GB FREQUENCY HVDC FREQUENCY RESPONSE PARAMTERS HVDC CONNECTIONS (TITLE II)

Size: px
Start display at page:

Download "GB FREQUENCY HVDC FREQUENCY RESPONSE PARAMTERS HVDC CONNECTIONS (TITLE II)"

Transcription

1 GB FREQUENCY HVDC FREQUENCY RESPONSE PARAMTERS HVDC CONNECTIONS (TITLE II) HVDC Article 11 Range Requirement Range Suggested GB Value Comments Hz 60 seconds Hz 60 seconds Hz Hz than RfG and DCC and DC PPm s (ie 90 minutes plus) than RfG and DCC and DC PPm s (ie 90 minutes plus) Hz 100 minutes Hz 100 minutes Hz Unlimited Hz Unlimited Hz 51.5Hz - 52 than RfG and DCC and DC PPm s (ie 90 minutes plus) Hz 100 minutes 51.5Hz minutes Mandatory requirement s may be agreed Work group to s may be agreed Work group to GB s may be agreed Work group to Policy Req d? (e.g. ncompatibility to be defined) Change req d?

2 12 ROCOF -2.5 to +2.5Hz/s than DC PPm s (ie 15 minutes plus) Measured over the previous 1 second -2.5 to +2.5Hz/s Measured over the previous 1 second s may be agreed Work group to Mandatory requirement 13(1)(a)(i) 13(1)(a)(ii) 13(1)(a)(iii) Controlability and Power Step Size for Transmitting HVDC Active Power Transmission capacity for each direction below which active power transmission is not requested The maximum delay within which the Max Step Size = 1MW Min Step Size = 1MW to believed to be part of data submission as part of trading in wholesale market / TSOG? to MW transfer should be controllable to the nearest whole MW to MW transfer should be controllable to the nearest whole MW 2 minutes as per BC2

3 13(1)(b) 13(1)(c) 13(1)(d) HVDC System shall be capable of adjusting the transmitted active power upon receipt of request from the relevant TSO Capability of modifying transmitted infeed in case of disturbances into one or more AC networks Reversal Ability to modify transmitted active power for the purpose of cross boarder balancing t specified Covered by Fault Ride Through additional text to be added for HVDC and delays greater than 10ms Would be required only on a site specific basis and would be specified in the Bilateral Agreement. General Grid Mod to refer to the requirement and delay Covered by CC through the requirement to have a load controller and the Balancing s General words required in relation to Power Reversal?

4 13(2) Ramp Rate Limit adjustment 13(3) Automatic Remedial Action t specified Ramp Rate Limits covered under BC1.A.1.1 Adjustment of Ramp Rates below the limits of BC1.A.1.1 are permissible see BC1 Other than the current requirements under the Balancing s any other requirements would be specified under the Bilateral Agreement 14 Synthetic Inertia t required see FFCI requirements Option 1 15 FSM, LFSM-O, LFSM-U Annex II(A)(1) FSM Deadband 0 ±500mHz Deadband 0 RfG See Insensitivity Annex II(A)(1)(d) Droop S1(u) Droop S2(d) Insensitivity 0.1% 0.1% 30mHz 0.5 seconds DroopS1 (u) 3 5% DroopS2 (d) 3 5% for upward regulation Insensitivity 15mHz for Deadband 0.5 seconds RfG for non synchronous Only by reference to additional requirements being specified in the Bilateral Current Grid does not make this clear Introduce term insensitivity as per RfG

5 Annex II(B)(1) Annex II(c)(1) LFSM-O LFSM-U 16 Control delay t1 delay t1 plant set to 1s Time t2 30 seconds Time t2 10 seconds RfG and current Grid practice Threshold f1 Droop S3 0.1% upwards Initial Full Threshold f2 Droop S4 0.1% Initial Full Modulation of Active Power in relation to Hz Threshold f1 50.4Hz Droop S2 10% or less Initial Full <2s RfG 10s current RfG Hz Threshold f2 49.5Hz Droop S4 10% RfG upwards Initial <2s RfG Full Modulation of Active Power in relation to To be determined plant Dependent CC of Grid Discuss with Working Group Discuss with Working Group

6 17 Loss of Active Power Changes Changes Loss of 1800MW 37 Black Start Black Start Specified in Bilateral Agreement in the same way as Generation SQSS with and Bilateral Agreement

Parameters related to frequency stability

Parameters related to frequency stability Parameters related to frequency stability EN-E guidance document for national implementation for network codes on grid connection 16 November 2016 EN-E AISBL Avenue de Cortenbergh 100 1000 Brussels Belgium

More information

ENTSO-E Draft Network Code on High Voltage Direct Current Connections and DCconnected

ENTSO-E Draft Network Code on High Voltage Direct Current Connections and DCconnected ENTSO-E Draft Network Code on High Voltage Direct Current Connections and DCconnected Power Park Modules 30 April 2014 Notice This document reflects the work done by ENTSO-E in line with ACER s framework

More information

DRAFT PROPOSAL FOR NC HVDC REQUIREMENTS OF GENERAL APPLICATION

DRAFT PROPOSAL FOR NC HVDC REQUIREMENTS OF GENERAL APPLICATION DRAFT PROPOSAL FOR NC REQUIREMENTS OF GENERAL APPLICATION December 2017 TABLE OF CONTENTS Table of Contents... 2 Introduction... 6 1. Scope of application... 8 2. TITLE II: General s for connections...

More information

INITIAL RfG FREQUENCY PARAMETER SELECTION. BASED ON DRAFT RfG VALUES. Requirement Range Suggested GB Value Comments

INITIAL RfG FREQUENCY PARAMETER SELECTION. BASED ON DRAFT RfG VALUES. Requirement Range Suggested GB Value Comments INITIAL RfG FREQUENCY PARAMETER SELECTION BASED ON DRAFT RfG VALUES Issue Article Level of Difficulty (1-5) Type A 1. 13.1(a) Frequency Ranges Requirement Range Suggested GB Value Comments 47 47.5Hz 47.5

More information

Requirements for Generators European Network Code High Level Implementation Issues

Requirements for Generators European Network Code High Level Implementation Issues Requirements for Generators European Network Code High Level Implementation Issues Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be

More information

each time the Frequency is above 51Hz. Continuous operation is required

each time the Frequency is above 51Hz. Continuous operation is required GC0101 EXTRACT OF EUROPEAN CONNECTION CONDITIONS LEGAL TEXT DATED 08/01/2018. ECC.6 ECC.6.1 ECC.6.1.1 ECC.6.1.2 ECC.6.1.2.1 ECC.6.1.2.1.1 ECC.6.1.2.1.2 ECC.6.1.2.1.3 TECHNICAL, DESIGN AND OPERATIONAL CRITERIA

More information

PROPOSAL FOR NC RFG REQUIREMENTS OF GENERAL APPLICATION

PROPOSAL FOR NC RFG REQUIREMENTS OF GENERAL APPLICATION PROPOSAL FOR NC RFG REQUIREMENTS OF GENERAL APPLICATION proposal following Art. 7(4) of the NC RfG 17 May 2018 Contents 1 Introduction... 3 2 Proposal for determination of significance [Art 5]... 5 2.1

More information

PROPOSAL FOR NC RFG REQUIREMENTS OF GENERAL APPLICATION

PROPOSAL FOR NC RFG REQUIREMENTS OF GENERAL APPLICATION PROPOSAL FOR NC RFG REQUIREMENTS OF GENERAL APPLICATION Public consultation 15 March 23 April 2018 Contents 1 Introduction... 3 2 Proposal for determination of significance [Art 5]... 5 2.1 Conditions

More information

TABLE 1 COMPARISION OF ENTSO-E RfG TO GB GRID CODE

TABLE 1 COMPARISION OF ENTSO-E RfG TO GB GRID CODE TABLE 1 Comparison to ENTSO-E RfG (Comparison based on Issue 5 Revision 11 only and ENSTO - E RFG Version dated 14 January 2014) (Note Does not include other Industry Codes) Table 1 compares the ENTSO-E

More information

Constant Terminal Voltage. Working Group 1 29 st January 2014

Constant Terminal Voltage. Working Group 1 29 st January 2014 Constant Terminal Voltage Working Group 1 29 st January 2014 Overview Objectives of Working Group ENTSO-E RfG Implications Options Summary Discussion 2 Objectives of Work Group National Grid in consultation

More information

DRAFT PROPOSAL FOR NC RFG REQUIREMENTS OF GENERAL APPLICATION

DRAFT PROPOSAL FOR NC RFG REQUIREMENTS OF GENERAL APPLICATION DRAFT PROPOSAL FOR NC RFG REQUIREMENTS OF GENERAL APPLICATION September 2017 Contents 1 Introduction... 3 2 Proposal for determination of significance [Art 5]... 4 2.1 Conditions for the choice of the

More information

DRAFT PROPOSAL FOR STORAGE CONNECTION REQUIREMENTS

DRAFT PROPOSAL FOR STORAGE CONNECTION REQUIREMENTS DRAFT PROPOSAL FOR STORAGE CONNECTION REQUIREMENTS December 2017 Contents 1 Background and reading instructions... 2 2 Definitions and applicability... 2 3 SPM categories types... 3 4 SPM Type A... 4 4.1

More information

Network Code for HVDC Connections and DC-connected Power Park Modules Requirement Outlines

Network Code for HVDC Connections and DC-connected Power Park Modules Requirement Outlines Network Code for HVDC Connections and DC-connected Power Park Modules Requirement Outlines 30 April 2014 Disclaimer: This document is not legally binding. It only aims at clarifying the content of the

More information

TECHNICAL OVERVIEW OF IMPACTING REQUIREMENTS FOR THE CATEGORIZATION OF THE POWER GENERATING MODULES

TECHNICAL OVERVIEW OF IMPACTING REQUIREMENTS FOR THE CATEGORIZATION OF THE POWER GENERATING MODULES TECHNICAL OVERVIEW OF IMPACTING REQUIREMENTS FOR THE CATEGORIZATION OF THE POWER GENERATING MODULES Task Force Implementation Network Codes 27/01/2017 Contents 1 Introduction... 2 2 Proposal for determination

More information

Parameters related to voltage issues

Parameters related to voltage issues Parameters related to voltage issues EN-E guidance document for national implementation for network codes on grid connection 16 November 2016 EN-E AISBL Avenue de Cortenbergh 100 1000 Brussels Belgium

More information

Automatic connection/reconnection and admissible rate of change of active power

Automatic connection/reconnection and admissible rate of change of active power Automatic connection/reconnection and admissible rate of change of active power ENTSO-E guidance document for national implementation of conditions for automatic connection / reconnection after incidental

More information

SELECTING NATIONAL MW BOUNDARIES

SELECTING NATIONAL MW BOUNDARIES SELECTING NATIONAL MW BOUNDARIES ENTSO-E guidance document for national implementation for network codes on grid connection 16 November 2016 Table of Contents DESCRIPTION...2 Codes(s) and Article(s)...2

More information

FNN comments on NC HVDC submitted to ENTSO E

FNN comments on NC HVDC submitted to ENTSO E the term HV is not defined > A further definition should be applied since the term is used all through the code A lot of terms from the Network Code RfG are used and should be checked regarding consistency

More information

Deleted: 9 4 anuary ... [1] Deleted: much more. Formatted ... [2] Formatted Table. Formatted: Indent: Left: 0.06 cm

Deleted: 9 4 anuary ... [1] Deleted: much more. Formatted ... [2] Formatted Table. Formatted: Indent: Left: 0.06 cm (Comparison based on GB Grid Code Issue 4 Revision 13 only and ENSTO - E RFG Internal Version dated 6 June 01) (Note Does not include other Industry Codes) Table compares the GB Grid Code with the ENTSO-E

More information

INCIDENTS CLASSIFICATION SCALE METHODOLOGY

INCIDENTS CLASSIFICATION SCALE METHODOLOGY 8 May 2014 WORKING GROUP INCIDENT CLASSIFICATION UNDER SYSTEM OPERATIONS COMMITTEE Contents Revisions... 5 References and Related documents... 5 Change request... 5 1. Overview... 6 1.1 Objectives and

More information

EUROPEAN COMPLIANCE PROCESSES (post RfG Implementation) CONTENTS. (This contents page does not form part of the Grid Code) Paragraph No/Title

EUROPEAN COMPLIANCE PROCESSES (post RfG Implementation) CONTENTS. (This contents page does not form part of the Grid Code) Paragraph No/Title EUROPEAN COMPLIANCE PROCESSES (post RfG Implementation) CONTENTS (This contents page does not form part of the Grid Code) Paragraph No/Title Page No ECP.1 INTRODUCTION... 2 ECP.2 OBJECTIVE... 3 ECP.3 SCOPE...

More information

Key DRAFT EUROPEAN CONNECTION CONDITIONS LEGAL TEXT DATED 13/12/17

Key DRAFT EUROPEAN CONNECTION CONDITIONS LEGAL TEXT DATED 13/12/17 Key DRAFT EUROPEAN CONNECTION CONDITIONS LEGAL TEXT DATED 13/12/17 Formatted: Highlight 1) Blue Text From Grid Code 2) Black Text Changes / Additional words 3) Orange/ Brown text From RfG 4) Purple From

More information

EUROPEAN COMPLIANCE PROCESSES (post RfG Implementation) CONTENTS. (This contents page does not form part of the Grid Code) Paragraph No/Title

EUROPEAN COMPLIANCE PROCESSES (post RfG Implementation) CONTENTS. (This contents page does not form part of the Grid Code) Paragraph No/Title EUROPEAN COMPLIANCE PROCESSES (post RfG Implementation) Style Definition: TOC 1: Right: -0.59 cm CONTENTS (This contents page does not form part of the Grid Code) Paragraph No/Title Page No ECP.1 INTRODUCTION...

More information

High Wind Speed Shutdown / Power Available

High Wind Speed Shutdown / Power Available High Wind Speed Shutdown / Power Available Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight line.

More information

Annex 2 - Proposed Grid Code Legal Text

Annex 2 - Proposed Grid Code Legal Text Annex 2 - Proposed Grid Code Legal Text FAULT RIDE THROUGH LEGAL TEXT This section contains the proposed legal text to give effect to the proposals. The proposed new text is in red and is based on Grid

More information

OPERATIONAL RESERVE AD HOC TEAM REPORT

OPERATIONAL RESERVE AD HOC TEAM REPORT OPERATIONAL RESERVE AD HOC TEAM REPORT FINAL VERSION WORKING DRAFT FOR THE PURPOSE OF FACILITATING AD HOC TEAM DISCUSSION WITHIN THE CONTEXT OF THE FUTURE NETWORK CODE LFC&R VERSION 6 Disclaimer This version

More information

WFPS1 WIND FARM POWER STATION GRID CODE PROVISIONS

WFPS1 WIND FARM POWER STATION GRID CODE PROVISIONS WFPS1 WIND FARM POWER STATION GRID CODE PROVISIONS WFPS1.1 INTRODUCTION 2 WFPS1.2 OBJECTIVE 2 WFPS1.3 SCOPE 3 WFPS1.4 FAULT RIDE THROUGH REQUIREMENTS 4 WFPS1.5 FREQUENCY REQUIREMENTS 5 WFPS1.6 VOLTAGE

More information

Indication of Dynamic Model Validation Process

Indication of Dynamic Model Validation Process Indication of Dynamic Model Validation Process Document Identifier Written by David Cashman Document Version Draft Checked by Date of Current Issue November 2013 Approved by Jon O Sullivan Disclaimer EirGrid,

More information

Forward Looking Frequency Trends Technical Brief ERS Framework 1 Measures 1, 2, and 4: Forward Looking Frequency Analysis

Forward Looking Frequency Trends Technical Brief ERS Framework 1 Measures 1, 2, and 4: Forward Looking Frequency Analysis Forward Looking Frequency Trends Technical Brief ERS Framework 1 Measures 1, 2, and 4: Forward Looking Frequency Analysis The NERC Planning Committee and Operating Committee jointly created the Essential

More information

Mandatory Frequency Response

Mandatory Frequency Response Mandatory Frequency Response A guide to the services procured by National Grid to manage the system frequency Version 1.1 National Grid is an international electricity and gas company responsible for operating

More information

Max voltage in 400 kv Networks

Max voltage in 400 kv Networks Max voltage in 400 kv Networks ENTSO-E GC ESC, 08, Brussels 1 Summary NEED TO WITHSTAND WIDE VOLTAGE RANGE 3 EXISTING CONNECTION RULES 4 KEMA REPORT ON RFG 5 STUDIES ABOUT TOV 6 REFERENCE TO EU NC REGULATIONS

More information

Harmonizing the Changing Resource Mix Keeping the Grid Together

Harmonizing the Changing Resource Mix Keeping the Grid Together Harmonizing the Changing Resource Mix Keeping the Grid Together Robert W. Cummings Senior Director of Engineering and Reliability Initiatives i-pcgrid March 30, 2017 NERC-IEEE Memorandum of Understanding

More information

IEEE sion/1547revision_index.html

IEEE sion/1547revision_index.html IEEE 1547 IEEE 1547: Standard for Interconnection and Interoperability of Distributed Energy Resources with Associated Electric Power Systems Interfaces http://grouper.ieee.org/groups/scc21/1547_revi sion/1547revision_index.html

More information

Grid Code Review Panel. Information Required to Evaluate Subsynchrononous Resonance on the Transmission System

Grid Code Review Panel. Information Required to Evaluate Subsynchrononous Resonance on the Transmission System Grid Code Review Panel Information Required to Evaluate Subsynchrononous Resonance on the Transmission System Summary of Issue A paper by National Grid Contact: Graham Stein 1. All electrical and electromechanical

More information

EUROPEAN CONNECTION CONDITIONS (ECC) CONTENTS. (This contents page does not form part of the Grid Code)

EUROPEAN CONNECTION CONDITIONS (ECC) CONTENTS. (This contents page does not form part of the Grid Code) GC0102 EXTRACT OF EUROPEAN CONNECTION CONDITIONS LEGAL TEXT DATED 08/01/2018 Paragraph No/Title EUROPEAN CONNECTION CONDITIONS (ECC) CONTENTS (This contents page does not form part of the Grid Code) Page

More information

RfG Implementation Fault Ride Through

RfG Implementation Fault Ride Through RfG Implementation Fault Ride Through Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight line. Antony

More information

Test for primary control capability

Test for primary control capability Page 1 of 8 Test for primary control capability Authors: Marc Scherer, Dominik Schlipf and Walter Sattinger Revisions: Version Date Author / department Section TC2008 26.08.2008 W. Sattinger / BT-NT Transmission

More information

Revision 24 of Issue 3 of the Grid Code has been approved by the Authority for implementation on 19 th November 2007.

Revision 24 of Issue 3 of the Grid Code has been approved by the Authority for implementation on 19 th November 2007. Our Ref: Your Ref: Date: November 2007 To: All Recipients of the Serviced Grid Code Regulatory Frameworks Electricity Codes National Grid Electricity Transmission plc National Grid House Warwick Technology

More information

EFCC Academia dissemination event

EFCC Academia dissemination event EFCC Academia dissemination event WP4-Hardware in the Loop Validation of the EFCC Scheme Mingyu Sun, Dr Mazaher Karimi, Rasoul Azizipanah-Abarghooee Prof Vladimir Terzija Ben Marshall University of Manchester

More information

System Operability Framework 2014

System Operability Framework 2014 System Operability Framework 2014 Welcome to the 2014 edition of the GB System Operability Framework (SOF). This framework has been developed to provide a holistic view of the long term system operation

More information

G59 and G83 Protection Requirements

G59 and G83 Protection Requirements G59 and G83 Protection Requirements Stakeholder Workshop 25 th April 2013, Glasgow 1 Energy Networks Association Introduction Graham Stein Technical Policy Manager Network Strategy National Grid graham.stein@nationalgrid.com

More information

Grid codes and wind farm interconnections CNY Engineering Expo. Syracuse, NY November 13, 2017

Grid codes and wind farm interconnections CNY Engineering Expo. Syracuse, NY November 13, 2017 Grid codes and wind farm interconnections CNY Engineering Expo Syracuse, NY November 13, 2017 Purposes of grid codes Grid codes are designed to ensure stable operating conditions and to coordinate the

More information

Background on Fast Fault Current Injection

Background on Fast Fault Current Injection Background on Fast Fault Current Injection The Power System, traditionally comprised of Synchronous Generating Units directly connected to the Transmission System with the Distribution Systems simply acting

More information

The EU Network Code on Requirements for Generators A Summary

The EU Network Code on Requirements for Generators A Summary The EU Network Code on Requirements for Generators A Summary Tanguy Hubert, PhD thubert@epri.com PDU Fall Advisory Meeting Hollywood, FL; September 20, 2016 Existing interconnection requirements in Europe

More information

RENEWABLE ENERGY SUB-CODE for Distribution Network connected Variable Renewable Energy Power Plants in Ghana

RENEWABLE ENERGY SUB-CODE for Distribution Network connected Variable Renewable Energy Power Plants in Ghana RENEWABLE ENERGY SUB-CODE for Distribution Network connected Variable Renewable Energy Power Plants in Ghana JANUARY 2015 i Table of Content PART A: 1 1 Introduction 1 1.1 Scope 1 1.2 Status 1 1.3 Terms

More information

WORKING GROUP REPORT. Frequency and voltage operating range. Prepared by the Working Group for submission to the Grid Code Review Panel

WORKING GROUP REPORT. Frequency and voltage operating range. Prepared by the Working Group for submission to the Grid Code Review Panel WORKING GROUP REPORT Frequency and voltage operating range Prepared by the Working Group for submission to the Grid Code Review Panel Reference Issue Draft 1.0 Date of Issue 14 th May 2010 Prepared by

More information

Loss of Mains Protection

Loss of Mains Protection Loss of Mains Protection Summary All generators that are connected to or are capable of being connected to the Distribution Network are required to implement Loss of Mains protection. This applies to all

More information

SYSTEM MONITORING FAULT RECORDING

SYSTEM MONITORING FAULT RECORDING * SYSTEM MONITORING FAULT RECORDING Disclaimer NGG and NGET or their agents, servants or contractors do not accept any liability for any losses arising under or in connection with this information. This

More information

Annex: HVDC Code comments

Annex: HVDC Code comments EnergyVille Thor Park 8300 Poort Genk 8300 3600 Genk Annex: HVDC Code comments Dr. Geraint Chaffey, Dr. Willem Leterme, Firew Dejene, Mian Wang, Alejandro Bayo Salas, Thomas Roose, Ozgur Can Sakinci, prof.

More information

FREQUENCY and VOLTAGE, ranges and durations

FREQUENCY and VOLTAGE, ranges and durations Eurelectric 10 September 2013 Proposals to amend the Draft RfG Code This paper includes informal proposals to amend the RfG Code regarding some critical requirements taking into account the content of

More information

TESTING GUIDANCE FOR PROVIDERS OF ENHANCED FREQUENCY RESPONSE BALANCING SERVICE

TESTING GUIDANCE FOR PROVIDERS OF ENHANCED FREQUENCY RESPONSE BALANCING SERVICE TESTING GUIDANCE FOR PROVIDERS OF ENHANCED FREQUENCY RESPONSE BALANCING SERVICE Authors Published Version Kevin Smethurst D3 - Sean Williams 29 March 2017 Final Vicci Walsh 1 Table of Contents 1 Introduction...

More information

IEEE 1547: Standard for Interconnection and Interoperability of Distributed Energy Resources with Associated Electric Power Systems Interfaces

IEEE 1547: Standard for Interconnection and Interoperability of Distributed Energy Resources with Associated Electric Power Systems Interfaces IEEE PES Boston Chapter Technical Meeting IEEE 1547: Standard for Interconnection and Interoperability of Distributed Energy Resources with Associated Electric Power Systems Interfaces P1547 Chair David

More information

DNVGL-ST-0125 Edition March 2016

DNVGL-ST-0125 Edition March 2016 STANDARD DNVGL-ST-0125 Edition March 2016 Grid code compliance The electronic pdf version of this document found through http://www.dnvgl.com is the officially binding version. The documents are available

More information

FREQUENTLY ASKED QUESTIONS

FREQUENTLY ASKED QUESTIONS NETWORK CODE FOR REQUIREMENTS FOR GRID CONNECTION APPLICABLE TO ALL GENERATORS FREQUENTLY ASKED QUESTIONS 24 JANUARY 2012 Disclaimer: This document is not legally binding. It only aims at clarifying the

More information

Probabilistic assessment of enhanced frequency response services using real frequency time series

Probabilistic assessment of enhanced frequency response services using real frequency time series Institutional Repository Probabilistic assessment of enhanced frequency response services using real frequency time series This item was submitted to 's Institutional Repository by the/an author. Citation:

More information

WP4-Hardware in the Loop Validation of the EFCC Scheme

WP4-Hardware in the Loop Validation of the EFCC Scheme WP4-Hardware in the Loop Validation of the EFCC Scheme Mingyu Sun, Dr Mazaher Karimi, Rasoul Azizipanah-Abarghooee Prof Vladimir Terzija Ben Marshall University of Manchester National Grid 0 Presentation

More information

IEEE Major Revision of Interconnection Standard

IEEE Major Revision of Interconnection Standard IEEE 1547-2018 - Major Revision of Interconnection Standard NRECA & APA s Emerging Priorities in Energy Research Day, Anchorage, AK Charlie Vartanian PE Secretary, IEEE 1547 Working Group October 31, 2018

More information

PRODUCED BY THE OPERATIONS DIRECTORATE OF ENERGY NETWORKS ASSOCIATION

PRODUCED BY THE OPERATIONS DIRECTORATE OF ENERGY NETWORKS ASSOCIATION PRODUCED BY THE OPERATIONS DIRECTORATE OF ENERGY NETWORKS ASSOCIATION Engineering Recommendation G99 Issue 1 2017 Draft in Progress - This version uses track changes to note changes made following the

More information

Connection of Embedded Generating Plant up to 5MW

Connection of Embedded Generating Plant up to 5MW Engineering Recommendation No.3 of the Electricity Distribution Code Connection of Embedded Generating Plant up to 5MW Version 1.0 30th November 2005 Prepared by: Al Ain Distribution Company, Abu Dhabi

More information

Implementation of Revised IEEE Standard 1547

Implementation of Revised IEEE Standard 1547 MAY 31, 2017 HOLYOKE, MASSACHUSETTS Implementation of Revised IEEE Standard 1547 Presentation to ISO-TO Operations Committee David Forrest Key Points As New England adds significant amounts of Distributed

More information

HVDC systems default parameters

HVDC systems default parameters ENTS-E guidance document for national implementation for network codes on grid connection 4. June 2018 ENTS-E AISBL Avenue Cortenbergh 100 1000 Brussels Belgium Tel +32 2 741 09 50 Fax +32 2 741 09 51

More information

Fault Ride Through. Antony Johnson / Richard Ierna National Grid TNS Technical Policy

Fault Ride Through. Antony Johnson / Richard Ierna National Grid TNS Technical Policy Fault Ride Through Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight line. Antony Johnson / Richard

More information

Intermittent Renewable Resources (Wind and PV) Distribution Connection Code (DCC) At Medium Voltage (MV)

Intermittent Renewable Resources (Wind and PV) Distribution Connection Code (DCC) At Medium Voltage (MV) Intermittent Renewable Resources (Wind and PV) Distribution Connection Code (DCC) At Medium Voltage (MV) IRR-DCC-MV 1. Introduction 1 IRR-DCC-MV 2. Scope 1 IRR-DCC-MV 2.1. General 1 IRR-DCC-MV 2.2. Affected

More information

Network Code for HVDC Connections and DC-connected Power Park Modules Explanatory Note

Network Code for HVDC Connections and DC-connected Power Park Modules Explanatory Note Network Code for HVDC Connections and DC-connected Power Park Modules Explanatory Note 30 April 2014 Disclaimer: This document is not legally binding. It only aims at clarifying the content of the Draft

More information

Distribution Code. Approved by CER. Version: 5.0 Date: April Distribution System Operator ESB Networks Limited

Distribution Code. Approved by CER. Version: 5.0 Date: April Distribution System Operator ESB Networks Limited Distribution Code Approved by CER Version: 5.0 Date: April 2016 Issued by: Distribution System Operator ESB Networks Limited CONTENTS Page Preface... vii 1. INDUSTRY STRUCTURE... viii 2. USE OF THE DISTRIBUTION

More information

Standard BAL-005-0b Automatic Generation Control

Standard BAL-005-0b Automatic Generation Control A. Introduction 1. Title: Automatic Generation Control 2. Number: BAL-005-0b 3. Purpose: This standard establishes requirements for Balancing Authority Automatic Generation Control (AGC) necessary to calculate

More information

High Penetration of Power Electronic Interfaced Power Sources (HPoPEIPS)

High Penetration of Power Electronic Interfaced Power Sources (HPoPEIPS) High Penetration of Power Electronic Interfaced Power Sources (HPoPEIPS) ENTSO-E Guidance document for national implementation for network codes on grid connection 29 March 2017 Description Code(s) & Article(s)

More information

Revision 32 of Issue 3 of the Grid Code has been approved by the Authority for implementation on 8 th December 2008.

Revision 32 of Issue 3 of the Grid Code has been approved by the Authority for implementation on 8 th December 2008. Our Ref: Your Ref: Date: December 2008 To: All Recipients of the Serviced Grid Code Regulatory Frameworks Electricity Codes National Grid Electricity Transmission plc National Grid House Warwick Technology

More information

DATA REGISTRATION CODE (DRC) CONTENTS. (This contents page does not form part of the Grid Code)

DATA REGISTRATION CODE (DRC) CONTENTS. (This contents page does not form part of the Grid Code) Paragraph No/Title DATA REGISTRATION CODE (DRC) CONTENTS (This contents page does not form part of the Grid Code) Page Number DRC.1 INTRODUCTION... 4 DRC.2 OBJECTIVE... 4 DRC.3 SCOPE... 4 DRC.4 DATA CATEGORIES

More information

LFC/AGC Nordic and European perspective. Exchange of balancing services international workshop Jan 2011 Whitley Gjerde

LFC/AGC Nordic and European perspective. Exchange of balancing services international workshop Jan 2011 Whitley Gjerde LFC/AGC Nordic and European perspective Exchange of balancing services international workshop 26-27 Jan 2011 Whitley Gjerde Contents Nordic Frequency quality Nordic reserve dimensioning project Nordic

More information

Lessons Learned in Model Validation for NERC Compliance

Lessons Learned in Model Validation for NERC Compliance Lessons Learned in Model Validation for NERC Compliance usa.siemens.com/digitalgrid NERC Modeling, Data, and Analysis MOD 025 2: Generator Real and Reactive Power Capability Demonstration MOD 026 1: Verification

More information

Participants Affiliation Present Excused. Stakeholders

Participants Affiliation Present Excused. Stakeholders NC HVDC User Group 5 th meeting Date: 10 March 2014 Time: 11h00 16h00 Place: ENTSO-E offices, Brussels MINUTES Participants Affiliation Present Excused Stakeholders Magnus CALLAVIK ABB X Sebastian PAPANAGIOTOU

More information

Load-Frequency Control and Reserves Network Code. David Bunney JESG 19 March 2013

Load-Frequency Control and Reserves Network Code. David Bunney JESG 19 March 2013 Load-Frequency Control and Reserves Network Code David Bunney JESG 19 March 2013 Agenda Overview and Timescales Stakeholder Engagement Overview of the Code More detailed discussion on Frequency Quality

More information

Wind Power Facility Technical Requirements CHANGE HISTORY

Wind Power Facility Technical Requirements CHANGE HISTORY CHANGE HISTORY DATE VERSION DETAIL CHANGED BY November 15, 2004 Page 2 of 24 TABLE OF CONTENTS LIST OF TABLES...5 LIST OF FIGURES...5 1.0 INTRODUCTION...6 1.1 Purpose of the Wind Power Facility Technical

More information

IEEE sion/1547revision_index.html

IEEE sion/1547revision_index.html IEEE 1547 IEEE 1547: Standard for Interconnection and Interoperability of Distributed Energy Resources with Associated Electric Power Systems Interfaces http://grouper.ieee.org/groups/scc21/1547_revi sion/1547revision_index.html

More information

Revised IEEE 1547 Standard for Interconnecting Distributed Energy Resources with Electric Power Systems- National Grid Solar Program

Revised IEEE 1547 Standard for Interconnecting Distributed Energy Resources with Electric Power Systems- National Grid Solar Program 1 Revised IEEE 1547 Standard for Interconnecting Distributed Energy Resources with Electric Power Systems- National Grid Solar Program Babak Enayati, PhD, PE Lead Engineer, National Grid Waltham, MA Email:

More information

Target Mchunu and Themba Khoza Eskom Transmission Division, System Operator Grid Code Management

Target Mchunu and Themba Khoza Eskom Transmission Division, System Operator Grid Code Management GRID CONNECTION CODE FOR RENEWABLE POWER PLANTS (RPPs) CONNECTED TO THE ELECTRICITY TRANSMISSION SYSTEM (TS) OR THE DISTRIBUTION SYSTEM (DS) IN SOUTH AFRICA Target Mchunu and Themba Khoza Eskom Transmission

More information

IEEE Std Bulk System Opportunities from New Distributed Energy Resource Interconnection and Interoperability Standards

IEEE Std Bulk System Opportunities from New Distributed Energy Resource Interconnection and Interoperability Standards IEEE Std 1547-2018 Bulk System Opportunities from New Distributed Energy Resource Interconnection and Interoperability Standards Clayton Stice, ERCOT Jens C. Boemer, EPRI (on behalf of SCC21) NERC SPIDER

More information

VGB / EURELECTRIC s generators RfG Network Code: Needs, Feasibility, Alternative Solutions and Costs

VGB / EURELECTRIC s generators RfG Network Code: Needs, Feasibility, Alternative Solutions and Costs VGB / EURELECTRIC s generators RfG Network Code: Needs, Feasibility, Alternative Solutions and Costs The European Commission has tasked a consortium of DNV KEMA and COWI to perform an impact assessment

More information

Wind Power Plants and future Power System Frequency Stability

Wind Power Plants and future Power System Frequency Stability Wind Power Plants and future Power System Frequency Stability Peter W. Christensen Vestas Technology R&D, Denmark Event on Future Power System Operation Lund University, Sweden, June 12, 2012 1 Agenda

More information

BPS-Connected Inverter-Based Resource Performance

BPS-Connected Inverter-Based Resource Performance 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 Reliability Guideline BPS-Connected Inverter-Based Resource Performance May 2018 20 21 22 23 24 25 26 27 28 29 NERC Report Title Report Date I 30 31 32 33

More information

Inverter-Based Resource Disturbance Analysis

Inverter-Based Resource Disturbance Analysis Inverter-Based Resource Disturbance Analysis Key Findings and Recommendations Informational Webinar February 15, 2018 August 16, 2016 Blue Cut Fire Disturbance Key Findings and Recommendations 2 Western

More information

OPERATING CODE NO. 5 (OC5)

OPERATING CODE NO. 5 (OC5) Paragraph No/Title OPERATING CODE NO. 5 (OC5) TESTING AND MONITORING CONTENTS (This contents page does not form part of the Grid Code) Page Number OC5.1 INTRODUCTION... 2 OC5.2 OBJECTIVE... 3 OC5.3 SCOPE...

More information

Design of Low Cost Embedded Power Plant Relay Testing Unit

Design of Low Cost Embedded Power Plant Relay Testing Unit Design of Low Cost Embedded Power Plant Relay Testing Unit S.Uthayashanger, S.Sivasatheeshan, P.R Talbad uthayashanger@yahoo.com Supervised by: Dr. Thrishantha Nanayakkara thrish@elect.mrt.ac.lk Department

More information

Loss of Solar Resources during Transmission Disturbances due to Inverter Settings II

Loss of Solar Resources during Transmission Disturbances due to Inverter Settings II Loss of Solar Resources during Transmission Disturbances due to Inverter Settings II Informational Webinar on Level 2 NERC Alert Ryan Quint, Senior Manager, Advanced Analytics and Modeling Rich Bauer,

More information

Reliability Guideline: Generating Unit Operations During Complete Loss of Communications

Reliability Guideline: Generating Unit Operations During Complete Loss of Communications 1 1 1 1 1 1 1 1 0 1 0 1 0 1 Reliability Guideline: Generating Unit Operations During Complete Loss of Communications Preamble It is in the public interest for the North American Electric Reliability Corporation

More information

GSR018/GC0077: Sub-Synchronous Oscillations (SSO)

GSR018/GC0077: Sub-Synchronous Oscillations (SSO) Stage 03: National Electricity Transmission System Security and Quality of Supply Standards (NETS SQSS) and Grid Code : Sub-Synchronous Oscillations (SSO) 01 Workgroup Report 02 Industry Consultation 03

More information

Fault Ride Through Principles. and. Grid Code Proposed Changes

Fault Ride Through Principles. and. Grid Code Proposed Changes Fault Ride Through Principles and Grid Code Proposed Changes Document identifier: FRT Principles and Proposals Authored by: Jonathan O Sullivan / Alan Rogers Document version: Ver 1.3 Checked by: Anne

More information

DATA REGISTRATION CODE CONTENTS. (This contents page does not form part of the Grid Code) DRC.1 INTRODUCTION... 1 DRC.2 OBJECTIVE...

DATA REGISTRATION CODE CONTENTS. (This contents page does not form part of the Grid Code) DRC.1 INTRODUCTION... 1 DRC.2 OBJECTIVE... DATA REGISTRATION CODE CONTENTS (This contents page does not form part of the Grid Code) Paragraph No/Title Page Number DRC.1 INTRODUCTION... 1 DRC.2 OBJECTIVE... 1 DRC.3 SCOPE... 1 DRC.4 DATA CATEGORIES

More information

Revision 1 of Issue 4 of the Grid Code has been approved by the Authority for implementation on 10 th February 2010.

Revision 1 of Issue 4 of the Grid Code has been approved by the Authority for implementation on 10 th February 2010. Our Ref: Your Ref: Date: 10 th February 2010 To: All Recipients of the Serviced Grid Code Regulatory Frameworks Electricity Codes National Grid Electricity Transmission plc National Grid House Warwick

More information

GSR018: Sub-Synchronous Oscillations (SSO) Workgroup Report

GSR018: Sub-Synchronous Oscillations (SSO) Workgroup Report Stage 01: Workgroup National Electricity Transmission System Security and Quality of Supply Standards (NETS SQSS) GSR018: Sub-Synchronous Oscillations (SSO) Workgroup 01 02 03 Workgroup Industry Consultation

More information

TESTING GUIDANCE FOR PROVIDERS OF FIRM FREQUENCY RESPONSE BALANCING SERVICE

TESTING GUIDANCE FOR PROVIDERS OF FIRM FREQUENCY RESPONSE BALANCING SERVICE TESTING GUIDANCE FOR PROVIDERS OF FIRM FREQUENCY RESPONSE BALANCING SERVICE Authors Published Version Update Summary Kevin Smethurst Vicci Walsh May 2017 D1 Kevin Smethurst Vicci Walsh Draft 2/6/17 D6

More information

Wind Requirements and Testing for Steady-State Voltage and Frequency Control

Wind Requirements and Testing for Steady-State Voltage and Frequency Control 1 Wind Requirements and Testing for Steady-State Voltage and Frequency Control IEEE PES General Meeting, Boston: July 18, 2016 Steven Saylors, P.E. Senior Specialist Vestas Wind Systems 2 Voltage Control

More information

Standard BAL b Automatic Generation Control

Standard BAL b Automatic Generation Control A. Introduction 1. Title: Automatic Generation Control 2. Number: BAL-005-0.2b 3. Purpose: This standard establishes requirements for Balancing Authority Automatic Generation Control (AGC) necessary to

More information

Transmission Interconnection Requirements for Inverter-Based Generation

Transmission Interconnection Requirements for Inverter-Based Generation Transmission Requirements for Inverter-Based Generation June 25, 2018 Page 1 Overview: Every generator interconnecting to the transmission system must adhere to all applicable Federal and State jurisdictional

More information

Technical Requirements for Connecting Small Scale PV (sspv) Systems to Low Voltage Distribution Networks

Technical Requirements for Connecting Small Scale PV (sspv) Systems to Low Voltage Distribution Networks 2014 Technical Requirements for Connecting Small Scale PV (sspv) Systems to Low Voltage Distribution Networks This document specifies the technical requirement for connecting sspv to the low voltage distribution

More information

Automated Event Analysis Tool using Synchrophasor Data in Indian Grid

Automated Event Analysis Tool using Synchrophasor Data in Indian Grid Automated Event Analysis Tool using Synchrophasor Data in Indian Grid NASPI Work Group Meeting March 2015 Rajkumar Anumasula Power System Operation Corporation Ltd. India Some Typical Numbers of Indian

More information

Partial Power Operation of Multi-level Modular Converters under Subsystem Faults

Partial Power Operation of Multi-level Modular Converters under Subsystem Faults Partial Power Operation of Multi-level Modular Converters under Subsystem Faults Philip Clemow Email: philipclemow@imperialacuk Timothy C Green Email: tgreen@imperialacuk Michael M C Merlin Email: michaelmerlin7@imperialacuk

More information

Standard BAL b Automatic Generation Control

Standard BAL b Automatic Generation Control A. Introduction 1. Title: Automatic Generation Control 2. Number: BAL-005-0.2b 3. Purpose: This standard establishes requirements for Balancing Authority Automatic Generation Control (AGC) necessary to

More information

Version 2.6 October Comments to this document can be forwarded to:

Version 2.6 October Comments to this document can be forwarded to: GRID CONNECTION CODE REQUIREMENTS FOR RENEWABLE POWER PLANTS (RPPs) CONNECTED TO THE TRANSMISSION SYSTEM (TS) OR THE DISTRIBUTION SYSTEM (DS) IN SOUTH AFRICA Version 2.6 October 2012 Comments to this document

More information