rich will decelerate. If these frequency rise

8 ADIBI et al.: POWER SYSTEM CONTROLLED SEPARATION 1901 TABLE VIII APPARENT IMPEDANCE PATHS Fig. 14. Out-of-step blocking. Fig. 15. Transfer tripping. TABLE VII INITIAL OPERATING CONDITION FOR THE OUT-OF-STEP BLOCKING AND TRANSFER-TRIPPING CASE and decay are not arrested by proper load shedding and load rejection, they could result in a blackout. However, as seen in Figs. 14 and 15, if the relays on e-f tie-line and g-h tie-line are blocked from operation and the tripping is transferred to e-g tie-line and f-h tie-line, the 640-bus interconnection separates into two balanced E-F and G-H parts. Table VIII lists results of simulations that are similar to Sections III-D, III-E, and III-F supporting three of the conjectures. IV. CONCLUDING REMARKS The purpose of this paper was to verify certain conjectures related to power system controlled separation. The five conjec- tures outlined in Section I were verified for the loosely connected 50-bus system and for the tightly net 640-bus interconnection. In these two systems, the locations of out-of-step operations could be identified by simulation and were supported by field experience. The first conjecture is that the locations for out-of-step operation is highly system specific and determination of their locations is a critical step in application of controlled separation. The other four conjectures, however, are generally applicable. The 50-bus system is a dynamic equivalent of much larger power system. This system was selected for establishing the research procedure because in practice, it was prone to transient instability and uncontrolled separation. The 640-bus system also has been reduced for this paper using similar techniques. This system was selected because it had a history of preventing wide-area cascading in response to internal and external faults [1], [23], [24], [29]. Numerous simulation cases were conducted in an attempt to verify the five conjectures. Only eight cases in Sections III-Dto III-G and in Figs were selected to describe and illustrate the phenomena, including sequential operation (cascading) of out-of-step relays, the effect of out-ofstep blocking, location and duration of the initial faults, the power system load levels, and network configuration. In general, power system faults are cleared without occurrence of uncontrolled separation, yet it is noted that the great 1965 blackout was initiated with a reactance relay operation on a 230-kV transmission line, resulting in several uncontrolled islands [1]. In order to monitor the out-of-step operations in a large power system, such as the 640-bus interconnection, the relay characteristic and the apparent impedance representations had to be simplified. Without this innovation, it would have been difficult to conduct the study efficiently. It is recognized that after an initiating event, the rise and decay in system frequency are automatically arrested by a number of corrective and complementary actions, including load rejection, controlled separation, load shedding, and low-frequency isolation scheme, in that order. An IEEE survey shows that over 100 utilities are practicing one or more of these corrective

9 1902 IEEE TRANSACTIONS ON POWER SYSTEMS, VOL. 21, NO. 4, NOVEMBER 2006 actions with an average success rate of about 50%. This paper deals with one of such corrective actions that of controlled separation and it is an attempt to improve its success rate. The five conjectures were conceived on the basis of analysis of the past major power system disturbances and on the observations of the actual system instabilities. It is believed that the verification of these conjectures together with knowledge of the prevailing system topology and load condition would allow controlled separation of power systems. The proposed conjectures are controversial, but the results should be of interest, precisely because in the blackout of August 14, 2003, one of the questions raised was Why the Blackout Stopped Where It Did [31]. The same phenomenon can be noted in the 1965, 1967, and 1977 blackouts. ACKNOWLEDGMENT The first author would like to thank Potomac Electric Power Company for providing partial network, dynamic, and operational data. He also would like to thank Prof. V. Vittal of ASU, Prof. M. Pavella of University of Liege, Mr. C. Taylor of BPA, Mr. D. Milanicz, System Protection and Control (SP&C) of BG&E, and Mr. A. Depew, SP&C of Pepco, for the discussion held regarding the five conjectures. REFERENCES [1] Prevention of Power Failures U.S. Federal Power Commission, vol. I III, U.S. Printing Office, [2] A. S. Shahnavaz et al., A scheme for controlled islanding to prevent subsequent blackout, IEEE Trans. Power Syst., vol. 18, no. 1, p , February [3] H. Tsun-Yu et al., Defense plan design in a longitudinal power system, in Proc. 14th PSCC, Sevilla, Spain, Jun [4] V. Vittal et al., Determination of generator groupings for an islanding scheme in Manitoba hydro system using the method of normal form, IEEE Trans. Power Syst., vol. 13, no. 4, pp , Nov [5] C. Counan et al., Major incidents on the french electric system potentiality and curative measure, in Proc. IEEE Power Eng. Soc. Summer Meeting, Seattle, WA, 1992, (92SM432-5PWRS). [6] Islanding of Union Electric Co/ and Western Part of Illinois Power Co. Systems, 10:32 a.m., Feb. 13, 1978 Report to MAIN, Apr. 24, [7] V. Vittal et al., Self-healing in power systems: an approach using islanding and rate of frequency decline-based load shedding, IEEE Trans. Power Syst., vol. 18, no. 1, pp , Feb [8] Q. Zhao et al., A study of system splitting strategies for island operation of power system: a two phase method based on OBDD, IEEE Trans. Power Syst., vol. 18, no. 4, pp , Nov [9] K. Sun et al., Splitting strategies for islanding operation of large-scale power system using OBDD-based methods, IEEE Trans. Power Syst., vol. 18, no. 2, pp , May [10] H. You et al., Slow coherency based islanding, IEEE Trans. Power Syst., vol. 19, no. 1, pp , Feb [11], Self-healing in power systems: an approach using islanding and rate of frequency decline-based load shedding, IEEE Trans. Power Syst., vol. 18, no. 1, pp , Feb [12] IEEE Power System Relaying Committee WG K12, System Protection and Voltage Stability, 93 THO PWR, [13] M. M. Adibi, Power system protective relaying and simulation models, in Proc IEEE Power Eng. Soc. PICA Conf., [14] M. M. Adibi and D. P. Milanicz, Protective system issues during restoration, IEEE Trans. Power Syst., vol. 10, no. 3, pp , Aug [15] A. Chang and M. M. Adibi, Power system dynamic equivalents, IEEE Trans. Power App. Syst., vol. PAS-89, no. 8, pp , Nov./Dec [16] M. M. Adibi et al., Solution methods for transient and dynamic stability, Proc. IEEE, vol. PROC-62, no. 7, pp , Jul [17] W. G. Tuel, Jr. and M. M. Adibi, Some considerations of power system stability studies, in Proc. IEEE PICA Conf., [18] C. W. Taylor et al., A new out-of-step relay with rate of change of apparent resistance augmentation, IEEE Trans. Power App. Syst., vol. PAS-102, no. 3, pp , Mar [19] J. M. Haner et al., Experience with the R-Rdot out-of-step relay, IEEE Trans. Power Del., vol. 1, no. 2, pp , Apr [20] M. M. Adibi et al., Frequency response of prime movers during restoration, IEEE Trans. Power Syst., vol. 14, no. 2, pp , May [21] J. R. Winkleman et al., An analysis of inter-area dynamics of multimachine systems, IEEE Trans. Power App. Syst., vol. PAS-100, pp , Feb [22] R. Podmore, Identification of coherent generators for dynamic equivalents, in IEEE PAS-97, 1978, pp [23] U.S. Department of Energy, Federal Energy Regulatory Commission, The Con Edison Power Failure of July 13 and 14, 1977, Final Staff Report, Jun [24] J. Coleman et al., System restoration: northeast blackout of Nov 9, 1965, PJM Blackout of June 5, 1967, and U.S.-Canada Blackout of Aug 14, 2003, LLC Training, [25] M. M. Adibi and D. K. Thorne, Local load shedding, IEEE Trans. Power Syst., vol. 3, no. 3, pp , Aug [26] C. W. Taylor et al., Northwest power pool transient stability and load shedding controls for generation-load imbalances, IEEE Trans. Power App. Syst., vol. PAS-100, no. 7, pp , Jul [27] M. M. Adibi, Load pickup & reserve distribution, An Operator Guide, EPRI EP-P1663-C673, Dec [28] H. B. Ross, An AGC implementation for system islanding and restoration conditions, IEEE Trans. Power Syst., vol. 9, no. 3, pp , Aug [29] The Con Edison Power Failure of July 13 and 14, 1977, U.S. Department of Energy, Federal Energy Regulatory Commission, U.S. Government Printing Office, Jun [30] EPRI-Extended Transient-Midterm Stability Program (ETMSP): Vol 3.1 Application Guide Rev. 1, May [31] Final Report on the August 14, 2003 Blackout in the United States and Canada Causes and Recommendations, p. 91, Blackout Final-web. pdf. M. M. Adibi (M 56 SM 72 F 95) received the B.Sc. degree in electrical engineering in 1950 from the University of Birmingham, Birmingham, U.K., and the M.E.E. degree in 1960 from Polytechnic Institute of Brooklyn, Brooklyn, NY. In 1967, as a Program Manager at IBM, he investigated the 1965 Northeast Blackout for the Department of Public Service of the State of New York, and in 1969 and following the PJM blackout of 1967, as an IBM Industry Consultant in the IBM Research Division, he investigated Bulk Power Security Assessment for Edison Electric Institute. Since 1979 and in the aftermath of the New York Blackout of 1977, he has chaired the Power System Restoration Working Group, publishing Power System Restoration Methodologies & Implementation Strategies (Piscataway, NJ: IEEE/Wiley, 2000). Mr. Adibi is a Registered Professional Engineer in the state of Maryland. R. J. Kafka (M 73 SM 88 F 00) received the B.S. degree in physics from Regis College, Denver, CO, in 1970 and the M.S degree from Purdue University, West Lafayette, IN, in He has been employed by the Potomac Electric Power Company (Pepco) since He was assigned to Pepco s system restoration study team in 1979, which produced one of the first formal power flow studies for a system restoration plan. He is Transmission Policy Manager of Pepco Holdings, Inc., Bethesda, MD. Mr. Kafka is a charter member of the Power System Restoration Working Group, Secretary of the Power System Operations Committee, and a Registered Professional Engineer in the state of Maryland. Sandeep Maram (S 05) was born in Hyderabad, India. He received the B.Eng. degree in electronics and communication engineering from Visveswariah Univerrsity, Belgaum, India, in He is currently pursuing the M.E.E. degree at Virginia Polytechnic Institute and State University, Blacksburg. Lamine M. Mili (SM 90) received the electrical engineering diploma from EPFL, Lausanne, Switzerland, in 1976, and the Ph.D. degree from the University of Liege, Liege, Belgium in He is a Professor of electrical and computer engineering at the ARI, Virginia Polytechnic Institute and State University. He recently organized a NSF workshop on the Mitigation of the Vulnerability of Critical Infrastructures to Catastrophic Events. Dr. Mili is the recipient of the NSF Research Initiation Award (1990) and the NSF Young Investigator Award (1992).

POWER systems are being operated closer to the stability

POWER systems are being operated closer to the stability IEEE TRANSACTIONS ON POWER SYSTEMS, VOL. 19, NO. 1, FEBRUARY 2004 483 Slow Coherency-Based Islanding Haibo You, Student Member, IEEE, Vijay Vittal, Fellow, IEEE, and Xiaoming Wang, Student Member, IEEE

More information

TRADITIONALLY, if the power system enters the emergency

TRADITIONALLY, if the power system enters the emergency IEEE TRANSACTIONS ON POWER SYSTEMS, VOL. 22, NO. 1, FEBRUARY 2007 433 A New System Splitting Scheme Based on the Unified Stability Control Framework Ming Jin, Tarlochan S. Sidhu, Fellow, IEEE, and Kai

More information

Controlled Islanding Followed by Load Shedding Based on Rate of Frequency Decline

Controlled Islanding Followed by Load Shedding Based on Rate of Frequency Decline Controlled Islanding Followed by Load Shedding Based on Rate of Frequency Decline Internet Seminar October 1, 2002 Vijay Vittal Students: Haibo You, Zhong Yang 2002 Iowa State University EPRI/DoD Initiative

More information

Transmission System Phase Backup Protection

Transmission System Phase Backup Protection Reliability Guideline Transmission System Phase Backup Protection NERC System Protection and Control Subcommittee Draft for Planning Committee Approval June 2011 Table of Contents 1. Introduction and Need

More information

PRC Generator Relay Loadability. Guidelines and Technical Basis Draft 4: (June 10, 2013) Page 1 of 75

PRC Generator Relay Loadability. Guidelines and Technical Basis Draft 4: (June 10, 2013) Page 1 of 75 PRC-025-1 Introduction The document, Power Plant and Transmission System Protection Coordination, published by the NERC System Protection and Control Subcommittee (SPCS) provides extensive general discussion

More information

PRC Generator Relay Loadability. Guidelines and Technical Basis Draft 5: (August 2, 2013) Page 1 of 76

PRC Generator Relay Loadability. Guidelines and Technical Basis Draft 5: (August 2, 2013) Page 1 of 76 PRC-025-1 Introduction The document, Power Plant and Transmission System Protection Coordination, published by the NERC System Protection and Control Subcommittee (SPCS) provides extensive general discussion

More information

1

1 Guidelines and Technical Basis Introduction The document, Power Plant and Transmission System Protection Coordination, published by the NERC System Protection and Control Subcommittee (SPCS) provides extensive

More information

NERC Protection Coordination Webinar Series June 16, Phil Tatro Jon Gardell

NERC Protection Coordination Webinar Series June 16, Phil Tatro Jon Gardell Power Plant and Transmission System Protection Coordination Phase Distance (21) and Voltage-Controlled or Voltage-Restrained Overcurrent Protection (51V) NERC Protection Coordination Webinar Series June

More information

Setting and Verification of Generation Protection to Meet NERC Reliability Standards

Setting and Verification of Generation Protection to Meet NERC Reliability Standards 1 Setting and Verification of Generation Protection to Meet NERC Reliability Standards Xiangmin Gao, Tom Ernst Douglas Rust, GE Energy Connections Dandsco LLC. Abstract NERC has recently published several

More information

EH2741 Communication and Control in Electric Power Systems Lecture 2

EH2741 Communication and Control in Electric Power Systems Lecture 2 KTH ROYAL INSTITUTE OF TECHNOLOGY EH2741 Communication and Control in Electric Power Systems Lecture 2 Lars Nordström larsno@kth.se Course map Outline Transmission Grids vs Distribution grids Primary Equipment

More information

1544 IEEE TRANSACTIONS ON POWER SYSTEMS, VOL. 26, NO. 3, AUGUST 2011

1544 IEEE TRANSACTIONS ON POWER SYSTEMS, VOL. 26, NO. 3, AUGUST 2011 1544 IEEE TRANSACTIONS ON POWER SYSTEMS, VOL. 26, NO. 3, AUGUST 2011 A New Unified Scheme for Controlled Power System Separation Using Synchronized Phasor Measurements Kai Sun, Member, IEEE, Kyeon Hur,

More information

Stability Issues of Smart Grid Transmission Line Switching

Stability Issues of Smart Grid Transmission Line Switching Preprints of the 19th World Congress The International Federation of Automatic Control Stability Issues of Smart Grid Transmission Line Switching Garng. M. Huang * W. Wang* Jun An** *Texas A&M University,

More information

Arvind Pahade and Nitin Saxena Department of Electrical Engineering, Jabalpur Engineering College, Jabalpur, (MP), India

Arvind Pahade and Nitin Saxena Department of Electrical Engineering, Jabalpur Engineering College, Jabalpur, (MP), India e t International Journal on Emerging Technologies 4(1): 10-16(2013) ISSN No. (Print) : 0975-8364 ISSN No. (Online) : 2249-3255 Control of Synchronous Generator Excitation and Rotor Angle Stability by

More information

Analysis of Effect on Transient Stability of Interconnected Power System by Introduction of HVDC Link.

Analysis of Effect on Transient Stability of Interconnected Power System by Introduction of HVDC Link. Analysis of Effect on Transient Stability of Interconnected Power System by Introduction of HVDC Link. Mr.S.B.Dandawate*, Mrs.S.L.Shaikh** *,**(Department of Electrical Engineering, Walchand College of

More information

PRC Generator Relay Loadability. A. Introduction 1. Title: Generator Relay Loadability 2. Number: PRC-025-1

PRC Generator Relay Loadability. A. Introduction 1. Title: Generator Relay Loadability 2. Number: PRC-025-1 PRC-025-1 Generator Relay Loadability A. Introduction 1. Title: Generator Relay Loadability 2. Number: PRC-025-1 Purpose: To set load-responsive protective relays associated with generation Facilities

More information

Power Plant and Transmission System Protection Coordination

Power Plant and Transmission System Protection Coordination Technical Reference Document Power Plant and Transmission System Protection Coordination NERC System Protection and Control Subcommittee Revision 1 July 2010 Table of Contents 1. Introduction... 1 1.1.

More information

ESB National Grid Transmission Planning Criteria

ESB National Grid Transmission Planning Criteria ESB National Grid Transmission Planning Criteria 1 General Principles 1.1 Objective The specific function of transmission planning is to ensure the co-ordinated development of a reliable, efficient, and

More information

Power System Protection Where Are We Today?

Power System Protection Where Are We Today? 1 Power System Protection Where Are We Today? Meliha B. Selak Power System Protection & Control IEEE PES Distinguished Lecturer Program Preceding IEEE PES Vice President for Chapters melihas@ieee.org PES

More information

A Comprehensive Approach for Sub-Synchronous Resonance Screening Analysis Using Frequency scanning Technique

A Comprehensive Approach for Sub-Synchronous Resonance Screening Analysis Using Frequency scanning Technique A Comprehensive Approach Sub-Synchronous Resonance Screening Analysis Using Frequency scanning Technique Mahmoud Elfayoumy 1, Member, IEEE, and Carlos Grande Moran 2, Senior Member, IEEE Abstract: The

More information

The Role of Effective Parameters in Automatic Load-Shedding Regarding Deficit of Active Power in a Power System

The Role of Effective Parameters in Automatic Load-Shedding Regarding Deficit of Active Power in a Power System Volume 7, Number 1, Fall 2006 The Role of Effective Parameters in Automatic Load-Shedding Regarding Deficit of Active Power in a Power System Mohammad Taghi Ameli, PhD Power & Water University of Technology

More information

ELEMENTS OF FACTS CONTROLLERS

ELEMENTS OF FACTS CONTROLLERS 1 ELEMENTS OF FACTS CONTROLLERS Rajiv K. Varma Associate Professor Hydro One Chair in Power Systems Engineering University of Western Ontario London, ON, CANADA rkvarma@uwo.ca POWER SYSTEMS - Where are

More information

Power Plant and Transmission System Protection Coordination of-field (40) and Out-of. of-step Protection (78)

Power Plant and Transmission System Protection Coordination of-field (40) and Out-of. of-step Protection (78) Power Plant and Transmission System Protection Coordination Loss-of of-field (40) and Out-of of-step Protection (78) System Protection and Control Subcommittee Protection Coordination Workshop Phoenix,

More information

Power Plant and Transmission System Protection Coordination

Power Plant and Transmission System Protection Coordination Agenda Item 5.h Attachment 1 A Technical Reference Document Power Plant and Transmission System Protection Coordination Draft 6.9 November 19, 2009 NERC System Protection and Control Subcommittee November

More information

Fault Ride Through Principles. and. Grid Code Proposed Changes

Fault Ride Through Principles. and. Grid Code Proposed Changes Fault Ride Through Principles and Grid Code Proposed Changes Document identifier: FRT Principles and Proposals Authored by: Jonathan O Sullivan / Alan Rogers Document version: Ver 1.3 Checked by: Anne

More information

ECE 422/522 Power System Operations & Planning/Power Systems Analysis II 5 - Reactive Power and Voltage Control

ECE 422/522 Power System Operations & Planning/Power Systems Analysis II 5 - Reactive Power and Voltage Control ECE 422/522 Power System Operations & Planning/Power Systems Analysis II 5 - Reactive Power and Voltage Control Spring 2014 Instructor: Kai Sun 1 References Saadat s Chapters 12.6 ~12.7 Kundur s Sections

More information

ISSUES OF SYSTEM AND CONTROL INTERACTIONS IN ELECTRIC POWER SYSTEMS

ISSUES OF SYSTEM AND CONTROL INTERACTIONS IN ELECTRIC POWER SYSTEMS ISSUES OF SYSTEM AND CONTROL INTERACTIONS IN ELECTRIC POWER SYSTEMS INDO-US Workshop October 2009, I.I.T. Kanpur INTRODUCTION Electric Power Systems are very large, spread over a wide geographical area

More information

Reliability Guideline: Generating Unit Operations During Complete Loss of Communications

Reliability Guideline: Generating Unit Operations During Complete Loss of Communications 1 1 1 1 1 1 1 1 0 1 0 1 0 1 Reliability Guideline: Generating Unit Operations During Complete Loss of Communications Preamble: It is in the public interest for the North American Electric Reliability Corporation

More information

NOWADAYS, there is much interest in connecting various

NOWADAYS, there is much interest in connecting various IEEE TRANSACTIONS ON SMART GRID, VOL. 4, NO. 1, MARCH 2013 419 Modified Dynamic Phasor Estimation Algorithm for the Transient Signals of Distributed Generators Dong-Gyu Lee, Sang-Hee Kang, and Soon-Ryul

More information

PRC Generator Relay Loadability. A. Introduction 1. Title: Generator Relay Loadability 2. Number: PRC-025-1

PRC Generator Relay Loadability. A. Introduction 1. Title: Generator Relay Loadability 2. Number: PRC-025-1 A. Introduction 1. Title: Generator Relay Loadability 2. Number: PRC-025-1 Purpose: To set load-responsive protective relays associated with generation Facilities at a level to prevent unnecessary tripping

More information

Performance of Relaying During Wide-area Stressed Conditions

Performance of Relaying During Wide-area Stressed Conditions Performance of Relaying During Wide-area Stressed Conditions IEEE Power Systems Relaying Committee C12 Working Group Report Presented by Pratap Mysore HDR Engineering Inc. July 25, 2012, San Diego, CA

More information

Transient stability improvement by using shunt FACT device (STATCOM) with Reference Voltage Compensation (RVC) control scheme

Transient stability improvement by using shunt FACT device (STATCOM) with Reference Voltage Compensation (RVC) control scheme I J E E E C International Journal of Electrical, Electronics ISSN No. (Online) : 2277-2626 and Computer Engineering 2(1): 7-12(2013) Transient stability improvement by using shunt FACT device (STATCOM)

More information

II. RESEARCH METHODOLOGY

II. RESEARCH METHODOLOGY Comparison of thyristor controlled series capacitor and discrete PWM generator six pulses in the reduction of voltage sag Manisha Chadar Electrical Engineering Department, Jabalpur Engineering College

More information

Texas Reliability Entity Event Analysis. Event: May 8, 2011 Loss of Multiple Elements Category 1a Event

Texas Reliability Entity Event Analysis. Event: May 8, 2011 Loss of Multiple Elements Category 1a Event Texas Reliability Entity Event Analysis Event: May 8, 2011 Loss of Multiple Elements Category 1a Event Texas Reliability Entity July 2011 Page 1 of 10 Table of Contents Executive Summary... 3 I. Event

More information

Three-Phase/Six-Phase Conversion Autotransformers

Three-Phase/Six-Phase Conversion Autotransformers 1554 IEEE TRANSACTIONS ON POWER DELIVERY, VOL. 18, NO. 4, OCTOBER 2003 Three-Phase/Six-Phase Conversion Autotransformers Xusheng Chen, Member, IEEE Abstract The first commercial demonstration of six-phase

More information

ITC Holdings Planning Criteria Below 100 kv. Category: Planning. Eff. Date/Rev. # 12/09/

ITC Holdings Planning Criteria Below 100 kv. Category: Planning. Eff. Date/Rev. # 12/09/ ITC Holdings Planning Criteria Below 100 kv * Category: Planning Type: Policy Eff. Date/Rev. # 12/09/2015 000 Contents 1. Goal... 2 2. Steady State Voltage & Thermal Loading Criteria... 2 2.1. System Loading...

More information

Delayed Current Zero Crossing Phenomena during Switching of Shunt-Compensated Lines

Delayed Current Zero Crossing Phenomena during Switching of Shunt-Compensated Lines Delayed Current Zero Crossing Phenomena during Switching of Shunt-Compensated Lines David K Olson Xcel Energy Minneapolis, MN Paul Nyombi Xcel Energy Minneapolis, MN Pratap G Mysore Pratap Consulting Services,

More information

A Topology-based Scheme for Adaptive Underfrequency Load Shedding

A Topology-based Scheme for Adaptive Underfrequency Load Shedding A Topology-based Scheme for Adaptive Underfrequency Load Shedding Dinh Thuc Duong and Kjetil Uhlen Department of Electric Power Engineering NTNU, Norwegian University of Science and Technology Trondheim,

More information

CHAPTER 4 POWER QUALITY AND VAR COMPENSATION IN DISTRIBUTION SYSTEMS

CHAPTER 4 POWER QUALITY AND VAR COMPENSATION IN DISTRIBUTION SYSTEMS 84 CHAPTER 4 POWER QUALITY AND VAR COMPENSATION IN DISTRIBUTION SYSTEMS 4.1 INTRODUCTION Now a days, the growth of digital economy implies a widespread use of electronic equipment not only in the industrial

More information

UPGRADING SUBSTATION RELAYS TO DIGITAL RECLOSERS AND THEIR COORDINATION WITH SECTIONALIZERS

UPGRADING SUBSTATION RELAYS TO DIGITAL RECLOSERS AND THEIR COORDINATION WITH SECTIONALIZERS UPGRADING SUBSTATION RELAYS TO DIGITAL RECLOSERS AND THEIR COORDINATION WITH SECTIONALIZERS 1 B. RAMESH, 2 K. P. VITTAL Student Member, IEEE, EEE Department, National Institute of Technology Karnataka,

More information

DISTRIBUTION SYSTEM VOLTAGE SAGS: INTERACTION WITH MOTOR AND DRIVE LOADS

DISTRIBUTION SYSTEM VOLTAGE SAGS: INTERACTION WITH MOTOR AND DRIVE LOADS DISTRIBUTION SYSTEM VOLTAGE SAGS: INTERACTION WITH MOTOR AND DRIVE LOADS Le Tang, Jeff Lamoree, Mark McGranaghan Members, IEEE Electrotek Concepts, Inc. Knoxville, Tennessee Abstract - Several papers have

More information

Effects of Phase-Shifting Transformers, and Synchronous Condensers on Breaker Transient Recovery Voltages

Effects of Phase-Shifting Transformers, and Synchronous Condensers on Breaker Transient Recovery Voltages Effects of Phase-Shifting Transformers, and Synchronous Condensers on Breaker Transient Recovery Voltages Waruna Chandrasena, Bruno Bisewski, and Jeff Carrara Abstract-- This paper describes several system

More information

COMPARATIVE PERFORMANCE OF SMART WIRES SMARTVALVE WITH EHV SERIES CAPACITOR: IMPLICATIONS FOR SUB-SYNCHRONOUS RESONANCE (SSR)

COMPARATIVE PERFORMANCE OF SMART WIRES SMARTVALVE WITH EHV SERIES CAPACITOR: IMPLICATIONS FOR SUB-SYNCHRONOUS RESONANCE (SSR) 7 February 2018 RM Zavadil COMPARATIVE PERFORMANCE OF SMART WIRES SMARTVALVE WITH EHV SERIES CAPACITOR: IMPLICATIONS FOR SUB-SYNCHRONOUS RESONANCE (SSR) Brief Overview of Sub-Synchronous Resonance Series

More information

EMERGING distributed generation technologies make it

EMERGING distributed generation technologies make it IEEE TRANSACTIONS ON POWER SYSTEMS, VOL. 20, NO. 4, NOVEMBER 2005 1757 Fault Analysis on Distribution Feeders With Distributed Generators Mesut E. Baran, Member, IEEE, and Ismail El-Markaby, Student Member,

More information

Distance Relay Response to Transformer Energization: Problems and Solutions

Distance Relay Response to Transformer Energization: Problems and Solutions 1 Distance Relay Response to Transformer Energization: Problems and Solutions Joe Mooney, P.E. and Satish Samineni, Schweitzer Engineering Laboratories Abstract Modern distance relays use various filtering

More information

Application Example Document ID: SA Rev. - September 24, 2004

Application Example Document ID: SA Rev. - September 24, 2004 Application Example Rev. - September 24, 2004 1 Summary Phasor based control of braking resistors A case study applied to large power oscillations experienced in the Swedish grid 1997 Phasor measurement,

More information

Combination of Adaptive and Intelligent Load Shedding Techniques for Distribution Network

Combination of Adaptive and Intelligent Load Shedding Techniques for Distribution Network Combination of Adaptive and Intelligent Load Shedding Techniques for Distribution Network M. Karimi, Student Member, IEEE, H. Mokhlis, Member, IEEE, A. H. A. Bakar, Member, IEEE, J. A. Laghari, A. Shahriari,

More information

Contingency Analysis using Synchrophasor Measurements

Contingency Analysis using Synchrophasor Measurements Proceedings of the 14 th International Middle East Power Systems Conference (MEPCON 1), Cairo University, Egypt, December 19-21, 21, Paper ID 219. Contingency Analysis using Synchrophasor Measurements

More information

DUKE ENERGY CAROLINAS TRANSMISSION SYSTEM PLANNING GUIDELINES. Transmission Planning

DUKE ENERGY CAROLINAS TRANSMISSION SYSTEM PLANNING GUIDELINES. Transmission Planning DUKE ENERGY CAROLINAS TRANSMISSION SYSTEM PLANNING GUIDELINES Transmission Planning TABLE OF CONTENTS I. SCOPE 1 II. TRANSMISSION PLANNING OBJECTIVES 2 III. PLANNING ASSUMPTIONS 3 A. Load Levels 3 B. Generation

More information

Reliability Guideline: Generating Unit Operations During Complete Loss of Communications

Reliability Guideline: Generating Unit Operations During Complete Loss of Communications 1 1 1 1 1 1 1 1 0 1 0 1 0 1 Reliability Guideline: Generating Unit Operations During Complete Loss of Communications Preamble It is in the public interest for the North American Electric Reliability Corporation

More information

S.A.Soman. Power Swing Detection, Blocking and Out of Step Relaying. Department of Electrical Engineering IIT Bombay. Power System Protection

S.A.Soman. Power Swing Detection, Blocking and Out of Step Relaying. Department of Electrical Engineering IIT Bombay. Power System Protection Department of Engineering IIT Bombay Power Swing Detection, and Relaying Power Swing Detection, and Out of Step Relaying 1 2 3 4 5 Setting of 6 7 8 Power Swing Detection, and Out of Step Relaying Power

More information

VOLTAGE STABILITY OF THE NORDIC TEST SYSTEM

VOLTAGE STABILITY OF THE NORDIC TEST SYSTEM 1 VOLTAGE STABILITY OF THE NORDIC TEST SYSTEM Thierry Van Cutsem Department of Electrical and Computer Engineering University of Liège, Belgium Modified version of a presentation at the IEEE PES General

More information

HISTORY: How we got to where we are. March 2015 Roy Boyer 1

HISTORY: How we got to where we are. March 2015 Roy Boyer 1 HISTORY: How we got to where we are March 2015 Roy Boyer 1 Traditional Stability Analysis: 1. Maintain synchronism of synchronous machines 2. Simplifying assumptions: 1. Balanced positive sequence system

More information

Adaptive Relaying of Radial Distribution system with Distributed Generation

Adaptive Relaying of Radial Distribution system with Distributed Generation Adaptive Relaying of Radial Distribution system with Distributed Generation K.Vijetha M,Tech (Power Systems Engineering) National Institute of Technology-Warangal Warangal, INDIA. Email: vijetha258@gmail.com

More information

A New Approach Applied to Adaptive Centralized Load Shedding Scheme

A New Approach Applied to Adaptive Centralized Load Shedding Scheme A New Approach Applied to Adaptive Centralized Load Shedding Scheme HAMID BENTARZI*, ABDERRAHMANE OUADI*, NADIR GHOUT*, FARID MAAMRI* and NIKOS E.MASTORAKIS** *Signals and Systems Laboratory (SiSyLAB)

More information

Simulation Programs for Load Shedding Studies: Expermintal Results

Simulation Programs for Load Shedding Studies: Expermintal Results Simulation Programs for Load Shedding Studies: Expermintal Results Rasha M. El Azab and P.Lataire Department Of Electrical Engineering And Energy Technology Vrije Universiteit Brussel Brussels, Belgium

More information

NERC Requirements for Setting Load-Dependent Power Plant Protection: PRC-025-1

NERC Requirements for Setting Load-Dependent Power Plant Protection: PRC-025-1 NERC Requirements for Setting Load-Dependent Power Plant Protection: PRC-025-1 Charles J. Mozina, Consultant Beckwith Electric Co., Inc. www.beckwithelectric.com I. Introduction During the 2003 blackout,

More information

Analysis and modeling of thyristor controlled series capacitor for the reduction of voltage sag Manisha Chadar

Analysis and modeling of thyristor controlled series capacitor for the reduction of voltage sag Manisha Chadar Analysis and modeling of thyristor controlled series capacitor for the reduction of voltage sag Manisha Chadar Electrical Engineering department, Jabalpur Engineering College Jabalpur, India Abstract:

More information

Using a Multiple Analog Input Distance Relay as a DFR

Using a Multiple Analog Input Distance Relay as a DFR Using a Multiple Analog Input Distance Relay as a DFR Dennis Denison Senior Transmission Specialist Entergy Rich Hunt, M.S., P.E. Senior Field Application Engineer NxtPhase T&D Corporation Presented at

More information

NVESTIGATIONS OF RECENT BLACK-

NVESTIGATIONS OF RECENT BLACK- DIGITAL VISION outs indicate that the root cause of almost all major power system disturbances is voltage collapse rather than the underfrequency conditions prevalent in the blackouts of the 1960s and

More information

generation greater than 75 MVA (gross aggregate nameplate rating) Generation in the ERCOT Interconnection with the following characteristics:

generation greater than 75 MVA (gross aggregate nameplate rating) Generation in the ERCOT Interconnection with the following characteristics: A. Introduction 1. Title: Verification of Models and Data for Turbine/Governor and Load Control or Active Power/Frequency Control Functions 2. Number: MOD-027-1 3. Purpose: To verify that the turbine/governor

More information

INTERLINE UNIFIED POWER QUALITY CONDITIONER: DESIGN AND SIMULATION

INTERLINE UNIFIED POWER QUALITY CONDITIONER: DESIGN AND SIMULATION International Journal of Electrical, Electronics and Data Communication, ISSN: 23284 Volume, Issue-4, April14 INTERLINE UNIFIED POWER QUALITY CONDITIONER: DESIGN AND SIMULATION 1 V.S.VENKATESAN, 2 P.CHANDHRA

More information

Power Plant and Transmission System Protection Coordination Fundamentals

Power Plant and Transmission System Protection Coordination Fundamentals Power Plant and Transmission System Protection Coordination Fundamentals NERC Protection Coordination Webinar Series June 2, 2010 Jon Gardell Agenda 2 Objective Introduction to Protection Generator and

More information

Table of Contents. Introduction... 1

Table of Contents. Introduction... 1 Table of Contents Introduction... 1 1 Connection Impact Assessment Initial Review... 2 1.1 Facility Design Overview... 2 1.1.1 Single Line Diagram ( SLD )... 2 1.1.2 Point of Disconnection - Safety...

More information

Reducing the Effects of Short Circuit Faults on Sensitive Loads in Distribution Systems

Reducing the Effects of Short Circuit Faults on Sensitive Loads in Distribution Systems Reducing the Effects of Short Circuit Faults on Sensitive Loads in Distribution Systems Alexander Apostolov AREVA T&D Automation I. INTRODUCTION The electric utilities industry is going through significant

More information

Real-time Decentralized Voltage Stability Monitoring and Protection against Voltage Collapse

Real-time Decentralized Voltage Stability Monitoring and Protection against Voltage Collapse Real-time Decentralized Voltage Stability Monitoring and Protection against Voltage Collapse Costas Vournas National Technical University of Athens vournas@power.ece.ntua.gr 1 Outline Introduction to Voltage

More information

Rajasthan Technical University, Kota

Rajasthan Technical University, Kota COURSE FILE POWER SYSTEM ENGINEERING Name Branch Session Semester : Dr. Dinesh Birla : Electrical Engineering : 2012-13, Odd Semester : B. Tech VII Semester Index: Course File Sr. No. 1 Students Detail

More information

Keywords: Transformer, differential protection, fuzzy rules, inrush current. 1. Conventional Protection Scheme For Power Transformer

Keywords: Transformer, differential protection, fuzzy rules, inrush current. 1. Conventional Protection Scheme For Power Transformer Vol. 3 Issue 2, February-2014, pp: (69-75), Impact Factor: 1.252, Available online at: www.erpublications.com Modeling and Simulation of Modern Digital Differential Protection Scheme of Power Transformer

More information

NERC Protection Coordination Webinar Series June 30, Dr. Murty V.V.S. Yalla

NERC Protection Coordination Webinar Series June 30, Dr. Murty V.V.S. Yalla Power Plant and Transmission System Protection ti Coordination Loss-of-Field (40) and Out-of of-step Protection (78) NERC Protection Coordination Webinar Series June 30, 2010 Dr. Murty V.V.S. Yalla Disclaimer

More information

Control of Over-voltages on Hydro-Québec 735-kV Series-Compensated System During a Major Electro-mechanical Transient Disturbance.

Control of Over-voltages on Hydro-Québec 735-kV Series-Compensated System During a Major Electro-mechanical Transient Disturbance. Paper number: #014 Control of Over-voltages on Hydro-Québec 735-kV Series-Compensated System During a Major Electro-mechanical Transient Disturbance. Que Bui-Van Michel Rousseau Bui_Van.Que@hydro.qc.ca

More information

Keeping it up to Speed Off-Nominal Frequency Operations. CETAC 2018 San Ramon

Keeping it up to Speed Off-Nominal Frequency Operations. CETAC 2018 San Ramon Keeping it up to Speed Off-Nominal Frequency Operations CETAC 2018 San Ramon 1 Welcome CETAC 2018 San Ramon Valley Conference Center General Class Information: Safety/Fire evacuation In event of emergency,

More information

Generator Protection GENERATOR CONTROL AND PROTECTION

Generator Protection GENERATOR CONTROL AND PROTECTION Generator Protection Generator Protection Introduction Device Numbers Symmetrical Components Fault Current Behavior Generator Grounding Stator Phase Fault (87G) Field Ground Fault (64F) Stator Ground Fault

More information

A Tutorial on the Application and Setting of Collector Feeder Overcurrent Relays at Wind Electric Plants

A Tutorial on the Application and Setting of Collector Feeder Overcurrent Relays at Wind Electric Plants A Tutorial on the Application and Setting of Collector Feeder Overcurrent Relays at Wind Electric Plants Martin Best and Stephanie Mercer, UC Synergetic, LLC Abstract Wind generating plants employ several

More information

Transient Stability Improvement Of Power System With Phase Shifting Transformer

Transient Stability Improvement Of Power System With Phase Shifting Transformer INTERNATIONAL JOURNAL OF TECHNOLOGY ENHANCEMENTS AND EMERGING ENGINEERING RESEARCH, VOL 3, ISSUE 3 19 Transient Stability Improvement Of Power System With Phase Shifting Transformer Jyothi Varanasi, Aditya

More information

Study of Effectiveness of Under-excitation Limiter in Dynamic Modeling of Diesel Generators

Study of Effectiveness of Under-excitation Limiter in Dynamic Modeling of Diesel Generators Study of Effectiveness of Under-excitation Limiter in Dynamic Modeling of Diesel Generators Saeed Mohajeryami, Zia Salami, Iman Naziri Moghaddam Energy Production and Infrastructure (EPIC) Electrical and

More information

Advanced Applications of Multifunction Digital Generator Protection

Advanced Applications of Multifunction Digital Generator Protection Advanced Applications of Multifunction Digital Generator Protection Charles J. Mozina Beckwith Electric Company 6190-118th Avenue North Largo, FL 33773-3724 U.S.A. Abstract: The protection of generators

More information

Protection Basics Presented by John S. Levine, P.E. Levine Lectronics and Lectric, Inc GE Consumer & Industrial Multilin

Protection Basics Presented by John S. Levine, P.E. Levine Lectronics and Lectric, Inc GE Consumer & Industrial Multilin Protection Basics Presented by John S. Levine, P.E. Levine Lectronics and Lectric, Inc. 770 565-1556 John@L-3.com 1 Protection Fundamentals By John Levine 2 Introductions Tools Outline Enervista Launchpad

More information

Frequency Control of Smart Grid - A MATLAB/SIMULINK Approach

Frequency Control of Smart Grid - A MATLAB/SIMULINK Approach Frequency Control o Smart Grid - A MATLAB/SIMULINK Approach Vikash Kumar Dr. Pankaj Rai Dr. Ghanshyam M.tech Student Department o Electrical Engg. Dept. o Physics Department o Electrical Engg. BIT Sindri,

More information

Switching and Fault Transient Analysis of 765 kv Transmission Systems

Switching and Fault Transient Analysis of 765 kv Transmission Systems Third International Conference on Power Systems, Kharagpur, INDIA December >Paper #< Switching and Transient Analysis of 6 kv Transmission Systems D Thukaram, SM IEEE, K Ravishankar, Rajendra Kumar A Department

More information

ANALYTICAL AND SIMULATION RESULTS

ANALYTICAL AND SIMULATION RESULTS 6 ANALYTICAL AND SIMULATION RESULTS 6.1 Small-Signal Response Without Supplementary Control As discussed in Section 5.6, the complete A-matrix equations containing all of the singlegenerator terms and

More information

Neural Network based Multi-Dimensional Feature Forecasting for Bad Data Detection and Feature Restoration in Power Systems

Neural Network based Multi-Dimensional Feature Forecasting for Bad Data Detection and Feature Restoration in Power Systems Neural Network based Multi-Dimensional Feature Forecasting for Bad Data Detection and Feature Restoration in Power Systems S. P. Teeuwsen, Student Member, IEEE, I. Erlich, Member, IEEE, Abstract--This

More information

Advantages and Disadvantages of EHV Automatic Reclosing

Advantages and Disadvantages of EHV Automatic Reclosing Technical Reference Document Advantages and Disadvantages of EHV Automatic Reclosing NERC System Protection and Control Subcommittee December 2009 Table of Contents 1. Introduction...1 2. Significant Autoreclosing

More information

ECE 692 Advanced Topics on Power System Stability 5 - Voltage Stability

ECE 692 Advanced Topics on Power System Stability 5 - Voltage Stability ECE 692 Advanced Topics on Power System Stability 5 - Voltage Stability Spring 2016 Instructor: Kai Sun 1 Content Basic concepts Voltage collapse and Saddle-node bifurcation P-V curve and V-Q curve Causes

More information

Application for A Sub-harmonic Protection Relay. ERLPhase Power Technologies

Application for A Sub-harmonic Protection Relay. ERLPhase Power Technologies Application for A Sub-harmonic Protection Relay ERLPhase Power Technologies 1 Outline Introduction System Event at Xcel Energy Event Analysis Microprocessor based relay hardware architecture Sub harmonic

More information

NERC Protection Coordination Webinar Series June 23, Phil Tatro

NERC Protection Coordination Webinar Series June 23, Phil Tatro Power Plant and Transmission System Protection Coordination Volts Per Hertz (24), Undervoltage (27), Overvoltage (59), and Under/Overfrequency (81) Protection NERC Protection Coordination Webinar Series

More information

PSV3St _ Phase-Sequence Voltage Protection Stage1 (PSV3St1) Stage2 (PSV3St2)

PSV3St _ Phase-Sequence Voltage Protection Stage1 (PSV3St1) Stage2 (PSV3St2) 1MRS752324-MUM Issued: 3/2000 Version: D/23.06.2005 Data subject to change without notice PSV3St _ Phase-Sequence Voltage Protection Stage1 (PSV3St1) Stage2 (PSV3St2) Contents 1. Introduction... 2 1.1

More information

NERC Protection Coordination Webinar Series June 9, Phil Tatro Jon Gardell

NERC Protection Coordination Webinar Series June 9, Phil Tatro Jon Gardell Power Plant and Transmission System Protection Coordination GSU Phase Overcurrent (51T), GSU Ground Overcurrent (51TG), and Breaker Failure (50BF) Protection NERC Protection Coordination Webinar Series

More information

Neutral Reactor Optimization in order to Reduce Arc Extinction Time during Three-Phase Tripping

Neutral Reactor Optimization in order to Reduce Arc Extinction Time during Three-Phase Tripping Neutral Reactor Optimization in order to Reduce Arc Extinction Time during Three-Phase Tripping P. Mestas, M. C. Tavares Abstract. The optimization of the grounding neutral reactor is a common practice

More information

System Protection and Control Subcommittee

System Protection and Control Subcommittee Power Plant and Transmission System Protection Coordination Volts Per Hertz (24), Undervoltage (27), Overvoltage (59), and Under/Overfrequency (81) Protection System Protection and Control Subcommittee

More information

Loss of Excitation protection of generator in R-X Scheme

Loss of Excitation protection of generator in R-X Scheme Volume 03 - Issue 02 February 2017 PP. 37-42 Loss of Excitation protection of generator in R-X Scheme Akshitsinh J. Raulji 1, Ajay M. Patel 2 1 (Electrical Engineering, Birla VishvakarmaMahavidyalaya/

More information

Capacitive Voltage Substations Ferroresonance Prevention Using Power Electronic Devices

Capacitive Voltage Substations Ferroresonance Prevention Using Power Electronic Devices Capacitive Voltage Substations Ferroresonance Prevention Using Power Electronic Devices M. Sanaye-Pasand, R. Aghazadeh Applied Electromagnetics Research Excellence Center, Electrical & Computer Engineering

More information

AS the power distribution networks become more and more

AS the power distribution networks become more and more IEEE TRANSACTIONS ON POWER SYSTEMS, VOL. 21, NO. 1, FEBRUARY 2006 153 A Unified Three-Phase Transformer Model for Distribution Load Flow Calculations Peng Xiao, Student Member, IEEE, David C. Yu, Member,

More information

EE 742 Chapter 9: Frequency Stability and Control. Fall 2011

EE 742 Chapter 9: Frequency Stability and Control. Fall 2011 EE 742 Chapter 9: Frequency Stability and Control Fall 2011 Meeting demand with generation Large and slow changes (24 hr) in power demand are met by unit commitment Medium and relatively fast changes (30

More information

Visualization and Animation of Protective Relay Operation

Visualization and Animation of Protective Relay Operation Visualization and Animation of Protective Relay Operation A. P. Sakis Meliopoulos School of Electrical and Computer Engineering Georgia Institute of Technology Atlanta, Georgia 30332 George J. Cokkinides

More information

ISO Rules Part 500 Facilities Division 502 Technical Requirements Section Wind Aggregated Generating Facilities Technical Requirements

ISO Rules Part 500 Facilities Division 502 Technical Requirements Section Wind Aggregated Generating Facilities Technical Requirements Applicability 1(1) Section 502.1 applies to the ISO, and subject to the provisions of subsections 1(2), (3) and (4) to any: (a) a new wind aggregated generating facility to be connected to the transmission

More information

LARGE-SCALE WIND POWER INTEGRATION, VOLTAGE STABILITY LIMITS AND MODAL ANALYSIS

LARGE-SCALE WIND POWER INTEGRATION, VOLTAGE STABILITY LIMITS AND MODAL ANALYSIS LARGE-SCALE WIND POWER INTEGRATION, VOLTAGE STABILITY LIMITS AND MODAL ANALYSIS Giuseppe Di Marzio NTNU giuseppe.di.marzio@elkraft.ntnu.no Olav B. Fosso NTNU olav.fosso@elkraft.ntnu.no Kjetil Uhlen SINTEF

More information

Endorsed Assignments from ERS Framework

Endorsed Assignments from ERS Framework ERSTF Completion Endorsed Assignments from ERS Framework Ref Number Title ERS Recommendatio n Ongoing Responsibility 1 Synch Inertia at Interconnection Level Measure 2 Initial Frequency Deviation Measure

More information

Power System Stability. Course Notes PART-1

Power System Stability. Course Notes PART-1 PHILADELPHIA UNIVERSITY ELECTRICAL ENGINEERING DEPARTMENT Power System Stability Course Notes PART-1 Dr. A.Professor Mohammed Tawfeeq Al-Zuhairi September 2012 1 Power System Stability Introduction Dr.Mohammed

More information

Southern Company Interconnection Requirements for Inverter-Based Generation

Southern Company Interconnection Requirements for Inverter-Based Generation Southern Company Interconnection Requirements for Inverter-Based Generation September 19, 2016 Page 1 of 16 All inverter-based generation connected to Southern Companies transmission system (Point of Interconnection

More information

Standard Development Timeline

Standard Development Timeline PRC-026-1 Relay Performance During Stable Power Swings Standard Development Timeline This section is maintained by the drafting team during the development of the standard and will be removed when the

More information

Hybrid Anti-Islanding Algorithm for Utility Interconnection of Distributed Generation

Hybrid Anti-Islanding Algorithm for Utility Interconnection of Distributed Generation Hybrid Anti-Islanding Algorithm for Utility Interconnection of Distributed Generation Maher G. M. Abdolrasol maher_photo@yahoo.com Dept. of Electrical Engineering University of Malaya Lembah Pantai, 50603