TSG AC Access Network & Air Interfaces (Approved) 3 7 June 2013 Meeting Summary The Hyatt Miami, Miami, FL

Size: px
Start display at page:

Download "TSG AC Access Network & Air Interfaces (Approved) 3 7 June 2013 Meeting Summary The Hyatt Miami, Miami, FL"

Transcription

1 TSG AC Access Network & Air Interfaces (Approved) June Meeting Summary The Hyatt Miami, Miami, FL 0. Call to Order & Opening Remarks The meeting was opened on June by the Vice Chair, Tony Lee (VIA Telecom) and began at :am local Miami time. Participants were reminded that attendance is taken electronically (tsgac.gpp.net) and asked to sign in accordingly. AC , the meeting room assignments, was reviewed.. Attendance Registration & Roll Call Quorum was achieved as nine () of the fifteen () quorum members were present (0% participation). There were no proxies noted at this meeting.. Introduction & Numbering of Contributions Contributions were uploaded to the GPP server and noted on the document register (AC ).. Agenda Approval Decision AC /0 0 The agenda presented in AC r was approved.. Assignment of Contributions to Agenda Items Contributions were assigned to agenda topics as noted on the agenda.. Approval of March (Busan) and April (Interim) Meeting Summaries Decision AC /0 0 AC r, the March TSG AC meeting summary, was approved. Decision AC /0 0 AC00 0 0r, the April TSG AC interim plenary meeting summary, was approved.. Review of Outstanding Action Items The outstanding assignments, as listed in AC r and AC00 0 0r, were reviewed. 0 A call for volunteers has been issued for persons who are interested in serving as the TSG AC WG Vice Chair. This action item remains open. 0 0 WG must develop text for the GPP website which shows the succession of C.S00 documents and provides the mapping to their TIA transposed version no later than the March meeting. AC provides proposed text to update the website. This action item is carried forward to the closing plenary.. Liaison Reports. Organizational Partners

2 June TSG AC Meeting Summary Page of 0 0. Steering Committee. SC PMT Action AC /0 0 AC00 0 0, TSG AC Workplan Reports, was remanded to all WGs for review and comment. Comments will be coordinated by WG.. GPP Secretariat The contributions from the Secretariat were noted FYI. AC , V&V Initiation C.P00 A v0.0 Comments Due May AC , V&V Initiation Announcement C.P00 A v0. E UTRAN cdma00 x Connectivity and Interworking Air Interface Specification AC , V&V Initiation Announcement A.R00 D v0. Interoperability Specification (IOS) Numbering Reference, AC , Publication of C.R00 E v.0 Software Distribution for Enhanced Variable Rate Codec (EVRC), Speech Service Options,, 0, and, Specification, AC , Publication of C.R00 E v.0 Software Distribution for Enhanced Variable Rate Codec (EVRC), Speech Service Options,, 0, and, Minimum Performance Specification (MPS), AC00 0 0, Publication of C.S00 E v.0 Minimum Performance Specification for the Enhanced Variable Rate Codec, Speech Service Options,, 0, and for Wideband Spread Spectrum Digital Systems, AC00 0 0, Publication of C.S v.0 Data Service Options for Spread Spectrum Systems, AC00 0 0, Publication of C.S00 A v.0 Electro Acoustic Recommended Minimum Performance Specification for cdma00 Mobile Stations AC00 0 0, Publication of A.S000 D v.0 Interoperability Specification (IOS) for High Rate Packet Data (HRPD) Radio Access Network Interfaces with Session Control in the Access Network AC00 0 0, Publication of A.S000 D v.0 Interoperability Specification (IOS) for High Rate Packet Data (HRPD) Radio Access Network Interfaces with Session Control in the Packet Control Function AC00 0 0, Republication of C.S00 A v.0 Mobile Equipment (ME) Conformance Testing with R UIM for cdma00 Spread Spectrum Standards. TSG SX. TIA. ITU. CDG

3 June TSG AC Meeting Summary Page of 0 0. OMA.0 GPP Action AC /0 0 AC00 0 0, Liaison Statement regarding information of progress in the SI on LTE HRPD SON, was remanded to all WGs for review and comment with comments coordinated by WG.. ETSI. onemm. Other Action AC /0 0 AC00 0 0, GSMA Liaison regarding Publication of GSMA Requirements for Networks and Terminals for the usage of the HD voice logo with GSM/UMTS/LTE, CDMA00 or DECT, was remanded to WG for review and action.. Working Group Reports. WG Application Services The WG objectives for the week were noted: An after the fact correspondence to the PMT regarding the review of the SRG. Proposed correspondence to the PMT regarding the review of GPP WIs (~) pending WG input prior to opening. The primary focus will be on the card specs. o C.S00 D v.0 R UIM point release in work could go to baseline. o C.S00 A v.0 ME with R UIM conformance point release in work o C.S00 B v.0 CSIM point release in work could go to baseline o C.S00 B v.0 CCAT new revision in work could go to baseline o C.S00 0 v.0 CCAT Conformance in R&F, should move to V&V at closing. Proposed publication at plenary o C.S00 A v.0unstructured Supplementary Service Data (USSD) Service Options for Spread Spectrum Systems: Service Options and (WI: GPP 00) o Assuming no technical changes from V&V, and will be proposed as "approve pending no comments received from TIA by (their ballot close date)." Could reach baseline o C.R00 I v.0 Administration of Parameter Value Assignments for cdma00 Spread Spectrum Standards (Needs a PN/DN request, WI: TSGAC ) AC , TSG AC Document Log, now includes the A designated documents that are currently being tracked via the active GPP workplan. Action AC /0 0 The backfilling of published A designated document information will continue and the TSG AC Document Log will be updated, accordingly.

4 June TSG AC Meeting Summary Page of 0 0 AC , WI Review Status, was provided FYI. Decision AC /0 0 AC00 0 0, Proposed correspondence to the PMT regarding TSG AC Review of GPP WIs, is approved for transmission to the PMT.. WG Signaling and Protocol A verbal report of WG activities and their plans for the week was presented by WG Chair, Orlett Pearson (Alcatel Lucent), as FYI. Action AC /0 0 AC00 0 0, Clarifying C.S00 on the GPP web site, is in response to an action item to clean up the numbering of the C.S00 documents and was remanded to WG and WG for review and comment w/comments to be coordinated by WG.. WG Physical Layer The WG objectives for the week were noted: ITU Stuffs Battery Life Bench Mark Discussion Administrative Stuffs. WG Performance The WG objectives for the week were noted: The following items are expected be forwarded to the plenary: PPV of C.S00 A v.0 Signaling Test Specification for E UTRAN cdma00 Connectivity and Interworking (WI: TSGC /GPP 00, TSGC /GPP 000) Proposed Input to ITU R regarding M.0 and M... WG Access Network Interfaces The WG objectives for the week were noted:. Address remanded contributions to date and any additional remands: AC00 0r0 onemm+network interaction.doc AC00 0 0r0 QC A.R00 D v0. IOS# Ref VnV comments.zip AC (and 0a) GSMA Liaison HD Voice Logo.pdf AC R (SI on LTE HRPD SON).zip. On going work items. RAN Management (A.S000 A): Coverage compensation message flows, procedures and requirements are to be incorporated into the baseline for initiation of R&F at the June closing TSG AC plenary. MM IOS (A.S00 0): MM power down function to complete and baseline to be updated for initiation of R&F at the June closing TSG AC plenary. x IOS (A.S00~ C/D): Draft MM enhancements for A.S00~ (includes overview, features and A) to mirror A.S00 changes with text targeted for September baseline (and December publication). IOS Numbering reference (A.R00 D):V&V to complete in the June meeting with publication ready text to be submitted into the June closing TSG AC plenary.

5 June TSG AC Meeting Summary Page of 0. WG tentative joint meeting with TSG SX PDS on MM... or other efforts (: 0: am).. Address WG scheduling needs for conference calls / next face to face meeting. 0. Old Business 0. Consideration of Projects for SC Level Review for Publication The documents that are scheduled to be submitted to the closing plenary for SC review were noted in the WG reports: C.S00 A v.0 E UTRAN cdma00 x Connectivity and Interworking Air Interface Specification C.S00 A v.0 Unstructured Supplementary Service Data (USSD) Service Options for Spread Spectrum Systems: Service Options and (WI: GPP 00) C.S00 A v.0 Signaling Test Specification for E UTRAN cdma00 Connectivity and Interworking (WI: TSGC /GPP 00, TSGC /GPP 000) 0. Consideration of Projects for SC Level Review for Re Publication 0. Consideration of Projects for Approval for V&V Review C.S00 0 v.0 Mobile Equipment (ME) Conformance Testing with CDMA Card Application Toolkit (WI: TSGC / GPP 00) is scheduled to be submitted to the closing plenary for V&V. 0. Consideration of Projects for Approval for Baseline Text: The documents that are scheduled to be submitted to the closing plenary for baseline text approval were noted in the WG reports: C.S00 0 v.0 Mobile Equipment (ME) Conformance Testing with CDMA Card Application Toolkit (WI: TSGC / GPP 00) C.P00 D v.0 Removable User Identity Module for Spread Spectrum Systems (WI: TSGC /GPP 00) C.S00 B v.0 cdma00 Application on UICC for Spread Spectrum Systems (TSGC /GPP 00) C.S00 00 A v.0 Data Service Options for Spread Spectrum Systems. (TSGC, GPP 00) 0. ITU Activities 0. Development Schedules 0. WI Approvals 0. Meeting Schedule Action AC /0 0 AC00 0 0, GPP Updated Meeting Calendar (), was remanded to all WGs for review and comment. During the Chair s meeting on Thursday, the WG Chairs are expected to provide a recommendation on the number of TSG meetings that will be needed in.

6 June TSG AC Meeting Summary Page of 0 0. Other. New Business. New (TSG AC) Work Items Action AC /0 0 AC00 0 0, Work item request for Bug fixes for x, DO, SVDO MPS, was remanded to WG for review and action and WG for review and comment. Action AC /0 0 AC00 0 0, A BDS Support Work Item, was remanded to WG for review and action and WG for review and comment. Action AC /0 0 AC00 0 0, A BDS Support Presentation, was remanded to WG and WG FYI.. Assigning Plenary Contribution Numbers to Advance Remands Decision AC /0 0 When a topic/contribution is advance remanded by the Secretary, the plenary contribution number will be provided at the time of remand.. TSG AC Comments on SC.P v0. (System Release Guide for Release AC00 0 0, TSG AC Comments on SC.P v0. System Release Guide for Release, was noted FYI as the information was previously provided to the PMT.. A.R00 D v.0 (IOS# Ref) V&V Comments Action AC /0 0 AC00 0 0, A.R00 D v0. (IOS# Ref) VnV comments, was remanded to WG for review and action.. Nomination of David Ott for TSG AC WG Chair AC00 0 0, Nomination of David Ott for TSG AC WG Chair, was presented. Decision AC /0 0 David Ott, Qualcomm, was appointed the TSG AC WG Chair.. x Device Binding Framework Overview Action AC /0 AC00 0 0, x Device Binding Framework Overview, was remanded to WG for review and action. The WG Chair noted that C.S000 will be affected and a new version of the document will be created. The TSG AC opening plenary recessed at approximately : (local) on June. Closing Plenary Friday, June TSG AC reconvened at :am (local) on June. There were two () additional companies in attendance at the closing plenary. During the closing plenary opening remarks it was noted:

7 June TSG AC Meeting Summary Page of 0 An update to the agenda was made and AC 0 00r was created An update to the document register was also created as shown in AC 0 000r. The WG Chairs have recommended that three () face to face meetings, with a duration of four () days each, be planned for. An interim plenary, to be held July at :00pm (ET), will be held.. Working Group Reports. WG Application Services AC00 0 0r, the WG Report, was presented as FYI. Decision AC /0 0 The new TSG AC Work items that came into the opening plenary will be discussed during interim plenary. The documents have been renumbered as AC0 0 0R and AC0 0 0R. Action AC /0 AC00 0, WG PN/DN Request, was approved and remanded to WG for action. As a result of the approval, documents C.R00 I v.0 and C.S00 B v.0 will be developed. Decision AC /0 0 AC00 0, C.P00 I v0. Administration of Parameter Value Assignments for cdma00 Spread Spectrum Standards proposed baseline text (to be published as C.R00 I v.0, WI: TSGAC / GPP 00), was approved as baseline and remanded to WG for R&F. Decision AC /0 0 AC00 0, C.P00 D v.0 Removable User Identity Module for Spread Spectrum Systems proposed baseline text (to be published as C.S00 D v.0, WI: TSGC /GPP 00) was approved as baseline and remanded to WG for R&F. Decision AC /0 0 AC00 0, C.P00 0 v0.0 Mobile Equipment (ME) Conformance Testing with DMA Card Application Toolkit proposed V&V text (to be published as C.S00 0 v.0, WI: TSGC /GPP 00) was approved for V&V with comments due July and liaised to TR.. Decision AC /0 AC00 0, Proposed Correspondence to the PMT regarding Work Plan questions, was approved for transmission to the PMT Coordinator. Decision AC /0 AC00 0, C.P00 A v.0 Unstructured Supplementary Service Data (USSD) Service Options for Spread Spectrum Systems: Service Options and proposed publication text (To be published as C.S00 A v.0, WI: GPP 00), was approved for publication and liaised to TR... WG Signaling and Protocol AC00 0 0r, WG Report, was presented FYI. Decision AC /0 AC00 0, C.S00 00 A v.0 Data Service Options for Spread Spectrum Systems Radio Link Protocol Type, is approved as baseline and remanded to WG for R&F.

8 June TSG AC Meeting Summary Page of 0 Action AC /0 A project number request for C.S00 00 A v.0 is to be submitted to the July interim plenary. Decision AC /0 AC00 0, C.S00 A v.0 E UTRAN cdma00 HRPD Connectivity and Interworking Air Interface Specification, is approved as baseline and remanded to WG for R&F. Action AC /0 A project number request for C.S00 A v.0 is to be submitted to the July interim plenary.. WG Physical Layer AC00 0 0r, WG Report, was presented FYI. Decision AC /0 AC00 0 r, DocNum/ProjNum request for Battery Life Measurement document, was approved and remanded to WG for assignment. (The WG Chair noted that the document number had been assigned previously (C.R0 0 v.0)). Decision AC /0 AC00 0, Proposed update to ITU R M.0 and M., was approved for transmission to ITU WP D and liaised to TR... WG Performance AC00 0 0r, WG report, was presented FYI. Decision AC /0 AC00 0, C.P00 A v0. Signaling Test Specification for EUTRAN cdma00 Connectivity and Interworking (TSGC ), was approved for Extended V&V with comments due July and liaised to TR.. Action AC /0 The proposed work item, AC00 0, WI request for C.S00 A v.0 (ehrpd and E UTRAN Interworking Signaling Test Specification requirements corrections) was defective as the CCF, as an MRP, cannot sponsor a work item. Huawei agreed to sponsor the work item. AC00 0 r, was then remanded to WG for review and comment and to WG for processing as a work item.. WG Access Network Interfaces AC00 0 0, WG Report, was presented FYI. Decision AC /0 AC00 0 0B, TSG AC WG Work plan and Release Features, was remanded to WG for review and action. Decision AC /0 AC00 0, RAN Management (A.S000 A), was approved as baseline and remanded to WG for R&F. (It was noted that a formal document request doesn t exist, as this document was grandfathered as a TSG A document). Decision AC /0

9 June TSG AC Meeting Summary Page of 0 AC00 0, MM IOS (A.S00 0), WI 00 and WI 00, is approved as baseline and remanded to WG for R&F. (It was noted that a formal document request doesn t exist, as this document was grandfathered as a TSG A document). Decision AC /0 AC00 0, IOS Numbering Reference (A.R00 D) was approved for publication.. Liaison Reports. Organizational Partners. Steering Committee. SC PMT Decision AC /0 AC00 0 0, notification of the start of TSG review of three () work item worksheets, was remanded to all working groups for review and comment. All comments will be coordinated by WG. (The WG chair noted that comments have been received from all TSG AC WGs and a correspondence will be proposed during the interim plenary.). GPP Secretariat. TSG SX. TIA AC00 0, C.S00 E v.0 V&V Comments from TIA, is remanded to WG for review and comment. (The WG Chair noted that a response back to TIA has been prepared and sent. No further action from TSG AC is required.). ITU Action AC /0 The following liaison statements from the ITU were previously remanded to WG for review and action: AC00 0 Liaison Statement to MGWS External Organizations on the Work for Revision of Recommendation ITU R M.0 and Report ITU R M. AC00 0 Liaison Statement on Working document towards a preliminary new Report ITU R [LMS.CRS] AC00 0 Liaison Statement on Work for Revision of Recommendation ITU R F. AC00 0 Liaison Statement on Technologies for Public Protection and Disaster Relief Communications associated with work on WRC Agenda Item. AC00 0 Liaison Statement on Revision of Recommendation ITU R M.0. CDG

10 June TSG AC Meeting Summary Page 0 of 0. OMA.0 GPP/ETSI Decision AC /0 AC00 0 0, Reply LS to MO Short Message Control Support in GPP, was remanded to WG for review and comment.. ETSI AC00 0 0, Reply LS to MO Short Message Control Support in GPP (in SCP()0000/ TSG AC_to_ETSI_SCP_re_MO_SMS_Control), was remanded to WG for review and comment. AC00 0 0, Reply LS to Request for coding value in ETSI TS 0 for ehrpd (in SCP()0000/ TSG AC_to_ETSI_SCP_re_CodingValueRequest), was remanded to WG for review and comment.. onemm. Other. Old Business. New Business. Future Meeting Schedule :00pm (ET) Interim Plenary September Guilin, China December Kauai, HI Detailed information on all TSG AC meetings can be found on the GPP online calendar ( Open Discussion & Other Business. Assignments See the annex to this report for the decisions and action items captured during the meeting.. Adjournment The TSG AC meeting ended at approximately 0:am (local) on June.

11 June TSG AC Meeting Summary Page of 0 June TSG AC Decisions Decision AC /0 0 The agenda presented in AC r was approved. Decision AC /0 0 AC r, the March TSG AC meeting summary, was approved. Decision AC /0 0 AC00 0 0r, the April TSG AC interim plenary meeting summary, was approved. Decision AC /0 0 AC00 0 0, Proposed correspondence to the PMT regarding TSG AC Review of GPP WIs, is approved for transmission to the PMT. Decision AC /0 0 When a topic/contribution is advance remanded by the Secretary, the plenary contribution number will be provided at the time of remand. Decision AC /0 0 David Ott, Qualcomm, was appointed the TSG AC WG Chair. Decision AC /0 0 The new TSG AC Work items that came into the opening plenary will be discussed during interim plenary. The documents have been renumbered as AC0 0 0R and AC0 0 0R. Decision AC /0 0 AC00 0, C.P00 I v0. Administration of Parameter Value Assignments for cdma00 Spread Spectrum Standards proposed baseline text (to be published as C.R00 I v.0, WI: TSGAC / GPP 00), was approved as baseline and remanded to WG for R&F. Decision AC /0 0 AC00 0, C.P00 D v.0 Removable User Identity Module for Spread Spectrum Systems proposed baseline text (to be published as C.S00 D v.0, WI: TSGC /GPP 00) was approved as baseline and remanded to WG for R&F. Decision AC /0 0 AC00 0, C.P00 0 v0.0 Mobile Equipment (ME) Conformance Testing with DMA Card Application Toolkit proposed V&V text (to be published as C.S00 0 v.0, WI: TSGC /GPP 00) was approved for V&V with comments due July and liaised to TR.. Decision AC /0 AC00 0, Proposed Correspondence to the PMT regarding Work Plan questions, was approved for transmission to the PMT Coordinator. Decision AC /0 AC00 0, C.P00 A v.0 Unstructured Supplementary Service Data (USSD) Service Options for Spread Spectrum Systems: Service Options and proposed publication text (To be published as C.S00 A v.0, WI: GPP 00), was approved for publication and liaised to TR..

12 June TSG AC Meeting Summary Page of 0 Decision AC /0 AC00 0, C.S00 00 A v.0 Data Service Options for Spread Spectrum Systems Radio Link Protocol Type, is approved as baseline and remanded to WG for R&F. Decision AC /0 AC00 0, C.S00 A v.0 E UTRAN cdma00 HRPD Connectivity and Interworking Air Interface Specification, is approved as baseline and remanded to WG for R&F. Decision AC /0 AC00 0 r, DocNum/ProjNum request for Battery Life Measurement document, was approved and remanded to WG for assignment. (The WG Chair noted that the document number had been previously assigned (C.R0 0 v.0)). Decision AC /0 AC00 0, Proposed update to ITU R M.0 and M., was approved for transmission to ITU WP D and liaised to TR.. Decision AC /0 AC00 0, C.P00 A v0. Signaling Test Specification for EUTRAN cdma00 Connectivity and Interworking (TSGC ), was approved for Extended V&V with comments due July and liaised to TR.. Decision AC /0 AC00 0 0B, TSG AC WG Work plan and Release Features, was remanded to WG for review and action. Decision AC /0 AC00 0, RAN Management (A.S000 A), was approved as baseline and remanded to WG for R&F. (It was noted that a formal document request doesn t exist, as this document was grandfathered as a TSG A document). Decision AC /0 AC00 0, MM IOS (A.S00 0), WI 00 and WI 00, is approved as baseline and remanded to WG for R&F. (It was noted that a formal document request doesn t exist, as this document was grandfathered as a TSG A document). Decision AC /0 AC00 0, IOS Numbering Reference (A.R00 D) was approved for publication. Decision AC /0 AC00 0 0, notification of the start of TSG review of three () work item worksheets, was remanded to all working groups for review and comment. All comments will be coordinated by WG. (The WG chair noted that comments have been received from all TSG AC WGs and a correspondence will be proposed during the interim plenary.) Decision AC /0 AC00 0 0, Reply LS to MO Short Message Control Support in GPP, was remanded to WG for review and comment.

13 June TSG AC Meeting Summary Page of 0 Carried Over Action Items 0 A call for volunteers has been issued for persons who are interested in serving as the TSG AC WG Vice Chair. 0 0 WG must develop text for the GPP website which shows the succession of C.S00 documents and provides the mapping to their TIA transposed version no later than the March meeting. AC 0 00R current status of proposed text. Review of information not complete. /0 AC00 0, Liaison statement from ITU R WPD regarding "Study on IMT Vision for and Beyond" was remanded to WG for review and action. (Due Dec ) /0 AC00 0, Liaison statement from ITU R WPD regarding "Study on Future Technology Trends for Terrestrial IMT Systems" was remanded to WG for review and action. (Due Sept ) June TSG AC Recorded Actions Action AC /0 0 AC00 0 0, TSG AC Workplan Reports, was remanded to all WGs for review and comment. Comments will be coordinated by WG. Action AC /0 0 AC00 0 0, Liaison Statement regarding information of progress in the SI on LTE HRPD SON, was remanded to all WGs for review and comment with comments coordinated by WG. Action AC /0 0 AC00 0 0, GSMA Liaison regarding Publication of GSMA Requirements for Networks and Terminals for the usage of the HD voice logo with GSM/UMTS/LTE, CDMA00 or DECT, was remanded to WG for review and action. Action AC /0 0 The backfilling of published A designated document information will continue and the TSG AC Document Log will be updated, accordingly. Action AC /0 0 AC00 0 0, Clarifying C.S00 on the GPP web site, is in response to an action item to clean up the numbering of the C.S00 documents and was remanded to WG and WG for review and comment w/comments to be coordinated by WG. Action AC /0 0 AC00 0 0, GPP Updated Meeting Calendar (), was remanded to all WGs for review and comment. During the Chair s meeting on Thursday, the WG Chairs are expected to provide a recommendation on the number of TSG meetings that will be needed in. Action AC /0 0

14 June TSG AC Meeting Summary Page of 0 AC00 0 0, Work item request for Bug fixes for x, DO, SVDO MPS, is remanded to WG for review and action and WG for review and comment. Action AC /0 0 AC00 0 0, A BDS Support Work Item, was remanded to WG for review and action and WG for review and comment. Action AC /0 0 AC00 0 0, A BDS Support Presentation, was remanded to WG and WG FYI. Action AC /0 0 AC00 0 0, A.R00 D v0. (IOS# Ref) VnV comments, was remanded to WG for review and action. Action AC /0 AC00 0 0, x Device Binding Framework Overview, was remanded to WG for review and action. The WG Chair noted that C.S000 will be affected and a new version of the document will be created. Action AC /0 AC00 0, WG PN/DN Request, was approved and remanded to WG for action. As a result of the approval, documents C.R00 I v.0 and C.S00 B v.0 will be developed. Action AC /0 A project number request for C.S00 00 A v.0 shall be submitted to the July interim plenary. Action AC /0 A project number request for C.S00 A v.0 shall be submitted to the July interim plenary. Action AC /0 AC00 0 r, WI request for C.S00 A v.0 (ehrpd and E UTRAN Interworking Signaling Test Specification requirements corrections), was remanded to WG for review and comment and to WG for processing as a work item. Action AC /0 The sponsors of the proposed work item submitted in AC00 0 r will provide a third sponsor as the CDG must be removed; an MRP cannot sponsor a work item. Action AC /0 The following liaison statements from the ITU were previously remanded to WG for review and action: AC00 0 Liaison Statement to MGWS External Organizations on the Work for Revision of Recommendation ITU R M.0 and Report ITU R M. AC00 0 Liaison Statement on Working document towards a preliminary new Report ITU R [LMS.CRS] AC00 0 Liaison Statement on Work for Revision of Recommendation ITU R F. AC00 0 Liaison Statement on Technologies for Public Protection and Disaster Relief Communications associated with work on WRC Agenda Item. AC00 0 Liaison Statement on Revision of Recommendation ITU R M.0

TSG AC Access Network & Air Interfaces (Approved) March 2013 Meeting Summary The Westin Chosun, Busan, South Korea

TSG AC Access Network & Air Interfaces (Approved) March 2013 Meeting Summary The Westin Chosun, Busan, South Korea TSG AC Access Network & Air Interfaces (Approved) March 0 Meeting Summary The Westin Chosun, Busan, South Korea 0 0. Call to Order & Opening Remarks The meeting was opened on March 0 by the Chair, Dr.

More information

ETSI TS V8.7.0 ( ) Technical Specification

ETSI TS V8.7.0 ( ) Technical Specification TS 136 214 V8.7.0 (2009-10) Technical Specification LTE; Evolved Universal Terrestrial Radio Access (E-UTRA); Physical layer - Measurements (3GPP TS 36.214 version 8.7.0 Release 8) 1 TS 136 214 V8.7.0

More information

ETSI TS V8.1.0 ( ) Technical Specification

ETSI TS V8.1.0 ( ) Technical Specification TS 136 410 V8.1.0 (2009-01) Technical Specification LTE; Evolved Universal Terrestrial Radio Access Network (E-UTRAN); S1 layer 1 general aspects and principles (3GPP TS 36.410 version 8.1.0 Release 8)

More information

www.telecom-cloud.net Harish Vadada The 3rd Generation Partnership Project (3GPP) is collaboration between groups of telecommunications associations, known as the Organizational Partners. The initial scope

More information

IEEE Working Group on Broadband Wireless Access (BWA)

IEEE Working Group on Broadband Wireless Access (BWA) IEEE 802.16 2003-07-21 IEEE 802.16-03/32 03/32 Working Group on Broadband Wireless Access (BWA) Welcome IEEE 802.16 Working Group on Broadband Wireless Access 802.16 Session #26 Opening Plenary 21 July

More information

ETSI TS V ( )

ETSI TS V ( ) TS 138 522 V15.0.0 (2018-10) TECHNICAL SPECIFICATION 5G; NR; User Equipment (UE) conformance specification; Applicability of radio transmission, radio reception and radio resource management test cases

More information

ETSI TS V1.5.1 ( ) Technical Specification

ETSI TS V1.5.1 ( ) Technical Specification TS 100 392-15 V1.5.1 (2011-02) Technical Specification Terrestrial Trunked Radio (TETRA); Voice plus Data (V+D); Part 15: TETRA frequency bands, duplex spacings and channel numbering 2 TS 100 392-15 V1.5.1

More information

ETSI TR V1.2.1 ( )

ETSI TR V1.2.1 ( ) TR 100 392-17-3 V1.2.1 (2006-06) Technical Report Terrestrial Trunked Radio (TETRA); Voice plus Data (V+D); Part 17: TETRA V+D and DMO specifications; Sub-part 3: Release 1.3 2 TR 100 392-17-3 V1.2.1 (2006-06)

More information

ETSI TR V1.2.1 ( )

ETSI TR V1.2.1 ( ) TR 102 021-1 V1.2.1 (2005-05) Technical Report Terrestrial Trunked Radio (TETRA); User Requirement Specification TETRA Release 2; Part 1: General overview 2 TR 102 021-1 V1.2.1 (2005-05) Reference RTR/TETRA-01136

More information

ETSI TR V9.0.0 ( ) Technical Report

ETSI TR V9.0.0 ( ) Technical Report TR 136 913 V9.0.0 (2010-02) Technical Report LTE; Requirements for further advancements for Evolved Universal Terrestrial Radio Access (E-UTRA) (LTE-Advanced) (3GPP TR 36.913 version 9.0.0 Release 9) 1

More information

ETSI TS V8.2.0 ( ) Technical Specification

ETSI TS V8.2.0 ( ) Technical Specification TS 136 306 V8.2.0 (2008-11) Technical Specification LTE; Evolved Universal Terrestrial Radio Access (E-UTRA); User Equipment (UE) radio access capabilities (3GPP TS 36.306 version 8.2.0 Release 8) 1 TS

More information

ETSI TS V1.4.1 ( ) Technical Specification

ETSI TS V1.4.1 ( ) Technical Specification TS 100 392-15 V1.4.1 (2010-03) Technical Specification Terrestrial Trunked Radio (TETRA); Voice plus Data (V+D); Part 15: TETRA frequency bands, duplex spacings and channel numbering 2 TS 100 392-15 V1.4.1

More information

5G Standardization Status in 3GPP

5G Standardization Status in 3GPP As the radio interface of mobile phones has evolved, it has typically been changed about every ten years, and the 5G (5th Generation) interface is expected to start being used in the 2020s. Similar to

More information

WINNER+ Miia Mustonen VTT Technical Research Centre of Finland. Slide 1. Event: CWC & VTT GIGA Seminar 2008 Date: 4th of December 2008

WINNER+ Miia Mustonen VTT Technical Research Centre of Finland. Slide 1. Event: CWC & VTT GIGA Seminar 2008 Date: 4th of December 2008 Process and Requirements for IMT-Advanced Miia Mustonen VTT Technical Research Centre of Finland Slide 1 Outline Definitions Process and time schedule of IMT-Advanced Minimum requirements Technical Performance

More information

ETSI TS V9.1.0 ( )

ETSI TS V9.1.0 ( ) TS 137 571-3 V9.1.0 (2012-03) Technical Specification Universal Mobile Telecommunications System (UMTS); LTE; Universal Terrestrial Radio Access (UTRA) and Evolved UTRA (E-UTRA) and Evolved Packet Core

More information

ETSI TS V ( ) Technical Specification

ETSI TS V ( ) Technical Specification TS 136 214 V10.1.0 (2011-04) Technical Specification LTE; Evolved Universal Terrestrial Radio Access (E-UTRA); Physical layer; Measurements (3GPP TS 36.214 version 10.1.0 Release 10) 1 TS 136 214 V10.1.0

More information

Signaling Test Specification for Mobile Station Equipment Identifier (MEID) Support for cdma2000 Spread Spectrum Systems

Signaling Test Specification for Mobile Station Equipment Identifier (MEID) Support for cdma2000 Spread Spectrum Systems GPP C.P00-B Version. Version Date: March 0 Signaling Test Specification for Mobile Station Equipment Identifier (MEID) Support for cdma000 Spread Spectrum Systems GPP 0 GPP and its Organizational Partners

More information

SCOPE OF ACCREDITATION TO ISO/IEC 17025:2005

SCOPE OF ACCREDITATION TO ISO/IEC 17025:2005 SCOPE OF ACCREDITATION TO ISO/IEC 17025:2005 SGS KOREA CO., LTD. (GUNPO LABORATORY) Gunpo1-4, LS-ro 182beon-gil, Gunpo-si, Gyeonggi-do, South Korea Technical Manager Automotive EMC Elan Lee elan.lee@sgs.com

More information

ETSI TS V ( )

ETSI TS V ( ) TS 132 451 V15.0.0 (2018-07) TECHNICAL SPECIFICATION Universal Mobile Telecommunications System (UMTS); LTE; Telecommunication management; Key Performance Indicators (KPI) for Evolved Universal Terrestrial

More information

ETSI TS V9.1.1 ( ) Technical Specification

ETSI TS V9.1.1 ( ) Technical Specification TS 136 410 V9.1.1 (2011-05) Technical Specification LTE; Evolved Universal Terrestrial Radio Access Network (E-UTRAN); S1 general aspects and principles (3GPP TS 36.410 version 9.1.1 Release 9) 1 TS 136

More information

Update on ITU-R Working Party 5D on IMT-2020 for 5G

Update on ITU-R Working Party 5D on IMT-2020 for 5G CEPT Workshop on 5G Mobile Communications 2-4 November 2016 Mainz, Germany Update on ITU-R Working Party on IMT-2020 for 5G Hakan Ohlsen Vice-Chairman, ITU-R Working Party Stephen M. Blust Chairman, ITU-R

More information

3GPP: Evolution of Air Interface and IP Network for IMT-Advanced. Francois COURAU TSG RAN Chairman Alcatel-Lucent

3GPP: Evolution of Air Interface and IP Network for IMT-Advanced. Francois COURAU TSG RAN Chairman Alcatel-Lucent 3GPP: Evolution of Air Interface and IP Network for IMT-Advanced Francois COURAU TSG RAN Chairman Alcatel-Lucent 1 Introduction Reminder of LTE SAE Requirement Key architecture of SAE and its impact Key

More information

3GPP TS V ( )

3GPP TS V ( ) TS 36.410 V10.2.0 (2011-09) Technical Specification 3rd Generation Partnership Project; Technical Specification Group Radio Access Network; Evolved Universal Terrestrial Radio Access Network (E-UTRAN);

More information

TECHNICAL COMMITTEE No. 100: AUDIO, VIDEO AND MULTIMEDIA SYSTEMS AND EQUIPMENT

TECHNICAL COMMITTEE No. 100: AUDIO, VIDEO AND MULTIMEDIA SYSTEMS AND EQUIPMENT 100(Tel Aviv/Secretariat)30 For IEC use only 2010-10-22 INTERNATIONAL ELECTROTECHNICAL COMMISSION TECHNICAL COMMITTEE No. 100: AUDIO, VIDEO AND MULTIMEDIA SYSTEMS AND EQUIPMENT Decision list of Fifteenth

More information

ETSI TS V1.1.1 ( ) Technical Specification

ETSI TS V1.1.1 ( ) Technical Specification TS 100 392-3-8 V1.1.1 (2008-04) Technical Specification Terrestrial Trunked Radio (TETRA); Voice plus Data (V+D); Part 3: Interworking at the Inter-System Interface (ISI); Sub-part 8: Generic Speech Format

More information

ETSI TR V ( )

ETSI TR V ( ) TR 136 913 V15.0.0 (2018-09) TECHNICAL REPORT LTE; Requirements for further advancements for Evolved Universal Terrestrial Radio Access (E-UTRA) (LTE-Advanced) (3GPP TR 36.913 version 15.0.0 Release 15)

More information

ETSI TS V ( )

ETSI TS V ( ) TS 136 307 V8.11.0 (2014-03) Technical Specification LTE; Evolved Universal Terrestrial Radio Access (E-UTRA); Requirements on User Equipments (UEs) supporting a release-independent frequency band (3GPP

More information

ETSI TS V ( )

ETSI TS V ( ) Technical Specification Universal Mobile Telecommunications System (UMTS); LTE; Universal Terrestrial Radio Access (UTRA) and Evolved UTRA () and Evolved Packet Core (EPC); User Equipment (UE) conformance

More information

1. Introduction. 2. General 2(6)

1. Introduction. 2. General 2(6) ARRANGEMENT between the Electronic Communications Office of the Republic of Latvia and the Communications Regulations Authority of the Republic of Lithuania on shared use of the frequency band 453.000-457.475/

More information

INTERNATIONAL TELECOMMUNICATION UNION

INTERNATIONAL TELECOMMUNICATION UNION 参考資料 2 INTERNATIONAL TELECOMMUNICATION UNION Radiocommunication Bureau (Direct Fax N. +41 22 730 57 85) Administrative Circular CACE/564 22 March 2012 To Administrations of Member States of the ITU, Radiocommunication

More information

3GPP TS V ( )

3GPP TS V ( ) TS 37.571-3 V10.1.1 (2012-09) Technical Specification 3rd Generation Partnership Project; Technical Specification Group Radio Access Network; Universal Terrestrial Radio Access (UTRA) and Evolved UTRA

More information

3GPP TS V ( )

3GPP TS V ( ) TS 36.410 V12.1.0 (2014-12) Technical Specification 3rd Generation Partnership Project; Technical Specification Group Radio Access Network; Evolved Universal Terrestrial Radio Access Network (E-UTRAN);

More information

ETSI TS V ( )

ETSI TS V ( ) TS 137 571-5 V14.3.0 (2018-04) TECHNICAL SPECIFICATION Universal Mobile Telecommunications System (UMTS); LTE; Universal Terrestrial Radio Access (UTRA) and Evolved UTRA (E-UTRA) and Evolved Packet Core

More information

IEEE Session #14 Opening Plenary Presentation

IEEE Session #14 Opening Plenary Presentation IEEE 802.16 Session #14 Opening Plenary Presentation Document Number: IEEE 802.16-01/31 Date Submitted: 2001-07-09 Source: Roger Marks Venue: IEEE 802.16 Session #14 Base Document: none Purpose: To assist

More information

3GPP TS V ( )

3GPP TS V ( ) TS 37.571-3 V10.5.0 (2013-09) Technical Specification 3rd Generation Partnership Project; Technical Specification Group Radio Access Network; Universal Terrestrial Radio Access (UTRA) and Evolved UTRA

More information

ETSI TS V ( )

ETSI TS V ( ) Technical Specification LTE; Evolved Universal Terrestrial Radio Access (E-UTRA); User Equipment (UE) conformance specification; Radio transmission and reception; Part 2: Implementation Conformance Statement

More information

Radiocommunication Bureau (BR)

Radiocommunication Bureau (BR) 参考資料 3 Radiocommunication Bureau (BR) Administrative Circular CACE/811 16 May 2017 To Administrations of Member States of the ITU, Radiocommunication Sector Members, ITU R Associates participating in the

More information

ETSI TS V8.3.0 ( ) Technical Specification

ETSI TS V8.3.0 ( ) Technical Specification TS 123 272 V8.3.0 (2009-03) Technical Specification Digital cellular telecommunications system (Phase 2+); Universal Mobile Telecommunications System (UMTS); LTE; Circuit Switched (CS) fallback in Evolved

More information

Status report of ETSI STC SMG2 to SMG#25

Status report of ETSI STC SMG2 to SMG#25 ETSI TC SMG Tdoc SMG 175/98 Meeting no 25 Sophia Antipolis, France 16-20 March 1998 Source: SMG2 Secretary and Chairman Date: 13 March 1998 Status report of ETSI STC SMG2 to SMG#25 Abstract: This document

More information

The following ETSI documents are issued under the. Comments are welcome and should be addressed to the named contact to arrive by 16 July 2013.

The following ETSI documents are issued under the. Comments are welcome and should be addressed to the named contact to arrive by 16 July 2013. I (EUROPEAN TELECOMMUNICATIONS STANDARDS INSTITUTE) EUROPEAN PUBLICATIONS EN 300 019-2-2: April 2013 (Version 2.3.1) Environmental Engineering (EE). Environmental conditions and environmental tests for

More information

ITU-R activities on 5G

ITU-R activities on 5G IEEE WCNC 2015 New Orleans, USA 9-12 March 2015 ITU-R activities on 5G Colin Langtry Chief, Radiocommunication Study Groups Department ITU-T Telecommunication standardization - network and service aspects

More information

ETSI TS V5.4.0 ( )

ETSI TS V5.4.0 ( ) Technical Specification Universal Mobile Telecommunications System (UMTS); UTRA Repeater; Radio transmission and reception () 1 Reference RTS/TSGR-0425106v540 Keywords UMTS 650 Route des Lucioles F-06921

More information

3GPP TS V8.9.0 ( )

3GPP TS V8.9.0 ( ) TS 36.306 V8.9.0 (2013-03) Technical Specification 3rd Generation Partnership Project; Technical Specification Group Radio Access Network; Evolved Universal Terrestrial Radio Access (E-UTRA); User Equipment

More information

ETSI TS V ( )

ETSI TS V ( ) TS 138 202 V15.2.0 (2018-07) TECHNICAL SPECIFICATION 5G; NR; Services provided by the physical layer (3GPP TS 38.202 version 15.2.0 Release 15) 1 TS 138 202 V15.2.0 (2018-07) Reference DTS/TSGR-0138202vf20

More information

ETSI TS V ( )

ETSI TS V ( ) TS 123 216 V11.7.0 (2013-01) Technical Specification Digital cellular telecommunications system (Phase 2+); Universal Mobile Telecommunications System (UMTS); LTE; Single Radio Voice Call Continuity (SRVCC);

More information

ETSI TR V3.0.0 ( )

ETSI TR V3.0.0 ( ) TR 121 910 V3.0.0 (2000-07) Technical Report Universal Mobile Telecommunications System (UMTS); Multi-mode User Equipment (UE) issues; Categories principles and procedures (3G TR 21.910 version 3.0.0 Release

More information

ETSI TS V ( )

ETSI TS V ( ) TS 136 521-3 V14.5.0 (2018-09) TECHNICAL SPECIFICATION LTE; Evolved Universal Terrestrial Radio Access (E-UTRA); User Equipment (UE) conformance specification; Radio transmission and reception; Part 3:

More information

ETSI documents published or circulated for vote/comment in December 2018

ETSI documents published or circulated for vote/comment in December 2018 ETSI documents published or circulated for vote/comment in December 2018 ETSI documents issued under AP20190307. Comments should be sent to the named contact by 05/02/2019 EN 300 338-1 Technical characteristics

More information

ETSI TS V ( )

ETSI TS V ( ) TS 134 114 V10.3.0 (2012-07) Technical Specification Digital cellular telecommunications system (Phase 2+); Universal Mobile Telecommunications System (UMTS); LTE; User Equipment (UE) / Mobile Station

More information

ETSI TS V ( ) Technical Specification

ETSI TS V ( ) Technical Specification TS 132 450 V10.1.0 (2011-06) Technical Specification Universal Mobile Telecommunications System (UMTS); LTE; Telecommunication management; Key Performance Indicators (KPI) for Evolved Universal Terrestrial

More information

ETSI TS V8.1.0 ( ) Technical Specification

ETSI TS V8.1.0 ( ) Technical Specification TS 125 144 V8.1.0 (2009-03) Technical Specification Universal Mobile Telecommunications System (UMTS); User Equipment (UE) and Mobile Station (MS) over the air performance requirements (3GPP TS 25.144

More information

Overview of some standardization activities on Cognitive Radio

Overview of some standardization activities on Cognitive Radio Overview of some standardization activities on Cognitive Radio Patricia MARTIGNE France Telecom R&D patricia.martigne@orange-ftgroup.com 1 A standardization roadmap 2006 2007 2008 2009 2010 2011 ITU-R

More information

Terrestrial Trunked Radio (TETRA); Voice plus Data (V+D); Part 10: Supplementary services stage 1; Sub-part 22: Dynamic Group Number Assignment (DGNA)

Terrestrial Trunked Radio (TETRA); Voice plus Data (V+D); Part 10: Supplementary services stage 1; Sub-part 22: Dynamic Group Number Assignment (DGNA) Final draft EN 300 392-10-22 V1.2.1 (2001-09) European Standard (Telecommunications series) Terrestrial Trunked Radio (TETRA); Voice plus Data (V+D); Part 10: Supplementary services stage 1; Sub-part 22:

More information

ETSI TR V5.0.1 ( )

ETSI TR V5.0.1 ( ) TR 143 026 V5.0.1 (2002-07) Technical Report Digital cellular telecommunications system (Phase 2+); Multiband operation of GSM / DCS 1800 by a single operator (3GPP TR 43.026 version 5.0.1 Release 5) GLOBAL

More information

Introduction to cdma2000 Standards for Spread Spectrum Systems Release C

Introduction to cdma2000 Standards for Spread Spectrum Systems Release C Version.0 Date: May 8, 00 Introduction to cdma000 Standards for Spread Spectrum Systems Release C GPP 00 GPP and its Organizational Partners claim copyright in this document and individual Organizational

More information

b. A roll call was completed and confirmed that there was a quorum of 22 present for this meeting (a minimum of 15 is required).

b. A roll call was completed and confirmed that there was a quorum of 22 present for this meeting (a minimum of 15 is required). MINUTES API Subcommittee 17 (SC17) Subsea Production Equipment 2017 Summer Committee Meeting Lloyd s Register Training Center, Houston, Texas Wednesday, June 14, 2017 Brian Skeels, (Co) Vice-Chairman Ross

More information

APT RECOMMENDATION USE OF THE BAND MHZ FOR PUBLIC PROTECTION AND DISASTER RELIEF (PPDR) APPLICATIONS

APT RECOMMENDATION USE OF THE BAND MHZ FOR PUBLIC PROTECTION AND DISASTER RELIEF (PPDR) APPLICATIONS APT RECOMMENDATION on USE OF THE BAND 4940-4990 MHZ FOR PUBLIC PROTECTION AND DISASTER RELIEF (PPDR) APPLICATIONS No. APT/AWF/REC-01(Rev.1) Edition: September 2006 Approved By The 31 st Session of the

More information

TELECOMMUNICATION STANDARDIZATION SECTOR

TELECOMMUNICATION STANDARDIZATION SECTOR INTERNATIONAL TELECOMMUNICATION UNION TELECOMMUNICATION STANDARDIZATION SECTOR STUDY PERIOD 2001-2004 ITU-T Special Study Group on IMT-2000 and Beyond CHAIRMAN S LETTER TO EXTERNAL ORGANIZATIONS TITLE:

More information

PRELIMINARY PROGRAMME

PRELIMINARY PROGRAMME ICG EXPERTS MEETING: GLOBAL NAVIGATION SATELLITE SYSTEMS SERVICES 14-18 December 2015 Vienna International Centre, Vienna, Austria Organized by International Committee on Global Navigation Satellite Systems

More information

International Telecommunication Union

International Telecommunication Union International Telecommunication Union ITU-R standardization of IMT-Advanced ITU-D Regional Development Forum for the Arab Region: "NGN and Broadband, Opportunities and Challenges Cairo (Egypt) 13-15 December

More information

ETSI TS V ( )

ETSI TS V ( ) TS 123 272 V10.7.0 (2012-03) Technical Specification Digital cellular telecommunications system (Phase 2+); Universal Mobile Telecommunications System (UMTS); LTE; Circuit Switched (CS) fallback in Evolved

More information

3GPP TS V ( )

3GPP TS V ( ) TS 32.451 V10.0.0 (2011-03) Technical Specification 3rd Generation Partnership Project; Technical Specification Group Services and System Aspects; Telecommunication management; Key Performance Indicators

More information

DraftETSI EN V1.2.1 ( )

DraftETSI EN V1.2.1 ( ) Draft EN 301 213-2 V1.2.1 (2000-04) European Standard (Telecommunications series) Fixed Radio Systems; Point-to-multipoint equipment; Point-to-multipoint digital radio systems in frequency bands in the

More information

ETSI TS V ( )

ETSI TS V ( ) TS 137 571-3 V14.3.1 (2018-01) TECHNICAL SPECIFICATION Universal Mobile Telecommunications System (UMTS); LTE; Universal Terrestrial Radio Access (UTRA) and Evolved UTRA (E-UTRA) and Evolved Packet Core

More information

Statement on variation of 900 MHz and 1800 MHz Wireless Telegraphy Act licences

Statement on variation of 900 MHz and 1800 MHz Wireless Telegraphy Act licences Statement on variation of 900 MHz and 1800 MHz Wireless Telegraphy Act licences Statement Publication date: 06 January 2011 Contents Section Page 1 Executive summary 1 2 Introduction 2 3 Assessment of

More information

24.25 and 86 GHz. WRC-19 agenda item 1.13 IMT-2020 between. Cindy Cook Chairman, TG 5/1

24.25 and 86 GHz. WRC-19 agenda item 1.13 IMT-2020 between. Cindy Cook Chairman, TG 5/1 Document WRC-19-IRWSP-17/12-E 16 November 2017 English only 1 st ITU INTER-REGIONAL WORKSHOP ON WRC-19 PREPARATION (Geneva, 21-22 November 2017) WRC-19 agenda item 1.13 IMT-2020 between 24.25 and 86 GHz

More information

ETSI TS V1.2.1 ( ) Technical Specification. Terrestrial Trunked Radio (TETRA); RF Sensitive Area Mode

ETSI TS V1.2.1 ( ) Technical Specification. Terrestrial Trunked Radio (TETRA); RF Sensitive Area Mode TS 101 975 V1.2.1 (2007-07) Technical Specification Terrestrial Trunked Radio (TETRA); RF Sensitive Area Mode 2 TS 101 975 V1.2.1 (2007-07) Reference RTS/TETRA-01069 Keywords TETRA, radio, MS 650 Route

More information

ETSI TS V ( ) Technical Specification

ETSI TS V ( ) Technical Specification TS 123 272 V10.4.0 (2011-06) Technical Specification Digital cellular telecommunications system (Phase 2+); Universal Mobile Telecommunications System (UMTS); LTE; Circuit Switched (CS) fallback in Evolved

More information

TCCA PMR Spectrum position

TCCA PMR Spectrum position TCCA 14 Blandford Square Newcastle upon Tyne NE1 4HZ UK +44 191 231 4328 admin@tandcca.com TCCA PMR Spectrum position This paper sets out the current (October 2016) TCCA position on spectrum for critical

More information

ETSI EN V1.2.1 ( )

ETSI EN V1.2.1 ( ) EN 300 113-2 V1.2.1 (2002-04) Candidate Harmonized European Standard (Telecommunications series) Electromagnetic compatibility and Radio spectrum Matters (ERM); Land mobile service; Radio equipment intended

More information

TheR&DandStandardization Activities of ARIB

TheR&DandStandardization Activities of ARIB TheR&DandStandardization Activities of ARIB Kohei Satoh Managing Director, Association of Radio Industries and Businesses (ARIB) Received: 29 March, 2013; Accepted: 9 October, 2013 Abstract Radio systems

More information

Awarded the special prize of broadcasting technology of the 40th Hoso Bunka Foundation Award

Awarded the special prize of broadcasting technology of the 40th Hoso Bunka Foundation Award October 2014 Awarded the special prize of broadcasting technology of the 40th Hoso Bunka Foundation Award Presentation ceremony of the 40th Hoso Bunka Foundation (HBF* ) Award was held in Tokyo on 25 June

More information

3GPP TSG RAN WG2 TR V0.1.0: on Opportunity Driven Multiple Access

3GPP TSG RAN WG2 TR V0.1.0: on Opportunity Driven Multiple Access Technical Specification Group - Radio Access Network Miami, 17 th to 19 th June 1999 TSGRP#4(99)318 Agenda Item: 7 Source: TSG RAN WG2 Title: (ODMA) 3GPP TSG RAN WG2 TR 25.924 V0.1.0: on Opportunity Driven

More information

ARIB STD-T V10.5.0

ARIB STD-T V10.5.0 ARIB STD-T63-36.521-2 V10.5.0 User Equipment (UE) conformance specification; Radio transmission and reception; Part 2: Implementation Conformance Statement (ICS) (Release 10) Refer to Industrial Property

More information

ITU-T SSG: IMT-2000 Core Network Activities

ITU-T SSG: IMT-2000 Core Network Activities ITU-T SSG: IMT-2000 Core Network Activities 1.2: ITU and IMT-2000 Overview ITU-BDT Regional Seminar on IMT-2000 for the Arab Region, Doha, Qatar 29 Sept. - 1 Oct. 2003 John Visser, P.Eng. Chairman, ITU-T

More information

3GPP TS V ( )

3GPP TS V ( ) TS 23.272 V9.15.0 (2013-09) Technical Specification 3rd Generation Partnership Project; Technical Specification Group Services and System Aspects; Circuit Switched (CS) fallback in Evolved Packet System

More information

ASC X12N/TG4/ Group Minutes X12N TG4 Implementation Guides ASC X12 Trimester Meeting (Jun. 7 Jun. 10, 2004)

ASC X12N/TG4/ Group Minutes X12N TG4 Implementation Guides ASC X12 Trimester Meeting (Jun. 7 Jun. 10, 2004) ASC X12N/TG4/2004-19 Group Minutes X12N TG4 Implementation Guides ASC X12 Trimester Meeting (Jun. 7 Jun. 10, 2004) Chair(s) Name Company Term End Date Email Pete Anderson UnitedHealth Group June 2006 pete_anderson@uhc.com

More information

IEEE l-00/16. IEEE Broadband Wireless Access Working Group <http://ieee802.org/16>

IEEE l-00/16. IEEE Broadband Wireless Access Working Group <http://ieee802.org/16> Project Title Date Submitted IEEE 802.16 Broadband Wireless Access Working Group Report on ITU-R JRG 8A-9B (Wireless Access) and Related Activities in ITU-R 2000-07-08 Source(s)José

More information

ETSI TR V (201

ETSI TR V (201 TR 136 903 V12.8.0 (201 16-01) TECHNICAL REPORT LTE; Evolved Universal Terrestrial Radio Access (E-UTRA) Universal Terrestrial and Evolved Radio Access Network (E-UTRAN); Derivation of test tolerances

More information

3GPP TS V ( )

3GPP TS V ( ) TS 23.272 V12.5.0 (2015-03) Technical Specification 3rd Generation Partnership Project; Technical Specification Group Services and System Aspects; Circuit Switched (CS) fallback in Evolved Packet System

More information

ETSI TS V8.0.0 ( ) Technical Specification

ETSI TS V8.0.0 ( ) Technical Specification Technical Specification Digital cellular telecommunications system (Phase 2+); Enhanced Full Rate (EFR) speech processing functions; General description () GLOBAL SYSTEM FOR MOBILE COMMUNICATIONS R 1 Reference

More information

ETSI TS V ( )

ETSI TS V ( ) TS 126 171 V14.0.0 (2017-04) TECHNICAL SPECIFICATION Digital cellular telecommunications system (Phase 2+) (GSM); Universal Mobile Telecommunications System (UMTS); LTE; Speech codec speech processing

More information

3GPP TS V ( )

3GPP TS V ( ) TS 36.307 V10.20.0 (2016-09) Technical Specification 3rd Generation Partnership Project; Technical Specification Group Radio Access Network; Evolved Universal Terrestrial Radio Access (E-UTRA); Requirements

More information

TS-3GB-N.S0017-Bv1.0 International Implementation of Wireless Telecommunication Systems Compliant with JJ-70.11

TS-3GB-N.S0017-Bv1.0 International Implementation of Wireless Telecommunication Systems Compliant with JJ-70.11 TS-GB-N.S00-Bv.0 International Implementation of Wireless Telecommunication Systems Compliant with JJ-0. May 0, 00 THE TELECOMMUNICATION TECHNOLOGY COMMITTEE TS-GB-N.S00-Bv.0 International Implementation

More information

Stoa Administrative Calendar

Stoa Administrative Calendar January o Select next year's NITOC TD to shadow this year's TD at NITOC (or earlier -Ideally this would happen ahead of time, so that the process would begin whenever the current TD begins working on the

More information

Title: LE Task Group Report - Session #45

Title: LE Task Group Report - Session #45 Title: LE Task Group Report - Session #45 Document Number: IEEE 802.16h-06/025r1 Date Submitted: September 28, 2006 Source: Chair of LE TG: Mariana Goldhamer Voice:+972 3 645 6241 mariana.goldhamer@alvarion.com

More information

3GPP TS V ( )

3GPP TS V ( ) TS 32.450 V13.0.0 (2016-01) Technical Specification 3rd Generation Partnership Project; Technical Specification Group Services and System Aspects; Telecommunication management; Key Performance Indicators

More information

ARIB STD-T V

ARIB STD-T V ARIB STD-T104-36.307 V11.17.0 Evolved Universal Terrestrial Radio Access (E-UTRA); Requirements on User Equipments (UEs) supporting a release-independent frequency band (Release 11) Refer to Industrial

More information

Final draft ETSI EN V2.1.1( )

Final draft ETSI EN V2.1.1( ) Final draft EN 300 132-3-0 V2.1.1(2011-10) European Standard Environmental Engineering (EE); Power supply interface at the input to telecommunications and datacom (ICT) equipment; Part 3: Operated by rectified

More information

IE047: TETRA Radio Telecoms System

IE047: TETRA Radio Telecoms System IE047: TETRA Radio Telecoms System IE047 Rev.001 CMCT COURSE OUTLINE Page 1 of 8 Training Description: Terrestrial Trunked Radio (TETRA) comprises of digital trunked mobile standards developed by the European

More information

Finding right frequencies

Finding right frequencies Finding right frequencies - new additional spectrum for future UMTS / IMT systems Lasse Wieweg World LTE Conference, Berlin - 17 July 2011 Agenda UMTS Forum contributions to the work on IMT the study work

More information

ETSI TS V ( )

ETSI TS V ( ) TS 132 450 V15.0.0 (2018-07) TECHNICAL SPECIFICATION Universal Mobile Telecommunications System (UMTS); LTE; Telecommunication management; Key Performance Indicators (KPI) for Evolved Universal Terrestrial

More information

Band Class Specification for cdma2000 Spread Spectrum Systems

Band Class Specification for cdma2000 Spread Spectrum Systems GPP C.S00-B Version.0 Date: August, 00 Band Class Specification for cdma000 Spread Spectrum Systems Revision B COPYRIGHT GPP and its Organizational Partners claim copyright in this document and individual

More information

Quality comparison of wideband coders including tandeming and transcoding

Quality comparison of wideband coders including tandeming and transcoding ETSI Workshop on Speech and Noise In Wideband Communication, 22nd and 23rd May 2007 - Sophia Antipolis, France Quality comparison of wideband coders including tandeming and transcoding Catherine Quinquis

More information

ETSI TS V ( )

ETSI TS V ( ) TS 123 272 V15.0.0 (2018-07) TECHNICAL SPECIFICATION Digital cellular telecommunications system (Phase 2+) (GSM); Universal Mobile Telecommunications System (UMTS); LTE; Circuit Switched (CS) fallback

More information

ETSI TS V (201

ETSI TS V (201 TS 136 307 V11.16.0 (201 16-08) TECHNICAL SPECIFICATION LTE; Evolved Universal Terrestrial Radio Access (E-UTRA); on User Equipments (UEs) supporting a release-independent frequency band Requirements (3GPP

More information

Advanced Warning Message Distribution Platform for the Next-generation Mobile Communication Network

Advanced Warning Message Distribution Platform for the Next-generation Mobile Communication Network SAE Emergency Warning System Area Mail Special Articles on SAE Standardization Technology Advanced Warning Message Distribution Platform for the Next-generation Mobile Communication Network 3GPP Release

More information

ETSI TS V1.1.1 ( )

ETSI TS V1.1.1 ( ) TS 100 392-3-7 V1.1.1 (2003-12) Technical Specification Terrestrial Trunked Radio (TETRA); Voice plus Data (V+D); Part 3: Interworking at the Inter-System Interface (ISI); Sub-part 7: Speech Format Implementation

More information

SCOPE OF ACCREDITATION TO ISO/IEC 17025:2005

SCOPE OF ACCREDITATION TO ISO/IEC 17025:2005 SCOPE OF ACCREDITATION TO ISO/IEC 17025:2005 CETECOM LIMITED 1 RN. 221, Dusanventuredigme Bldg. 415 Heungan-daero, Dongan-gu Anyang-si, Gyeonggi-do, 14059 South Korea Authorized Representative: Norbert

More information

ETSI TR V ( )

ETSI TR V ( ) TR 136 932 V14.0.0 (2017-04) TECHNICAL REPORT LTE; Scenarios and requirements for small cell enhancements for E-UTRA and E-UTRAN (3GPP TR 36.932 version 14.0.0 Release 14) 1 TR 136 932 V14.0.0 (2017-04)

More information