Special Notice N SN-0001 Special Program Announcement for 2018 Office of Naval Research Research Opportunity: CLAWS

Size: px
Start display at page:

Download "Special Notice N SN-0001 Special Program Announcement for 2018 Office of Naval Research Research Opportunity: CLAWS"

Transcription

1 Special Notice N SN-0001 Special Program Announcement for 2018 Office of Naval Research Research Opportunity: CLAWS I. INTRODUCTION This announcement describes a research thrust, entitled CLAWS, to be launched under the N S-B001, Long Range Broad Agency Announcement (BAA) for Navy and Marine Corps Science and Technology which can be found at Grants/Funding-Opportunities/Broad-Agency-Announcements.aspx. The research opportunity described in this announcement specifically falls under numbered paragraph A of the Ocean Battlespace Sensing S&T Department (Code 32). The submission of proposals, their evaluation and the placement of research contracts will be carried out as described in that BAA. The purpose of this announcement is to focus attention of the scientific community on 1) the area to be studied, and 2) the planned timetable for the submission of white papers and proposals. II. TOPIC DESCRIPTION The CLAWS Innovative Naval Prototype (INP) effort will develop autonomy and supporting technologies required to enable the survivability of Large and Extra Large Unmanned Underwater Vehicles (L&XL UUV) to complete functional assignments. In accordance with the Navy s UUV Family of Systems, Large UUVs are defined as vehicles greater than 21in and less than 84in diameter, Extra Large UUVs are diameter larger than 84. The goals of this effort will be focused on vehicle autonomy for awareness, decision making, and validation of the autonomous behaviors. The L&XL UUVs will enable the extension of Navy platforms sensing capability and oceanographic collections. The creation of these technologies and 1

2 behaviors will fill critical warfighting gaps at both the strategic and tactical levels. The technology areas specific to this effort that have been identified as critical to achieving these goals are 1) Autonomy and Sensing Technologies 2) Autonomy Validation. 1.1 TECHNOLOGY AREA 1: Autonomy and Sensing Technologies The Office of Naval Research (ONR) is interested in receiving proposals for autonomy and sensing technologies to integrate into and test on L&XL UUV systems. The effort will be broken out into base and option periods, noted as the proof of concept phase and autonomy demonstration phases. The objectives for each phase are described below. A full technical and cost proposal for the proof of concept phase and a description of the technical approach for the autonomy demonstration option are being requested at this time. ONR will initially select for award only proof of concept proposals. The focus of the CLAWS effort is to be environmentally adaptive. The efforts will include autonomy definition and development, supporting hardware, at sea demonstration and validation. The deliverables will be the functional autonomous behaviors, supporting documentation, the sensor(s), reach back approaches, and sensing requirements for the L&XL UUVs to operate in coastal, open-ocean, and complex littoral environments. The requested L&XL UUV autonomous functions will include data collection, exfiltration, and sensor/system delivery for oceanographic data collection. The hierarchy of the autonomous behaviors is consistent with decision making from oceanographic models and in situ, in stride ocean sampling leading to improved route planning, efficiency, and task execution. The L&XL UUVs will require in situ decision making for orienting, collecting, and acting on optimal data sets across open ocean, coastal, and complex littoral environments. Open ocean environments are defined as environments that have minimal amounts of traffic and or restraining features that limit the L&XL UUV navigation, communications, or operational depth of the vehicle. Coastal environments will be defined as the coastal ocean regions where the L&XL UUV will encounter extreme tidal variations, high currents, unmapped bottoms, plateaus, changes in salinity, and high variations in bottom contours. Note the previous items are listed as examples but are not limited to these cited considerations. A complex littoral environment will likely be any coastal environment the vehicle will be operating in with high obstacles densities per square mile and when the L&XL UUV is left for unattended/autonomous operations. A complex littoral environment will limit communication, navigational updates, and data transfer opportunities. It will be characterized by many types of noisy and mobile activities all of which may be a threat to the well-being of the L&XL UUV. The UUV may expect to encounter deep draft commercial merchant traffic, fishing activities of all types, marine mammals, geophysical prospecting, nets and bottom trawls which will need to be avoided. The aim of this effort is to ensure we sense and avoid before being seen, run over, entangled, or vandalized. Additionally, the L&XL UUV will need to acquire ocean data of sufficient quality to inform existing predictive ocean models. The collected environmental parameters will enable an in 2

3 situ decision to be formed on: the number of samples collected/required, location(s)/orientation(s) to fully observe the phenomenon or features, and prioritizing the data fields to orient vehicle to transfer data or to hold the data until a time of less constrained operations. Finally, depending on the required autonomous function the L&XL UUV will be required to deliver sensors to support sustained measurements and optimal sensor placement (onboard and off board). In this example connectivity with the relevant subject matter experts is critical, but will be limited. The data transfer rates with the L&XL UUV will not exceed 2.4 Kbs and will have time limitations, less than 5 minutes, for the connectivity duration. The L&XL UUV will be required to establish prioritized data matrices based on the environment and assignment. The matrices will be passed to the subject matter experts (SME)for concurrence and confirmation. It is envisioned that the SMEs will maintain the necessary communication requirements with the sensor after confirmation of deployment from the vehicle. The objectives of the autonomy development portion of this CLAWS INP S&T program will be contracted in a base and option period. Autonomy Proof of Concept Base: This will be a six to twelve month base effort with funding ranging from $500,000 $1,000,000. The base effort will document, define, and simulate the planned functional autonomous behavior(s). It will be assumed that changing environmental conditions (oceanographic, acoustic, and non-acoustic) will be represented in the simulation environment. The L&XL UUV will need to optimize location, orientation, and sensing mode to accomplish tasked assignments within the simulated environments. Simulations of the autonomous behaviors across three previous defined environments are required (coastal, open ocean, and complex littoral environments). Minimal operator assistance can be requested from the L&XL UUV over data rates not exceeding 2.4Kbs. Autonomy Demonstration Option: This will be a two to three year effort based on the accomplishments of the base period. The option will focus on the development of L&XL UUV autonomy software and hardware for long task durations greater than 45 days that can operate with minimal human interaction in specified areas (coastal, open ocean, and complex littoral environments). Decision making based on local environment (oceanographic, acoustic, and non-acoustic) is required to effectively complete tasked assignments. Obstacle avoidance, detection, identification, and characterization include all potential impediments to operations including natural and manmade stimuli. Once outside the notional communications limited areas, operator assistance can be requested from the L&XL UUV when the assignment requires. The data transfer rates will not exceed 2.4 Kbs and will have time limitations for the connectivity duration. Year 1 will continue to focus on development, implementation, and integration. Years 2 and 3 will focus on at sea experimentation, refinement, and validation. About ninety at sea days per year is expected to meet necessary requirements. The CLAWS program will conduct simulations in the base period and at sea testing during the option period of this technical focus area. The proposal must define the language in which the algorithms will be coded, the simulation method for developing and testing the 3

4 algorithms, definition of sensors to be used, definition of the hardware that the algorithms will run, performance of the proposed autonomy, all interfaces to and from the algorithms and sensors, and the notional validation approach. MATLAB code is adequate for the base effort. The option period can be used to code the system into real time implementation. Proposals can describe a complete system concept or specialized autonomy components that focus on one or more of the categories listed below. In all cases, proposals must provide a detailed scope of work for the development of the core technologies, including a description of the algorithm, development, laboratory implementation, embedded implementation using hardware in the loop, at-sea experimentation, validation approach, and power, volume, and weight estimates Background ONR seeks full technical proposals for the development of vehicle autonomy technologies capable of the performance characteristics to operate for extended periods of time in coastal, open ocean, and complex littoral environments. Initial user feedback has identified technical gaps for autonomous behavior challenges. The initial user feedback list is identified below for example purposes and all other behaviors and functions deemed necessary should be proposed. 1) Environmental Awareness (oceanographic, acoustic, and non-acoustic) Develop local environmental attributes for informed task modification and execution Drive and orient vehicle to minimize issue/mishaps Orient vehicle to optimize system/sensor location and data collection Decide when user interaction is required to complete tasking based on sampled environment Develop near field interactions of vehicle with off board systems and features 2) Detect, Characterize, Identify, and Act Built from sense and avoid, route optimization, and statistical evaluation efforts Drives vehicle based on behavior from the characterization of specific sensed attributes Develops a data attributes metrics based on task priority and sensor pedigree Optimizes approach, ingress, egress, and avoid behaviors for giving tasking and changing oceanographic, acoustic, and non-acoustic conditions Efficiency of performing tasked effort 3) Task Execution Autonomous task scheduling based on in-situ decision making Communicates (within system) relevant sensor attributes based on self-awareness Relevant data transfers (internal and external) = passing minimum number of bits from sensor through system architecture Receive relevant task objective updates based on collected data and attributes Update task execution based on mastery of local environment with inputs from 4

5 external authority 4) Payload Delivery Environmental sensor placement/deployment provided for reference payload sizes only. References are notional only and do not constitute a specific recommendation or solution. A size buoy SOLO full size profiling Float REMUS 600 or equivalent Bluefin 21 or equivalent EM-APEX floats OBS sensors and mounting systems Unexpected challenges may arise during autonomous operations, so the autonomy should be flexible to account for unknowns Program Plan Autonomy Proof of Concept Base: This will be a six to twelve month base effort with funding ranging from $500,000 $1,000,000. The base effort will document, define, and simulate the planned functional autonomous behavior(s). It will be assumed that changing environmental conditions (oceanographic, acoustic, and non-acoustic) will be represented in the simulation environment. The L&XL UUV will need to optimize location, orientation, and sensing mode to accomplish tasked assignments within the simulated environments. Simulations of the autonomous behaviors across three previous defined environments are required (coastal, open ocean, and complex littoral environments). Minimal operator assistance can be requested from the L&XL UUV over data rates not exceeding 2.4Kbs. During the base period, performers will work to develop the algorithms and hardware to meet the thresholds defined below in Table A1 and perform the objectives in autonomy proof of concept base period. If private funds have been used to develop technologies or concepts related to the proposed design, the U.S. Government requires, at a minimum, Government Purpose Rights in the technical data and computer software developed under the contract. A full scale Government-operated UUV prototype may be provided as Government furnished property or as Government furnished information for autonomy testing and integration during the option in the autonomy demonstration portion. TABLE A1: AUTONOMY ENVIRONMENTAL METRICS. All hardware shall meet the following environmental metrics: Specification Metric OPERATING CONDITIONS 5

6 Neutrally buoyant in Salinity Water Temperature Air Temperature Temperature Shock Shipboard Shock Shipboard Vibration Humidity Salt Fog Fungus 25 parts per thousand (ppt) -1.1 C to 35.0 C (30 F to 95 F) C to 50 C (-20 F to 122 F) C to 50 C (-20 F to 122 F) MIL-S-901D (Grade B) while secured to transportation pallet MIL-STD % relative humidity Marine Environment Avoid Materials that promote fungal growth Icing/Freezing Rain Operate where icing may occur from sea splash/spray Electromagnetic Environment MIL-STD-461F (RE101, RE102, RS101, RS103, CE101 and CE102) Depth Operate up to 1,000 Non-Operating Conditions Transportation Altitude 0 to 12,192 M(0-40,000 ft) (pressurized or non-pressurized) Transportation & Storage Temperature C to C (-40 F to 160 F) Transportation Shock & Vibration Withstand ground, air, rail, ship transport (MIL-STD-1366E guidance) Storage Operate where icing may occur from sea splash/spray Autonomy Proof of Concept Base Deliverables: Monthly progress and financial reports Algorithm description document Open architecture plan Measurement and analysis plan Interface control document (including space, power, and volume of any added hardware) Preliminary system design Test and validation approach Technical data package, including (but not limited to) detailed block diagram of the autonomy approach, detailed algorithm descriptions, technology readiness levels for each hardware component and software subsystems, 3D models of all hardware being proposed, and key findings from proof of concept execution Test and simulation software to validate autonomy algorithms Technical lessons learned from effort Autonomy demonstration option documentation Overview and execution plan, including steps to enhance the technology to meet 6

7 the objective metrics, interim testing periods, and a prioritized list of risks. Technical and cost proposal delivered 30 days before the end of the base period of performance. Initial cost analysis, including up front, life cycle, and total ownership costs. Demonstration of base effort using test and simulation software for a 30+ day assignment. Autonomy Demonstration Option: The autonomy demonstration option period is anticipated to be a month performance period whereby the proposed hardware is expected to meet or exceed the criteria listed in Table A2 below. The period of performance will depend on the state of technology being proposed and estimated time required to bring the research to fruition. The option will focus on the development of L&XL UUV autonomy software and hardware for long task durations greater than 45 days that can operate with minimal human interaction in specified areas (coastal, open ocean, and complex littoral environments). Decision making based on local environment (oceanographic, acoustic, and non-acoustic) is required to effectively complete tasked assignments. Obstacle avoidance, detection, identification, and characterization include all potential impediments to operations including natural and manmade stimuli. Once outside the notional communications limited areas, operator assistance can be requested from the L&XL UUV when the assignment requires. The data transfer rates will not exceed 2.4 Kbs and will have time limitations for the connectivity duration. Year 1 will continue focus on development, implementation, and integration. Years 2 and 3 will focus on at sea experimentation, refinement, and validation. About ninety at sea days per year is expected to meet necessary requirements. TABLE A2: AUTONOMY PHASE II ENVIRONMENTAL METRICS. All hardware shall meet the following environmental metrics: Specification Metric OPERATING CONDITIONS Neutrally Buoyant in Salinity 25 parts per thousand (ppt) Water Temperature Air Temperature Temperature Shock Shipboard Shock Shipboard Vibration Humidity Salt Fog Fungus -1.1 C to 35.0 C (30 F to 95 F) C to 50 C (-20 F to 122 F) C to 50 C (-20 F to 122 F) MIL-S-901D (Grade B) while secured to transportation pallet MIL-STD % relative humidity Marine Environment Avoid Materials that promote fungal growth 7

8 Icing/Freezing Rain Operate where icing may occur from sea splash/spray Electromagnetic Environment MIL-STD-461F (RE101, RE102, RS101, RS103, CE101 and CE102) Depth Operate up to 1000 feet Non-Operating Conditions Transportation Altitude 0 to 12,192 M(0-40,000 ft) (pressurized or non-pressurized) Transportation & Storage Temperature C to C (-40 F to 160 F) Transportation Shock & Vibration Withstand ground, air, rail, ship transport (MIL-STD-1366E guidance) Storage Operate where icing may occur from sea splash/spray Autonomy demonstration projects will be expected to conduct integrated full-scale testing at a Technology Readiness Level of 6 or greater within the option period of performance. Offerors must demonstrate that their proposed autonomy and sensing technology has the potential to meet a full task profile without operator assistance. The proposal must provide annual technology development spirals for both simulation testing and UUV integration. A full scale Government-operated L&XL UUV prototype can be used for autonomy testing during the option period, or the contractor can propose to develop and build or use its own vehicle for evaluation purposes. If the contractors request access to the Government UUV, the proposal must include a schedule of time requested for their technology testing. Autonomy Demonstration Option Deliverables: Monthly progress and financial reports Algorithm description document Open architecture plan Measurement and analysis plan Interface control document (including space, power, and volume of any added hardware) Preliminary system design Test and validation approach Technical data package, including (but not limited to) detailed block diagram of the autonomy approach, detailed algorithm descriptions, technology readiness levels for each hardware component and software subsystems, 3D models of all hardware being proposed, and key findings from proof of concept execution. Test and simulation software to validate autonomy algorithms. Program reviews Design concept review(s) Test readiness review Autonomy demonstration option documentation Test reports Technical lessons learned 8

9 Technical findings and future recommendations Data analysis and archives Updated cost analysis, including up front, life cycle, and total ownership costs. Final report, including (but not limited to) detailed block diagram of updated technology, test results from any and all endurance testing, relevant 2-D or 3-D models and drawings of the new technology, technology readiness levels for each hardware component and software subsystems, and key findings from Phase II execution, recommendations necessary to further mature the technology, and component risks that need further development/ testing of components that are not fully matured to TRL 6. All supporting hardware, software, and equipment developed under this contract Demonstration of base effort on a UUV for a 45+ day task. 1.2 TECHNOLOGY AREA 2: Autonomy Validation ONR is interested in receiving proposals for autonomy validation this includes approaches, software, and associated hardware. The autonomy validation effort will be broken out into a base and option period, noted as the base validation proof of concept and the autonomy validation option. The objectives for the base and option periods are described below. A full technical and cost proposal for the proof of concept phase and a description of the technical approach for the autonomy demonstration are being requested at this time. ONR will initially select for award only proof of concept proposals. The focus of the CLAWS autonomy validation effort is to build operator trust for vehicle operations across the planned operational environments. The efforts will include the necessary elements to build operator trust through each phase of intended system operations from mission planning through post vehicle recovery. The deliverables will be the functional validation approach/method, supporting documentation, the sensor(s), and sensing requirements to validate autonomous behaviors for the L&XL UUV to operate in coastal, open ocean, and complex littoral environments. The requested L&XL UUV autonomy validation approaches will include but not limited to transit, data collection, exfiltration, and sensor/system delivery for oceanographic data collection. The objectives of the autonomy validation technical area of this CLAWS INP will be contracted in a two phased approach for a base and option period: Autonomy validation proof of concept base period: This will be a six to twelve month base effort with funding ranging from $500,000 $1,000,000. The base effort will document, define, and simulate approaches to characterize performance factors and dependencies required for validation in changing environmental conditions (oceanographic, acoustic, and non-acoustic) and will be represented in the simulation environment. Potential validation approaches to consider as examples will help the operators gain trust through system interactions, mission planning, demonstrations, data exfiltration, and command on control of the vehicle. Simulations of the 9

10 validation approach are requested across three previous defined environments (coastal, open ocean, and complex littoral environments). Autonomy validation demonstration option period: This will be a two to three year effort based on the accomplishments in the base period. The option will focus on validating the approaches identified in the base period. Year 1 emphasis is placed on the measurements, analysis, and execution necessary to prove the approach and decision making in coastal, open ocean, and complex littoral environments supporting focus areas in environmental awareness, task execution, payload delivery, and detection, characterize, identify, and act areas identified in the autonomy efforts. Years 2 and 3 will focus on quantifiable validation approaches. The CLAWS program will conduct simulations only in base period and will evaluate the requirements for necessary tests during the remaining option period. The proposal must define the language in which the validation approach will be coded, the simulation method for developing and testing the algorithms, definition of sensors to be used, definition of the hardware that the algorithms will run, performance of the proposed autonomy, all interfaces to and from the algorithms and sensors, and the notional validation approach. MATLAB code is adequate for the base effort. The option can be used to code the system into real time implementation. Proposals can describe a complete system concept or specialized components that focus on one or more of the categories listed. In all cases, proposals must provide a detailed scope of work for the development of the core technologies, including a description of the approach, development, laboratory implementation, embedded implementation using hardware in the loop, at-sea experimentation, and validation approach Background ONR seeks full technical proposals for the development of vehicle autonomy validation approaches. The approaches need to show how we can build operator trust to extend vehicle operations and minimize the interactions between the operator and the vehicle. This requires validation of in situ decision making on the vehicle and representative/informed operational forecasting for the operator. Initial user feedback has identified many technical gaps in approaches for autonomy validation. A limited list is cited below as reference questions for examples; all other elements deemed necessary to support the goal should be proposed: What method(s) are best suited for statistical modeling of autonomous functions and behaviors to achieve assigned tasks Can we predict behavior based on the performance factors and dependencies Can we forecast obstacles or impediments that effect our user vehicle interactions. Aka surface ships or fishing fleet on both vehicle and command center What/when/how is the ideal validation test to perform for each behavior Do we know the assumptions that require success or failure in the giving conditions Can we characterize and evaluate autonomous task scheduling based on in situ decision making 10

11 1.2.2 Program Plan Autonomy Validation proof of Concept Base: Autonomy validation proof of concept base period: This will be a six to twelve month base effort with funding ranging from $500,000 $1,000,000. The base effort will document, define, and simulate approaches to characterize performance factors and dependencies required for validation in changing environmental conditions (oceanographic, acoustic, and non-acoustic) and will be represented in the simulation environment. Potential validation approaches to consider as examples will help the operators gain trust through system interactions, mission planning, demonstrations, data exfiltration, and command on control of the vehicle. Simulations of the validation approach are requested across three previous defined environments (coastal, open ocean, and complex littoral environments). Autonomy Validation proof of Concept Base Deliverables: Monthly progress and financial reports Autonomy validation description document Documented assumptions, trade spaces Measurement and analysis plan Preliminary system design Test and validation approach Technical data packages, including (but not limited to) detailed block diagram of the validation approach, performance factor descriptions and input parameters, external variable sensitivities, and key findings from proof of concept execution. Test and simulation software Technical lessons learned from effort Lessons learned documentation on proposed approach Autonomy validation demonstration option documentation Overview and execution plan, including steps to enhance the technology to meet objectives, interim testing periods, and a prioritized list of risks associated. Technical and cost proposal delivered 30 days before the end of the base period of performance. Initial cost analysis, including up front, life cycle, and total ownership costs. Demonstration of base effort using test and simulation software Autonomy Validation Demonstration Option: The autonomy validation demonstration option period is anticipated to be a month performance period. The period of performance will depend on the state of technology being proposed and estimated time required to bring the research to fruition. 11

12 The autonomy validation demonstration option will focus on validating the approaches identified in the base period. Year 1 emphasis is the measurements, analysis, and execution necessary to prove the approach and decision making in coastal, open ocean, and complex littoral environments supporting focus areas in environmental awareness, task execution, payload delivery, and detection, characterize, identify, and act areas identified in the autonomy efforts. Years 2 and 3 will focus on quantifiable validation approaches. Autonomy validation demonstration projects will be expected to conduct testing at a TRL 6 or greater within the option period of performance. Offerors must demonstrate that their proposed validation approach has the potential to meet quantifiable objectives. The proposal must provide annual technology development spirals to represent state of advance for the efforts. A full scale Government-operated L&XL UUV prototype can be used for validation testing during the option period, or the contractor can propose to develop and build or use its own vehicle for validation purposes. If the contractors request access to the Government UUV, the proposal must include a schedule of time requested for their technology testing. Autonomy Validation Demonstration Option Deliverables: Autonomy validation description document Documented assumptions, trade spaces Measurement and analysis plan Test and validation approach Test reports Preliminary system design Technical data packages, including (but not limited to) detailed block diagram of the validation approach, performance factor descriptions and input parameters, external variable sensitivities, and key findings from proof of concept execution. Test and simulation software Technical lessons learned from effort Autonomy validation demonstration option documentation Test reports Technical lessons learned Technical findings and future recommendations Data analysis and archives Updated cost analysis, including up front, life cycle, and total ownership costs. Overview and execution plan, including steps to enhance the technology to meet objectives, interim testing periods, and a prioritized list of risks associated. Final cost analysis, including up front, life cycle, and total ownership costs. Demonstration of option effort using test and simulation software Quarterly program reviews such as: Approach concept review(s) Test readiness review Execution reviews 12

13 Technical findings and reports III. WHITE PAPER SUBMISSION Although not required, white papers are strongly encouraged for all offerors seeking funding. Each white paper will be evaluated by the Government to determine whether the technology advancement proposed appears to be of particular value to the Department of the Navy (DoN). Initial Government evaluations and feedback will be issued via notification from the technical point of contact. The initial white paper appraisal is intended to give entities a sense of whether their concepts are likely to be funded. Detailed full proposal (technical and cost volumes) will be subsequently encouraged from those offerors whose proposed technologies have been identified through the above referenced as being of particular value to the Government. However, any such encouragement does not assure a subsequent award. Full proposals may also be submitted by any offeror whose white paper was not identified as being of particular value to the Government or any offeror who did not submit a white paper. For white papers that propose efforts that are considered of particular value to the Navy, but either exceed available budgets or contain certain tasks or applications that are not desired by the Navy, ONR may suggest a full proposal with reduced effort to fit within expected available budgets or an effort that refocuses the tasks or application of the technology to maximize the benefit to the Navy. White papers should not exceed 4 single-sided pages, exclusive of cover page and resume of principal investigator, and should be in 12-point times new roman font with margins not less than one inch. White papers shall be in Adobe PDF format (preferred) or in Microsoft Word format compatible with MS Office The cover page should be labeled White Paper for ONR 2018 Research Opportunity: CLAWS and include the following information: title of the proposed effort, technical point of contact, telephone number, fax numbers, and address. The 4-page body of the white paper should include the following information: (1) Principal Investigator; (2) Relevance of the proposed effort to the research areas described in section II; (3) Technical objective of the proposed effort; (4) Technical approach that will be pursued to meet the objective; (5) A summary of recent relevant technical breakthroughs; and (6) A funding plan showing requested funding per fiscal year. A resume of the principal investigator, not to exceed 1 page, should also be included after the 4- page body of the white paper. 13

14 To ensure full, timely consideration for funding, white papers should be submitted no later than 17 January White papers received after that date will be considered as time and availability of funding permit. The planned date for completing the review of white papers is 14 February IV. FULL PROPOSAL SUBMISSION AND AWARD INFORMATION Full proposals should be submitted under N S-B001 by 16 March Full Proposals received after that date will be considered as time and availability of funding permit. ONR anticipates that contracts will be issued for this effort. Full proposals for contracts should be submitted in accordance with the instructions at section IV, application and submission information, item 2.b, full proposals and item 6, submission of full proposals for contracts, cooperative agreements, and other transactions. The technical proposal/content shall be single spaced and not exceed 20 pages. The cover page, resumes, bibliographies, and table of contents are excluded in the page count. For contract proposal submission, (2) hardcopies and one (1) electronic submission on CD-ROM are requested. ONR plans to fund three to five individual awards for each technical topic area with a value of $500,000 $1,000,000 for the base period, using research funds. However, lower and higher cost proposals will be considered. The period of performance for projects may be from one year from contract award to a total contract period of five years if the options are executed. Although ONR expects the above described program plan to be executed, ONR reserve the right to make changes. Funding decisions should be made by 30 April Selected projects will have an estimated award date of 31 July Special Instructions for Classified Responses. Proposals submitted under this notice are expected to be unclassified; however, classified proposals are permitted up to GENSER SECRET. If a classified proposal is submitted and selected for award, the resultant award will be unclassified. Classified proposals shall be submitted directly to the attention of ONR s Document Control Unit at the following address and marked in the following manner: OUTSIDE ENVELOPE 14

15 (no classification marking): Office of Naval Research Attn: Document Control Unit ONR Code North Randolph Street Arlington, VA The inner wrapper of the classified proposal shall be addressed to the attention of the cognizant Technical Point of Contact (TPOC), ONR Code 321 and marked in the following manner: INNER ENVELOPE (stamped with the overall classification of the material) Program Name: CLAWS Office of Naval Research ATTN: Mr. Jon C. Erickson ONR Code: North Randolph Street Arlington, VA All response submissions will be protected from unauthorized disclosure in accordance with FAR Subpart , applicable law, and DoD/DoN regulations. Offerors are expected to appropriately mark each page of their submission that contains proprietary information. In either case of an unclassified or classified proposal submission, it is the responsibility of the submitting individual to ensure he/she receives an confirming receipt from the TPOC (listed below). V. SIGNIFICANT DATES AND TIMES Event Date Time Recommended White Paper Submission Date 17 JANUARY :00 PM Eastern Standard Time Notification of White Paper Valuation* 14 FEBRUARY :00 PM Eastern Standard Time Recommended Full Proposal Submission 16 MARCH :00 PM Eastern Standard Time Notification of Selection: Full Proposals * 30 APRIL 2018 N/A Awards * 31 JULY 2018 N/A Note: * These are approximate dates. VI. POINTS OF CONTACT In addition to the points of contact listed in N S-B001, the specific points of contact for this announcement are listed below: 15

16 All UNCLASSIFIED communications shall be submitted via . All technical questions of an UNCLASSIFIED nature to the Technical POC shall be sent via with a copy to the designated Business POC. Technical Point of Contact: Name: Mr. Jon C. Erickson Title: Program Officer Code: Ocean Battlespace Sensing, Code 321 Address: Office of Naval Research 875 North Randolph Street Arlington, VA Address: Jon.Erickson@navy.mil Business Point of Contact: Name: Mr. Sean M. Palmer Title: Contracting Officer Division: ONR Code 253 Address: Office of Naval Research 875 North Randolph Street Arlington, VA Address: sean.m.palmer@navy.mil Questions of a security nature should be submitted to: Security Point of Contact: Name: Ms. Torri Woodfolk Title: Industrial Security Specialist Code: Security Department, Code 43 Address: Office of Naval Research 875 North Randolph Street Arlington, VA Address: Torri.Powell@navy.mil (please note that the address does differ from the POC s name) VII. ADDRESS FOR THE SUBMISSION OF WHITE PAPERS AND FULL PROPOSALS FOR CONTRACTS White papers should be submitted electronically to the program technical point of contact, Mr. Jon C. Erickson. Files exceeding 10MB in size should not be ed, but instead transmitted via a file transfer service, for example AMRDEC Safesite, or mailed on DCROM or DVD. The DVD or CD-ROM of the full proposal including all supporting documentation should be sent to the Office of Naval Research at the following address: 16

17 Primary Point of Contact Office of Naval Research Attn: Mr. Jon C. Erickson ONR Department Code North Randolph Street Arlington, VA Secondary Point of Contact Office of Naval Research Attn: Dr. Dan Deitz ONR Department Code North Randolph Street Arlington, VA VIII. SUBMISSION OF QUESTIONS Any questions regarding this announcement must be provided to the Technical POC and/or the Business POC listed above. All questions shall be submitted in writing by electronic mail. Answers to questions submitted in response to this Special Notice will be addressed in the form of an Amendment and will be posted to the following web pages: Federal Business Opportunities (FEDBIZOPPS) Webpage ONR Special Notice Webpage - Opportunities/Special-Notices.aspx Questions regarding white papers or full proposals should be submitted NLT two weeks before the dates recommended for receipt of white papers and/or full proposals. Questions after this date may not be answered. Classified questions shall be handled through the ONR Security POC. Specifically, any entity wanting to ask a classified question shall send an unclassified to the ONR Security POC with a copy to both the Technical POC and the Business POC stating that the entity would like to ask a classified question. Do NOT any classified questions. The Security POC will contact the entity and arrange for the classified question to be asked through a secure method of communication. 17

ONR Special Notice N R-SN01

ONR Special Notice N R-SN01 Special Notice N00014-17-R-SN01 Special Program Announcement for 2017 Office of Naval Research Swampworks Research Opportunity: Carbon Nanotube (CNT) Electrical Cabling I. INTRODUCTION This announcement

More information

I. I N T R O D U C T I O N UNCLASSIFED

I. I N T R O D U C T I O N UNCLASSIFED Special Notice N00014-17-SN-0007 Special Program Announcement for 2017 Office of Naval Research Research Opportunity: Future X-Band Radar (FXR) Science and Technology I. I N T R O D U C T I O N This announcement

More information

Demonstration System Development for Advanced Shipboard Desalination FNC

Demonstration System Development for Advanced Shipboard Desalination FNC AMENDMENT NUMBER 0002 BAA 11-010 ENTITLED Demonstration System Development for Advanced Shipboard Desalination FNC The purpose of Amendment 0001 is to provide answers to following questions: Q1- Do you

More information

ONR BAA Affordable Electronically Scanned Array Technology for Next Generation Naval Platforms. Questions & Answers 3/21/07

ONR BAA Affordable Electronically Scanned Array Technology for Next Generation Naval Platforms. Questions & Answers 3/21/07 ONR BAA 07-010 Affordable Electronically Scanned Array Technology for Next Generation Naval Platforms Questions & Answers 3/21/07 NOTE: Questions and Answers in this document are considered. Final Versions

More information

Future Attribute Screening Technology (FAST) Demonstration Laboratory

Future Attribute Screening Technology (FAST) Demonstration Laboratory BROAD AGENCY ANNOUCEMENT (BAA) HSARPA BAA 07-03A Future Attribute Screening Technology (FAST) Demonstration Laboratory 1. Section I entitled, GENERAL INFORMATION is modified as follows: a. Paragraph 5

More information

ARCHIVED REPORT. Marine Technology - Archived 7/2005

ARCHIVED REPORT. Marine Technology - Archived 7/2005 Land & Sea-Based Electronics Forecast ARCHIVED REPORT For data and forecasts on current programs please visit www.forecastinternational.com or call +1 203.426.0800 Marine Technology - Archived 7/2005 Outlook

More information

Office of Naval Research. BAA , Undersea Cooperative Cueing and Intervention (UC2I) Amendment 3

Office of Naval Research. BAA , Undersea Cooperative Cueing and Intervention (UC2I) Amendment 3 Office of Naval Research BAA 07-028, Undersea Cooperative Cueing and Intervention (UC2I) Amendment 3 The following questions and answers are provided for all potential respondents in the interest of procurement

More information

Acoustic Communications and Navigation for Mobile Under-Ice Sensors

Acoustic Communications and Navigation for Mobile Under-Ice Sensors DISTRIBUTION STATEMENT A. Approved for public release; distribution is unlimited. Acoustic Communications and Navigation for Mobile Under-Ice Sensors Lee Freitag Applied Ocean Physics and Engineering 266

More information

Page 1 of 5 Buyers: Login Register Vendors: Login Register Accessibility Scenario-Based Assessment of High Frequency (HF), High Band Width Communications Solicitation Number: W911NF18R-DHS_HF Agency: Department

More information

Lesson 17: Science and Technology in the Acquisition Process

Lesson 17: Science and Technology in the Acquisition Process Lesson 17: Science and Technology in the Acquisition Process U.S. Technology Posture Defining Science and Technology Science is the broad body of knowledge derived from observation, study, and experimentation.

More information

Joint Industry Programme on E&P Sound and Marine Life - Phase III

Joint Industry Programme on E&P Sound and Marine Life - Phase III Joint Industry Programme on E&P Sound and Marine Life - Phase III Request for Proposals Number: JIP III-15-03 Long Term Fixed Acoustic Monitoring of Marine Mammals throughout the Life Cycle of an Offshore

More information

Partnering: Labs and Small Businesses

Partnering: Labs and Small Businesses Partnering: Labs and Small Businesses NATIONAL SBIR/STTR FALL CONFERENCE Nov 13, 2014 Alex Athey, Ph.D. Applied Research Laboratories The University of Texas at Austin alex.athey@arlut.utexas.edu 512-777-1616

More information

Early Design Naval Systems of Systems Architectures Evaluation

Early Design Naval Systems of Systems Architectures Evaluation ABSTRACT Early Design Naval Systems of Systems Architectures Evaluation Mona Khoury Gilbert Durand DGA TN Avenue de la Tour Royale BP 40915-83 050 Toulon cedex FRANCE mona.khoury@dga.defense.gouv.fr A

More information

Disruption Opportunity Special Notice DARPA-SN Imaging Through Almost Anything, Anywhere (ITA3)

Disruption Opportunity Special Notice DARPA-SN Imaging Through Almost Anything, Anywhere (ITA3) Disruption Opportunity Special Notice DARPA-SN-17-72 Imaging Through Almost Anything, Anywhere (ITA3) I. Opportunity Description The Defense Advanced Research Projects Agency (DARPA) Defense Sciences Office

More information

NEVADA DEPARTMENT OF TRANSPORTATION Addendum 3 to RFP July 28, 2017

NEVADA DEPARTMENT OF TRANSPORTATION Addendum 3 to RFP July 28, 2017 NEVADA DEPARTMENT OF TRANSPORTATION Addendum 3 to RFP 697-16-016 July 28, 2017 Reference is made to the Request for Proposal (RFP) to Service Providers for Nevada Shared Radio Replacement Project, upon

More information

NATIONAL GEOSPATIAL-INTELLIGENCE AGENCY 11.2 Small Business Innovation Research (SBIR) Proposal Submission Instructions

NATIONAL GEOSPATIAL-INTELLIGENCE AGENCY 11.2 Small Business Innovation Research (SBIR) Proposal Submission Instructions NATIONAL GEOSPATIAL-INTELLIGENCE AGENCY 11.2 Small Business Innovation Research (SBIR) Proposal Submission Instructions GENERAL INFORMATION The mission of the National Geospatial-Intelligence Agency (NGA)

More information

Technology Roadmapping. Lesson 3

Technology Roadmapping. Lesson 3 Technology Roadmapping Lesson 3 Leadership in Science & Technology Management Mission Vision Strategy Goals/ Implementation Strategy Roadmap Creation Portfolios Portfolio Roadmap Creation Project Prioritization

More information

Amendment 0002 Special Notice N SN-0006 Future X-Band Radar (FXR) Industry Day

Amendment 0002 Special Notice N SN-0006 Future X-Band Radar (FXR) Industry Day Amendment 0002 Special Notice N00014-17-SN-0006 Future X-Band Radar (FXR) Industry Day The purposes of Amendment 0002 to Special Notice N00014-17-SN-0006 are as follows: 1. Revise Paragraph Number 5 entitled,

More information

REQUEST FOR INFORMATION (RFI) United States Marine Corps Experimental Forward Operating Base (ExFOB) 2014

REQUEST FOR INFORMATION (RFI) United States Marine Corps Experimental Forward Operating Base (ExFOB) 2014 REQUEST FOR INFORMATION (RFI) United States Marine Corps Experimental Forward Operating Base (ExFOB) 2014 OVERVIEW: This announcement constitutes a Request for Information (RFI) notice for planning purposes.

More information

DEFENSE LOGISTICS AGENCY DLA LAND AND MARITIME POST OFFICE BOX 3990 COLUMBUS, OH

DEFENSE LOGISTICS AGENCY DLA LAND AND MARITIME POST OFFICE BOX 3990 COLUMBUS, OH DEFENSE LOGISTICS AGENCY DLA LAND AND MARITIME POST OFFICE BO 3990 COLUMBUS, OH 4328-3990 MEMORANDUM FOR MILITARY/INDUSTRY DISTRIBUTION 22 August 208 SUBJECT: Initial Drafts of MIL-PRF-880/F, /2L, /28G,

More information

Technical Exploitation Support Request for Information (RFI)

Technical Exploitation Support Request for Information (RFI) Technical Exploitation Support Request for Information (RFI) This announcement constitutes a Sources Sought, Request for Information (RFI) ONLY. The Virginia Contracting Activity (VaCA) solely for information,

More information

A Multi-Use Low-Cost, Integrated, Conductivity/Temperature Sensor

A Multi-Use Low-Cost, Integrated, Conductivity/Temperature Sensor A Multi-Use Low-Cost, Integrated, Conductivity/Temperature Sensor Guy J. Farruggia Areté Associates 1725 Jefferson Davis Hwy Suite 703 Arlington, VA 22202 phone: (703) 413-0290 fax: (703) 413-0295 email:

More information

Acoustic Communications and Navigation for Mobile Under-Ice Sensors

Acoustic Communications and Navigation for Mobile Under-Ice Sensors DISTRIBUTION STATEMENT A. Approved for public release; distribution is unlimited. Acoustic Communications and Navigation for Mobile Under-Ice Sensors Lee Freitag Applied Ocean Physics and Engineering 266

More information

UNCLASSIFIED. UNCLASSIFIED Office of Secretary Of Defense Page 1 of 5 R-1 Line #102

UNCLASSIFIED. UNCLASSIFIED Office of Secretary Of Defense Page 1 of 5 R-1 Line #102 Exhibit R-2, RDT&E Budget Item Justification: PB 2015 Office of Secretary Of Defense Date: March 2014 0400: Research, Development, Test & Evaluation, Defense-Wide / BA 4: Advanced Component Development

More information

Special Notice 12-SN Basic and Applied Research in Sea-Based Aviation Aircraft Science and Technology. Amendment 0006.

Special Notice 12-SN Basic and Applied Research in Sea-Based Aviation Aircraft Science and Technology. Amendment 0006. Special Notice 12-SN-0028 2012 Basic and Applied Research in Sea-Based Aviation Aircraft Science and Technology Amendment 0006 5 November 2011 The purpose of this Amendment is to update the Q&A list with

More information

Coastal Benthic Optical Properties Fluorescence Imaging Laser Line Scan Sensor

Coastal Benthic Optical Properties Fluorescence Imaging Laser Line Scan Sensor Coastal Benthic Optical Properties Fluorescence Imaging Laser Line Scan Sensor Dr. Michael P. Strand Naval Surface Warfare Center Coastal Systems Station, Code R22 6703 West Highway 98, Panama City, FL

More information

Comments of Shared Spectrum Company

Comments of Shared Spectrum Company Before the DEPARTMENT OF COMMERCE NATIONAL TELECOMMUNICATIONS AND INFORMATION ADMINISTRATION Washington, D.C. 20230 In the Matter of ) ) Developing a Sustainable Spectrum ) Docket No. 181130999 8999 01

More information

UNCLASSIFIED. FY 2016 Base FY 2016 OCO

UNCLASSIFIED. FY 2016 Base FY 2016 OCO Exhibit R2, RDT&E Budget Item Justification: PB 2016 Navy : February 2015 1319: Research, Development, Test & Evaluation, Navy / BA 4: Advanced Component Development & Prototypes (ACD&P) COST ($ in Millions)

More information

U.S. ARMY RESEARCH, DEVELOPMENT AND ENGINEERING COMMAND

U.S. ARMY RESEARCH, DEVELOPMENT AND ENGINEERING COMMAND U.S. ARMY RESEARCH, DEVELOPMENT AND ENGINEERING COMMAND Army RDTE Opportunities Michael Codega Soldier Protection & Survivability Directorate Natick Soldier Research, Development & Engineering Center 29

More information

Fiscal 2007 Environmental Technology Verification Pilot Program Implementation Guidelines

Fiscal 2007 Environmental Technology Verification Pilot Program Implementation Guidelines Fifth Edition Fiscal 2007 Environmental Technology Verification Pilot Program Implementation Guidelines April 2007 Ministry of the Environment, Japan First Edition: June 2003 Second Edition: May 2004 Third

More information

ARTES Competitiveness & Growth Full Proposal. Requirements for the Content of the Technical Proposal

ARTES Competitiveness & Growth Full Proposal. Requirements for the Content of the Technical Proposal ARTES Competitiveness & Growth Full Proposal Requirements for the Content of the Technical Proposal Part 3C (DDVP) Statement of Applicability and Proposal Submission Requirements Applicable Domain(s) Space

More information

RDT&E BUDGET ITEM JUSTIFICATION SHEET (R-2 Exhibit)

RDT&E BUDGET ITEM JUSTIFICATION SHEET (R-2 Exhibit) , R-1 #49 COST (In Millions) FY 2000 FY2001 FY2002 FY2003 FY2004 FY2005 FY2006 FY2007 Cost To Complete Total Cost Total Program Element (PE) Cost 21.845 27.937 41.497 31.896 45.700 57.500 60.200 72.600

More information

STATEMENT OF WORK Environmental Assessment for the Red Cliffs/Long Valley Land Exchange in Washington County, Utah

STATEMENT OF WORK Environmental Assessment for the Red Cliffs/Long Valley Land Exchange in Washington County, Utah I. Introduction STATEMENT OF WORK Environmental Assessment for the Red Cliffs/Long Valley Land Exchange in Washington County, Utah The Bureau of Land Management s (BLM) St. George Field Office (SGFO) requires

More information

DMTC Guideline - Technology Readiness Levels

DMTC Guideline - Technology Readiness Levels DMTC Guideline - Technology Readiness Levels Technology Readiness Levels (TRLs) are a numerical classification on the status of the development of a technology. TRLs provide a common language whereby the

More information

Licence Application Submission Procedure for Planned Radio Stations Below 960 MHz

Licence Application Submission Procedure for Planned Radio Stations Below 960 MHz Issue 5 October 2008 Spectrum Management and Telecommunications Radio Standards Procedure Licence Application Submission Procedure for Planned Radio Stations Below 960 MHz Aussi disponible en français

More information

HR001117S0014 Nascent Light Matter Interactions Frequently Asked Questions (FAQs) as of 12/14/17

HR001117S0014 Nascent Light Matter Interactions Frequently Asked Questions (FAQs) as of 12/14/17 HR001117S0014 Nascent Light Matter Interactions Frequently Asked Questions (FAQs) as of 12/14/17 39Q: The abstract template requests links in the bibliography to relevant papers, references, and resumes.

More information

Office of Technology Development (OTD) Gap Fund

Office of Technology Development (OTD) Gap Fund The University of Southern Mississippi Office of Technology Development (OTD) Gap Fund SUBMISSION PROCESS The Office of Technology Development (OTD) Gap Fund is intended to further the commercial potential

More information

PM-FSS-ULCANS-RFI Questions & Answers Last Updated 4/26/2017 PRE- SOLICITATION

PM-FSS-ULCANS-RFI Questions & Answers Last Updated 4/26/2017 PRE- SOLICITATION PRE- SOLICITATION PM-FSS-ULCANS-RFI Question 1: Are you looking for camo with multiple types of performance or just once that will perform best to a certain sensor? Answer 1: The ULCANS Increment I camouflage

More information

UNCLASSIFIED INTRODUCTION TO THE THEME: AIRBORNE ANTI-SUBMARINE WARFARE

UNCLASSIFIED INTRODUCTION TO THE THEME: AIRBORNE ANTI-SUBMARINE WARFARE U.S. Navy Journal of Underwater Acoustics Volume 62, Issue 3 JUA_2014_018_A June 2014 This introduction is repeated to be sure future readers searching for a single issue do not miss the opportunity to

More information

***************************************************************************** DRAFT UFGS- 01 XX XX (FEB 2014)

***************************************************************************** DRAFT UFGS- 01 XX XX (FEB 2014) DRAFT UFGS- 01 XX XX (FEB 2014) ------------------------ Drafting Activity: USACE UNIFIED FACILITIES GUIDE SPECIFICATION SECTION TABLE OF CONTENTS DIVISION 01 GENERAL REQUIREMENTS SECTION 01 XX XX (FEB

More information

SATELLITE NETWORK NOTIFICATION AND COORDINATION REGULATIONS 2007 BR 94/2007

SATELLITE NETWORK NOTIFICATION AND COORDINATION REGULATIONS 2007 BR 94/2007 BR 94/2007 TELECOMMUNICATIONS ACT 1986 1986 : 35 SATELLITE NETWORK NOTIFICATION AND COORDINATION ARRANGEMENT OF REGULATIONS 1 Citation 2 Interpretation 3 Purpose 4 Requirement for licence 5 Submission

More information

UNCLASSIFIED. FY 2016 Base FY 2016 OCO

UNCLASSIFIED. FY 2016 Base FY 2016 OCO Exhibit R-2, RDT&E Budget Item Justification: PB 2016 Navy Date: February 2015 1319: Research, elopment, Test & Evaluation, Navy / BA 3: Advanced Technology elopment (ATD) COST ($ in Millions) Prior Years

More information

PERFORMANCE SPECIFICATION SHEET MICROPHONE ASSEMBLY AND MICROPHONE, DYNAMIC, M26542/9-01 AND M-133/U

PERFORMANCE SPECIFICATION SHEET MICROPHONE ASSEMBLY AND MICROPHONE, DYNAMIC, M26542/9-01 AND M-133/U PERFORMANCE SPECIFICATION SHEET INCH-POUND MIL-PRF-26542/9C 2 December 2013 SUPERSEDING MIL-PRF-26542/9C 16 July 2002 MICROPHONE ASSEMBLY AND MICROPHONE, DYNAMIC, M26542/9-01 AND M-133/U This specification

More information

Module 2 Lesson 201 Project Coordinator (PC) Duties

Module 2 Lesson 201 Project Coordinator (PC) Duties Module 2 Lesson 201 Project Coordinator (PC) Duties RDT&E Team, TCJ5-GC Oct 2017 1 Overview/Objectives The intent of lesson 201 is to provide instruction on: Project Coordinator Duties Monthly Obligation

More information

Best Practices for Technology Transition. Technology Maturity Conference September 12, 2007

Best Practices for Technology Transition. Technology Maturity Conference September 12, 2007 Best Practices for Technology Transition Technology Maturity Conference September 12, 2007 1 Report Documentation Page Form Approved OMB No. 0704-0188 Public reporting burden for the collection of information

More information

Understanding DARPA - How to be Successful - Peter J. Delfyett CREOL, The College of Optics and Photonics

Understanding DARPA - How to be Successful - Peter J. Delfyett CREOL, The College of Optics and Photonics Understanding DARPA - How to be Successful - Peter J. Delfyett CREOL, The College of Optics and Photonics delfyett@creol.ucf.edu November 6 th, 2013 Student Union, UCF Outline Goal and Motivation Some

More information

ONR Overview NDIA S&E Conference 2015

ONR Overview NDIA S&E Conference 2015 ONR Overview NDIA S&E Conference 2015 Dr. Lawrence C. Schuette Acting Director of Research - ONR March 2015 DISTRIBUTION STATEMENT A. Approved for public release ONR Organization N84M PMR-51 NRL ONRG Chief

More information

BROAD AGENCY ANNOUNCEMENT FY12 TECHNOLOGY DEMONSTRATION MISSIONS PROGRAM OFFICE OF THE CHIEF TECHNOLOGIST PROPOSALS DUE.

BROAD AGENCY ANNOUNCEMENT FY12 TECHNOLOGY DEMONSTRATION MISSIONS PROGRAM OFFICE OF THE CHIEF TECHNOLOGIST PROPOSALS DUE. OMB Approval Number 2700-0085 Broad Agency Announcement NNM12ZZP03K BROAD AGENCY ANNOUNCEMENT FY12 TECHNOLOGY DEMONSTRATION MISSIONS PROGRAM OFFICE OF THE CHIEF TECHNOLOGIST PROPOSALS DUE April 30, 2012

More information

Stiletto. Maritime Demonstration Program C-UUV Capability Demonstration

Stiletto. Maritime Demonstration Program C-UUV Capability Demonstration Maritime Demonstration Program C-UUV Capability Demonstration Persistent Aquatic Living Sensors (PALS) Proposers Day Presentation Biological Technologies Office (BTO) Defense Advanced Research Projects

More information

National Shipbuilding Research Program

National Shipbuilding Research Program Project Title: Implementation of Sustainment Technologies for the Ohio Replacement Class and VIRGINIA Class Submarines to Reduce Total Ownership Costs and Increase Operational Availability NSRP TIA #2013-449

More information

UNCLASSIFIED. UNCLASSIFIED Navy Page 1 of 10 R-1 Line #12

UNCLASSIFIED. UNCLASSIFIED Navy Page 1 of 10 R-1 Line #12 Exhibit R-2, RDT&E Budget Item Justification: PB 2015 Navy Date: March 2014 1319: earch, Development, Test & Evaluation, Navy / BA 2: Applied earch COST ($ in Millions) Prior Years FY 2013 FY 2014 FY 2015

More information

Department of Energy s Legacy Management Program Development

Department of Energy s Legacy Management Program Development Department of Energy s Legacy Management Program Development Jeffrey J. Short, Office of Policy and Site Transition The U.S. Department of Energy (DOE) will conduct LTS&M (LTS&M) responsibilities at over

More information

DISTRIBUTION STATEMENT A. Approved for public release; distribution is unlimited.

DISTRIBUTION STATEMENT A. Approved for public release; distribution is unlimited. DISTRIBUTION STATEMENT A. Approved for public release; distribution is unlimited. Glider-based Passive Acoustic Monitoring Techniques in the Southern California Region & West Coast Naval Training Range

More information

MASSACHUSETTS INSTITUTE OF TECHNOLOGY Department of Ocean Engineering PROJECTS IN NAVAL SHIPS CONVERSION DESIGN IAP 2003

MASSACHUSETTS INSTITUTE OF TECHNOLOGY Department of Ocean Engineering PROJECTS IN NAVAL SHIPS CONVERSION DESIGN IAP 2003 MASSACHUSETTS INSTITUTE OF TECHNOLOGY Department of Ocean Engineering Objective: 13.413 PROJECTS IN NAVAL SHIPS CONVERSION DESIGN IAP 2003 Approach: Major objectives in this project include: (a) application

More information

Transitioning Technology to Naval Ships. Dr. Norbert Doerry Technical Director, SEA 05 Technology Group SEA05TD

Transitioning Technology to Naval Ships. Dr. Norbert Doerry Technical Director, SEA 05 Technology Group SEA05TD Transitioning Technology to Naval Ships Transportation Research Board Public Meeting National Academy of Sciences June 10, 2010 Dr. Norbert Technical Director, SEA 05 Technology Group SEA05TD Norbert.doerry@navy.mil

More information

NSWC / Indian Head Division

NSWC / Indian Head Division NDIA 48th Annual Fuze Conference Weapon Fuzing / Safety & Arming Technology Programs Overview NSWC / Indian Head Division John Hendershot (Code 4420: Phone 301-744-1934 or e-mail hendershotje@ih.navy.mil)

More information

PERFORMANCE SPECIFICATION SHEET

PERFORMANCE SPECIFICATION SHEET INCH-POUND 10 August 2016 SUPERSEDING 16 November 2011 PERFORMANCE SPECIFICATION SHEET CONNECTORS, RECEPTACLE, ELECTRICAL, COAXIAL, RADIO FREQUENCY, SERIES SMB (CABLED, PIN CONTACT, JAMNUT MOUNTED, REAR

More information

Mid-Frequency Noise Notch in Deep Water. W.S. Hodgkiss / W.A. Kuperman. June 1, 2012 May 31, 2013

Mid-Frequency Noise Notch in Deep Water. W.S. Hodgkiss / W.A. Kuperman. June 1, 2012 May 31, 2013 Mid-Frequency Noise Notch in Deep Water W.S. Hodgkiss and W.A. Kuperman June 1, 2012 May 31, 2013 A Proposal to ONR Code 322 Attn: Dr. Robert Headrick, Office of Naval Research BAA 12-001 UCSD 20123651

More information

PI: Rhoads. ERRoS: Energetic and Reactive Robotic Swarms

PI: Rhoads. ERRoS: Energetic and Reactive Robotic Swarms ERRoS: Energetic and Reactive Robotic Swarms 1 1 Introduction and Background As articulated in a recent presentation by the Deputy Assistant Secretary of the Army for Research and Technology, the future

More information

MINISTRY OF AGRICULTURE, LIVESTOCK & FISHERIES STATE DEPARTMENT OF FISHERIES AND BLUE ECONOMY

MINISTRY OF AGRICULTURE, LIVESTOCK & FISHERIES STATE DEPARTMENT OF FISHERIES AND BLUE ECONOMY MINISTRY OF AGRICULTURE, LIVESTOCK & FISHERIES STATE DEPARTMENT OF FISHERIES AND BLUE ECONOMY KENYA MARINE FISHERIES AND SOCIO-ECONOMIC DEVELOPMENT PROJECT (KEMFSED) TERMS OF REFERENCE For an Individual

More information

Disruption Opportunity Special Notice. Fundamental Design (FUN DESIGN)

Disruption Opportunity Special Notice. Fundamental Design (FUN DESIGN) I. Opportunity Description Disruption Opportunity Special Notice DARPA-SN-17-71, Amendment 1 Fundamental Design (FUN DESIGN) The Defense Advanced Research Projects Agency (DARPA) Defense Sciences Office

More information

Large Displacement Unmanned Undersea Vehicle Innovative Naval Prototype Industry Day

Large Displacement Unmanned Undersea Vehicle Innovative Naval Prototype Industry Day DISTRIBUTION STATEMENT A. Approved for public release; distribution is unlimited Large Displacement Unmanned Undersea Vehicle Innovative Naval Prototype Industry Day March 10 th, 2011 DISTRIBUTION STATEMENT

More information

DEPARTMENT OF DEFENSE HANDBOOK STANDARD MICROCIRCUIT DRAWINGS

DEPARTMENT OF DEFENSE HANDBOOK STANDARD MICROCIRCUIT DRAWINGS NOT MEASUREMENT SENSITIVE w/change 2 28 March 2017 SUPERSEDING w/change 1 6 January 2012 DEPARTMENT OF DEFENSE HANDBOOK STANDARD MICROCIRCUIT DRAWINGS This handbook is for guidance only. Do not cite this

More information

Amendment 04. Special Notice 12-SN-0028, entitled 2012 Basic and Applied Research in Sea- Based Aviation Aircraft Science and Technology

Amendment 04. Special Notice 12-SN-0028, entitled 2012 Basic and Applied Research in Sea- Based Aviation Aircraft Science and Technology Amendment 04 Special Notice 12-SN-0028, entitled 2012 Basic and Applied Research in Sea- Based Aviation Aircraft Science and Technology The purpose of Amendment 04 to this Special Notice is to provide

More information

This announcement constitutes a Request for Information (RFI) notice for planning purposes.

This announcement constitutes a Request for Information (RFI) notice for planning purposes. REQUEST FOR INFORMATION (RFI) United States Marine Corps Expeditionary Energy Concepts (E2C) 2015 (Formerly known as the Experimental Forward Operating Base (ExFOB) demonstration) OVERVIEW: This announcement

More information

DARPA-SN Imaging Through Almost Anything, Anywhere (ITA3) Frequently Asked Questions (FAQs) as of 9/11/2017

DARPA-SN Imaging Through Almost Anything, Anywhere (ITA3) Frequently Asked Questions (FAQs) as of 9/11/2017 DARPA-SN-17-72 Imaging Through Almost Anything, Anywhere (ITA3) Frequently Asked Questions (FAQs) as of 9/11/2017 35Q: This FAQ supercedes 30Q. Are there any plans to postpone the solicitation deadline

More information

NET SENTRIC SURVEILLANCE BAA Questions and Answers 2 April 2007

NET SENTRIC SURVEILLANCE BAA Questions and Answers 2 April 2007 NET SENTRIC SURVEILLANCE Questions and Answers 2 April 2007 Question #1: Should we consider only active RF sensing (radar) or also passive (for detection/localization of RF sources, or using transmitters

More information

SECTION SUBMITTAL PROCEDURES

SECTION SUBMITTAL PROCEDURES SECTION 01330 - SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 1 Specification

More information

SECTION SUBMITTAL PROCEDURES

SECTION SUBMITTAL PROCEDURES SECTION 013300 PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification Sections, apply

More information

Special Notice # N R-S002 - Frequently Asked Questions #1

Special Notice # N R-S002 - Frequently Asked Questions #1 Special Notice # N00014-19-R-S002 - Frequently Asked Questions #1 General and Contracting Questions 1. Q: Would you please describe CONOPS more? A: The CONOPS described in the Special Notice and at the

More information

UCCS University Hall Fire Sprinkler System Upgrade March 1, 2011 RTA SECTION SUBMITTAL PROCEDURES PART 1 - GENERAL

UCCS University Hall Fire Sprinkler System Upgrade March 1, 2011 RTA SECTION SUBMITTAL PROCEDURES PART 1 - GENERAL SECTION 013300 - SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification

More information

TECHNICAL INSTRUCTION (NAVSEA TEMPLATE) Ref: (a) NAVSEA (TECHNICAL INSTRUCTIONS) Enclosure (if applicable): [ ]

TECHNICAL INSTRUCTION (NAVSEA TEMPLATE) Ref: (a) NAVSEA (TECHNICAL INSTRUCTIONS) Enclosure (if applicable): [ ] TECHNICAL INSTRUCTION (NAVSEA TEMPLATE) Ref: (a) NAVSEA 5252.242-9115 (TECHNICAL INSTRUCTIONS) Enclosure (if applicable): [ ] This Technical Instruction (TI) is issued pursuant to reference (a) from my

More information

Ground Robotics Capability Conference and Exhibit. Mr. George Solhan Office of Naval Research Code March 2010

Ground Robotics Capability Conference and Exhibit. Mr. George Solhan Office of Naval Research Code March 2010 Ground Robotics Capability Conference and Exhibit Mr. George Solhan Office of Naval Research Code 30 18 March 2010 1 S&T Focused on Naval Needs Broad FY10 DON S&T Funding = $1,824M Discovery & Invention

More information

PERFORMANCE SPECIFICATION SHEET SWITCH, ASSEMBLIES, SENSITIVE, TRIGGER, 7 AMPERES, UNSEALED

PERFORMANCE SPECIFICATION SHEET SWITCH, ASSEMBLIES, SENSITIVE, TRIGGER, 7 AMPERES, UNSEALED INCH-POUND MIL-PRF-8805/111B 19 November 2018 SUPERSEDING MIL-PRF-8805/111A 31 October 2001 PERFORMANCE SPECIFICATION SHEET SWITCH, ASSEMBLIES, SENSITIVE, TRIGGER, 7 AMPERES, UNSEALED This specification

More information

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017 SECTION 01 3300 - SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification

More information

August 9, Attached please find the progress report for ONR Contract N C-0230 for the period of January 20, 2015 to April 19, 2015.

August 9, Attached please find the progress report for ONR Contract N C-0230 for the period of January 20, 2015 to April 19, 2015. August 9, 2015 Dr. Robert Headrick ONR Code: 332 O ce of Naval Research 875 North Randolph Street Arlington, VA 22203-1995 Dear Dr. Headrick, Attached please find the progress report for ONR Contract N00014-14-C-0230

More information

TERMS OF REFERENCE FOR CONSULTANTS

TERMS OF REFERENCE FOR CONSULTANTS Strengthening Systems for Promoting Science, Technology, and Innovation (KSTA MON 51123) TERMS OF REFERENCE FOR CONSULTANTS 1. The Asian Development Bank (ADB) will engage 77 person-months of consulting

More information

DISTRIBUTION STATEMENT A. Approved for public release; distribution is unlimited.

DISTRIBUTION STATEMENT A. Approved for public release; distribution is unlimited. DISTRIBUTION STATEMENT A. Approved for public release; distribution is unlimited. Understanding the Effects of Water-Column Variability on Very-High-Frequency Acoustic Propagation in Support of High-Data-Rate

More information

Controlling Changes Lessons Learned from Waste Management Facilities 8

Controlling Changes Lessons Learned from Waste Management Facilities 8 Controlling Changes Lessons Learned from Waste Management Facilities 8 B. M. Johnson, A. S. Koplow, F. E. Stoll, and W. D. Waetje Idaho National Engineering Laboratory EG&G Idaho, Inc. Introduction This

More information

Consultation Paper on Using a Portion of the Band GHz for Tactical Common Data Link (TCDL) Systems

Consultation Paper on Using a Portion of the Band GHz for Tactical Common Data Link (TCDL) Systems December 2008 Spectrum Management and Telecommunications Consultation Paper on Using a Portion of the Band 14.5-15.35 GHz for Tactical Common Data Link (TCDL) Systems Aussi disponible en français Department

More information

ONR MIW Technology Efforts Using UUV s and Autonomy November 17, 2016

ONR MIW Technology Efforts Using UUV s and Autonomy November 17, 2016 ONR MIW Technology Efforts Using UUV s and Autonomy November 17, 2016 Dr. Frank Herr Head, Ocean Battlespace Sensing S&T Department Office of Naval Research 703-696-4125 Frank.Herr@navy.mil MIW S&T Investment

More information

DARPA-BAA Next Generation Social Science (NGS2) Frequently Asked Questions (FAQs) as of 3/25/16

DARPA-BAA Next Generation Social Science (NGS2) Frequently Asked Questions (FAQs) as of 3/25/16 DARPA-BAA-16-32 Next Generation Social Science (NGS2) Frequently Asked Questions (FAQs) as of 3/25/16 67Q: Where is the Next Generation Social Science (NGS2) BAA posted? 67A: The NGS2 BAA can be found

More information

MISSISSIPPI STATE UNIVERSITY Office of Planning Design and Construction Administration

MISSISSIPPI STATE UNIVERSITY Office of Planning Design and Construction Administration SECTION 01 340 - SHOP DRAWINGS, PRODUCT DATA AND SAMPLES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other

More information

Global Science Mission Requirements (SMRs) Steering Committee Organizational Meeting. December 13, 2004 Marriott Hotel San Francisco, CA

Global Science Mission Requirements (SMRs) Steering Committee Organizational Meeting. December 13, 2004 Marriott Hotel San Francisco, CA Global Science Mission Requirements (SMRs) Steering Organizational Meeting December 13, 2004 Marriott Hotel San Francisco, CA Summary Report Meeting Participants: Bruce Howe (UW), Chair Bob Embley (OSU)

More information

UNCLASSIFIED R-1 ITEM NOMENCLATURE FY 2013 OCO

UNCLASSIFIED R-1 ITEM NOMENCLATURE FY 2013 OCO Exhibit R-2, RDT&E Budget Item Justification: PB 2013 Air Force DATE: February 2012 BA 3: Advanced Development (ATD) COST ($ in Millions) Program Element 75.103 74.009 64.557-64.557 61.690 67.075 54.973

More information

PERFORMANCE SPECIFICATION SHEET

PERFORMANCE SPECIFICATION SHEET INCH-POUND MIL-PRF-87819/4A 23 February 2015 SUPERSEDING MIL-PRF-87819/4A 30 September 2009 PERFORMANCE SPECIFICATION SHEET HEADSET-MICROPHONE, HEARING PROTECTIVE TYPE MODERATE AMBIENT NOISE LEVELS, UP

More information

UNCLASSIFIED. UNCLASSIFIED R-1 Line Item #13 Page 1 of 11

UNCLASSIFIED. UNCLASSIFIED R-1 Line Item #13 Page 1 of 11 Exhibit R-2, PB 2010 Air Force RDT&E Budget Item Justification DATE: May 2009 Applied Research COST ($ in Millions) FY 2008 Actual FY 2009 FY 2010 FY 2011 FY 2012 FY 2013 FY 2014 FY 2015 Cost To Complete

More information

CMW DELIVERABLES SPECIFICATION Version 1.0

CMW DELIVERABLES SPECIFICATION Version 1.0 CMW DELIVERABLES SPECIFICATION Version 1.0 Code: CMW-CADD-STD-06 June 2012 CONTENTS 1 INTRODUCTION... 3 2 GENERAL... 3 3 GRAPHIC FORMAT... 3 4 CADD STANDARDS... 3 5 DELIVERY MEDIA AND FORMAT... 4 6 DRAWING

More information

Case studies on specific organizations will include, but are not limited to, the following elements:

Case studies on specific organizations will include, but are not limited to, the following elements: Issued on: January 5, 2018 Submit by: On a rolling basis (Schedule explained below in Section VII) For: Digital Development for Feed the Future Case Study Writers Period of Performance: Approximately 2-4

More information

TCC/SHORE TRANSIT BUS MAINTENANCE FACILITY - PHASE II

TCC/SHORE TRANSIT BUS MAINTENANCE FACILITY - PHASE II SECTION 013300 - SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification

More information

ESME Workbench Enhancements

ESME Workbench Enhancements DISTRIBUTION STATEMENT A. Approved for public release; distribution is unlimited. ESME Workbench Enhancements David C. Mountain, Ph.D. Department of Biomedical Engineering Boston University 44 Cummington

More information

PERFORMANCE SPECIFICATION SHEET CONNECTOR, PLUG, ELECTRICAL, TRIAXIAL, RADIO FREQUENCY (SERIES TRB, PIN CONTACT, CLASS 2)

PERFORMANCE SPECIFICATION SHEET CONNECTOR, PLUG, ELECTRICAL, TRIAXIAL, RADIO FREQUENCY (SERIES TRB, PIN CONTACT, CLASS 2) INCH-POUND MIL-PRF-49142/3G 05 February 2016 SUPERSEDING MIL-PRF-49142/3F 18 April 2005 PERFORMANCE SPECIFICATION SHEET CONNECTOR, PLUG, ELECTRICAL, TRIAXIAL, RADIO FREQUENCY (SERIES TRB, PIN CONTACT,

More information

CHAPTER 11 PRELIMINARY SITE PLAN APPROVAL PROCESS

CHAPTER 11 PRELIMINARY SITE PLAN APPROVAL PROCESS CHAPTER 11 PRELIMINARY SITE PLAN APPROVAL PROCESS 11.01.00 Preliminary Site Plan Approval 11.01.01 Intent and Purpose 11.01.02 Review 11.01.03 Application 11.01.04 Development Site to be Unified 11.01.05

More information

Terry Max Christy & Jeremy Borgman Dr. Gary Dempsey & Nick Schmidt November 29, 2011

Terry Max Christy & Jeremy Borgman Dr. Gary Dempsey & Nick Schmidt November 29, 2011 P r o j e c t P r o p o s a l 0 Nautical Autonomous System with Task Integration Project Proposal Terry Max Christy & Jeremy Borgman Dr. Gary Dempsey & Nick Schmidt November 29, 2011 P r o j e c t P r

More information

MORGAN STATE UNIVERSITY PROCEDURES ON PATENTS AND TECHNOLOGY TRANSFER APPROVED BY THE PRESIDENT NOVEMBER 2, 2015

MORGAN STATE UNIVERSITY PROCEDURES ON PATENTS AND TECHNOLOGY TRANSFER APPROVED BY THE PRESIDENT NOVEMBER 2, 2015 MORGAN STATE UNIVERSITY PROCEDURES ON PATENTS AND TECHNOLOGY TRANSFER APPROVED BY THE PRESIDENT NOVEMBER 2, 2015 I. Introduction The Morgan State University (hereinafter MSU or University) follows the

More information

CMRE La Spezia, Italy

CMRE La Spezia, Italy Innovative Interoperable M&S within Extended Maritime Domain for Critical Infrastructure Protection and C-IED CMRE La Spezia, Italy Agostino G. Bruzzone 1,2, Alberto Tremori 1 1 NATO STO CMRE& 2 Genoa

More information

ARTES Competitiveness & Growth Full Proposal. Requirements for the Content of the Technical Proposal. Part 3B Product Development Plan

ARTES Competitiveness & Growth Full Proposal. Requirements for the Content of the Technical Proposal. Part 3B Product Development Plan ARTES Competitiveness & Growth Full Proposal Requirements for the Content of the Technical Proposal Part 3B Statement of Applicability and Proposal Submission Requirements Applicable Domain(s) Space Segment

More information

SECTION SUBMITTAL PROCEDURES

SECTION SUBMITTAL PROCEDURES SECTION 01330 SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 DESCRIPTION A. Scope: 1. CONTRACTOR shall provide submittals in accordance with the General Conditions as modified by the Supplementary Conditions,

More information

TECHNICAL RISK ASSESSMENT: INCREASING THE VALUE OF TECHNOLOGY READINESS ASSESSMENT (TRA)

TECHNICAL RISK ASSESSMENT: INCREASING THE VALUE OF TECHNOLOGY READINESS ASSESSMENT (TRA) TECHNICAL RISK ASSESSMENT: INCREASING THE VALUE OF TECHNOLOGY READINESS ASSESSMENT (TRA) Rebecca Addis Systems Engineering Tank Automotive Research, Development, and Engineering Center (TARDEC) Warren,

More information

Jerome Tzau TARDEC System Engineering Group. UNCLASSIFIED: Distribution Statement A. Approved for public release. 14 th Annual NDIA SE Conf Oct 2011

Jerome Tzau TARDEC System Engineering Group. UNCLASSIFIED: Distribution Statement A. Approved for public release. 14 th Annual NDIA SE Conf Oct 2011 LESSONS LEARNED IN PERFORMING TECHNOLOGY READINESS ASSESSMENT (TRA) FOR THE MILESTONE (MS) B REVIEW OF AN ACQUISITION CATEGORY (ACAT)1D VEHICLE PROGRAM Jerome Tzau TARDEC System Engineering Group UNCLASSIFIED:

More information