Argo Information Centre Report #6 12/12/ Active Floats 2592 set up for GTS 2660 set up for GDACs 57 grey listed active floats

Size: px
Start display at page:

Download "Argo Information Centre Report #6 12/12/ Active Floats 2592 set up for GTS 2660 set up for GDACs 57 grey listed active floats"

Transcription

1 Argo Information Centre Report #6 12/12/ Active Floats 2592 set up for GTS 2660 set up for GDACs 57 grey listed active floats 1. Implementation... 2 Table 1 - New Floats: Table 2 - Floats back on line: Table 3 - Latest deployments not (yet) added: Table 4 - Floats distributed at GDACs and not monitored by the AIC: Table 5 - Active floats declared inactive (no locations since 30 days): Table 6 - Deployment failures: Table 7 Location Problems: Table 8 -Beached Floats Table 9 - Deployment Planning: Data Management... 5 Table 10 - Floats to be set up for GTS: Table 11 - Floats to be set up for GDACs: Table 12 - DAC-less active floats (Directory /gts at GDACs):... 9 Table 13 - DAC-less inactive floats (Directory /gts at GDACs): Table 14 - Metadata files anomalies (source: Coriolis) Table 15 Code anomalies (source: MEDS) Table 16 Instrument Type Code anomalies (source: MEDS) Actions... 12

2 1. Implementation Table 1 - New Floats: 26 WMO TEL. DATE LAT LON COUNTRY PROG BASIN /11/ UNITED STATES Argo WHOI Atlantic Ocean /11/ UNITED STATES Argo WHOI Atlantic Ocean /11/ UNITED STATES Argo WHOI Atlantic Ocean /07/ GERMANY Argo AWI Atlantic Ocean /07/ GERMANY Argo AWI Atlantic Ocean /07/ GERMANY Argo AWI Atlantic Ocean /12/ FRANCE CONGAS Atlantic Ocean /12/ FRANCE CONGAS Atlantic Ocean /12/ FRANCE CONGAS Atlantic Ocean /12/ FRANCE CONGAS Atlantic Ocean /11/ CANADA Argo CANADA Atlantic Ocean /11/ AUSTRALIA Argo AUSTRALIA Indian Ocean /11/ AUSTRALIA Argo AUSTRALIA Indian Ocean /11/ AUSTRALIA Argo AUSTRALIA Indian Ocean /11/ AUSTRALIA Argo AUSTRALIA Indian Ocean /11/ UNITED STATES Argo SIO Indian Ocean /12/ JAPAN Argo JAPAN Indian Ocean /11/ JAPAN Argo JAPAN Pacific Ocean /11/ UNITED STATES Argo PMEL Pacific Ocean /11/ UNITED STATES Argo SIO Pacific Ocean /11/ UNITED STATES Argo SIO Pacific Ocean /11/ AUSTRALIA Argo AUSTRALIA Pacific Ocean /11/ AUSTRALIA Argo AUSTRALIA Pacific Ocean /11/ AUSTRALIA Argo AUSTRALIA Pacific Ocean /11/ AUSTRALIA Argo AUSTRALIA Pacific Ocean /11/ FRANCE FLOPS Pacific Ocean All these floats are now in the system and visible in the float database, interactive map, stats, etc. Bi-daily status files (updated at 6h00 and 18h00 UTC) are served here: ASCII GIS shapefiles Google Earth If your recent deployments are not listed here please make sure you have notified them, and check tables 3 & 9. Remarks: - Float (PMEL) has wrong deployment lat/lon => Update Notification - Basins have been redefined (for stats, tables, search engine) o Arctic Ocean added ( > 70 N) o Med. Sea unchanged o Atlantic Ocean refined (some west Atlantic floats were listed in Pacific) o Indian Ocean western boundary shifted to 150 (to be consistent with all maps projection) o Southern Ocean removed: it was defined as lat < -40. Hence statistics on deployment per basin, or query on Atlantic/Indian/Pacific were not accurate because of the important overlap with main basins. It is simple to query the database for your definition of southern ocean. This can be discussed further but the goal here is to have a classification that sticks with reality.

3 If I want to list all floats in the pacific and If I keep a southern ocean (lat < -40) I will miss many floats. Table 2 - Floats back on line: 12 WMO TELECOM PROG. Latest Loc. Data Status Comment Argo JAPAN 06/12/2006 No Data Grey Listed Argo SIO 26/11/2006 Good Data Argo UW 03/12/2006 partial profile Argo eq. UK 10/12/2006 No Data Argo eq. AWI 08/12/2006 Good Data under ice Argo eq. AWI 08/12/2006 Good Data under ice Argo eq. AWI 05/12/2006 Good Data under ice Argo AWI 07/12/2006 Good Data under ice Argo AWI 04/12/2006 Good Data under ice Argo AWI 03/12/2006 Good Data under ice Argo AWI 09/12/2006 No Data under ice Argo AWI 08/12/2006 No Data under ice - Float status changes from "dead" to "active" - Think to eventually grey list problematic floats - Take care to not allocate such Argos Ids to new platforms - If no data, check if data processing was not stopped Table 3 - Latest deployments not (yet) added: 7 WMO TELECOM Dep. Date PROGRAM Basin Waiting pop up /07/2006 Argo AWI Atlantic Ocean /07/2006 Argo AWI Atlantic Ocean /10/2006 Argo WHOI Atlantic Ocean /10/2006 Argo WHOI Atlantic Ocean /01/2007 Argo PMEL Pacific Ocean /11/2006 Argo PMEL Pacific Ocean /11/2006 Good Hope Atlantic Ocean Iridium Floats None - Please update notification if deployment postponed Table 4 - Floats distributed at GDACs and not monitored by the AIC: 1 WMO TELECOM DATE PROGRAM ?? Argo WHOI =>TO NOTIFY

4 Table 5 - Active floats declared inactive (no locations since 30 days): 18 WMO TELECOM DATE PROG AGE /10/2006 Argo AUSTRALIA /10/2006 Argo JAPAN /10/2006 Argo KORDI /10/2006 Argo METRI/KMA /10/2006 Argo NORWAY /10/2006 Argo SIO /10/2006 Argo SIO /10/2006 Argo SIO /09/2006 Argo SIO /10/2006 Argo UW /10/2006 Argo UW /10/2006 Argo UW /10/2006 Argo UW /10/2006 Argo WHOI /10/2006 Argo WHOI /10/2006 Argo eq. NAVOCEANO /10/2006 Argo eq. UK /10/2006 FLOSTRAL-INSU 933 Table 6 - Deployment failures: 1 WMO TELECOM DATE PROGRAM Comment /10/2006 Argo UW Table 7 Location Problems: 4 WMO TELECOM Program Location System Argo SIO Argos Argo JAPAN Argos Argo PMEL Argos Argo UW Argos - Permanent location error (cycling) - Possible double use of Argos IDs => TO CHECK Table 8 -Beached Floats 20 WMO Telecom Model Program Age Comments Retrieval APEX Argo CHINA 1414 Philippines APEX Argo INDIA 930 Maldives APEX Argo INDIA 1260 Maldives APEX Argo JAPAN 1360 Philippines APEX Argo JAPAN 1031 Philippines APEX Argo JAPAN 1370 Philippines APEX Argo METRI/KMA 1520 Philippines APEX Argo METRI/KMA 1130 Philippines APEX Argo METRI/KMA 1130 Indonesia APEX Argo UW 1165 Maldives APEX Argo UW 1397 Peru APEX Argo UW 1250 Sri Lanka On going APEX Argo UW 1354 Tanzania SOLO Argo WHOI 401 Cape Verde APEX Argo eq. IFM 1200 Somalia

5 APEX Argo eq. NAVO Turkey Provor EGYPT 294 Egypt Provor CONGAS 683 France On going SOLO Argo SIO 698 Lifou - NC APEX Argo eq. UW-UA 230 Crete Floats above should not stay on the beaches => PROCEED TO RETRIEVE Contact the AIC if you need assistance for the retrieval procedure. Check all these platforms with Google Earth at: Table 9 - Deployment Planning: 5 WMO TELECOM DATE LAT LON COUNTRY PROGRAM /12/ FRANCE CONGAS 19XXXX1 XXXX1 01/04/ KENYA Argo KENYA 19XXXX2 XXXX2 01/04/ KENYA Argo KENYA 19XXXX3 XXXX3 01/04/ KENYA Argo KENYA 19XXXX4 XXXX4 01/04/ KENYA Argo KENYA 19XXXX5 XXXX5 01/04/ KENYA Argo KENYA All this deployments have been formally notified. Try to notify your deployment in advance so we can have a global view of planning. To that end a new layer has been added to the interactive map: Any change in the deployments plans (via the notification interface) will be reflected on the global map with a bidaily update. Don t hesitate to use it to organise your planning. 2. Data Management Table 10 - Floats to be set up for GTS: 89 WMO PROGRAM TELECOM MODEL AGE DAC GDAC Argo AUSTRALIA APEX 11 CSIRO Argo AUSTRALIA APEX 3 CSIRO Argo AUSTRALIA APEX 10 CSIRO Argo AWI NEMO 160 Coriolis Argo AWI APEX 89 Coriolis Argo AWI 9353 APEX 60 Coriolis Argo AWI 9372 APEX 68 Coriolis Argo AWI 9358 APEX 59 Coriolis Argo AWI 9362 APEX 70 Coriolis Argo AWI APEX 70 Coriolis Argo AWI 9369 APEX 48 Coriolis Argo AWI NEMO 150 Coriolis Argo AWI NEMO 159 Coriolis Argo BSH NEMO 68 Coriolis Argo BSH NEMO 82 Coriolis Argo IFM-GEOMAR NEMO 550 Coriolis Argo IFM-GEOMAR NEMO 560 Coriolis Argo KORDI Provor 48 CLS/Coriolis Argo KORDI 4670 Provor 97 CLS/Coriolis Argo KORDI Provor 54 CLS/Coriolis Argo METRI/KMA APEX 120 METRI/KMA Argo METRI/KMA APEX 110 METRI/KMA Argo METRI/KMA APEX 120 METRI/KMA

6 Argo METRI/KMA APEX 97 METRI/KMA Argo METRI/KMA APEX 120 METRI/KMA Argo METRI/KMA APEX 120 METRI/KMA Argo METRI/KMA APEX 121 METRI/KMA Argo METRI/KMA APEX 120 METRI/KMA Argo METRI/KMA APEX 90 METRI/KMA Argo METRI/KMA APEX 91 METRI/KMA Argo METRI/KMA APEX 110 METRI/KMA Argo METRI/KMA APEX 91 METRI/KMA Argo METRI/KMA APEX 90 METRI/KMA Argo METRI/KMA APEX 110 METRI/KMA Argo METRI/KMA APEX 120 METRI/KMA Argo SIO SOLO 85 SAI Argo SIO SOLO 90 SAI Argo SIO SOLO 91 SAI Argo SIO SOLO 80 SAI Argo SIO SOLO 85 SAI Argo UW APEX 41 SAI Argo UW APEX 48 SAI Argo UW APEX 32 SAI Argo UW APEX 82 SAI Argo UW APEX 91 SAI Argo UW APEX 91 SAI Argo UW 5142 APEX 32 SAI Argo UW 5141 APEX 34 SAI Argo UW 5140 APEX 34 SAI Argo UW APEX 32 SAI Argo UW APEX 52 SAI Argo UW APEX 71 SAI Argo UW APEX 81 SAI Argo UW APEX 90 SAI Argo UW APEX 90 SAI Argo UW APEX 73 SAI Argo UW APEX 73 SAI Argo UW APEX 73 SAI Argo UW APEX 40 SAI Argo UW APEX 41 SAI Argo UW APEX 51 SAI Argo UW APEX 50 SAI Argo UW APEX 53 SAI Argo UW APEX 41 SAI Argo UW APEX 41 SAI Argo UW APEX 41 SAI Argo UW APEX 41 SAI Argo UW APEX 83 SAI Argo UW APEX 73 SAI Argo UW APEX 83 SAI Argo UW APEX 83 SAI Argo UW APEX 83 SAI Argo UW APEX 63 SAI Argo UW APEX 93 SAI Argo UW APEX 93 SAI Argo UW APEX 83 SAI Argo UW APEX 83 SAI

7 Argo UW APEX 73 SAI Argo UW APEX 73 SAI Argo UW APEX 83 SAI Argo UW APEX 53 SAI Argo UW APEX 81 SAI Argo UW APEX 92 SAI Argo UW APEX 91 SAI Argo WHOI SOLO 722 SAI Argo WHOI SOLO 111 SAI Argo WHOI SOLO 578 SAI CONGAS Provor 0 Coriolis CONGAS Provor 0 Coriolis Table 11 - Floats to be set up for GDACs: 83 WMO PROGRAM TELECOM MODEL AGE DAC GTS Argo AUSTRALIA APEX 8 CSIRO Argo AWI NEMO 159 Coriolis Argo AWI 9358 APEX 59 Coriolis Argo AWI 9369 APEX 48 Coriolis Argo AWI 9362 APEX 70 Coriolis Argo AWI NEMO 160 Coriolis Argo AWI APEX 70 Coriolis Argo AWI APEX 89 Coriolis Argo AWI 9372 APEX 68 Coriolis Argo AWI NEMO 150 Coriolis Argo AWI 9353 APEX 60 Coriolis Argo BSH NEMO 82 Coriolis Argo BSH NEMO 68 Coriolis Argo CANADA APEX 10 MEDS Argo INDIA APEX 76 INCOIS Argo INDIA APEX 70 INCOIS Argo JAPAN APEX 10 JMA Argo JAPAN APEX 0 JMA Argo KORDI 4670 Provor 97 KORDI Argo KORDI APEX 99 KORDI Argo KORDI APEX 98 KORDI Argo KORDI Provor 48 KORDI Argo KORDI APEX 380 KORDI Argo KORDI Provor 54 KORDI Argo KORDI APEX 99 KORDI Argo SIO SOLO 90 AOML Argo SIO SOLO 91 AOML Argo SIO SOLO 85 AOML Argo SIO SOLO 85 AOML Argo SIO SOLO 85 AOML Argo SIO SOLO 80 AOML Argo UW 5142 APEX 32 AOML Argo UW 5140 APEX 34 AOML Argo UW 5141 APEX 34 AOML Argo UW APEX 41 AOML Argo UW APEX 50 AOML Argo UW APEX 52 AOML Argo UW APEX 81 AOML

8 Argo UW APEX 83 AOML Argo UW APEX 83 AOML Argo UW APEX 83 AOML Argo UW APEX 83 AOML Argo UW APEX 73 AOML Argo UW APEX 83 AOML Argo UW APEX 41 AOML Argo UW APEX 41 AOML Argo UW APEX 41 AOML Argo UW APEX 53 AOML Argo UW APEX 41 AOML Argo UW APEX 48 AOML Argo UW APEX 32 AOML Argo UW APEX 91 AOML Argo UW APEX 82 AOML Argo UW APEX 92 AOML Argo UW APEX 91 AOML Argo UW APEX 81 AOML Argo UW APEX 91 AOML Argo UW APEX 73 AOML Argo UW APEX 73 AOML Argo UW APEX 83 AOML Argo UW APEX 83 AOML Argo UW APEX 93 AOML Argo UW APEX 93 AOML Argo UW APEX 63 AOML Argo UW APEX 41 AOML Argo UW APEX 40 AOML Argo UW APEX 73 AOML Argo UW APEX 32 AOML Argo UW APEX 73 AOML Argo UW APEX 73 AOML Argo UW APEX 90 AOML Argo UW APEX 90 AOML Argo UW APEX 71 AOML Argo UW APEX 53 AOML Argo UW APEX 51 AOML Argo WHOI SOLO 111 AOML Argo WHOI SOLO 578 AOML Argo WHOI SOLO 722 AOML CONGAS Provor 0 Coriolis CONGAS Provor 0 Coriolis CONGAS Provor 1 Coriolis CONGAS Provor 0 Coriolis FLOPS Provor 13 Coriolis

9 Table 12 - DAC-less active floats (Directory /gts at GDACs): WMO PROGRAM TELECOM MODEL AGE STATUS Duplicate Argo AUSTRALIA APEX 70 Yes Argo AUSTRALIA APEX 41 Yes Argo AUSTRALIA APEX 3 Yes Argo AUSTRALIA APEX 41 Yes Argo AUSTRALIA APEX 41 Yes Argo AUSTRALIA APEX 41 Yes Argo AUSTRALIA APEX 41 Yes Argo KORDI APEX Argo KORDI APEX Argo KORDI APEX Argo KORDI APEX Argo KORDI APEX Argo KORDI 4664 APEX Argo KORDI APEX Argo KORDI APEX Argo KORDI APEX Argo KORDI APEX Argo KORDI APEX Argo KORDI APEX Argo KORDI 4252 APEX Argo KORDI APEX Argo KORDI APEX Argo KORDI 4666 APEX Argo KORDI APEX Argo KORDI APEX Argo KORDI APEX Argo KORDI APEX Argo KORDI APEX Argo KORDI APEX Argo KORDI APEX Argo KORDI APEX Argo KORDI APEX Argo KORDI APEX Argo KORDI APEX Argo KORDI APEX Argo KORDI APEX Argo KORDI APEX Argo KORDI APEX Argo KORDI APEX Argo KORDI APEX Argo KORDI APEX Argo RUSSIA APEX Argo RUSSIA APEX Argo eq. JMA APEX 50 Yes Argo eq. NAVOCEANO APEX Argo eq. NAVOCEANO APEX Argo eq. NAVOCEANO APEX 1490

10 All floats with the column duplicate = yes should be removed by GDACs from this directory. Remark: It seems that the procedure (at Coriolis GDAC) that gathers the TESAC of unknown platforms is too general and creates duplicates. This procedure should check if this WMO already exists in other dac/ directories. Table 13 - DAC-less inactive floats (Directory /gts at GDACs): WMO PROGRAM TELECOM MODEL AGE STATUS Duplicate Argo CANADA APEX 1887 Yes Argo CANADA APEX 2216 Yes Argo INDIA APEX 807 No Argo KORDI APEX Argo KORDI 4684 APEX Argo KORDI 4665 APEX Argo KORDI APEX Argo KORDI 4662 APEX Argo KORDI 4670 APEX Argo eq. NAVOCEANO APEX Argo eq. NAVOCEANO APEX Argo eq. NAVOCEANO APEX Argo eq. NAVOCEANO APEX Argo eq. NAVOCEANO APEX Argo eq. NAVOCEANO APEX Argo eq. NAVOCEANO APEX Argo eq. NAVOCEANO APEX Argo eq. NAVOCEANO APEX Argo eq. NAVOCEANO APEX Argo eq. NAVOCEANO APEX Argo eq. NAVOCEANO APEX Argo eq. NAVOCEANO APEX Argo eq. NAVOCEANO APEX Argo eq. NAVOCEANO APEX Argo eq. NAVOCEANO APEX Argo eq. NAVOCEANO APEX Argo eq. NAVOCEANO APEX Argo eq. NAVOCEANO APEX Argo eq. NAVOCEANO APEX Argo eq. NAVOCEANO APEX Argo eq. NAVOCEANO APEX Argo eq. NAVOCEANO APEX Argo eq. NAVOCEANO APEX Argo eq. NAVOCEANO APEX Argo eq. NAVOCEANO APEX Argo eq. NAVOCEANO APEX Argo eq. NAVOCEANO APEX Argo eq. NAVOCEANO APEX Argo eq. NAVOCEANO APEX Argo eq. NAVOCEANO APEX Argo eq. NAVOCEANO APEX 485

11 29020 Argo eq. NAVOCEANO APEX Argo eq. NAVOCEANO APEX Argo eq. NAVOCEANO APEX Argo eq. NAVOCEANO APEX Argo eq. NAVOCEANO APEX Argo eq. NAVOCEANO APEX Argo eq. NAVOCEANO APEX Argo eq. NAVOCEANO APEX Argo eq. NAVOCEANO APEX Argo eq. NAVOCEANO APEX Argo eq. NAVOCEANO APEX Argo eq. NAVOCEANO APEX Argo eq. NAVOCEANO APEX Argo eq. NAVOCEANO APEX Argo eq. NAVOCEANO APEX Argo eq. NAVOCEANO APEX Argo eq. NAVOCEANO APEX Argo eq. UW APEX Argo eq. UW 9472 APEX Argo eq. UW 4101 APEX Argo eq. UW APEX Argo eq. UW 5084 APEX Argo eq. UW 2829 PALACE Argo eq. UW 2839 PALACE Argo eq. UW 2790 PALACE Argo eq. UW 2837 PALACE Argo eq. UW 4082 PALACE Argo eq. UW 2809 PALACE Argo eq. UW 4083 PALACE Argo eq. UW 4087 PALACE Argo eq. UW 2807 PALACE Argo eq. UW 2821 PALACE Argo eq. UW 2796 PALACE Argo eq. UW 4089 PALACE Argo eq. UW 2816 PALACE Argo eq. UW 9263 APEX Argo eq. UW 2803 PALACE Argo eq. UW 2802 PALACE Argo eq. UW PALACE Argo eq. UW APEX Argo eq. UW APEX Argo eq. UW 5078 APEX Argo eq. UW PALACE Argo eq. UW 4084 PALACE Argo eq. UW 4099 APEX Argo eq. UW APEX Argo eq. UW 2791 PALACE 2147 GDACs should remove definitely the platforms that have duplicates. DACs should generate historical netcdf files for these floats or at least to say if they could or not.

12 Table 14 - Metadata files anomalies (source: Coriolis) DAC # Files at GDACs # Anomalies aoml bodc coriolis csio 32 0 csiro incois jma kma meds Details of anomalies are available at Coriolis: Table 15 Code anomalies (source: MEDS) WMO CENTER IXIXIXXRXR PROGRAM None Table 16 Instrument Type Code anomalies (source: MEDS) WMO CENTRE1 DATE1 LEVEL CENTRE2 DATE2 LEVEL2 DAC EGRR EGRR BODC KARS KARS AOML/SAI EGRR EGRR BODC AMMC AMMC BOM EGRR EGRR BODC EGRR EGRR BODC EGRR EGRR BODC EGRR EGRR BODC Data selection from to (yyyymmdd) Floats that reported more than 1 TESAC in 60 hours 3. Actions - DACs to set up data distribution for floats as appropriate (check tables 10 & 11) - GDACs to remove files in /gts (check table 12 & 13) - DACs to generate historical netcdf files for inactive floats in /gts directory (chack table 13) - DACs to check codes in TESAC and duplicates (check table 15 & 16) - ALL Argo Programmes: please notify in advance your deployments in order too: o o o o Respect intergovernmental IOC resolution XX-6 Inform the Argo community of your deployment plans for a better organisation (share deployment opportunities, avoid overlaps, etc) Detect WMO ID / Argos Ids duplicates Optimize and anticipate data distribution These reports are stored on-line, section Documents. Argo TC

The retrieval of beached Argo Floats Report by the AIC

The retrieval of beached Argo Floats Report by the AIC The retrieval of beached Argo Floats Report by the AIC December 2005 1) Background The Argo Executive at its meeting in February 2005 considered how Argo should deal with floats that are washed up on shore.

More information

Improving Argos Doppler Location with Kalman Filtering - Advantages for Argo Floats

Improving Argos Doppler Location with Kalman Filtering - Advantages for Argo Floats Improving Argos Doppler Location with Kalman Filtering - Advantages for Argo Floats YANN BERNARD*, MATHIEU BELBEOCH** E-mails: ybernard@cls.fr, belbeoch@jcommops.org *Collecte Localisation Satellites;

More information

Japanese Argo Program

Japanese Argo Program PICES XV Oct15, 2006 Japanese Argo Program Nobie Shikama (JAMSTEC) What is Argo? Argo is a global ocean monitoring network of 3,000 floats which measure T-S profile of upper 2,000m every 10 days and transmit

More information

Pacific Regional Argo Center (PARC) Progress report Argo Data Management Meeting Tianjin, Nov 2006

Pacific Regional Argo Center (PARC) Progress report Argo Data Management Meeting Tianjin, Nov 2006 Pacific Regional Argo Center (PARC) Progress report Argo Data Management Meeting Tianjin, Nov 2006 PARC Review: Participants To date, participants from JAMSTEC, JMA, IPRC, KORDI, KMA, CSIRO, and CSIO have

More information

AST#12 March 2011, Buenos Aires

AST#12 March 2011, Buenos Aires AST#12 March 2011, Buenos Aires Argo is the best cooperative effort in the history of oceanography 12 nations maintain the global array and 20 more fill regional gaps 2 54% maintained by the USA Growing

More information

The present 5-year cycle of U.S. Argo implementation began in July 2015, and extends through June 2020.

The present 5-year cycle of U.S. Argo implementation began in July 2015, and extends through June 2020. U.S. Argo National Report to AST-18, March 2017. Organization of U.S. Argo: The U.S. Argo Program is supported with major funding provided by the National Oceanic and Atmospheric Administration (NOAA),

More information

Argo ways to use the data

Argo ways to use the data Argo ways to use the data Howard Freeland Argo Director at Institute of Ocean Sciences, Sidney, BC, Canada Tel: (250)-363-6590 Email: Howard.Freeland@pac.dfo-mpo.gc.ca Argo ways to use the data How you

More information

US NATIONAL DATA MANAGEMENT REPORT. September 1 st 2015 September 1 st th ADMT Meeting. Tianjin, China STATUS

US NATIONAL DATA MANAGEMENT REPORT. September 1 st 2015 September 1 st th ADMT Meeting. Tianjin, China STATUS US NATIONAL DATA MANAGEMENT REPORT September 1 st 2015 September 1 st 2016 17 th ADMT Meeting Tianjin, China STATUS US Argo Data Assembly Center at AOML The US Argo Data Assembly Center (DAC) at AOML is

More information

Argo data management report 2011 Coriolis DAC & GDAC

Argo data management report 2011 Coriolis DAC & GDAC Argo data management report 2011 Coriolis DAC & GDAC Data Assembly Centre and Global Data Assembly Centre Annual report September 2010 - October 2011 Version 1.0 November 7 th, 2011 Maps of the 15 590

More information

6th ARGO DATA MANAGEMENT MEETING. Tokyo 8 th -10 th November 2005

6th ARGO DATA MANAGEMENT MEETING. Tokyo 8 th -10 th November 2005 6th ARGO DATA MANAGEMENT MEETING Tokyo 8 th -10 th November 2005 Version 1.1 15 th December 2005 5 th Argo Data Management Meeting Report 8 th -10 th November 2005 TABLE OF CONTENTS 1. Objectives of the

More information

18 th meeting of the International Argo Steering Team

18 th meeting of the International Argo Steering Team 18 th meeting of the International Argo Steering Team Hobart, Tasmania March 14-16, 2017 Contents Meeting Summary 1. Welcome and Introduction 1 2. Objectives of the meeting... 1 3. Action items from AST-17.

More information

French National report on Argo 2012 Present status and future plans

French National report on Argo 2012 Present status and future plans French National report on Argo 2012 Present status and future plans March 2013 V. Thierry, S. Pouliquen, E. Mamaca, C. Coatanoan, S. Le Reste, C. Cabanes LPO-Report N 13/02 1. Background, organization

More information

9th ARGO DATA MANAGEMENT MEETING. Honolulu 29 th - 31 st October 2008

9th ARGO DATA MANAGEMENT MEETING. Honolulu 29 th - 31 st October 2008 9th ARGO DATA MANAGEMENT MEETING Honolulu 29 th - 31 st October 2008 Version 0.2 14 th November 2008 9 th Argo Data Management Meeting Report 29 th 31 st October 2008 TABLE OF CONTENTS 1.! Objectives of

More information

Global Comparison of Argo dynamic height with Altimeter sea level anomalies

Global Comparison of Argo dynamic height with Altimeter sea level anomalies Global Comparison of Argo dynamic height with Altimeter sea level anomalies Stéphanie Guinehut, Anne-Lise Dhomps, Gilles Larnicol CLS, Space Oceanography Division Christine Coatanoan, Pierre-Yves Le Traon

More information

Argo watches the Oceans

Argo watches the Oceans A Argo watches the Oceans Howard Freeland Argo Director at Institute of Ocean Sciences, Sidney, BC, Canada Tel: (250)-363-6590 Email: Howard.Freeland@pac.dfo-mpo.gc.ca Why are we doing Argo? Measurements

More information

Argo data management report 2014 Coriolis DAC & GDAC Data Assembly Centre and Global Data Assembly Centre Annual report October September 2014

Argo data management report 2014 Coriolis DAC & GDAC Data Assembly Centre and Global Data Assembly Centre Annual report October September 2014 Argo data management report 2014 Coriolis DAC & GDAC Data Assembly Centre and Global Data Assembly Centre Annual report October 2013 - September 2014 Version 1.1 October 30 th, 2014 2 DAC status This report

More information

The Ship Of Opportunity Programme Implementation Panel Report. Gustavo Jorge Goni NOAA/AOML Miami, FL

The Ship Of Opportunity Programme Implementation Panel Report. Gustavo Jorge Goni NOAA/AOML Miami, FL The Ship Of Opportunity Programme Implementation Panel Report Gustavo Jorge Goni NOAA/AOML Miami, FL Gustavo.Goni@noaa.gov Ship of Opportunity Program SOOP Provides platform to deploy or install: Expendable

More information

Argo. 1,000m: drift approx. 9 days. Total cycle time: 10 days. Float transmits data to users via satellite. Descent to depth: 6 hours

Argo. 1,000m: drift approx. 9 days. Total cycle time: 10 days. Float transmits data to users via satellite. Descent to depth: 6 hours Float transmits data to users via satellite Total cycle time: 10 days Descent to depth: 6 hours 1,000m: drift approx. 9 days Temperature and salinity profiles are recorded during ascent: 6 hours Float

More information

Argo data management report 2015 Coriolis DAC & GDAC Data Assembly Centre and Global Data Assembly Centre Annual report October 2015 Version 1.

Argo data management report 2015 Coriolis DAC & GDAC Data Assembly Centre and Global Data Assembly Centre Annual report October 2015 Version 1. Argo data management report 2015 Coriolis DAC & GDAC Data Assembly Centre and Global Data Assembly Centre Annual report October 2015 Version 1.1 November 2 nd, 2015 2 DAC status This report covers the

More information

AST-14 Meeting, Wellington, New Zealand, March 2013

AST-14 Meeting, Wellington, New Zealand, March 2013 AST-14 Meeting, Wellington, New Zealand, 19-21 March 2013 Outline 1. Organization of China Argo, and source of funding 2. Float deployment and float recovery 3. Application of Argo data 4. Development

More information

Argo National Data Management Report (2016) India

Argo National Data Management Report (2016) India Argo National Data Management Report (2016) India 1. Status Data acquired from floats India has deployed 27 new floats (including 8 Apex-Bio Argo floats and 2 with EM software) between October 2015 and

More information

US NATIONAL DATA MANAGEMENT REPORT. at Scripps Institution of Oceanography

US NATIONAL DATA MANAGEMENT REPORT. at Scripps Institution of Oceanography US NATIONAL DATA MANAGEMENT REPORT December 1 st 2017 November 16 th 2018 19 th ADMT Meeting at Scripps Institution of Oceanography STATUS US Argo Data Assembly Center at AOML, summary The US Argo Data

More information

Extending Argo into marginal Seas: the Mediterranean and Black Seas

Extending Argo into marginal Seas: the Mediterranean and Black Seas Extending Argo into marginal Seas: the Mediterranean and Black Seas Pierre-Marie Poulain Istituto Nazionale di Oceanografia e di Geofisica Sperimentale (OGS) Trieste, Italy Outline Argo float deployments

More information

SOOP PROGRAMME IMPLEMENTATION. (Submitted by Gustavo Goni, SOOPIP Chairperson) Summary and purpose of the document

SOOP PROGRAMME IMPLEMENTATION. (Submitted by Gustavo Goni, SOOPIP Chairperson) Summary and purpose of the document WORLD METEOROLOGICAL ORGANIZATION JOINT WMO / IOC TECHNICAL COMMISSION FOR OCEANOGRAPHY AND MARINE METEOROLOGY (JCOMM) SHIP OBSERVATIONS TEAM INTERGOVERNMENTAL OCEANOGRAPHIC COMMISSION (OF UNESCO) SOT-V/Doc.

More information

Past Achievement, Future Risks and Opportunities

Past Achievement, Future Risks and Opportunities Argo: Past Achievement, Future Risks and Opportunities Toshio Suga, Tohoku University and JAMSTEC, Japan On behalf of Susan Wijffels, CSIRO/ Centre for Australian Weather and Climate Research, Australia

More information

Shigeki Hosoda (JAMSTEC)

Shigeki Hosoda (JAMSTEC) Shigeki Hosoda (JAMSTEC) Motivation: After achievement of 3000 floats in the global ocean, Japan Argo community was delay to show any next plan. Also, decreasing the fund of Japan Argo (especially in JAMSTEC)

More information

Argo-Spain Annual Report 2017

Argo-Spain Annual Report 2017 Argo-Spain Annual Report 2017 Present status and future plans Alberto González Santana, Pedro Vélez Belchí 1. Introduction In 2002, Argo-Spain started the Argo program through a European project where

More information

Maintaining the Argo bibliographies. Megan Scanderbeg

Maintaining the Argo bibliographies. Megan Scanderbeg Maintaining the Argo bibliographies Megan Scanderbeg AST-17 Meeting in Yokohama, Japan March 216 Update for the past year 39 Argo papers published in 299 days in 215 3 articles in Nature Climate Change

More information

17th ARGO DATA MANAGEMENT MEETING

17th ARGO DATA MANAGEMENT MEETING 17th ARGO DATA MANAGEMENT MEETING TIANJIN 28 th September 30 th September 2016 Version 2.0 22 nd December 2016 17 th Argo Data Management Meeting Report 28-30 September 2016 TABLE OF CONTENTS 1 Objectives

More information

AST-16 Meeting in Brest, France March Megan Scanderbeg

AST-16 Meeting in Brest, France March Megan Scanderbeg AST-16 Meeting in Brest, France March 2015 Megan Scanderbeg Argo in flux Original Argo & enhancements Balance funding needs (which differ by country) and the need to relay information to general public

More information

Argo in the Mediterranean and Black seas

Argo in the Mediterranean and Black seas Argo in the Mediterranean and Black seas Pierre-Marie Poulain Istituto Nazionale di Oceanografia e di Geofisica i Sperimentale (OGS) Trieste, Italy Outline Argo float deployments and data in the Mediterranean

More information

6 th meeting of the. International Argo Science Team. IFREMER, Brest France

6 th meeting of the. International Argo Science Team. IFREMER, Brest France 6 th meeting of the International Argo Science Team IFREMER, Brest France March 9-11 2004 1 2 Contents 1. Welcome and introduction 1 2. Introduction to IAST-6. 1 2.1 Action items from AST-5 1 3. Status

More information

8 th meeting of the International Argo Steering Team

8 th meeting of the International Argo Steering Team 8 th meeting of the International Argo Steering Team Paris, France March 6-9, 2007 Contents Meeting Summary 1. Welcome and introduction. 1 2. Action items from AST-7 2 3. Issues from ADMT-7 2 4. Data Management

More information

Who Reads and Who Follows? What analytics tell us about the audience of academic blogging Chris Prosser Politics in

Who Reads and Who Follows? What analytics tell us about the audience of academic blogging Chris Prosser Politics in Who Reads and Who Follows? What analytics tell us about the audience of academic blogging Chris Prosser Politics in Spires @caprosser 1 What do we want to know about the audience for academic blogging?

More information

On the beginnings of Argo: Ingredients of an ocean observing system. Dean Roemmich Co-Chair, Argo Steering Team

On the beginnings of Argo: Ingredients of an ocean observing system. Dean Roemmich Co-Chair, Argo Steering Team On the beginnings of Argo: Ingredients of an ocean observing system Dean Roemmich Co-Chair, Argo Steering Team Motivation Any major expansion of Argo (Deep Ocean, Biogeochemical, Boundary Currents, Coastal)

More information

4 nd Bio Argo Workshop November , Bermuda. Introduction

4 nd Bio Argo Workshop November , Bermuda. Introduction 4 nd Bio Argo Workshop November 2 3 2015, Bermuda Introduction Between ADMT 15 to ADMT 16 some milestones AST 16 Brest Bio Argo Task Team: terms of reference accepted Move towards global implementation

More information

7th ARGO DATA MANAGEMENT MEETING. Tianjin 1 st - 3 rd November 2006

7th ARGO DATA MANAGEMENT MEETING. Tianjin 1 st - 3 rd November 2006 7th ARGO DATA MANAGEMENT MEETING Tianjin 1 st - 3 rd November 2006 Version 2.0 December 1 st, 2006 7 th Argo Data Management Meeting Report 1 st -3 rd November 2006 TABLE OF CONTENTS 1. Objectives of the

More information

1. The status of implementation (major achievements and problems in 2016)

1. The status of implementation (major achievements and problems in 2016) 1. The status of implementation (major achievements and problems in 2016) - floats deployed and their performance Most of the floats deployed by Germany are operated by BSH but additional funding has been

More information

The Annual Cycle of Steric Height and Sea Surface Height in the Equatorial Pacific

The Annual Cycle of Steric Height and Sea Surface Height in the Equatorial Pacific The Annual Cycle of Steric Height and Sea Surface Height in the Equatorial Pacific D. Roemmich, J. Gilson, F. Gasparin, and B. Cornuelle Scripps Institution of Oceanography UCSD OSTST Meeting, Boulder

More information

Euro-Argo Status. P.Y. Le Traon, S. Pouliquen, E. Mamaca and Euro-Argo partners. AST-13, Paris, March 2012

Euro-Argo Status. P.Y. Le Traon, S. Pouliquen, E. Mamaca and Euro-Argo partners. AST-13, Paris, March 2012 Euro-Argo Status P.Y. Le Traon, S. Pouliquen, E. Mamaca and Euro-Argo partners AST-13, Paris, March 2012 Euro-Argo: A new European Research Infrastructure Coordinator: Institut Français de Recherche pour

More information

2012 Argo Canada report of activities (submitted by Denis Gilbert)

2012 Argo Canada report of activities (submitted by Denis Gilbert) 2012 Argo Canada report of activities (submitted by Denis Gilbert) 14 th meeting of the Argo Steering Team (AST-14) Wellington, New Zealand March 18-21, 2013 1. Status of implementation (major achievements

More information

7 th meeting of the. International Argo Science Team

7 th meeting of the. International Argo Science Team 7 th meeting of the International Argo Science Team Hyderabad, India January 16-18, 2006 Contents 1. Welcome and introduction 1 2. Introduction to AST-7 1 2.1 Action items from AST-6 (2004) and Argo Exec

More information

EN ANNEX I allocations by specific objective in Euro

EN ANNEX I allocations by specific objective in Euro EN ANNEX I allocations by specific objective in Euro Objective 1 Objective 2 Objective 3 Objective 4 Objective 5 Man-made crises Natural s ALERT / Small scale / Epidemics Complementary and thematic activities

More information

EN ANNEX I allocations by specific objective in Euro

EN ANNEX I allocations by specific objective in Euro EN ANNEX I allocations by specific objective in Euro Objective 1 Objective 2 Objective 3 Objective 4 Objective 5 Man-made crises Natural Small scale / Epidemics Complementary and thematic activities and

More information

Argo Chinese National Report 2012

Argo Chinese National Report 2012 The 14 th Argo Steering Team Meeting, Wellington, New Zealand, March 19 21, 2013 Argo Chinese National Report 2012 (Jianping Xu & Zenghong Liu, The Second Institute of Oceanography, SOA) 1. The status

More information

Data Buoy Cooperation Panel - A Retrospective. Al Wallace DBCP 31

Data Buoy Cooperation Panel - A Retrospective. Al Wallace DBCP 31 Data Buoy Cooperation Panel - A Retrospective Al Wallace DBCP 31 Objective Chronicle the history of the DBCP Document successes and accomplishments Highlight approaches Acknowledge contributions 2 The

More information

Progress in Refreshing the Tropical Atmosphere Ocean (TAO) Array

Progress in Refreshing the Tropical Atmosphere Ocean (TAO) Array Progress in Refreshing the Tropical Atmosphere Ocean (TAO) Array Richard L. Crout, PhD, Dawn Petraitis, Lex LeBlanc, Landry J. Bernard, and Karen Grissom NOAA/NWS National Data Buoy Center Stennis Space

More information

ISU Symposium The Public Face of Space Strasbourg, France February A quiet and sustainable success story.

ISU Symposium The Public Face of Space Strasbourg, France February A quiet and sustainable success story. ISU Symposium The Public Face of Space Strasbourg, France 16 18 February 2010 The International Cospas-Sarsat Programme: A quiet and sustainable success story Dany St-Pierre Cospas-Sarsat Secretariat ISU

More information

Table of Contents Executive Summary 29

Table of Contents Executive Summary 29 Contents Table of Contents Executive Summary 29 Section 1: Introduction 33 Section 2: World 37 2.1.1. Main consumers 37 2.1.2. Main producers 2015 and 2016 39 2.1.3. Main importers 2015 and 2016 40 2.1.4.

More information

WWNWS3/3/3/1A Meeting 3 1 August 2011 Agenda Item NAVTEX Panel Report SUMMARY

WWNWS3/3/3/1A Meeting 3 1 August 2011 Agenda Item NAVTEX Panel Report SUMMARY WWNWS WWNWS3/3/3/1A Meeting 3 1 August 2011 Agenda Item 3.3.1 NAVTEX Panel Report Submitted by Chair, IMO International NAVTEX Co-ordinating Panel SUMMARY Executive Summary: This report provides a summary

More information

Regulatory status for using RFID in the UHF spectrum 3 May 2006

Regulatory status for using RFID in the UHF spectrum 3 May 2006 Regulatory status for using RFID in the UHF spectrum 3 May NOTE: The following countries were updated since the last publication of 3 March : Thailand, Romania. The table attached provides an overview

More information

Argonautics. Newsletter of the international Argo project. Number 3 January 2004

Argonautics. Newsletter of the international Argo project. Number 3 January 2004 Number 3 January 2004 Argonautics Newsletter of the international Argo project Contents Editorial 1 First Argo Workshop 2 Argo data Team meeting 3 Spain joins Argo 4 POGO-5 meeting 4 Co-chairs of Argo

More information

Chartboost Power-Up Report

Chartboost Power-Up Report 12 Advanced Tips for Promoting and Monetizing Your Mobile Game Chartboost Power-Up Report February 2015 Google Play Game Sessions Beats ios in the Americas! Middle East Territories Display Dramatic Growth

More information

NFC Forum: The Evolution of a Consortium

NFC Forum: The Evolution of a Consortium NFC Forum: The Evolution of a Consortium Presented by Greg Kohn Sr. Operations Director, NFC Forum ANSI Open Forum: Building Bridges across the Standards Ecosystem October 9, 2012 Part of the World Standards

More information

SECTION A APPENDIX J - COST-OF-LIVING INDEXES: FROM TO LOCALITIES , 999

SECTION A APPENDIX J - COST-OF-LIVING INDEXES: FROM TO LOCALITIES , 999 THIS MESSAGE CONSTITUTES OFFICIAL NOTIFICATION OF BI-MONTHLY STATION ALLOWANCE REVIEWS EFFECTIVE 01 MARCH 2012, FOR THE FOLLOWING COUNTRIES: ARGENTINA, AUSTRALIA, BOTSWANA, BRAZIL, BURMA, CANADA, CHILE,

More information

The 21st Session of the Asia-Pacific Regional Space Agency Forum (APRSAF): Dawn of a New Decade

The 21st Session of the Asia-Pacific Regional Space Agency Forum (APRSAF): Dawn of a New Decade The 21st Session of the Asia-Pacific Regional Space Agency Forum (APRSAF): Dawn of a New Decade 52 nd Session of Scientific and Technical Subcommittee Kazuhiro MIYAZAKI Office for Space Utilization Promotion,

More information

PREDEPLOYMENT_CALIB_xxx STRING LENGTH

PREDEPLOYMENT_CALIB_xxx STRING LENGTH Open Questions PREDEPLOYMENT_CALIB_xxx STRING LENGTH o PREDEPLOYMENT_CALIB_XXX are in the meta.nc file o PREVIOUSLY, the size was 1024 o We asked for 4096 => We don t have room to store a long calibration

More information

Monthly Summary of Troop Contribution to UN Operations

Monthly Summary of Troop Contribution to UN Operations Monthly Summary of Troop Contribution to UN Operations Month of Report : 3-Dec-3 Country Description of Post M F Totals ) Albania Individual Police............ 0 Subtotal for Country ) Algeria Experts

More information

(3) How does one obtain patent protection?

(3) How does one obtain patent protection? Patenting in Kenya (1) Introduction A patent gives the owner the exclusive rights to prevent others from manufacturing, using or selling the protected invention in a given country. A patent is a legally

More information

This document is downloaded from DR-NTU, Nanyang Technological University Library, Singapore.

This document is downloaded from DR-NTU, Nanyang Technological University Library, Singapore. This document is downloaded from DR-NTU, Nanyang Technological University Library, Singapore. Title Status report of satellite communication in Singapore Author(s) Citation Status report of satellite communication

More information

Strengthening civil registration and vital statistics systems - a necessity for the region to overcome socioeconomic and health challenges

Strengthening civil registration and vital statistics systems - a necessity for the region to overcome socioeconomic and health challenges Strengthening civil registration and vital statistics systems - a necessity for the region to overcome socioeconomic and health challenges Dr. Lene Mikkelsen On behalf of the Asia Pacific Observatory on

More information

Eric ALLAIX DGAC-DSNA

Eric ALLAIX DGAC-DSNA WRC-12 A.I. 1.7 Eric ALLAIX DGAC-DSNA Ministère de l'écologie, de l'énergie,du Développement durable et de la Mer, en charge des Technologies vertes et des Négociations sur le climat Summary Overview Historical

More information

APTIAD and its use in evidence based policymaking Mia Mikic Trade Policy Section Trade and Investment Division

APTIAD and its use in evidence based policymaking Mia Mikic Trade Policy Section Trade and Investment Division WTO/ESCAP Regional Seminar on the WTO and Regional Trade Agreements for Asian Economies 25-27 July 2011 APTIAD and its use in evidence based policymaking Mia Mikic mikic@un.org Trade Policy Section Trade

More information

Other Timber Product. Future Outlook. perkasa

Other Timber Product. Future Outlook. perkasa 21 perkasa Other Timber Product Other timber products includes veneer, dowels, moulding, particleboard, fibreboard, block board, laminated board, woodchip and other timber products (mention in Table 1).

More information

SECTION A APPENDIX J - COST-OF-LIVING INDEXES: FROM TO LOCALITIES , 999 FROM TO LOCALITIES

SECTION A APPENDIX J - COST-OF-LIVING INDEXES: FROM TO LOCALITIES , 999 FROM TO LOCALITIES THIS MESSAGE CONSTITUTES OFFICIAL NOTIFICATION OF BI-MONTHLY STATION ALLOWANCE REVIEWS EFFECTIVE 16 AUGUST 2011, FOR THE FOLLOWING COUNTRIES: ARGENTINA, BARBADOS, BELGIUM, BELIZE, BOTSWANA, BRAZIL, CAMEROON,

More information

Provided by. RESEARCH ON INTERNATIONAL MARKETS We deliver the facts you make the decisions

Provided by. RESEARCH ON INTERNATIONAL MARKETS We deliver the facts you make the decisions Provided by April 2015 PREFACE Market reports by ystats.com inform top managers about recent market trends and assist with strategic company decisions. A list of advantages ystats.com provides secondary

More information

Satellites and autonomous robots: The future for Arctic observations

Satellites and autonomous robots: The future for Arctic observations Satellites and autonomous robots: The future for Arctic observations Jeremy Wilkinson British Antarctic Survey jpw28@bas.ac.uk Polarforskningskonferencen 2016 DTU, Oticon Salen, Anker Engelunds Vej 1,

More information

Mapping Your Success 2013 BSI Healthcare Road Show

Mapping Your Success 2013 BSI Healthcare Road Show Mapping Your Success 2013 BSI Healthcare Road Show Welcome & Outline Objectives for Today Please let me introduce myself.. Gary Slack Global Director BSI Medical Devices Based London 2 Changing Global

More information

Gender Equality Commitment Workshop JUNE 2018

Gender Equality Commitment Workshop JUNE 2018 Gender Equality Commitment Workshop JUNE 2018 Dr. Zsuzsanna Tungli Managing Partner Lorraine Fagan Director Developing Global Leaders/Cultural Training Asia Email ztungli@developinggloballeaders.com lorrainefagan@culturaltrainingasia.com

More information

Future of Sustained Observations

Future of Sustained Observations Future of Sustained Observations OceanObs 09 identified tremendous opportunities, significant challenges Called for a framework for planning and moving forward with an enhanced global sustained ocean observing

More information

Statement from UN ESCAP*

Statement from UN ESCAP* UNITED NATIONS SECRETARIAT ESA/STAT/AC.97/12 Department of Economic and Social Affairs 08 September 2004 Statistics Division English only United Nations Symposium on Population and Housing Censuses 13-14

More information

Keysight Technologies Medalist i1000d Boundary Scan Debug

Keysight Technologies Medalist i1000d Boundary Scan Debug Keysight Technologies Medalist i1000d Boundary Scan Debug White Paper By William Xiao, ICT Technical Marketing Engineer Keysight Technologies Introduction With Boundary scan test technology being more

More information

GLOBAL PRIVATE EQUITY Report Charts

GLOBAL PRIVATE EQUITY Report Charts GLOBAL PRIVATE EQUITY 2003 Report Charts THE WORLD VIEW Investment & Fund Raising Trends THE WORLD VIEW 2002 Main Headlines At least $102 billion of private equity and venture capital was invested globally

More information

Acoustic Communications and Navigation for Mobile Under-Ice Sensors

Acoustic Communications and Navigation for Mobile Under-Ice Sensors DISTRIBUTION STATEMENT A. Approved for public release; distribution is unlimited. Acoustic Communications and Navigation for Mobile Under-Ice Sensors Lee Freitag Applied Ocean Physics and Engineering 266

More information

ABB Oy, KPM. Sakeusmittaukset paperikoneen massanvalmistuksessa

ABB Oy, KPM. Sakeusmittaukset paperikoneen massanvalmistuksessa ABB Oy, KPM Sakeusmittaukset paperikoneen massanvalmistuksessa KPM Kajaani Process Measurements Ltd. KPM was established 2001 KPM was acquired by ABB on 2011, now Worldwide Sales and Service Network Researh

More information

Japan s Leading Exhibition for Robotics Technologies Jan. 17[Wed]-19[Fri], 2018 Tokyo Big Sight, Japan

Japan s Leading Exhibition for Robotics Technologies Jan. 17[Wed]-19[Fri], 2018 Tokyo Big Sight, Japan Japan s Leading Exhibition for Robotics Technologies Jan. 17[Wed]-19[Fri], 2018 Tokyo Big Sight, Japan Web: http://www.robodex.jp/en/ POST SHOW REPORT 2018 FACTS & FIGURES 17,186 Visitors 200 Exhibitors

More information

Acknowledgements. Chapter 1 Cartographic skills 1. Chapter 2 Graphical skills 33. Chapter 3 Numerical and statistical skills 59

Acknowledgements. Chapter 1 Cartographic skills 1. Chapter 2 Graphical skills 33. Chapter 3 Numerical and statistical skills 59 Learn and practise the geographical, numerical and statistical skills you need to succeed by working through clear explanations of each skill and easy-to-follow guidance on applying the skills in your

More information

ARGOS SYSTEM. (Submitted by the Technical Coordinator and CLS) Summary and purpose of document

ARGOS SYSTEM. (Submitted by the Technical Coordinator and CLS) Summary and purpose of document WORLD METEOROLOGICAL ORGANIZATION DATA BUOY COOPERATION PANEL INTERGOVERNMENTAL OCEANOGRAPHIC COMMISSION (OF UNESCO) DBCP-XXIII/Doc. 8. (1.IX.2007) TWENTY-THIRD SESSION JEJU, REPUBLIC OF KOREA 15-19 OCTOBER

More information

1. Introduction. defining and producing new materials with advanced properties, or optimizing industrial processes.

1. Introduction. defining and producing new materials with advanced properties, or optimizing industrial processes. Call for Interest Commercial Agents to market and sell the use of the facilities, resources and services on board the International Space Station in the Materials and Processes sector across Europe 1.

More information

AFRIWOOD POST SHOW REPORT E A S T A F R I C A. East Africa s Largest International Trade Exhibition On Woodworking & Furniture Manufacturing

AFRIWOOD POST SHOW REPORT E A S T A F R I C A. East Africa s Largest International Trade Exhibition On Woodworking & Furniture Manufacturing th 5. 2018 AFRIWOOD E A S T A F R I C A East Africa s Largest International Trade Exhibition On Woodworking & Furniture Manufacturing POST SHOW REPORT 03-05 May 2018 Kenyatta Int l. Convention Centre,

More information

Indian e-visa Application Guide Latest update: June 2017

Indian e-visa Application Guide Latest update: June 2017 Indian e-visa Application Guide Latest update: June 2017 You can apply for your e-visa online between 120 and 4 days before you arrive in India. Although the new online system is much simpler than the

More information

PROJECT FINAL REPORT

PROJECT FINAL REPORT PROJECT FINAL REPORT Grant Agreement number: 211 597 Project acronym: EURO-ARGO Project title: EURO-ARGO Funding Scheme: Global Ocean Observing Infrastructure Period covered: from January 2008 to June

More information

US Market Watch (Apr-Nov 2016)

US Market Watch (Apr-Nov 2016) US Market Watch (Apr-Nov 2016) 1.0 Introduction: The US is the second largest T&C market of the world after EU and imported $ 119.64 billion during 2015. The US T&C Tab-1:US import of T&C imports from

More information

By Lonely Planet - Lonely Planet Kenya (Travel Guide) (8th Edition) (5/16/12) By Lonely Planet

By Lonely Planet - Lonely Planet Kenya (Travel Guide) (8th Edition) (5/16/12) By Lonely Planet By Lonely Planet - Lonely Planet Kenya (Travel Guide) (8th Edition) (5/16/12) By Lonely Planet Lonely Planet Shstring - Free Download from - "Lonely Planet Rio de Janeiro, 8th Edition" ISBN: 1742200621

More information

The population census as a tool to count forcibly displaced populations

The population census as a tool to count forcibly displaced populations The population census as a tool to count forcibly displaced populations Presentation to Conference of Refugee Statistics, Antalya, Turkey 7-9 October 2015, Vebjørn Aalandslid, Statistics Norway The presentation

More information

WARRSAT: A REGIONAL REMOTE SENSING CAPACITY BUILDING CENTRE

WARRSAT: A REGIONAL REMOTE SENSING CAPACITY BUILDING CENTRE WARRSAT: A REGIONAL REMOTE SENSING CAPACITY BUILDING CENTRE Mervyn LYNCH 1, William ERB 2 and Peter FEARNS 1 1 Remote Sensing and Satellite Research Group School of Applied Science Curtin University of

More information

Economic Outlook for 2016

Economic Outlook for 2016 Economic Outlook for 2016 Arturo Bris Professor of Finance, IMD Director, IMD World Competitiveness Center Yale International Center for Finance European Corporate Governance Institute 2015 IMD International.

More information

Ultra-Broadband Forum September 2015 Madrid, Spain

Ultra-Broadband Forum September 2015 Madrid, Spain Ultra-Broadband Forum 2015 8-9 September 2015 Madrid, Spain Ovum s Global Broadband Experience Scorecard Mark Newman, Chief Research Officer, Ovum mark.newman@ovum.com Introducing Ovum s Global Broadband

More information

Report on GNSS Training

Report on GNSS Training Report on GNSS Training Course ID: T141-30 Afghanistan, Australia, Austria, Bangladesh, Bhutan, Cambodia, India, Indonesia, Japan, Maldives, Mongolia, Nepal, The Philippines, Sri Lanka, Tajikistan, Thailand,

More information

STAINLESS STEEL STAINLESS STEEL MANUFACTURING STAINLESS STEEL TRADING BRIGHT BARS WIRES PRECISION COMPONENTS

STAINLESS STEEL STAINLESS STEEL MANUFACTURING STAINLESS STEEL TRADING BRIGHT BARS WIRES PRECISION COMPONENTS STAINLESS STEEL BRIGHT BARS WIRES PRECISION COMPONENTS BHANSALI is diversified business group with interests in Stainless Steel, Textiles and ABS Plastics. Under the dynamic leadership of Mr. Pukhraj Bhansali

More information

USE OF THE RCDS MODE OF ECDIS (Submissions by Australia and Norway to IMO MSC/78)

USE OF THE RCDS MODE OF ECDIS (Submissions by Australia and Norway to IMO MSC/78) IHB File No. S3/8152 CIRCULAR LETTER 21/2004 22 March 2004 USE OF THE RCDS MODE OF ECDIS (Submissions by Australia and Norway to IMO MSC/78) Ref: 1. WEND Letter 1/2004, dated 1 st February 2004 2. IMO

More information

Linemaster Marine Electronics. Sky Technologies MARINE SERVICES AGENTS APAC

Linemaster Marine Electronics. Sky Technologies MARINE SERVICES AGENTS APAC MARINE SERVICES AGENTS APAC Linemaster Marine Electronics Linemaster was founded in 1992. The result of an idea to create a product to aid in the deployment of Longlines. Today the Linemaster Longline

More information

AIF DISTINGUISHED SPEAKER SERIES 2015 CAN ASEAN RE-INVENT ITSELF?

AIF DISTINGUISHED SPEAKER SERIES 2015 CAN ASEAN RE-INVENT ITSELF? AIF DISTINGUISHED SPEAKER SERIES 2015 CAN ASEAN RE-INVENT ITSELF? PROFESSOR KISHORE MAHBUBANI Tuesday, 17 November 2015 Multipurpose Hall, Level 3 Lanai Kijang, Kuala Lumpur, Malaysia ABSTRACT ASEAN has

More information

The Space Frequency Coordination Group (SFCG)

The Space Frequency Coordination Group (SFCG) The Space Frequency Coordination Group (SFCG) Edoardo Marelli ITU-R WP 7C Chairman and SFCG Executive Secretary ITU-R Seminar Manta (Ecuador) 20 September 2012 The SFCG in a nutshell The SFCG in a nutshell

More information

Report on Global Sneaker Market by Player, Region, Type, Application and Sales Channel.pdf

Report on Global Sneaker Market by Player, Region, Type, Application and Sales Channel.pdf Report Information More information from: https://www.wiseguyreports.com/reports/3405395-2013-2028-report-on-global-sneaker-market-by 2013-2028 Report on Global Sneaker Market by Player, Region, Type,

More information

Interaction at the Air-Water Interface II

Interaction at the Air-Water Interface II http://www.carboschools.org Interaction at the Air-Water Interface II Note: Seawater can not be used for this experiment, see note4 at the end of the document. Introduction: What happens to the surface

More information

The Patent Cooperation Treaty (PCT)

The Patent Cooperation Treaty (PCT) The Patent Cooperation Treaty (PCT) Ms. Eva Schumm, Legal Officer PCT Legal and User Support Section PCT Legal and User Relations Division Brussels, September 18, 2018 Introduction to the PCT System 1

More information

BodyKey App 2.0 User Guide (AMWAY -Organised and Self-Organised Challenge)

BodyKey App 2.0 User Guide (AMWAY -Organised and Self-Organised Challenge) BodyKey App 2.0 User Guide (AMWAY -Organised and Self-Organised Challenge) What s in this guide Getting Started 3 Introduction to BodyKey Challenge BodyKey Reward System Challenge Ranking Board AMWAY -Organised

More information

RTAs and the WTO in Todays Trading Environment IATRC Theme Day San Diego 9 December 2012

RTAs and the WTO in Todays Trading Environment IATRC Theme Day San Diego 9 December 2012 RTAs and the WTO in Todays Trading Environment IATRC Theme Day San Diego 9 December 2012 Rohini Acharya Regional Trade Agreements Section Trade Policies Review Division World Trade Organization RTAs and

More information

International Cospas-Sarsat Programme : From operations to MEOSAR prospects

International Cospas-Sarsat Programme : From operations to MEOSAR prospects International Cospas-Sarsat Programme : From operations to MEOSAR prospects Presented by Jean-Charles CORNILLOU MRCC Corsen director with the help of Michel MARGERY (CNES) & Alex GENICOT (FMCC) UN/USA

More information