CETU France. ANAS Italy. Réunion ATMB - CETU

Size: px
Start display at page:

Download "CETU France. ANAS Italy. Réunion ATMB - CETU"

Transcription

1 Réunion ATMB -

2 Tende Tunnel: - On the border between and - Important passage through Southern Alps - Direct link between River Po plain (Cuneo, Turin) and French Riviera (Côte d Azur) Italian Riviera (Liguria) Réunion ATMB - 2

3 Tunnel built in m long Réunion ATMB - 3

4 About m above sea level Surroundings of Italian portal Surroundings of French portal Réunion ATMB -

5 French portal Narrow (4.9 m at minimum) Low (3.9 m height gauge) Réunion ATMB - 5

6 Rather low traffic: veh/j (AADT) 5 % trucks But jams during week-ends Initially: Two-way traffic for cars Alternated one-way traffic for trucks A different operator on each side Limited co-operation between the two operators Partially different equipment on both sides Safety was not well ensured Réunion ATMB - 6

7 Improving safety of Tende tunnel: from operational measures to new tunnel 1. Improved organisation and safety of existing tunnel 2. Design of the new tunnel 3. Safety procedures 4. Current status Réunion ATMB - 7

8 Binational co-operation In 2000, and created the Inter-Governmental Commission (IGC) for the improvement of liaisons between FR & IT through Southern Alps Tende tunnel is in the IGC s scope: - 1st priority: improve safety of existing tunnel - 2nd priority: plan a new tunnel Réunion ATMB - 8

9 Binational co-operation In 2003, the IGC created the Safety Committee for the Tende tunnel (SC) with representatives of both countries from: - ministries of Transport and the Interior - prefectures - owners of the road through the tunnel - fire-brigades This enabled to progressively harmonise and improve: - safety equipment - operation - procedures Réunion ATMB - 9

10 Improved operational procedures Changes in traffic conditions were progressive (due to local reluctance because of risk of congestion) Finally: - one-way alternated traffic for all vehicles - regulated by traffic lights at portals Common procedures: - safety documentation (ref. EU Directive) - binational emergency plan - periodic exercises (2 per year) - feedback from incidents 4 firemen round the clock at French portal (later also at Italian portal during peak hours) Réunion ATMB - 10

11 Treaty between and To go further a treaty was necessary: - signed in Paris in March ratified by French and Italian parliaments - entered into force on 1st November 2008 was put in charge of: - managing the tunnel - building a new tunnel with reimbursing its part of the expenses entrusted these tasks to, the Italian national agency for highways Réunion ATMB - 11

12 The treaty led to a strong safety increase of the existing tunnel A single operator (key for safety) The tunnel has been connected to the new control centre built by in Turin round the clock surveillance and monitoring All equipment has been harmonised, and is maintained and activated in the same way A Safety Officer has been appointed (as defined in European Directive 2004/54/EC) Réunion ATMB - 12

13 However, the existing tunnel still has important drawbacks Narrow cross-section Low height gauge resulting in low capacity (alternated traffic) No emergency exit over 3200 m resulting in insufficient safety (partly compensated by firemen at portals) Réunion ATMB - 13

14 Improving safety of Tende tunnel: from operational measures to new tunnel 1. Improved organisation and safety of existing tunnel 2. Design of the new tunnel 3. Safety procedures 4. Current status Réunion ATMB - 14

15 The aim: 2 tubes with no height / width restriction and standard safety level Réunion ATMB - 15

16 In each tube - a single traffic lane (3.50 m) - an emergency lane (2.70 m) Réunion ATMB - 16

17 Improve the access roads on both sides Italian side Réunion ATMB - French side 17

18 Two phases for the tunnel construction 1) Bore a new tube (traffic left in the existing one) 2) Enlarge the existing tunnel (all traffic in the new tube) Before finally having one-way traffic in each tube Difficulties to keep traffic during works (tunnel construction + improvement of access roads) Temporary roads / structures Alternated traffic at certain periods Réunion ATMB - 18

19 A complex geological / technical environment - Including anhydrite on the French side (risk of swelling) - -Difficulty to enlarge an old, partly mansonry tunnel Bron, 3 septembre 2012 Réunion ATMB 19

20 After the works Studies of the French portals Before the works Réunion ATMB - After the works

21 Before the works Studies of the Italian portals After the works Réunion ATMB -

22 Tunnel equipment - Ventilation - Fire detection - Lighting - Fire hydrants - Signage - CCTV - Drainage of dangerous liquids Réunion ATMB - - Emergency phones - Fire extinguishers - Radio rebroadcast - Barriers at portals

23 Safety at each construction phase Phase 1 Boring the new tube Réunion ATMB - Phase 2 Widening the existing tube 23

24 Opening cross-connections as the new tube is bored (with procedures in case of evacuation during works) Réunion ATMB - 24

25 Improving safety of Tende tunnel: from operational measures to new tunnel 1. Improved organisation and safety of existing tunnel 2. Design of the new tunnel 3. Safety procedures 4. Current status Réunion ATMB - 25

26 Approval of design and monitoring of construction Technical Commission chaired by FR / IT technical bodies (1 year each) - monitors design and construction - examines technical and financial aspects Safety Committee chaired by FR / IT ministry members (1 year each) - gives opinion on safety documentation and all safety matters Inter-Governmental Commission chaired by high level FR / IT officials (1 year each) - approves design, commissioning, Réunion ATMB - financial balance, etc. 26

27 Ensuring safety Reference texts - Paris treaty between and - EU Directive 2004/54/EC - FR and IT national texts Administrative authority = Inter-Governmental Commission (after opinion given by the Safety Committee) Safety Officer - Appointed by (according to EU Directive) - Gives an opinion on safety documentation, incidents, training, etc. Réunion ATMB - 27

28 Successive safety documentations SD 1 (operation of current tunnel): approved by IGC, covers current situation SD 2 (new tunnel at design stage): approved by IGC before final design approval Before each construction phase starts: SD 3: Commissioning of Phase 1 (new tube construction) Design of Phases 2 and 3 SD 4: Commissioning of Phase 2 (existing tube widening) Design of Phase 3 Before final opening: SD 5: Commissioning of Phase 3 (2 unidirectional tubes) Réunion ATMB - 28

29 Operational means / measures * Traffic forecast Dangerous goods risk analysis Emergency response plan * SAFETY DOCUMENTATION Specific hazard investigation Report/analyses on incidents ** Any other risk analysis Réunion ATMB - System of permanent feedback * Operational safety measures Demonstration of safety level Tunnel description List/analysis of exercices ** Opinion of external expert * From commissioning stage ** Once tunnel in operation 29

30 Risk analyses: Specific hazard investigation According to French regulations (cf. Guide) Typical fire scenarios Réunion ATMB - 30

31 Risk analyses: Specific hazard investigation Use of 1-D CFD model Réunion ATMB - - Movements of heat and toxic gases - Users egress - Doses received by users (heat and toxic gases) - Estimation of human consequences 31

32 Risk analyses: F-N curve (according to Italian legislation) Phase 1 (current tunnel) - Compare non complying existing tunnel with reference complying tunnel - Risk is admissible because in ALARP zone Réunion ATMB - 32

33 Risk analyses: F-N curve (according to Italian legislation) Phase 2 (construction of new tunnel) - Compare non complying situation with reference complying tunnel - Risk is lower than in Phase 1 and admissible Réunion ATMB - 33

34 Improving safety of Tende tunnel: from operational measures to new tunnel 1. Improved organisation and safety of existing tunnel 2. Design of the new tunnel 3. Safety procedures 4. Current status Réunion ATMB - 34

35 Call for bids and start of works The call for bid included (among others): - Safety and co-ordination plan - Safety Documentation (SD 2) - «Essential data on safety» In case of changes regarding safety: - Demonstrate that safety level is not decreased Call for bid in , contract now signed Works to start at the end of 2012: - Phase 1 (new bore): 4 years - Phase 2 (widening existing tunnel): 3 years - Final opening (2 unidirectional tubes): 2020 Réunion ATMB - 35

36 Conclusions Improving safety of the Tende tunnel was a long process: - 12 years ( ) to achieve a reasonable safety level in the existing tunnel - another 8 years ( ) to build a new twin-bore tunnel (standards compliant) The most important and long part was to establish good co-operation between the relevant bodies of the two countries (road owners and operators but also prefectures, fire-brigades, police, etc.) Réunion ATMB - 36

37 Conclusions The most significant step was to establish a unique operator for the whole tunnel: - to operate the existing tunnel - to build and operate the new tunnel (this required a treaty between the 2 countries) Excellent co-operation between and made it possible to reach a reasonable safety level in the existing tunnel But a new tunnel was necessary to reach «normal» safety level and sufficient capacity Réunion ATMB - 37

38 Thank you for your attention! Gracias por su atención! Réunion ATMB -

Appendix CANADA / Québec Montréal tunnels Ville-Marie & Viger

Appendix CANADA / Québec Montréal tunnels Ville-Marie & Viger PIARC WG5 Complex Underground Road Networks Part A Case Studies - appendices Appendix 3.1 - CANADA / Québec Montréal tunnels Ville-Marie & Viger 1. SUMMARY The Ville-Marie and Viger tunnel complex is part

More information

(Non-legislative acts) DECISIONS

(Non-legislative acts) DECISIONS 4.12.2010 Official Journal of the European Union L 319/1 II (Non-legislative acts) DECISIONS COMMISSION DECISION of 9 November 2010 on modules for the procedures for assessment of conformity, suitability

More information

COMMISSION IMPLEMENTING DECISION. of XXX

COMMISSION IMPLEMENTING DECISION. of XXX EUROPEAN COMMISSION Brussels, XXX [ ](2018) XXX draft COMMISSION IMPLEMENTING DECISION of XXX on the harmonisation of radio spectrum for use by short range devices within the 874-876 and 915-921 MHz frequency

More information

Results of public consultation ITS

Results of public consultation ITS Results of public consultation ITS 1. Introduction A public consultation (survey) was carried out between 29 February and 31 March 2008 on the preparation of the Action Plan on Intelligent Transport Systems

More information

LOUDON COUNTY ARES EMERGENCY OPERATIONS PLAN

LOUDON COUNTY ARES EMERGENCY OPERATIONS PLAN LOUDON COUNTY ARES EMERGENCY OPERATIONS PLAN MARCH 2008 I. INTRODUCTION A. Amateur Radio Service LOUDON COUNTY, TENNESSEE AMATEUR RADIO EMERGENCY SERVICE EMERGENCY OPERATIONS PLAN The Amateur Radio Service

More information

PHOTOGRAMMETRIC ADVANCED DETECTION SOLUTION INCIDENT DETECTION IN TUNNELS

PHOTOGRAMMETRIC ADVANCED DETECTION SOLUTION INCIDENT DETECTION IN TUNNELS - 102 - PHOTOGRAMMETRIC ADVANCED DETECTION SOLUTION INCIDENT DETECTION IN TUNNELS de Kok P., Zenz T., Markus J. Siemens Building Technologies Austria ABSTRACT Use of photogrammetric methods and image analysis

More information

(Text with EEA relevance)

(Text with EEA relevance) L 257/57 COMMISSION IMPLEMENTING DECISION (EU) 2018/1538 of 11 October 2018 on the harmonisation of radio spectrum for use by short-range devices within the 874-876 and 915-921 MHz frequency bands (notified

More information

RADIO SPECTRUM COMMITTEE

RADIO SPECTRUM COMMITTEE EUROPEAN COMMISSION Directorate-General for Communications Networks, Content and Technology Electronic Communications Networks and Services Radio Spectrum Policy Brussels, 08 June 2018 DG CONNECT/B4 RSCOM17-60rev3

More information

Evaluation of the Three-Year Grant Programme: Cross-Border European Market Surveillance Actions ( )

Evaluation of the Three-Year Grant Programme: Cross-Border European Market Surveillance Actions ( ) Evaluation of the Three-Year Grant Programme: Cross-Border European Market Surveillance Actions (2000-2002) final report 22 Febuary 2005 ETU/FIF.20040404 Executive Summary Market Surveillance of industrial

More information

West Virginia Association of School Business Officials Fall Conference

West Virginia Association of School Business Officials Fall Conference West Virginia Department of Education Presentation before the West Virginia Association of School Business Officials Fall Conference October 19, 2011 Grand Pointe Conference & Reception Center Vienna/Parkersburg,

More information

NEW CAPABILITIES IN ROAD TUNNEL OPERATION EDUCATION

NEW CAPABILITIES IN ROAD TUNNEL OPERATION EDUCATION IV International Conference on Civil Engineering Education EUCEET 2018 J. Turmo, & J.A. Lozano (Eds) NEW CAPABILITIES IN ROAD TUNNEL OPERATION EDUCATION PETER DANIŠOVIČ¹, JURAJ ŠRÁMEK² AND MICHAL HODOŇ³

More information

Questions and answers on the revised directive on restrictions of certain dangerous substances in electrical and electronic equipment (RoHS)

Questions and answers on the revised directive on restrictions of certain dangerous substances in electrical and electronic equipment (RoHS) MEMO/08/763 Brussels, 3 December 2008 Questions and answers on the revised directive on restrictions of certain dangerous substances in electrical and electronic equipment (RoHS) What is RoHS about? The

More information

GEAR 2030 WORKING GROUP 2 Roadmap on automated and connected vehicles

GEAR 2030 WORKING GROUP 2 Roadmap on automated and connected vehicles GEAR 2030 WORKING GROUP 2 Roadmap on automated and connected vehicles Europe has a very strong industrial basis on automotive technologies and systems. The sector provides jobs for 12 million people and

More information

Network Standard NS

Network Standard NS Network Standard NS 21-2006 Artwork on Western Power Assets Technical Requirements for application to South West Interconnected System (SWIS) DMS #1049174 NS 21-2006 Artwork on Western Power Assets REVISION

More information

Exhibit A Project Identification. Exhibit B Project Charter / Project Intent. Exhibit C Project Scope. Exhibit C Project Schedule

Exhibit A Project Identification. Exhibit B Project Charter / Project Intent. Exhibit C Project Scope. Exhibit C Project Schedule Exhibit A Project Identification Exhibit B Project Charter / Project Intent Exhibit C Project Scope Exhibit C Project Schedule Exhibit D Project Budget Exhibit E Owner Supplied Documents Exhibit F Sample

More information

Decision to make the Wireless Telegraphy (Vehicle Based Intelligent Transport Systems)(Exemption) Regulations 2009

Decision to make the Wireless Telegraphy (Vehicle Based Intelligent Transport Systems)(Exemption) Regulations 2009 Decision to make the Wireless Telegraphy (Vehicle Based Intelligent Transport Systems)(Exemption) Regulations 2009 Statement Publication date: 23 January 2009 Contents Section Page 1 Summary 1 2 Introduction

More information

An introduction to the 7 th Framework Programme for Research and Technological Development. Gorgias Garofalakis

An introduction to the 7 th Framework Programme for Research and Technological Development. Gorgias Garofalakis An introduction to the 7 th Framework Programme for Research and Technological Development Gorgias Garofalakis Contents What & why Potential impact Scope Inputs Framework Programme Budget and duration

More information

Group of Administrative Co-operation Under the R&TTE Directive. 5 th R&TTE Market Surveillance Campaign on WLAN 5 GHz

Group of Administrative Co-operation Under the R&TTE Directive. 5 th R&TTE Market Surveillance Campaign on WLAN 5 GHz Group of Administrative Co-operation Under the R&TTE Directive Ref. Ares(2015)1723904-23/04/2015 5 th R&TTE Market Surveillance Campaign on WLAN 5 GHz REPORT ON THE 5 TH JOINT CROSS-BORDER R&TTE MARKET

More information

Israel Railways No Fault Liability Renewal The Implementation of New Technological Safety Devices at Level Crossings. Amos Gellert, Nataly Kats

Israel Railways No Fault Liability Renewal The Implementation of New Technological Safety Devices at Level Crossings. Amos Gellert, Nataly Kats Mr. Amos Gellert Technological aspects of level crossing facilities Israel Railways No Fault Liability Renewal The Implementation of New Technological Safety Devices at Level Crossings Deputy General Manager

More information

L AGENCE NATIONALE DES FREQUENCES (ANFR) Planning and refarming. Keywords for spectrum efficiency. ITU Regional seminar St-Petersburg 6-8 June 2018

L AGENCE NATIONALE DES FREQUENCES (ANFR) Planning and refarming. Keywords for spectrum efficiency. ITU Regional seminar St-Petersburg 6-8 June 2018 L AGENCE NATIONALE DES FREQUENCES (ANFR) Planning and refarming. Keywords for spectrum efficiency ITU Regional seminar St-Petersburg 6-8 June 2018 NATIONAL REGIONAL GLOBAL Legal Framework Recommendations

More information

Contents EUROPEAN UNION AGENCY FOR RAILWAYS. Accompanying Report Practical arrangements for safety certification ERA-REC-126/ACR V 1.

Contents EUROPEAN UNION AGENCY FOR RAILWAYS. Accompanying Report Practical arrangements for safety certification ERA-REC-126/ACR V 1. Contents 1. Executive summary... 3 2. Introduction... 4 2.1. Purpose and scope... 4 2.2. Background... 4 3. Workgroups... 5 4. Working method... 5 5. Content of the practical arrangements... 7 5.1. Objective...

More information

A New Platform for escience and data research into the European Ecosystem.

A New Platform for escience and data research into the European Ecosystem. Digital Agenda A New Platform for escience and data research into the European Ecosystem. Iconference Wim Jansen einfrastructure DG CONNECT European Commission The 'ecosystem': some facts 1. einfrastructure

More information

OF THE EUROPEAN UNION AGENCY FOR RAILWAYS. for. European Commission. regarding OPINION ERA/OPI/ CCS TSI Error Corrections

OF THE EUROPEAN UNION AGENCY FOR RAILWAYS. for. European Commission. regarding OPINION ERA/OPI/ CCS TSI Error Corrections EUROPEAN UNION AGENCY FOR RAILWAYS Opinion ERA/OPI/2017-2 Making the rai way system work better for society. OPINION ERA/OPI/201 7-2 OF THE EUROPEAN UNION AGENCY FOR RAILWAYS for European Commission regarding

More information

VIRTUALFIRES a virtual reality simulator for tunnel fires

VIRTUALFIRES a virtual reality simulator for tunnel fires - 175 - ABSTRACT VIRTUALFIRES a virtual reality simulator for tunnel fires Gernot Beer, Thomas Reichl and Gunther Lenz Institut für Baustatik, Graz University of Technology, Austria The project VIRTUALFIRES,

More information

IoT governance roadmap

IoT governance roadmap IoT governance roadmap Florent Frederix Head of RFID Sector INFSO D4, European Commission Brussels, June 30, 2011 Content Why is governance for discussion? What is the IoT? What is IoT governance? Identified

More information

Status of the European EGNOS and Galileo Programmes. Frank Udnaes Galileo policy and Infrastructure group EC DG-TREN. June 2008

Status of the European EGNOS and Galileo Programmes. Frank Udnaes Galileo policy and Infrastructure group EC DG-TREN. June 2008 Status of the European EGNOS and Galileo Programmes Frank Udnaes Galileo policy and Infrastructure group EC DG-TREN EUROPEAN COMMISSION z June 2008 Galileo An infrastructure 30 satellite Constellation

More information

Revision of the EU General Safety Regulation and Pedestrian Safety Regulation

Revision of the EU General Safety Regulation and Pedestrian Safety Regulation AC.nl Revision of the EU General Safety Regulation and Pedestrian Safety Regulation 11 September 2018 ETSC isafer Fitting safety as standard Directorate-General for Internal Market, Automotive and Mobility

More information

RADIO SPECTRUM POLICY GROUP. Commission activities related to radio spectrum policy

RADIO SPECTRUM POLICY GROUP. Commission activities related to radio spectrum policy EUROPEAN COMMISSION Directorate-General for Communications Networks, Content and Technology Electronic Communications Networks and Services Radio Spectrum Policy Group RSPG Secretariat Brussels, 03 October

More information

(EC) ), 11(8) 347/ /2009, (EC)

(EC) ), 11(8) 347/ /2009, (EC) ENTSOs consistent and interlinked electricity and gas model in accordance with Article 11(8) of Regulation (EU) No 347/2013 of the European Parliament and of the Council of 17 April 2013 21 December 2016

More information

ACCESS TO HIGH VOLTAGE APPARATUS

ACCESS TO HIGH VOLTAGE APPARATUS CORPORATE PROCEDURE ACCESS TO HIGH VOLTAGE APPARATUS Approved By: Prepared By: Issue Date: 17/6/2011 Andrew Macrides Access to Apparatus Rules File No: Managing Director Committee QDOC2011/63 Status: Approved

More information

BORIS A Common Situation Awareness System for Finnish Authorities Participating in Oil Spill Response. In official service since the beginning of 2013

BORIS A Common Situation Awareness System for Finnish Authorities Participating in Oil Spill Response. In official service since the beginning of 2013 Meri Hietala, Samuli Neuvonen, Kati Tahvonen Finnish Environment Institute 15.8.2013 BORIS A Common Situation Awareness System for Finnish Authorities Participating in Oil Spill Response In official service

More information

Draft Report of the 1 st Session GRSG informal group on awareness of Vulnerable Road Users proximity in low speed manoeuvres (VRU-Proxi)

Draft Report of the 1 st Session GRSG informal group on awareness of Vulnerable Road Users proximity in low speed manoeuvres (VRU-Proxi) Submitted by the VRU-Proxi Secretary Informal document GRSG-112-13 (112 th GRSG, 24-28 April 2017 agenda item 5.) VRU-Proxi-01-06 Draft Report of the 1 st Session GRSG informal group on awareness of Vulnerable

More information

Asset Management of Ageing Infrastructure

Asset Management of Ageing Infrastructure Asset Management of Ageing Infrastructure Asset Management Symposium TU Delft December22, 2016 Leo Klatter Introduction Ministry of Infrastructure and the Environment, the Netherlands Major Projects and

More information

L 312/66 Official Journal of the European Union

L 312/66 Official Journal of the European Union L 312/66 Official Journal of the European Union 11.11.2006 COMMISSION DECISION of 9 November 2006 on harmonisation of the radio spectrum for use by short-range devices (notified under document number C(2006)

More information

ISO INTERNATIONAL STANDARD. Space systems Space debris mitigation requirements. Systèmes spatiaux Exigences de mitigation des débris spatiaux

ISO INTERNATIONAL STANDARD. Space systems Space debris mitigation requirements. Systèmes spatiaux Exigences de mitigation des débris spatiaux INTERNATIONAL STANDARD ISO 24113 Second edition 2011-05-15 Space systems Space debris mitigation requirements Systèmes spatiaux Exigences de mitigation des débris spatiaux Reference number ISO 24113:2011(E)

More information

(Text with EEA relevance)

(Text with EEA relevance) 20.12.2016 L 345/67 COMMISSION IMPLEMTING DECISION (EU) 2016/2317 of 16 December 2016 amending Decision 2008/294/EC and Implementing Decision 2013/654/EU, in order to simplify the operation of mobile communications

More information

SUMMARY OF THE IMPACT ASSESSMENT

SUMMARY OF THE IMPACT ASSESSMENT EN EN EN EUROPEAN COMMISSION Brussels, 30.6.2010 SEC(2010) 797 COMMISSION STAFF WORKING DOCUMENT SUMMARY OF THE IMPACT ASSESSMENT Accompanying document to the Proposal for a COUNCIL REGULATION on the translation

More information

Item 2. September 28, 2017

Item 2. September 28, 2017 September 28, 2017 Item 2 Applicant: Georgetown Development Location: 190 N 1100 W Prepared by: Sean Conroy, Community Development Director Public Hearing: No Zone: PRD-1 Attachments: 1. Findings. 2. Project

More information

Annex III - 3. Memorandum of Understanding on the development of the Pan-European Transport Corridor VII (The Danube) (DRAFT)

Annex III - 3. Memorandum of Understanding on the development of the Pan-European Transport Corridor VII (The Danube) (DRAFT) Annex III - 3 Memorandum of Understanding on the development of the Pan-European Transport Corridor VII (The Danube) (DRAFT) Desiring to promote international transport of goods and passengers through

More information

PRIVACY IMPACT ASSESSMENT

PRIVACY IMPACT ASSESSMENT PRIVACY IMPACT ASSESSMENT PRIVACY IMPACT ASSESSMENT The template below is designed to assist you in carrying out a privacy impact assessment (PIA). Privacy Impact Assessment screening questions These questions

More information

Management. Industrial Safety and Heal. Sixth Edition. David W. Rieske. C. Ray Asfahl. University of Arkansas UNIVERSITATSB'.

Management. Industrial Safety and Heal. Sixth Edition. David W. Rieske. C. Ray Asfahl. University of Arkansas UNIVERSITATSB'. Industrial Safety and Heal Management Sixth Edition C. Ray Asfahl David W. Rieske \ University of Arkansas TECHNISCHE INFORMAT i O N SSiSU,)TH EK UNIVERSITATSB'.BLIOTHEK Prentice Hall Upper Saddle River

More information

Proposal for a REGULATION OF THE EUROPEAN PARLIAMENT AND OF THE COUNCIL

Proposal for a REGULATION OF THE EUROPEAN PARLIAMENT AND OF THE COUNCIL EUROPEAN COMMISSION Brussels, 13.6.2013 COM(2013) 316 final 2013/0165 (COD) Proposal for a REGULATION OF THE EUROPEAN PARLIAMENT AND OF THE COUNCIL concerning type-approval requirements for the deployment

More information

Porter County Plan Commission

Porter County Plan Commission Plan Type: Development Plan Administrative DRC PC Primary Plan Administrative DRC PC Secondary Plat/Replat Administrative DRC PC PUD Conceptual Detailed Final Project Information Project Name: Developer

More information

Notice from the Federal Ministry of Labour and Social Affairs of May 2011 IIIb

Notice from the Federal Ministry of Labour and Social Affairs of May 2011 IIIb The following text is a translation 1 of the interpretation of the term "assemblies of machinery" used in the Machinery Directive 2006/42/EC from 5 th May 2011 [ ] Federal Ministry of Labour and Social

More information

WG food contact materials

WG food contact materials WG food contact materials Monday 30 January European Commission DG SANTE, Unit E2 Food Processing Technologies and Novel Foods Food Contact Materials This presentation does not present any official views

More information

European Rail Research Advisory Council

European Rail Research Advisory Council MARKET IMPACT EVALUATION ERRAC was set up in 2001 and is the single European body with the competence and capability to help revitalise the European rail sector : To make it more competitive To foster

More information

COUNCIL OF THE EUROPEAN UNION. Brussels, 19 May 2014 (OR. en) 9879/14 Interinstitutional File: 2013/0165 (COD) ENT 123 MI 428 CODEC 1299

COUNCIL OF THE EUROPEAN UNION. Brussels, 19 May 2014 (OR. en) 9879/14 Interinstitutional File: 2013/0165 (COD) ENT 123 MI 428 CODEC 1299 COUNCIL OF THE EUROPEAN UNION Brussels, 19 May 2014 (OR. en) 9879/14 Interinstitutional File: 2013/0165 (COD) T 123 MI 428 CODEC 1299 NOTE From: To: General Secretariat of the Council Council No. prev.

More information

ERDS Simulator Emergency Response Driving Simulator

ERDS Simulator Emergency Response Driving Simulator ERDS Simulator Emergency Response Driving Simulator Safe in every situation. Rosenbauer - ERDS Emergency Response Driving Simulator Reduce your risk - To a minimum. Train emergency journeys with the ERDS

More information

(Text with EEA relevance)

(Text with EEA relevance) L 149/16 14.6.2018 COMMISSION IMPLEMTING REGULATION (EU) 2018/868 of 13 June 2018 amending Regulation (EU) No 1301/2014 and Regulation (EU) No 1302/2014 as regards provisions on energy measuring system

More information

1 of 7 23/09/ :51

1 of 7 23/09/ :51 1 of 7 23/09/2010 19:51 Important legal notice Contact EPSO on EUROPA English Interactive Test The new face of European small and medium-sized enterprises (SMEs) at the Commission will be the Estonian

More information

Update on relevant points discussed at 27 th Madrid Forum. Walter Boltz

Update on relevant points discussed at 27 th Madrid Forum. Walter Boltz Update on relevant points discussed at 27 th Madrid Forum Walter Boltz Main topics of interest Energy Union Security of Supply European Gas Target Model Gas Quality Harmonisation Role of the Gas Regional

More information

RED Compliance Association REDCA TGN 01 Version 1.0 November 2018 Page 1 of 14

RED Compliance Association REDCA TGN 01 Version 1.0 November 2018 Page 1 of 14 November 2018 Page 1 of 14 REDCA Technical Guidance Note 01 on the RED compliance requirements for a Radio Equipment often referred to as Radio Module and the Final Radio Equipment Product that integrates

More information

CHAPTER 26 SITE PLAN REVIEW

CHAPTER 26 SITE PLAN REVIEW CHAPTER 26 SITE PLAN REVIEW Section 26.1. Committee. The Planning Commission shall appoint three members of the Planning Commission to the site plan review committee which shall be responsible for site

More information

The automatic vehicles access control system of the historical centre of Rome

The automatic vehicles access control system of the historical centre of Rome The automatic vehicles access control system of the historical centre of Rome E. Antonucci 1, F.Garzia 2, G.M.Veca 2 1 STA S.p.A., Rome, Italy 2 Department of Electrical Engineering University of Rome

More information

Heads of European Radiological

Heads of European Radiological Heads of European Radiological protection Competent Authorities Association O. Guzmán French Nuclear Safety Authority, ASN HERCA Secretariat Summary - Background - Terms of Reference (ToR): - Objectives

More information

CHECKLIST PRELIMINARY SUBDIVISION AND PRELIMINARY SITE PLAN

CHECKLIST PRELIMINARY SUBDIVISION AND PRELIMINARY SITE PLAN N/A Waiver (1) Four (4) copies of application form. (2) Fifteen (15) copies of plan (3) Subdivision/site plan application fee & professional review escrow deposit (4) Variance application fee & professional

More information

CAN YOU RECOVER? THE LANDLORDSOURCE EMERGENCY/DISASTER SYSTEM

CAN YOU RECOVER? THE LANDLORDSOURCE EMERGENCY/DISASTER SYSTEM How the Emergency/Disaster System Works CAN YOU RECOVER? THE LANDLORDSOURCE EMERGENCY/DISASTER SYSTEM Authored by Jean M. Storms, MPM, RMP ------------------------------------------------------------------------

More information

SECTION 2 GENERAL REQUIREMENTS

SECTION 2 GENERAL REQUIREMENTS SECTION 2 GENERAL REQUIREMENTS 2-1 ENGINEER REQUIRED: All plans and specifications for Improvements which are to be accepted for maintenance by the County and private, on-site drainage and grading shall

More information

DISPLAY/BOOTH RULES AND REGULATIONS

DISPLAY/BOOTH RULES AND REGULATIONS DISPLAY/BOOTH RULES AND REGULATIONS ALSO PLEASE REFER TO THE EXHIBITING SUCCESS MANUAL AVAILABLE ONLINE AT www.cangift.org (SEE INSTRUCTIONS ON PAGE 2) DISPLAY/BOOTH RULES & REGULATIONS ALSO PLEASE REFER

More information

HDD Wire Guided Waterway Crossing ATON Plan. Youghiogheny River (S122)

HDD Wire Guided Waterway Crossing ATON Plan. Youghiogheny River (S122) HDD Wire Guided Waterway Crossing ATON Plan Youghiogheny River (S122) Mariner East Phase 2 Pipeline Project Prepared for: Sunoco Pipeline, L.P. 535 Friztown Road Sinking Springs, PA 19608 Prepared by:

More information

Le laboratoire national de référence de l eau et des milieux aquatiques. 21 october- PARIS NORMAN-EAQC Wise

Le laboratoire national de référence de l eau et des milieux aquatiques. 21 october- PARIS NORMAN-EAQC Wise Le laboratoire national de référence de l eau et des milieux aquatiques HISTORY 2001-2002 Competent authorities and public institutes begin to consider the need to create a reference laboratory for water

More information

ETSON: Role and activities for harmonizing safety assessment practices. Benoit De Boeck ETSON President. N2017 ETSON - Pitesti (May 2017) 1

ETSON: Role and activities for harmonizing safety assessment practices. Benoit De Boeck ETSON President. N2017 ETSON - Pitesti (May 2017) 1 ETSON: Role and activities for harmonizing safety assessment practices Benoit De Boeck ETSON President N2017 ETSON - Pitesti (May 2017) 1 CONTENTS 1 The rationale for ETSON Core values, members, organisation

More information

THE METHODOLOGY: STATUS AND OBJECTIVES THE PILOT PROJECT B

THE METHODOLOGY: STATUS AND OBJECTIVES THE PILOT PROJECT B Contents The methodology: status and objectives 3 The pilot project B 3 Definition of the overall matrix 4 The starting phases: setting up the framework for the pilot project 4 1) Constitution of the local

More information

Tabriz Urban Railway Organization. An Introduction to Tabriz Metro Line 3 Project

Tabriz Urban Railway Organization. An Introduction to Tabriz Metro Line 3 Project An Introduction to Tabriz Metro Line 3 Project 1 TABLE OF CONTENT 1. INTRODUCTION... 3 2. TRAFFIC INFORMATION...6 3. REGIONAL GEOLOGY...10 3.1 Geotechnical conditions...11 4. STATIONS...12 4.1 Preliminary

More information

Public consultation for the evaluation of Directive 2006 /42/EC

Public consultation for the evaluation of Directive 2006 /42/EC Contribution ID: e248d932-fc94-4748-9974-fa75c390c3df Date: 16/12/2016 13:55:04 Public consultation for the evaluation of Directive 2006 /42/EC Fields marked with are mandatory. Introduction This open

More information

FIRE INVESTIGATOR SCENE EXAMINATION

FIRE INVESTIGATOR SCENE EXAMINATION 10 FIRE INVESTIGATOR SCENE EXAMINATION 1. Secure a fire ground/scene so that unauthorized persons can recognize the perimeters of the investigative scene and are kept from restricted areas and evidence

More information

Technical Regulations for space operations

Technical Regulations for space operations Technical Regulations for space operations A tool box to protect people, goods, public health and the environment Treaty on Principles Governing the Activities of States in the Exploration and Use of Outer

More information

A new role for Research and Development within the Swedish Total Defence System

A new role for Research and Development within the Swedish Total Defence System Summary of the final report submitted by the Commission on Defence Research and Development A new role for Research and Development within the Swedish Total Defence System Sweden s security and defence

More information

Machinery ADCO WG on Market Surveillance

Machinery ADCO WG on Market Surveillance MD ADCO.2014.13_01_Final Machinery ADCO WG on Market Surveillance Good Practice Guide on Market Surveillance Interventions Machinery Part 1: Guidance (page numbers corrected 27/5/2014) Part 1: Guidance

More information

Policing in the 21 st Century. Response from the Royal Academy of Engineering to the Home Affairs Select Committee

Policing in the 21 st Century. Response from the Royal Academy of Engineering to the Home Affairs Select Committee Policing in the 21 st Century Response from the Royal Academy of Engineering to the Home Affairs Select Committee February 2008 Introduction The Royal Academy of Engineering is pleased to contribute to

More information

KING COUNTY FIRE MODEL PROCEDURE Section 15 Abandon / Withdraw

KING COUNTY FIRE MODEL PROCEDURE Section 15 Abandon / Withdraw KING COUNTY FIRE MODEL PROCEDURE Section 15 Abandon / Withdraw Adopted 1/21/07 Revised 6/5/17 1.0 PURPOSE 1.1 This model procedure is endorsed by the King County Fire Chiefs Association as a template for

More information

Position Paper.

Position Paper. Position Paper Brussels, 30 September 2010 ORGALIME OPINION ON THE POSITION OF THE COUNCIL AT FIRST READING WITH A VIEW TO THE ADOPTION OF A REGULATION OF THE EUROPEAN PARLIAMENT AND OF THE COUNCIL LAYING

More information

Siemens ST950 & ST900 Statement of Compliance Against TR 2513 Issue A, September 2005 Performance Specification for Wig Wag Signal Control Equipment

Siemens ST950 & ST900 Statement of Compliance Against TR 2513 Issue A, September 2005 Performance Specification for Wig Wag Signal Control Equipment Mobility and Logistics Traffic Solutions Sopers Lane Poole, Dorset BH17 7ER SYSTEM/PROJECT/PRODUCT: Traffic Controllers Siemens ST950 & ST900 Statement of Against TR 2513 Issue A, September 2005 Performance

More information

Special Provision No. 799F07 September 2011 CONSTRUCTION SPECIFICATION FOR PORTABLE TEMPORARY TRAFFIC SIGNALS TABLE OF CONTENTS

Special Provision No. 799F07 September 2011 CONSTRUCTION SPECIFICATION FOR PORTABLE TEMPORARY TRAFFIC SIGNALS TABLE OF CONTENTS PORTABLE TEMPORARY TRAFFIC SIGNALS Item No. Special Provision No. 799F07 September 2011 CONSTRUCTION SPECIFICATION FOR PORTABLE TEMPORARY TRAFFIC SIGNALS TABLE OF CONTENTS 1.0 SCOPE 2.0 REFERENCES 3.0

More information

Edward Waller Joseph Chaput Presented at the IAEA International Conference on Physical Protection of Nuclear Material and Facilities

Edward Waller Joseph Chaput Presented at the IAEA International Conference on Physical Protection of Nuclear Material and Facilities Training and Exercising the Nuclear Safety and Nuclear Security Interface Incident Response through Synthetic Environment, Augmented Reality and Virtual Reality Simulations Edward Waller Joseph Chaput

More information

Draft submission paper: Hydrographic Offices way on EMODnet. Subject : Hydrographic Offices way on EMODnet. Foreword :

Draft submission paper: Hydrographic Offices way on EMODnet. Subject : Hydrographic Offices way on EMODnet. Foreword : Subject : Hydrographic Offices way on EMODnet Foreword : This paper is aimed to present the state of the EMODnet project, the European Commission s policy for this project, the principles of the Hydrographic

More information

Connected Vehicles and Maintenance Operations

Connected Vehicles and Maintenance Operations Connected Vehicles and Maintenance Operations Presentation to AASHTO SCOM Dean Deeter Athey Creek Consultants Topics Connected Vehicle Priorities Survey Results Connected Vehicle Applications Related to

More information

Site Plan Review Application. Interest in the Property (e.g. fee simple, land option, etc.)

Site Plan Review Application. Interest in the Property (e.g. fee simple, land option, etc.) 1. Identification CITY OF FENTON 301 South Leroy Street Fenton, Michigan 48430-2196 (810) 629-2261 FAX (810) 629-2004 Site Plan Review Application Project Name Applicant Name Address City/State/Zip Phone

More information

Learning Legacy Document. London Fire Brigade Incident Management Requirements. 1) Communications Equipment. Version 3 20/08/15 1 of 5. a.

Learning Legacy Document. London Fire Brigade Incident Management Requirements. 1) Communications Equipment. Version 3 20/08/15 1 of 5. a. London Fire Brigade Incident Management Requirements 1) Communications Equipment a. General This requires the provision of radio equipment such that firefighters, while attending emergency incidents below

More information

SECTION 35 ANTENNAS AND TOWERS

SECTION 35 ANTENNAS AND TOWERS SECTION 35 ANTENNAS AND TOWERS Section: 515-35-1 Purpose and Intent 515-35-2 General Standards 515-35-3 Certification, Inspection and Maintenance 515-35-4 Tower Design 515-35-5 Co-Location Requirement

More information

Malta Intercontinental hotel - EMWIS STEERING COMMITTEE Meeting n 7 BACKGROUND NOTE (ONLINE)

Malta Intercontinental hotel -   EMWIS STEERING COMMITTEE Meeting n 7 BACKGROUND NOTE (ONLINE) DATE: PLACE: SUBJECT: 4 th May 2004 from 9:00 to 15:00 Malta Intercontinental hotel - http://www.malta.intercontinental.com/ EMWIS STEERING COMMITTEE Meeting n 7 BACKGROUND NOTE (ONLINE) VERSION 2004-04-19

More information

SPECIAL PROVISION Description of Project, Scope of Contract and Sequence of Work

SPECIAL PROVISION Description of Project, Scope of Contract and Sequence of Work 2004 Specifications CSJ 0110-04-166 SPECIAL PROVISION 000--363 Description of Project, Scope of Contract and Sequence of Work 1. General. The work to be performed on this project consists of furnishing,

More information

The European statement of principles on human machine interaction 2005

The European statement of principles on human machine interaction 2005 The European statement of principles on human machine interaction 2005 Alan Stevens 1*, Anders Hallen 2, Annie Pauzie 3, Bénédicte Vezier 4, Christhard Gelau 5, Lutz Eckstein 6, Trent Victor 7, Winfried

More information

(Non-legislative acts) REGULATIONS

(Non-legislative acts) REGULATIONS 19.11.2013 Official Journal of the European Union L 309/1 II (Non-legislative acts) REGULATIONS COMMISSION DELEGATED REGULATION (EU) No 1159/2013 of 12 July 2013 supplementing Regulation (EU) No 911/2010

More information

Last Name: First Name: M.I:

Last Name: First Name: M.I: ARCHITECTURE DESIGN REVIEW BOARD APPLICATION OFFICE USE ONLY APPLICATION # Permit # Fee Collected $ 1. Filing Status Initial Submission Amendment Withdrawal 2. Cost of Construction (Industry Standards)

More information

Proposal for a COUNCIL REGULATION. on denominations and technical specifications of euro coins intended for circulation. (recast)

Proposal for a COUNCIL REGULATION. on denominations and technical specifications of euro coins intended for circulation. (recast) EUROPEAN COMMISSION Brussels, 11.4.2013 COM(2013) 184 final 2013/0096 (NLE) C7-0132/13 Proposal for a COUNCIL REGULATION on denominations and technical specifications of euro coins intended for circulation

More information

HUD 811 PRA Environmental Review and Funding Requirements

HUD 811 PRA Environmental Review and Funding Requirements HUD 811 PRA Environmental Review and Funding Requirements HUD 811 PRA funds come with their own environmental review requirements that differ from familiar HOME and OHFA requirements and are somewhat more

More information

Publishing date: 22/12/2014 Document title: ACER Opinion on the draft ENTSO-E Work Programme We appreciate your feedback

Publishing date: 22/12/2014 Document title: ACER Opinion on the draft ENTSO-E Work Programme We appreciate your feedback Publishing date: 22/12/2014 Document title: ACER Opinion on the draft ENTSO-E Work Programme 2014-2015 We appreciate your feedback Please click on the icon to take a 5 online survey and provide your feedback

More information

Recast de la législation européenne et impact sur l organisation hospitalière

Recast de la législation européenne et impact sur l organisation hospitalière Recast de la législation européenne et impact sur l organisation hospitalière MEDICAL DEVICES IN BELGIUM. What s up? Brussels44Center 24.10.2017 Valérie Nys Need for changes? Regulatory system is highly

More information

To explore the meaning and use of graffiti as a form of criminal damage and vandalism, particularly in relation to the public transport network.

To explore the meaning and use of graffiti as a form of criminal damage and vandalism, particularly in relation to the public transport network. Graffiti Key Stage 3 Aim of this lesson Learning objective To explore the meaning and use of graffiti as a form of criminal damage and vandalism, particularly in relation to the public transport network.

More information

COMMISSION REGULATION (EU) No /.. of XXX

COMMISSION REGULATION (EU) No /.. of XXX EUROPEAN COMMISSION Brussels, XXX [ ](2013) XXX draft COMMISSION REGULATION (EU) No /.. of XXX on implementing Directive 2009/125/EC of the European Parliament and of the Council with regard to small,

More information

COMMISSION DELEGATED DIRECTIVE../ /EU. of XXX

COMMISSION DELEGATED DIRECTIVE../ /EU. of XXX EUROPEAN COMMISSION Brussels, XXX [ ](2014) XXX draft COMMISSION DELEGATED DIRECTIVE../ /EU of XXX amending, for the purposes of adapting to technical progress, Annex IV to Directive 2011/65/EU of the

More information

First MyOcean User Workshop 7-8 April 2011, Stockholm Main outcomes

First MyOcean User Workshop 7-8 April 2011, Stockholm Main outcomes First MyOcean User Workshop 7-8 April 2011, Stockholm Main outcomes May, 9th 2011 1. Objectives of the MyOcean User Workshop The 1 st MyOcean User Workshop took place on 7-8 April 2011, about two years

More information

ACTIVITY REPORT OF THE NATIONAL INDUSTRIAL COMPETITIVENESS COMMISSION PRAMONĖ 4.0 OF 2017

ACTIVITY REPORT OF THE NATIONAL INDUSTRIAL COMPETITIVENESS COMMISSION PRAMONĖ 4.0 OF 2017 ACTIVITY REPORT OF THE NATIONAL INDUSTRIAL COMPETITIVENESS COMMISSION PRAMONĖ 4.0 OF 2017 23 April 2018 Vilnius 2 I. Introduction On 19 April 2016, The European Commission (hereinafter referred to as the

More information

TERMS OF REFERENCE FOR CONSULTANTS Attached Technical Assistance on Sri Lanka: Expressway Operations Improvement Project

TERMS OF REFERENCE FOR CONSULTANTS Attached Technical Assistance on Sri Lanka: Expressway Operations Improvement Project Expressway Operations Improvement Project (TRTA SRI 50299) I. Background TERMS OF REFERENCE FOR CONSULTANTS Attached Technical Assistance on Sri Lanka: Expressway Operations Improvement Project 1. The

More information

INTERIOR SIGNAGE MANUAL

INTERIOR SIGNAGE MANUAL INTERIOR SIGNAGE MANUAL ➊ Purpose ➋ Procedures ➌ ADA Requirements INTERIOR SIGNAGE MANUAL ➍ Text, Braille, Pictograms and Color ➎ Families of Interior Signage ➏ Mounting Guidelines ➐ Signage Diagrams ➑

More information

DNVGL-CG-0214 Edition September 2016

DNVGL-CG-0214 Edition September 2016 CLASS GUIDELINE DNVGL-CG-0214 Edition September 2016 The content of this service document is the subject of intellectual property rights reserved by ("DNV GL"). The user accepts that it is prohibited by

More information

Currently 2 vacant engineer positions (1 Engineer level, 1 Managing Engineer level)

Currently 2 vacant engineer positions (1 Engineer level, 1 Managing Engineer level) INDOT Agency Factoids (System/Comm.) Number of signalized intersections- 2570 200 connected by fiber 300 connected by radio 0 connected by twisted pair 225 connected by cellular 1500 not connected to communication

More information

EU Environmental Technology Verification (ETV) pre-programme

EU Environmental Technology Verification (ETV) pre-programme EU Environmental Technology Verification (ETV) pre-programme Europe is confronted with urgent environmental challenges such as climate change, the unsustainable use of resources and loss of biodiversity.

More information

FILED: NEW YORK COUNTY CLERK 02/08/ :01 AM INDEX NO /2015 NYSCEF DOC. NO. 70 RECEIVED NYSCEF: 02/08/2018

FILED: NEW YORK COUNTY CLERK 02/08/ :01 AM INDEX NO /2015 NYSCEF DOC. NO. 70 RECEIVED NYSCEF: 02/08/2018 SUPREME COURT OF THE STATE OF NEW YORK COUNTY OF NEW YORK..-- ------------------------..-..-..--------X VALDEMIR SANTANA and NIDIA SANTANA, Plaintiff(s), Index No: 159025/15 -against- AFFIDAVIT OF DOUGLAS

More information