1 Armada Synergy Ltd. Mitchell Pinckard 15 April 2014 Knots Ahead of the Rest

2 Oil & Gas The global oil and gas industry relies on quality data collection, assessment and interpretation services over the entire life of field, contributing to exploration, development, production, decommissioning and remediation.

3 Fugro: Local Presence - Global Perspective Fugro delivers services from a global network of offices and facilities. Localised services are backed by an internationally acclaimed knowledge base and resource provision. 3

4 Bumi Armada: A new player in Well Intervention 4

5 Armada Synergy ltd (JV Bumi Armada & Fugro)

6 Construction and Installation Off the Critical Path Build The Foundation You Need (Pilot Hole First?) Losses? Set a Liner Set the Primary Conductor Set Surface 6

7 Construction and Installation Bring Your Drilling Unit on Location to set BOP and Drill Your Money Section 7

8 Construction and Installation Set the Tree with The Synergy 8

9 Construction and Installation FPSO? Set SURF 9

10 Operation - Ramp up to full capacity Fugro - After Storm Survey 10

11 Decommission & Reinstatement 11

12 Decommission & Reinstatement 12

13 Decommission & Reinstatement 13

14 Typical Large Bore Gas Well

15 Targeted Tasks Well Foundation Top Hole Drilling Running XT Cleaning up wells 15% 25% Benefits of this strategy are: Tasks Eliminated from MODU Critical Path Reduced overall spud to Production time though concurrent operations Decrease well stagnation time prior to well start up and final cleanup to the facility Cyclone Flexibility with concurrent operations Additional Tasks SubSea Foundations Permanent Anchors Life of Field Utility

16 The Vessel: Synergy Delivered and working from November 2009 Built in Bergen, Norway Length 103.7m, Breadth 19.7m DP-2 Dynamic Positioning UK Safety Case Class Notation DNV+1A1 R ICE-C SF COMF-V(3) HELDK-SH E0 DYNPOS-AUTR CLEAN DRILL DK(+)

17 The Vessel: Synergy 150 ton compensated SWL below top drive (Actual Working) Fully automated drilling system Substantial underdeck bulk and fluid storage Halliburton Cement Unit 7m x 7m Moonpool Adaptable cursor system Integrated tree handling and skidding system FWD of mast. AHC 25t Deck Crane Additional compensated heavy lift wires (2) 32 tonnes capacity each Integrated ROV system

18 Seacor Drilling Rig and Top Drive R190 Seacore Drilling Rig Compensated Varco TDS 250 Top Drive 150 Ton Safe Working Load below Top Drive

19 Automatic Pipe Handling System. PLC controlled pipe handling crane and pipe feeder. Hands - off tubular handling. 650 m (2,000+ ft) /hr tripping speed (doubles). Varco Iron Roughneck. Power slips.

20 Drilling Control Automatic cyber drillers console. Remote touch screen mud mixing controls. Pipe-handler/pipe-feeder control work station.

21 Drilling Control Raised doghouse Commanding view of fwd and aft work decks. Aker Cherry picker work platform (no man-riding winch required) Auto elevators

22 Drilling Korea 2010 Drilling operations offshore Korea 2010

23 Deck Operations

24 Mud Pumps 3 x Wirth 800HP mud pumps 2000gpm at 1600psi 1000gpm at 3000psi 5000psi surface system

25 Mud Mixing and Storage Automatic mud mixing system 6 x 71m 3 (6 x 2,500 ft 3) bulk silos 1,930 bbls surface liquid mud tanks 5,220 bbls brine capacity Can Upgrade Brine to Mud & DW to Brine

26 Halliburton Advantage Cement Unit

27 Moonpool / Cursor System Standard 7.2m x 7.2m Moonpool Internal size of Cursor 6.0m x 6.0m Optional Cursor/Protection system for BOPs and Trees or other heavy items. Protects Moonpool and Bottom of boat upon exit/entry of object to moonpool.

28 Rooster Box Details

29 Scope of Work The work scope will be executed over five (5) phases; Pre-project planning and Engineering Mobilization Offshore Operations De-mobilization Project Completion.

30 Basic Schematic

31 Over-trawl Structure

32 Details A project Master Document Schedule (MDS) developed Operating limits matrix specific to the Project Rigging/sea fastening design. Deck layouts/vessel stability & installation design Asset tracking register. Project specific procedures/rig books. Definition of and interface management Hazard Identification and Risk Assessment HAZID/HAZOP Report SIMOPS manual.

33 Wells Initiation Recover Anti-Trawling Structure from Wellhead. Run in hole Selective Perforating guns and Recoverable Packer. Set packer and selectively perforate 9-5/8" casing. Check for pressure or flow from 9-5/8" x 13-3/8" Annulus. Bleed off Selectively perforate both 9-5/8" and 13-3/8" casing. Check for pressure or flow from 13-3/8" x 20" Annulus, Bleed off. Recover Packer and perforating guns. Cut and recover 9-5/8" casing from +/240m below seabed. Cut and recover 13-3/8" casing from +/-230 m below seabed. Run in hole cement stinger on Drill pipe and set final cement abandonment plug over 9-5/8 and 13-3/8" casing stumps. Pull out of hole. Run diamond saw cutter, Cut and recover Casing. Confirm seabed clear and complete as left survey

34 Second Set of Wells Recover Anti-Trawling Structure from Wellhead Run diamond saw cutter. Cut and recover 13-3/8 Confirm seabed clear.

35 Some Photo s

36 Contact Details Armada Synergy David John Carr VP Oil Field Services Mobile Roberto Beneventi GM Vessel Well Operations Mobile Mitchell Pinckard Business Development Mobile Kevin Bosley Managing Director Mobile BUMI ARMADA BERHAD Level 21, Menara Perak - 24, Jalan Perak, Kuala Lumpur, Malaysia Web site: Tel: Fugro Drilling & Well Services, Inc Hillcroft (77081), Houston, Texas Web site: Tel: Fax:

37 Thank You Knots Ahead of the Rest

38 15 th April 2014 Rev OWI Conference New Vessel Technology Panel Phil Bosworth Helix State of the Nation

39 Groups of vessels used for well intervention Vessel 1 Small monohull - Life of Field ROV vessels (also used for construction) : m long 2 Medium monohull dedicated riserless intervention vessels m long 3 Semi-sub dedicated HP riser based heavy intervention vessels 4 Large monohull - dedicated HP riser based heavy intervention vessels >150m long 5 New design combos purpose designed to client specs around field development needs Usable Deck m² <3000 >3000 Helix units?? 39

40 Capabilities Life of Field vessels 1. Acid scale squeeze 2. Limited stimulation <10bpm 3. Well abandonment Cat 1 wellhead recovery 4. Limited wireline operations benign regions 1. Low operability & efficiency 40

41 Capabilities dedicated riserless intervention vessel 1. All Slickline & E:line ops 2. High rate pumping - full stimulation to 50bpm 3. Efficient XT change 4. Abandonment preparation for MODU 1. Suspend well, CXT recovery & wellhead recovery (Cat 1) 5. High operability & highly efficient 41

42 Capabilities dedicated HP riser based semi-sub & long monohull intervention vessels 1. Heavy well intervention w/ coiled tubing, WL & pumping 2. Full or partial well abandonment w/ completion & csg recovery 3. Spill response 4. Field development 1. Booster well construction & maintenance 2. Upper completions, XT & well clean-up/hand-over 3. Subsea construction & top hole drilling On the well site - SIMOPS Q4000 was continually over well site for 47 days 16 42

43 New for UK market H Q7000 Aimed at increased recovery out of plan jobs Short duration campaigns Heavy well intervention & CTD Full or partial well abandonment Workover in CNS/NNS Field development Open flat deck 3 sided access Efficiency of rig-up & service change DP3 fast move & position vs MODU Safety improvements vs MODU Operability improvements vs MODU 43

44 Q7000 purpose built DP3 intervention semi-sub Cost efficiency 1. <2/3 job duration vs MODU 2. Higher operating limits vs MODU 3. UKCS job cost : 44-54% of MODU 4. WoS job cost : 53-67% of MODU Q7000 & IRS Moored Rig & BOP Transit to 500m & over well (towing, mooring, DP, etc) Mob & prep kit on site ROV survey & well handover Recover TC, run & test IRS Surface rig up CTLF etc In-hole services Service change-overs (SL, EL, CT) Surface rig down CTLF etc Recover IRS, deploy TC & as-left ROV survey & well handover Demob kit on site Move off well to 500m Total days Q7 does in % faster 32% $35,000,000 $30,000,000 $25,000,000 $20,000,000 $15,000,000 Q7000 MODU $10,000,000 $5,000,000 $0 Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec 44

45 Q7000 purpose built DP3 intervention semi-sub 1. Operational risk mitigators 1. Coiled Tubing & Drill Pipe capability at all times 2. Dedicated crews 3. Workover riser not required from operator 4. Speed to leave site & transit 2. Safety risk mitigators 1. Integrated riser, CTU, tower & vessel EQD system 2. Zero manriding 3. No anchor handlers 4. FRC close cover virtually eliminated 3. New frontiers / harsh environments - North WoS 1. HP riser ops over riserless ops 45

46 Thank you.. 46

47 Bumi Armada New Vessel Technology Panel Building Trust Knots Ahead of the Rest

48 Disclaimer This presentation may contain statements of future expectations and other forward-looking statements based on management s and/or other information providers current views and assumptions and involve known and unknown risks and uncertainties that could cause actual results, performance, or events to differ materially from those in such statements. Such forward-looking statements are subject to various risks and uncertainties, which may materially and adversely impact the actual results and performance of the Company s businesses. Certain such forward-looking statements can be identified by the use of forward-looking terminology such as believes, may, will, should, would be, expects or anticipates or similar expressions, or the negative thereof, or other variations thereof, or comparable terminology, or by discussions of strategy, plans, or intentions. Should one or more of these risks or uncertainties materialise, or should underlying assumptions prove incorrect, actual results may vary materially from those described as anticipated, believed, or expected in this presentation. The Company does not intend, and does not assume any obligation, to update any industry information or forward-looking statements set forth in this presentation to reflect subsequent events or future circumstances. 48

49 New Vessel Technology Panel a s d f Current Vessel Capability/SWOT analysis Innovation and New Technology Capability vs Cost 49

50 Integrated Offshore Oilfield Services Provider BUSINESS STREAMS OSV Offshore Support Vessels FPSO Floating Production, Storage and Offloading T&I Transport and Installation OFS Oilfield Services GDT Gas Development and Technology ENABLERS E&T Engineering and Technology Major Projects AMO Asset Management and Operations 50

51 Global Execution Local Delivery Integrated Offshore Oilfield Services Provider Kraken Field - FPSO Under Conversion Armada Installer, DLB FPSO Armada Sterling FPSO Armada TGT1 Armada Hawk UNITED KINGDOM Aberdeen London RUSSIA Astrakhan TURKMENISTAN UNITED STATES Turkmenbashi Ashgabat Houston SAUDI ARABIA MEXICO Ciudad del Carmen Shore base / office FPSO T & I BRAZIL GHANA NIGERIA Lagos Port Harcourt CONGO Port Point - Noire ANGOLA Al Khobar UAE Dubai Mumbai INDIA MALAYSIA Kemaman Kuala Lumpur VIETNAM Vung Tau Miri SINGAPORE Labuan BRUNEI Jakarta INDONESIA SOUTH EAST ASIA Rio de Janeiro SOUTH AFRICA Perth AUSTRALIA Armada Condor FPSO Armada Perdana FPSO Armada Perkasa FPSO Armada Sterling II- FPSO Under Conversion FPSO Armada Claire 51

52 Oilfield Services - Armada Synergy 103.7m long lightweight riserless drillship. DP-2, Ice class vessel. Fully automated riserless drilling system with 150ton AHC tower. Halliburton Cement Unit. 7.2m x 7.2m Moonpool. Adaptable cursor system. Integrated tree handling and skidding system FWD of mast. AHC 25t Deck Crane. Additional compensated heavy lift wires (2) 32 tonnes capacity each. Integrated ROV system.

53 OFS Subsea Intervention System Project LIMO Subsea Equipment: The image to the right is a developing representation of what the OFS Subsea Well Intervention System may look like? Still early days...? Work continues. With research already confirming the optimum Supply Chain. 53

54 VS 4819 Light Well Intervention Vessel 120 m long, m breadth Light Well Intervention vessel. NOV WISE Stimulation Spread, Cement Unit, Wireline Unit built into vessel capability. 110 POB. 7.2m x 7.2m Moonpool, c/w adaptable cursor system. 165 T NOV Varco AHC Tower. AHC 100 T Crane. Fully integrated ROV system, for two working class ROVs. OFS Subsea Intervention System, 7 nominal, 10,000 psi working pressure (FEED ongoing). Currently under conceptual study, moving to detailed Class and Tender design.

55 Thank You Knots Ahead of the Rest

56 Bumi Armada, Oilfield Services, the Armada Synergy, the VS 4819 LWIV, Armada Atlántico Sul & Introducing Project LIMO Knots Ahead of the Rest

57 Vision, Mission and Core Values Our Vision Our Company s One Vision, One DNA To be the Trusted Offshore and Marine Energy Services Provider in Every Corner of the World Hands-on Execution Customer Focus Brutal Openness Our Mission To provide effective integrated floating solutions in a safe, reliable and environmentally-friendly manner therefore fueling the growth of our host nations and communities People Development Collaboration Safety Mindset Building Trust Core Values Commercial Awareness knots ahead of the rest 7

58 Integrated Offshore Oilfield Services Provider BUSINESS STREAMS OSV Offshore Support Vessels FPSO Floating Production, Storage and Offloading T&I Transport and Installation OFS Oilfield Services GDT Gas Development and Technology ENABLERS E&T Engineering and Technology Major Projects AMO Asset Management and Operations knots ahead of the rest 10 8

59 Oilfield Services (OFS); Mission: To maximise the life of field recovery from our clients Oil and Gas assets Subsea Well Services Enhanced Oil Recovery 59

60 Armada Synergy 103.7m long lightweight riserless drillship. DP-2, Ice class vessel. Fully automated riserless drilling system with 150ton AHC tower. Halliburton Cement Unit. 7.2m x 7.2m Moonpool. Adaptable cursor system. Integrated tree handling and skidding system FWD of mast. AHC 25t Deck Crane. Additional compensated heavy lift wires (2) 32 tonnes capacity each. Integrated ROV system.

61 Armada Synergy; added value Top hole drilling MPSV Remove up to 20% of the drilling program off the rig critical path, Determine drillability in advance of rig arrival, Confirm shallow hazards offline of the drilling rig. Aid subsea development and installation activities. Subsea Well Intervention (2015) OFS Subsea Intervention System under development allowing light well interventions subsea (Project LiMo )

62 VS 4819 Light Well Intervention Vessel 120 m long, m breadth Light Well Intervention vessel. NOV WISE Stimulation Spread, Cement Unit, Wireline Unit built into vessel capability. 110 POB. 7.2m x 7.2m Moonpool, c/w adaptable cursor system. 165 T NOV Varco AHC Tower. AHC 100 T Crane. Fully integrated ROV system, for two working class ROVs. OFS Subsea Intervention System, 7 nominal, 10,000 psi working pressure (FEED ongoing). Currently under conceptual study, moving to detailed Class and Tender design.

63 Armada Atlantico Sul Hybrid Vessel Multi Purpose Deepwater Well Intervention, THC, Well Stimulation, P&A, and Well Testing / Clean Up Vessel. 150 m long, m breadth Hybrid Multi Purpose Vessel. NOV WISE Stimulation Spread, Cement Unit, Wireline Unit built into vessel capability. 120 POB. 11.2m x 9.2m Moonpool, 750 T NOV Varco AHC Tower, 170ft clear height, Crown Block Motion Compensator. AHC 250 T Crane. Fully integrated ROV system, for two working class ROVs. OFS Rigid Riser Subsea Intervention System, 7 3/8, 10,000 psi working pressure (FEED in dialogue).

64 OFS Intervention System Project LIMO Meaning; Light of Weight & Modular of Design Research committed to and decision made to engage with Subsea Technologies Limited of Aberdeen in the role of; FEED Lead, Design House, and Project Manager. First system to be of 7 1/8, 10K working pressure with the challenge being to develop a subsea intervention system fully compliant with and based around API, ISO and DNV standards for subsea well control products, work over risers, ROV interfaces and subsea structures. System to weigh no more than 60 tons whilst being compliant with Client needs and expectations in terms of well control and redundancy. The subsea well intervention system will be designed around shelf deployment in, largely, the UK Continental Shelf but with other geo markets in mind. System designed around shallow to mid water depths, thru water deployment and offering light intervention but with modularity built into its design Modularity to consider deeper water depths requiring the deployment of Rigid Riser and extension of services provided by OFS into Coil Tubing and Well Clean Up. 5 1/8 System will follow 64

65 Project LIMO (continued 01); The intervention system will be designed with an electro-hydraulic control system in order to provide responsiveness, a smaller umbilical diameter, enhanced monitoring of operations and system diagnostics and ease of moving the system from shallow to deep water. While research continues on developing our optimum Supply Chain OFS driver is to offer a mix of proven and innovative technologies via diversity of suppliers. Proven shear seal technology Qualified to NORSOK D002 Standard, Innovative Technology; The multi-functional SLIC Connector; comprises a family of products which allow the user to create; a riser connector, a wireline pressure control head or a subsea lifting tool through the installation of various cartridges. XR Connector; providing radically improved vessel safety, and offering reduced cost through enhanced vessel operability. 65

66 OFS Subsea Intervention System evolving Subsea Equipment: The image to the right is a developing representation of what the OFS Subsea Well Intervention System may look like? Still early days...? Work continues. With research already confirming the optimum Supply Chain. 66

67 Project LIMO; what remains? FEED Study scheduled to complete at the end of May 2014 already well developed. FMEA scheduled for mid May with STL, Client and JV participation. This is KEY! Detailed design resulting in Bill of Materials and approved Basis of Design. Enter Build Period, estimating ~ 18 months FAT, SIT test programmes already in development. 67

68 Preferred Model moving Forward: Vessels to integrate Marine, ROV, MPT, SIS, Wireline and perhaps a light Stimulation Capability for Client in support of a safe, integrated and effective service delivery Should some Clients however prefer a call off model reflecting current contracting arrangements can also be negotiated. 68

69 Finally, thanks for being given the opportunity to meet you, your attention and interest. Knots Ahead of the Rest

HELIX ENERGY SOLUTIONS

HELIX ENERGY SOLUTIONS HELIX ENERGY SOLUTIONS OFFSHORE CAPABILITIES www.helixesg.com About Us WELL OPERATIONS SUBSEA WELL INTERVENTION PRODUCTION FACILITIES The purpose-built vessels of our Well Operations business units serve

More information

MSV Seawell. The vessel that pioneered subsea light well intervention

MSV Seawell. The vessel that pioneered subsea light well intervention MSV Seawell The vessel that pioneered subsea light well intervention PRODUCTION ENHANCEMENT WELL MAINTENANCE SATURATION DIVING WELL ABANDONMENT/FIELD DECOMMISSIONING MSV Seawell specifications Classification

More information

Riserless Subsea P&A. Deepwater Decommissioning Workshop 2016 W I L D W E L L C O N T R O L S U B S E A I N T E R V E N T I O N

Riserless Subsea P&A. Deepwater Decommissioning Workshop 2016 W I L D W E L L C O N T R O L S U B S E A I N T E R V E N T I O N Riserless Subsea P&A Deepwater Decommissioning Workshop 2016 W I L D W E L L C O N T R O L S U B S E A I N T E R V E N T I O N 7 Series S U B S E A I N T E R V E N T I O N 7 Series Nominal Bore Size 7.375

More information

Doing More With Lightweight. Well Intervention Subsea Europe Drummond Lawson. London, 30 th October Managing Director

Doing More With Lightweight. Well Intervention Subsea Europe Drummond Lawson. London, 30 th October Managing Director Doing More With Lightweight Well Intervention Subsea Europe 2008 London, 30 th October 2008 Drummond Lawson Managing Director What Is It? Lightweight Subsea Well Intervention (LSWI) Re-entering existing

More information

Speaker at the Americas: Decommissioning and Well Abandonment. September 23, 2015

Speaker at the Americas: Decommissioning and Well Abandonment. September 23, 2015 Speaker at the Americas: Decommissioning and Well Abandonment September 23, 2015 TETRA Offshore Services TETRA Offshore Services ISO 9001:2008 Certified 2 Decommissioning Case Study - Agenda A general

More information

Topaz Tangaroa Multipurpose Field and ROV Support Vessel. Vessel Specifications

Topaz Tangaroa Multipurpose Field and ROV Support Vessel. Vessel Specifications Topaz Tangaroa Multipurpose Field and ROV Support Vessel Vessel Specifications Vessel Specification DP2 IMR VESSEL WITH 120T CRANE, 82 POB AND 1,000M² DECK Length overall: Breadth moulded: Depth to main

More information

Increased Safety & Efficiency from a Dedicated Light Well Intervention Vessel on Deepwater Subsea Wells

Increased Safety & Efficiency from a Dedicated Light Well Intervention Vessel on Deepwater Subsea Wells Increased Safety & Efficiency from a Dedicated Light Well Intervention Vessel on Deepwater Subsea Wells A Truly Integrated Service Delivery 09 August 2017 Agenda Introduction to Light Well Intervention

More information

Deepwater riserless (RLWI) enablers for increased oil recovery. Bringing shallow water experience to deepwater.

Deepwater riserless (RLWI) enablers for increased oil recovery. Bringing shallow water experience to deepwater. Deepwater riserless (RLWI) enablers for increased oil recovery. Bringing shallow water experience to deepwater. Well Intervention Services Deepwater RLWI success criteria RLWI history Technology Focus

More information

Well Integrity & Production Enhancement using an Integrated LWIV West African Case Study

Well Integrity & Production Enhancement using an Integrated LWIV West African Case Study Well Integrity & Production Enhancement using an Integrated LWIV West African Case Study Ekene Ogbechie Business Development Manager Agenda Campaign Overview Drivers & Objectives Location Vessels & Intervention

More information

Subsea Intervention: Is It Worth It? Drummond Lawson

Subsea Intervention: Is It Worth It? Drummond Lawson Subsea Intervention: Is It Worth It? Drummond Lawson 1 Subsea Intervention Is It Worth It? Subsea development timeline Why Intervene? What can you achieve? Intervention methods Intervention drivers What

More information

Well Abandonment Services. Plug into a New Approach

Well Abandonment Services. Plug into a New Approach Well Abandonment Services Plug into a New Approach Get it Right the First Time Permanent Solutions to Your Well Abandonment Challenge Thousands of wells await safe and permanent abandonment. It s critical

More information

BT-4000 LIGHT WORKOVER UNIT

BT-4000 LIGHT WORKOVER UNIT BT-4000 LIGHT WORKOVER UNIT BT-4000 LIGHT WORKOVER UNIT DESIGNED TO IMPROVE EFFICIENCY DURING WELL INTERVENTION OPERATIONS The BT-4000 LWO is the new generation DP-3 semi-submersible for efficient light

More information

June 24, 2010 RPSEA Project 1502 Thomas E. Williams int.com

June 24, 2010 RPSEA Project 1502 Thomas E. Williams  int.com June 24, 2010 RPSEA Project 1502 Thomas E. Williams www.nautilus int.com RPSEA 1502 Coiled Tubing from a Small Vessel June 2010 Update Presentation Topics Background Project Objectives System Configuration

More information

Well Abandonment & Field Decommissioning. Product Catalogue Destini Oil Service 1

Well Abandonment & Field Decommissioning. Product Catalogue Destini Oil Service 1 Well Abandonment & Field Decommissioning Product Catalogue Destini Oil Service 1 2 Destini Oil Service Product Catalogue VISION MISSION To be a fully integrated, globally competitive oil and gas company.

More information

Marginal Project Development

Marginal Project Development Marginal Project Development A case study of the MC-66 / OCHRE Project Richard Weser MC66 OCHRE Joint Venture Project OCHRE PROSPECT DEVELOPMENT Mississippi Canyon 66 1 Gas Subsea 7.9-Mile Tieback to Taylor

More information

NORMAND MERMAID - LIGHT OFFSHORE CONSTRUCTION VESSEL RELIABLE COMPETENT DEMANDING COLLABORATIVE

NORMAND MERMAID - LIGHT OFFSHORE CONSTRUCTION VESSEL RELIABLE COMPETENT DEMANDING COLLABORATIVE NORMAND MERMAID - LIGHT OFFSHORE CONSTRUCTION VESSEL OCEAN INSTALLER s business model rests in essence on a tailor made approach and close cooperation with clients. We know that speed, timely deliveries

More information

Richard Rickett, General Manager Engineering and Procurement - March Case Study

Richard Rickett, General Manager Engineering and Procurement - March Case Study Richard Rickett, General Manager Engineering and Procurement - March 2015 Case Study Case Study : Diverless Fast Track Repair of Mooring System Introduction ~ 300 floating production units in use around

More information

Volve Subsea Removal. Trond Hofseth Subsea Operations Conference. Haugesund

Volve Subsea Removal. Trond Hofseth Subsea Operations Conference. Haugesund Volve Subsea Removal Trond Hofseth Subsea Operations Conference Haugesund 08.08.2018 Recovery and disposal of: STL loading buoy Mid-Water Arch (MWA) 9 off mooring lines Approximately 1.600m of exposed

More information

SWS Ultra deepwater drillship

SWS Ultra deepwater drillship SWS 12000 Ultra deepwater drillship SWS 12000 DP ultra deepwater drillship DRILLING FEATURES The SWS 12000 is designed for maximum flexibility for drilling operations in water depth up to 3,650 m. Focus

More information

James Fisher Offshore. Your specialist partner in the delivery of subsea and topside projects.

James Fisher Offshore. Your specialist partner in the delivery of subsea and topside projects. James Fisher Offshore Your specialist partner in the delivery of subsea and topside projects. About James Fisher Offshore (JFO) is a specialist offshore partner, providing equipment and expert services

More information

A marginal field (re-)development using several alternative methodologies 1

A marginal field (re-)development using several alternative methodologies 1 Bart Heijermans Helix ESG Chief Operating Officer Company The Phoenix Update Project A marginal field (re-)development using several alternative methodologies 1 Our Mission Helix Producer I Helix Energy

More information

RISER SYSTEMS. Our world class innovation solving your riser challenges

RISER SYSTEMS. Our world class innovation solving your riser challenges RISER SYSTEMS Our world class innovation solving your riser challenges OUR WORLD CLASS INNOVATION SOLVING YOUR RISER contents Riser Analysis 3 Subsea Riser Systems 4 Connectors (Subsea and Surface) Surface

More information

Geoprober Drilling Moving from Ideas To Reality (Status August, 2005)

Geoprober Drilling Moving from Ideas To Reality (Status August, 2005) Geoprober Drilling Moving from Ideas To Reality (Status August, 2005) Reel A 4 OD Reel B 3-1/8 OD Anaconda CT Unit Drilling Rig 27 m derrick, 200 tonnes Heave comp 120 tonnes 4.8m Existing Equipment Refurbishment

More information

Vincent/Enfield Conductor and Flowbase Installation Review. Roy Grant, TSMarine

Vincent/Enfield Conductor and Flowbase Installation Review. Roy Grant, TSMarine Vincent/Enfield Conductor and Flowbase Installation Review Roy Grant, TSMarine Project scope Offshore installation Mobilised in Dampier (KBSB) on 10 October TSMarine scope is onshore project management

More information

MARS. Multiple application reinjection system

MARS. Multiple application reinjection system MARS Multiple application reinjection system Unique Technology. Universal Application. Historically, installing processing hardware on existing subsea trees has been a high-risk and costly activity due

More information

Hans J Lindland FMC Kongsberg Subsea Innovative Technologies, Creative Solutions

Hans J Lindland FMC Kongsberg Subsea Innovative Technologies, Creative Solutions Lett Brønnintervensjon Hans J Lindland FMC Kongsberg Subsea Why Light Well Intervention? Reservoir recovery is significantly lower (oil) for subsea wells than for platform wells Cost for drilling units

More information

Personalized Service, Industry Expertise. Franklin Howard

Personalized Service, Industry Expertise. Franklin Howard Personalized Service, Industry Expertise. Franklin Howard PRODUCTS Franklin Howard International provides high quality drilling equipment and spare parts from top manufacturers in the United States. Warranty

More information

Company Update. Spill Containment Fast Response to GOM Subsea Oil Spills. Changing the way you succeed.

Company Update. Spill Containment Fast Response to GOM Subsea Oil Spills. Changing the way you succeed. Company Update Spill Containment Fast Response to GOM Subsea Oil Spills Changing the way you succeed. Helix Deepwater Scope of Operations Changing the way you succeed. 2 Vessel selection Working in Gulf

More information

Kuala Lumpur 3 October 2012 State of the Industry of Riserless Light Well Interventions (RLWI)

Kuala Lumpur 3 October 2012 State of the Industry of Riserless Light Well Interventions (RLWI) Kuala Lumpur 3 October 2012 State of the Industry of Riserless Light Well Interventions (RLWI) Bevan Morrison, VP Global Subsea Intervention Solutions Agenda Subsea well intervention introduction Economic

More information

Transition PPT Template. J.P. Morgan. June 2015 V 3.0. Energy Equity Conference June 27, 2017

Transition PPT Template. J.P. Morgan. June 2015 V 3.0. Energy Equity Conference June 27, 2017 Transition PPT Template J.P. Morgan June 2015 V 3.0 Energy Equity Conference 2017 June 27, 2017 Forward-Looking Statements This presentation contains forward-looking statements, including, in particular,

More information

Well Intervention Vessels Used in the G.O.M. Macondo Incident Response. Helix - Well Ops June 2011

Well Intervention Vessels Used in the G.O.M. Macondo Incident Response. Helix - Well Ops June 2011 Well Intervention Vessels Used in the G.O.M. Macondo Incident Response Mark de Castro Mark de Castro Helix - Well Ops June 2011 Helix Vessels at Macondo Helix Q4000 Helix Express Helix Producer I 2 Q4000

More information

The Next Generation of Reeled Pipe Lay Vessels: for Ultra Deep Water Field Developments in Remote Locations

The Next Generation of Reeled Pipe Lay Vessels: for Ultra Deep Water Field Developments in Remote Locations The Next Generation of Reeled Pipe Lay Vessels: for Ultra Deep Water Field Developments in Remote Locations SUBSEA ASIA 2012 Kuala Lumpur Convention Centre, Malaysia Conference 03 October 2012 By John

More information

Mærsk Deliverer. Ultra deepwater drilling and development. semi-submersible

Mærsk Deliverer. Ultra deepwater drilling and development. semi-submersible Mærsk Deliverer Ultra deepwater drilling and development semi-submersible Maersk Drilling Mærsk Deliverer TYPE DPS2/M, Column stabilised dynamically positioned semisubmersible drilling rig with capability

More information

SUBSEA 101. Find more Subsea 101 case studies online

SUBSEA 101. Find more Subsea 101 case studies online SUBSEA 101 The purpose of this document is to help define some of the rationale behind the selection of a subsea tree configuration in a theoretical field for a project we are calling Project X. This section

More information

Noble Corporation. Don Jacobsen Senior Vice President Industry & Government Relations Marine/Offshore Industry Conference 29 March 2012

Noble Corporation. Don Jacobsen Senior Vice President Industry & Government Relations Marine/Offshore Industry Conference 29 March 2012 Noble Corporation Don Jacobsen Senior Vice President Industry & Government Relations 20 Marine/Offshore Industry Conference 29 March 202 Forward Looking Statement These presentations contain forward-looking

More information

ACTEON FLS - DECOMMISSIONING

ACTEON FLS - DECOMMISSIONING ACTEON FLS - DECOMMISSIONING CLIENT VERSION 15 FEBRUARY 2016 INTRODUCTION TO ACTEON FLS ACTEON FLS Subsea services company Acteon has launched a new service. Acteon Field Life Service (FLS) offers a joined-up

More information

Send your directly to

Send your  directly to Welcome to Chess Subsea Production System Training - SPS Subsea production system (SPS) is associated with the overall process and all the equipment involved in drilling, field development, and field operation.

More information

InterMoor Innovation in Action. InterMoor: USA Mexico Brazil Norway Singapore & Malaysia UK West Africa

InterMoor Innovation in Action. InterMoor: USA Mexico Brazil Norway Singapore & Malaysia UK West Africa InterMoor Innovation in Action InterMoor: USA Mexico Brazil Norway Singapore & Malaysia UK West Africa InterMoor is an Acteon Company linking subsea services 3 InterMoor Services MOORINGS Rig Moves Permanent

More information

WELLBORE ABANDONMENT CHALLENGES & OPERATIONS A-1, A-2, A-3, A-5, A-6, DEEP MENSA A-4 (PREVIOUSLY ABANDONED)

WELLBORE ABANDONMENT CHALLENGES & OPERATIONS A-1, A-2, A-3, A-5, A-6, DEEP MENSA A-4 (PREVIOUSLY ABANDONED) MENSA FIELD (MC 768) WELLBORE ABANDONMENT CHALLENGES & OPERATIONS A-1, A-2, A-3, A-5, A-6, DEEP MENSA A-4 (PREVIOUSLY ABANDONED) Chris Gerace Completions and Well Intervention Engineer 1 DEFINITIONS &

More information

MAERSK SUPPLY SERVICE. Actively taking part in solving the energy challenges of tomorrow

MAERSK SUPPLY SERVICE. Actively taking part in solving the energy challenges of tomorrow MAERSK SUPPLY SERVICE Actively taking part in solving the energy challenges of tomorrow Utilising our marine capabilities, Expanding to new industries At Maersk Supply Service, we use our marine expertise

More information

Matrix Composites & Engineering Ltd

Matrix Composites & Engineering Ltd Matrix Composites & Engineering Ltd Euroz 2015 Industrials Tour 10 June 2015 Overview Introduction to Matrix Business Operations and Outlook Plant Tour 2 Introduction to Matrix WHO WE ARE AND WHAT WE DO

More information

Mooring Capabilities. Angola Brazil Egypt Equatorial Guinea Malaysia Mexico Norway Singapore United Kingdom United States

Mooring Capabilities. Angola Brazil Egypt Equatorial Guinea Malaysia Mexico Norway Singapore United Kingdom United States Headquartered in the United States, InterMoor has facilities across the globe: Angola Brazil Egypt Equatorial Guinea Malaysia Mexico Norway Singapore United Kingdom United States Mooring Capabilities For

More information

Angola Brazil Mooring Egypt Equatorial Guinea Capabilities Malaysia Mexico Norway Singapore United Kingdom United States

Angola Brazil Mooring Egypt Equatorial Guinea Capabilities Malaysia Mexico Norway Singapore United Kingdom United States Mooring Capabilities InterMoor. The Global Mooring Specialist. Deepwater mooring technology has evolved in the past 20 years, and much of the industry s progress has been pioneered by InterMoor, an Acteon

More information

Mooring Capabilities. Angola Brazil Egypt Equatorial Guinea Malaysia Mexico Norway Singapore United Kingdom United States

Mooring Capabilities. Angola Brazil Egypt Equatorial Guinea Malaysia Mexico Norway Singapore United Kingdom United States Headquartered in the United States, InterMoor has facilities across the globe: Angola Brazil Egypt Equatorial Guinea Malaysia Mexico Norway Singapore United Kingdom United States Mooring Capabilities For

More information

Deepwater well design, construction & drilling operations

Deepwater well design, construction & drilling operations Deepwater well design, construction & drilling operations Training and development 1 Kingdom Drilling Services Ltd Our Mission Deliver a recognized excellence in deepwater industry training, education

More information

VIRTUS CONNECTION SYSTEMS Advanced Diverless Connection Solutions for any Subsea Field Application

VIRTUS CONNECTION SYSTEMS Advanced Diverless Connection Solutions for any Subsea Field Application VIRTUS CONNECTION SYSTEMS Advanced Diverless Connection Solutions for any Subsea Field Application 2 Virtus Subsea Connectors Delivering Long-Lasting Reliability at Each Subsea Connection Subsea production

More information

Getting to Grips with Deepwater Handling Operations

Getting to Grips with Deepwater Handling Operations Getting to Grips with Deepwater Handling Operations Mark Wood, Regional Manager SE Asia, First Subsea Ltd Agenda First Subsea Trends in Offshore Handling Deepwater Handling Challenges Ball and Taper Technology

More information

Marine Risers. Capability & Experience

Marine Risers. Capability & Experience Marine Risers Capability & Experience Capability Overview INTECSEA now offers, in a single company, industry leading capability for all marine riser systems including top-tensioned risers (TTRs) for direct

More information

Dry trees for cost effective solution with the Wellhead Barge: WHB

Dry trees for cost effective solution with the Wellhead Barge: WHB Dry trees for cost effective solution with the Wellhead Barge: WHB Benjamin MAURIES SAIPEM PAU, FRANCE 5 7 APRIL 2016 Dry Tree Solution for Mild Environments Dry Tree solutions have been developed and

More information

OFFSHORE CLAMP PRODUCT GUIDE INTELLIGENT ENGINEERING

OFFSHORE CLAMP PRODUCT GUIDE INTELLIGENT ENGINEERING OFFSHORE CLAMP PRODUCT GUIDE INTELLIGENT ENGINEERING Red Marine provides intelligent engineering solutions to global clients working in the oil & gas, nuclear and renewable energy industries. With a broad

More information

An Introduction to Oil & Gas Drilling and Well Operations

An Introduction to Oil & Gas Drilling and Well Operations An Introduction to Oil & Gas Drilling and Well Operations Educational Material from the IOM 3 Oil and Gas Division The global network for the materials cycle Introduction The Institute of Materials, Minerals

More information

IMR in Subsea 7 for Statoil, past and future, the new IMR vessel Seven Viking

IMR in Subsea 7 for Statoil, past and future, the new IMR vessel Seven Viking IMR in Subsea 7 for Statoil, past and future, the new IMR vessel Seven Viking th March 20 Bjørn Serck-Hanssen Agenda Agenda IMR Scope of Work Asset Development Drivers for 365 days operation Past - Future

More information

Oil&Gas Subsea Production

Oil&Gas Subsea Production Oil&Gas Subsea Production Oil&Gas Subsea Production The first subsea technologies were developed in the 1970s for production at depths of a few hundred meters. Technology has advanced since then to enable

More information

Marine integrity monitoring. Offshore oil and gas

Marine integrity monitoring. Offshore oil and gas Marine integrity monitoring Offshore oil and gas Where will our knowledge take you? BMT has over 0 years experience in the design, procurement, integration and installation of monitoring systems worldwide.

More information

Marine integrity monitoring Offshore oil and gas

Marine integrity monitoring Offshore oil and gas Marine integrity monitoring Offshore oil and gas Where will our knowledge take you? BMT has over 0 years experience in the design, procurement, integration and installation of monitoring systems worldwide.

More information

Intervention/Decommissioning

Intervention/Decommissioning Intervention/Decommissioning By Nicholas Samford Lloyds Register Intervention/Decommissioning SME Working together for a safer world Planning Decommissioning Operations Planning Decommissioning and P&A

More information

Technological and Logistical Challenges during Construction & Installation of Deepwater Mega Subsea Development in West Africa

Technological and Logistical Challenges during Construction & Installation of Deepwater Mega Subsea Development in West Africa Technological and Logistical Challenges during Construction & Installation of Deepwater Mega Subsea Development in West Africa 1 SAFER, SMARTER, GREENER Content Going Deeper Scale/Size of Deepwater Mega

More information

SUBSEA WELL CONTAINMENT. Global Basis. Deepwater & Emerging Technologies Group (DETG) AADE Houston Chapter 25 January 2012

SUBSEA WELL CONTAINMENT. Global Basis. Deepwater & Emerging Technologies Group (DETG) AADE Houston Chapter 25 January 2012 SUBSEA WELL CONTAINMENT Global Basis Deepwater & Emerging Technologies Group (DETG) AADE Houston Chapter 25 January 2012 Bill Mahler Wild Well Control, Inc. Response Components - Plus Many More Components

More information

Offshore Drilling Rigs

Offshore Drilling Rigs Offshore Drilling Rigs Drilling Offshore Drilling Rigs Many of the world s potential reserves of hydrocarbons lie beneath the sea, and the hydrocarbon industry has developed techniques suited to conditions

More information

ULTRA-DEEPWATER RISERLESS INTERVENTION SYSTEM (RIS)

ULTRA-DEEPWATER RISERLESS INTERVENTION SYSTEM (RIS) RPSEA PROJECT DW 2301 ULTRA-DEEPWATER RISERLESS INTERVENTION SYSTEM (RIS) DTC International, Inc. 5540 Brittmoore Road Houston, Texas 77041 23 March 2010 RIS PROJECT TEAM MEMBERS DTC International, Inc.

More information

Britcham Brasil X Seminário Internacional de Energia

Britcham Brasil X Seminário Internacional de Energia Britcham Brasil X Seminário Internacional de Energia Aker Solutions Provedor de Tecnologia no Presente e no Futuro Nov.2012 Public 2012 Aker 2012 Solutions Aker Solutions From reservoir to production Aker

More information

ENGINEERING SOLUTIONS AND CAPABILITIES. Capacity enhancement for deep water operations THE CHALLENGE THE SOLUTION

ENGINEERING SOLUTIONS AND CAPABILITIES. Capacity enhancement for deep water operations THE CHALLENGE THE SOLUTION Capacity enhancement for deep water operations ENGINEERING SOLUTIONS AND CAPABILITIES THE CHALLENGE THE SOLUTION Operations are taking place in much deeper waters and in more diverse locations, Aquatic

More information

ACID STIMULATION CASE STUDY

ACID STIMULATION CASE STUDY ACID STIMULATION CASE STUDY 07/03/2018 AGENDA Introduction Rigless system overview Operational considerations Case Study Interference Test objectives & Equipment Interference Test results Summary Conclusion

More information

Floating Systems. Capability & Experience

Floating Systems. Capability & Experience Floating Systems Capability & Experience Capability Overview INTECSEA has more than 30 years of extensive experience with all types of floating systems: TLPs, spars, monohulls and semi-submersibles. Key

More information

The Future of Offshore Drilling: Beyond Ultra Deep. Chris Beckett, CEO Pacific Drilling S.A. September 22, 2014

The Future of Offshore Drilling: Beyond Ultra Deep. Chris Beckett, CEO Pacific Drilling S.A. September 22, 2014 The Future of Offshore Drilling: Beyond Ultra Deep Chris Beckett, CEO Pacific Drilling S.A. September 22, 2014 Pacific Drilling: Committed to being the Preferred Ultra Deepwater Driller Only 100% high

More information

AADE Houston Chapter. Group. 26 January 2011

AADE Houston Chapter. Group. 26 January 2011 AADE Houston Chapter Deepwater and Emerging Technologies Group 26 January 2011 BOEMRE Compliance Guidelines Department of Interior s Increased Safety Measures for Energy Development on the Outer Continental

More information

SUBSEA 7 AND GRANHERNE ALLIANCE. Engaging Early to Deliver Value

SUBSEA 7 AND GRANHERNE ALLIANCE. Engaging Early to Deliver Value SUBSEA 7 AND GRANHERNE ALLIANCE Viable Solutions Operators are seeking novel and reliable concepts to overcome industry challenges such as complex reservoirs, cost, growth and schedule creep and to optimise

More information

Offshore Support Vessels Located in the US Gulf of Mexico in March 2018

Offshore Support Vessels Located in the US Gulf of Mexico in March 2018 Offshore Support Vessels Located in the US Gulf of Mexico in March 18 IMCA March 1, 18 Prepared by IMCA The International Marine Contractors Association (IMCA) is the international trade association representing

More information

BP SWOPS Single Well Oil Production System. Sandy Meldrum CEng, MIMechE

BP SWOPS Single Well Oil Production System. Sandy Meldrum CEng, MIMechE Sandy Meldrum CEng, MIMechE Concept A means of producing oil from small offshore fields which would be uneconomic for fixed platforms or other conventional means. System Overview Comprised Production Vessel

More information

Join a winning team and engineer your future with Expro

Join a winning team and engineer your future with Expro Join a winning team and engineer your future with Expro Expro s business is well flow management, providing services and products that: measure improve control and process flow from high-value oil & gas

More information

M. Kevin McEvoy. Oceaneering International, Inc. Chief Executive Officer 2015 GLOBAL ENERGY AND POWER EXECUTIVE CONFERENCE JUNE 2, 2015 NEW YORK, NY

M. Kevin McEvoy. Oceaneering International, Inc. Chief Executive Officer 2015 GLOBAL ENERGY AND POWER EXECUTIVE CONFERENCE JUNE 2, 2015 NEW YORK, NY 2015 GLOBAL ENERGY AND POWER EXECUTIVE CONFERENCE JUNE 2, 2015 NEW YORK, NY M. Kevin McEvoy Chief Executive Officer Oceaneering International, Inc. Safe Harbor Statement Statements we make in this presentation

More information

Low Cost Field Development using Hybrid Risers. Learn more at

Low Cost Field Development using Hybrid Risers. Learn more at Low Cost Field Development using Hybrid Risers Prahlad Enuganti Technical Manager 2H Offshore Engineering Ltd., Aberdeen 1 Typical Field Development Options Fixed Structure Shallow Water Platform Wells

More information

Riser Installation in Deep & Ultra Deep Water

Riser Installation in Deep & Ultra Deep Water Riser Installation in Deep & Ultra Deep Water Frank Lim 38 th Annual Offshore Pipeline Technology Conference Amsterdam, February 2015 Outline Introduction Overview of current deepwater riser systems and

More information

COSL MEXICO OVERVIEW SERVICE LINES IN MEXICO INTEGRATED SERVICES

COSL MEXICO OVERVIEW SERVICE LINES IN MEXICO INTEGRATED SERVICES S COSL MEXICO OVERVIEW SERVICE LINES IN MEXICO INTEGRATED SERVICES COSL MÉXICO OVERVIEW COSL China has operated in Southeast Asia for over 50 years. COSL México is a Mexican company, subsidiary of China

More information

Emergency Pipeline Repair Systems; A Global Overview of Best Practice

Emergency Pipeline Repair Systems; A Global Overview of Best Practice Emergency Pipeline Repair Systems; A Global Overview of Best Practice Brief Introduction to EPRS EPRS: Key Challenges Worldwide EPRS: Global Approaches to These Challenges Best Practice Comparison James

More information

Engineering. Drafting & Design. Regulatory Interface. Project & Construction Management. Marine Operations Services

Engineering. Drafting & Design. Regulatory Interface. Project & Construction Management. Marine Operations Services Engineering Drafting & Design Regulatory Interface Project & Construction Management Marine Operations Services Corporate Overview EXMAR Offshore is dedicated to the ownership and leasing of offshore assets

More information

OFFSHORE EQUIPMENT. Pipelay Umbilical lay flex lay cable lay. Fpso-Flng-Frsu Wind Turbine FPU-TlP-SEMI-SPAR INSTALLATION & CONSTRUCTION PLATFORM

OFFSHORE EQUIPMENT. Pipelay Umbilical lay flex lay cable lay. Fpso-Flng-Frsu Wind Turbine FPU-TlP-SEMI-SPAR INSTALLATION & CONSTRUCTION PLATFORM INSTALLATION & CONSTRUCTION Pipelay Umbilical lay flex lay cable lay Fpso-Flng-Frsu Wind Turbine FPU-TlP-SEMI-SPAR OFFSHORE EQUIPMENT Drilling UNIT PLATFORM SUBSEA NEWBUILD, Upgrade And Maintenance Lift

More information

Investor Presentation

Investor Presentation Connecting What s Needed with What s Next Investor Presentation September 2017 Forward-Looking Statements Statements we make in this presentation that express a belief, expectation, or intention are forward

More information

A WORLD-LEADING SEABED-TO-SURFACE PARTNER

A WORLD-LEADING SEABED-TO-SURFACE PARTNER A WORLD-LEADING SEABED-TO-SURFACE PARTNER 4 What we do 6 Why choose Subsea 7? 7 Project management and engineering expertise 8 A selection of our key projects 10 High-quality, fully integrated offshore

More information

Innovative Subsea Engineering

Innovative Subsea Engineering Innovative Subsea Engineering www.subsea.co.uk Innovative Subsea Engineering Formed in 1985 by a team of experienced engineers and diving professionals, Subsea Innovation is a company dedicated to delivering

More information

The use of an integrated contract model (iepci) for Subsea developments

The use of an integrated contract model (iepci) for Subsea developments NH GRAND HOTEL KRASNAPOLSKY AMSTERDAM 3-5 APRIL 2017 The use of an integrated contract model (iepci) for Subsea developments Tim Crome 1991 1993 1995 1997 1999 2001 2003 2005 2007 2009 2011 MCE Deepwater

More information

New Developments in Regulation of U.S. Offshore Oil and Gas Operations

New Developments in Regulation of U.S. Offshore Oil and Gas Operations New Developments in Regulation of U.S. Offshore Oil and Gas Operations Peking University Law School and The University of Texas School of Law Carol Dinkins Partner Vinson & Elkins, LLP August 21, 2012

More information

Siem WIS. Siem WIS AS. Closed Loop Drilling CLD. August Siem WIS AS.

Siem WIS. Siem WIS AS. Closed Loop Drilling CLD. August Siem WIS AS. AS Closed Loop Drilling CLD August 2010 2010 AS. Technology summary has secured intellectual property rights (IPR) for all key components of its portfolio: CircSub To drill with constant Mud Circulation

More information

Subsea UK Neil Gordon Chief Executive Officer Championing the UK Subsea Sector Across the World

Subsea UK Neil Gordon Chief Executive Officer Championing the UK Subsea Sector Across the World Subsea UK Neil Gordon Chief Executive Officer Championing the UK Subsea Sector Across the World 1 Overview About Subsea UK Facts and figures UK industry evolution Centre of Excellence Technology and Innovation

More information

Capital Marked Presentation. Dof Subsea Atlantic Region

Capital Marked Presentation. Dof Subsea Atlantic Region Capital Marked Presentation Dof Subsea Atlantic Region Agenda Atlantic Business and Area of Operation Clients & Some Ongoing Contracts Our Capabilities Market Outlook DOF Subsea 2 Atlantic Business and

More information

Conductor Installation Services. Today s technology traditional values

Conductor Installation Services. Today s technology traditional values Conductor Installation Services Today s technology traditional values Adding value to the conductor installation process Conductor Installation Services Ltd (CIS) installs well conductors and pile foundations

More information

Alan R. Curtis Chief Financial Officer

Alan R. Curtis Chief Financial Officer Connecting What s Needed with What s Next Alan R. Curtis Chief Financial Officer Jefferies Energy Conference November 28, 2017 Houston, TX Forward-Looking Statements Statements we make in this presentation

More information

Morgan Stanley Houston Energy Summit

Morgan Stanley Houston Energy Summit Morgan Stanley Houston Energy Summit February 25, 2014 Forward-Looking Statements This presentation contains forward-looking statements that involve risks, uncertainties and assumptions that could cause

More information

M. Kevin McEvoy. Oceaneering International, Inc. President & CEO. December 2, 2014 New York, NY. Safe Harbor Statement

M. Kevin McEvoy. Oceaneering International, Inc. President & CEO. December 2, 2014 New York, NY. Safe Harbor Statement December 2, 2014 New York, NY M. Kevin McEvoy President & CEO Oceaneering International, Inc. Safe Harbor Statement Statements we make in this presentation that express a belief, expectation, or intention

More information

Subsea Wellhead Solutions

Subsea Wellhead Solutions GE Oil & Gas Subsea Wellhead Solutions Advanced technologies with industry-proven reliability, performance, and safety for all operating conditions Reliability is a must Offshore operations are moving

More information

2011 Capital Markets Day

2011 Capital Markets Day 2011 Capital Markets Day Geir Håøy President Kongsberg Maritime WORLD CLASS through people, technology and dedication Kongsberg Maritime Introduction Significant market position within the drilling segment

More information

Engineering Procurement Construction Installation. Company Profile.

Engineering Procurement Construction Installation. Company Profile. Engineering Procurement Construction Installation Company Profile www.ariosh.com info@ariosh.com at a Glance 400+ Employees Established 1997 Engineering & Construction World Class Offices ariosh Fabrication

More information

Subsea Structural Engineering Services. Capability & Experience

Subsea Structural Engineering Services. Capability & Experience Subsea Structural Engineering Services Capability & Experience Capability Overview INTECSEA s subsea structural engineering team has a proven track record for providing solutions to problems in the implementation

More information

Rod Larson President, Latin America. Houston, Texas March 9-10, 2011

Rod Larson President, Latin America. Houston, Texas March 9-10, 2011 Rod Larson President, Latin America Houston, Texas March 9-10, 2011 Jan-10 Feb-10 Mar-10 Apr-10 May-10 Jun-10 Jul-10 Aug-10 Sep-10 Oct-10 Nov-10 Dec-10 Jan-11 Feb-11 Gulf of Mexico: Post-Macondo Slowdown

More information

From late-life reservoir management through to final permanent abandonment, we create bespoke solutions to meet your specific well requirements.

From late-life reservoir management through to final permanent abandonment, we create bespoke solutions to meet your specific well requirements. From late-life reservoir management through to final permanent abandonment, we create bespoke solutions to meet your specific well requirements. LATE-LIFE RESERVOIR MANAGEMENT All oil and gas fields will

More information

DEA Technology Forum 17 Nov. 2011

DEA Technology Forum 17 Nov. 2011 DEA Technology Forum 17 Nov. 2011 Helix Company Fast Response Update System GOM Subsea Oil Spill Control & Containment Steve Scanio Helix Energy Solutions Deepwater Spill Defense Shields Surface Collection

More information

GTSC Rig for Hands-on Training

GTSC Rig for Hands-on Training GTSC Rig for Hands-on Training The Rig To meet the high demand of Petroleum Industry, GTSC has launched the Middle East s first fully operational Training Rig & Well in May 2010 at its main building location

More information

The intent of this guideline is to assist the Drilling Engineer in his preparation of the deepwater drill stem test design and procedure.

The intent of this guideline is to assist the Drilling Engineer in his preparation of the deepwater drill stem test design and procedure. 1 The intent of this guideline is to assist the Drilling Engineer in his preparation of the deepwater drill stem test design and procedure. This document is not intended to override any specific local

More information

Offshore Wind Risks - Issues and Mitigations

Offshore Wind Risks - Issues and Mitigations DNV Offshore Wind Soren Karkov DNV an independent foundation Our Purpose To safeguard life, property and the environment Our Vision Global impact for a safe and sustainable future 2 More than 145 Years