1 Centennial Coal INGLENOOK EXPLORATION PROJECT LANDHOLDER LIAISON PROGRAMME JULY 2011

2 Table of Contents 1. LANDHOLDER LIAISON PROGRAMME PURPOSE OBJECTIVES SCOPE RESPONSIBILITY THE COMMUNITY DEMOGRAPHICS COMMUNITY FEEDBACK EXPLORATION PROGRAMME BACKGROUND DESCRIPTION OF THE ACTIVITY EXPLORATION DRILLING EQUIPMENT TIMING CONSULTATION STRATEGIES COMMUNITY ENQUIRIES PROCEDURE CONSULTATION REVIEW PERIOD CONTACTS APPENDICES...15 Page i

3 List of Tables Table 1 - Conceptual Consultation Timeline...12 Table 2 - Community Enquiries Reporting Requirements...13 List of Figures Figure 1 Exploration Drilling Consultation Flow Chart...2 Figure 2- Flow Chart for Managing a Community Initiated Contact...3 Figure 3- Panoramic view of the project area landscape...4 Figure 4 - Mid-Western Regional Council LGA...6 Figure 5 - A stream (left) and spring fed dam (right) sampled in the project area...7 Figure 6 - Location Map of Centennial Coal s Operations...8 Figure 7 - Typical Drill Site Layout (Not to Scale)...9 Figure 8 - A Rehabilitated Drill Site...10 Figure 9 - Typical drill rig (left) and rod handler (right)...11 Figure 10 - Typical drill rig in operation...11 List of Appendix Appendix 1 Record of Changes to System Document...15 Appendix 2 - Plans for ELs 7431, 7432, 7442 and A Appendix 3 - Enquiry Report Form...20 Page ii

4 List of Abreviations ING Inglenook Exploration Project. EL Exploration Licence (refer Mining Act 1992). NGO Non-Government Organisation. Page iii

5 REVIEW AND DOCUMENT CONTROL This Inglenook Exploration Project Landholder Liaison Programme should be reviewed regularly and updated as required. Any additional stakeholders identified during the course of the Project will be added to the Western Projects Database and communicated through the appropriate methods. DOCUMENT DETAILS Name: Inglenook Exploration Project Landholder Liaison Programme Reference: ING Landholder Liaison Programme.doc Revision No.: 1 Document Status Final Rev No. Date Details of Revision Reviewed By Draft issued for comment 2 nd draft issued for comment Final draft issued for comment J Sandona. REVISION DETAILS B Pierna F Bartier J Marshall B Preston Final document controlled copy J Sandona Circulation Details Name Position Circ. Date Method B.Preston GM Projects and Business Development R Tacon GM Operations - West M Cairney GM Health, Safety, Environment and Community (HSEC) K.Brassil Group Manager - External Affairs J.Brunton Geologist - Projects B Pierna Exploration Coordinator Inglenook Project A Howard Regional Environmental Officer Central West F Bartier Regional Environmental Manager Central West Inspector of Coal Mines DTIRIS, Mineral Resources, Lithgow Branch Team Leader Environment, Central West DTIRIS, Mineral Resources, Orange Page iv

6 1. LANDHOLDER LIAISON PROGRAMME 1.1 PURPOSE The purpose of the Landholder Liaison Programme is to provide a consistent management framework to identify and consult with landholders that are affected by the exploration programme within the Inglenook Project Area. The engagement strategy for the exploration programme described in this Landholder Liaison Programme covers the proposed Inglenook exploration drilling programme, which is anticipated to last approximately three (3) years. The key principles of the Landholder Liaison Programme include: Respond to landholder enquiries; No surprises; and, Establishment and maintenance of integrity in business. 1.2 OBJECTIVES Centennial Coal acknowledges feedback from the community and individual landholders and gives it thoughtful consideration. Centennial Coal places the utmost importance in maintaining effective communication with the communities in which we operate as with all stakeholders in our business. Complimentary to the Project s Stakeholder Engagement Plan, the Landholder Liaison Programme is designed to help develop good relationships between Centennial Coal and landholders in a way that enables Centennial to undertake its business in a responsible and effective manner whilst respecting the needs and of landholders and the local community. The objectives of the Landholder Liaison Programme are to: Facilitate the communication, consultation and engagement of landholders with the Inglenook Exploration Project Team; Outline communication methods planned to share project information; Define a means of recording feedback from landholders; and, Provide procedures for addressing all landholder enquiries. Figure 1 describes the consultation process with landholders directly affected by the exploration drilling programme and landholders of neighbouring properties. Figure 2 describes the procedure for addressing all landholder enquiries. 1.3 SCOPE The landholders, their landholdings and non-centennial owned lands affected by ELs 7431, 7432, 7442 and A RESPONSIBILITY It is the Regional Environmental Officer Central West s (REO CW) responsibility to ensure that the Landholder Liaison Programme is implemented and coordinated as appropriate and that the information is maintained and monitored in accordance with the Exploration Licence Conditions and Centennial Coal s Environmental Management System. The REO-CW must also ensure that there is the operation of an information line (in accordance with ELs 7431, 7432, 7442 and A414) and that affected landholders are informed of this. Page 1

7 Figure 1 Exploration Drilling Consultation Flow Chart Identify proposed drill hole location Is it on private land? Yes Contact landholder(s) No Identify suitable drill site with landholder(s) Is it on Crown or public land? Yes Negotiate access agreement No Is there a residence within 200 metres of a drill site? Yes Obtain consent No Notify neighbouring properties Commence exploration drilling Page 2

8 Figure 2- Flow Chart for Managing a Community Initiated Contact Community Initiated Contact Contact received by project team member. Project team member to record particulars of the enquiry on the enquiry report form (Appendix 2) including details of the issue, and contact name and details of the person making the enquiry. Give the contact person your name. Can the issue be solved by the person receiving the contact? Yes No Resolve issue and record details of the action taken on the enquiry report form (Appendix 2) Notify the REO-CW or Project Manager. Explain this to the person making the enquiry and give a timeframe for response. Pass the completed Enquiry Report Form to the REO-CW. Page 3

9 2. THE COMMUNITY 2.1 DEMOGRAPHICS The exploration area is rural and comprises the localities of Ilford, Running Stream, Razorback and portions of Round Swamp and Clandulla. The land features undulating hills with cliffs and pagodas on the periphery reaching elevations over 1000 metres above sea level. The hills are partially forested with land cleared for grazing. The prominent feature of the landscape is the many water sources such as streams, creeks, springs, soaks and dams that protrude on the surface. Figure 3 shows a view of the area described. The area is located in the southern portion of the Mid-Western Regional Council LGA (refer Figure 4) and the northern portion of the Lithgow LGA. Figure 3- Panoramic view of the project area landscape From the Australian Bureau of Statistics (ABS) 2006 Census, the most common industries of employment for persons aged 15 years and over, usually resident, in 2850 (Postal Area) which includes the locality of Mudgee were Sheep, Beef Cattle and Grain Farming 8.1%, School Education 5.3%, Coal Mining 4.2%, Cafes, Restaurants and Takeaway Food Services 4.0% and Supermarket and Grocery Stores 2.9%. The most common responses for occupation for employed persons were Managers 18.9%, Technicians and Trades Workers 15.6%, Professionals 13.6%, Labourers 13.4% and Sales Workers 10.9%. There were 3,878 families: 42.2% were couple families with children, 42.4% were couple families without children, 14.1% were one parent families and 1.3% were other families. From the ABS 2006 Census for Ilford, the most common industries of employment for persons aged 15 years and over, usually resident, include Sheep, Beef Cattle and Grain Farming 27.4%, School Education 8.5%, Coal Mining 5.7%, Management and Related Consulting Services 4.7% and Cement, Lime, Plaster and Concrete Product Manufacturing 4.7%. The most common responses for occupation for employed persons were Managers 29.2%, Technicians and Trades Workers 22.6%, Labourers 14.2%, Clerical and Administrative Workers 9.4% and Professionals 8.5%. There were 76 families in Ilford: 28.9% were couple families with children, 53.9% were couple families without children, 17.1% were one parent families and 0.0% were other families. Page 4

10 From the ABS 2006 Census for Clandulla, the most common industries of employment for persons aged 15 years and over, usually resident, include Cement, Lime, Plaster and Concrete Product Manufacturing 14.0%, Coal Mining 12.0%, Sheep, Beef Cattle and Grain Farming 10.7%, Hardware, Building and Garden Supplies Retailing 4.7% and Residential Care Services 4.7%. The most common responses for occupation for employed persons were Technicians and Trades Workers 26.0%, Managers 24.7%, Machinery Operators and Drivers 11.3%, Labourers 10.7% and Professionals 8.7%. There were 100 families in Clandulla: 50.0% were couple families with children, 50.0% were couple families without children. There are a significant number of landholdings that are owned by people not resident in the locality. These landholdings are often used as weekend and holiday retreats. There are also a significant number of fifth and sixth generational families with history that dates back to the earliest European settlement of the area. The elders of these families have invaluable and extensive knowledge of history, the land, characteristics and features of the localities in the Project Area. The extensive historical and experiential knowledge of the area held by these locals is extremely valuable to both the community and the project and every effort should be made to capture and record the information offered for posterity. The different history and lifestyle motivations of different peoples manifest as different needs and concerns requiring sensitive and tailored management by Centennial Coal. In parallel with the history of agriculture in the area mining has also occurred for gold and precious metals from the late 1800 s and coal mining from the early 1900 s. Exploration drilling activities to determine a coal resource have also been undertaken since the 1980 s by the NSW Government and several companies. In addition to the mining activity there are a number of existing leases held in the area for mining, petroleum and geothermal energy. Page 5

11 Figure 4 - Mid-Western Regional Council LGA Page 6

12 2.2 COMMUNITY FEEDBACK Although there has been an established history of mining and industry in the area there has also been a growth in environmental awareness since the 1970 s and a changing demographic profile in the area that has increasingly challenged the place and role of coal exploration and mining in the area. From the granting of the Inglenook Exploration Licences and entry of Centennial Coal in the project area in early 2010, groups and individuals of different backgrounds and needs in the community have provided feedback on coal exploration and any potential mining. Key feedback from the community has included: The potential damage and loss of the surface and groundwater resource that exists as creeks, streams, springs, dams and water bores and the consequential effect to landholders properties, livelihood and quality of life; The aesthetic degradation of the landscape due to open cut mining; The general degradation of the area due to dust, noise and truck haulage of coal; A decrease in the demand and value of real estate in the area; The apprehension of landholders to undertake improvement works to their property in anticipation of the effects that exploration and mining will have on their quality of life. Centennial Coal will give consideration to this feedback in the course of the project. Centennial Coal plans to develop a comprehensive knowledgebase of the area by extensive environmental measurement/monitoring and collating/interpreting the data through feasibility studies. The feasibility studies will define a project description and develop a final development proposal for submission to the Department of Planning, NSW. Throughout these processes Centennial Coal will continue community consultation keeping the community abreast of major milestones in the project. Figure 5 - A stream (left) and spring fed dam (right) sampled in the project area. Page 7

13 3. EXPLORATION PROGRAMME 3.1 BACKGROUND Centennial Coal Pty Limited has proposed to commence exploration work at the Inglenook Project, NSW. The Inglenook Project consists of several exploration licence areas located on the Castlereagh Highway in the locality of Ilford between the townships of Capertee and Kandos approximately 20 km north northwest of the township of Capertee. It is situated in the Western Coalfields of NSW approximately 60 km north northwest of Lithgow and 70 km south south-east of Mudgee as shown in Figure 6. In late 2008 the Department of Primary Industries, now known as the NSW Department of Trade and Investment, Regional Infrastructure and Services (DTIRIS), invited companies to submit an Expression of Interest for a number of potential mining areas in NSW. Centennial Coal lodged an Expression of Interest over the areas known as Ilford, Cameron Road and Melrose. These adjoin two (2) other exploration lease areas known as Running Stream and Cherry Tree Hill that have been held for many years by Xstrata and Centennial Coal respectively. In August 2009 Centennial Coal was advised of the successful tender and the need to apply for three (3) new exploration licences over an area of approximately 95 square kilometres in the Western Coalfield. In March 2010, DTIRIS issued Centennial Coal three (3) new exploration licences; Ilford (EL 7431), Cameron Road (EL 7432) and Melrose (EL 7442). The exploration licence areas are in close proximity to Centennial Coal s Airly and Charbon Operations in the western coalfield. Plans of the individual exploration licence areas are shown in Appendix 3. While it is known that coal does occur in the area there is insufficient information to accurately determine its quantity and quality, therefore an exploration-drilling programme over several years is required to determine if there is a viable future mining project. Figure 6 - Location Map of Centennial Coal s Operations Page 8

14 3.2 DESCRIPTION OF THE ACTIVITY Centennial Coal proposes to undertake exploration drilling within ELs 7431, 7432, 7442 and Authorisation Area A414. The exploration drilling programme will consist of exploration boreholes distributed across the area in a grid pattern and drilled vertically from the surface to intersect and recover the target strata. The exploration boreholes will be drilled to build on existing information on coal quality and geological conditions of this resource for potential future underground mining. Some minor surface clearance is likely to be required to establish drilling sites. Where possible, drill sites are selected as close as possible to existing access roads/tracks to minimise clearing requirements. The drilling footprint at each exploration hole will require a disturbance area of approximately 25m x 25m (sites may also be chosen in existing cleared areas where possible). Drilling activities require sumps to collect drill cuttings and to control and recycle drilling fluids down the borehole. Each drill site will be serviced by an aboveground sump in the initial stages of the drilling or the use of an in-ground sump if required. Where an aboveground sump is used the drill cuttings will be removed off-site. The general layout of a typical drill site is shown in Figure 7 below. Each drill site will be rehabilitated at the completion of drilling activities except where a drillhole is left open for water monitoring, monitoring equipment is installed in the hole and an access track is maintained to provide access to the monitoring site. An example of a rehabilitated drill site, without water monitoring, is shown in Figure 8. Figure 7 - Typical Drill Site Layout (Not to Scale) Page 9

15 Landholder Liaison Programme Figure 8 - A Rehabilitated Drill Site 3.3 EXPLORATION DRILLING EQUIPMENT Key equipment used in the exploration drilling project includes drill rigs and rod handlers, above-ground sumps, support trucks and light vehicles. Site and access preparation equipment will include the use of an excavator. With agreement from a landholder and if practicable, onsite water sources will be used to supply water for drilling activities, alternatively a water cart will supply water to the site for use in the drilling process. Dust and noise suppression will be implemented if and when required. Figures 9 and 10 show drilling equipment and operations. Page 10

16 Figure 9 - Typical drill rig (left) and rod handler (right) Figure 10 - Typical drill rig in operation Page 11

17 3.4 TIMING Standard operating hours will be between 7 am and 6 pm, Monday to Friday and between 8am and 1 pm Saturday. If and when required, incidental works may also be undertaken outside these hours. The anticipated duration of drilling at each site is approximately two to three weeks depending on borehole depth and site conditions encountered. Exploration drilling is expected to commence late 2011 and will take approximately three (3) years to complete. 4. CONSULTATION STRATEGIES A range of measures will be utilised by Centennial Coal to provide information to the relevant stakeholders on its proposed activities throughout the exploration programme. These will include: Personal communication; Letter; Newsletter; Community information sessions; Community open days; Community Consultative Committee (CCC) meetings; Centennial Coal website; Local newspaper; and, Briefing presentations. Table 2 below outlines a conceptual timeline for consultation with relevant stakeholders and how it will occur in the initial stage of the exploration project. Table 1 - Conceptual Consultation Timeline Date Medium Content June st Newsletter Scope and intent of the exploration drilling programme April 2011 April 2011 Aquaterra community information sessions 1 st Community Consultative Committee (CCC) meeting Discuss individual sampling results. Discuss outcomes of water census. Discuss hydrogeology and geology of exploration area Coordinated by RPS Aquaterra and attended by landholders and interested community members Scope and intent of the exploration drilling programme and project update. Attended by nominated NSW and local government officials, Centennial Coal and community representatives. May nd CCC meeting Project update and Water Census Overview. Attended by nominated NSW and local government officials, Centennial Coal and community representatives. July nd Newsletter Project Update including Water Census Overview July 2011 Community Open Day Display and disseminate information to the community including a drilling equipment exhibit at the Running Stream Community Hall. August rd CCC meeting Attended by nominated NSW and local government officials, Centennial Coal and community representatives. January rd Newsletter Exploration programme update. July th Newsletter Exploration programme update. Page 12

18 5. COMMUNITY ENQUIRIES PROCEDURE Members of the community can make any enquiry about the project via a dedicated information line comprising a phone number and address. The Inglenook Exploration Project Information Line is and inglenook@centennialcoal.com.au. Although the line is not manned 24 hours a day, the message bank and s will be checked regularly and a follow up response made as soon as practicable. Person receiving a call During calls of enquiry it is the recipient s responsibility to correctly fill out the enquiry report form (Appendix 3) and to follow the flow chart for community initiated contact in Figure 2. All enquiries received must be reported in accordance with Table 2. Table 2 - Community Enquiries Reporting Requirements Report to Report Mechanism Reported By Report Time Project Manager Verbal/weekly report REO-CW Within 1 working day of becoming known Project Manager Monthly Operational Report REO-CW Within 3 working days following month end Community Consultative Committee (CCC) Report to scheduled meetings Project Manager At meetings plus documented in minutes General Manager- Projects and Business Development Monthly report Project Manager Within 5 working days following month end Centennial Board Monthly Environment Report General Manager HSEC Relevant Board report/meeting DTIRIS and other Government agencies AEMR Project Manager with report prepared by REO-CW By mid-february Banpu Minerals Company Annual Report Board Approx September Group Environmental Manager Monthly Report REO-CW End of month 5.1 CONSULTATION Affected Landholders have been made aware of the ELs and will be informed of any possible future exploration activities on their landholdings. As previously mentioned, Figure 1 Exploration Drilling Consultation Flowchart describes the consultation process with landholders directly affected by the exploration drilling programme and landholders of neighbouring properties. Consultation with the Project Manager will be conducted prior to any information dissemination. The Group Manager-External Affairs will be consulted as required by corporate guidelines when appropriate. Page 13

19 5.2 REVIEW PERIOD The Landholder Liaison Programme for ELs 7431, 7432, 7442 and A414 will be reviewed periodically. 6. CONTACTS The Contacts for the Inglenook Exploration Project are outline below. For any community enquiries relating to this Project contact a project team member in order of listing below. Any media enquiries should be directed to the Centennial Coal Group Manager External Affairs. John Sandona Inglenook Project Manager Phone: (02) John.Sandona@centennialcoal.com.au Barbara Pierna Exploration Coordinator Phone: (02) Barbara.Pierna@centennialcoal.com.au Alanna Howard Regional Environmental Officer Central West (REO-CW). Phone: (02) Alanna.Howard@centennialcoal.com.au Katie Brassil Group Manager - External Affairs Phone: (02) katie.brassil@centennialcoal.com.au Page 14

20 7. APPENDICES Appendix 1 Record of Changes to System Document Date Change Authorised By Revision No. 31 December 2010 Draft Developed Project Manager 0 July 2011 Final document controlled copy Project Manager 1 Page 15

21 Appendix 2 - Plans for ELs 7431, 7432, 7442 and A414 Page 16

22 Page 17

23 Page 18

24 Landholder Liaison Programme Page 19

25 Appendix 3 - Enquiry Report Form Inglenook Exploration Project Enquiry Report Form DATE: TIME: RECEIVED BY: METHOD ENQUIRY LOGGED: (circle) Telephone In person Written Other DETAILS OF PERSON MAKING ENQUIRY: Given Not Given Name: Address: Contact Phone No. Home: Work: NATURE OF INQUIRY/COMPLAINT/ REQUEST FOR INFORMATION Inspected By: Date: Time: ACTION TAKEN RECORD SHEET PASSES TO REGIONAL ENVIRONMENTAL OFFICER Date: Note: This form is to be given to the REO-CW on completion. Records to be kept on file for a minimum of 4 years and produced to any officer of the EPA who asks to see them. Page 20

26

PROJECT LOCATION PROJECT DESCRIPTION

PROJECT LOCATION PROJECT DESCRIPTION APPLICATION: Environmental Authorisation for Prospecting Activities REF NO: NW 12443 PR APPLICANT: Khuma Mining and Exploration (Pty) Ltd MINERALS: Gold, Silver and associated precious metals LOCATION:

More information

Exploration Licence EL Ballarat West

Exploration Licence EL Ballarat West Exploration Licence EL 006667 Ballarat West What is an Exploration Licence? An Exploration Licence grants exclusive rights, subject to conditions, to explore for minerals in the licence area. Mining is

More information

EIA FOR EXPLORATION DRILLING WITHIN BLOCK ER236, OFFSHORE OF THE EAST COAST OF SOUTH AFRICA. Background Information Document. Purpose of this Document

EIA FOR EXPLORATION DRILLING WITHIN BLOCK ER236, OFFSHORE OF THE EAST COAST OF SOUTH AFRICA. Background Information Document. Purpose of this Document Background Information Document EIA FOR EXPLORATION DRILLING WITHIN BLOCK ER236, OFFSHORE OF THE EAST COAST OF SOUTH AFRICA Purpose of this Document Eni South Africa BV (Eni), and Sasol Africa Limited

More information

Quarterly Activities Report for Quarter Ended 31 March 2010

Quarterly Activities Report for Quarter Ended 31 March 2010 Quarterly Activities Report for Quarter Ended 31 March 2010 30 April 2010 Highlights Substantial increase (up 46%) in Maryborough coking coal resource to 83Mt Indicated and Inferred (9.5Mt Indicated, 73.5Mt

More information

clarify the roles of the Department and minerals industry in consultation; and

clarify the roles of the Department and minerals industry in consultation; and Procedures for Crown Consultation with Aboriginal Communities on Mineral Exploration Mineral Resources Division, Manitoba Science, Technology, Energy and Mines The Government of Manitoba recognizes it

More information

4 CONSULTATION WITH INTERESTED AND AFFECTED PARTIES

4 CONSULTATION WITH INTERESTED AND AFFECTED PARTIES 4 CONSULTATION WITH INTERESTED AND AFFECTED PARTIES This Chapter describes the process that was followed to notify, consult, and consider the input of Interested and Affected Parties (I&APs). Figure 4.1

More information

National Grid s commitments when undertaking works in the UK. Our stakeholder, community and amenity policy

National Grid s commitments when undertaking works in the UK. Our stakeholder, community and amenity policy National Grid s commitments when undertaking works in the UK Our stakeholder, community and amenity policy Introduction This document describes the ten commitments we have made to the way we carry out

More information

Section 1 Introduction

Section 1 Introduction ENVIRONMENTAL ASSESSMENT Section 1 Introduction PACIFIC BLUE METAL PTY LTD This section provides a brief introduction to the Environmental Assessment, introduces the Proponent and provides a brief history

More information

BEFORE THE QUEENSTOWN-LAKES DISTRICT COUNCIL PROPOSED DISTRICT PLAN HEARINGS PANEL. IN THE MATTER of the Resource Management Act 1991

BEFORE THE QUEENSTOWN-LAKES DISTRICT COUNCIL PROPOSED DISTRICT PLAN HEARINGS PANEL. IN THE MATTER of the Resource Management Act 1991 BEFORE THE QUEENSTOWN-LAKES DISTRICT COUNCIL PROPOSED DISTRICT PLAN HEARINGS PANEL IN THE MATTER of the Resource Management Act 1991 AND the Proposed District Plan STATEMENT OF EVIDENCE OF TIMOTHY CARR

More information

MULTI-YEAR AREA-BASED PERMITTING (MYAB) PROPONENT GUIDE for MINERAL and COAL EXPLORATION

MULTI-YEAR AREA-BASED PERMITTING (MYAB) PROPONENT GUIDE for MINERAL and COAL EXPLORATION MULTI-YEAR AREA-BASED PERMITTING (MYAB) PROPONENT GUIDE for MINERAL and COAL EXPLORATION 1. What is a Multi-Year Area-Based Permit? Multi-year area-based (MYAB) permitting is the practice of authorizing

More information

Guidance on design of work programmes for minerals prospecting, exploration and mining permits

Guidance on design of work programmes for minerals prospecting, exploration and mining permits MINERALS GUIDELINES JUNE 2017 CROWN MINERALS ACT 1991 MINERALS PROGRAMME FOR MINERALS (EXCLUDING PETROLEUM) 2013 CROWN MINERALS (MINERALS OTHER THAN PETROLEUM) REGULATIONS 2007 Guidance on design of work

More information

Attended Noise Monitoring - Quarter Ending September 2013

Attended Noise Monitoring - Quarter Ending September 2013 Unity Mining Level 10, 350 Collins St Melbourne VIC 3000 Version: Page 2 PREPARED BY: ABN 29 001 584 612 Units 7-8, 26-28 Napier Close Deakin ACT 2600 Australia (PO Box 9344 Deakin ACT 2600 Australia)

More information

Consultation on Amendments to Industry Canada s Antenna Tower Siting Procedures

Consultation on Amendments to Industry Canada s Antenna Tower Siting Procedures February 2014 Consultation on Amendments to Industry Canada s Antenna Tower Siting Procedures Aussi disponible en français Contents 1. Intent... 1 2. Mandate... 1 3. Policy... 1 4. Background... 1 5. Review

More information

Committee on Development and Intellectual Property (CDIP)

Committee on Development and Intellectual Property (CDIP) E CDIP/6/4 REV. ORIGINAL: ENGLISH DATE: NOVEMBER 26, 2010 Committee on Development and Intellectual Property (CDIP) Sixth Session Geneva, November 22 to 26, 2010 PROJECT ON INTELLECTUAL PROPERTY AND TECHNOLOGY

More information

2020 Census Local Update of Census Addresses Operation (LUCA)

2020 Census Local Update of Census Addresses Operation (LUCA) 2020 Census Local Update of Census Addresses Operation (LUCA) The Decennial Census The purpose is to conduct a census of population and housing and disseminate results to the President, the States, and

More information

Western Alberta Transmission Line

Western Alberta Transmission Line Western Alberta Transmission Line July 010 Who can you contact for more information? To learn more about the proposed project you can contact: AltaLink at 1-877-67-5973 (toll-free) E-mail: westernline@altalink.ca

More information

A. BACKGROUND B. GENERAL TERMS OF REFERENCE

A. BACKGROUND B. GENERAL TERMS OF REFERENCE Page 1 of 7 A. BACKGROUND National Oil Corporation of Kenya (NOC) is a company wholly owned by the Government of Kenya which is charged with the mandate to participate in all aspects of petroleum business

More information

CHIEF ENGINEER PROCEDURE MANAGEMENT OF OVERLAPPING DESIGN AGREEMENT

CHIEF ENGINEER PROCEDURE MANAGEMENT OF OVERLAPPING DESIGN AGREEMENT Approval Amendment Record Approval Date Version Description 30/05/2014 1 Initial issue under MTM. This procedure supersedes the Overlapping Design Agreement, Application and Transfer Log documents L2-SIG-PRO-007,

More information

ENVIRONMENTAL IMPACT ASSESSMENT

ENVIRONMENTAL IMPACT ASSESSMENT ENVIRONMENTAL IMPACT ASSESSMENT ENVIRONMENTAL AUTHORISATION PROCESS FOR THE PROPOSED UPGRADE AND NEW CONSTRUCTION RELATED TO THE DEVELOPMENT OF THE SWAZILAND RAIL LINK PROJECT, FROM DAVEL TO NERSTON (MPUMALANGA)

More information

Community management plan for mining exploration

Community management plan for mining exploration Community management plan for mining exploration Cristian Rojas Universidad de Chile Allison Coppel de Guerrero Teck, Chile ABSTRACT Problem Often Explorations ignore or minimise community relations, which

More information

Detail Design For Pavement Rehabilitation on Trunk Highway 14 From Tracy to Revere

Detail Design For Pavement Rehabilitation on Trunk Highway 14 From Tracy to Revere Detail Design For Pavement Rehabilitation on Trunk Highway 14 From Tracy to Revere Section 1 Introduction and Intersection Information State Project (SP) 6401-37 on MN Highway 14 SP 6401-37 is a Bituminous

More information

DMPGM DEPARTMENT OF MINERAL POLICY & GEOHAZARDS MANAGEMENT REVIEW OF THE MINING (SAFETY) ACT AND REGULATION

DMPGM DEPARTMENT OF MINERAL POLICY & GEOHAZARDS MANAGEMENT REVIEW OF THE MINING (SAFETY) ACT AND REGULATION DMPGM DEPARTMENT OF MINERAL POLICY & GEOHAZARDS MANAGEMENT REVIEW OF THE Presentation by: Melinda Kera Principal Legal Advisor- Legal Advisory Branch Mineral Policy & Legislation Division REFORMING THE

More information

The Forestville/ Goodwood Tram Overpass Murals Project (Good Forest Murals) 1 PROJECT AIMS AND OBJECTIVES

The Forestville/ Goodwood Tram Overpass Murals Project (Good Forest Murals) 1 PROJECT AIMS AND OBJECTIVES The Forestville/ Goodwood Tram Overpass Murals Project (Good Forest Murals) 1 PROJECT AIMS AND OBJECTIVES The City of Unley and Department of Planning, Transport and Infrastructure (DPTI) seeks to commission

More information

Making It Your Own A PUBLIC ART POLICY AND PLANNING TEMPLATE. Arts North West Creative Opportunities 2012

Making It Your Own A PUBLIC ART POLICY AND PLANNING TEMPLATE. Arts North West Creative Opportunities 2012 2012 Making It Your Own A PUBLIC ART POLICY AND PLANNING TEMPLATE This Public Art Policy and Planning Template has been produced by Arts North West to assist LGAs and associated arts organisations in the

More information

Western Isles HVDC Link Consultation

Western Isles HVDC Link Consultation Western Isles HVDC Link Consultation Western Isles HVDC Link Consultation Who we are We are Scottish and Southern Electricity Networks, operating under licence as Scottish Hydro Electric Transmission Plc

More information

QUARTERLY ACTIVITIES REPORT for Bandanna Energy Limited and wholly owned subsidiaries ( Bandanna ) THREE MONTHS to 30 June 2012

QUARTERLY ACTIVITIES REPORT for Bandanna Energy Limited and wholly owned subsidiaries ( Bandanna ) THREE MONTHS to 30 June 2012 ABN 34 009 356 665 QUARTERLY ACTIVITIES REPORT for Bandanna Energy Limited and wholly owned subsidiaries ( Bandanna ) THREE MONTHS to 30 June 2012 Executive Summary With critical infrastructure arrangements

More information

KANMANTOO-CALLINGTON COMMUNITY CONSULTATIVE COMMITTEE (KCCCC)

KANMANTOO-CALLINGTON COMMUNITY CONSULTATIVE COMMITTEE (KCCCC) KANMANTOO-CALLINGTON COMMUNITY CONSULTATIVE COMMITTEE (KCCCC) DRAFT NOTES TO THE MEETING 27 May 2010 Secretariat: Kanmantoo-Callington CCC Secretariat c/- Tanya Carter Hillgrove Resources Ph 8538 5100

More information

Complete Count Committee Action Guide. Purpose

Complete Count Committee Action Guide. Purpose Complete Count Committee Action Guide A Complete Count Committee is a team of community leaders appointed by the highest elected of icial of a jurisdiction for the purpose of developing and implementing

More information

The Corporation of the City of Nelson Office of the Finance and Purchasing Manager Telephone : (250) Fax : (250)

The Corporation of the City of Nelson Office of the Finance and Purchasing Manager Telephone : (250) Fax : (250) The Office of the Finance and Purchasing Manager Telephone : (250) 352-8204 Fax : (250) 352-6594 REQUEST FOR PREQUALIFICATIONS RADIO COMMUNICATIONS INFRASTRUCTURE UPGRADE CONTRACTOR SERVICES 2018-PRQ-01

More information

For personal use only

For personal use only 7 August 2017 ASX: MOD Drilling Resumes at T3 Copper Project Drilling at T3 Copper Project resumes today following DEA approval Approval granted for 17 months, until December 2018 Initial program will

More information

Photography and Videos at School Policy

Photography and Videos at School Policy Photography and Videos at School Policy Last updated: 25 May 2018 Contents: Statement of intent 1. Legal framework 2. Definitions 3. Roles and responsibilities 4. Parental consent 5. General procedures

More information

Quarterly Activities Report 31 January 2013

Quarterly Activities Report 31 January 2013 New Hope Corporation Limited ABN 38 010 653 844 Contact Phone: +61 7 3418 0500 Fax: +61 7 3418 0355 Quarterly Activities Report 31 January 2013 Jan 13 ( 000t) Quarter Ended Jan 12 ( 000t) Change (%) Jan

More information

LAND AT YENNADON QUARRY, IRON MINE LANE, DOUSLAND, YELVERTON, PL20 6NA

LAND AT YENNADON QUARRY, IRON MINE LANE, DOUSLAND, YELVERTON, PL20 6NA LAND AT YENNADON QUARRY, IRON MINE LANE, DOUSLAND, YELVERTON, PL20 6NA CONSULTATION WITH REGARD TO FUTURE PLANNING APPLICATION FOR THE PROPOSED PHASED RESTORATION SCHEME & EXTENSION TO YENNADON QUARRY

More information

MUNICIPALITY OF NORTHERN BRUCE PENINSULA COUNCIL MEETING AGENDA NO December 19, At 1:00 p.m.

MUNICIPALITY OF NORTHERN BRUCE PENINSULA COUNCIL MEETING AGENDA NO December 19, At 1:00 p.m. MUNICIPALITY OF NORTHERN BRUCE PENINSULA COUNCIL MEETING AGENDA NO. 11-28 December 19, 2011 Page At 1:00 p.m. 1. CALL TO ORDER AND DISCLOSURE OF PECUNIARY INTEREST 2. APPROVAL OF THE AGENDA 1. APPROVAL

More information

Environment Protection Authority (EPA), Industrial Noise Policy (INP) 2000;

Environment Protection Authority (EPA), Industrial Noise Policy (INP) 2000; 10 October 2017 Suite 6, Level 1,, 146 Hunter Street Newcastle NSW 2300 PO Box 506 Pere Riini Quarry Manager Hanson Construction Materials Pty Ltd Level 5, 75 George Street Parramatta, NSW 2150 Newcastle,

More information

Queensland exploration program

Queensland exploration program Queensland exploration program June 2018 CS8393 06/18 State of Queensland, 2018 The Queensland Government supports and encourages the dissemination and exchange of its information. The copyright in this

More information

East Anglia TWO and East Anglia ONE North. Summary and Approach to Site Selection

East Anglia TWO and East Anglia ONE North. Summary and Approach to Site Selection East Anglia TWO and East Anglia ONE North Summary and Approach to Site Selection 1 Introduction ScottishPower Renewables (SPR) has recently concluded work in order to inform our onshore site selection

More information

PROPOSALS FOR AQUIND INTERCONNECTOR

PROPOSALS FOR AQUIND INTERCONNECTOR PROPOSALS FOR AQUIND INTERCONNECTOR Introduction AQUIND Limited is the developer of AQUIND Interconnector, a new underground and subsea electric power transmission link that will connect the UK and French

More information

Committee on Development and Intellectual Property (CDIP)

Committee on Development and Intellectual Property (CDIP) E CDIP/10/13 ORIGINAL: ENGLISH DATE: OCTOBER 5, 2012 Committee on Development and Intellectual Property (CDIP) Tenth Session Geneva, November 12 to 16, 2012 DEVELOPING TOOLS FOR ACCESS TO PATENT INFORMATION

More information

Review of Baseline Noise Monitoring results and Establishment of Noise Criteria

Review of Baseline Noise Monitoring results and Establishment of Noise Criteria Appendix G Review of Baseline Noise Monitoring results and Establishment of Noise Criteria Environmental Management Plan G May 2014 Colton Coal Mine Aldershot, Queensland Review of Baseline Noise Monitoring

More information

Extract of Advance copy of the Report of the International Conference on Chemicals Management on the work of its second session

Extract of Advance copy of the Report of the International Conference on Chemicals Management on the work of its second session Extract of Advance copy of the Report of the International Conference on Chemicals Management on the work of its second session Resolution II/4 on Emerging policy issues A Introduction Recognizing the

More information

Resources and Energy Group (REZ) is pleased to enclose a brief presentation on the Radio Gold Mine Project.

Resources and Energy Group (REZ) is pleased to enclose a brief presentation on the Radio Gold Mine Project. 25 May 2016 The Manager Company Announcements Office ASX Limited 20 Bridge Street SYDNEY NSW 2000 Dear Sir / Madam Radio Gold Mine Project Resources and Energy Group (REZ) is pleased to enclose a brief

More information

Overview of Mineral Exploration and Development Regulations in Ontario Municipality of Trent Lakes March 8, 2018

Overview of Mineral Exploration and Development Regulations in Ontario Municipality of Trent Lakes March 8, 2018 Overview of Mineral Exploration and Development Regulations in Ontario Municipality of Trent Lakes March 8, 2018 Shannon Dennie Ministry of Northern Development and Mines Presentation Content 2 1. Provide

More information

Mining and Petroleum Services Centre of Excellence

Mining and Petroleum Services Centre of Excellence Department for Manufacturing, Innovation, Trade, Resources and Energy Mining and Petroleum Services Centre of Excellence RESA s Productivity Breakfast 17 October 2013 www.dmitre.sa.gov.au South Australian

More information

EMP Approval to Drill Next Dome Complex

EMP Approval to Drill Next Dome Complex 11 September 2018 ASX: MOD EMP Approval to Drill Next Dome Complex Environmental management plan (EMP) approval for T20 Dome Complex EMP covers ~700km 2 along the northern part of T20, ~80km west of planned

More information

Ohio Department of Transportation Division of Production Management Office of Geotechnical Engineering. Geotechnical Bulletin

Ohio Department of Transportation Division of Production Management Office of Geotechnical Engineering. Geotechnical Bulletin Ohio Department of Transportation Division of Production Management Office of Geotechnical Engineering Geotechnical Bulletin GB 5 GEOTECHNICAL SUBMISSION GUIDELINES Geotechnical Bulletin GB5 was developed

More information

Frequently Asked Questions

Frequently Asked Questions Frequently Asked Questions Well Application Audit Submissions (Technical) March 2016 This document clarifies and supports the submission of audit documentation for the technical requirements of Directive

More information

Subject Cessnock Water Supply Upgrade Community Working Group meeting # 4. Date 20 April 2010 Our ref

Subject Cessnock Water Supply Upgrade Community Working Group meeting # 4. Date 20 April 2010 Our ref Minutes Subject Cessnock Water Supply Upgrade Community Working Group meeting # 4 Date 20 April 2010 Our ref Location Time Functions room Comfort Inn, Cessnock 6.15pm 7.45pm Prepared by Hunter Water Corporation

More information

Maintenance of Traffic sequence of operations including any phasing and detour maps;

Maintenance of Traffic sequence of operations including any phasing and detour maps; All Local-let projects are required to have a Stage 2 submittal to the LPA Manager for review. The only exceptions are 2-lane resurfacing, striping, guardrail, and raised pavement markers, unless otherwise

More information

Precision surface and underground exploration drilling

Precision surface and underground exploration drilling Precision surface and underground exploration drilling Values H M R High work standards for quality production Maintain effective client communication and a small environmental footprint Results in a safe

More information

EEB/ZMWG-UNDP/SGP Asian Workshop. EXPERIENCES FROM THE FIELD: Ghana Case Solomon Kusi Ampofo

EEB/ZMWG-UNDP/SGP Asian Workshop. EXPERIENCES FROM THE FIELD: Ghana Case Solomon Kusi Ampofo EEB/ZMWG-UNDP/SGP Asian Workshop Building Local to Global Coalitions for Chemical and Waste Management towards Zero Mercury Use, Supply, Trade and Emissions Developing and implementing ASGM National Action

More information

Government of India R F D. (Results-Framework Document) for. Indian Bureau of Mines ( )

Government of India R F D. (Results-Framework Document) for. Indian Bureau of Mines ( ) Government of India R F D (Results-Framework Document) for Indian Bureau of Mines (2014-2015) Page : 2 of 22 Results-Framework Document (RFD) for Indian Bureau of Mines-(2014-2015) Section 1: Vision, Mission,

More information

Joint Industry Programme on E&P Sound and Marine Life - Phase III

Joint Industry Programme on E&P Sound and Marine Life - Phase III Joint Industry Programme on E&P Sound and Marine Life - Phase III Request for Proposals Number: JIP III-15-03 Long Term Fixed Acoustic Monitoring of Marine Mammals throughout the Life Cycle of an Offshore

More information

GOVERNMENT OF ROMANIA

GOVERNMENT OF ROMANIA GOVERNMENT OF ROMANIA DEPARTMENT FOR INFRASTRUCTURE PROJECTS AND FOREIGN INVESTMENT CONCESSION OF PERIMETERS AND NEGOTIATION OF THE CONDITIONS FOR THE PROJECTS CONCERNING EXTRACTION AND EXPLOITATION OF

More information

VCE Systems Engineering: Administrative information for Schoolbased Assessment in 2019

VCE Systems Engineering: Administrative information for Schoolbased Assessment in 2019 VCE Systems Engineering: Administrative information for Schoolbased Assessment in 2019 Units 3 and 4 School-assessed Task The School-assessed Task contributes 50 per cent to the study score and is commenced

More information

The U.S. Decennial Census A Brief History

The U.S. Decennial Census A Brief History 1 The U.S. Decennial Census A Brief History Under the direction of then Secretary of State, Thomas Jefferson, the first U.S. Census began on August 2, 1790, and was to be completed by April 1791 The total

More information

Establishment of Electrical Safety Regulations Governing Generation, Transmission and Distribution of Electricity in Ontario

Establishment of Electrical Safety Regulations Governing Generation, Transmission and Distribution of Electricity in Ontario August 7, 2001 See Distribution List RE: Establishment of Electrical Safety Regulations Governing Generation, Transmission and Distribution of Electricity in Ontario Dear Sir/Madam: The Electrical Safety

More information

United Nations Statistics Division Programme in Support of the 2020 Round of Population and Housing Censuses

United Nations Statistics Division Programme in Support of the 2020 Round of Population and Housing Censuses United Nations Statistics Division Programme in Support of the 2020 Round of Population and Housing Censuses Srdjan Mrkić United Nations Statistics Division Definitions A population census is the total

More information

Quarterly Noise Monitoring Report Austar Coal Mine Middle Road, Paxton NSW January 2007

Quarterly Noise Monitoring Report Austar Coal Mine Middle Road, Paxton NSW January 2007 REPORT 30-1664R1R0 Quarterly Noise Monitoring Report Austar Coal Mine Middle Road, Paxton NSW January 2007 PREPARED FOR P.O Box 806 Cessnock NSW 2325 14 MAY 2007 Quarterly Noise Monitoring Report Austar

More information

Noise monitoring during drilling operations Lower Stumble Well Site Balcombe, West Sussex

Noise monitoring during drilling operations Lower Stumble Well Site Balcombe, West Sussex Noise monitoring during drilling operations Lower Stumble Well Site Balcombe, West Sussex Report ref. PJ3159/13181 Date August 13 Issued to Cuadrilla Resources Limited Issued by Peter Jackson MSc MIOA

More information

Ruapehu Alpine Lifts. Whakapapa Electrical Network Strategy. Summary Consultation Document. 15 December 2016

Ruapehu Alpine Lifts. Whakapapa Electrical Network Strategy. Summary Consultation Document. 15 December 2016 Ruapehu Alpine Lifts Whakapapa Electrical Network Strategy Summary Consultation Document 15 December 2016 1. Introduction Local Networks are electricity distribution networks connected to Transpower s

More information

LAND AT LONG BUCKBY IMMEDIATE RESIDENTIAL LAND 0.42 ha

LAND AT LONG BUCKBY IMMEDIATE RESIDENTIAL LAND 0.42 ha LAND AT LONG BUCKBY IMMEDIATE RESIDENTIAL LAND 0.42 ha OPPORTUNITY TO ACQUIRE AN IMMEDIATE RESIDENTIAL DEVELOPMENT SITE BY INFORMAL TENDER. DEADLINE 12 NOON TUESDAY 16 th FEBRUARY 2016. LONG BUCKBY CONSENTED

More information

PROPOSALS FOR AQUIND INTERCONNECTOR

PROPOSALS FOR AQUIND INTERCONNECTOR PROPOSALS FOR AQUIND INTERCONNECTOR Get in touch To find out more about AQUIND Interconnector, please visit our consultation website at https://aquindconsultation.co.uk If you have any questions, you can

More information

For personal use only

For personal use only 1 September 2017 ASX: MOD MOD Doubles Exploration Budget to A$10M MOD doubles exploration spend to fast track drilling of regional targets A$10M exploration budget approved for 12 months from October 2017

More information

Work Type Definition and Submittal Requirements Work Type: Subsurface Utility Engineering (SUE)

Work Type Definition and Submittal Requirements Work Type: Subsurface Utility Engineering (SUE) MUST be qualified under Minnesota Department of Transportation Prequalification Program - Work Type 15.1 Subsurface Utility Engineering The first section, Work Type Definition, provides a detailed explanation

More information

Agenda Item: ATCM 13, CEP 5 Presented by: An Antarctic Climate Change Communication Plan

Agenda Item: ATCM 13, CEP 5 Presented by: An Antarctic Climate Change Communication Plan IP Agenda Item: ATCM 13, CEP 5 Presented by: Original: ASOC English An Antarctic Climate Change Communication Plan 1 An Antarctic Climate Change Communication Plan Summary The Antarctic Treaty Meeting

More information

TPS 66. Edition 2 March TPS 66 / Edition: 2 Page 1 of 10

TPS 66. Edition 2 March TPS 66 / Edition: 2 Page 1 of 10 TPS 66 Edition 2 March 2018 UKAS Technical Policy Statement for the Implementation of IAF MD 17 Witnessing Activities for the Accreditation of Management Systems Certification Bodies TPS 66 / Edition:

More information

Years 9 and 10 standard elaborations Australian Curriculum: Design and Technologies

Years 9 and 10 standard elaborations Australian Curriculum: Design and Technologies Purpose The standard elaborations (SEs) provide additional clarity when using the Australian Curriculum achievement standard to make judgments on a five-point scale. They can be used as a tool for: making

More information

HIGHLIGHTS THIS QUARTER

HIGHLIGHTS THIS QUARTER Tel: 61 (8) 9485 0039 Fax: 61 (8) 9485 0069 ASX ANNOUNCEMENT/MEDIA RELEASE BrazIron, Ltd Suite 5, Level 3 38 Richardson Street WEST PERTH WA 6005 ASX: BZL 22 April 2014 BRAZIRON QUARTERLY ACTIVITIES REPORT

More information

Notice of Intent to Prepare a Master Leasing Plan, Amendments to the Resource

Notice of Intent to Prepare a Master Leasing Plan, Amendments to the Resource 4310-DQ-P DEPARTMENT OF THE INTERIOR Bureau of Land Management (LLUTY01000.L16100000.DP0000) Notice of Intent to Prepare a Master Leasing Plan, Amendments to the Resource Management Plans for the Moab

More information

II. Statutory and Regulatory Authorities for Underground Coal Mines

II. Statutory and Regulatory Authorities for Underground Coal Mines I. Purposes MEMORANDUM OF UNDERSTANDING BETWEEN THE U.S. DEPARTMENT OF LABOR, MINE SAFETY AND HEALTH ADMINISTRATION AND THE U.S. DEPARTMENT OF THE INTERIOR, BUREAU OF LAND MANAGEMENT The purposes of this

More information

5 TH MANAGEMENT SEMINARS FOR HEADS OF NATIONAL STATISTICAL OFFICES (NSO) IN ASIA AND THE PACIFIC SEPTEMBER 2006, DAEJEON, REPUBLIC OF KOREA

5 TH MANAGEMENT SEMINARS FOR HEADS OF NATIONAL STATISTICAL OFFICES (NSO) IN ASIA AND THE PACIFIC SEPTEMBER 2006, DAEJEON, REPUBLIC OF KOREA Malaysia 5 TH MANAGEMENT SEMINARS FOR HEADS OF NATIONAL STATISTICAL OFFICES (NSO) IN ASIA AND THE PACIFIC. 18 20 SEPTEMBER 2006, DAEJEON, REPUBLIC OF KOREA 1. Overview of the Population and Housing Census

More information

For personal use only

For personal use only Range Resources Limited ( Range or the Company ) 24 September Trinidad Operations Update Range is pleased to provide the following update with respect to its Trinidad operations, with the following highlights:

More information

T3 Mine Feasibility Study Update

T3 Mine Feasibility Study Update 16 October 2018 ASX: MOD T3 Mine Feasibility Study Update Excellent progress on T3 Feasibility Study, due for completion March 2019 T3 ESIA Scoping and Terms of Reference approved by DEA with report due

More information

Phoenix South-3 drilling commenced 17 April 2018

Phoenix South-3 drilling commenced 17 April 2018 Phoenix South-3 drilling commenced 17 April 2018 Highlights Drilling of the Phoenix South-3 well has now commenced Currently preparing to run 36 surface conductor Significant resource being targeted of

More information

Notice of Availability of the Record of Decision for the Grand Junction Field Office

Notice of Availability of the Record of Decision for the Grand Junction Field Office This document is scheduled to be published in the Federal Register on 08/24/2015 and available online at http://federalregister.gov/a/2015-20706, and on FDsys.gov 4130-JB DEPARTMENT OF THE INTERIOR Bureau

More information

Radiocommunication Facility Review Protocol

Radiocommunication Facility Review Protocol Radiocommunication Facility Review Protocol 1.0 PURPOSE 1.1 The purpose of this protocol is to outline the guidelines and review process through which Radiocommunication Facilities are evaluated within

More information

Arrangements for: National Progression Award in Food Manufacture (SCQF level 6) Group Award Code: GF4N 46. Validation date: July 2012

Arrangements for: National Progression Award in Food Manufacture (SCQF level 6) Group Award Code: GF4N 46. Validation date: July 2012 Arrangements for: National Progression Award in Manufacture (SCQF level 6) Group Award Code: GF4N 46 Validation date: July 2012 Date of original publication: Version: 03 Acknowledgement SQA acknowledges

More information

Scotian Basin Exploration Drilling Project: Timeline

Scotian Basin Exploration Drilling Project: Timeline Scotian Basin Exploration Drilling Project: Timeline When it comes to exploratory drilling programs that an operator proposes to conduct, the Canada- Nova Scotia Offshore Petroleum Board (CNSOPB) goes

More information

1 st MEETING OF THE IHO COUNCIL

1 st MEETING OF THE IHO COUNCIL C1-3.1 1 st MEETING OF THE IHO COUNCIL Monaco, 17-19 October 2017 REPORT OF THE IHO HYDROGRAPHIC SERVICES AND STANDARDS COMMITTEE C1-3.1 - P a g e 3 REPORT OF THE HYDROGRAPHIC STANDARDS AND SERVICES COMMITTEE

More information

2016 Census of Population: Age and sex release

2016 Census of Population: Age and sex release Catalogue no. 98-501-X2016002 ISBN 978-0-660-07150-3 Release and Concepts Overview 2016 Census of Population: Age and sex release Release date: March 15, 2017 Please note that this Release and Concepts

More information

2. As such, Proponents of Antenna Systems do not require permitting of any kind from the Town.

2. As such, Proponents of Antenna Systems do not require permitting of any kind from the Town. Subject: Antenna Systems Policy Number: Date Developed: 2008/09 Date Approved: April 8, 2009 Lead Department: Planning and Development Date Modified: (if applicable) November 26, 2014 A. PROTOCOL STATEMENT:

More information

NCRIS Capability 5.7: Population Health and Clinical Data Linkage

NCRIS Capability 5.7: Population Health and Clinical Data Linkage NCRIS Capability 5.7: Population Health and Clinical Data Linkage National Collaborative Research Infrastructure Strategy Issues Paper July 2007 Issues Paper Version 1: Population Health and Clinical Data

More information

Economic and Social Council

Economic and Social Council United Nations Economic and Social Council Distr.: General 18 December 2017 Original: English Statistical Commission Forty-ninth session 6 9 March 2018 Item 4 (a) of the provisional agenda* Items for information:

More information

2020 Census Geographic Partnership Programs. Heidi Crawford Data Dissemination Specialist U.S. Census 1 Bureau

2020 Census Geographic Partnership Programs. Heidi Crawford Data Dissemination Specialist U.S. Census 1 Bureau 2017 Oregon Census Data Users Workshop September 20 &21, 2017 2020 Census Geographic Partnership Programs Heidi Crawford Data Dissemination Specialist U.S. Census 1 Bureau Geographic Partnership Opportunities

More information

Noise Monitoring Program

Noise Monitoring Program for Document Table of Contents for... 1 1 Purpose... 3 1.1 Purpose... 3 2 Noise Impact Assessment Criteria... 3 2.1 Noise Criteria... 3 3 Measurement and Evaluation... 6 3.1 Monitoring Locations... 6 3.2

More information

Singapore s Census of Population 2010

Singapore s Census of Population 2010 Singapore s Census of Population 2010 By Ms Seet Chia Sing and Ms Wong Wei Lin Income, Expenditure and Population Statistics Division Singapore Department of Statistics What is a Census? The United Nations

More information

QUARTERLY ACTIVITY REPORT

QUARTERLY ACTIVITY REPORT FOR THE QUARTER ENDING 30 JUNE 2014 Titan Energy Ltd (ASX: TTE) ( Titan or the Company ) is pleased to provide the following report on its operations during the three-month period ending 30 June 2014.

More information

Notice of Proposed Withdrawal Extension, Red Rock Canyon State Park; California. AGENCY: Bureau of Land Management, Department of the Interior.

Notice of Proposed Withdrawal Extension, Red Rock Canyon State Park; California. AGENCY: Bureau of Land Management, Department of the Interior. This document is scheduled to be published in the Federal Register on 03/16/2016 and available online at http://federalregister.gov/a/2016-05911, and on FDsys.gov 4310-40 DEPARTMENT OF THE INTERIOR Bureau

More information

Title: care.data Pathfinder Stage CCG Recruitment and Selection Process

Title: care.data Pathfinder Stage CCG Recruitment and Selection Process Ref: care.data/programme Board/Paper 06 Title: care.data Pathfinder Stage CCG Recruitment and Selection Process Author: David Corbett, Programme Head, Data Delivery Programme Board Sponsor: Eve Roodhouse,

More information

Terms of Reference. Call for Experts in the field of Foresight and ICT

Terms of Reference. Call for Experts in the field of Foresight and ICT Terms of Reference Call for Experts in the field of Foresight and ICT Title Work package Lead: Related Workpackage: Related Task: Author(s): Project Number Instrument: Call for Experts in the field of

More information

Both strategies are available on the CCG s website:

Both strategies are available on the CCG s website: Appendix 3.4 MEETING: Haringey Clinical Commissioning Group Governing Body DATE: Thursday, 25 July 2013 TITLE: Communications and Engagement Strategy: update on progress LEAD DIRECTOR/ MANAGER: Jennie

More information

ISO Nexus RF User Guide. Introduction to Nexus RF. Doc No: (Introduction)

ISO Nexus RF User Guide. Introduction to Nexus RF. Doc No: (Introduction) ISO 9001 Nexus RF User Guide Introduction to Nexus RF Doc No: 29-00001 (Introduction) Table of Contents Are you prepared for an Emergency? Page 2 What is Nexus? Page 2-3 Why Choose Nexus RF? Page 3-7 Endless

More information

Years 5 and 6 standard elaborations Australian Curriculum: Design and Technologies

Years 5 and 6 standard elaborations Australian Curriculum: Design and Technologies Purpose The standard elaborations (SEs) provide additional clarity when using the Australian Curriculum achievement standard to make judgments on a five-point scale. They can be used as a tool for: making

More information

Caroline Thomas Chief Counsel, Exploration, Property & Aboriginal Affairs, Vale. Paul MacLean President, EEM Sustainable Management

Caroline Thomas Chief Counsel, Exploration, Property & Aboriginal Affairs, Vale. Paul MacLean President, EEM Sustainable Management Speaker Panel Nalin Sahni, B.Sc. (Eng.), M.E.M., J.D. Associate, FMC Law Practice focused on litigation and commercial transactions with complex environmental, energy, Aboriginal, and mining issues Geological

More information

Introduction INTRODUCTION

Introduction INTRODUCTION Introduction 1-1 1.0 INTRODUCTION Newmont Golden Ridge Limited (the Company ), a subsidiary of Newmont Mining Corporation (Newmont) and formerly known as Golden Ridge Resources Limited (GRRL), is proposing

More information

Notice of Intent to Amend the California Desert Conservation Area, Bakersfield,

Notice of Intent to Amend the California Desert Conservation Area, Bakersfield, This document is scheduled to be published in the Federal Register on 02/02/2018 and available online at https://federalregister.gov/d/2018-02098, and on FDsys.gov 4310-40 DEPARTMENT OF THE INTERIOR Bureau

More information

Phoenix South-3 drilling update 29 June 2018

Phoenix South-3 drilling update 29 June 2018 Phoenix South-3 drilling update 29 June 2018 Carnarvon Petroleum Limited ( Carnarvon ) (ASX:CVN) is pleased to provide the following update on the drilling of the Phoenix South-3 ( PS-3 ). Progress The

More information

SUBMISSION ON PLAN CHANGE 34 (LAKE TAUPO EROSION AND FLOOD STRATEGY): BY NGATI KURAUIA HAPŪ.

SUBMISSION ON PLAN CHANGE 34 (LAKE TAUPO EROSION AND FLOOD STRATEGY): BY NGATI KURAUIA HAPŪ. SUBMISSION ON PLAN CHANGE 34 (LAKE TAUPO EROSION AND FLOOD STRATEGY): BY NGATI KURAUIA HAPŪ. Map 1: Ngāti Kurauia Customary Area of Interest SUMMARY OF KEY SUBMISSION POINTS: 1) Land ownership of Ngati

More information

2010 World Programme on Population and Housing Censuses Final Report March 2009 to February 2010

2010 World Programme on Population and Housing Censuses Final Report March 2009 to February 2010 2010 World Programme on Population and Housing Censuses Final Report March 2009 to February 2010 A. SUMMARY Over the period March 2009 to February 2010, UNSD continued monitoring national census planning

More information