PROJECT SUPPORT STATEMENT APN: Meadow Lane Court, Placerville, CA
|
|
- Iris Gilmore
- 5 years ago
- Views:
Transcription
1 PROJECT SUPPORT STATEMENT DEVEPLOMENT APPLICATION FOR VERIZON SITE MOSQUITO ROAD APN: Meadow Lane Court, Placerville, CA INTRODUCTION Verizon Wireless is seeking to improve communications service in the El Dorado County area near Mosquito Rd. in Placerville. Verizon would like to increase coverage and capacity in the area by constructing a new telecommunications facility in to improve service for both current and potential customers. Additionally, this network development will increase public safety within these areas and bring wireless and broad band service, to areas that currently have poor capacity service. This tower will help alleviate an area of poor coverage and inadequate capacity within this service area, which causes reoccurring lost calls and ineffective service. This site will relieve inadequate capacity in the area due to high cell phone usage along Mosquito Rd. and will also improve service in the town of Placerville and outlying areas within the proposed service area. The proposed location of the tower is set within an unutilized portion of this parcel and will be designed to comply with the City of Placerville s general plan. The proposed Verizon Communications facility will include: a 20 x30 steel platform, encircled by a wooden fence to provide screening of the equipment cabinets and a 30kVA emergency standby generator. In addition an 90 stealth, monopine will be located adjacent to the platform and will include (4) antenna sectors with (2) antennas per sector, (2) remote radio units (RRU s) per sector (total is 8). This tower has been designed to accommodate future collocation by other carriers. The parcel select selected for this communication is owned by, El Dorado Irrigation District, a public entity and totals 2.40 acres. The location for this project is situated approximately 852 from Mosquito Road. The project will employ a stealth monopine that will blend in with the large trees nearby. This unmanned facility will provide service to area travelers, residents and businesses 24 hours a day, 7 days a week. This site will also serve as a back up to the existing landline service in the area and will provide improved mobile communications, essential to modern day commerce and recreation. This tower has been designed at the following height for the following reasons. 1. The signal from the proposed tower mounted antennas needs to be high enough to clear all near field obstructions such as trees, water tank and adjacent hills, in order to effectively communicate with other antennas in the Verizon network. In addition the 90 overall height is required in order to adequately serve the intended coverage area in this portion of the Verizon network. Stated differently, a 40 height would not provide the required clearance of the before mentioned obstructions or provide the required visibility of outlying areas required of a telecommunication site at this location. 2. In addition, the fact that the tower is designed as a monopine, rather than a conventional tower, requires that an additional 5 in height be added to the tower to accommodate a crown in order to better approximate the natural appearance of a pine tree. 3. Furthermore, this tower has been design to accommodate future additional carriers and the requisite clearance between antenna centerlines and the proposed microwave antenna. This is a required design feature of all new towers in El Dorado County and is intended to encourage collocation on existing towers, rather than the construction of new communication facilities. Project Support Statement Verizon Mosquito Road Site
2 SAFETY BENEFITS OF IMPROVED WIRELESS SERVICE Mobile phone use has become an extremely important system for public safety. Along roads and highways without public call boxes, mobile phones are often the only means for emergency roadside communication. Motorists with disabled vehicles (or worse) can use their phone to call in and request appropriate assistance. With good cellular coverage along important roadways, emergency response is just a phone call away. Furthermore, as a back up system to traditional landline phone service, mobile phones have proven to be extremely important during natural disasters and other catastrophes. Verizon has taken the responsibility for back up service very seriously. As such, Verizon has incurred increased expense to install a standby diesel generator at this facility to insure quality communication for the surrounding community regardless of any disaster or catastrophe. CONVENIENCE BENEFITS OF IMPROVED WIRELESS SERVICE Modern day life has become increasingly dependent on instant communications. Whether it is a parent calling their child, spouse calling a spouse, or general contractor ordering materials to the jobsite, wireless phone service is no longer just a convenience. It has become a way of life and a way of business. COMPLIANCE WITH COUNTY DEVELOPMENT STANDARDS Per the City of Placerville general plan section confirms that the following uses are permitted in ANY ZONE: Communication equipment buildings Public utility or public service buildings and uses Radio, microwave, television and telephone transmitter and broadcasting stations, including amateur and professional In addition, the existing water tank storage facility has already compromised the exiting parcel with large, commercial water storage tanks. The proposed cell tower has been designed as a stealth monopine, with all antennas and associated equipment screened by branches and antenna socks. In addition the site has been designed to conform with the City of Placerville noise standards (See attached noise study). COMPLIANCE WITH FCC STANDARDS This project will not interfere with any TV, radio, telephone, satellite, or any other signals. Any interference would be against the Federal Law and would be a violation Verizon Wireless FCC License. In addition, this project will conform to all FCC standards. TECHNOLOGY AND CONSUMER SERVICES THE CARRIER WILL PROVIDE ITS CUSTOMERS Verizon offers its customers multiple services such as, voice calls, text messaging, mobile , picture/video messaging, mobile web, navigation, broadband access. Wireless service enhances public safety and emergency communications in the community. In rural areas such as the subject location, cellular phone service can cover much larger geographic areas than traditional landline phone service. FUTURE COLLOCATION OPPORTUNITIES The proposed site has been designed to allow for future co location opportunities with other carriers. The land lease provides sufficient space for additional service providers and the tower and its foundation are designed for future equipment. This tower will eliminate the need for multiple towers within the same Project Support Statement Verizon Mosquito Road Site 2
3 general vicinity as it has been designed to accommodate up to (3) carriers and their associated ground equipment. LIGHTING Unless tower lighting is required by the FAA the only lighting on the facility will be a shielded motion sensor light by the door on the equipment shelter for servicing the equipment. NOISE The standby generator will be operated for approximately 15 minutes per week for maintenance purposes, and during power outages and disasters. HAZARDOUS MATERIAL A Hazardous Material Business Plan will also be submitted upon project completion, and stored on site after construction ENVIRONMENTAL SETTING The site is set within a parcel that is zoned for R 1, 20,000 (Single Family residential zone) and is consistent with application design standards in the area and environment. MAINTENANCE AND STANDY GENERATOR TESTING Verizon installs a standby diesel generator and batteries at many of its cell sites. The generator and batteries serve a vital role in Verizon emergency and disaster preparedness plan. In the event of a power outage, Verizon communications equipment will first transition over to the back up batteries. The batteries can run the site for a few hours depending upon the demand placed upon the equipment. Should the power outage extend beyond the capacity of the batteries, the back up generator will automatically start and continue to run the site. This two state back up plan is an extremely important component of Verizon communications sites. Back up batteries and generators allow Verizon communications sites to continue providing valuable communications services in the event of a power outage, natural disaster or other emergency. A standby generator will be installed at the site to ensure quality and consistent coverage in the event of a power outage or disaster. This generator will be run for approximately 15 minutes per week for maintenance purposes, and during power outages and disasters. A technician will visit the site approximately twice a month to check the facility and perform any necessary maintenance. CONSTRUCTION SCHEDULE The construction of the facility will be in compliance with all local rules and regulations. The typical duration is two months. The crew size will range from two to ten individuals. Project Support Statement Verizon Mosquito Road Site 3
4 Verizon Wireless Proposed Base Station (Site No Mosquito Road ) 1070 Meadow Lane Court Placerville, California Statement of Hammett & Edison, Inc., Consulting Engineers The firm of Hammett & Edison, Inc., Consulting Engineers, has been retained on behalf of Verizon Wireless, a personal wireless telecommunications carrier, to evaluate the base station (Site No Mosquito Road ) proposed to be located at 1070 Meadow Lane Court in Placerville, California, for compliance with appropriate guidelines limiting human exposure to radio frequency ( RF ) electromagnetic fields. Executive Summary Verizon proposes to install directional panel antennas on a tall pole to be located at 1070 Meadow Lane Court in Placerville. The proposed operation will comply with the FCC guidelines limiting public exposure to RF energy. Prevailing Exposure Standards The U.S. Congress requires that the Federal Communications Commission ( FCC ) evaluate its actions for possible significant impact on the environment. A summary of the FCC s exposure limits is shown in Figure 1. These limits apply for continuous exposures and are intended to provide a prudent margin of safety for all persons, regardless of age, gender, size, or health. The most restrictive FCC limit for exposures of unlimited duration to radio frequency energy for several personal wireless services are as follows: Wireless Service Frequency Band Occupational Limit Public Limit Microwave (Point-to-Point) 5,000 80,000 MHz 5.00 mw/cm mw/cm 2 BRS (Broadband Radio) 2, WCS (Wireless Communication) 2, AWS (Advanced Wireless) 2, PCS (Personal Communication) 1, Cellular SMR (Specialized Mobile Radio) MHz [most restrictive frequency range] General Facility Requirements Base stations typically consist of two distinct parts: the electronic transceivers (also called radios or channels ) that are connected to the traditional wired telephone lines, and the passive antennas that send the wireless signals created by the radios out to be received by individual subscriber units. The transceivers are often located at ground level and are connected to the antennas by coaxial cables. A small antenna for reception of GPS signals is also required, mounted with a clear view of the sky. Because of the short wavelength of the frequencies assigned by the FCC for wireless services, the Q2T5 Page 1 of 3
5 Verizon Wireless Proposed Base Station (Site No Mosquito Road ) 1070 Meadow Lane Court Placerville, California antennas require line-of-sight paths for their signals to propagate well and so are installed at some height above ground. The antennas are designed to concentrate their energy toward the horizon, with very little energy wasted toward the sky or the ground. This means that it is generally not possible for exposure conditions to approach the maximum permissible exposure limits without being physically very near the antennas. Computer Modeling Method The FCC provides direction for determining compliance in its Office of Engineering and Technology Bulletin No. 65, Evaluating Compliance with FCC-Specified Guidelines for Human Exposure to Radio Frequency Radiation, dated August Figure 2 describes the calculation methodologies, reflecting the facts that a directional antenna s radiation pattern is not fully formed at locations very close by (the near-field effect) and that at greater distances the power level from an energy source decreases with the square of the distance from it (the inverse square law ). The conservative nature of this method for evaluating exposure conditions has been verified by numerous field tests. Site and Facility Description Based upon information provided by Verizon, including zoning drawings by Borges Architectural Group, Inc., dated June 27, 2014, it is proposed to install eight Andrew Model SBNHH-1D65B directional panel antennas on a new 85-foot steel pole, configured to resemble a pine tree, to be sited northwest of the water tank located at 1070 Meadow Lane Court in Placerville. The antennas would be mounted with up to 4 downtilt at an effective height of about 77 feet above ground and would be oriented in pairs toward 80 T, 170 T, 260 T, and 350 T, to provide service in all directions. The maximum effective radiated power in any direction would be 10,310 watts, representing simultaneous operation at 4,620 watts for AWS, 4,310 watts for PCS, and 1,380 watts for 700 MHz service; no operation is proposed in the cellular band. Also proposed to be located on the pole, at an effective height of about 60 feet above ground, is a microwave dish antenna, for interconnection of this site with others in the Verizon network. There are reported no other wireless telecommunications base stations at the site or nearby. Study Results For a person anywhere at ground, the maximum RF exposure level due to the proposed Verizon operation, including the contribution of the microwave antenna, is calculated to be mw/cm 2, which is 1.2% of the applicable public exposure limit. The maximum calculated level for a person on the nearby water tank * is 0.67% of the public exposure limit. The maximum calculated level at the * Located at least 80 feet away, based on photographs from Google Maps. Q2T5 Page 2 of 3
6 Verizon Wireless Proposed Base Station (Site No Mosquito Road ) 1070 Meadow Lane Court Placerville, California second-floor elevation of any nearby residence is 0.30% of the public exposure limit. It should be noted that these results include several worst-case assumptions and therefore are expected to overstate actual power density levels from the proposed operation. No Recommended Mitigation Measures Due to their mounting locations, the Verizon antennas would not be accessible to the general public, and so no mitigation measures are necessary to comply with the FCC public exposure guidelines. It is presumed that Verizon will, as an FCC licensee, take adequate steps to ensure that its employees or contractors receive appropriate training and comply with FCC occupational exposure guidelines whenever work is required near the antennas themselves. Conclusion Based on the information and analysis above, it is the undersigned s professional opinion that operation of the base station proposed by Verizon Wireless at 1070 Meadow Lane Court in Placerville, California, will comply with the prevailing standards for limiting public exposure to radio frequency energy and, therefore, will not for this reason cause a significant impact on the environment. The highest calculated level in publicly accessible areas is much less than the prevailing standards allow for exposures of unlimited duration. This finding is consistent with measurements of actual exposure conditions taken at other operating base stations. Authorship The undersigned author of this statement is a qualified Professional Engineer, holding California Registration No. E-20309, which expires on March 31, This work has been carried out under her direction, and all statements are true and correct of her own knowledge except, where noted, when data has been supplied by others, which data she believes to be correct. February 12, 2015 Andrea L. Bright, P.E. 707/ Located at least 110 feet away, based on photographs from Google Maps. Q2T5 Page 3 of 3
7 FCC Radio Frequency Protection Guide The U.S. Congress required (1996 Telecom Act) the Federal Communications Commission ( FCC ) to adopt a nationwide human exposure standard to ensure that its licensees do not, cumulatively, have a significant impact on the environment. The FCC adopted the limits from Report No. 86, Biological Effects and Exposure Criteria for Radiofrequency Electromagnetic Fields, published in 1986 by the Congressionally chartered National Council on Radiation Protection and Measurements ( NCRP ). Separate limits apply for occupational and public exposure conditions, with the latter limits generally five times more restrictive. The more recent standard, developed by the Institute of Electrical and Electronics Engineers and approved as American National Standard ANSI/IEEE C , Safety Levels with Respect to Human Exposure to Radio Frequency Electromagnetic Fields, 3 khz to 300 GHz, includes similar limits. These limits apply for continuous exposures from all sources and are intended to provide a prudent margin of safety for all persons, regardless of age, gender, size, or health. As shown in the table and chart below, separate limits apply for occupational and public exposure conditions, with the latter limits (in italics and/or dashed) up to five times more restrictive: Frequency Applicable Range (MHz) Electromagnetic Fields (f is frequency of emission in MHz) Electric Field Strength (V/m) Magnetic Field Strength (A/m) Equivalent Far-Field Power Density (mw/cm 2 ) / f / f / f / f 823.8/ f 4.89/ f 2.19/ f 900/ f 2 180/ f , f 1.59 f f /106 f /238 f/300 f/1500 1, , Occupational Exposure Power Density (mw/cm 2 ) PCS Cell FM 0.1 Public Exposure Frequency (MHz) Higher levels are allowed for short periods of time, such that total exposure levels averaged over six or thirty minutes, for occupational or public settings, respectively, do not exceed the limits, and higher levels also are allowed for exposures to small areas, such that the spatially averaged levels do not exceed the limits. However, neither of these allowances is incorporated in the conservative calculation formulas in the FCC Office of Engineering and Technology Bulletin No. 65 (August 1997) for projecting field levels. Hammett & Edison has built those formulas into a proprietary program that calculates, at each location on an arbitrary rectangular grid, the total expected power density from any number of individual radio sources. The program allows for the description of buildings and uneven terrain, if required to obtain more accurate projections. FCC Guidelines Figure 1
8 RFR.CALC Calculation Methodology Assessment by Calculation of Compliance with FCC Exposure Guidelines The U.S. Congress required (1996 Telecom Act) the Federal Communications Commission ( FCC ) to adopt a nationwide human exposure standard to ensure that its licensees do not, cumulatively, have a significant impact on the environment. The maximum permissible exposure limits adopted by the FCC (see Figure 1) apply for continuous exposures from all sources and are intended to provide a prudent margin of safety for all persons, regardless of age, gender, size, or health. Higher levels are allowed for short periods of time, such that total exposure levels averaged over six or thirty minutes, for occupational or public settings, respectively, do not exceed the limits. Near Field. Prediction methods have been developed for the near field zone of panel (directional) and whip (omnidirectional) antennas, typical at wireless telecommunications base stations, as well as dish (aperture) antennas, typically used for microwave links. The antenna patterns are not fully formed in the near field at these antennas, and the FCC Office of Engineering and Technology Bulletin No. 65 (August 1997) gives suitable formulas for calculating power density within such zones. For a panel or whip antenna, power density S = and for an aperture antenna, maximum power density Smax = 180 BW 0.1 P net D 2 h, in mw /cm 2, where BW = half-power beamwidth of the antenna, in degrees, and Pnet = net power input to the antenna, in watts, D = distance from antenna, in meters, h = aperture height of the antenna, in meters, and = aperture efficiency (unitless, typically ) P net h 2, in mw /cm 2, The factor of 0.1 in the numerators converts to the desired units of power density. Far Field. OET-65 gives this formula for calculating power density in the far field of an individual RF source: power density S = RFF 2 ERP 4 D 2, in mw /cm 2, where ERP = total ERP (all polarizations), in kilowatts, RFF = relative field factor at the direction to the actual point of calculation, and D= distance from the center of radiation to the point of calculation, in meters. The factor of 2.56 accounts for the increase in power density due to ground reflection, assuming a reflection coefficient of 1.6 (1.6 x 1.6 = 2.56). The factor of 1.64 is the gain of a half-wave dipole relative to an isotropic radiator. The factor of 100 in the numerator converts to the desired units of power density. This formula has been built into a proprietary program that calculates, at each location on an arbitrary rectangular grid, the total expected power density from any number of individual radiation sources. The program also allows for the description of uneven terrain in the vicinity, to obtain more accurate projections. Methodology Figure 2
9 Verizon Wireless Proposed Base Station (Site No Mosquito Road ) 1070 Meadow Lane Court Placerville, California Statement of Hammett & Edison, Inc., Consulting Engineers The firm of Hammett & Edison, Inc., Consulting Engineers, has been retained on behalf of Verizon Wireless, a personal telecommunications carrier, to evaluate its base station (Site No Mosquito Road ) proposed to be located at 1070 Meadow Lane Court in Placerville, California, for compliance with appropriate guidelines limiting sound levels from the installation. Executive Summary Verizon proposes to install a new base station, consisting of equipment cabinets, a back-up generator, and antennas on a tall pole, near the municipal water tank located at 1070 Meadow Lane Court in Placerville. Noise levels from the equipment operations will be below the City s permitted limits. Prevailing Standard The City of Placerville sets forth limits on sound levels in its General Plan. Proposed equipment installations in noise-sensitive areas are restricted by Part II Section VI Subsection 4.a. of the Plan to noise not exceeding 60 dba L dn in outdoor activity areas on the receiving parcel. The composite day-night average L dn that is referenced for this evaluation is a measure that incorporates a 10 dba penalty during nighttime hours (10 pm to 7 am), to reflect typical residential conditions, where noise is more readily heard at night. A noise level expressed in L dn is, by definition, 6.4 dba higher than the continuous equivalent level L eq averaged over the same 24-hour period. Figure 1 attached describes the calculation methodology used to determine applicable noise levels for evaluation against the prevailing standard. conservatively calculated at the property lines of nearby parcels. For the purpose of this study, noise levels are The operation of the back-up power generator during an emergency, when commercial power is unavailable, is considered to be exempt from these limits; however, the generator s operation during periodic, no-load testing is evaluated for compliance. General Facility Requirements Wireless telecommunications facilities ( cell sites ) typically consist of two distinct parts: electronic base transceiver stations ( BTS or cabinets ) that are connected to traditional wired telephone lines, and the antennas that send wireless signals created by the BTS out to be received by individual subscriber units. The BTS are often located outdoors at ground level and are connected to the antennas by coaxial cables. The BTS typically require environmental units to cool the electronics the W8J7.1 Page 1 of 3
10 Verizon Wireless Proposed Base Station (Site No Mosquito Road ) 1070 Meadow Lane Court Placerville, California inside. Such cooling is often integrated into the BTS, although external air conditioning may be installed, especially when the BTS are housed within a larger enclosure. Most cell sites have back-up battery power available, to run the base station for some number of hours in the event of a power outage. Many sites have back-up power generators installed, to run the station during an extended power outage. Site & Facility Description Based upon information provided by Verizon, including zoning drawings by Borges Architectural Group, Inc., dated June 11, 2015, that carrier proposes to install several equipment cabinets and a back-up power generator within a new fenced compound on a new platform to be constructed on the El Dorado Irrigation District property located at 1070 Meadow Lane Court in Placerville. For the purpose of this study, the four equipment cabinets with active cooling fans are assumed to be three CUBE Model PM63912JF1 cabinets cooled by Dantherm 4K BTU air-conditioning units and one CUBE Model PM63912UC1 cabinet cooled by a Dantherm 10K BTU air-conditioning unit. A Generac Model SD030 back-up diesel generator, configured with the manufacturer s Level 2A sound enclosure, is to be installed to the southwest of the cabinets, for emergency use in the event of an extended commercial power outage. The generator is typically operated with no load for a single 15-minute period once a week during daytime hours on a weekday, to maintain its readiness for emergency operation. Several directional panel antennas and a microwave dish antenna are proposed to be located on a tall pole to be sited near the platform; this portion of the base station is passive, generating no noise. The nearest residential property lines are to the west, about 53 feet away, and to the north, about 69 feet away. Study Results The manufacturers provide the following maximum noise levels from their equipment: Maximum L eq Reference Equipment Noise Level Distance Dantherm 10K BTU AC 74 dba 5 feet Dantherm 4K BTU AC 62 dba 5 feet Generac SD dba 23 feet The calculated noise levels for the simultaneous operation of all fans in all four Verizon cabinets are 56.0 and 54.7 dba L dn, at the west and north property lines, respectively, meeting the City s noise limit of 60 dba L dn. On the day on which the generator is tested, these calculated noise levels are 58.1 and 56.1 dba L dn, respectively, also below the City s limit. W8J7.1 Page 2 of 3
11 Verizon Wireless Proposed Base Station (Site No Mosquito Road ) 1070 Meadow Lane Court Placerville, California Conclusion Based on the information and analysis above, it is the undersigned s professional opinion that the operation of the Verizon Wireless base station proposed to be located at 1070 Meadow Lane Court in Placerville, California, will comply with the City s requirements for limiting acoustic noise emission levels. Authorship The undersigned author of this statement is a qualified Professional Engineer, holding California Registration Nos. E and M-20676, which expire on June 30, This work has been carried out under his direction, and all statements are true and correct of his own knowledge except, where noted, when data has been supplied by others, which data he believes to be correct. William F. Hammett, P.E. June 30, / W8J7.1 Page 3 of 3
12 Noise Level Calculation Methodology Most municipalities and other agencies specify noise limits in units of dba, which is intended to mimic the reduced receptivity of the human ear to Sound Pressure ( L P ) at particularly low or high frequencies. This frequency-sensitive filter shape, shown in the graph to the right as defined in the International Electrotechnical Commission Standard No. 179, the American National Standards Institute Standard No. 5.1, and various other standards, is also incorporated into most calibrated field test equipment for measuring noise levels. 30 dba library 40 dba rural background 50 dba office space 60 dba conversation 70 dba car radio 80 dba traffic corner 90 dba lawnmower The dba units of measure are referenced to a pressure of 20!Pa (micropascals), which is the threshold of normal hearing. Although noise levels vary greatly by location and noise source, representative levels are shown in the box to the left. Manufacturers of many types of equipment, such as air conditioners, generators, and telecommunications devices, often test their products in various configurations to determine the acoustical emissions at certain distances. This data, normally expressed in dba at a known reference distance, can be used to determine the corresponding sound pressure level at any particular distance, such as at a nearby building or property line. The sound pressure drops as the square of the increase in distance, according to the formula: L P = L K + 20 log( D K/D P ), where L P is the sound pressure level at distance D p and L K is the known sound pressure level at distance D K. Individual sound pressure levels at a particular point from several different noise sources cannot be combined directly in units of dba. Rather, the units need to be converted to scalar sound intensity units in order to be added together, then converted back to decibel units, according to the formula: where L T is the total sound pressure level and L L 1, L 2, etc are individual sound pressure levels. T = 10 log (10 L 1/ L 2/ 10 + ), Certain equipment installations may include the placement of barriers and/or absorptive materials to reduce transmission of noise beyond the site. Noise Reduction Coefficients ( NRC ) are published for many different materials, expressed as unitless power factors, with 0 being perfect reflection and 1 being perfect absorption. Unpainted concrete block, for instance, can have an NRC as high as However, a barrier s effectiveness depends on its specific configuration, as well as the materials used and their surface treatment. Methodology Figure 1
13 Kelly-Moore Log Cabin Brown
Verizon Wireless Proposed Base Station (Site No South Goleta ) 4500 Hollister Avenue Santa Barbara, California
Statement of Hammett & Edison, Inc., Consulting Engineers The firm of Hammett & Edison, Inc., Consulting Engineers, has been retained on behalf of Verizon Wireless, a personal wireless telecommunications
More informationVerizon Wireless Proposed Base Station (Site No Lake Cachuma ) 2680 Highway 154 Santa Barbara County, California
Statement of Hammett & Edison, Inc., Consulting Engineers The firm of Hammett & Edison, Inc., Consulting Engineers, has been retained on behalf of Verizon Wireless, a personal wireless telecommunications
More informationAT&T Mobility Proposed Base Station (Site No. CN4779A) 1101 Keaveny Court Walnut Creek, California
Statement of Hammett & Edison, Inc., Consulting Engineers The firm of Hammett & Edison, Inc., Consulting Engineers, has been retained on behalf of AT&T Mobility, a personal wireless telecommunications
More informationVerizon Wireless Proposed Base Station (Site No Berkeley Bekins ) 2721 Shattuck Avenue Berkeley, California
Statement of Hammett & Edison, Inc., Consulting Engineers The firm of Hammett & Edison, Inc., Consulting Engineers, has been retained on behalf of Verizon Wireless, a personal wireless telecommunications
More informationRoyal Street Communications, LLC Proposed Base Station (Site No. LA0366A) 315 4th Avenue Venice, California
Statement of Hammett & Edison, Inc., Consulting Engineers The firm of Hammett & Edison, Inc., Consulting Engineers, has been retained on behalf of Royal Street Communications, LLC, a personal wireless
More informationVerizon Wireless Proposed Base Station (Site No Palos Verdes ) 1506 Camino Verde Walnut Creek, California
Attachment 6 Statement of Hammett & Edison, Inc., Consulting Engineers The firm of Hammett & Edison, Inc., Consulting Engineers, has been retained on behalf of Verizon Wireless, a personal wireless telecommunications
More informationSutro Tower, Inc San Francisco, California
Sutro Tower, Inc San Francisco, California Statement of Hammett & Edison, Inc., Consulting Engineers The firm of Hammett & Edison, Inc., Consulting Engineers, has been retained by Sutro Tower, Inc., to
More informationLocation Map. Legend. Exhibit A5
Location Map Legend Exhibit A5 033302 Copy right, Airphoto USA, LLC, All Rights Reserved. This Dipiction was complied from unverified public and private resourses and is illustrative only. No representation
More informationRadio Frequency Electromagnetic Energy (RF-EME) Compliance Report
Page 1 of 36 Radio Frequency Electromagnetic Energy (RF-EME) Compliance Report Site No. FN03XC065 Huntmount Medical Center 2999 Regent Street Berkeley, California 94705 Alameda County 37.855900; -122.256000
More information2200 Noll Drive Lancaster, PA Latitude: N 40º (NAD 83) Longitude: W 76º (NAD 83) 362 AMSL
April 27, 2017 James M. Strong McNees Wallace & Nurick LLC 100 Pine Street, P.O. Box 1166 Harrisburg, PA 17108-1166 Subject: Electromagnetic Exposure Analysis WHEATLAND 2200 Noll Drive Lancaster, PA 17603
More informationRadio Frequency Electromagnetic Energy (RF-EME) Compliance Report
Page 1 of 16 Radio Frequency Electromagnetic Energy (RF-EME) Compliance Report Ashby & Adeline 2004 Emerson Street Berkeley, California 94704 Santa Clara County 37.854095; -122.268552 NAD83 Rooftop May
More informationCity of Laguna Hills Application for a Conditional Use Permit Project Information and Justification
Authorized Agent for Verizon Wireless City of Laguna Hills Application for a Conditional Use Permit Project Information and Justification With current efforts underway to establish the required infrastructure
More informationWireless Facility Peer Engineering Review
Page 1 of 11 Wireless Facility Peer Engineering Review Regarding Verizon Wireless Application 2750 Dwight Way, Berkeley, CA August 10, 2015 Page 2 of 11 Introduction RCC Consultants, Inc. has been engaged
More informationFrequently Asked Questions about Wireless Facilities on Wooden Utility Poles and Streetlight Poles
City Hall 10300 Torre Avenue Cupertino, CA 95014-3255 PH: (408) 777-3354 FX: (408) 777-3333 PUBLIC WORKS DEPARTMENT Frequently Asked Questions about Wireless Facilities on 1. What is a small cell facility?
More informationWireless Facility Engineering Review
Page 1 of 7 Wireless Facility Engineering Review AT&T Application for Site (CNU 4989) 2095 Rose Street, Berkeley, CA 2/18/2013 RCC Consultants, Inc. Western Regional Office 266 E. 33 rd Street, San Bernardino,
More informationCalculated Radio Frequency Emissions Report. Cotuit Relo MA 414 Main Street, Cotuit, MA 02635
C Squared Systems, LLC 65 Dartmouth Drive Auburn, NH 03032 (603) 644-2800 support@csquaredsystems.com Calculated Radio Frequency Emissions Report Cotuit Relo MA 414 Main Street, Cotuit, MA 02635 July 14,
More informationRF EMISSIONS COMPLIANCE REPORT. Verizon Wireless. Report Status: Verizon Wireless is Compliant
RF EMISSIONS COMPLIANCE REPORT Verizon Wireless Site: Site ID: 199 Address: TBD 8/12/2015 Report Status: Verizon Wireless is Compliant Prepared By: Sitesafe, Inc. 200 North Glebe Road, Suite 1000 Arlington,
More informationCity of San José, California CITY COUNCIL POLICY
City of San José, California CITY COUNCIL POLICY TITLE 1 1 of 6 EFFECTIVE DATE 1/22/91 REVISED DATE 9/16/03 APPROVED BY Council Action - January 22, 1991; August 11, 1992; August 20, 1996 (9d); September
More informationCITY OF PACIFIC GROVE 300 Forest Avenue, Pacific Grove, California AGENDA REPORT. Item 8a
CITY OF PACIFIC GROVE 300 Forest Avenue, Pacific Grove, California 93950 AGENDA REPORT TO: Chair Fredrickson and Members of the Planning Commission FROM: Wendy Lao, AICP, Associate Planner MEETING DATE:
More informationBefore the Federal Communications Commission Washington, D.C
Before the Federal Communications Commission Washington, D.C. 20554 In the Matter of ) ) Proposed Changes in the Commission s ) ET Docket No. 03-137 Rules Regarding Human Exposure to ) Radiofrequency Electronic
More informationSECTION 35 ANTENNAS AND TOWERS
SECTION 35 ANTENNAS AND TOWERS Section: 515-35-1 Purpose and Intent 515-35-2 General Standards 515-35-3 Certification, Inspection and Maintenance 515-35-4 Tower Design 515-35-5 Co-Location Requirement
More informationWireless Facility Engineering Review
Page 1 of 8 Wireless Facility Engineering Review Sprint Application for Site (Site No. FN03XC064) 1760 Solano Avenue, Berkeley, CA 10/9/2013 RCC Consultants, Inc. - Western Regional Office 266 E. 33 rd
More informationRadio Frequency Electromagnetic Energy (RF-EME) Compliance Report
Radio Frequency Electromagnetic Energy (RF-EME) Compliance Report Prepared for: Sprint Nextel c/o Black & Veatch Corporation 2999 Oak Rd. Suite 910 Walnut Creek,CA 94597 Hopkins of Berkely - St. Mary's
More informationRADIO FREQUENCY NIER REPORT
RADIO FREQUENCY NIER REPORT City of Albany Cellular Sites Prepared for: City of Albany Prepared August 26, 2013 by: Peter Gruchawka, President Accord Communications (707) 833-5027 Accord Communications
More informationC. CEQA Determination: Categorically exempt pursuant to Section of the CEQA Guidelines ( Existing Facilities ).
Z O N I N G A D J U S T M E N T S B O A R D S t a f f R e p o r t FOR BOARD ACTION FEBRUARY 17, 2011 1760 Solano Avenue Use Permit Modification #09-70000017 to modify the T-Mobile wireless telecommunication
More informationELECTROMAGNETIC ENERGY (EME) EXPOSURE REPORT
ELECTROMAGNETIC ENERGY (EME) EXPOSURE REPORT Site Name: Site ID: USID: FA Location: Marin Avenue CCL04554 101927 10113497 Site Type: Location: Latitude (NAD83): NAD83): Longitude (NAD83): Report Completed:
More informationWireless Facility Radio Frequency Exposure Compliance Review
Wireless Facility Radio Frequency Exposure Compliance Review Gibraltar Peak Communications Site 3035 Gibraltar Road, Santa Barbara, CA 9/21/2015 Preiser Consulting 23836 La Posta Court, Corona, CA 92883
More informationELECTROMAGNETIC ENERGY (EME) EXPOSURE REPORT
ELECTROMAGNETIC ENERGY (EME) EXPOSURE REPORT Site Name: Site ID: USID: FA Location: Scott and Coyote Creek CVL01624 47719 10102020 Site Type: Location: Latitude (NAD83): NAD83): Longitude (NAD83): Report
More informationMeasurements of Exposures Around Vodafone New Zealand Limited Cellsites from June 2012 to May 2013
Measurements of Exposures Around Vodafone New Zealand Limited Cellsites from June 2012 to May 2013 This report was prepared for: Vodafone New Zealand Limited Private Bag 92161 AUCKLAND By M Dirksen Reviewed
More informationInitial Comments on DRI Application for Wakeby Road Cell Tower September 26, 2017
Thinking outside the sphere Initial Comments on DRI Application for Wakeby Road Cell Tower September 26, 2017 The Cape Cod Commission ( Commission ) is hearing an application for DRI review of a proposed
More informationPROJECT DESCRIPTION AT&T Proposed Telecommunications Facility 2700 Watt Avenue APN#
PROJECT DESCRIPTION AT&T Proposed Telecommunications Facility 2700 Watt Avenue APN# 269-0090-051 Proposed Use AT&T is currently deploying the infrastructure of its wireless communications network in California.
More informationSafety Code 6 (SC6) Measurement Procedures (Uncontrolled Environment)
February 2011 Spectrum Management and Telecommunications Technical Note Safety Code 6 (SC6) Measurement Procedures (Uncontrolled Environment) Aussi disponible en français NT-329 Contents 1.0 Purpose...1
More informationRADIOFREQUENCY ELECTROMAGNETIC FIELDS
CHAPTER 19. RADIOFREQUENCY ELECTROMAGNETIC FIELDS 19.1 INTRODUCTION 19.1.1 CONTEXT The proposed buildings of the World Trade Center Memorial and Redevelopment Plan (Proposed Action) are being designed
More informationModify Section , Major Impact Services and Utilities, of Chapter (Civic Use Types):
ORDINANCE NO. AN ORDINANCE CHANGING THE ZONING CODE FOR MENDOCINO COUNTY The Board of Supervisors of the County of Mendocino, State of California, ordains as follows: Pursuant to Division I of Title 20,
More information# Insite RE Inc./ Verizon Wireless Special Use Permit Project Review for Planning and Zoning Commission
#2015-52 Insite RE Inc./ Verizon Wireless Special Use Permit Project Review for Planning and Zoning Commission Meeting Date: October 21, 2015 Request: Location: A Special Use Permit for a wireless communication
More informationS 0342 S T A T E O F R H O D E I S L A N D
LC000 01 -- S 0 S T A T E O F R H O D E I S L A N D IN GENERAL ASSEMBLY JANUARY SESSION, A.D. 01 A N A C T RELATING TO PUBLIC UTILITIES AND CARRIERS - SMALL CELL SITING ACT Introduced By: Senators DiPalma,
More informationModeling Electromagnetic Radiation on Lookout Mountain, Colorado
Modeling Electromagnetic Radiation on Lookout Mountain, Colorado 1. Introduction 1.1. Goal of Research This Capstone project has been initiated in an attempt to model the Electromagnetic Radiation (EMR)
More informationPROJECT NARRATIVE AND ALTERNATIVE ANALYSIS
PROJECT NARRATIVE AND ALTERNATIVE ANALYSIS 15505 Sand Canyon Avenue Building D-1 Irvine, CA 92618 May 23, 2011 Subject: Verizon Wireless Proposed Cordillera Telecommunications Facility Located at 4515
More informationRadio Frequency Emissions Analysis Report Sprint Wireless Water Tank Facility
Radio Frequency Emissions Analysis Report Sprint Wireless Water Tank Facility Site ID: BS3XC490 Site Name: Cedar St. Water Tank Address: 396 Cedar Street, Ashland, MA 0171 Latitude: 4.35300 Longitude:
More informationMINOR SITE PLAN APPLICATION TOWER COLLOCATION OR MODIFICATION (ELIGIBLE FACILITIES)
MINOR SITE PLAN APPLICATION TOWER COLLOCATION OR MODIFICATION (ELIGIBLE FACILITIES) TOWN OF CLAYTON Planning Department 111 E. Second St., P.O. Box 879 Clayton, NC 27528 Phone: 919-553-5002 Fax: 919-553-1720
More informationCOUNTY OF CLEVELAND, NORTH CAROLINA AGENDA FOR THE PLANNING BOARD MEETING. July 31, :00 PM. Commissioners Chamber
COUNTY OF CLEVELAND, NORTH CAROLINA AGENDA FOR THE PLANNING BOARD MEETING July 31, 2018 6:00 PM Commissioners Chamber Call to order and Establishment of a Quorum Invocation and Pledge of Allegiance Approval
More informationBancroft & Piedmont Cellular Facility
Page 1 of 19 Environmental Noise Analysis Bancroft & Piedmont Cellular Facility Berkeley, California BAC Job # 2015-177 Prepared For: Complete Wireless Consulting Attn: Ms. Kim Le 2009 V Street Sacramento,
More informationDavid J. Gellner, AICP, Principal Planner
Staff Report PLANNING DIVISION COMMUNITY & ECONOMIC DEVELOPMENT To: From: Salt Lake City Planning Commission David J. Gellner, AICP, Principal Planner - 801-535-6107 - david.gellner@slcgov.com Date: October
More informationWHITEPAPER WHITEPAPER
WHITEPAPER WHITEPAPER Radio Frequency Emissions Analysis of Radio Frequency Exposure Associated with Silver Spring Networks Advanced Metering Devices Executive Summary This document provides information
More informationCITY OF BROOKLYN PARK COMMUNICATIONS TECHNOLOGY SITE APPLICATION / MODIFICATION REQUEST FORM
City of Brooklyn Park 5200 85 th Avenue N. Brooklyn Park, MN 55443-1825 Permit #: CITY OF BROOKLYN PARK COMMUNICATIONS TECHNOLOGY SITE APPLICATION / MODIFICATION REQUEST FORM Site Name & Address: (existing
More informationCHAPTER TELECOMMUNICATIONS FACILITIES
Telecommunications Facilities CITY OF CITRUS HEIGHTS MUNICIPAL CODE - TITLE 106 - ZONING CODE CHAPTER 106.44 - TELECOMMUNICATIONS FACILITIES Sections: 106.44.010 - Purpose 106.44.020 - Definitions 106.44.030
More informationSec Radio, television, satellite dish and communications antennas and towers.
Se 2106. - Radio, television, satellite dish and communications antennas and towers. (a) (b) (c) (d) No guy wires or other accessories associated with any antenna or tower shall cross, encroach, or otherwise
More informationEXHIBIT 2 Page 1 of 5 Reasonable Necessity for Eminent Domain Action Tuttle Property Final Report PREPARED JANUARY 2018 FOR BROWARD COUNTY, FLORIDA MissionCriticalPartners.com State College Office 690
More informationUC Berkeley Northside Relocation Cellular Facility
Page 1 of 19 Environmental Noise Analysis UC Berkeley Northside Relocation Cellular Facility Berkeley, California BAC Job # 2015-290 Prepared For: Complete Wireless Consulting Attn: Kim Le 2009 V Street
More informationNON-IONIZING ELECTROMAGNETIC EXPOSURE ANALYSIS & ENGINEERING CERTIFICATION
NON-IONIZING ELECTROMAGNETIC EXPOSURE ANALYSIS & ENGINEERING CERTIFICATION SITE NAME: SEA Dutch Cup SITE ADDRESS: 1102 E Main Street Sultan, WA 98294 DATE: June 2, 2017 PREPARED BY: B. J. THOMAS, P.E.
More informationProposed Action Hutch Mountain Communications Site Coconino National Forest June 2016
Proposed Action Hutch Mountain Communications Site Coconino National Forest June 2016 PURPOSE AND NEED The proposed Hutch Mountain Communications Site project is part of a broader wireless industry strategy
More informationR ICHARD T ELL A SSOCIATES, INC.
R ICHARD T ELL A SSOCIATES, INC. Supplemental Report on An Analysis of Radiofrequency Fields Associated with Operation of the PG&E SmartMeter Program Upgrade System October 27, 2008 Prepared for Pacific
More informationMoline Illinois CODE OF ORDINANCES. Art. IX. Miscellaneous DIVISION 3. IN-BUILDING EMERGENCY RADIO SYSTEM COVERAGE
Moline Illinois CODE OF ORDINANCES Art. IX. Miscellaneous DIVISION 3. IN-BUILDING EMERGENCY RADIO SYSTEM COVERAGE SEC. 8-9300. TITLE. The title of this division shall be the Emergency Radio System Coverage
More informationEssentia Electromagnetic Monitor Model: EM2
Essentia Electromagnetic Monitor Model: EM2 The Essentia EM2 was designed to bridge the gap between inexpensive monitors with limited response and expensive full spectrum units. It has a small, sensitive
More informationHealth Issues. Introduction. Ionizing vs. Non-Ionizing Radiation. Health Issues 18.1
Health Issues 18.1 Health Issues Introduction Let s face it - radio waves are mysterious things. Especially when referred to as electromagnetic radiation the concept makes many people nervous. In this
More informationWIRELESS TELECOMMUNICATION FACILITIES. Chapter 15
Title 9 Land Management Code WIRELESS TELECOMMUNICATION FACILITIES Chapter 15 9-15-1: PURPOSE: 9-15-2: DEFINITIONS: 9-15-3: APPLICABILITY: 9-15-4: MASTER PLAN REQUIRED: 9-15-5: ALLOWABLE USES: 9-15-6:
More informationCity of Burbank. Planning and Transportation Division WIRELESS AND DISTRIBUTED ANTENNA SYSTEM ( DAS ) PROJECTS SUPPLEMENTAL APPLICATION FORM
Planning and Transportation Division WIRELESS AND DISTRIBUTED ANTENNA SYSTEM ( DAS ) PROJECTS SUPPLEMENTAL APPLICATION FORM 150 North Third Street Burbank, California 91502 www.burbankusa.com T: 818-235-5250
More informationITU-T Study Group 5. EMF Environmental Characterization
International Telecommunication Union EMF Environmental Characterization Jeffrey Boksiner Senior Consultant, Telcordia Technologies, Inc Workshop on: EMC, safety and EMF effects in telecommunications o
More information: PERSONAL WIRELESS TELECOMMUNICATIONS SERVICE FACILITIES: REGULATIONS AND DEVELOPMENT STANDARDS:
10-1-1118: PERSONAL WIRELESS TELECOMMUNICATIONS SERVICE FACILITIES: REGULATIONS AND DEVELOPMENT STANDARDS: A. PERMITTED IN R-3, R-4, AND R-5 ZONES AND IN ALL NON-RESIDENTIAL ZONES. Subject to the regulations
More informationSudden Valley RF Documentation
Network Engineering Verizon Wireless 3305 160th Ave. SE M/S 231 Bellevue, WA 98008 Sudden Valley RF Documentation Overview: Verizon Wireless strives to provide excellent wireless service for our customers
More informationFM Transmission Systems Course
FM Transmission Systems Course Course Description An FM transmission system, at its most basic level, consists of the transmitter, the transmission line and antenna. There are many variables within these
More informationCLARK COUNTY FIRE CODE AMENDMENTS
CLARK COUNTY FIRE CODE AMENDMENTS SECTION 510 EMERGENCY RESPONDER RADIO COVERAGE SYSTEM is amended to read as follows: SECTION 510 EMERGENCY RESPONDER RADIO COVERAGE SYSTEM 510.1 Emergency responder radio
More informationMACKENZIE & ALBRITTON LLP 220 SANSOME STREET, 14 FLOOR - SAN FRANCISCO, CALIFORNIA 94104
Council Agenda: Item No.: i»» MACKENZIE & ALBRITTON LLP 220 SANSOME STREET, 14 FLOOR - SAN FRANCISCO, CALIFORNIA 94104 11-2- TELEPHONE 415/288-4000 FACSIMILE 415/288-4010 June 3,2016 VIA EMAIL City Council
More informationTechnical Requirements for Cellular Radiotelephone Systems Operating in the Bands MHz and MHz
Issue 7 September 2008 Spectrum Management and Telecommunications Standard Radio System Plan Technical Requirements for Cellular Radiotelephone Systems Operating in the Bands 824-849 MHz and 869-894 MHz
More informationSoundview Cell Tower 1
Soundview Cell Tower 1 2 3 4 Coverage Gaps ATT 5 Coverag e Gaps Verizon 6 Coverag e Gaps Sprint 7 Coverag e Gaps T-Mobile 8 Cell Sites serving New Canaan (Contrary to popular belief, no cell towers in
More informationDESIGN AND DEVELOPMENT STANDARDS FOR WIRELESS FACILITIES IN THE PUBLIC RIGHTS-OF-WAY
DESIGN AND DEVELOPMENT STANDARDS FOR WIRELESS FACILITIES IN THE PUBLIC RIGHTS-OF-WAY The following Design and Development Standards are subject to change at any time at the sole discretion of the City
More informationWireless System Collocation Presents New Issues For Worker Protection
Wireless System Collocation Presents New Issues For Worker Protection The electricity transmission and distribution community has been unaffected by standards covering radio frequency radiation until now.
More informationEMERGENCY RESPONDER RADIO SIGNAL PERMIT APPLICATION
CITY OF LACEY Community & Economic Development Department 420 College Street SE Lacey, WA 98503 (360) 491-5642 CASH OR CHECK ONLY PLEASE EMERGENCY RESPONDER RADIO SIGNAL PERMIT APPLICATION FOR INSTALLATION/MODIFICATION
More informationData and Computer Communications. Tenth Edition by William Stallings
Data and Computer Communications Tenth Edition by William Stallings Data and Computer Communications, Tenth Edition by William Stallings, (c) Pearson Education - Prentice Hall, 2013 Wireless Transmission
More informationRadio Frequency Engineering Report. Proposed Raymond, ME Cellular Facility
Radio Frequency Engineering Report Proposed, ME Cellular Facility (Site No.: 3462 ) May 12, 2010 C Squared Systems, LLC 920 Candia Road Manchester, NH 03109 Phone: (603) 657-9702 Fax: (603) 657-9707 Support@csquaredsystems.com
More informationHuman Exposure Requirements for R&TTE and FCC Approval
Human Exposure Requirements for R&TTE and FCC Approval Derek Y. W. LEUNG Founding and Committee Member of EMC Chapter- IEEE-HK Requirements of Non-Specific Short Range Device (SRD) for CE Marking Radio
More informationCITY OF PINE CITY SMALL WIRELESS FACILITY DESIGN GUIDELINES
CITY OF PINE CITY SMALL WIRELESS FACILITY DESIGN GUIDELINES I. PURPOSE AND COMPLIANCE In implementing City Code, Chapter 8, Section 815, the City Council of the City of Pine City (the City ) finds that
More informationELECTROMAGNETIC FIELD (EMF) STRENGTH MEASUREMENTS SITE: ROHRERSTOWN ELEMENTARY SCHOOL OCTOBER 16, 2017
ELECTROMAGNETIC FIELD (EMF) STRENGTH MEASUREMENTS SITE: ROHRERSTOWN ELEMENTARY SCHOOL OCTOBER 16, 2017 Rohrerstown Elementary School Hempfield School District 2200 Noll Drive Lancaster, PA 17603 Millennium
More informationRF EMISSIONS FROM SMART GRID ELECTRIC METERS, HAN DEVICES, AND THEIR RELATIONSHIP TO THE FCC MAXIMUM PERMISSIBLE EXPOSURE LIMIT (MPE)
RF EMISSIONS FROM SMART GRID ELECTRIC METERS, HAN DEVICES, AND THEIR RELATIONSHIP TO THE FCC MAXIMUM PERMISSIBLE EXPOSURE LIMIT (MPE) PREPARED FOR BY Gordon W. Hudson 20 th September 2012 Table of Contents
More informationNotice of Decision. [2] The subject property is on Plan Blk 1 Lot 51A, located at Avenue NW, within the PU Public Utility Zone.
10019 103 Avenue NW Edmonton, AB T5J 0G9 P: 780-496-6079 F: 780-577-3537 sdab@edmonton.ca edmontonsdab.ca Date: November 2, 2018 Project Number: 286136272-001 File Number: SDAB-D-18-181 Notice of Decision
More informationRadiofrequency (RF) Safety Overview Massachusetts Environmental Health Association
Radiofrequency (RF) Safety Overview Massachusetts Environmental Health Association May 16, 2018 Kevin McManus Senior Program Director kmcmanus@ebiconsulting.com 781-254-5727 (cell) Agenda 1) RF-EME 101
More informationTOWN OF HILLSBOROUGH SUPPLEMENTAL APPLICATION FORM FOR WIRELESS PROJECTS
TOWN OF HILLSBOROUGH SUPPLEMENTAL APPLICATION FORM FOR WIRELESS PROJECTS AND DISTRIBUTED ANTENNA SYSTEM ( DAS ) PROJECTS The, California recognizes that the provision of wireless and DAS services are highly
More informationENGINEERING REPORT CONCERNING THE EFFECTS UPON FCC LICENSED RF FACILITIES DUE TO CONSTRUCTION OF THE (Name of Project) WIND PROJECT Near (City, State)
ENGINEERING REPORT CONCERNING THE EFFECTS UPON FCC LICENSED RF FACILITIES DUE TO CONSTRUCTION OF THE (Name of Project) WIND PROJECT Near (City, State) for (Name of Company) January 3, 2011 By: B. Benjamin
More informationGlossary of Terms Black Sky Event: Blue Sky Operations: Federal Communications Commission (FCC): Grey Sky Operations:
Glossary of Terms The following is a list of terms commonly used in the electric utility industry regarding utility communications systems and emergency response. The purpose of this document is to provide
More informationRegulatory Authority of Bermuda report on
Regulatory Authority of Bermuda report on Bermuda Electric Light Company Smart Meter Maximum Permissible Exposure 14 June 2018 This report reflects the electromagnetic radio frequency Maximum Permissible
More informationARLINGTON COUNTY, VIRGINIA. County Board Agenda Item Meeting of July 18, 2015
ARLINGTON COUNTY, VIRGINIA County Board Agenda Item Meeting of July 18, 2015 DATE: July 3, 2015 SUBJECT: U-3409-15-1 USE PERMIT for installation of telecommunications equipment at Mercedes-Benz of Arlington;
More informationRegulatory Framework for RF Safety in Mauritius
Regulatory Framework for RF Safety in Mauritius Jerome LOUIS Director Engineering ICTA This Session PART I Background Base Station Site Selection Base Station authorisation process Exposure Limits adopted
More informationRe. Invitation to Comment on a Proposed Small Cell Telecommunications Installation Near (Road reserve) Coogee Bay Road COOGEE NSW 2034
The Occupier 22 nd February 2018 Dear Sir/Madam Re. Invitation to Comment on a Proposed Small Cell Telecommunications Installation Near (Road reserve) 146-148 Coogee Bay Road COOGEE NSW 2034 Urbis is writing
More informationPLANNING DIVISION COMMUNITY & NEIGHBORHOODS DEPARTMENT
Staff Report PLANNING DIVISION COMMUNITY & NEIGHBORHOODS DEPARTMENT To: Salt Lake City Administrative Hearing Officer From: Casey Stewart; 801-535-6260 Date: Re: September 22, 2017 (for September 28 Administrative
More informationSECTION EMERGENCY RESPONDER RADIO COVERAGE SYSTEMS
510.1 Emergency responder radio coverage in new buildings. Approved radio coverage for emergency responders shall be provided within all buildings meeting any one of the following conditions: 1. There
More informationColubris Networks. Antenna Guide
Colubris Networks Antenna Guide Creation Date: February 10, 2006 Revision: 1.0 Table of Contents 1. INTRODUCTION... 3 2. ANTENNA TYPES... 3 2.1. OMNI-DIRECTIONAL ANTENNA... 3 2.2. DIRECTIONAL ANTENNA...
More informationWHEREAS, the City of (the City ) is an Illinois municipality in. accordance with the Constitution of the State of Illinois of 1970; and,
SMALL CELL ANTENNA/TOWER RIGHT-OF-WAY SITING ORDINANCE WHEREAS, the City of (the City ) is an Illinois municipality in accordance with the Constitution of the State of Illinois of 1970; and, WHEREAS, the
More informationSummerlin South Community Association. Model Rules for Installation of Antennas in Planned Unit Developments. Satellite Antenna Resolution & Criteria
Summerlin South Community Association Model Rules for Installation of Antennas in Planned Unit Developments Satellite Antenna Resolution & Criteria I. Preamble These rules are adopted by the Board of Directors
More informationTechnical Requirements for Land Mobile and Fixed Radio Services Operating in the Bands MHz and MHz
Provisional - Issue 1 March 2004 Spectrum Management and Telecommunications Policy Standard Radio System Plans Technical Requirements for Land Mobile and Fixed Radio Services Operating in the Bands 138-144
More informationGuidelines for the Submission of Applications to Provide Mobile-Satellite Service in Canada
Issue 5 May 2014 Spectrum Management and Telecommunications Client Procedures Circular Guidelines for the Submission of Applications to Provide Mobile-Satellite Service in Canada Aussi disponible en français
More informationSNC0080 Abbott & Iber
SNC0080 Abbott & Iber Municipal Review and Concurrence of an Antenna System Application Public Notification Package Wireless Communications Site 145 Iber Rd., Ottawa, Ontario, K2S 1E7 Purpose This information
More informationCOMMUNITY BENEFITS. How Mobile Devices are Used Today (Mobile Device: Cellular Phones, Tablets, etc..)
COMMUNITY BENEFITS How Mobile Devices are Used Today (Mobile Device: Cellular Phones, Tablets, etc..) 90% of American households use wireless service with approximately 52% being wireless only for telephone
More informationSimple Guide to In-Building Coverage Systems
Simple Guide to In-Building Coverage Systems for Building Owners, Managers and Tenants Accessing high-quality network coverage for mobile phones or tablet devices can be problematic within large buildings
More informationClark County Fire Prevention Las Vegas Nevada
Clark County Fire Prevention Las Vegas Nevada PUBLIC SAFETY/FIRST RESPONDER RADIO AMPLIFICATION SYSTEMS SCOPE: This guideline sets forth requirements for the design, installation and testing of Public
More informationBefore the FEDERAL COMMUNICATIONS COMMISSION Washington, DC ) ) ) ) ) COMMENTS OF REDLINE COMMUNICATIONS INC.
Before the FEDERAL COMMUNICATIONS COMMISSION Washington, DC 20554 In the Matter of Amendment of the Commission's Rules with Regard to Commercial Operations in the 3550-3650 MHz Band GN Docket No. 12-354
More informationPolicy for the Licensing of Very Low Capacity Point to Point Links in the Band MHz
October 1, 1983 Spectrum Management Radio Systems Policy See also: Policy for the Licensing of Very Low Capacity Point to Point Links in the Band DGTP-005-96 Proposed Spectrum Utilization Policy to Support
More informationTOWN OF LOS ALTOS HILLS April 4, 2013 Staff Report to the Planning Commission
ITEM3.3 TOWN OF LOS ALTOS HILLS April 4, 2013 Staff Report to the Planning Commission SUBJECT: FROM: CONDITIONAL USE PERMIT RENEW AL AND MODIFICAITONS FOR AN EXISTING/ PREVIOUSLY APPROVED WIRELESS COMMUNICATIONS
More informationTechnical Requirements for Land Mobile and Fixed Radio Services Operating in the Bands / MHz and / MHz
Issue 5 November 2013 Spectrum Management and Telecommunications Standard Radio System Plan Technical Requirements for Land Mobile and Fixed Radio Services Operating in the Bands 806-821/851-866 MHz and
More informationProvided by: Radio Systems, Inc. 601 Heron Drive Bridgeport, NJ
Provided by: Radio Systems, Inc. 601 Heron Drive Bridgeport, NJ 08014 856-467-8000 www.radiosystems.com Before the Federal Communications Commission Washington, DC 20554 GEN Docket No. 87-839 In the Matter
More informationPlanning Commission Agenda Report Meeting Date 6/07/18
Planning Commission Agenda Report Meeting Date 6/07/18 DATE: May 18, 2018 Files: UP 17-21 TO: FROM: RE: PLANNING COMMISSION Shannon Costa, Assistant Planner (879-6807, shannon.costa@chicoca.gov) Use Permit
More information