Public Hearing. Preliminary Draft Development Plans Cay Hill- Little Bay & Cul de Sac

Size: px
Start display at page:

Download "Public Hearing. Preliminary Draft Development Plans Cay Hill- Little Bay & Cul de Sac"

Transcription

1 Public Hearing Preliminary Draft Development Plans Cay Hill- Little Bay & Cul de Sac Development plan SXM September 2012

2 Welcome by the initiator of this public hearing Minister Maurice Lake: Ministry of Public Housing, Spatial Planning, Environment and Infrastructure On behalf of Minister Lake we welcome you at this meeting to discuss the Preliminary Draft Development Plans: Cay Hill- Little Bay & Cul de Sac Public Development Hearing plan Preliminary SXM September Draft Development 2012 Plans Cay Hill- Little Bay & Cul de Sac, September 9, 2014

3 Welcome by the hosts of this meeting Louis Brown: Acting Secretary General VROMI Emmalexis Velasquez: PR officer VROMI Thijs Sommers: Project Leader VROMI Public Development Hearing plan Preliminary SXM September Draft Development 2012 Plans Cay Hill- Little Bay & Cul de Sac Slide 3 of 54

4 Agenda General explanation about the Development Plans Topics Preliminary Draft Development Plans: Infrastructure Tourism and recreation Commercial and public facilities Residential Agriculture Nature and landscape Cultural history and archeology General remarks and Preliminary Draft Map Public Development Hearing plan Preliminary SXM September Draft Development 2012 Plans Cay Hill- Little Bay & Cul de Sac Public Hearing Preliminary Draft Development Plan Simpson Bay, February 25, 2014 Slide 4 of 54

5 Purpose of a Development Plan Legal framework for possible future development To designate and/or reserve land for desired use To prevent undesired development To offer legal security to residents about future development It s not an Action Plan ; it s a framework plan And, we will make it in consultation with you Public Development Hearing plan Preliminary SXM September Draft Development 2012 Plans Cay Hill- Little Bay & Cul de Sac Slide 5 of 55 Public Hearing Preliminary Draft Development Plan Simpson Bay, February 25, 2014 Slide 5 of 54

6 How does it work? A Development Plans contains: A map with zoning designations; Regulations: land use and building regulations; Elucidation: what, why and how Public Development Hearing plan Preliminary SXM September Draft Development 2012 Plans Cay Hill- Little Bay & Cul de Sac Slide 6 of 55 Public Hearing Preliminary Draft Development Plan Simpson Bay, February 25, 2014 Slide 6 of 54

7 Scope of a Development Plan It is a framework plan: reserve space in terms of zoning with a scope of 10 years Not an action plan, a development plan does not include: Maintenance policies Detailed designs of roads, public facilities etc. Above mentioned issues are also important, but should be addressed in other plans/ policies with a different scope Public Development Hearing plan Preliminary SXM September Draft Development 2012 Plans Cay Hill- Little Bay & Cul de Sac Slide 7 of 55 Public Hearing Preliminary Draft Development Plan Simpson Bay, February 25, 2014 Slide 7 of 54

8 Process to follow September 2012: Points of Departure (presentation on gov. website) February 2013: from starting points to development plan (presentation on gov. website) Tonight: Public Hearing Preliminary Draft Development Plan Public Development Hearing plan Preliminary SXM September Draft Development 2012 Plans Cay Hill- Little Bay & Cul de Sac Slide 8 of 55 Public Hearing Preliminary Draft Development Plan Simpson Bay, February 25, 2014 Slide 8 of 54

9 Goal of this Public Hearing Public Hearing of the preliminary draft development plans as prescribed by the National Ordinance on Spatial Development Planning (Article 4.1) Everyone can express their views and concerns regarding this preliminary draft development plan The outcome of this public hearing will be taken into account and the draft development plan will be put on public review accordingly One combined presentation about two separate preliminary draft development plans, namely Cay Hill- Little Bay and Cul de Sac Public Hearing Preliminary Draft Development Plans Cay Hill- Little Bay & Cul de Sac Slide Slide 9 of 955 of 54 Public Development Hearing plan Preliminary SXM September Draft Development 2012 Plan Simpson Bay, February 25, 2014

10 2ᶰᵈ public meeting recap Some of the issues discussed: Traffic congestion and new road links Village centers Emilio Wilson Estate Flooding issues/ water management Public Development Hearing plan Preliminary SXM September Draft Development 2012 Plans Cay Hill- Little Bay & Cul de Sac Slide 10 of 55 Public Hearing Preliminary Draft Development Plan Simpson Bay, February 25, 2014 Slide 10 of 54

11 Preliminary Draft Development Plans Main topics: Traffic Tourism and recreation Commercial and public facilities Residential Agriculture Nature and landscape Cultural history and archeology Public Development Hearing plan Preliminary SXM September Draft Development 2012 Plans Cay Hill- Little Bay & Cul de Sac Slide 11 of 55 Public Hearing Preliminary Draft Development Plan Simpson Bay, February 25, 2014 Slide 11 of 54

12 Preliminary Draft Development Plans Main topics: Traffic Tourism and recreation Commercial and public facilities Residential Agriculture Nature, landscape and water Cultural history and archeology Public Development Hearing plan Preliminary SXM September Draft Development 2012 Plans Cay Hill- Little Bay & Cul de Sac Slide 12 of 55 Public Hearing Preliminary Draft Development Plan Simpson Bay, February 25, 2014 Slide 12 of 54

13 Traffic Traffic zoning designation for existing main roads Traffic zoning designation for new main roads: Link 2, Link 4, Link 6, Link 7 based on comprehensive road network plan (1994) Secondary roads are part of the underlying zoning designations Public Development Hearing plan Preliminary SXM September Draft Development 2012 Plans Cay Hill- Little Bay & Cul de Sac Slide 13 of 55 Public Hearing Preliminary Draft Development Plan Simpson Bay, February 25, 2014 Slide 13 of 54

14 Traffic, Link 2 Traffic zoning designation for Link 2: connection from Zagersgut Road to L.B. Scott Road, to relieve the junction of Churchill Roundabout Below: draft design Link 2 Public Development Hearing plan Preliminary SXM September Draft Development 2012 Plans Cay Hill- Little Bay & Cul de Sac Slide 14 of 55 Public Hearing Preliminary Draft Development Plan Simpson Bay, February 25, 2014 Slide 15 of 54

15 Traffic, Link 6 Link 6: Connection from Cul de Sac to Dutch Quarter The eastern part, will lead from the Bethlehem Estate to Waymouth Estate. This section consists of a new road in the adjacent Development Plan of Dutch Quarter; the road connection continues over the hill, to LB Scott Road, along the existing Mildrum Road, which needs to be upgraded Public Development Hearing plan Preliminary SXM September Draft Development 2012 Plans Cay Hill- Little Bay & Cul de Sac Slide 15 of 55 Public Hearing Preliminary Draft Development Plan Simpson Bay, February 25, 2014 Slide 15 of 54

16 Traffic, Link 6 In the development plan: reserve space of 30 meters for Link 6 for further detailing Public Development Hearing plan Preliminary SXM September Draft Development 2012 Plans Cay Hill- Little Bay & Cul de Sac Slide 16 of 55 Public Hearing Preliminary Draft Development Plan Simpson Bay, February 25, 2014 Slide 15 of 54

17 Traffic, Link 7 and Link 4 Link 7: parallel road/ alternative to L.b. Scott Road; connects with existing road network in St. Peters in the north and links up with Link 4 and Link 2 Link 4 is an upgrade and extension of existing G.A. Arnell Rd. (old Cake House Rd.) Public Development Hearing plan Preliminary SXM September Draft Development 2012 Plans Cay Hill- Little Bay & Cul de Sac Slide 17 of 55 Public Hearing Preliminary Draft Development Plan Simpson Bay, February 25, 2014 Slide 15 of 54

18 Preliminary Draft Development Plans Main topics: Traffic Tourism and recreation Commercial and public facilities Residential Agriculture Nature, landscape and water Cultural history and archeology Public Development Hearing plan Preliminary SXM September Draft Development 2012 Plans Cay Hill- Little Bay & Cul de Sac Slide 18 of 55 Public Hearing Preliminary Draft Development Plan Simpson Bay, February 25, 2014 Slide 23 of 54

19 Tourism and recreation Zoning designation Recreation- Stay over tourism, for resorts including associated facilities Solitary hotels and guesthouse: part of other land use designations, mainly Center areas Public Development Hearing plan Preliminary SXM September Draft Development 2012 Plans Cay Hill- Little Bay & Cul de Sac Slide 19 of 55 Public Hearing Preliminary Draft Development Plan Simpson Bay, February 25, 2014 Slide 24 of 54

20 Tourism and recreation Land use designation for touristic development west of Little Bay pond (based on existing planning permit) Land use designation for additional touristic development south of Little Bay Pond, conditional to certain requirements: e.g. public accessibility of the beach Zoning designation Recreation- Beach in order to preserve the beach (translation of Beach Policy) Public Development Hearing plan Preliminary SXM September Draft Development 2012 Plans Cay Hill- Little Bay & Cul de Sac Slide 20 of 55 Public Hearing Preliminary Draft Development Plan Simpson Bay, February 25, 2014 Slide 24 of 54

21 Preliminary Draft Development Plans Main topics: Traffic Tourism and recreation Commercial and public facilities Residential Agriculture Nature, landscape and water Cultural history and archeology Public Development Hearing plan Preliminary SXM September Draft Development 2012 Plans Cay Hill- Little Bay & Cul de Sac Slide 21 of 55 Public Hearing Preliminary Draft Development Plan Simpson Bay, February 25, 2014 Slide 30 of 54

22 Commercial and public facilities Proposed Commercial Centre in the area around Churchill Roundabout, as far as the planned Link 2 Central location, important infrastructural node, accessibility will be further improved by means of Link 2 Public Development Hearing plan Preliminary SXM September Draft Development 2012 Plans Cay Hill- Little Bay & Cul de Sac Slide 22 of 55 Public Hearing Preliminary Draft Development Plan Simpson Bay, February 25, 2014 Slide 32 of 54

23 Commercial and public facilities Cluster of public/social facilities and related functions in a green and suburban setting around Welgelegen Road Facilitated by zoning designation for sports, social, mixed and commercial functions Public Development Hearing plan Preliminary SXM September Draft Development 2012 Plans Cay Hill- Little Bay & Cul de Sac Slide 23 of 55 Public Hearing Preliminary Draft Development Plan Simpson Bay, February 25, 2014 Slide 32 of 54

24 Commercial and public facilities Cluster of (secondary) schools in Cul de Sac area; existing schools are facilitated by Social zoning designation Concentration of schools adds to congestion in the Cul de Sac area Strive for a better spatial distribution of (secondary) schools in the future, to be facilitated in terms of zoning in other plan areas Public Development Hearing plan Preliminary SXM September Draft Development 2012 Plans Cay Hill- Little Bay & Cul de Sac Slide 23 of 55 Public Hearing Preliminary Draft Development Plan Simpson Bay, February 25, 2014 Slide 32 of 54

25 Commercial and public facilities Reserve space for Village Heart : commercial-, public functions and recreational space centralized around proposed nodes; Stimulates social cohesion and the quality of life, and will contribute to limiting traffic movements Facilitated within Centre zoning designation Public Development Hearing plan Preliminary SXM September Draft Development 2012 Plans Cay Hill- Little Bay & Cul de Sac Slide 24 of 55 Public Hearing Preliminary Draft Development Plan Simpson Bay, February 25, 2014 Slide 33 of 54

26 Preliminary Draft Development Plan Simpson Bay Main topics: Traffic Airport Tourism and recreation Commercial and public facilities Residential Nature, landscape and water Cultural history and archeology Public Development Hearing plan Preliminary SXM September Draft Development 2012 Plans Cay Hill- Little Bay & Cul de Sac Slide 25 of 55 Public Hearing Preliminary Draft Development Plan Simpson Bay, February 25, 2014 Slide 34 of 54

27 Residential Three different kind of residential zoning designations: Category 1: W -1: < 50m Category 2: W - 2: > 50m Category 3: W - U To be detailed Public Development Hearing plan Preliminary SXM September Draft Development 2012 Plans Cay Hill- Little Bay & Cul de Sac Slide 26 of 55 Public Hearing Preliminary Draft Development Plan Simpson Bay, February 25, 2014 Slide 35 of 54

28 Residential W-1 Residential-1 : lower lying areas (< 50 meter altitude) No minimum lot size Maximum building density of 40% Maximum building height of 10m. Public Development Hearing plan Preliminary SXM September Draft Development 2012 Plans Cay Hill- Little Bay & Cul de Sac Slide 27 of 55 Public Hearing Preliminary Draft Development Plan Simpson Bay, February 25, 2014 Slide 35 of 54

29 Residential W-2 Residential-2 : higher areas (> 50 meter altitude) Minimum lot size and maximum building density based on elevation and slope of the area (translation of Hillsides Policy) Maximum building height of 6,5m Public Development Hearing plan Preliminary SXM September Draft Development 2012 Plans Cay Hill- Little Bay & Cul de Sac Slide 28 of 55 Public Hearing Preliminary Draft Development Plan Simpson Bay, February 25, 2014 Slide 35 of 54

30 Residential W-U Residential- to be detailed For large areas not yet built, without a planning permit, but that might be developed in the future Subdivision plan has to be made by the developer and to be approved by the Minister of VROMI based on the criteria of the Development Plan (access, water management, etc.) Public Development Hearing plan Preliminary SXM September Draft Development 2012 Plans Cay Hill- Little Bay & Cul de Sac Slide 29 of 55 Public Hearing Preliminary Draft Development Plan Simpson Bay, February 25, 2014 Slide 35 of 54

31 Residential General regulations: All types of residential use are in principle allowed as long as they comply with building regulations No commercial activities allowed except from home-based occupation such as architect or administration and small guesthouses, bed and breakfast Parking regulations: minimum of one parking space per dwelling plus one additional parking space for every two bedrooms Existing rights such as irrevocable planning permits will be respected Public Development Hearing plan Preliminary SXM September Draft Development 2012 Plans Cay Hill- Little Bay & Cul de Sac Slide 30 of 55 Public Hearing Preliminary Draft Development Plan Simpson Bay, February 25, 2014 Slide 37 of 54

32 Overview residential areas Cay Hill- Little Bay Public Development Hearing plan Preliminary SXM September Draft Development 2012 Plans Cay Hill- Little Bay & Cul de Sac Slide 31 of 55 Public Hearing Preliminary Draft Development Plan Simpson Bay, February 25, 2014 Slide 38 of 54

33 Overview residential areas Cul de Sac Public Development Hearing plan Preliminary SXM September Draft Development 2012 Plans Cay Hill- Little Bay & Cul de Sac Slide 32 of 55 Public Hearing Preliminary Draft Development Plan Simpson Bay, February 25, 2014 Slide 38 of 54

34 Preliminary Draft Development Plan Simpson Bay Main topics: Traffic Tourism and recreation Commercial and public facilities Residential Agriculture Nature, landscape and water Cultural history and archeology Public Development Hearing plan Preliminary SXM September Draft Development 2012 Plans Cay Hill- Little Bay & Cul de Sac Slide 33 of 55 Public Hearing Preliminary Draft Development Plan Simpson Bay, February 25, 2014 Slide 39 of 54

35 Agriculture Small scale agriculture in principle allowed in every zoning designation, also encouraged for (temporary) use of empty lots Exemption can be granted for livestock farming, under certain conditions, the farm must not disproportionately affect the residential and living environment of the adjacent lands Public Development Hearing plan Preliminary SXM September Draft Development 2012 Plans Cay Hill- Little Bay & Cul de Sac Slide 34 of 55 Public Hearing Preliminary Draft Development Plan Simpson Bay, February 25, 2014 Slide 40 of 54

36 Agriculture Area in Reward designated specifically for agricultural purposes, is partially already in use as such For livestock and/or an agricultural station Public Development Hearing plan Preliminary SXM September Draft Development 2012 Plans Cay Hill- Little Bay & Cul de Sac Slide 35 of 55 Public Hearing Preliminary Draft Development Plan Simpson Bay, February 25, 2014 Slide 40 of 54

37 Preliminary Draft Development Plan Simpson Bay Main topics: Traffic Tourism and recreation Commercial and public facilities Residential Agriculture Nature, landscape and water Cultural history and archeology Public Development Hearing plan Preliminary SXM September Draft Development 2012 Plans Cay Hill- Little Bay & Cul de Sac Slide 36 of 55 Public Hearing Preliminary Draft Development Plan Simpson Bay, February 25, 2014 Slide 39 of 54

38 Nature, landscape and water: Little Bay Pond Little Bay Pond: important for water management (stormwater buffer) and ecology. Zoning designation of Water- Natural value for the pond and Nature for shores (mangroves) Public Development Hearing plan Preliminary SXM September Draft Development 2012 Plans Cay Hill- Little Bay & Cul de Sac Slide 37 of 55 Public Hearing Preliminary Draft Development Plan Simpson Bay, February 25, 2014 Slide 40 of 54

39 Nature, landscape and water: green hills Preserve higher slopes of green hills, also within the adjacent Development Plan Hillside Conservation Areas Because of landscape and ecological value, buffer for rainwater and prevention of erosion Public Development Hearing plan Preliminary SXM September Draft Development 2012 Plans Cay Hill- Little Bay & Cul de Sac Slide 38 of 55 Public Hearing Preliminary Draft Development Plan Simpson Bay, February 25, 2014 Slide 40 of 54

40 Nature, landscape and water: Water management In the development plans various measures regarding the water management Regulations for: flood prone areas, runoff water, natural gutters and water retention sites Area at risk of flooding (Unesco-IHE, 2006)UnFlooding of Emilio Wilson Estate in 2005 Public Development Hearing plan Preliminary SXM September Draft Development 2012 Plans Cay Hill- Little Bay & Cul de Sac Slide 39 of 55 Public Hearing Preliminary Draft Development Plan Simpson Bay, February 25, 2014 Slide 40 of 54

41 Nature, landscape and water: Water management Regulations for flood prone areas: minimum elevation of ground floor height Public Development Hearing plan Preliminary SXM September Draft Development 2012 Plans Cay Hill- Little Bay & Cul de Sac Slide 40 of 55 Public Hearing Preliminary Draft Development Plan Simpson Bay, February 25, 2014 Slide 40 of 54

42 Nature, landscape and water: Water management Regulations for run-off water: water management plan one of the criteria for new subdivisions in the areas zoned as Residential - to be detailed Focus on retention/storage of water instead of fast discharge Example of on-site water retention provisions (Planning Department Grand Cayman) Public Development Hearing plan Preliminary SXM September Draft Development 2012 Plans Cay Hill- Little Bay & Cul de Sac Slide 41 of 55 Public Hearing Preliminary Draft Development Plan Simpson Bay, February 25, 2014 Slide 40 of 54

43 Nature, landscape and water: Water management Protection of natural gutters by means of double zoning Water management Space reservation for water detention sites by means of double zoning Water management : Ball Park and Emilio Wilson Estate Public Development Hearing plan Preliminary SXM September Draft Development 2012 Plans Cay Hill- Little Bay & Cul de Sac Slide 42 of 55 Public Hearing Preliminary Draft Development Plan Simpson Bay, February 25, 2014 Slide 40 of 54

44 Nature, landscape and water: Water management Water detention site: to manage water quantity, protect lower laying areas against flooding No permanent water, only limited period of time during extreme rainfall, other use during normal circumstances Proposed detention sites: Emilio Wilson Park and Ball field (Unesco -IHE, 2008) Examples of detentions sites in use as park/ public space and sports field in respectively USA and Japan (Pennsylvania environmental found on and Rijkswaterstaat, Riza, 2006) Public Hearing Preliminary Draft Development Plans Cay Hill- Little Bay & Cul de Sac Slide Slide 4340 of of 5554 Public Development Hearing plan Preliminary SXM September Draft Development 2012 Plan Simpson Bay, February 25, 2014

45 Preliminary Draft Development Plan Simpson Bay Main topics: Traffic Airport Tourism and recreation Commercial and public facilities Residential Agriculture Nature, landscape and water Cultural history and archeology Public Development Hearing plan Preliminary SXM September Draft Development 2012 Plans Cay Hill- Little Bay & Cul de Sac Slide 44 of 55 Public Hearing Preliminary Draft Development Plan Simpson Bay, February 25, 2014 Slide 44 of 54

46 Cultural history, monuments Designated monuments are protected via the Monument Ordinance and marked on the map of the Development Plan (awareness function) Remnants of Ebenezer Plantation and Mary s Fancy Plantation: could be restored/developed into a small park close to and supplementary to the proposed village hearts, within the Green- Park zoning designation Public Development Hearing plan Preliminary SXM September Draft Development 2012 Plans Cay Hill- Little Bay & Cul de Sac Slide 45 of 55 Public Hearing Preliminary Draft Development Plan Simpson Bay, February 25, 2014 Slide 45 of 54

47 Cultural history, monuments Remnants of sugar plantation complexes Industry and Rockland/ Golden Rock on property known as Emilio Wilson Estate Lower part zoned as Green- Park, allows for activities such as market/ fair and associated facilities (e.g. restaurant) Area of 6 ha. adjacent to St. Johns Estate reserved for low density development (approx. 15 dwellings) within Residentialto be detailed zoning designation Space reservation for Link 7 within Traffic zoning designation Nature zoning designation for area above Link 7 within adjacent development plan Hillside Conservation areas Public Development Hearing plan Preliminary SXM September Draft Development 2012 Plans Cay Hill- Little Bay & Cul de Sac Slide 46 of 55 Public Hearing Preliminary Draft Development Plan Simpson Bay, February 25, 2014 Slide 45 of 54

48 Archeological value Double zoning with Value- Archeological: For areas with a expected high archeological value, such as locations of former plantations Development might only be allowed if the archeological value is not at stake Evaluation by VROMI specialist; field research and preservation of artifacts might be required in some occasions The Minister may entirely or partly remove the Value- Archeological zoning from the map if, on the basis of archaeological investigation, no archeological values were found to be present. Public Development Hearing plan Preliminary SXM September Draft Development 2012 Plans Cay Hill- Little Bay & Cul de Sac Slide 47 of 55 Public Hearing Preliminary Draft Development Plan Simpson Bay, February 25, 2014 Slide 47 of 54

49 Preliminary Draft Development Plan Simpson Bay Main topics: Traffic Tourism and recreation Commercial and public facilities Residential Agriculture Nature, landscape and water Cultural history and archeology General remarks and Preliminary Draft Map Public Development Hearing plan Preliminary SXM September Draft Development 2012 Plans Cay Hill- Little Bay & Cul de Sac Slide 48 of 55 Public Hearing Preliminary Draft Development Plan Simpson Bay, February 25, 2014 Slide 48 of 54

50 General remark: existing situations What if existing situation (building and/or usage, or building permit) is different from the Development Plan? -> Situation can be maintained, if: it was legally put there, and; it was already there before publication of Draft Development plan Public Development Hearing plan Preliminary SXM September Draft Development 2012 Plans Cay Hill- Little Bay & Cul de Sac Slide 49 of 55 Public Hearing Preliminary Draft Development Plan Simpson Bay, February 25, 2014 Slide 49 of 54

51 General remark: preparatory resolution Preparatory resolution Hillside Areas is in effect for all the areas in Sint Maarten above the 50 meter altitude, which includes a significant part of the Cay Hill- Little Bay and Cul de Sac Development Plans Building and/or civil work permits might only be issued if they comply with the Development Plans in preparation Information is available on the government website: Public Development Hearing plan Preliminary SXM September Draft Development 2012 Plans Cay Hill- Little Bay & Cul de Sac Slide 50 of 55 Public Hearing Preliminary Draft Development Plan Simpson Bay, February 25, 2014 Slide 50 of 54

52 Public Public Development Hearing Hearing plan Preliminary Preliminary SXM September Draft Draft Development Development 2012 Plans Simpson Cay Hill- Bay, Little February Bay & Cul 25, de 2014 Sac Slide Slide of of 5554

53 Preliminary Draft Map Cay Hill- Little Bay Slide 52 of 54 Public Development Hearing plan Preliminary SXM September Draft Development 2012 Plans Cay Hill- Little Bay & Cul de Sac Slide 52 of 55

54 Preliminary Draft Map Cul de Sac Public Development Hearing plan Preliminary SXM September Draft Development 2012 Plans Cay Hill- Little Bay & Cul de Sac Slide 53 of 55

55 What is next? Public Review of the Draft Development Plans. Everyone is invited to review and submit their written objections (if any) to the Minister of VROMI Will be announced through the local news media shortly, stay tuned! Public Development Hearing plan Preliminary SXM September Draft Development 2012 Plans Cay Hill- Little Bay & Cul de Sac Slide 54 of 55 Public Hearing Preliminary Draft Development Plan Simpson Bay, February 25, 2014 Slide 53 of 54

56 Thank you for your attention Questions, comments? This presentation will be uploaded to: > Ministry of Public Housing, Spatial Planning, Environment & Infrastructure > Zoning/ Development Plans Public Development Hearing plan Preliminary SXM September Draft Development 2012 Plan Cay Hill-Little Bay and Cul de Sac Slide 55 of 55

CHAPTER 11 PRELIMINARY SITE PLAN APPROVAL PROCESS

CHAPTER 11 PRELIMINARY SITE PLAN APPROVAL PROCESS CHAPTER 11 PRELIMINARY SITE PLAN APPROVAL PROCESS 11.01.00 Preliminary Site Plan Approval 11.01.01 Intent and Purpose 11.01.02 Review 11.01.03 Application 11.01.04 Development Site to be Unified 11.01.05

More information

A. ARTICLE 4 SKETCH PLAN REQUIREMENTS, MAJOR SUBDIVISION AND/OR LAND DEVELOPMENT

A. ARTICLE 4 SKETCH PLAN REQUIREMENTS, MAJOR SUBDIVISION AND/OR LAND DEVELOPMENT 400. 402.A. ARTICLE 4 SKETCH PLAN REQUIREMENTS, MAJOR SUBDIVISION AND/OR LAND DEVELOPMENT SECTION 400 PURPOSE The purpose of the Sketch Plan is to provide an opportunity for the applicant to consult early

More information

5 February 11, 2015 Public Hearing

5 February 11, 2015 Public Hearing 5 February 11, 2015 Public Hearing CITY OF VIRGINIA BEACH AMENDMENT TO ZONING ORDINANCE SMALL WIRELESS COMMUNICATION FACILITY REQUEST: An ordinance to Amend City Zoning Ordinance Section 111 by adding

More information

APPLICATION FOR SITE PREPARATION PERMIT

APPLICATION FOR SITE PREPARATION PERMIT Engineering Division 550 Landa Street New Braunfels, Texas 78130 (830) 221-4020 1. Subdivision/Plat Name: Location Description/ Nearest Intersection: Acreage: APPLICATION FOR SITE PREPARATION PERMIT No.

More information

Public School Facilities Element

Public School Facilities Element Public School Facilities Element GOAL 1: THROUGH PARTNERSHIPS AND EFFECTIVE COLLABORATION AMONG LOCAL GOVERNMENTS AND THE PINELLAS COUNTY SCHOOL DISTRICT, AND BECAUSE OF A SHARED COMMITMENT TO EDUCATIONAL

More information

AN OVERVIEW OF THE STATE OF MARINE SPATIAL PLANNING IN THE MEDITERRANEAN COUNTRIES MALTA REPORT

AN OVERVIEW OF THE STATE OF MARINE SPATIAL PLANNING IN THE MEDITERRANEAN COUNTRIES MALTA REPORT AN OVERVIEW OF THE STATE OF MARINE SPATIAL PLANNING IN THE MEDITERRANEAN COUNTRIES MALTA REPORT Malta Environment & Planning Authority May 2007 AN OVERVIEW OF THE STATE OF MARINE SPATIAL PLANNING IN THE

More information

Site Plan/Building Permit Review

Site Plan/Building Permit Review Part 6 Site Plan/Building Permit Review 1.6.01 When Site Plan Review Applies 1.6.02 Optional Pre- Application Site Plan/Building Permit Review (hereafter referred to as Site Plan Review) shall be required

More information

Summerland Planning Advisory Committee

Summerland Planning Advisory Committee Summerland Planning Advisory Committee SunPAC Meeting #32 May 10, 2011 1 SunPAC Meeting Agenda Call to Order Agenda Item: 1 Item 1: Pledge of allegiance and roll call Item 2: Public comment period Item

More information

City of Colleyville Community Development Department. Site/Landscape Plan Application Packet

City of Colleyville Community Development Department. Site/Landscape Plan Application Packet City of Colleyville Community Development Department Site/Landscape Plan Application Packet 1 Development Application Fees City of Colleyville 100 Main Street Colleyville TX 76034 817.503.1050 Zoning Zoning

More information

CITY OF DES MOINES, IA PERMIT AND DEVELOPMENT CENTER 602 Robert D Ray Drive Des Moines, IA Phone:

CITY OF DES MOINES, IA PERMIT AND DEVELOPMENT CENTER 602 Robert D Ray Drive Des Moines, IA Phone: CITY OF DES MOINES, IA PERMIT AND DEVELOPMENT CENTER 602 Robert D Ray Drive Des Moines, IA 50311 Phone: 515-283-4200 Minor Site Plan list This checklist should be used as a guide in the preparation of

More information

SITE PLAN APPLICATION

SITE PLAN APPLICATION SITE PLAN APPLICATION SECTION 1. APPLICANT/OWNER INFORMATION Please Print or Type Applicant/Developer: City: State: Zip: Telephone: Fax: E-mail: Applicant s Status: (Check One) Owner Tenant Prospective

More information

B.2 MAJOR SUBDIVISION PRELIMINARY PLAN CHECKLIST

B.2 MAJOR SUBDIVISION PRELIMINARY PLAN CHECKLIST B.2 MAJOR SUBDIVISION PRELIMINARY PLAN CHECKLIST YES* GENERAL SUBMISSION ITEMS Does the submission include: 1. Thirteen (13) copies of completed Application Form? 2. Thirteen (13) copies of the Preliminary

More information

City of San José, California CITY COUNCIL POLICY

City of San José, California CITY COUNCIL POLICY City of San José, California CITY COUNCIL POLICY TITLE 1 1 of 6 EFFECTIVE DATE 1/22/91 REVISED DATE 9/16/03 APPROVED BY Council Action - January 22, 1991; August 11, 1992; August 20, 1996 (9d); September

More information

PLANNING AND DEVELOPMENT

PLANNING AND DEVELOPMENT OVERVIEW Effective January 1, 1992 all applications for multi-family residential and all non-residential building permits require site plan approval before permit issuance. All new developments and existing

More information

SITE PLAN Application Packet (Required For All Non-Residential Development Projects)

SITE PLAN Application Packet (Required For All Non-Residential Development Projects) SITE PLAN Application Packet (Required For All Non-Residential Development Projects) Community Development Department 90 North Main Street, Tooele, UT 84074 (435) 843-2130 Fax (435) 843-2139 Dear Applicant,

More information

CITY OF EL MIRAGE DEVELOPMENT APPLICATION PROCESS

CITY OF EL MIRAGE DEVELOPMENT APPLICATION PROCESS DEVELOPMENT APPLICATION PROCESS Development Applications are reviewed by the El Mirage Technical Advisory Committee (TAC) to ensure Building, Engineering and Zoning compliance before scheduling public

More information

CITY OF EL MIRAGE DEVELOPMENT APPLICATION PROCESS

CITY OF EL MIRAGE DEVELOPMENT APPLICATION PROCESS DEVELOPMENT APPLICATION PROCESS I. Technical Advisory Committee (TAC) 1. Submit TAC Review Application (See Page 3 for TAC Review Application Requirements) 2. Review of TAC Review Application by Technical

More information

ZONING R-LI Low Intensity Residential District. [Amended by Ord. No. 1684] PERMITTED USES BY RIGHT.

ZONING R-LI Low Intensity Residential District. [Amended by Ord. No. 1684] PERMITTED USES BY RIGHT. 130.19. R-LI Low Intensity Residential District. [Amended 10-2-95 by Ord. No. 1684] 130.19.1. Purpose. To preserve steep slopes, floodplains, and other sensitive natural areas and to provide opportunities

More information

Article 4 PROCEDURES for PLOT PLAN and SITE PLAN REVIEW

Article 4 PROCEDURES for PLOT PLAN and SITE PLAN REVIEW Article 4 PROCEDURES for PLOT PLAN and SITE PLAN REVIEW Section 4.01 Purpose It is the intent of this Article to specify standards, application and data requirements, and the review process which shall

More information

Hillside & Foothills Development Application

Hillside & Foothills Development Application Hillside & Foothills Development Application This box for office use only File #: Cross Referenced File(s): Fee: Zone(s): Are Pre-Application materials attached? Yes No This application is a request to

More information

Management Unit 2: East Beach to West Beach, Selsey

Management Unit 2: East Beach to West Beach, Selsey Management Unit 2: East Beach to West Beach, Selsey Unit limits 4400m from 487200E, 094300N to 484450E, 093100N This Unit also forms Unit 1 of the South Downs SMP. Coastal processes The Selsey peninsula,

More information

there are no known Critical Environmental Area(s) on the site which will be impaired as the result of the proposed Actions; and

there are no known Critical Environmental Area(s) on the site which will be impaired as the result of the proposed Actions; and TOWN OF FARMINGTON PLANNING BOARD PB 0501-18 & 0502-18 SEQR Resolution Determination of Non-Significance Preliminary Subdivision Plat & Preliminary Site Plan, James Brenchley, 5106 Rushmore Road Whereas,

More information

BRASELTON WATER AND WASTEWATER DEPARTMENT CONSTRUCTION PLAN REVIEW CHECKLIST May 2006

BRASELTON WATER AND WASTEWATER DEPARTMENT CONSTRUCTION PLAN REVIEW CHECKLIST May 2006 Project Name: BRASELTON WATER AND WASTEWATER DEPARTMENT CONSTRUCTION PLAN REVIEW CHECKLIST May 2006 Phase: Unit: # Lots: Development Type (residential, commercial, industrial, etc.) Braselton Project No.

More information

BEFORE THE BOARD OF COUNTY COMMISSIONERS OF DESCHUTES COUNTY, OREGON * * * *

BEFORE THE BOARD OF COUNTY COMMISSIONERS OF DESCHUTES COUNTY, OREGON * * * * REVIEWED LEGAL COUNSEL For Recording Stamp Only BEFORE THE BOARD OF COUNTY COMMISSIONERS OF DESCHUTES COUNTY, OREGON An Ordinance Amending Deschutes County Code Title 18 to Provide a Definition of Agricultural

More information

CONCEPT REVIEW GUIDELINES

CONCEPT REVIEW GUIDELINES Department of Planning & Community Development @ Jefferson Station 1526 E. Forrest Avenue Suite 100 East Point, GA 30344 404.270.7212 (Phone) 404.765.2784 (Fax) www.eastpointcity.org CONCEPT REVIEW GUIDELINES

More information

Porter County Plan Commission

Porter County Plan Commission Plan Type: Development Plan Administrative DRC PC Primary Plan Administrative DRC PC Secondary Plat/Replat Administrative DRC PC PUD Conceptual Detailed Final Project Information Project Name: Developer

More information

City of Massillon Site Plan Checklist

City of Massillon Site Plan Checklist City of Massillon Site Plan Checklist The following information MUST be included with all Site Plans submitted for review and processing in order to constitute a complete Site Plan Package. Incomplete

More information

Site Plan Review Application. Interest in the Property (e.g. fee simple, land option, etc.)

Site Plan Review Application. Interest in the Property (e.g. fee simple, land option, etc.) 1. Identification CITY OF FENTON 301 South Leroy Street Fenton, Michigan 48430-2196 (810) 629-2261 FAX (810) 629-2004 Site Plan Review Application Project Name Applicant Name Address City/State/Zip Phone

More information

Community & Economic Development Department Planning Division Frederick Street PO Box 8805 Moreno Valley, CA SUBMITAL REQUIREMENTS

Community & Economic Development Department Planning Division Frederick Street PO Box 8805 Moreno Valley, CA SUBMITAL REQUIREMENTS Community & Economic Development Department Planning Division 14177 Frederick Street PO Box 8805 Moreno Valley, CA 92552-0805 (951) 413-3206 Fax (951) 413-3210 SECOND UNITS Completed and Signed Project

More information

INTENT An Administrative Site Plan is required for the following situations, excluding single-family detached development:

INTENT An Administrative Site Plan is required for the following situations, excluding single-family detached development: SECTION 13-400 ADMINISTRATIVE SITE PLAN 13-401 INTENT An Administrative Site Plan is required for the following situations, excluding single-family detached development: A. All development on vacant land

More information

Conceptual, Preliminary and Final Site Plan Review in Holladay City

Conceptual, Preliminary and Final Site Plan Review in Holladay City Conceptual, Preliminary and Final Site Plan Review in Holladay City The City of Holladay incorporated in December, 1999 and adopted its own zoning ordinance in May, 2000. All land use decisions are made

More information

3 Economic Development

3 Economic Development 3 Economic Development Introduction: The Economic Development Element of the Comprehensive Plan is intended to guide the climate for enterprise and commercial exchange in Buckley and reinforce the overall

More information

DESIGN REVIEW COMMITTEE AGENDA ITEM

DESIGN REVIEW COMMITTEE AGENDA ITEM DESIGN REVIEW COMMITTEE AGENDA ITEM AGENDA DATE: MARCH 16, 2016 TO: THRU: FROM: SUBJECT: Chair Fox and Members of the Design Review Committee Leslie Aranda Roseberry, Planning Manager Robert Garcia, Senior

More information

Planning Permit Application LAND USE PRELIMINARY APPLICATION (LUP)

Planning Permit Application LAND USE PRELIMINARY APPLICATION (LUP) Planning Permit Application LAND USE PRELIMINARY APPLICATION (LUP) 415 W 6 th ST ~ Vancouver, WA 98660 PO Box 1995 ~ Vancouver, WA 98668 Phone (360) 487-7800 www.cityofvancouver.us Type Of Work Type I

More information

FRAMEWORK ACT ON MARINE FISHERY DEVELOPMENT. [Enforcement Date: Nov. 28, 2009] [Act No. 9717, May 27, 2009, Other Laws and Regulations Amended]

FRAMEWORK ACT ON MARINE FISHERY DEVELOPMENT. [Enforcement Date: Nov. 28, 2009] [Act No. 9717, May 27, 2009, Other Laws and Regulations Amended] The English version is translated and uploaded only for the purpose of no other than PR, and thereby, Framework Act on Marine Fishery Development in the Korean language will prevail regarding authorization

More information

Objective 3.1: Provide or stimulate provision by the private sector of affordable housing units.

Objective 3.1: Provide or stimulate provision by the private sector of affordable housing units. 3. HOUSING ELEMENT The purpose of this element is to provide plans and policies that will assist the City in meeting identified or projected deficits in the supply of housing, correcting substandard or

More information

SUBMITTAL REQUIREMENTS FOR USE PROCESS III OR PROCESS IV

SUBMITTAL REQUIREMENTS FOR USE PROCESS III OR PROCESS IV COMMUNITY DEVELOPMENT DEPARTMENT 33325 8 th Avenue South Federal Way WA 98003 253-835-2607; Fax 253-835-2609 www.cityoffederalway.com SUBMITTAL REQUIREMENTS FOR USE PROCESS III OR PROCESS IV USE PROCESS

More information

Essential Skills: Reading and Interpreting Maps and Plans

Essential Skills: Reading and Interpreting Maps and Plans Essential Skills: Reading and Interpreting Maps and Plans Prepared for: NEW YORK STATE PLANNING FEDERATION April 14, 2015 Prepared by: BME ASSOCIATES Peter G. Vars, P.E. Stages of Plan Review Concept /

More information

TOWN OF MANCHESTER PLANNING AND ZONING COMMISSION. 7:00 P.M. 494 Main Street AGENDA

TOWN OF MANCHESTER PLANNING AND ZONING COMMISSION. 7:00 P.M. 494 Main Street AGENDA TOWN OF MANCHESTER PLANNING AND ZONING COMMISSION September 18, 2017 Lincoln Center Hearing Room 7:00 P.M. 494 Main Street AGENDA PUBLIC HEARING: 1. TOWN OF MANCHESTER PLANNING & ZONING COMMISSION To revise

More information

HAMILTON TOWNSHIP Department of Planning and Zoning Application for a Commercial / Industrial Site Plan Review

HAMILTON TOWNSHIP Department of Planning and Zoning Application for a Commercial / Industrial Site Plan Review HAMILTON TOWNSHIP Department of Planning and Zoning Application for a Commercial / Industrial Site Plan Review Date: Application is hereby made for a Site Plan Review for a commercial or industrial use.

More information

State College Area School District

State College Area School District State College Area School District The following is a guideline for project design submittals to the Facility Committee of the State College Area School District. During the design process the committee

More information

Application Submittal Checklist for a BASIC USE PERMIT (BUP) Planning & Development Department Planning Division

Application Submittal Checklist for a BASIC USE PERMIT (BUP) Planning & Development Department Planning Division Application Submittal Checklist for a BASIC USE PERMIT (BUP) APPLICABILITY. This checklist should be used when submitting an application for a Basic Use Permit. When is a Basic Use Permit required? Section

More information

Item 2. September 28, 2017

Item 2. September 28, 2017 September 28, 2017 Item 2 Applicant: Georgetown Development Location: 190 N 1100 W Prepared by: Sean Conroy, Community Development Director Public Hearing: No Zone: PRD-1 Attachments: 1. Findings. 2. Project

More information

SOUTH BAY CORPORATE CENTER

SOUTH BAY CORPORATE CENTER F O R L E A S E 1 9 2, 6 6 9 S F C o r p o r at e H e a d q u a r t e r s O f f i c e a n d R & D B u i l d i n G South Bay Corporate Center is a prominent office and R&D corporate headquarters facility

More information

DEPARTMENT OF COMMUNITY DEVELOPMENT SITE PLAN INFORMATION

DEPARTMENT OF COMMUNITY DEVELOPMENT SITE PLAN INFORMATION DEPARTMENT OF COMMUNITY DEVELOPMENT SITE PLAN INFORMATION 220 Clay Street Cedar Falls, Iowa 50613 General Information: Applications for developing a commercial, multi-family, or residential (in an overlay

More information

CITY OF LOVELAND VISUAL ARTS COMMISSION ACQUISITION POLICY

CITY OF LOVELAND VISUAL ARTS COMMISSION ACQUISITION POLICY CITY OF LOVELAND VISUAL ARTS COMMISSION ACQUISITION POLICY The following acquisition policy provides a framework for decisions relating to the duties and responsibilities of the Visual Arts Commission

More information

List of Figures. List of Forms

List of Figures. List of Forms City of Columbia Engineering Regulations PART 1: SUBMISSION OF PLANS Table of Contents Paragraph Description Page No. 1.1 General 1-1 1.2 Engineer s Report 1-1 1.3 Plans 1-3 1.4 Revisions to Approved Plan

More information

CHECKLIST THE FOLLOWING INFORMATION AND DOCUMENTATION MUST BE SUBMITTED TO DEVELOPMENT SERVICES BEFORE YOUR APPLICATION CAN BE PROCESSED.

CHECKLIST THE FOLLOWING INFORMATION AND DOCUMENTATION MUST BE SUBMITTED TO DEVELOPMENT SERVICES BEFORE YOUR APPLICATION CAN BE PROCESSED. CHECK LIST MOBILEHOME PERMANENT FOUNDATION BUILDING PERMIT SAN JOAQUIN COUNTY COMMUNITY DEVELOPMENT DEPARTMENT 1810 E. HAZELTON AVENUE, STOCKTON CA 95205 BUSINESS PHONE: (209) 468-3121 INSPECTION REQUEST-24

More information

MINOR SUBDIVISION. [ ] [ ] [ ] [ ] B. Dimensions, bearings and curve data for all property lines and easements.

MINOR SUBDIVISION. [ ] [ ] [ ] [ ] B. Dimensions, bearings and curve data for all property lines and easements. MINOR SUBDIVISION 190-69. Minor subdivisions. In addition to the requirements indicated in 190-67 (SEE BELOW), the information below shall be shown on the plans for all minor subdivision applications.

More information

Welcome Public Open House

Welcome Public Open House Peachland Study Welcome Public Open House Preliminary Review of Alternate & Existing Route Options Peachland Study Open House Purpose & Objectives 1. Present possible options for meeting the current and

More information

CAB APPLICATION FOR MASTER SIGNAGE PLAN

CAB APPLICATION FOR MASTER SIGNAGE PLAN CAB APPLICATION FOR MASTER SIGNAGE PLAN Instructions: Fully complete all sections of the application form (Type or print-must be legible) Application Sections 1. Applicant 2. Master Signage Plan Requirements

More information

SUBMITTAL REQUIREMENTS RCV D REJECT PENDING

SUBMITTAL REQUIREMENTS RCV D REJECT PENDING 1 of 5 SUBMITTAL REQUIREMENTS RCV D REJECT PENDING 1. General Information. 1.1 Applicant s name, address and contact numbers. 1.2 Project name, type, address and legal description of the property. 1.3

More information

DESIGN REVIEW PROCESS AND APPLICATION

DESIGN REVIEW PROCESS AND APPLICATION DESIGN REVIEW PROCESS AND APPLICATION Design review is the first step in the process of any construction project requiring permits. The Community Redevelopment Agency (CRA) Board is responsible for ensuring

More information

SECTION 2 GENERAL REQUIREMENTS

SECTION 2 GENERAL REQUIREMENTS SECTION 2 GENERAL REQUIREMENTS 2-1 ENGINEER REQUIRED: All plans and specifications for Improvements which are to be accepted for maintenance by the County and private, on-site drainage and grading shall

More information

CHECKLIST PRELIMINARY SUBDIVISION AND PRELIMINARY SITE PLAN

CHECKLIST PRELIMINARY SUBDIVISION AND PRELIMINARY SITE PLAN N/A Waiver (1) Four (4) copies of application form. (2) Fifteen (15) copies of plan (3) Subdivision/site plan application fee & professional review escrow deposit (4) Variance application fee & professional

More information

PLANNING DEPARTMENT SUBMITTAL REQUIREMENTS FOR CONDITIONAL USE PERMITS CLASS 4 DEVELOPMENT REVIEW PROCESS. A. Written Material

PLANNING DEPARTMENT SUBMITTAL REQUIREMENTS FOR CONDITIONAL USE PERMITS CLASS 4 DEVELOPMENT REVIEW PROCESS. A. Written Material PLANNING DEPARTMENT 970.668.4200 0037 Peak One Dr. PO Box 5660 www.summitcountyco.gov Frisco, CO 80443 SUBMITTAL REQUIREMENTS FOR CONDITIONAL USE PERMITS CLASS 4 DEVELOPMENT REVIEW PROCESS Per the provisions

More information

SECTION 100 PRELIMINARY CONSIDERATIONS & INSTRUCTIONS

SECTION 100 PRELIMINARY CONSIDERATIONS & INSTRUCTIONS SECTION 100 PRELIMINARY CONSIDERATIONS & INSTRUCTIONS 101 General 102 Submittal Requirements A. Initial Submittal B. Second Submittal 103 Plan Requirements A. Subdivisions B. Site Plans 104 Approval of

More information

Article 4.0 Measurements and Exceptions

Article 4.0 Measurements and Exceptions This Article identifies and explains some of the more common forms of measurement used throughout this Ordinance. It also specifies exceptions to certain requirements of this Ordinance. Sec. 4.1 Measurements

More information

SITE PLAN, SUBDIVISION & EXTERIOR DESIGN REVIEW PROCESS

SITE PLAN, SUBDIVISION & EXTERIOR DESIGN REVIEW PROCESS INCORPORATED VILLAGE OF ROCKVILLE CENTRE BUILDING DEPARTMENT SITE PLAN, SUBDIVISION & EXTERIOR DESIGN REVIEW PROCESS Presubmission - Prior to a formal submission, the applicant should meet in person with

More information

CLAY TOWNSHIP BOARD OF SUPERVISORS REGULAR MEETING MINUTES July 10, 2017

CLAY TOWNSHIP BOARD OF SUPERVISORS REGULAR MEETING MINUTES July 10, 2017 CLAY TOWNSHIP BOARD OF SUPERVISORS REGULAR MEETING MINUTES July 10, 2017 The Supervisors of Clay Township met on a regularly scheduled meeting date of July 10, 2017, at the Clay Township Municipal Office,

More information

strategic policies in the adopted development plan for South Cambridgeshire. Some

strategic policies in the adopted development plan for South Cambridgeshire. Some Strategic in adopted development plan for South Cambridgeshire According to the National Planning Policy Framework () a local planning authority should set out clearly the for their area (para 184). There

More information

APPLICATION DESIGN REVIEW Please Print or Type

APPLICATION DESIGN REVIEW Please Print or Type www.srcity.org ZONING ADMINISTRATOR (ZA) APPLICATION DESIGN REVIEW Please Print or Type DESIGN REVIEW BOARD File # Related Files: LOCATION OF PROJECT (ADDRESS) ASSESSOR S PARCEL NUMBER(S) EXISTING ZONING

More information

Summerland Planning Advisory Committee. SunPAC Meeting #31 April 28, 2011

Summerland Planning Advisory Committee. SunPAC Meeting #31 April 28, 2011 Summerland Planning Advisory Committee SunPAC Meeting #31 April 28, 2011 1 SunPAC Meeting Agenda Call to Order Item 1: Pledge of allegiance and roll call Agenda Item: 1 Item 2: Public comment period Item

More information

1.1 Introduction to the Kaikoura District Plan

1.1 Introduction to the Kaikoura District Plan 1. Introduction 1.1 Introduction to the Kaikoura District Plan This document is a Proposed Plan which is the first District Plan prepared under the Resource Management Act (1991) for the Kaikoura District.

More information

LOWNDES COUNTY ENGINEERING PLAN REVIEW CHECKLIST. Design Professional: Phone: Developer: Phone: 2 nd Submittal (No Fee)

LOWNDES COUNTY ENGINEERING PLAN REVIEW CHECKLIST. Design Professional: Phone: Developer: Phone: 2 nd Submittal (No Fee) MEMORANDUM MICHAEL B. FLETCHER, P.E. COUNTY ENGINEER 327 N. Ashley Street Valdosta, GA 31601 Telephone: (229) 671-2424 Fax: (229) 245-5299 mfletcher@lowndescounty.com LOWNDES COUNTY ENGINEERING PLAN REVIEW

More information

PRELIMINARY PLAT CHECK LIST

PRELIMINARY PLAT CHECK LIST Name of Proposed Subdivision: The following items must be included with the initial submittal of a Preliminary Plat: Application, filled out completely Project Narrative Pre-application Conference Report

More information

VARIANCE APPLICATION (NO SITE PLAN OR SUBDIVISION)

VARIANCE APPLICATION (NO SITE PLAN OR SUBDIVISION) VARIANCE APPLICATION (NO SITE PLAN OR SUBDIVISION) 190-66. General procedure for completeness review. A. In order to be determined complete for review by the Board, all of the required information must

More information

Checklist for Tentative Subdivision Map

Checklist for Tentative Subdivision Map Checklist for Tentative Subdivision Map All submittal information shall be provided to the Community Development Department. All submittal information shall be presented along with the Uniform Application,

More information

Last Name: First Name: M.I:

Last Name: First Name: M.I: ARCHITECTURE DESIGN REVIEW BOARD APPLICATION OFFICE USE ONLY APPLICATION # Permit # Fee Collected $ 1. Filing Status Initial Submission Amendment Withdrawal 2. Cost of Construction (Industry Standards)

More information

APPLICATION FOR SITE PLAN REVIEW

APPLICATION FOR SITE PLAN REVIEW APPLICATION FOR SITE PLAN REVIEW ONLY COMPLETE SUBMISSIONS WILL BE PROCESSED CITY OF PORT ST. LUCIE P&Z File No. PLANNING & ZONING DEPARTMENT Fees (Nonrefundable) $ Arch.: $ (772) 871-5212 FAX: (772) 871-5124

More information

Building Standards Department. Markham eplan Submission Standards For Building Permits, Sign Permits and Zoning Preliminary Review

Building Standards Department. Markham eplan Submission Standards For Building Permits, Sign Permits and Zoning Preliminary Review Markham eplan Submission Standards For Building Permits, Sign Permits and Zoning Preliminary Review eplan Submission Standards Building Standards February 2018 SUBMISSION STANDARDS PREPARING YOUR ELECTRONIC

More information

Directors Absent: Anthony Agnitti Thomas Henderson

Directors Absent: Anthony Agnitti Thomas Henderson Southfield Redevelopment Authority Board of Directors Meeting Permit Granting Authority Conservation Commission Applicable Subdivision Board Monday, May 8, 2017 @ 7:00pm Conference Room, SRA Offices Directors

More information

National Grid s commitments when undertaking works in the UK. Our stakeholder, community and amenity policy

National Grid s commitments when undertaking works in the UK. Our stakeholder, community and amenity policy National Grid s commitments when undertaking works in the UK Our stakeholder, community and amenity policy Introduction This document describes the ten commitments we have made to the way we carry out

More information

CITY OF APACHE JUNCTION DEVELOPMENT SERVICES CIVIL ENGINEERING PLAN REVIEW CHECKLIST PROJECT: LOCATION:

CITY OF APACHE JUNCTION DEVELOPMENT SERVICES CIVIL ENGINEERING PLAN REVIEW CHECKLIST PROJECT: LOCATION: CITY OF APACHE JUNCTION DEVELOPMENT SERVICES CIVIL ENGINEERING PLAN REVIEW CHECKLIST PROJECT: LOCATION: LOG NO.: LEGEND REVIEW REVIEWED BY DATE / - Requirement satisfied 1 O Requirement not satisfied 2?

More information

A. Dewatering observation wells are part of dewatering allowance.

A. Dewatering observation wells are part of dewatering allowance. SECTION 312319 - DEWATERING PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections,

More information

CHAPTER 3. Public Schools Facility Element

CHAPTER 3. Public Schools Facility Element CHAPTER 3 Public Schools Facility Element Page 1 of 12 CHAPTER 3 PUBLIC SCHOOL FACILITIES ELEMENT GOAL 3.1: Collaborate and coordinate with the School Board of Volusia County to provide and maintain a

More information

GENERAL REQUIREMENTS (Print or Type) PROJECT DESCRIPTION OWNER CERTIFICATION

GENERAL REQUIREMENTS (Print or Type) PROJECT DESCRIPTION OWNER CERTIFICATION GENERAL REQUIREMENTS (Print or Type) Name of Proposed Project: Location of Project: Legal Description of Project (Assessor s Parcel No. or T, R S,): Staff Use Only CASE NO.: RELATED FILES: Applicant s

More information

CLAY TOWNSHIP BOARD OF SUPERVISORS REGULAR MEETING MINUTES March 14, 2016

CLAY TOWNSHIP BOARD OF SUPERVISORS REGULAR MEETING MINUTES March 14, 2016 CLAY TOWNSHIP BOARD OF SUPERVISORS REGULAR MEETING MINUTES March 14, 2016 The Supervisors of Clay Township met on a regularly scheduled meeting date of March 14, 2016, at the Clay Township Municipal Office,

More information

SECTION 3 IMPROVEMENT PLAN REQUIREMENTS

SECTION 3 IMPROVEMENT PLAN REQUIREMENTS SECTION 3 IMPROVEMENT PLAN REQUIREMENTS CONTENTS Page 3-1 Digital Submittals 3-2 3-2 Paper Size and Scale 3-2 3-3 Drafting Standard 3-2 3-4 Title Sheet 3-2 3-5 Title Block 3-3 3-6 Drainage, Sewer, Water,

More information

KEY MAP PLAN AREA MAP. St. Albans Sub-Area Plan. Area Boundary

KEY MAP PLAN AREA MAP. St. Albans Sub-Area Plan. Area Boundary Richmond Official Community Plan CITY CENTRE AREA ST. ALBANS SUB-AREA PLAN Bylaw 7100 Schedule 2.10A ST. ALBANS SUB-AREA PLAN z ST. ALBANS SUB-AREA PLAN z ST. ALBANS SUB-AREA PLAN KEY MAP PLAN AREA MAP

More information

SECTION DEWATERING PART 1 - GENERAL 1.1 RELATED DOCUMENTS

SECTION DEWATERING PART 1 - GENERAL 1.1 RELATED DOCUMENTS SECTION 312319 - DEWATERING PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections,

More information

Application for Site Plan Review

Application for Site Plan Review Application for Site Plan Review 3275 Central Blvd., Hudsonville, Michigan 49426-1450, 616.669.0200 fax 616.669.2330 It is STRONGLY recommended that any application that must go before the Planning Commission

More information

David J. Gellner, AICP, Principal Planner

David J. Gellner, AICP, Principal Planner Staff Report PLANNING DIVISION COMMUNITY & ECONOMIC DEVELOPMENT To: From: Salt Lake City Planning Commission David J. Gellner, AICP, Principal Planner - 801-535-6107 - david.gellner@slcgov.com Date: October

More information

City of Hamilton INFORMATION FOR CONDITIONAL USE PERMIT

City of Hamilton INFORMATION FOR CONDITIONAL USE PERMIT City of Hamilton INFORMATION FOR CONDITIONAL USE PERMIT There is a $200.00 non-refundable fee for each request. Requests must be completed and submitted to the Public Works Department, City of Hamilton,

More information

SUBDIVISION PLAT APPLICATION

SUBDIVISION PLAT APPLICATION SUBDIVISION PLAT APPLICATION ONLY COMPLETE SUBMISSIONS WILL BE PROCESSED CITY OF PORT ST. LUCIE P&Z File No. PLANNING & ZONING DEPARTMENT Fee (Nonrefundable)$ (772)871-5212 FAX: (772)871-5124 Receipt #.......................................

More information

EAST BRANDYWINE TOWNSHIP PLANNING COMMISSION REGULAR SESSION Wednesday, December 6, 2017

EAST BRANDYWINE TOWNSHIP PLANNING COMMISSION REGULAR SESSION Wednesday, December 6, 2017 EAST BRANDYWINE TOWNSHIP PLANNING COMMISSION REGULAR SESSION Wednesday, Those in Attendance: Mr. Bruce Rawlings, Chairman Mr. Ronald Fanelli, Vice-Chairman Mr. Jim Buczala, Member Mr. Michael Corbin, Member

More information

MINOR SITE PLAN APPLICATION COVER SHEET

MINOR SITE PLAN APPLICATION COVER SHEET MINOR SITE PLAN APPLICATION COVER SHEET TOWN OF CLAYTON Planning Department 111 E. Second St., P.O. Box 879 Clayton, NC 27528 Phone: 919-553-5002 Fax: 919-553-1720 Name of Project: Date: Applicant Name:

More information

5.7 Plan Documentation and Supporting Information.

5.7 Plan Documentation and Supporting Information. 5.7 and Supporting Information. In any case where the and Supporting Information for a Development Plan requires the submission of a Site Plan, Overall Plan, Landscape Plan, Building Elevations, Sign Plan

More information

Please remove and replace the entire Table of Contents, Section A to Section J and all Appendices.

Please remove and replace the entire Table of Contents, Section A to Section J and all Appendices. Please remove and replace the entire Table of Contents, Section A to Section J and all Appendices. The following is a list of changes to the Design Criteria: 1. A2.01 General Note 4 Utility Coordination

More information

Authorized Agent: City of Manassas Check List Attached: Contact: Address: Phone Number: Fax Number: Developer s Name: Phone Number:

Authorized Agent: City of Manassas Check List Attached: Contact:   Address: Phone Number: Fax Number: Developer s Name: Phone Number: CITY OF MANASSAS DEPARTMENT OF COMMUNITY DEVELOPMENT DEVELOPMENT SERVICES DIVISION 9027 Center Street Room 201 Manassas, Virginia, 20110 Phone: 703-257-8278 Fax: 703-257-5831 Application Date: APPLICANT

More information

WILTON MANORS, Island City 2020 WILTON DRIVE, WILTON MANORS, FLORIDA 33305

WILTON MANORS, Island City 2020 WILTON DRIVE, WILTON MANORS, FLORIDA 33305 WILTON MANORS, Island City 2020 WILTON DRIVE, WILTON MANORS, FLORIDA 33305 COMMUNITY DEVELOPMENT SERVICES (954) 390-2180 FAX: (954) 567-6069 This package includes: General Submittal Procedures Submittal

More information

Queenstown Park Limited. Appellant. Queenstown Lakes District Council. Respondent NOTICE OF APPEAL ON BEHALF OF QUEENSTOWN PARK LIMITED

Queenstown Park Limited. Appellant. Queenstown Lakes District Council. Respondent NOTICE OF APPEAL ON BEHALF OF QUEENSTOWN PARK LIMITED BEFORE THE ENVIRONMENT COURT AT CHRISTCHURCH IN THE MATTER of the Resource Management Act 1991 ( RMA ) AND IN THE MATTER of the Queenstown Lakes Proposed District Plan BETWEEN Queenstown Park Limited Appellant

More information

CITY OF OLIVETTE SITE PLAN AND COMMUNITY DESIGN REVIEW INFORMATION PACKET

CITY OF OLIVETTE SITE PLAN AND COMMUNITY DESIGN REVIEW INFORMATION PACKET CITY OF OLIVETTE SITE PLAN AND COMMUNITY DESIGN REVIEW INFORMATION PACKET THE FOLLOWING PACKET CONTAINS: PETITION FOR NONRESIDENTIAL DEVELOPMENT SITE PLAN AND COMMUNITY DESIGN REVIEW SCHEDULE OF DATES

More information

CITY OF LOMPOC DEVELOPMENT ASSISTANCE BROCHURE ENCROACHMENT PERMITS AND PUBLIC IMPROVEMENT PLANS

CITY OF LOMPOC DEVELOPMENT ASSISTANCE BROCHURE ENCROACHMENT PERMITS AND PUBLIC IMPROVEMENT PLANS CITY OF LOMPOC DEVELOPMENT ASSISTANCE BROCHURE E-10 ENCROACHMENT PERMITS AND PUBLIC IMPROVEMENT PLANS The City of Lompoc has determined that the Engineering Division should administer and issue Encroachment

More information

EYDON PARISH COUNCIL

EYDON PARISH COUNCIL EYDON PARISH COUNCIL Minutes of the Meeting of Eydon Parish Council held from 7.30pm, Tuesday 14 th of February 2017 in the Village Hall, High Street, Eydon. 1. Councillors present: Cllrs K Simmons (Chairman),

More information

Zoning Clearance Application

Zoning Clearance Application Community Development Department Planning Division 100 Civic Center Drive Calabasas, CA 91302 Telephone: 818-224-1600 Fax: 818-225-7329 Zoning Clearance Application www.cityofcalabasas.com PROPERTY INFORMATION

More information

REQUIRED MATERIALS FOR RESIDENTIAL ACCESSORY STRUCTURE PERMITS (Garages, Sheds, and other structures over 200 sq ft or on a permanent foundation)

REQUIRED MATERIALS FOR RESIDENTIAL ACCESSORY STRUCTURE PERMITS (Garages, Sheds, and other structures over 200 sq ft or on a permanent foundation) REQUIRED MATERIALS FOR RESIDENTIAL ACCESSORY STRUCTURE PERMITS (Garages, Sheds, and other structures over 200 sq ft or on a permanent foundation) The following materals shall be submitted and reviewed

More information

Fiscal 2007 Environmental Technology Verification Pilot Program Implementation Guidelines

Fiscal 2007 Environmental Technology Verification Pilot Program Implementation Guidelines Fifth Edition Fiscal 2007 Environmental Technology Verification Pilot Program Implementation Guidelines April 2007 Ministry of the Environment, Japan First Edition: June 2003 Second Edition: May 2004 Third

More information

1 MUNICIPAL INFRASTRUCTURE

1 MUNICIPAL INFRASTRUCTURE Engineering Design Criteria & Standard Drawings Page 5 1 MUNICIPAL INFRASTRUCTURE 1.1 Drawing & Submission Requirements 1.1.1 General This section discusses the requirements for the submission of engineering

More information

SANITARY SEWER SYSTEM ADMINISTRATIVE STANDARDS A.1 SANITARY SEWER SYSTEM PLAN SUBMITTAL PROCEDURES AND GENERAL REQUIREMENTS

SANITARY SEWER SYSTEM ADMINISTRATIVE STANDARDS A.1 SANITARY SEWER SYSTEM PLAN SUBMITTAL PROCEDURES AND GENERAL REQUIREMENTS SANITARY SEWER SYSTEM ADMINISTRATIVE STANDARDS A.1 SANITARY SEWER SYSTEM PLAN SUBMITTAL PROCEDURES AND GENERAL REQUIREMENTS All plans for sanitary sewer main extensions, improvements and modifications

More information