GB FREQUENCY HVDC FREQUENCY RESPONSE PARAMTERS HVDC CONNECTIONS (TITLE II)
|
|
- Briana Jackson
- 5 years ago
- Views:
Transcription
1 GB FREQUENCY HVDC FREQUENCY RESPONSE PARAMTERS HVDC CONNECTIONS (TITLE II) HVDC Article 11 Range Requirement Range Suggested GB Value Comments Hz 60 seconds Hz 60 seconds Hz Hz than RfG and DCC and DC PPm s (ie 90 minutes plus) than RfG and DCC and DC PPm s (ie 90 minutes plus) Hz 100 minutes Hz 100 minutes Hz Unlimited Hz Unlimited Hz 51.5Hz - 52 than RfG and DCC and DC PPm s (ie 90 minutes plus) Hz 100 minutes 51.5Hz minutes Mandatory requirement s may be agreed Work group to s may be agreed Work group to GB s may be agreed Work group to Policy Req d? (e.g. ncompatibility to be defined) Change req d?
2 12 ROCOF -2.5 to +2.5Hz/s than DC PPm s (ie 15 minutes plus) Measured over the previous 1 second -2.5 to +2.5Hz/s Measured over the previous 1 second s may be agreed Work group to Mandatory requirement 13(1)(a)(i) 13(1)(a)(ii) 13(1)(a)(iii) Controlability and Power Step Size for Transmitting HVDC Active Power Transmission capacity for each direction below which active power transmission is not requested The maximum delay within which the Max Step Size = 1MW Min Step Size = 1MW to believed to be part of data submission as part of trading in wholesale market / TSOG? to MW transfer should be controllable to the nearest whole MW to MW transfer should be controllable to the nearest whole MW 2 minutes as per BC2
3 13(1)(b) 13(1)(c) 13(1)(d) HVDC System shall be capable of adjusting the transmitted active power upon receipt of request from the relevant TSO Capability of modifying transmitted infeed in case of disturbances into one or more AC networks Reversal Ability to modify transmitted active power for the purpose of cross boarder balancing t specified Covered by Fault Ride Through additional text to be added for HVDC and delays greater than 10ms Would be required only on a site specific basis and would be specified in the Bilateral Agreement. General Grid Mod to refer to the requirement and delay Covered by CC through the requirement to have a load controller and the Balancing s General words required in relation to Power Reversal?
4 13(2) Ramp Rate Limit adjustment 13(3) Automatic Remedial Action t specified Ramp Rate Limits covered under BC1.A.1.1 Adjustment of Ramp Rates below the limits of BC1.A.1.1 are permissible see BC1 Other than the current requirements under the Balancing s any other requirements would be specified under the Bilateral Agreement 14 Synthetic Inertia t required see FFCI requirements Option 1 15 FSM, LFSM-O, LFSM-U Annex II(A)(1) FSM Deadband 0 ±500mHz Deadband 0 RfG See Insensitivity Annex II(A)(1)(d) Droop S1(u) Droop S2(d) Insensitivity 0.1% 0.1% 30mHz 0.5 seconds DroopS1 (u) 3 5% DroopS2 (d) 3 5% for upward regulation Insensitivity 15mHz for Deadband 0.5 seconds RfG for non synchronous Only by reference to additional requirements being specified in the Bilateral Current Grid does not make this clear Introduce term insensitivity as per RfG
5 Annex II(B)(1) Annex II(c)(1) LFSM-O LFSM-U 16 Control delay t1 delay t1 plant set to 1s Time t2 30 seconds Time t2 10 seconds RfG and current Grid practice Threshold f1 Droop S3 0.1% upwards Initial Full Threshold f2 Droop S4 0.1% Initial Full Modulation of Active Power in relation to Hz Threshold f1 50.4Hz Droop S2 10% or less Initial Full <2s RfG 10s current RfG Hz Threshold f2 49.5Hz Droop S4 10% RfG upwards Initial <2s RfG Full Modulation of Active Power in relation to To be determined plant Dependent CC of Grid Discuss with Working Group Discuss with Working Group
6 17 Loss of Active Power Changes Changes Loss of 1800MW 37 Black Start Black Start Specified in Bilateral Agreement in the same way as Generation SQSS with and Bilateral Agreement
Parameters related to frequency stability
Parameters related to frequency stability EN-E guidance document for national implementation for network codes on grid connection 16 November 2016 EN-E AISBL Avenue de Cortenbergh 100 1000 Brussels Belgium
More informationENTSO-E Draft Network Code on High Voltage Direct Current Connections and DCconnected
ENTSO-E Draft Network Code on High Voltage Direct Current Connections and DCconnected Power Park Modules 30 April 2014 Notice This document reflects the work done by ENTSO-E in line with ACER s framework
More informationDRAFT PROPOSAL FOR NC HVDC REQUIREMENTS OF GENERAL APPLICATION
DRAFT PROPOSAL FOR NC REQUIREMENTS OF GENERAL APPLICATION December 2017 TABLE OF CONTENTS Table of Contents... 2 Introduction... 6 1. Scope of application... 8 2. TITLE II: General s for connections...
More informationINITIAL RfG FREQUENCY PARAMETER SELECTION. BASED ON DRAFT RfG VALUES. Requirement Range Suggested GB Value Comments
INITIAL RfG FREQUENCY PARAMETER SELECTION BASED ON DRAFT RfG VALUES Issue Article Level of Difficulty (1-5) Type A 1. 13.1(a) Frequency Ranges Requirement Range Suggested GB Value Comments 47 47.5Hz 47.5
More informationRequirements for Generators European Network Code High Level Implementation Issues
Requirements for Generators European Network Code High Level Implementation Issues Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be
More informationeach time the Frequency is above 51Hz. Continuous operation is required
GC0101 EXTRACT OF EUROPEAN CONNECTION CONDITIONS LEGAL TEXT DATED 08/01/2018. ECC.6 ECC.6.1 ECC.6.1.1 ECC.6.1.2 ECC.6.1.2.1 ECC.6.1.2.1.1 ECC.6.1.2.1.2 ECC.6.1.2.1.3 TECHNICAL, DESIGN AND OPERATIONAL CRITERIA
More informationPROPOSAL FOR NC RFG REQUIREMENTS OF GENERAL APPLICATION
PROPOSAL FOR NC RFG REQUIREMENTS OF GENERAL APPLICATION proposal following Art. 7(4) of the NC RfG 17 May 2018 Contents 1 Introduction... 3 2 Proposal for determination of significance [Art 5]... 5 2.1
More informationPROPOSAL FOR NC RFG REQUIREMENTS OF GENERAL APPLICATION
PROPOSAL FOR NC RFG REQUIREMENTS OF GENERAL APPLICATION Public consultation 15 March 23 April 2018 Contents 1 Introduction... 3 2 Proposal for determination of significance [Art 5]... 5 2.1 Conditions
More informationTABLE 1 COMPARISION OF ENTSO-E RfG TO GB GRID CODE
TABLE 1 Comparison to ENTSO-E RfG (Comparison based on Issue 5 Revision 11 only and ENSTO - E RFG Version dated 14 January 2014) (Note Does not include other Industry Codes) Table 1 compares the ENTSO-E
More informationConstant Terminal Voltage. Working Group 1 29 st January 2014
Constant Terminal Voltage Working Group 1 29 st January 2014 Overview Objectives of Working Group ENTSO-E RfG Implications Options Summary Discussion 2 Objectives of Work Group National Grid in consultation
More informationDRAFT PROPOSAL FOR NC RFG REQUIREMENTS OF GENERAL APPLICATION
DRAFT PROPOSAL FOR NC RFG REQUIREMENTS OF GENERAL APPLICATION September 2017 Contents 1 Introduction... 3 2 Proposal for determination of significance [Art 5]... 4 2.1 Conditions for the choice of the
More informationDRAFT PROPOSAL FOR STORAGE CONNECTION REQUIREMENTS
DRAFT PROPOSAL FOR STORAGE CONNECTION REQUIREMENTS December 2017 Contents 1 Background and reading instructions... 2 2 Definitions and applicability... 2 3 SPM categories types... 3 4 SPM Type A... 4 4.1
More informationNetwork Code for HVDC Connections and DC-connected Power Park Modules Requirement Outlines
Network Code for HVDC Connections and DC-connected Power Park Modules Requirement Outlines 30 April 2014 Disclaimer: This document is not legally binding. It only aims at clarifying the content of the
More informationTECHNICAL OVERVIEW OF IMPACTING REQUIREMENTS FOR THE CATEGORIZATION OF THE POWER GENERATING MODULES
TECHNICAL OVERVIEW OF IMPACTING REQUIREMENTS FOR THE CATEGORIZATION OF THE POWER GENERATING MODULES Task Force Implementation Network Codes 27/01/2017 Contents 1 Introduction... 2 2 Proposal for determination
More informationParameters related to voltage issues
Parameters related to voltage issues EN-E guidance document for national implementation for network codes on grid connection 16 November 2016 EN-E AISBL Avenue de Cortenbergh 100 1000 Brussels Belgium
More informationAutomatic connection/reconnection and admissible rate of change of active power
Automatic connection/reconnection and admissible rate of change of active power ENTSO-E guidance document for national implementation of conditions for automatic connection / reconnection after incidental
More informationSELECTING NATIONAL MW BOUNDARIES
SELECTING NATIONAL MW BOUNDARIES ENTSO-E guidance document for national implementation for network codes on grid connection 16 November 2016 Table of Contents DESCRIPTION...2 Codes(s) and Article(s)...2
More informationFNN comments on NC HVDC submitted to ENTSO E
the term HV is not defined > A further definition should be applied since the term is used all through the code A lot of terms from the Network Code RfG are used and should be checked regarding consistency
More informationDeleted: 9 4 anuary ... [1] Deleted: much more. Formatted ... [2] Formatted Table. Formatted: Indent: Left: 0.06 cm
(Comparison based on GB Grid Code Issue 4 Revision 13 only and ENSTO - E RFG Internal Version dated 6 June 01) (Note Does not include other Industry Codes) Table compares the GB Grid Code with the ENTSO-E
More informationINCIDENTS CLASSIFICATION SCALE METHODOLOGY
8 May 2014 WORKING GROUP INCIDENT CLASSIFICATION UNDER SYSTEM OPERATIONS COMMITTEE Contents Revisions... 5 References and Related documents... 5 Change request... 5 1. Overview... 6 1.1 Objectives and
More informationEUROPEAN COMPLIANCE PROCESSES (post RfG Implementation) CONTENTS. (This contents page does not form part of the Grid Code) Paragraph No/Title
EUROPEAN COMPLIANCE PROCESSES (post RfG Implementation) CONTENTS (This contents page does not form part of the Grid Code) Paragraph No/Title Page No ECP.1 INTRODUCTION... 2 ECP.2 OBJECTIVE... 3 ECP.3 SCOPE...
More informationKey DRAFT EUROPEAN CONNECTION CONDITIONS LEGAL TEXT DATED 13/12/17
Key DRAFT EUROPEAN CONNECTION CONDITIONS LEGAL TEXT DATED 13/12/17 Formatted: Highlight 1) Blue Text From Grid Code 2) Black Text Changes / Additional words 3) Orange/ Brown text From RfG 4) Purple From
More informationEUROPEAN COMPLIANCE PROCESSES (post RfG Implementation) CONTENTS. (This contents page does not form part of the Grid Code) Paragraph No/Title
EUROPEAN COMPLIANCE PROCESSES (post RfG Implementation) Style Definition: TOC 1: Right: -0.59 cm CONTENTS (This contents page does not form part of the Grid Code) Paragraph No/Title Page No ECP.1 INTRODUCTION...
More informationHigh Wind Speed Shutdown / Power Available
High Wind Speed Shutdown / Power Available Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight line.
More informationAnnex 2 - Proposed Grid Code Legal Text
Annex 2 - Proposed Grid Code Legal Text FAULT RIDE THROUGH LEGAL TEXT This section contains the proposed legal text to give effect to the proposals. The proposed new text is in red and is based on Grid
More informationOPERATIONAL RESERVE AD HOC TEAM REPORT
OPERATIONAL RESERVE AD HOC TEAM REPORT FINAL VERSION WORKING DRAFT FOR THE PURPOSE OF FACILITATING AD HOC TEAM DISCUSSION WITHIN THE CONTEXT OF THE FUTURE NETWORK CODE LFC&R VERSION 6 Disclaimer This version
More informationWFPS1 WIND FARM POWER STATION GRID CODE PROVISIONS
WFPS1 WIND FARM POWER STATION GRID CODE PROVISIONS WFPS1.1 INTRODUCTION 2 WFPS1.2 OBJECTIVE 2 WFPS1.3 SCOPE 3 WFPS1.4 FAULT RIDE THROUGH REQUIREMENTS 4 WFPS1.5 FREQUENCY REQUIREMENTS 5 WFPS1.6 VOLTAGE
More informationIndication of Dynamic Model Validation Process
Indication of Dynamic Model Validation Process Document Identifier Written by David Cashman Document Version Draft Checked by Date of Current Issue November 2013 Approved by Jon O Sullivan Disclaimer EirGrid,
More informationForward Looking Frequency Trends Technical Brief ERS Framework 1 Measures 1, 2, and 4: Forward Looking Frequency Analysis
Forward Looking Frequency Trends Technical Brief ERS Framework 1 Measures 1, 2, and 4: Forward Looking Frequency Analysis The NERC Planning Committee and Operating Committee jointly created the Essential
More informationMandatory Frequency Response
Mandatory Frequency Response A guide to the services procured by National Grid to manage the system frequency Version 1.1 National Grid is an international electricity and gas company responsible for operating
More informationMax voltage in 400 kv Networks
Max voltage in 400 kv Networks ENTSO-E GC ESC, 08, Brussels 1 Summary NEED TO WITHSTAND WIDE VOLTAGE RANGE 3 EXISTING CONNECTION RULES 4 KEMA REPORT ON RFG 5 STUDIES ABOUT TOV 6 REFERENCE TO EU NC REGULATIONS
More informationHarmonizing the Changing Resource Mix Keeping the Grid Together
Harmonizing the Changing Resource Mix Keeping the Grid Together Robert W. Cummings Senior Director of Engineering and Reliability Initiatives i-pcgrid March 30, 2017 NERC-IEEE Memorandum of Understanding
More informationIEEE sion/1547revision_index.html
IEEE 1547 IEEE 1547: Standard for Interconnection and Interoperability of Distributed Energy Resources with Associated Electric Power Systems Interfaces http://grouper.ieee.org/groups/scc21/1547_revi sion/1547revision_index.html
More informationGrid Code Review Panel. Information Required to Evaluate Subsynchrononous Resonance on the Transmission System
Grid Code Review Panel Information Required to Evaluate Subsynchrononous Resonance on the Transmission System Summary of Issue A paper by National Grid Contact: Graham Stein 1. All electrical and electromechanical
More informationEUROPEAN CONNECTION CONDITIONS (ECC) CONTENTS. (This contents page does not form part of the Grid Code)
GC0102 EXTRACT OF EUROPEAN CONNECTION CONDITIONS LEGAL TEXT DATED 08/01/2018 Paragraph No/Title EUROPEAN CONNECTION CONDITIONS (ECC) CONTENTS (This contents page does not form part of the Grid Code) Page
More informationRfG Implementation Fault Ride Through
RfG Implementation Fault Ride Through Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight line. Antony
More informationTest for primary control capability
Page 1 of 8 Test for primary control capability Authors: Marc Scherer, Dominik Schlipf and Walter Sattinger Revisions: Version Date Author / department Section TC2008 26.08.2008 W. Sattinger / BT-NT Transmission
More informationRevision 24 of Issue 3 of the Grid Code has been approved by the Authority for implementation on 19 th November 2007.
Our Ref: Your Ref: Date: November 2007 To: All Recipients of the Serviced Grid Code Regulatory Frameworks Electricity Codes National Grid Electricity Transmission plc National Grid House Warwick Technology
More informationEFCC Academia dissemination event
EFCC Academia dissemination event WP4-Hardware in the Loop Validation of the EFCC Scheme Mingyu Sun, Dr Mazaher Karimi, Rasoul Azizipanah-Abarghooee Prof Vladimir Terzija Ben Marshall University of Manchester
More informationSystem Operability Framework 2014
System Operability Framework 2014 Welcome to the 2014 edition of the GB System Operability Framework (SOF). This framework has been developed to provide a holistic view of the long term system operation
More informationG59 and G83 Protection Requirements
G59 and G83 Protection Requirements Stakeholder Workshop 25 th April 2013, Glasgow 1 Energy Networks Association Introduction Graham Stein Technical Policy Manager Network Strategy National Grid graham.stein@nationalgrid.com
More informationGrid codes and wind farm interconnections CNY Engineering Expo. Syracuse, NY November 13, 2017
Grid codes and wind farm interconnections CNY Engineering Expo Syracuse, NY November 13, 2017 Purposes of grid codes Grid codes are designed to ensure stable operating conditions and to coordinate the
More informationBackground on Fast Fault Current Injection
Background on Fast Fault Current Injection The Power System, traditionally comprised of Synchronous Generating Units directly connected to the Transmission System with the Distribution Systems simply acting
More informationThe EU Network Code on Requirements for Generators A Summary
The EU Network Code on Requirements for Generators A Summary Tanguy Hubert, PhD thubert@epri.com PDU Fall Advisory Meeting Hollywood, FL; September 20, 2016 Existing interconnection requirements in Europe
More informationRENEWABLE ENERGY SUB-CODE for Distribution Network connected Variable Renewable Energy Power Plants in Ghana
RENEWABLE ENERGY SUB-CODE for Distribution Network connected Variable Renewable Energy Power Plants in Ghana JANUARY 2015 i Table of Content PART A: 1 1 Introduction 1 1.1 Scope 1 1.2 Status 1 1.3 Terms
More informationWORKING GROUP REPORT. Frequency and voltage operating range. Prepared by the Working Group for submission to the Grid Code Review Panel
WORKING GROUP REPORT Frequency and voltage operating range Prepared by the Working Group for submission to the Grid Code Review Panel Reference Issue Draft 1.0 Date of Issue 14 th May 2010 Prepared by
More informationLoss of Mains Protection
Loss of Mains Protection Summary All generators that are connected to or are capable of being connected to the Distribution Network are required to implement Loss of Mains protection. This applies to all
More informationSYSTEM MONITORING FAULT RECORDING
* SYSTEM MONITORING FAULT RECORDING Disclaimer NGG and NGET or their agents, servants or contractors do not accept any liability for any losses arising under or in connection with this information. This
More informationAnnex: HVDC Code comments
EnergyVille Thor Park 8300 Poort Genk 8300 3600 Genk Annex: HVDC Code comments Dr. Geraint Chaffey, Dr. Willem Leterme, Firew Dejene, Mian Wang, Alejandro Bayo Salas, Thomas Roose, Ozgur Can Sakinci, prof.
More informationFREQUENCY and VOLTAGE, ranges and durations
Eurelectric 10 September 2013 Proposals to amend the Draft RfG Code This paper includes informal proposals to amend the RfG Code regarding some critical requirements taking into account the content of
More informationTESTING GUIDANCE FOR PROVIDERS OF ENHANCED FREQUENCY RESPONSE BALANCING SERVICE
TESTING GUIDANCE FOR PROVIDERS OF ENHANCED FREQUENCY RESPONSE BALANCING SERVICE Authors Published Version Kevin Smethurst D3 - Sean Williams 29 March 2017 Final Vicci Walsh 1 Table of Contents 1 Introduction...
More informationIEEE 1547: Standard for Interconnection and Interoperability of Distributed Energy Resources with Associated Electric Power Systems Interfaces
IEEE PES Boston Chapter Technical Meeting IEEE 1547: Standard for Interconnection and Interoperability of Distributed Energy Resources with Associated Electric Power Systems Interfaces P1547 Chair David
More informationDNVGL-ST-0125 Edition March 2016
STANDARD DNVGL-ST-0125 Edition March 2016 Grid code compliance The electronic pdf version of this document found through http://www.dnvgl.com is the officially binding version. The documents are available
More informationFREQUENTLY ASKED QUESTIONS
NETWORK CODE FOR REQUIREMENTS FOR GRID CONNECTION APPLICABLE TO ALL GENERATORS FREQUENTLY ASKED QUESTIONS 24 JANUARY 2012 Disclaimer: This document is not legally binding. It only aims at clarifying the
More informationProbabilistic assessment of enhanced frequency response services using real frequency time series
Institutional Repository Probabilistic assessment of enhanced frequency response services using real frequency time series This item was submitted to 's Institutional Repository by the/an author. Citation:
More informationWP4-Hardware in the Loop Validation of the EFCC Scheme
WP4-Hardware in the Loop Validation of the EFCC Scheme Mingyu Sun, Dr Mazaher Karimi, Rasoul Azizipanah-Abarghooee Prof Vladimir Terzija Ben Marshall University of Manchester National Grid 0 Presentation
More informationIEEE Major Revision of Interconnection Standard
IEEE 1547-2018 - Major Revision of Interconnection Standard NRECA & APA s Emerging Priorities in Energy Research Day, Anchorage, AK Charlie Vartanian PE Secretary, IEEE 1547 Working Group October 31, 2018
More informationPRODUCED BY THE OPERATIONS DIRECTORATE OF ENERGY NETWORKS ASSOCIATION
PRODUCED BY THE OPERATIONS DIRECTORATE OF ENERGY NETWORKS ASSOCIATION Engineering Recommendation G99 Issue 1 2017 Draft in Progress - This version uses track changes to note changes made following the
More informationConnection of Embedded Generating Plant up to 5MW
Engineering Recommendation No.3 of the Electricity Distribution Code Connection of Embedded Generating Plant up to 5MW Version 1.0 30th November 2005 Prepared by: Al Ain Distribution Company, Abu Dhabi
More informationImplementation of Revised IEEE Standard 1547
MAY 31, 2017 HOLYOKE, MASSACHUSETTS Implementation of Revised IEEE Standard 1547 Presentation to ISO-TO Operations Committee David Forrest Key Points As New England adds significant amounts of Distributed
More informationHVDC systems default parameters
ENTS-E guidance document for national implementation for network codes on grid connection 4. June 2018 ENTS-E AISBL Avenue Cortenbergh 100 1000 Brussels Belgium Tel +32 2 741 09 50 Fax +32 2 741 09 51
More informationFault Ride Through. Antony Johnson / Richard Ierna National Grid TNS Technical Policy
Fault Ride Through Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight line. Antony Johnson / Richard
More informationIntermittent Renewable Resources (Wind and PV) Distribution Connection Code (DCC) At Medium Voltage (MV)
Intermittent Renewable Resources (Wind and PV) Distribution Connection Code (DCC) At Medium Voltage (MV) IRR-DCC-MV 1. Introduction 1 IRR-DCC-MV 2. Scope 1 IRR-DCC-MV 2.1. General 1 IRR-DCC-MV 2.2. Affected
More informationNetwork Code for HVDC Connections and DC-connected Power Park Modules Explanatory Note
Network Code for HVDC Connections and DC-connected Power Park Modules Explanatory Note 30 April 2014 Disclaimer: This document is not legally binding. It only aims at clarifying the content of the Draft
More informationDistribution Code. Approved by CER. Version: 5.0 Date: April Distribution System Operator ESB Networks Limited
Distribution Code Approved by CER Version: 5.0 Date: April 2016 Issued by: Distribution System Operator ESB Networks Limited CONTENTS Page Preface... vii 1. INDUSTRY STRUCTURE... viii 2. USE OF THE DISTRIBUTION
More informationStandard BAL-005-0b Automatic Generation Control
A. Introduction 1. Title: Automatic Generation Control 2. Number: BAL-005-0b 3. Purpose: This standard establishes requirements for Balancing Authority Automatic Generation Control (AGC) necessary to calculate
More informationHigh Penetration of Power Electronic Interfaced Power Sources (HPoPEIPS)
High Penetration of Power Electronic Interfaced Power Sources (HPoPEIPS) ENTSO-E Guidance document for national implementation for network codes on grid connection 29 March 2017 Description Code(s) & Article(s)
More informationRevision 32 of Issue 3 of the Grid Code has been approved by the Authority for implementation on 8 th December 2008.
Our Ref: Your Ref: Date: December 2008 To: All Recipients of the Serviced Grid Code Regulatory Frameworks Electricity Codes National Grid Electricity Transmission plc National Grid House Warwick Technology
More informationDATA REGISTRATION CODE (DRC) CONTENTS. (This contents page does not form part of the Grid Code)
Paragraph No/Title DATA REGISTRATION CODE (DRC) CONTENTS (This contents page does not form part of the Grid Code) Page Number DRC.1 INTRODUCTION... 4 DRC.2 OBJECTIVE... 4 DRC.3 SCOPE... 4 DRC.4 DATA CATEGORIES
More informationLFC/AGC Nordic and European perspective. Exchange of balancing services international workshop Jan 2011 Whitley Gjerde
LFC/AGC Nordic and European perspective Exchange of balancing services international workshop 26-27 Jan 2011 Whitley Gjerde Contents Nordic Frequency quality Nordic reserve dimensioning project Nordic
More informationLessons Learned in Model Validation for NERC Compliance
Lessons Learned in Model Validation for NERC Compliance usa.siemens.com/digitalgrid NERC Modeling, Data, and Analysis MOD 025 2: Generator Real and Reactive Power Capability Demonstration MOD 026 1: Verification
More informationParticipants Affiliation Present Excused. Stakeholders
NC HVDC User Group 5 th meeting Date: 10 March 2014 Time: 11h00 16h00 Place: ENTSO-E offices, Brussels MINUTES Participants Affiliation Present Excused Stakeholders Magnus CALLAVIK ABB X Sebastian PAPANAGIOTOU
More informationLoad-Frequency Control and Reserves Network Code. David Bunney JESG 19 March 2013
Load-Frequency Control and Reserves Network Code David Bunney JESG 19 March 2013 Agenda Overview and Timescales Stakeholder Engagement Overview of the Code More detailed discussion on Frequency Quality
More informationWind Power Facility Technical Requirements CHANGE HISTORY
CHANGE HISTORY DATE VERSION DETAIL CHANGED BY November 15, 2004 Page 2 of 24 TABLE OF CONTENTS LIST OF TABLES...5 LIST OF FIGURES...5 1.0 INTRODUCTION...6 1.1 Purpose of the Wind Power Facility Technical
More informationIEEE sion/1547revision_index.html
IEEE 1547 IEEE 1547: Standard for Interconnection and Interoperability of Distributed Energy Resources with Associated Electric Power Systems Interfaces http://grouper.ieee.org/groups/scc21/1547_revi sion/1547revision_index.html
More informationRevised IEEE 1547 Standard for Interconnecting Distributed Energy Resources with Electric Power Systems- National Grid Solar Program
1 Revised IEEE 1547 Standard for Interconnecting Distributed Energy Resources with Electric Power Systems- National Grid Solar Program Babak Enayati, PhD, PE Lead Engineer, National Grid Waltham, MA Email:
More informationTarget Mchunu and Themba Khoza Eskom Transmission Division, System Operator Grid Code Management
GRID CONNECTION CODE FOR RENEWABLE POWER PLANTS (RPPs) CONNECTED TO THE ELECTRICITY TRANSMISSION SYSTEM (TS) OR THE DISTRIBUTION SYSTEM (DS) IN SOUTH AFRICA Target Mchunu and Themba Khoza Eskom Transmission
More informationIEEE Std Bulk System Opportunities from New Distributed Energy Resource Interconnection and Interoperability Standards
IEEE Std 1547-2018 Bulk System Opportunities from New Distributed Energy Resource Interconnection and Interoperability Standards Clayton Stice, ERCOT Jens C. Boemer, EPRI (on behalf of SCC21) NERC SPIDER
More informationVGB / EURELECTRIC s generators RfG Network Code: Needs, Feasibility, Alternative Solutions and Costs
VGB / EURELECTRIC s generators RfG Network Code: Needs, Feasibility, Alternative Solutions and Costs The European Commission has tasked a consortium of DNV KEMA and COWI to perform an impact assessment
More informationWind Power Plants and future Power System Frequency Stability
Wind Power Plants and future Power System Frequency Stability Peter W. Christensen Vestas Technology R&D, Denmark Event on Future Power System Operation Lund University, Sweden, June 12, 2012 1 Agenda
More informationBPS-Connected Inverter-Based Resource Performance
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 Reliability Guideline BPS-Connected Inverter-Based Resource Performance May 2018 20 21 22 23 24 25 26 27 28 29 NERC Report Title Report Date I 30 31 32 33
More informationInverter-Based Resource Disturbance Analysis
Inverter-Based Resource Disturbance Analysis Key Findings and Recommendations Informational Webinar February 15, 2018 August 16, 2016 Blue Cut Fire Disturbance Key Findings and Recommendations 2 Western
More informationOPERATING CODE NO. 5 (OC5)
Paragraph No/Title OPERATING CODE NO. 5 (OC5) TESTING AND MONITORING CONTENTS (This contents page does not form part of the Grid Code) Page Number OC5.1 INTRODUCTION... 2 OC5.2 OBJECTIVE... 3 OC5.3 SCOPE...
More informationDesign of Low Cost Embedded Power Plant Relay Testing Unit
Design of Low Cost Embedded Power Plant Relay Testing Unit S.Uthayashanger, S.Sivasatheeshan, P.R Talbad uthayashanger@yahoo.com Supervised by: Dr. Thrishantha Nanayakkara thrish@elect.mrt.ac.lk Department
More informationLoss of Solar Resources during Transmission Disturbances due to Inverter Settings II
Loss of Solar Resources during Transmission Disturbances due to Inverter Settings II Informational Webinar on Level 2 NERC Alert Ryan Quint, Senior Manager, Advanced Analytics and Modeling Rich Bauer,
More informationReliability Guideline: Generating Unit Operations During Complete Loss of Communications
1 1 1 1 1 1 1 1 0 1 0 1 0 1 Reliability Guideline: Generating Unit Operations During Complete Loss of Communications Preamble It is in the public interest for the North American Electric Reliability Corporation
More informationGSR018/GC0077: Sub-Synchronous Oscillations (SSO)
Stage 03: National Electricity Transmission System Security and Quality of Supply Standards (NETS SQSS) and Grid Code : Sub-Synchronous Oscillations (SSO) 01 Workgroup Report 02 Industry Consultation 03
More informationFault Ride Through Principles. and. Grid Code Proposed Changes
Fault Ride Through Principles and Grid Code Proposed Changes Document identifier: FRT Principles and Proposals Authored by: Jonathan O Sullivan / Alan Rogers Document version: Ver 1.3 Checked by: Anne
More informationDATA REGISTRATION CODE CONTENTS. (This contents page does not form part of the Grid Code) DRC.1 INTRODUCTION... 1 DRC.2 OBJECTIVE...
DATA REGISTRATION CODE CONTENTS (This contents page does not form part of the Grid Code) Paragraph No/Title Page Number DRC.1 INTRODUCTION... 1 DRC.2 OBJECTIVE... 1 DRC.3 SCOPE... 1 DRC.4 DATA CATEGORIES
More informationRevision 1 of Issue 4 of the Grid Code has been approved by the Authority for implementation on 10 th February 2010.
Our Ref: Your Ref: Date: 10 th February 2010 To: All Recipients of the Serviced Grid Code Regulatory Frameworks Electricity Codes National Grid Electricity Transmission plc National Grid House Warwick
More informationGSR018: Sub-Synchronous Oscillations (SSO) Workgroup Report
Stage 01: Workgroup National Electricity Transmission System Security and Quality of Supply Standards (NETS SQSS) GSR018: Sub-Synchronous Oscillations (SSO) Workgroup 01 02 03 Workgroup Industry Consultation
More informationTESTING GUIDANCE FOR PROVIDERS OF FIRM FREQUENCY RESPONSE BALANCING SERVICE
TESTING GUIDANCE FOR PROVIDERS OF FIRM FREQUENCY RESPONSE BALANCING SERVICE Authors Published Version Update Summary Kevin Smethurst Vicci Walsh May 2017 D1 Kevin Smethurst Vicci Walsh Draft 2/6/17 D6
More informationWind Requirements and Testing for Steady-State Voltage and Frequency Control
1 Wind Requirements and Testing for Steady-State Voltage and Frequency Control IEEE PES General Meeting, Boston: July 18, 2016 Steven Saylors, P.E. Senior Specialist Vestas Wind Systems 2 Voltage Control
More informationStandard BAL b Automatic Generation Control
A. Introduction 1. Title: Automatic Generation Control 2. Number: BAL-005-0.2b 3. Purpose: This standard establishes requirements for Balancing Authority Automatic Generation Control (AGC) necessary to
More informationTransmission Interconnection Requirements for Inverter-Based Generation
Transmission Requirements for Inverter-Based Generation June 25, 2018 Page 1 Overview: Every generator interconnecting to the transmission system must adhere to all applicable Federal and State jurisdictional
More informationTechnical Requirements for Connecting Small Scale PV (sspv) Systems to Low Voltage Distribution Networks
2014 Technical Requirements for Connecting Small Scale PV (sspv) Systems to Low Voltage Distribution Networks This document specifies the technical requirement for connecting sspv to the low voltage distribution
More informationAutomated Event Analysis Tool using Synchrophasor Data in Indian Grid
Automated Event Analysis Tool using Synchrophasor Data in Indian Grid NASPI Work Group Meeting March 2015 Rajkumar Anumasula Power System Operation Corporation Ltd. India Some Typical Numbers of Indian
More informationPartial Power Operation of Multi-level Modular Converters under Subsystem Faults
Partial Power Operation of Multi-level Modular Converters under Subsystem Faults Philip Clemow Email: philipclemow@imperialacuk Timothy C Green Email: tgreen@imperialacuk Michael M C Merlin Email: michaelmerlin7@imperialacuk
More informationStandard BAL b Automatic Generation Control
A. Introduction 1. Title: Automatic Generation Control 2. Number: BAL-005-0.2b 3. Purpose: This standard establishes requirements for Balancing Authority Automatic Generation Control (AGC) necessary to
More informationVersion 2.6 October Comments to this document can be forwarded to:
GRID CONNECTION CODE REQUIREMENTS FOR RENEWABLE POWER PLANTS (RPPs) CONNECTED TO THE TRANSMISSION SYSTEM (TS) OR THE DISTRIBUTION SYSTEM (DS) IN SOUTH AFRICA Version 2.6 October 2012 Comments to this document
More information