PPA Department Heads Meeting. D. MacFarlane October 17, 2013

Size: px
Start display at page:

Download "PPA Department Heads Meeting. D. MacFarlane October 17, 2013"

Transcription

1 PPA Department Heads Meeting D. MacFarlane October 17, 2013

2 Visitors Jim Tarpinian and Frank O Neill:» Management Walk-around program and use of ATS system Background» Renewed emphasis at the lab level» Important to connect supervisor and employee in the workplace» May have been occurring informally, but no record» Requirement now is to record in ATS: record of walk around, any findings or actions 2

3 Science program dates and news NSF Final Design Review for LSST: postponed SPC meeting: Oct 30-Nov 1: postponed 3

4 Next steps for performance evaluations Will meet with department heads to go over department self-assessments Performance evaluations due by Oct 28» Will review aggregate performance evaluations to look for inconsistent grading scales and provide supervisor feedback Will also be requesting department heads identify 20% best and 20% worst performers» PPA management will review Directorate-wide as well for consistency» Will be useful input to overall lab normalization review 4

5 Lab Agenda for FY2014 5

6 s Excel in strategic particle physics, particle astrophysics, and cosmology programs Continue as a major partner on energy frontier physics Establish a leading dark energy science program Establish major role in next generation dark matter search Be a major partner in intensity frontier physics Play a lead role in next generation US particle astrophysics experiments 6

7 Tactical actions: FY Continue as a major partner on the energy frontier: Establish a role in support of ATLAS phase 1 and phase 2 upgrade programs Complete design implementation of new CSC readout with RCE/ATCA platform [Huffer] Complete production of IBL inner services and participate in IBL stave tests and IBL/pixel integration efforts [Grenier] 1.2 Continue as a major partner on the energy frontier: Advance the case for US engagement in a next generation linear collider Develop a appropriate scope for US contributions to a detector at the International Linear Collider based on unique capabilities of the US community [Breidenbach] 7

8 Tactical actions: FY Establish a leading dark energy science program: Execute the construction of the LSST camera and develop the data management system Successfully achieve CD-3a for the LSST camera project [Kahn, Kurita] Successfully complete the NSF Final Design Review for the LSST Project [Kahn, Kurita] 2.2 Establish a leading dark energy science program: Develop a capability for delivering forefront dark energy science Conduct dark energy investigations with Stage 2 and 3 data using prototype LSST analysis tools [Marshall] Complete LSST DESC computing model for resources required up to First Light [Dubois] Develop a plan, together with NOAO, for an LSST User Center [Dubois] Lead simulation of DES data to support broad dark energy research and optimization of combined probes of dark energy [Wechsler] 8

9 Tactical actions: FY Establish a major role in next generation direct dark matter search experiments Complete proposal for G2 SuperCDMS experiment [Partridge] Demonstrate readiness to begin full-scale production of SuperCDMS SNOLab detectors [Brink] Demonstrate readiness to begin full-scale production of SuperCDMS SNOLab detector support towers and associated mechanical, wiring, thermal, and electronic infrastructure [Partridge] Complete hiring of two new faculty to lead the development of a major new effort on the next generation liquid xenon experiment LZ Develop and implement a strategy for focusing dark matter efforts on the successful proposals emerging from the G2 technology down selection PEMP 3.2 (HEP) SLAC has been investigating a variety of new initiatives on the Cosmic Frontier since the end of B-factory operations. Many of these initiatives are currently pre-decisional or in the early stages of the DOE critical decision process, and their priority within the HEP portfolio is not established. In FY 2014 HEPAP will produce a new strategic plan (P5) for the field, so during FY 2014 using the HEPAP plan SLAC should reduce the number of efforts to arrive at effective and coherent program on the Cosmic Frontier that is sustainable within foreseeable budgets 9

10 Tactical actions: FY Continue as a major partner in intensity frontier physics: Establish a role on in next generation longbaseline neutrino physics Deliver demonstration RCE/ATCA-based DAQ system to the 35 ton liquid argon prototype for the LBNE experiment [Graham] Complete prototype pattern recognition and reconstruction software to the MicroBooNE experiment [Usher] 4.2 Continue as a major partner in intensity frontier physics: Establish a next generation neutrinoless double beta decay search experiment Complete TBD milestone on neo R&D plan [Fouts] Establish an organizational structure for neo R&D with the neo Collaboration that provides a coordinated plan for development of a ton-scale detector with scientific and technical milestones [Fouts] PEMP 3.2 (HEP) SLAC is engaged in the neo R&D program which could position the EO collaboration to build a ton-scale neutrinoless double beta decay experiment. SLAC should assign a project manager to this program and he/she should develop a schedule for neo R&D which has scientific and technical milestones that could lead to a design of a ton-scale detector. This schedule should include the efforts of the collaborating institutions as well as SLAC 10

11 Tactical actions: FY Continue as a major partner in intensity frontier physics: Pursue the search for heavy photon candidates for dark matter Conduct Silicon Vertex Tracker (SVT) subsystem readiness reviews before construction of the Heavy Photon Search (HPS) experiment [Oriunno] Install the SVT and DAQ for the HPS experiment in Hall B at JLAB [Jaros] 5. Play a lead role in next generation US particle astrophysics experiments Reprocess archived Fermi LAT event data through Pass8 event reconstruction for LAT performance studies and source analysis [Dubois] Support LAT and mission analyses as needed to demonstrate readiness for a new Fermi sky survey observing plan [Cameron] Understand properties and instrumental effects related to the 130 GeV line as a dark matter candidate [Bloom] Prepare a detailed and credible plan for CTA for the P5 panel [Funk] PEMP 3.2 (HEP) SLAC has been investigating a variety of new initiatives on the Cosmic Frontier since the end of B-factory operations. Many of these initiatives are currently pre-decisional or in the early stages of the DOE critical decision process, and their priority within the HEP portfolio is not established. In FY 2014 HEPAP will produce a new strategic plan (P5) for the field, so during FY 2014 using the HEPAP plan SLAC should reduce the number of efforts to arrive at effective and coherent program on the Cosmic Frontier that is sustainable within foreseeable budgets 11

12 Update on layoffs Announced need to reduce PPA staffing on Sep 30» Anticipated FY2014 funding, combined with 3% rise in indirect rate leaves us over staffed by FTEs» Voluntary layoff period closed Oct 15 with one request Plan for involuntary layoffs in development» Expect to complete tentative plan, including discussions with supervisors next week» Will review with DOE shortly afterwards and aim to implement by end of October 12

Kevin Lesko LBNL. Introduction and Background

Kevin Lesko LBNL. Introduction and Background Why the US Needs a Deep Domestic Research Facility: Owning rather than Renting the Education Benefits, Technology Advances, and Scientific Leadership of Underground Physics Introduction and Background

More information

SLAC National Accelerator Laboratory

SLAC National Accelerator Laboratory SLAC SLAC National Accelerator Laboratory 2575 Sand Hill Road Menlo Park, CA 94025 7015 slac.stanford.edu National Accelerator Laboratory Great Lab. Great University. Great Science. The 430-acre campus

More information

U.S. Department of Energy. Office of Science. Fiscal Year Performance Evaluation Report of the. Stanford University for

U.S. Department of Energy. Office of Science. Fiscal Year Performance Evaluation Report of the. Stanford University for U.S. Department of Energy Office of Science Fiscal Year 2015 Performance Evaluation Report of the Stanford University for Management and Operations of Science and Technology at the SLAC National Accelerator

More information

SLAC National Accelerator Laboratory Annual Laboratory Plan FY 2016

SLAC National Accelerator Laboratory Annual Laboratory Plan FY 2016 SLAC National Accelerator Laboratory Annual Laboratory Plan FY 2016 Published By SLAC National Accelerator Laboratory 2575 Sand Hill Road Menlo Park, CA 94025 SLAC is operated by Stanford University for

More information

HPS Upgrade Proposal

HPS Upgrade Proposal HPS Upgrade Proposal HPS collaboration July 20, 2017 Analysis of the HPS engineering run data showed worse than expected reach in both the bump hunt and the vertexing searches. These reach discrepancies

More information

U.S. Department of Energy. Office of Science. Fiscal Year Performance Evaluation Report of the. Stanford University for

U.S. Department of Energy. Office of Science. Fiscal Year Performance Evaluation Report of the. Stanford University for U.S. Department of Energy Office of Science Fiscal Year 2011 Performance Evaluation Report of the Stanford University for Management and Operations of Science and Technology at the For the period October

More information

GEM chambers for SoLID Nilanga Liyanage. University of Virginia

GEM chambers for SoLID Nilanga Liyanage. University of Virginia GEM chambers for SoLID Nilanga Liyanage University of Virginia SoLID Spectrometer Gas Cerenkov Shashlyk Baffles GEM s 2 Main Challenge: large area COMPASS GEM chambers only 30 cm x 30 cm; there were total

More information

Trigger Algorithms for the SuperCDMS Dark Matter Search

Trigger Algorithms for the SuperCDMS Dark Matter Search Trigger Algorithms for the SuperCDMS Dark Matter Search Xuji Zhao Advisor: David Toback Texas A&M University Masters Defense Aug 11, 2015 1 Outline Introduction: dark matter and the CDMS experiment Triggering

More information

LHC Experiments - Trigger, Data-taking and Computing

LHC Experiments - Trigger, Data-taking and Computing Physik an höchstenergetischen Beschleunigern WS17/18 TUM S.Bethke, F. Simon V6: Trigger, data taking, computing 1 LHC Experiments - Trigger, Data-taking and Computing data rates physics signals ATLAS trigger

More information

The LHCb Vertex Locator : Marina Artuso, Syracuse University for the VELO Group

The LHCb Vertex Locator : Marina Artuso, Syracuse University for the VELO Group The LHCb Vertex Locator : status and future perspectives Marina Artuso, Syracuse University for the VELO Group The LHCb Detector Mission: Expore interference of virtual new physics particle in the decays

More information

Innovative Approaches in Collaborative Planning

Innovative Approaches in Collaborative Planning Innovative Approaches in Collaborative Planning Lessons Learned from Public and Private Sector Roadmaps Jack Eisenhauer Senior Vice President September 17, 2009 Ross Brindle Program Director Energetics

More information

ANL HEP Division Strategic Plan Planning Group Report May 3, 2004

ANL HEP Division Strategic Plan Planning Group Report May 3, 2004 ANL HEP Division Strategic Plan Planning Group Report May 3, 2004 0.0 Executive Summary The Argonne High Energy Physics program consists of cutting edge research in Experimental, Theoretical, and Accelerator

More information

Revealing the Hidden Nature of Space and Time

Revealing the Hidden Nature of Space and Time Revealing the Hidden Nature of Space and Time Charting the Course for Elementary Particle Physics EPP2010 at BPA Meeting 4 November 2006 J. Bagger, H.A. Neal Genesis Previous NRC report on Elementary Particle

More information

CLAS12 First Experiment Workshop Report

CLAS12 First Experiment Workshop Report CLAS12 First Experiment Workshop Report Latifa Elouadrhiri Jefferson Lab For more details about the workshop https://www.jlab.org/indico/event/201/ CLAS Collaboration Jefferson Lab March 28-31, 2017 1

More information

Measurement of SQUID noise levels for SuperCDMS SNOLAB detectors

Measurement of SQUID noise levels for SuperCDMS SNOLAB detectors Measurement of SQUID noise levels for SuperCDMS SNOLAB detectors Maxwell Lee SLAC National Accelerator Laboratory, Menlo Park, CA, 94025, MS29 SLAC-TN-15-051 Abstract SuperCDMS SNOLAB is a second generation

More information

An Update on the Report of the. High Energy Physics Advisory Panel

An Update on the Report of the. High Energy Physics Advisory Panel An Update on the Report of the High Energy Physics Advisory Panel University Grants Program Subpanel Homer A. Neal BPA Update November 3, 2007 1 Purpose of Study To examine the state of the NSF and DoE

More information

Visions of discovery David B. Cline Memorial Symposium William A. Barletta

Visions of discovery David B. Cline Memorial Symposium William A. Barletta Visions of discovery David B. Cline Memorial Symposium William A. Barletta Director, US Particle Accelerator School Dept. of Physics, MIT & UCLA Faculty of Economics, University of Ljubljana Coming to

More information

CFHT and Subaru Wide Field Camera

CFHT and Subaru Wide Field Camera CFHT and Subaru Wide Field Camera WIRCam and Beyond: OIR instrumentation plan of ASIAA Chi-Hung Yan Institute of Astronomy and Astrophysics, Academia Sinica Canada France Hawaii Telescope 3.6 m telescope

More information

Low noise readout techniques for Charge Coupled Devices (CCD) Gustavo Cancelo, Juan Estrada, Guillermo Fernandez Moroni, Ken Treptow, Ted Zmuda

Low noise readout techniques for Charge Coupled Devices (CCD) Gustavo Cancelo, Juan Estrada, Guillermo Fernandez Moroni, Ken Treptow, Ted Zmuda Low noise readout techniques for Charge Coupled Devices (CCD) Gustavo Cancelo, Juan Estrada, Guillermo Fernandez Moroni, Ken Treptow, Ted Zmuda Charge Coupled Devices (CCD) Potential well Characteristics:

More information

NASA Mars Exploration Program Update to the Planetary Science Subcommittee

NASA Mars Exploration Program Update to the Planetary Science Subcommittee NASA Mars Exploration Program Update to the Planetary Science Subcommittee Jim Watzin Director MEP March 9, 2016 The state-of-the-mep today Our operational assets remain healthy and productive: MAVEN has

More information

Follow the Yellow Brick Road

Follow the Yellow Brick Road NDCEE National Defense Center for Environmental Excellence National Defense Center for Environmental Excellence TRANSFERRING TECHNOLOGY SOLUTIONS Supporting Readiness, Sustainability, and Transformation

More information

Cryogenic Operations at SLAC

Cryogenic Operations at SLAC Cryogenic Operations at SLAC J. G. Weisend II, A. Candia, W.W. Craddock, E. Thompson CryoOps 2006 5/30/2006 J. G. Weisend II 1 What Do We Do? Cryogenics at SLAC involve: Large scale He refrigerator operation

More information

Astrophysics. Paul Hertz. First Response to Midterm Assessment. Director, Astrophysics Division Science Mission

Astrophysics. Paul Hertz. First Response to Midterm Assessment. Director, Astrophysics Division Science Mission National Aeronautics and Space Administration Astrophysics First Response to Midterm Assessment NAC Astrophysics Subcommittee October 3, 2016 Paul Hertz Director, Astrophysics Division Science Mission

More information

Preliminary Design Phase Activities, Priorities and Opportunities

Preliminary Design Phase Activities, Priorities and Opportunities Preliminary Design Phase Activities, Priorities and Opportunities Massively multiplexed spectroscopy with MSE: Science, Project and Vision Kei Szeto MSE Project Office 28 February, 2019 Outline Overview

More information

The Vertex Tracker. Marco Battaglia UC Berkeley and LBNL. Sensor R&D Detector Design PhysicsBenchmarking

The Vertex Tracker. Marco Battaglia UC Berkeley and LBNL. Sensor R&D Detector Design PhysicsBenchmarking The Vertex Tracker Marco Battaglia UC Berkeley and LBNL Sensor R&D Detector Design PhysicsBenchmarking Sensor R&D CCD Sensors N. de Groot Reports from LCFI progress with successful tests of CPCCD clocked

More information

Working Towards Large Area, Picosecond-Level Photodetectors

Working Towards Large Area, Picosecond-Level Photodetectors Working Towards Large Area, Picosecond-Level Photodetectors Matthew Wetstein - Enrico Fermi Institute, University of Chicago HEP Division, Argonne National Lab Introduction: What If? Large Water-Cherenkov

More information

CMS Tracker studies. Daniel Pitzl, DESY

CMS Tracker studies. Daniel Pitzl, DESY CMS Tracker studies Daniel Pitzl, DESY Present CMS silicon tracker Design Material budget Upgrade phase I: 4 layer pixel 5 layer pixel? Resolution studies with broken line fits CMS Si Tracker 2 Phase I

More information

PROJECT X: A MULTI-MW PROTON SOURCE AT FERMILAB *

PROJECT X: A MULTI-MW PROTON SOURCE AT FERMILAB * PROJECT X: A MULTI-MW PROTON SOURCE AT FERMILAB * Stephen D. Holmes, Fermilab, Batavia, IL, 60510, U.S.A. Abstract As the Fermilab Tevatron Collider program draws to a close a strategy has emerged of an

More information

arxiv: v1 [physics.pop-ph] 16 Nov 2017

arxiv: v1 [physics.pop-ph] 16 Nov 2017 Proceedings of the Fifth Annual LHCP November 21, 2017 EXHIBITING THE ALICE EXPERIMENT arxiv:1711.07350v1 [physics.pop-ph] 16 Nov 2017 DESPINA HATZIFOTIADOU On behalf of the ALICE Collaboration, Universita

More information

Layout and prototyping of the new ATLAS Inner Tracker for the High Luminosity LHC

Layout and prototyping of the new ATLAS Inner Tracker for the High Luminosity LHC Layout and prototyping of the new ATLAS Inner Tracker for the High Luminosity LHC Ankush Mitra, University of Warwick, UK on behalf of the ATLAS ITk Collaboration PSD11 : The 11th International Conference

More information

Computing for the Intensity Frontier

Computing for the Intensity Frontier 42 Computing for the Intensity Frontier Conveners: B. Rebel, M. C. Sanchez, S. Wolbers 42.1 Introduction Computing at the Intensity Frontier (IF) has many significant challenges. The experiments, projects

More information

SCIENCE IN THE CENTRE STRATEGIC PLAN

SCIENCE IN THE CENTRE STRATEGIC PLAN SCIENCE IN THE CENTRE STRATEGIC PLAN 2017-2021 CONTACT Telephone: +47 73 59 21 45 Email address: post@vm.ntnu.no Street address: Erling Skakkes gate 47A, Trondheim Mailing address: NTNU Vitenskapsmuseet,

More information

By Nicholas Bock. symmetry volume 06 issue 06 december 09. Photos: Reidar Hahn, Fermilab

By Nicholas Bock. symmetry volume 06 issue 06 december 09. Photos: Reidar Hahn, Fermilab Preserving the DATA harvest 18 Canning, pickling, drying, freezing physicists wish there were an easy way to preserve their hard-won data so future generations of scientists, armed with more powerful tools,

More information

Q1-2 Q3-4 Q1-2 Q3-4 Q1-2 Q3-4 Q1-2 Q3-4 Q1-2 Q3-4 Q1-2 Q3-4 Q1-2 Q3-4 Q1-2 Q3-4 Q1-2 Q3-4 Q1-2 Q3-4. Final design and pre-production.

Q1-2 Q3-4 Q1-2 Q3-4 Q1-2 Q3-4 Q1-2 Q3-4 Q1-2 Q3-4 Q1-2 Q3-4 Q1-2 Q3-4 Q1-2 Q3-4 Q1-2 Q3-4 Q1-2 Q3-4. Final design and pre-production. high-granularity sfcal Performance simulation, option selection and R&D Figure 41. Overview of the time-line and milestones for the implementation of the high-granularity sfcal. tooling and cryostat modification,

More information

Preserving and Expanding Access to Legacy HEP Data Sets

Preserving and Expanding Access to Legacy HEP Data Sets Preserving and Expanding Access to Legacy HEP Data Sets Gregory Dubois-Felsmann, SLAC BaBar Computing Coordinator 2005-last week LSST Data Management system architect from 11/15 ICFA Seminar - 28 October

More information

SLAC is operated by Stanford University for the Department of Energy s Office of Science.

SLAC is operated by Stanford University for the Department of Energy s Office of Science. SLAC is operated by Stanford University for the Department of Energy s Office of Science. Approval This SLAC Annual Laboratory Plan for fiscal year 2018 has been reviewed and approved by: Electronically

More information

European Strategy for Particle Physics and its Update Plan

European Strategy for Particle Physics and its Update Plan European Strategy for Particle Physics and its Update Plan https://europeanstrategygroup.web.cern.ch/europeanstrategygroup/ The XL International Meeting on Fundamental Physics Benasque, Spain, 1 June 2012

More information

ORGANISATION EUROPEENNE POUR LA RECHERCHE NUCLEAIRE CERN EUROPEAN ORGANIZATION FOR NUCLEAR RESEARCH

ORGANISATION EUROPEENNE POUR LA RECHERCHE NUCLEAIRE CERN EUROPEAN ORGANIZATION FOR NUCLEAR RESEARCH Minutes-214 21 January 2016 ORGANISATION EUROPEENNE POUR LA RECHERCHE NUCLEAIRE CERN EUROPEAN ORGANIZATION FOR NUCLEAR RESEARCH CERN RESEARCH BOARD MINUTES OF THE 214 th MEETING OF THE RESEARCH BOARD HELD

More information

UK High-Field NMR Funding and the UKRI Infrastructure Roadmap

UK High-Field NMR Funding and the UKRI Infrastructure Roadmap UK High-Field NMR Funding and the UKRI Infrastructure Roadmap Tony Chapman, EPSRC UK NMR Manager s Meeting University of Warwick 20 th June 2018 Topics to be covered today Part 1- An overview of UK investment

More information

What do the experiments want?

What do the experiments want? What do the experiments want? prepared by N. Hessey, J. Nash, M.Nessi, W.Rieger, W. Witzeling LHC Performance Workshop, Session 9 -Chamonix 2010 slhcas a luminosity upgrade The physics potential will be

More information

PMT Calibration in the XENON 1T Demonstrator. Abstract

PMT Calibration in the XENON 1T Demonstrator. Abstract PMT Calibration in the XENON 1T Demonstrator Sarah Vickery Nevis Laboratories, Columbia University, Irvington, NY 10533 USA (Dated: August 2, 2013) Abstract XENON Dark Matter Project searches for the dark

More information

Business Plan Summary

Business Plan Summary Owner: 2012-2016 Business Plan Summary Program Corporate, Operational & Council Services Service grouping Corporate Services Service Type Internal Service Mike Bushby Division Manager Fleet Services and

More information

D. Ferrère, Université de Genève on behalf of the ATLAS collaboration

D. Ferrère, Université de Genève on behalf of the ATLAS collaboration D. Ferrère, Université de Genève on behalf of the ATLAS collaboration Overview Introduction Pixel improvements during LS1 Performance at run2 in 2015 Few challenges met lessons Summary Overview VCI 2016,

More information

Strip Detectors. Principal: Silicon strip detector. Ingrid--MariaGregor,SemiconductorsasParticleDetectors. metallization (Al) p +--strips

Strip Detectors. Principal: Silicon strip detector. Ingrid--MariaGregor,SemiconductorsasParticleDetectors. metallization (Al) p +--strips Strip Detectors First detector devices using the lithographic capabilities of microelectronics First Silicon detectors -- > strip detectors Can be found in all high energy physics experiments of the last

More information

Noise Characteristics Of The KPiX ASIC Readout Chip

Noise Characteristics Of The KPiX ASIC Readout Chip Noise Characteristics Of The KPiX ASIC Readout Chip Cabrillo College Stanford Linear Accelerator Center What Is The ILC The International Linear Collider is an e- e+ collider Will operate at 500GeV with

More information

SNOLAB Facility & Science Programme Update. Nigel J.T. Smith Director, SNOLAB

SNOLAB Facility & Science Programme Update. Nigel J.T. Smith Director, SNOLAB SNOLAB Facility & Science Programme Update Nigel J.T. Smith Director, SNOLAB - Brief update on the Science Programme - The SNOLAB Community - Update on SNOLAB Process - Facility Developments - Organisation

More information

8.882 LHC Physics. Detectors: Muons. [Lecture 11, March 11, 2009] Experimental Methods and Measurements

8.882 LHC Physics. Detectors: Muons. [Lecture 11, March 11, 2009] Experimental Methods and Measurements 8.882 LHC Physics Experimental Methods and Measurements Detectors: Muons [Lecture 11, March 11, 2009] Organization Project 1 (charged track multiplicity) no one handed in so far... well deadline is tomorrow

More information

acatech Industrie 4.0 Maturity Index Development of company-specific Industrie 4.0 roadmaps FIR e. V. an der RWTH Aachen

acatech Industrie 4.0 Maturity Index Development of company-specific Industrie 4.0 roadmaps FIR e. V. an der RWTH Aachen acatech Industrie 4.0 Maturity Index Development of company-specific Industrie 4.0 roadmaps The Maturity Index is developed by renowned partners from industry and research Project partners Industrie 4.0

More information

Asteroid Redirect Mission (ARM) Update to the Small Bodies Assessment Group

Asteroid Redirect Mission (ARM) Update to the Small Bodies Assessment Group National Aeronautics and Space Administration Asteroid Redirect Mission (ARM) Update to the Small Bodies Assessment Group Michele Gates, Program Director, ARM Dan Mazanek, Mission Investigator, ARM June

More information

Research Management Plan for the Heavy Ion Physics Program Using the Compact Muon Solenoid Detector at the Large Hadron Collider

Research Management Plan for the Heavy Ion Physics Program Using the Compact Muon Solenoid Detector at the Large Hadron Collider DRAFT: 22-Aug-2007 Research Management Plan for the Heavy Ion Physics Program Using the Compact Muon Solenoid Detector at the Large Hadron Collider Project # XXXX For the U.S. Department of Energy Office

More information

Digital Engineering Support to Mission Engineering

Digital Engineering Support to Mission Engineering 21 st Annual National Defense Industrial Association Systems and Mission Engineering Conference Digital Engineering Support to Mission Engineering Philomena Zimmerman Dr. Judith Dahmann Office of the Under

More information

Direct Dark Matter Search with XMASS --- modulation analysis ---

Direct Dark Matter Search with XMASS --- modulation analysis --- Direct Dark Matter Search with XMASS --- modulation analysis --- ICRR, University of Tokyo K. Kobayashi On behalf of the XMASS collaboration September 8 th, 2015 TAUP 2015, Torino, Italy XMASS experiment

More information

Performance of the ATLAS Muon Trigger in Run I and Upgrades for Run II

Performance of the ATLAS Muon Trigger in Run I and Upgrades for Run II Journal of Physics: Conference Series PAPER OPEN ACCESS Performance of the ALAS Muon rigger in Run I and Upgrades for Run II o cite this article: Dai Kobayashi and 25 J. Phys.: Conf. Ser. 664 926 Related

More information

FY18 CIF Business Plan and Budget (SUMMARY)

FY18 CIF Business Plan and Budget (SUMMARY) Joint CTF-SCF.17/3 May 23, 2017 Joint Meeting of the CTF and SCF Trust Fund Committees Washington, DC June 7, 2017 Agenda Item 3 FY18 CIF Business Plan and Budget (SUMMARY) PROPOSED DECISION The Joint

More information

Space Technology FY 2013

Space Technology FY 2013 Space Technology FY 2013 Dr. Mason Peck, Office of the Chief Technologist ASEB April 4, 2012 O f f i c e o f t h e C h i e f T e c h n o l o g i s t Technology at NASA NASA pursues breakthrough technologies

More information

CERN-PH-ADO-MN For Internal Discussion. ATTRACT Initiative. Markus Nordberg Marzio Nessi

CERN-PH-ADO-MN For Internal Discussion. ATTRACT Initiative. Markus Nordberg Marzio Nessi CERN-PH-ADO-MN-190413 For Internal Discussion ATTRACT Initiative Markus Nordberg Marzio Nessi Introduction ATTRACT is an initiative for managing the funding of radiation detector and imaging R&D work.

More information

The LHCb Upgrade BEACH Simon Akar on behalf of the LHCb collaboration

The LHCb Upgrade BEACH Simon Akar on behalf of the LHCb collaboration The LHCb Upgrade BEACH 2014 XI International Conference on Hyperons, Charm and Beauty Hadrons! University of Birmingham, UK 21-26 July 2014 Simon Akar on behalf of the LHCb collaboration Outline The LHCb

More information

arxiv: v2 [physics.ins-det] 13 Oct 2015

arxiv: v2 [physics.ins-det] 13 Oct 2015 Preprint typeset in JINST style - HYPER VERSION Level-1 pixel based tracking trigger algorithm for LHC upgrade arxiv:1506.08877v2 [physics.ins-det] 13 Oct 2015 Chang-Seong Moon and Aurore Savoy-Navarro

More information

Brief to the. Senate Standing Committee on Social Affairs, Science and Technology. Dr. Eliot A. Phillipson President and CEO

Brief to the. Senate Standing Committee on Social Affairs, Science and Technology. Dr. Eliot A. Phillipson President and CEO Brief to the Senate Standing Committee on Social Affairs, Science and Technology Dr. Eliot A. Phillipson President and CEO June 14, 2010 Table of Contents Role of the Canada Foundation for Innovation (CFI)...1

More information

The trigger system of the muon spectrometer of the ALICE experiment at the LHC

The trigger system of the muon spectrometer of the ALICE experiment at the LHC The trigger system of the muon spectrometer of the ALICE experiment at the LHC Francesco Bossù for the ALICE collaboration University and INFN of Turin Siena, 09 June 2010 Outline 1 Introduction 2 Muon

More information

RD51 ANNUAL REPORT WG1 - Technological Aspects and Development of New Detector Structures

RD51 ANNUAL REPORT WG1 - Technological Aspects and Development of New Detector Structures RD51 ANNUAL REPORT 2009 WG1 - Technological Aspects and Development of New Detector Structures Conveners: Serge Duarte Pinto (CERN), Paul Colas (CEA Saclay) Common projects Most activities in WG1 are meetings,

More information

PROJECT DESCRIPTION Development of Bulk Micromegas with ASIC Readout

PROJECT DESCRIPTION Development of Bulk Micromegas with ASIC Readout PROJECT DESCRIPTION Development of Bulk Micromegas with ASIC Readout 1 Personnel and Institution(s) requesting funding M. Gold, J. Matthews, D. Loomba, M. Hoeferkamp, University of New Mexico Collaborators

More information

DESY Project. Introduction. E Elsen

DESY Project. Introduction. E Elsen ILC @ DESY Project Introduction E Elsen ILC@DESY E Elsen 2.12.2004 Why ILC @ DESY? Welcome to ILC Asian Regional Team for Linear Collider Accelerator Development KEK Home KEK Acc. Lab. ILC-Asia Accelerator

More information

R&D for ILC detectors

R&D for ILC detectors EUDET R&D for ILC detectors Daniel Haas Journée de réflexion Cartigny, Sep 2007 Outline ILC Timeline and Reference Design EUDET JRA1 testbeam infrastructure JRA1 DAQ Testbeam results Common DAQ efforts

More information

1. PUBLISHABLE SUMMARY

1. PUBLISHABLE SUMMARY Ref. Ares(2018)3499528-02/07/2018 1. PUBLISHABLE SUMMARY Summary of the context and overall objectives of the project (For the final period, include the conclusions of the action) The AIDA-2020 project

More information

DAQ & Electronics for the CW Beam at Jefferson Lab

DAQ & Electronics for the CW Beam at Jefferson Lab DAQ & Electronics for the CW Beam at Jefferson Lab Benjamin Raydo EIC Detector Workshop @ Jefferson Lab June 4-5, 2010 High Event and Data Rates Goals for EIC Trigger Trigger must be able to handle high

More information

UniTO - PROPOSAL PhD programme in_physics HR-MPGD-4-NG-HEP

UniTO - PROPOSAL PhD programme in_physics HR-MPGD-4-NG-HEP UniTO - PROPOSAL PhD programme in_physics HR-MPGD-4-NG-HEP Scientific Project Proposal The PhD Doctoral School in Physics of the University of Turin can host a three-year doctoral programme aimed to develop

More information

Nikhef jamboree - Groningen 12 December Atlas upgrade. Hella Snoek for the Atlas group

Nikhef jamboree - Groningen 12 December Atlas upgrade. Hella Snoek for the Atlas group Nikhef jamboree - Groningen 12 December 2016 Atlas upgrade Hella Snoek for the Atlas group 1 2 LHC timeline 2016 2012 Luminosity increases till 2026 to 5-7 times with respect to current lumi Detectors

More information

10.01: Development of Radiation Hard Pixel Detectors for the CMS Tracker Upgrade for the SLHC

10.01: Development of Radiation Hard Pixel Detectors for the CMS Tracker Upgrade for the SLHC CMS Upgrade MB Response to SLHC Document: 10.01: Development of Radiation Hard Pixel Detectors for the CMS Tracker Upgrade for the SLHC (Contact Person: Simon Kwan, Fermilab) It is our intent to recommend

More information

A new strips tracker for the upgraded ATLAS ITk detector

A new strips tracker for the upgraded ATLAS ITk detector A new strips tracker for the upgraded ATLAS ITk detector, on behalf of the ATLAS Collaboration : 11th International Conference on Position Sensitive Detectors 3-7 The Open University, Milton Keynes, UK.

More information

White Paper: Integrated Circuit Design in US High Energy Physics

White Paper: Integrated Circuit Design in US High Energy Physics White Paper: Integrated Circuit Design in US High Energy Physics July 10, 2013 Editor: G. Haller (SLAC) Authors: G. De Geronimo (BNL) D. Christian (FNAL) C. Bebek, M. Garcia-Sciveres, H. Von der Lippe

More information

Resistive Plate Chambers for Experiments at India-based Neutrino Observatory(INO) Saikat Biswas VECC, Kolkata India

Resistive Plate Chambers for Experiments at India-based Neutrino Observatory(INO) Saikat Biswas VECC, Kolkata India Resistive Plate Chambers for Experiments at India-based Neutrino Observatory(INO) Saikat Biswas VECC, Kolkata India 1 INO Collaboration Spokesperson : Prof. N.K. Mondal Collaborating institutions/universities

More information

Conclusions concerning various issues related to the development of the European Research Area

Conclusions concerning various issues related to the development of the European Research Area COUNCIL OF THE EUROPEAN UNION Conclusions concerning various issues related to the development of the European Research Area The Council adopted the following conclusions: "THE COUNCIL OF THE EUROPEAN

More information

Metrological Telecommunication System Development Project

Metrological Telecommunication System Development Project Philippines Metrological Telecommunication System Development Project 1. Project Profile and Japan s ODA Loan Report Date: March 2001 Field Survey: September 2000 The Philippines Manila Cebu Site Map:

More information

NEDO s Activities in the Robotics and Artificial Intelligence Fields

NEDO s Activities in the Robotics and Artificial Intelligence Fields NEDO s Activities in the Robotics and Artificial Intelligence Fields November 29, 2017 Dr. Shuji Yumitori Director General, Robot and Artificial Intelligence Technology Department New Energy and Industrial

More information

Streaming Readout for EIC Experiments

Streaming Readout for EIC Experiments Streaming Readout for EIC Experiments Douglas Hasell Detectors, Computing, and New Technologies Parallel Session EIC User Group Meeting Catholic University of America August 1, 2018 Introduction Goal of

More information

Astrophysics. Paul Hertz Director, Astrophysics Division Science Mission

Astrophysics. Paul Hertz Director, Astrophysics Division Science Mission National Aeronautics and Space Administration Astrophysics Large Mission Concept Studies Kick Off AAS 227th Meeting Kissimmee, Florida January 6, 2016 Paul Hertz Director, Astrophysics Division Science

More information

PandaX-III High Pressure Gas TPC and its Prototype

PandaX-III High Pressure Gas TPC and its Prototype PandaX-III High Pressure Gas TPC and its Prototype Ke HAN ( 韩柯 ) Shanghai Jiao Tong University On Behalf of the PandaX-III Collaboration May 25, 2017 Outline PandaX-III project overview Design features

More information

Data acquisition and Trigger (with emphasis on LHC)

Data acquisition and Trigger (with emphasis on LHC) Lecture 2! Introduction! Data handling requirements for LHC! Design issues: Architectures! Front-end, event selection levels! Trigger! Upgrades! Conclusion Data acquisition and Trigger (with emphasis on

More information

HP Laboratories. US Labor Rates for Directed Research Activities. Researcher Qualifications and Descriptions. HP Labs US Labor Rates

HP Laboratories. US Labor Rates for Directed Research Activities. Researcher Qualifications and Descriptions. HP Labs US Labor Rates HP Laboratories US Labor Rates for Directed Research Activities This note provides: Information about the job categories and job descriptions that apply to HP Laboratories (HP Labs) research, managerial

More information

ASX CHESS Replacement Project Webinar

ASX CHESS Replacement Project Webinar ASX CHESS Replacement Project Webinar Q4 update 14 December 2017 Audio Trouble Shooting & Reminder to Submit Questions Your Participation Having trouble hearing via Computer Audio? Switch to Phone call!

More information

NASA Office of the Chief Technologist

NASA Office of the Chief Technologist National Aeronautics and Space Administration NASA Office of the Chief Technologist Vicki K. Crisp Deputy Chief Technologist (Acting) Fall 2017 Office of the Chief Technologist Key Roles Advises the NASA

More information

10246/10 EV/ek 1 DG C II

10246/10 EV/ek 1 DG C II COUNCIL OF THE EUROPEAN UNION Brussels, 28 May 2010 10246/10 RECH 203 COMPET 177 OUTCOME OF PROCEEDINGS from: General Secretariat of the Council to: Delegations No. prev. doc.: 9451/10 RECH 173 COMPET

More information

Lecture 2. Part 2 (Semiconductor detectors =sensors + electronics) Segmented detectors with pn-junction. Strip/pixel detectors

Lecture 2. Part 2 (Semiconductor detectors =sensors + electronics) Segmented detectors with pn-junction. Strip/pixel detectors Lecture 2 Part 1 (Electronics) Signal formation Readout electronics Noise Part 2 (Semiconductor detectors =sensors + electronics) Segmented detectors with pn-junction Strip/pixel detectors Drift detectors

More information

Torpedo Factory Art Center Board Strategic Road Map

Torpedo Factory Art Center Board Strategic Road Map Board Strategic Road Map March 20, 2014 Framework Background Mission Values Objectives Strategies Action Steps 2 Background A planning framework is vital to the success of any nonprofit organization. In

More information

Development of a Highly Selective First-Level Muon Trigger for ATLAS at HL-LHC Exploiting Precision Muon Drift-Tube Data

Development of a Highly Selective First-Level Muon Trigger for ATLAS at HL-LHC Exploiting Precision Muon Drift-Tube Data Development of a Highly Selective First-Level Muon Trigger for ATLAS at HL-LHC Exploiting Precision Muon Drift-Tube Data S. Abovyan, V. Danielyan, M. Fras, P. Gadow, O. Kortner, S. Kortner, H. Kroha, F.

More information

Operational Experience with the ATLAS Pixel Detector

Operational Experience with the ATLAS Pixel Detector The 4 International Conferenceon Technologyand Instrumentation in Particle Physics May, 22 26 2017, Beijing, China Operational Experience with the ATLAS Pixel Detector F. Djama(CPPM Marseille) On behalf

More information

Expected Performance of the ATLAS Inner Tracker at the High-Luminosity LHC

Expected Performance of the ATLAS Inner Tracker at the High-Luminosity LHC Expected Performance of the ATLAS Inner Tracker at the High-Luminosity LHC Noemi Calace noemi.calace@cern.ch On behalf of the ATLAS Collaboration 25th International Workshop on Deep Inelastic Scattering

More information

Corner Rafts LSST Camera Workshop SLAC Sept 19, 2008

Corner Rafts LSST Camera Workshop SLAC Sept 19, 2008 Corner Rafts LSST Camera Workshop SLAC Sept 19, 2008 Scot Olivier LLNL 1 LSST Conceptual Design Review 2 Corner Raft Session Agenda 1. System Engineering 1. Tolerance analysis 2. Requirements flow-down

More information

ABSTRACT. Keywords: ESSP, Earth Venture, program management, NASA Science Mission Directorate, Class-D mission, Instrument-first 1.

ABSTRACT. Keywords: ESSP, Earth Venture, program management, NASA Science Mission Directorate, Class-D mission, Instrument-first 1. SSC14-VI-10 Opportunities for Small Satellites in NASA s Earth System Science Pathfinder (ESSP) Program Frank Peri, Richard, C. Law, James E. Wells NASA Langley Research Center, 9 Langley Boulevard, Hampton,

More information

Proposal to DOE/NSF for ILC Detector R&D

Proposal to DOE/NSF for ILC Detector R&D Proposal to DOE/NSF for ILC Detector R&D May 26, 2006 Proposal Name Design and Prototyping of a Scintillator-based Tail-catcher/Muon Tracker. Classification (accelerator/detector: subsystem) Detector:

More information

SiD Beyond the DBD. Marcel Stanitzki

SiD Beyond the DBD. Marcel Stanitzki SiD Beyond the DBD SLAC 23/08/2012 SiD Beyond the DBD I. Life Drama in several acts before July 4th, 2012 II. July 4th, 2012 III. The LC post July 4th IV. SiD What are our next steps V. To be written (by

More information

PoS(LHCP2018)031. ATLAS Forward Proton Detector

PoS(LHCP2018)031. ATLAS Forward Proton Detector . Institut de Física d Altes Energies (IFAE) Barcelona Edifici CN UAB Campus, 08193 Bellaterra (Barcelona), Spain E-mail: cgrieco@ifae.es The purpose of the ATLAS Forward Proton (AFP) detector is to measure

More information

TRIUMF ACCELERATING CANADIAN BUSINESS THROUGH SCIENCE AND INNOVATION Pre-Budget Consultation

TRIUMF ACCELERATING CANADIAN BUSINESS THROUGH SCIENCE AND INNOVATION Pre-Budget Consultation Canada s national laboratory for particle and nuclear physics Laboratoire national canadien pour la recherche en physique nucléaire et en physique des particules TRIUMF ACCELERATING CANADIAN BUSINESS THROUGH

More information

STRATEGIC FRAMEWORK Updated August 2017

STRATEGIC FRAMEWORK Updated August 2017 STRATEGIC FRAMEWORK Updated August 2017 STRATEGIC FRAMEWORK The UC Davis Library is the academic hub of the University of California, Davis, and is ranked among the top academic research libraries in North

More information

A Modular Readout System For A Small Liquid Argon TPC Carl Bromberg, Dan Edmunds Michigan State University

A Modular Readout System For A Small Liquid Argon TPC Carl Bromberg, Dan Edmunds Michigan State University A Modular Readout System For A Small Liquid Argon TPC Carl Bromberg, Dan Edmunds Michigan State University Abstract A dual-fet preamplifier and a multi-channel waveform digitizer form the basis of a modular

More information

Development of Telescope Readout System based on FELIX for Testbeam Experiments

Development of Telescope Readout System based on FELIX for Testbeam Experiments Development of Telescope Readout System based on FELIX for Testbeam Experiments, Hucheng Chen, Kai Chen, Francessco Lanni, Hongbin Liu, Lailin Xu Brookhaven National Laboratory E-mail: weihaowu@bnl.gov,

More information

EVCA Strategic Priorities

EVCA Strategic Priorities EVCA Strategic Priorities EVCA Strategic Priorities The following document identifies the strategic priorities for the European Private Equity and Venture Capital Association (EVCA) over the next three

More information

Vertex Detector. ECFA/DESY Workshop Amsterdam, April 2003 Chris Damerell. Conceptual design requirements (update) Detector technology options

Vertex Detector. ECFA/DESY Workshop Amsterdam, April 2003 Chris Damerell. Conceptual design requirements (update) Detector technology options Vertex Detector ECFA/DESY Workshop Amsterdam, April 2003 Chris Damerell Conceptual design requirements (update) Detector technology options Route to convergence Construction, commissioning, operation and

More information

Phase 1 upgrade of the CMS pixel detector

Phase 1 upgrade of the CMS pixel detector Phase 1 upgrade of the CMS pixel detector, INFN & University of Perugia, On behalf of the CMS Collaboration. IPRD conference, Siena, Italy. Oct 05, 2016 1 Outline The performance of the present CMS pixel

More information