TECHNICAL INSTRUCTION (NAVSEA TEMPLATE) Ref: (a) NAVSEA (TECHNICAL INSTRUCTIONS) Enclosure (if applicable): [ ]
|
|
- Hubert Gibson
- 6 years ago
- Views:
Transcription
1 TECHNICAL INSTRUCTION (NAVSEA TEMPLATE) Ref: (a) NAVSEA (TECHNICAL INSTRUCTIONS) Enclosure (if applicable): [ ] This Technical Instruction (TI) is issued pursuant to reference (a) from my capacity as the Contracting Officer s Representative (COR) for the contract/order identified below. This TI is issued with the understanding that implementation is within the present scope of the contract/order and that it does not change the statement of work or other terms and conditions. Nothing herein should be construed as amending the subject contract/order or as changing any contractual requirements. If the contractor believes that compliance with anything herein would constitute a change in the requirements of the subject contract/order, the contractor should not accept the TI and notify the Contracting Officer, in writing, within ten (10) working days, specify the reason(s) for such belief, and take no further action. A copy should also be sent to the COR. Note: The contractor shall inform the COR, in writing, when 75% of the costs allotted to this TI have been expended. Expenditures for this TI shall not exceed the allotted amount. This TI is contingent upon the availability of funds and performance shall not commence until funding has been obligated on the contract/order. TI No./Revision No. TI Revision Issue Date (if applicable) Original TI Issue Date Purpose of Revision (if applicable) Contract/Task Order No. Agency/Activity Sponsoring Office Program/Technical Office Contracting Officer s TI 2-07 Rev. Orig On Award N D-7995/0002 CDSA, Dam Neck Organization NAVSEA Code PMS-325 Name Code Telephone Address Richard A. Gapski richard.gapski@navy.mil Name Code Telephone Address Ernest F Kerekes R ernest.kerekes@navy.mil 1
2 Representative (COR) Name Code Telephone Address Contracting Officer Charles E Thompson charles.e.thompson@navy.mil Contractor WR Systems LTD Contractor POC Name Code Telephone Address Kevin Newman knewman@wrsystems.com Severability Severable X Non-Severable Special Skills Required Applicable Section C, Descriptions and Specifications SOW/PBWS C.3.1 Systems Engineering Paragraph C.3.7 Technical Support Number(s) TI Title PBX C4I Prototype Drawing and Technical Documentation Development Support 1 General 1.1 Develop biweekly funding status and progress updates (C.4.3) 1.2 Assist in developing concepts and formatting the C4I requirements into a tabular format for inclusion into the Capabilities Production Document (CPD) (C.3.1.b) 1.3 Attend meetings monthly (record meeting minutes) (C.3.7.d) 2 Detailed Design. Drawing Development shall be developed in accordance with, NSWCCDDN Process, QP/WI Serial Number , Drawing Development Process. Quality assurance shall be performed in accordance with NSWCCDDN Process, QP/WI Serial Number , Technical Documentation Review & Approval Process.(C.3.7.b) TI Description 2.1 Engineered Drawing Development: Prototype Engineering Drawings shall be developed in accordance with, NSWCCDDN Process, QP/WI Serial Number , Computer Aided Design Drawing Standard for Combatant Craft. Drawings are to be of similar scope and detail as the MK VI Patrol Boat drawings that will be provided for guidance. drawing numbers shall be used and will be provided upon request C4I System Communication One Line Diagram C4I 12 Volt Power Distribution Unit (PDU) Assembly C4I 24 Volt Power Distribution Unit (PDU) Assembly C4I System Communication Block Wiring Diagram and Details C4I System Communication Cable Run Sheets C4I System Communication Equipment Arrangement & Details 2.2. Develop Master Equipment List (MEL): The MEL is considered to be the list of major equipment s in the C4I system to include all long lead items. The MEL will be of similar scope and detail as the MK VI Patrol Boat MEL that will be provided. 2.3 Develop Master Parts List (MPL): The MPL is considered to include all of the equipment and material required for installation of a complete operational C4I system on the PBX that does not include material included on the MEL. The MPL will be of similar scope and detail as the MK VI Patrol Boat MPL that will be provided. 2
3 2.4 Develop Design History: Historical technical documentation shall be preserved in accordance with, NSWCCDDN Process, QP/WI Serial Number , Historical Technical Documentation Process Drawing History Calculations Load Analysis Voltage Drop Weight Report Parts Validation: Validation of the Parts shall be done in accordance with the Vendor Cut Sheets 2.5 Develop System Operational Verification Test (SOVT) 2.6 Develop the C4I Boat Builder Installation Specification Only work uniquely and specifically identifiable to PBX is chargeable to this CLIN/SLIN. Common support costs which benefit other customers may not be charged to this CLIN/SLIN. Applicable Documents If none, insert Furnished Information (GFI), Furnished Equipment (GFE), Furnished Material (GFM); Furnished Facilities (GFF) If none, insert Temporary Duty/ Travel Requirements If none, insert GFI: CCD Processes MK VI C4I Drawings, Design History, Calculations, MEL, MPL WR Systems LTD/ Joint Expeditionary Base Little Creek Travel Authorization (TA) requests shall be submitted to and/or authorized by the Contracting Officer s Representative (COR). CONUS Trips People Duration From Destination OCONUS Trips People Duration From Destination 3
4 Funding Information (e.g., CLIN, SLIN, ACRN) Period of Performance Deliverable(s) Security Classification Hazard and Safety Information (The checked (X) Hazard and Safety Instructions are applicable to this TI) TI ROM Cost Estimate: LABOR Funding Identifier Project/Program Name Appropriation FY Appropriation Type Funded Amount 7200 FY14 OPN $78,400 ODC Funding Identifier Project/Program Name Appropriation FY Appropriation Type 9200 FROM TO On Award 30 Apr 2017 Deliverable Identifier Description Medium Frequency A003 Project Status Report Electronic Monthly Funded Amount Due Date Every other Monday A006 Drawings Electronic One Time 1 Sep 16 A006 MEL Electronic One Time ASREQ A006 MPL Electronic One Time ASREQ A005 Design History Electronic One Time 1Nov 16 A007 SOVT Electronic One Time 1 Nov 16 A002 Final Report Electronic One Time A020 unclassified Mtg minutes Electronic One Time Known Hazards: (List known hazards here) X No Hazard or Safety Information applicable Other (Specify: ) Other (Specify: ) Other (Specify: ) Total Hours ODCs Travel Total Estimate 800 $78, Days After EOT 5Days After Meeting This TI shall not be construed as a change to the terms or conditions of the subject contract/order. 4
5 Contracting Officer concurrence: Charles E Thompson (Signature) (print name) (date) Contracting Officer Ernest F Kerekes (Signature) (print name) (date) Contracting Officer s Representative Acknowledgement of receipt by Contractor: Donald D Conklin (Signature) (print name) (date) Authorized Representative of Contractor NOTE ALL TECHNICAL INSTRUCTIONS MUST BE CONCURRED WITH BY THE Contracting Officer PRIOR TO RELEASE. Copy to: 5
6 STEP-BY-STEP INSTRUCTIONS The following table provides step-by-step instructions on how to complete the Technical Instruction (TI) template. The TI template is setup as a form. The grey boxes and check boxes indicate areas that are required to be filled out. To move through the fields simply use the tab key to move from one field to the next. If additional space is required for any block, continue on a separate sheet, indicating the relevant block name(s). Routing should generally be as follows: The COR prepares the TI. If needed, the COR may obtain the ROM information from the contractor, including any travel and ODCs. Once the COR has finalized the TI, the COR submits the TI to the Contracting Officer for concurrence. After the Contracting Officer concurs, the Contracting Officer will return the TI to the COR for signature and submittal to the Contractor. The Contractor will return the signed TI to the COR. The signed TI will be maintained in the official COR file and the COR will make distribution as necessary. BLOCK TI No./Revision No. TI Revision Date Original TI Issue Date Purpose of Revision Contract/Task Order No. Agency/Activity Sponsoring Office Program/Technical Office Contracting Officer s Representative (COR) Contracting Officer Contractor Contractor POC INSTRUCTIONS (use the Tab button to navigate from field to field) Assign a TI number. If the TI is revised, a revision number or letter is assigned. Insert the date the TI revision is issued. This date will change with each subsequent revision. Insert the date the original TI is issued. The issue date remains unchanged. Indicate the purpose of the revision, i.e., incremental funding, etc. Insert the contract and task/delivery order number (if applicable). Insert the name of the agency/activity requesting the work, e.g., NAVSEA. Insert the sponsoring office s organization and code information, e.g.peo-sub and PMS 425. Insert the program/technical office s code information, e.g. John Doe, Code 25. Identify the COR information. Identify the Contracting Officer information. Insert the name of the Prime Contractor who will be performing the work. Insert the Prime Contractor s information here. 6
7 Severability Special Skills Required Applicable SOW/PBWS Paragraph Number(s) TI Title TI Description Applicable Documents Determine the severability of the tasking. (Note: Nonseverable work represents a single undertaking or a requirement that was conceived as a single end product or result. Severable work, on the other hand, is conceived as a recurring requirement for the same type of service, to be furnished and paid for on an incremental basis). Special skills required to complete the tasking must be identified here (e.g., welding certification, CPR training, etc.). Identify the applicable SOW/PBWS paragraph number. Insert brief TI title. This space is used to further identify or define the requirements. Do not insert (cut or paste) paragraphs from the SOW/PBWS in this area, as they are already identified in the Applicable SOW/PBWS Paragraph Number(s) block above. Do not provide instructions to the contractor as to how they are to accomplish the tasking, who they are to hire, or who they are to use as a subcontractor, as these determinations are made by the contractor. Applicable documentation generally includes Mil- Standards/Specs, Special Instructions, etc. If none, insert. Furnished Information (GFI), Furnished Equipment (GFE), Furnished Material (GFM); Furnished Facilities (GFF) Duty Location Temporary Duty/ Travel Requirements Funding Information Identify all Furnished Information, Equipment, Material, Facilities or other items provided by the, including the date provided/available, an adequate description, location, building number, serial numbers, model numbers and quantities, as applicable. Attachments may be used if the list is extensive, but should be identified in this block (e.g., See Attachment 1 Furnished Equipment ). If none, insert. Identify the location(s) where the work will be performed. This may be single or multiple locations on site, off site or both. Identify all travel anticipated to occur within the Continental United States (CONUS) or Outside the Continental United States (OCONUS). If none, insert. Identify the Labor or Other Direct Costs (ODC) funding identifier, followed by the associated Project or Program Name, appropriation FY, appropriation type and the funded amount, which can either be the total or an increment. If the 7
8 Period of Performance Data Deliverable(s) Security Classification Hazard and Safety Information (The checked (X) Hazard and Safety Instructions are applicable to this TI) ROM Cost Estimate TI is incrementally funded, the COR shall keep a running total of funding provided to date relative to the TI ROM total cost estimate in the official COR file. The period of performance identifies the time anticipated to complete the tasking. Identify all required data deliverables. Insert deliverable identifier (e.g., A001), description, required medium for delivery, frequency of delivery, and due date. Identify Security Classification (e.g., Confidential; Secret; etc.). If no security classification is required or identified in the contract/to, insert Unclassified. Determine the appropriate Hazard and Safety Information. If there are Known Hazards, list the known hazards. If known hazards are too numerous to mention, you may reference an attached document (e.g., see attached Exhibit 2 List of Known Hazards ). Identify any unique instructions that deal with the identified known hazards. The COR shall fill-in total cost estimate information. 8
9 THIS PAGE INTENTIONALLY LEFT BLANK 9
Jacksonville District Master
-01 33 00 (April 2006) From USACE / NAVFAC / AFCESA UFGS UNIFIED FACILITIES GUIDE SPECIFICATIONS Revised thoughout - changes not indicated by CHG tags SECTION TABLE OF CONTENTS DIVISION 01 - GENERAL REQUIREMENTS
More informationSECTION SUBMITTAL PROCEDURES
SECTION 01330 SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 DESCRIPTION A. Scope: 1. CONTRACTOR shall provide submittals in accordance with the General Conditions as modified by the Supplementary Conditions,
More informationSECTION SUBMITTAL PROCEDURES
SECTION 01330 - SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 1 Specification
More informationUCCS University Hall Fire Sprinkler System Upgrade March 1, 2011 RTA SECTION SUBMITTAL PROCEDURES PART 1 - GENERAL
SECTION 013300 - SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification
More informationSECTION SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 RELATED DOCUMENTS
SECTION 01 33 00 - SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification
More information***************************************************************************** DRAFT UFGS- 01 XX XX (FEB 2014)
DRAFT UFGS- 01 XX XX (FEB 2014) ------------------------ Drafting Activity: USACE UNIFIED FACILITIES GUIDE SPECIFICATION SECTION TABLE OF CONTENTS DIVISION 01 GENERAL REQUIREMENTS SECTION 01 XX XX (FEB
More informationSection Meetings Section Material and Equipment. None Required
January 2000 Page 1 of 8 PART 1 GENERAL 1.01 OTHER CONTRACT DOCUMENTS 1.02 DESCRIPTION OF WORK 1.03 RELATED WORK PART 2 PRODUCTS The General Conditions of the Contract, General Requirements and Supplemental
More informationADDENDUM NO. 2 PROJECT: COURTLAND PUMP STATION CONTRACT: IFB NO COM.00030
ADDENDUM NO. 2 PROJECT: COURTLAND PUMP STATION CONTRACT: IFB NO. 2018-008-COM.00030 To: Prospective Bidders of Record Date: December 17, 2018 The following changes, additions, revisions, and/or deletions
More informationSECTION SUBMITTAL PROCEDURES
SECTION 013300 PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification Sections, apply
More informationJEFFERSON LAB TECHNICAL ENGINEERING & DEVELOPMENT FACILITY (TEDF ONE) Newport News, Virginia
BULLETIN NO. 6 TO THE PLANS AND SPECIFICATIONS FOR JEFFERSON LAB TECHNICAL ENGINEERING & DEVELOPMENT FACILITY (TEDF ONE) Newport News, Virginia EwingCole Architects.Engineers.Interior Designers.Planners
More informationDIVISION 1 GENERAL REQUIREMENTS SECTION SUBMITTAL PROCEDURES
DIVISION 1 GENERAL REQUIREMENTS SECTION 01 33 00 PART 1 - GENERAL 1.1 SUMMARY A. This section includes administrative and procedural requirements for submittals required for performance of the work, including
More informationNORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017
SECTION 01 3300 - SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification
More informationThe enclosed information is provided for consideration in the preparation of your response to the abovereferenced
To: Prospective Vendor(s) Date: October 25, 2016 Subject: Solicitation Number: DHSMV-RFI-007-16 Cameras and Related Accessories Addendum No. 1 The enclosed information is provided for consideration in
More informationPROJECT TITLE PROJECT NO: CONTRACT TITLE UNIVERSITY OF CALIFORNIA, DAVIS CITY, CALIFORNIA
SECTION 01 78 00 CLOSE-OUT SUBMITTALS PART 1 - GENERAL 1.1 GUARANTEES A. Compile and submit guarantees, bonds, and service and maintenance contracts specified in the individual B. Guarantees from Subcontractors
More informationSUBMITTAL PROCEDURES
SUBMITTAL PROCEDURES PART 1 GENERAL The ASPA Project Engineer (APE) may request submittals in addition to those specified when deemed necessary to adequately describe the work covered in the respective
More informationA. Action Submittals: Written and graphic information that requires Engineer's responsive action.
SECTION 01330 - SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 1 Specification
More informationA. Action Submittals: Written and graphic information that requires Architect's responsive action.
SECTION 01330 - SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 1 Specification
More informationUNION COUNTY VOCATIONAL-TECHNICAL SCHOOLS West Hall Addition Project Raritan Road, Scotch Plains, NJ
SECTION 013300 - SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 1 General
More informationMISSISSIPPI STATE UNIVERSITY Office of Planning Design and Construction Administration
SECTION 01 340 - SHOP DRAWINGS, PRODUCT DATA AND SAMPLES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other
More informationTCC/SHORE TRANSIT BUS MAINTENANCE FACILITY - PHASE II
SECTION 013300 - SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification
More informationNEVADA DEPARTMENT OF TRANSPORTATION Addendum 3 to RFP July 28, 2017
NEVADA DEPARTMENT OF TRANSPORTATION Addendum 3 to RFP 697-16-016 July 28, 2017 Reference is made to the Request for Proposal (RFP) to Service Providers for Nevada Shared Radio Replacement Project, upon
More informationSATELLITE NETWORK NOTIFICATION AND COORDINATION REGULATIONS 2007 BR 94/2007
BR 94/2007 TELECOMMUNICATIONS ACT 1986 1986 : 35 SATELLITE NETWORK NOTIFICATION AND COORDINATION ARRANGEMENT OF REGULATIONS 1 Citation 2 Interpretation 3 Purpose 4 Requirement for licence 5 Submission
More informationEast Central College
SECTION 013300 - SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification
More informationCMW DELIVERABLES SPECIFICATION Version 1.0
CMW DELIVERABLES SPECIFICATION Version 1.0 Code: CMW-CADD-STD-06 June 2012 CONTENTS 1 INTRODUCTION... 3 2 GENERAL... 3 3 GRAPHIC FORMAT... 3 4 CADD STANDARDS... 3 5 DELIVERY MEDIA AND FORMAT... 4 6 DRAWING
More informationTaylor County July 2011 SECTION SHOP DRAWINGS, WORKING DRAWINGS AND SAMPLES
SECTION 01340 SHOP DRAWINGS, WORKING DRAWINGS AND SAMPLES PART 1 - GENERAL 1.1 REQUIREMENTS INCLUDED A. Contractor shall submit to the Architect/Engineer for review and exception, if any, such working
More informationSECTION ADMINISTRATIVE REQUIREMENTS SECTION ADMINISTRATIVE REQUIREMENTS
PART 1 GENERAL 1.01 SECTION INCLUDES A. Project Coordination. B. Preconstruction meeting. C. Progress meetings. D. Preinstallation conferences. E. Requests for information (RFI). F. Coordination drawings.
More informationWorking Drawing Manual
Working Drawing Manual 2012 Table of Contents Section 1 Working Drawing Types... 1 1.1 General... 1 Section 2 Processing Steps... 1 2.1 Project Manager... 1 2.2 Engineering Document Unit... 2 2.3 Contractor...
More informationSECTION SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES
SECTION 01334 SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES PART 1 GENERAL 1.01 SUMMARY A. Submit to the ENGINEER for review, such working drawings, shop drawings, test reports and data on materials and equipment
More informationSECTION PROJECT MANAGEMENT AND COORDINATION
SECTION 013100 - PROJECT MANAGEMENT AND COORDINATION PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other
More informationDecember 31, 2015 A. THE BID OPENING DATE IS UNCHANGED. B. Questions, Additions, and Deletions
December 31, 2015 BOARD OF COUNTY COMMISSIONERS ORANGE COUNTY, FLORIDA Y16-721-MM / ADDENDUM No. 1 ORANGE COUNTY CONVENTION CENTER PHASE III VALENCIA BALLROOM RENOVATION Bid Opening Date: January 12, 2016
More informationCo-ordination of the Group of Notified Bodies for the Construction Products Directive 89/106/EEC. GNB-CPD Conference on CPR
GNB-CPD All Co-ordination of the Group of Notified Bodies for the Construction Products Directive 89/106/EEC NB-CPD/All-13/112 Issued: 13 June 2013 Answers to GNB- CPD questions GNB-CPD Conference on CPR
More informationEngineering Drawing System
LPR 7320.1 Effective Date: February 2, 2010 Expiration Date: February 2, 2015 Langley Research Center Engineering Drawing System National Aeronautics and Space Administration Responsible Office: Systems
More informationFuture Attribute Screening Technology (FAST) Demonstration Laboratory
BROAD AGENCY ANNOUCEMENT (BAA) HSARPA BAA 07-03A Future Attribute Screening Technology (FAST) Demonstration Laboratory 1. Section I entitled, GENERAL INFORMATION is modified as follows: a. Paragraph 5
More information2016 CDM Smith All Rights Reserved July 2016 SECTION PROJECT MEETINGS
PART 1 GENERAL 1.01 REQUIREMENTS INCLUDED SECTION 01 20 00 PROJECT MEETINGS A. Construction Manager shall schedule and administer pre-construction meeting, periodic progress meetings, and specially called
More informationPROJECT TITLE PROJECT NO: CONTRACT TITLE UNIVERSITY OF CALIFORNIA, DAVIS CITY, CALIFORNIA
If project is not administered in PRISM, coordinate use of Exhibit 6 submittal schedule with this section. SECTION 01 33 23 SHOP DRAWINGS, PRODUCT DATA AND SAMPLES PART 1 - GENERAL 1.1 REQUIREMENTS INCLUDED
More informationAnswer: Qualification statement should be provided with the bid.
Little Diversified Architectural Consulting, Inc. 5815 Westpark Drive Charlotte, North Carolina 28217 Phone: 704-525-6350 Fax: 704-561-8700 Lincoln County Probation Renovation 208 N. Government Street
More informationSeptember 6, 2018 CITY OF BERKELEY SHATTUCK RECONFIGURATION AND PEDESTRIAN SAFETY PROJECT SPECIFICATION NO C ADDENDUM NO.
Department of Public Works Transportation Division September 6, 2018 CITY OF BERKELEY SHATTUCK RECONFIGURATION AND PEDESTRIAN SAFETY PROJECT SPECIFICATION NO. 17-11090-C ADDENDUM NO. 3 Dear Bidder: The
More informationSECTION SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES
SECTION 01 33 23 SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES PART 1 GENERAL 1.1 DESCRIPTION A. This specification defines the general requirements and procedures for submittals. A submittal is information
More informationREQUEST FOR QUOTATION INVITATION
REQUEST FOR QUOTATION INVITATION DATE: July 15, 2010 DPS: REQUIREMENT: SUBJECT: Patricia Farina DPS Contract Administrator Email: Patricia.Farina@cityofchicago.org Telephone: 312-744-7660 Silver Halide
More informationWGA DOCUMENTARY SCREENPLAY CONTRACT
WGA DOCUMENTARY SCREENPLAY CONTRACT ( Company ) has read the Writers Guild of America ( WGA ) Documentary Screenplay Contract (the Documentary Screenplay Contract ). Company desires to produce (the Picture
More informationFAST TRACK WORKSHOP OBJECTIVES
1 FAST TRACKING FAST TRACK WORKSHOP OBJECTIVES TO UNDERSTAND: 1. WHY ARE CRITICAL PATH ( FAST TRACK ) DESIGN SUBMITTAL PACKAGES ALLOWED 2. WHEN IS FAST TRACK ALLOWED 3. WHEN IS THE CONTRACTOR ALLOWED TO
More informationINDEX OF SPECIFICATIONS SECTION F SPECIAL CONDITIONS DIVISION 1 - GENERAL REQUIREMENTS:
INDEX OF SPECIFICATIONS SECTION F SPECIAL CONDITIONS DIVISION 1 - GENERAL REQUIREMENTS: 013300 SUBMITTAL PROCEDURES 018116 CONSTRUCTION WASTE MANAGEMENT DIVISION 2 EXISTING CONDITIONS: 023000 EARTHWORK
More informationCHAPTER 11 PRELIMINARY SITE PLAN APPROVAL PROCESS
CHAPTER 11 PRELIMINARY SITE PLAN APPROVAL PROCESS 11.01.00 Preliminary Site Plan Approval 11.01.01 Intent and Purpose 11.01.02 Review 11.01.03 Application 11.01.04 Development Site to be Unified 11.01.05
More informationTechnical Exploitation Support Request for Information (RFI)
Technical Exploitation Support Request for Information (RFI) This announcement constitutes a Sources Sought, Request for Information (RFI) ONLY. The Virginia Contracting Activity (VaCA) solely for information,
More informationEngineering Drawing System
LPR 7320.1 Effective Date: July 18, 2004 Expiration Date: July 18, 2008 Langley Research Center Engineering Drawing System National Aeronautics and Space Administration Responsible Office: Systems Engineering
More informationSHARED TENANT SERVICE (STS) ARRANGEMENTS
Southwestern Bell Telephone 2nd Revised Sheet 1 Company d/b/a AT&T Missouri Replacing 1st Revised Sheet 1 37.1 Definition of Service 37.1.1 Shared Tenant Service (STS) Arrangements are the provision of
More informationPS901500E IDENTIFICATION, MARKING, HANDLING, PROCESSING AND INSPECTION OF CRITICAL PARTS
SECURITY CLASS: UNCLASSIFIED COML. CLASS: UNCLASSIFIED DOCUMENT IDENTIFIER SUBJECT: IDENTIFICATION, MARKING, HANDLING, PROCESSING AND INSPECTION OF CRITICAL PARTS MATERIAL ENGINEERING & TECHNOLOGY DEVELOPMENT
More informationSECTION A. RFI: Request from Contractor seeking interpretation, information, or clarification of the Contract Documents.
SECTION 01 3000 PART 1 GENERAL 1.1 SECTION INCLUDES A. Electronic document submittal service. B. Preconstruction meeting. C. Submittals for review, information, and project closeout. D. Submittal procedures.
More informationSECTION SUBMITTALS. A. PART A and DIVISION 1 of PART B are hereby made a part of this SECTION.
SECTION 013300 PART 1 GENERAL 1.01 GENERAL REQUIREMENTS A. PART A and DIVISION 1 of PART B are hereby made a part of this SECTION. B. Examine all conditions as they exist at the project prior to submitting
More informationPower Verification in Racks B and B950-02
Table of Contents 1.0 Introduction... 1 2.0 Accountability... 1 3.0 Hazards Internal to this Rack... 2 4.0 External Hazards Due to Sources in this Rack... 2 5.0 Battery Charger 120 VAC Verification...
More information(AMMA) American Maritime Modernization Association
(AMMA) American Maritime Modernization Association AUDIT GUIDE FOR THE EVALUATION OF AMMA MEMBER WELDING, BRAZING, AND NON-DESTRUCTIVE TESTING (NDT) PROGRAMS Revised By: Joe Frith, AMMA Welding/Brazing/NDT
More informationPROCEDURE FOR PROCESSING WORKING DRAWINGS
PROCEDURE FOR PROCESSING WORKING DRAWINGS MAY 2005 Procedure for Processing Working Drawings GENERAL: The procedure for the review and processing of working drawings provide for two primary types of drawings,
More informationIEEE Broadband Wireless Access Working Group < Proposed PAR to convert P802.16d from Amendment to Revision
2003-05-15 IEEE C802.16-03/08 Project Title Date Submitted IEEE 802.16 Broadband Wireless Access Working Group Proposed PAR to convert P802.16d from Amendment to Revision 2003-05-15
More informationsubmittals 1s e c t i o n
Architectural Woodwork Standards submittals 1s e c t i o n SECTION 1 introductory Information Introduction...25 What to Expect...25 Purpose...25 Level of Detail...25 Approvals...25 Scheduling...25 The
More informationSECTION CONTRACTOR SUBMITTALS. A. All submittals by the CONTRACTOR shall be submitted to the ENGINEER.
SECTION 01300 - PART 1 - GENERAL 1.1 GENERAL A. All submittals by the CONTRACTOR shall be submitted to the ENGINEER. B. Unless otherwise noted, within 14 days after the date of commencement as stated in
More informationType Approval JANUARY The electronic pdf version of this document found through is the officially binding version
STANDARD FOR CERTIFICATION No. 1.2 Type Approval JANUARY 2013 The electronic pdf version of this document found through http://www.dnv.com is the officially binding version The content of this service
More informationWorking Drawing Procedure
Working Drawing Procedure June 2007 Prepared by Structural Engineering & Construction Services 1.0 Working Drawing Procedure 1.1 General There are two primary types of working drawings, those requiring
More information835 Gil Harbin Industrial Blvd Valdosta, GA 31601
QUALITY CONTROL PLAN NAVFAC SE PUBLIC WORKS MAYPORT FEAD MAYPORT 1966 BONHOMME RICHARD STREET MAYPORT NAVAL STATION FL 32228-0073 N69450-08-D-1781/0004 835 Gil Harbin Industrial Blvd Valdosta, GA 31601
More informationPUERTO RICO TELEPHONE COMPANY, INC. Second Revision - Page K-1-1 Canceling First Revision - Page K-1-1. ADDITIONAL SERVICES TARIFF SCHEDULE (Cont.
Second Revision - Page K-1-1 Canceling First Revision - Page K-1-1 25.1 Applicability TO THE PUBLIC TELEPHONE NETWORK This tariff applies to the Basic Interconnection Services provided by the Company,
More informationSECTION SUBMITTALS PART 1 - GENERAL 1.01 RELATED DOCUMENTS
SECTION 01300 SUBMITTALS PART 1 - GENERAL 1.01 RELATED DOCUMENTS A. Drawings and general provisions of Contract, including General and Supplementary Conditions and other Division-1 Specification Sections,
More informationWGA LOW BUDGET AGREEMENT--APPLICATION
WGA LOW BUDGET AGREEMENT--APPLICATION ( Company ) has read the Writers Guild of America ( WGA ) Low Budget Agreement (the Low Budget Agreement ). Company desires to produce (the Picture ) under the Low
More informationCITY OF MORRO BAY / CAYUCOS SANITARY DISTRICT
CITY OF MORRO BAY / CAYUCOS SANITARY DISTRICT ADDENDUM NO. 1 TO REQUEST FOR PROPOSALS For EQUIPMENT FOR THE 2014 CITY OF MORRO BAY / CAYUCOS SANITARY DISTRICT WASTEWATER TREATMENT PLANT IMPROVEMENT PROJECT:
More informationAdvice No Rule 8 Metering and Schedule 300 Charges as Defined by Rules and Regulations
January 4, 2017 VIA ELECTRONIC FILING Public Utility Commission of Oregon 201 High Street SE, Suite 100 Salem, OR 97301-3398 Attn: Filing Center RE: Advice No. 17-001 Rule 8 Metering and Schedule 300 Charges
More information(R) Aerospace First Article Inspection Requirement FOREWORD
AEROSPACE STANDARD AS9102 Technically equivalent to AECMA pren 9102 Issued 2000-08 Revised 2004-01 REV. A Supersedes AS9012 (R) Aerospace First Article Inspection Requirement FOREWORD In December 1998,
More informationDIVISION 1 - GENERAL REQUIREMENTS SECTION SUBMITTALS
DIVISION 1 - GENERAL REQUIREMENTS SECTION 01300 - SUBMITTALS PART 1 - GENERAL 1.1 STIPULATIONS A. The section "Special Requirements" forms a part of this section by this reference thereto and shall have
More informationSection 12 Original Contents Sheet 1. B. Conditions and Limitations. C. Regulations. 1. Concurrence 2. Exceptions. D. Specific Company Services
d/b/a TDS TELECOM Original Contents Sheet 1 Contents A. General B. Conditions and Limitations C. Regulations 1. Concurrence 2. Exceptions D. Specific Company Services 1. Voice Grade Circuits (Grandfathered
More informationA. This section specifies procedural requirements for Shop Drawings, product data, samples, and other miscellaneous Work-related submittals.
SECTION 01300 PART 1 GENERAL 1.1 SECTION INCLUDES A. Description of Requirements B. Submittal Procedures C. Specific Submittal Requirements D. Action on Submittals E. Repetitive Review 1.2 DESCRIPTION
More informationFiscal 2007 Environmental Technology Verification Pilot Program Implementation Guidelines
Fifth Edition Fiscal 2007 Environmental Technology Verification Pilot Program Implementation Guidelines April 2007 Ministry of the Environment, Japan First Edition: June 2003 Second Edition: May 2004 Third
More informationSANITARY SEWER SYSTEM ADMINISTRATIVE STANDARDS A.1 SANITARY SEWER SYSTEM PLAN SUBMITTAL PROCEDURES AND GENERAL REQUIREMENTS
SANITARY SEWER SYSTEM ADMINISTRATIVE STANDARDS A.1 SANITARY SEWER SYSTEM PLAN SUBMITTAL PROCEDURES AND GENERAL REQUIREMENTS All plans for sanitary sewer main extensions, improvements and modifications
More informationSECTION 2 GENERAL REQUIREMENTS
SECTION 2 GENERAL REQUIREMENTS 2-1 ENGINEER REQUIRED: All plans and specifications for Improvements which are to be accepted for maintenance by the County and private, on-site drainage and grading shall
More informationJanuary, 2014 Page 1 of 5
Part 1 General 1.1 General Instructions.1 These instructions add information to all articles of contracts with professionals..2 For each project, McGill University Facilities Operations and Development
More informationGSFC CONFIGURATION MANAGEMENT MANUAL
GSFC-CM-001 Effective Date: 05/03/2007 Expiration Date: 05/03/2008 National Aeronautics and Space Administration Goddard Space Flight Center Greenbelt, MD 20771 GSFC CONFIGURATION MANAGEMENT MANUAL Responsible
More informationVanderbilt University Standard Specification Revised 2/6/08
SECTION 01 78 23 OPERATION AND MAINTENANCE DATA PART 1 GENERAL 1.01 RELATED SECTIONS A. Section 01 77 00 Closeout Procedures B. Section 01 78 39 Project Record Documents 1.02 SUMMARY A. This section provides
More informationSAN ANTONIO WATER SYSTEM PURCHASING DEPARTMENT FORMAL INVITATION FOR BIDS ANNUAL CONTRACT FOR WELL MAINTENANCE SERVICES ADDENDUM NO.
SAN ANTONIO WATER SYSTEM PURCHASING DEPARTMENT Issued By: D. Anthony Rubin Date Issued: May 21, 2015 BID NO.: 15-7031 FORMAL INVITATION FOR BIDS ANNUAL CONTRACT FOR WELL MAINTENANCE SERVICES ADDENDUM NO.
More informationWork Type Definition and Submittal Requirements 14.6 Signing Plan Design & Special Provisions. Work Type Definition
Work Type Definition Pages 1-3 detail the work type definition. In order to become pre-qualified for this work type, please see the Work Type Submittal Requirements on pages 4-6. I. Description Signing
More informationSTANDARD SPECIFICATIONS SECTION SUBMITTAL PROCEDURES
STANDARD SPECIFICATIONS SECTION 01330 SUBMITTAL PROCEDURES PART 1 GENERAL 1.1 DESCRIPTION A. Section includes general requirements and procedures related to preparation and transmittal of Submittals to
More informationGreater Dayton Regional Transit Authority 4 S. Main Street Dayton, OH 45402
Greater Dayton Regional Transit Authority 4 S. Main Street Dayton, OH 45402 May 31, 2017 TO: RE: Prospective Bidders Request for Quotation (RFQ) Copying Services The Greater Dayton Regional Transit Authority
More informationTAB B-9 RECORD DRAWINGS
TAB B-9 RECORD DRAWINGS Project record drawings and shall be prepared for all University of Arizona projects. The concept Record Drawings shall replace what has previously been called As-Builts. During
More informationProduct Guide Verizon Delaware LLC. Section 11 Delaware LLC Original Sheet 1. Channels
Delaware LLC Original Sheet 1 A. GENERAL A channel is defined as a transmission path between two points over which a single category of communications service is provided, usually furnished between different
More informationSupplier Quality Requirements for First Article Inspection SQR-011. Revision Date: 30 November Approved. Frank Mariot
Supplier Quality Requirements for First Article Inspection SQR-011 Revision Date: 30 November 2016 Approved Frank Mariot Supply Chain Quality Manager Suppliers may view this document via the Internet at:
More informationThis Call for Qualifications does not require the preparation of a design proposal.
EDMS# 211137 I. Introduction This Call for Qualifications invites professional artists, or artist team, to participate in a two-stage selection process to develop an original, public art work for Port
More informationSECTION SHORT CIRCUIT, COMPONENT PROTECTION, FLASH HAZARD AND SELECTIVE COORDINATION STUDY
SECTION 16075 - SHORT CIRCUIT, COMPONENT PROTECTION, FLASH HAZARD AND SELECTIVE COORDINATION STUDY PART 1 GENERAL 1.1 SUMMARY A. Section Includes: 1. Provide a short-circuit, component protection, flash
More informationSAN FRANCISCO UNIFIED SCHOOL DISTRICT FACILITIES, DESIGN AND CONSTRUCTION ADDENDUM NO. 2
SAN FRANCISCO UNIFIED SCHOOL DISTRICT FACILITIES, DESIGN AND CONSTRUCTION ADDENDUM NO. 2 PROJECT: June Jordan School for Equity DATE: April 17, 2017 Security Cameras & Science Classrooms Improvements Project
More informationAIA Continuing Education
AIA Continuing Education Hall & Company is a Registered Provider with the American Institute of Architects Continuing Education Systems. Credit earned based on the completion of this program will be reported
More informationThis specification describes the general requirements for Engineering Services provided to Vale.
1/9 1.0 PURPOSE This specification describes the general requirements for Engineering Services provided to Vale. 2.0 GENERAL For the purposes of this document, the Engineering Consultant shall be referred
More information2017 CDM Smith All Rights Reserved November 2016 SECTION PROJECT MANAGEMENT INFORMATION SYSTEM (PMIS)
ATTACHMENT 5, CONTRACT 13, ADDENDUM 3 2017 CDM Smith 14955-109447 SECTION 01725 PROJECT MANAGEMENT INFORMATION SYSTEM (PMIS) PART 1 GENERAL 1.01 DESCRIPTION A. The Owner and Contractor shall utilize the
More informationAn interpretation of NHS England s Primary Care Co-commissioning: Regional Roadshows questions and answers Rachel Lea, Beds & Herts LMC Ltd
An interpretation of NHS England s Primary Care Co-commissioning: Regional Roadshows questions and answers Rachel Lea, Beds & Herts LMC Ltd 2. Joint Commissioning Arrangements 2.1 One option for CCGs is
More informationSECTION PANELBOARDS
PART 1 - GENERAL 1.1 DESCRIPTION SECTION 26 24 16 PANELBOARDS SPEC WRITER NOTE: Delete between // --- // if not applicable to project. Also, delete any other item or paragraph not applicable in the section
More informationBAE Systems Combat Vehicles Supplier Quality Assurance AS9102 Requirement
1 BAE Systems Combat Vehicles Supplier Quality Assurance AS9102 Requirement February 27, 2019 2 Scope The intent of this document is to provide an understanding, and clarification as to what BAE Systems
More informationRef: S935/gb. 13 th April 2012
The Institution of Engineering and Technology Michael Faraday House Six Hills Way, Stevenage Hertfordshire, SG1 2AY United Kingdom T +44 (0) 1438 313311 F +44 (0) 1438 765526 www.theiet.org Ref: S935/gb
More informationWGA LOW BUDGET AGREEMENT
WGA LOW BUDGET AGREEMENT ( Company ) has read the Writers Guild of America ( WGA ) Low Budget Agreement (the Low Budget Agreement ). Company desires to produce (the Picture ) under the Low Budget Agreement.
More informationCHIEF ENGINEER PROCEDURE MANAGEMENT OF OVERLAPPING DESIGN AGREEMENT
Approval Amendment Record Approval Date Version Description 30/05/2014 1 Initial issue under MTM. This procedure supersedes the Overlapping Design Agreement, Application and Transfer Log documents L2-SIG-PRO-007,
More informationSubmittal Packages Detailed with Items and Reviewers
Submittal Packages Detailed with Items and Reviewers Tenochca Upgrades Project # 2351 San Diego State University 5500 Campanile Drive San Diego, CA 92182 Tel: 619-594-3740 Fax: 0054-096813-1 Tile Carpeting
More informationChapter 1 General Design Information
Chapter 1 General Information Introduction The primary aim in both designing and checking is to produce a structure that will safely carry the anticipated loads. The design team, consisting of the designers,
More informationCHESS Release Business and Technical Overview Client Segregation Enhancements to CHESS
CHESS Release Business and Technical Overview Client Segregation Enhancements to CHESS Table of Contents 1. OVERVIEW... 3 1.1. BACKGROUND... 3 1.2. PHASE 1... 3 1.3. PHASE 2... 3 1.3.1. Corporate Actions
More informationCOMPLIANCE WITH THIS PUBLICATION IS MANDATORY
BY ORDER OF THE COMMANDER MACDILL AIR FORCE BASE MACDILL AIR FORCE BASE INSTRUCTION 33-118 12 NOVEMBER 2013 COMMUNICATIONS AND INFORMATION ELECTROMAGNETIC SPECTRUM MANAGEMENT COMPLIANCE WITH THIS PUBLICATION
More informationDNVGL-CP-0338 Edition October 2015
CLASS PROGRAMME DNVGL-CP-0338 Edition October 2015 The electronic pdf version of this document, available free of charge from http://www.dnvgl.com, is the officially binding version. FOREWORD DNV GL class
More informationKINGS COUNTY JAIL EXPANSION PHASE III COUNTY OF KINGS
SECTION 01 3100 - PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification Sections,
More informationSupplier Quality Requirements for First Article Inspection SQR-011. Revision Date: 16 March 2011
Supplier Quality Requirements for First Article Inspection SQR-011 Revision Date: 16 March 2011 Approved David Copeland, Manager Supply Chain Quality Suppliers may view this document via the Internet at:
More informationQUALITY CONTROL INSTRUCTIONS
QUALITY CONTROL INSTRUCTIONS QCI NO. 100 REVISION E SPC PROCEDURE WRITTEN BY: R. Zielinski DATE: 2/3/92 APPROVED BY: APPROVED BY: Department Manager Quality Assurance Manager DATE: DATE: SF 118 1 CHANGE
More information