1 RObotic GEostationary orbit Restorer (ROGER) Executive Summary ESA/ESTEC Contract No /01/NL/WK Cover + x + 42 pages September 2003 Duncan Smith This document is subject to the release conditions printed on the reverse of this page

2 Customer Reference Number Project Title Company Name Customer Contact Customer Information Contract Number 15678/01/NL/WK Milestone Number Deliverable No. 12 Date Due (dd/mm/yyyy) RObotic GEostationary orbit Restorer European Space Agency (ESA/ESTEC) G. Visentin This Document was produced by QinetiQ for the European Space Agency (ESA) under Order/Contract reference 15678/01/NL/WK Copyright of QinetiQ ltd 2003 Approval for wider use of releases must be sought from: Intellectual Property Department, QinetiQ ltd, Cody Technology Park, Farnborough, Hampshire GU14 0LX ii

3 Authorisation Prepared by Title Duncan Smith Technical Manager Signature Date Location Space Department, QinetiQ Reviewed by Title Dr Hedley Stokes Project Manager Signature Date Authorised by Title Dr Mike Jackson Director, Space Signature Date iii

4 Record of changes Issue Date Detail of Changes 0.1 May 03 Draft issue for review 0.2 May 03 2 nd Draft 1.0 September 03 Final issue iv

5 Abstract The RObotic GEostationary orbit Restorer (ROGER) is a study focused on the need for and feasibility of a mission to control the threat from faulty satellites and large debris. This report presents the work performed within the ROGER project. It has been prepared a team lead by QinetiQ, Space Department, and comprising OHB-System, Dutch Space and Esys, for the European Space Agency (ESA/ESTEC) under contract 15678/01/NL/WK. The aim of the work is to examine the threat from overcrowding in GEO, determine possible mission scenarios and subsequently the justification for a RObotic GEostationary orbit Restorer, and finally to suggest a plausible technical implementation for such a mission and identify the necessary development and demonstration activities. This final report comprises an executive summary report and six annexes describing the technical work performed in the project. v

6 List of contents Authorisation Record of changes iii iv Abstract v List of contents List of Tables List of Figures vi viii ix 1 Introduction Re-orbiting Policies of Operators Long and Short Term Risk and Need for Early Mitigation Real Potential for a Re-orbiting Mission Likely Economic Case for a Re-orbiting Mission Role of Regulation and Operator Policies Synergies from Other Fields Programme description 3 2 GEO Utilisation Status & Trend Current GEO Status GEO Spacecraft Failures Data Market Trends GEO Simulator Analysis of collision risk assessment 10 3 ROGER Scenario and Justification Intervention Concepts Technical Constraints and Solutions Benefits Analysis Summary and implications for an operational mission 25 4 ROGER definition and development plan ROGER System Design Development, Schedule and Cost ROGER Demonstrator Development 34 5 Conclusions 37 vi

7 6 References 38 7 Glossary 39 Distribution list 40 Report documentation page 41 vii

8 List of Tables Table 2-1 End of life actions for GEO satellites between (derived from [6,7]) 7 Table 2-2 The risk of a single collision occurring between tracked objects during the simulation 10 Table 3-1 Case (ii) servicing event types (derived from [5]) 14 Table 3-2 Case (iii) servicing event types (derived from [5]) 15 Table 3-3 Summary of capture methods 17 Table 3-4 Estimated mission duration and repeat rates 19 Table 3-5 ROGER ROM cost per target 21 Table 4-1 Key spacecraft parameters 32 Table 4-2 High level mass breakdown for the ROGER spacecraft 32 Table 4-3 Expected programme costs 34 Table 4-4 Evolution of risk levels during ROGER development 36 viii

9 List of Figures Figure 1-1 Work Breakdown Structure (high-level) 3 Figure 1-2 Study Logic Diagram 4 Figure 2-1 Distribution of satellites in GEO by status (derived from DISCOS data [4]) 5 Figure 2-2 Probability of successful satellite operation (derived from SpaceBase data [5]) 6 Figure 2-3 Satellite replacement and augmentation 7 Figure 2-4 GEO longitude distributions for nominal launch rate and re-orbiting behaviour 8 Figure 2-5 The operational GEO region as defined for GEOSIM 9 Figure 2-6 Satellite oriented co-ordinate system 9 Figure 2-7 Determining the collision probability 10 Figure 2-8 Correspondence between longitude distribution and collision risk 11 Figure 3-1 Large inflatable hands or mechnical rakes 17 Figure 3-2 Capture of target using the Octopus tentacle solution 18 Figure 3-3 Apogee engine coupling tool of ESS/T [9] 18 Figure 3-4 Dependency of ROGER mission costs of the number of re-orbited target S/C 20 Figure 4-1 ROGER spaceacraft configuration outside view 27 Figure 4-2 ROGER spacecraft configuration (cutaway view) 28 Figure 4-3 ROGER Stowed configuration 29 Figure 4-4 Transition of target from controlled status to flat spin 30 Figure 4-5 Approach to a target in a flat spin 30 Figure 4-6 ROGER Position determination and data properties 31 Figure 4-7 SNECMA continuous thrust transfer strategy [11] 32 Figure 4-8 Proposed ROGER development schedule 34 ix

10 This page is intentionally blank x

11 1 Introduction The future growth of space debris has been studied and characterised extensively for low Earth orbit and more recently for the geosynchronous orbital environment. For objects in geostationary or geosynchronous orbits the presence of even a relatively small number of satellites has a special significance given the small range of suitable orbital parameters. The unique operational characteristics of GEO mean that all users are constrained to the same narrow corridor of space. Given that there is no natural sink for objects at GEO altitudes the number of objects in the corridor will continue to increase, enhancing the collision risk, unless some mitigation measures are implemented. Sources of debris in GEO are primarily considered to be uncontrolled satellites that have either completed their propellant reserves or have failed, and launch vehicle upper stages. Additionally there is a small contribution from related objects, such as explosive bolts and lanyards, and the two explosive break-ups known to have occurred in GEO. Due to the distance involved for GEO observations and the resolution of most ground based systems the characterisation of the debris environment in GEO is not as mature as that in LEO. 1.1 Re-orbiting Policies of Operators The unique orbital characteristics of the GEO ring make it a very valuable natural resource. In order to preserve this resource for future satellite operations users have been encouraged over the years to re-orbit their satellites at end of life. This involves boosting the satellite to a graveyard region above the GEO ring. Today this practice is not fully embraced by all satellite operators, indeed only one third of satellites that reached the end of their missions last year are believed to have successfully re-orbited. Failed satellites, which could not subsequently be re-orbited, are believed to comprise a small but significant fraction of the total number of uncontrolled objects remaining in GEO. 1.2 Long and Short Term Risk and Need for Early Mitigation The actual risk of a collision between two objects, be they operating satellites or otherwise, is at present still very low for objects in or crossing GEO. Studies performed to date suggest that on the basis of business as usual, future launch and explosion rates there are likely to be at most a few collisions between large objects over the next hundred years. However if it was intended only to curb this problem when the threat became very serious, the population of uncontrolled objects would have grown so much as to present an enormous task for an object removal programme. Thus prevention is more desirable than cure. On this basis it is of real concern that a re-orbiting strategy should be adopted universally. Furthermore the proportion of satellites suffering total failures has not reduced as the market has grown so there is expected to be a growing population of uncontrolled objects regardless of the extent of regulation on re-orbiting policy. Page 1 of 42

12 1.3 Real Potential for a Re-orbiting Mission There is a case for restricting the increase of uncontrolled objects in GEO. It is known that many satellites are not re-orbited at the end of their mission for a number of reasons. Previous studies have investigated the possibility of rendezvous and docking with an uncontrolled target and concluded basic technical feasibility. The possibility exists therefore that spent satellites could be removed to a graveyard orbit continually by one or more shuttle vehicles. This would reduce the increase in such objects and could even reduce the total number of objects depending on the vigour of the programme. 1.4 Likely Economic Case for a Re-orbiting Mission The economic case for re-orbiting to graveyard has also been studied. One example was the removal of dead satellites on the basis of the direct threat they posed to operators. It was concluded in [3] that the fee that could be raised from commercial spacecraft operators as a subscription for satellite removal would not pay for the capital cost of a mission, as the threat is presently perceived to be low. The concept was also studied of an operator hiring the services of a re-orbiting mission as a means of preventing wastage of propellant through uncertainty of the quantity remaining for a graveyard manoeuvre. The net effect would be to allow the operator to use the spacecraft until its propellant reserves were absolutely exhausted. It was perceived that the potential revenue from this concept was higher than the first case identified but again would not cover the capital cost of the mission. 1.5 Role of Regulation and Operator Policies At present there are no enforceable regulations on the re-orbiting of satellites. The Inter Agency Space Debris Committee (IADC) has established a guideline for re-orbiting which has been incorporated into the draft European Space Debris Mitigation Standards (EDMS) document. This includes determination of the distance that an object should be removed from GEO based on its mass, cross-sectional area and reflectivity. Some states, e.g. the UK, have developed a licensing process for satellite operators requiring them to adhere to these guidelines and some operators may have adopted them as good practice. However whilst it is essentially voluntary the guidelines will likely not be adopted universally as there are many instances when an operator will not be able to replace a satellite and will wish to keep it in use as long as possible. It is not inconceivable, though perhaps unlikely, that a sufficiently universal intergovernmental body could succeed in imposing an enforced re-orbiting requirement on the majority of operators. This could have the direct effect of causing the owners to undertake this themselves, or it could be undertaken by a dedicated re-orbiting mission. 1.6 Synergies from Other Fields The GSV study [3] was aimed principally at the repair or recovery of a satellite struck by mechanical failure or in some other way stranded. The economic investigation concluded that a commercial service for this purpose could command high fees if successful. It acknowledged though that the opportunities for such intervention are rare or at least randomly distributed. The study suggested that a plausible composite mission would be feasible with the revenue stream obtained partially from a re-orbiting mission and partially from an imaging or servicing mission. Page 2 of 42

13 It may be possible to reduce the growth of hazards in GEO with a dedicated re-orbiting mission though it may only be viable as a joint mission. It may therefore become necessary to study the economic and technical feasibility of ancillary tasks in order to determine the case for the primary objective. This study thoroughly investigates the tangible requirement for a re-orbiting mission and takes advantage of the technical synergies with servicing missions in order to determine a workable technical and economic solution. 1.7 Programme description This technical work is divided into three major work packages as shown in figure 1-1. The final work package, WP 5000, has been devoted to the production of a video, a brochure and web pages describing the project. Figure 2-2 shows the applied study logic. The remainder of this document summarises the key issues developed in the course of the study. Robotic Geostationary Orbit Restorer Management GEO Utilisation ROGER Scenario ROGER definition ROGER publishing (QinetiQ) status and and Justification and development material trend (QinetiQ) (QinetiQ) plan (OHB-System) (QinetiQ) 2100 Current GEO status (QinetiQ) 3100 Intervention concepts (QinetiQ) 4100 Literature Survey (OHB-System/Fokker Space) 5100 Publishing materials - System (QinetiQ) 2200 Failures data (QinetiQ) 3200 Benefits analysis (ESYS) 4200 ROGER System Design and development plan (OHB-System/Fokker Space) 5200 Publishing materials - ROGER (OHB-System) 2300 Market Trends (ESYS) 3300 Technical constraints and solutions (OHB-System/Fokker Space) 4300 ROGER Demonstration (OHB-System/Fokker Space) 5300 Publishing materials - Robotics (Fokker Space) 2400 GEO simulator & User handbook (QinetiQ) 3400 Synthesis of Economic and Technical cases (QinetiQ) 4400 Commercial Evaluation (Fokker Space) 2500 Analysis & Technical note (QinetiQ) 3500 Requirements for an operational mission (OHB-System/Fokker Space) Figure 1-1 Work Breakdown Structure (high-level) Page 3 of 42

14 2100 Current GEO Status 2200 Failures data 2300 Market Trends 2400 GEO simulator 2500 Analysis and technical note 3200 Benefits analysis 3100 Intervention concepts 3300 Technical constraints and solutions 3400 Synthesis of economic and technical cases 3500 Requirements 4100 Literature survey 4200 ROGER system D&D 4300 ROGER demonstration 4400 Commercial evaluation 5000 Publishing materials Figure 1-2 Study Logic Diagram Page 4 of 42

15 2 GEO Utilisation Status & Trend The aim of the first major study task is to provide the basis for possible mission scenarios and the justification for a Robotic Geostationary Orbit Restorer. 2.1 Current GEO Status The current population of objects residing in, or crossing, the GEO region has been determined by querying ESA's DISCOS database. Analysis has categorised the use and occupancy of the longitude slots in GEO by mission classification, country of origin and control status. Key results include: As of January 2002 there are 900 reported objects in GEO of which ~ 28% are controlled, operational satellites. A significant proportion of the population, ~ 10%, are military satellites and rocket bodies that do not have publicly available orbital elements. Analysis of the distribution of objects around the GEO ring showed the most heavily utilised longitude slots are ~ 75ºE and ~ 105ºW due to a combination of natural orbital perturbations and mission requirements. Figure 2-1 shows the distribution of objects by longitude and status. Figure 2-1 Distribution of satellites in GEO by status (derived from DISCOS data [4]) By far the most dominant mission type at GEO is telecommunications - commercial and military services combined constitute ~ 85% of the satellite population. Additional analysis revealed 239 objects in GTO orbit that regularly intersect the operational GEO region, noting that the injection accuracy of launch vehicles could play a significant role in determining the potential hazard such objects pose to the geostationary orbit. Page 5 of 42

16 These population inputs will be used as the basis for a traffic model upon which the threat from overcrowding may be determined. 2.2 GEO Spacecraft Failures Data The traffic model will project growth in utilisation according to current market research. In order to support the use of this model a satellite failure analysis has been performed. This has determined a range of parameters, including the probability of satellite failure at a given stage in its mission, the average design lives for several mass and functional categories, the proportion of satellites being re-orbited at the end of their operational lives and the rate of occurrence of failures with some potential for servicing. All the results have made use of data available in the QinetiQ SpaceBase database of satellites and in-orbit events [5], which contains data on 6000 satellites and 1800 events. Some other sources were also used, notably the published review of re-orbiting success conducted annually by ESA based on the DISCOS database [6,7]. Key results include: The probability of satellite failure at a given point of the mission has been determined and this indicates that most satellites considerably exceed their formal design lives. See Figure years 5-10 years years Fraction/Multiple of Design Life Figure 2-2 Probability of successful satellite operation (derived from SpaceBase data [5]) Nearly 40% of all geostationary satellites are not re-orbited at the end of their design lives and only 30% are re-orbited in accordance with the IADC guideline, see Table 2-1. Approximately 3 4% of GEO satellites could not be re-orbited even if the operators were prepared to do so, due to onboard failures. Some satellites do develop failures with servicing potential. The most common types of event are appendage deployments and permanent failure to maintain attitude and longitude, which have occurrence rates of 3.3% and 2.9% respectively. Page 6 of 42

17 Abandoned Inadequate Re-orbited Total Table 2-1 End of life actions for GEO satellites between (derived from [6,7]) 2.3 Market Trends The evolution of the geostationary orbital region is contingent on the future GEO satellite population. A GEO satellite population model has been developed, which can statistically predict the number of satellites placed in GEO over the coming years. The period of interest was determined to be the time of initiation of the study, 2002, through to 2030 thus enveloping the period of operation anticipated for the ROGER mission. The starting point for the model was taken as the market baseline, which includes the current population of satellites in GEO, their distribution around the geostationary ring and estimates of satellite failure and re-orbiting rates, as discussed above. The model is able to extrapolate forward in time from this initial population by replacing satellites that have failed and introducing additional satellites that reflect increased market demand To 2030 Initial population Brand new satellites Replacement satellites Figure 2-3 Satellite replacement and augmentation Wherever possible, independent predictions of the future values of parameters such as launch rates and the mass distribution of satellites from have been used [8]. The output from the model is a comprehensive data set of satellites introduced into GEO, between 2002 and 2030, for a number of different assumptions regarding re-orbit policy and launch traffic rate. The traffic scenarios considered were as follows: Page 7 of 42

18 nominal launch rate and re-orbiting behaviour lowest launch rate and nominal re-orbiting behaviour highest launch rate and nominal re-orbiting behaviour nominal launch rate and worst re-orbiting behaviour nominal launch rate and best re-orbiting behaviour. The bounds for nominal best and worse re-orbiting behaviour were derived from Table 2-1. Those from the launch rate were deduced from [8]. Ten data sets of each case were produced with different random seeds governing the application of failure probabilities and replacement launches. As an example Figure 2-4 shows the progression in distribution over longitude slots from 2002 to 2030 under assumptions of nominal launch rate and re-orbiting behaviour. Note that this distribution does not include the natural evolution of the satellite s longitude. Figure 2-4 GEO longitude distributions for nominal launch rate and re-orbiting behaviour 2.4 GEO Simulator To evaluate the consequences of future use and satellite failures on the geostationary environment, the future traffic projections have been combined with realistic orbital dynamics and a collision prediction algorithm to produce a computer simulation of GEO. The GEO Simulator (GEOSIM) software tool was designed to provide an analysis of the effect on the geostationary ring of current and future satellite operations. This tool has been developed to ESA PSS-05 (lite) software engineering standards to run under the ESA standard desktop operating system, Windows 95, and is also compatible with Windows NT and The model considers the region of GEO defined in Figure 2-5 and is based upon the GEO and GTO populations described in sections 2.1 and 2.3. Within the software, the object population is evolved over time using components of the QinetiQ Orbit Software Suite. This propagates the positions of objects to a high accuracy using numerical integration. The station-keeping cycles of operational satellites are modelled by an Page 8 of 42

19 algorithm designed to represent generic cycles that are considered typical of current satellite operations. GEO altitude km Manoeuvre corridor Protected Region Operational zone GEO altitude (35,786 km) Manoeuvre corridor GEO altitude km Figure 2-5 The operational GEO region as defined for GEOSIM A close approach and collision prediction algorithm was designed to enable a quantitative assessment of the risk, making the best use of the publicly available orbital positions obtained during the analysis of the current population. The object position is conceptualised as in Figure 2-6 and an ellipsoid based on uncertainties in the along track, across track and radial positions is super-imposed over the nominal position. N Earth Across-track (w) Along-track (v) Radial (u) Figure 2-6 Satellite oriented co-ordinate system The position of the object within its uncertainty volume is described using a normal distribution. By assuming that the along-track, across-track and radial errors are all independent of each other the probability density function may be described by three independent, one-dimensional distributions. The probability of collision is determined on the basis of the intersection of each object with the uncertainty volume of the other object as in Figure 2-7. In this manner a collision probability for each object pair is determined for the period in which the uncertainty volumes intersect. Page 9 of 42

20 uncertainty volume Object 1 'target' r v Object 2 'chaser' r Figure 2-7 Determining the collision probability 2.5 Analysis of collision risk assessment The GEO Simulator has been used to investigate the best and worst cases thought to apply in GEO over the period to 2030 and thus provide a quantitative assessment of the effect of future launch traffic and space debris mitigation policies. Future Population Scenarios Probability of a Single Collision Nominal % Low launch rate % High launch rate % Best re-orbit rate % Worst re-orbit rate % Nominal excluding GTO objects % Table 2-2 The risk of a single collision occurring between tracked objects during the simulation The results from the analysis with GEOSIM are given in Table 2-2. The key points include: Page 10 of 42 there is a ~ 2.8%, or 1 in 35, chance of a collision occurring between two tracked objects in the GEO region in the period 2002 to 2030, assuming nominal launch traffic and re-orbit rates apply; this rises to 3.7%, or almost as high as 1 in 25, for the worst re-orbiting case the standard deviations shown are those resulting from the necessarily random element of the future traffic projection; a significant proportion of close conjunctions are between two controlled satellites, which is attributed to the similarity of manoeuvre profiles used; the overall risk of a collision does not drop significantly when GTO objects are excluded from the nominal case; by 2030 the number of uncontrolled objects populating the GEO region increases to 79% for nominal launch rate and re-orbiting assumptions.

21 As expected, significant numbers of objects collect around the most highly utilised orbital slots, see Figure 2-8, with a corresponding increase in the local collision risk. It should be noted that a small number of close conjunctions, having a high probability, could bias the collision probability at a given longitude No. Objects in Final Population Collision Risk 3.5E E E E-03 No. Objects E E E E E Probability E-03 Longitude East (5 degree bins) Figure 2-8 Correspondence between longitude distribution and collision risk An investigation was also aimed at resolving the collision hazard resulting from a permanent manoeuvre failure of one satellite amongst a co-located cluster of satellites. This study was actually based on a the current Astra fleet at 19.2ºE. For this longitude it is determined that the risk to the remaining satellites of the cluster is not significantly increased in comparison to their background risk from other all uncontrolled objects. This result, which may vary according to longitude, occurs because the natural evolution of the failed satellite, due to orbital perturbations, will move it away from the vicinity of the cluster. It is believed that these results are broadly compatible with other detailed studies into the collision risk at GEO. It is important to note that this result excludes any consideration of the untracked debris population in the geosynchronous region. The lower limit of object size for detection by the US Strategic Command Surveillance Network is 1m at GEO. Furthering our knowledge of the untracked population is key to providing a full understanding of the collision risk present at geostationary altitudes. To summarise the six principal cases evaluated have suggested that: 1. The re-orbiting policy dominates collision probabilities, having a much greater influence on the evolution of GEO than expected variations in future launch traffic. 2. For the whole near term period from 2002 to 2030 there is a cumulative chance of collision over the 28-year period of 2.8% for the nominal re-orbiting case over all objects. This rises to 3.7% for the worst re-orbiting case. If GEO re-orbiting was implemented to its fullest the collision risk in the region may be almost stable with a cumulative chance of collision of 1.7% over the same period. 3. Variations in the predicted launch traffic rate (as derived by the ROGER GEO satellite population model) do not play a significant role in decreasing or increasing the collision risk over the next 30 years. Page 11 of 42

22 4. The results indicate also that the role of GTO objects for the collision probability in the GEO region is not significant. Page 12 of 42

23 3 ROGER Scenario and Justification The aim of the second major study area is to determine plausible technical and economic scenarios for a Robotic Geostationary Orbit Restorer. 3.1 Intervention Concepts The results from section 2.5 suggest the following policies for a re-orbiting programme: 1. mass removal is required for general GEO resident objects. Mass removal for GTO objects is less significant and GTO objects are not presently subject to the same re-orbiting guidelines as GEO objects; 2. mass removal effectively needs to keep the number of objects static. The earlier such a programme is started the less the future risk will be. A scheme may therefore be based on removing objects as they become uncontrolled or removing objects in high-risk longitudes. There is no need to consider the removal of older objects with higher inclinations. Removal of objects as they reach the end of their controlled lives has the advantage that the operator will generally still exist as an entity and may be approached regarding the disposal. This achieves the required result and avoids the need to deal with issues of ownership, liability and payment from potentially defunct organisations. The predictions also suggest that mass removal of GTO like orbits need not be considered to a first order. The principal mission of interest is re-orbiting. This mission is studied from a commercial and publicly funded perspective. The possibility of commercial funding of servicing missions is also examined to scope the possibility that commercial servicing could assist in the economic viability of a re-orbiting mission. This is based on the perception that servicing missions may have a high value in their own right and also have sufficient technical similarity to a re-orbiting intervention mission such that development costs and possibly even flight hardware may be shared. A search of literature regarding servicing concepts and the related applications of robotics has been conducted. A number of recent and current satellite servicing system concepts have been reviewed and demonstrate: feasibility of proximity manoeuvres docking with ABM adapter relative expense of robotic technology teleoperation. The following robotic concepts are perceived to have the strongest connection with the ROGER concept for spacecraft capture and servicing activities: DLR ROTEX experiment DLR/Japanese GETEX/ETSVII experiments ESA ERA. A number of non-robotic concepts for spacecraft capture were also considered and thus the review looked for contemporary mechanical design concepts of interest: NASA inflatable lenticular antenna reflector Page 13 of 42

24 Dornier telescopic mast tethers for orbiting object capture. Some of the content of previous studies and experiments in servicing missions is directly relevant to the re-orbiting task as well as to servicing aspects of the ROGER concept, including: DLR ESS(T)/OSS mission studies DLR/Japanese GETEX/ETSVII experiments ESA GSV study. The output of the literature search was used to generate several intervention concepts, distinguished by purpose and timeframe. The purposes are re-orbiting and servicing, and a number of servicing events are then considered based on their likelihood of occurrence. The selected cases of intervention concepts for the ROGER spacecraft and mission are: Case (i)a: Government or commercially funded re-orbiting mission using a minimum development route (e.g. with no reliance on robotics) Case (i)b: Government or commercially funded re-orbiting using currently mature robotic technology (i.e. minimum development still consistent with servicing possibilities) Case (ii): Commercially funded servicing mission using currently mature robotic technology Case (iii): Commercially funded servicing mission using more advanced technology, expected to be mature in perhaps years, aiming to take advantage of a wider range of servicing targets. Thus cases (i)a and (i)b envelop the principle aim of re-orbiting and possible subsidy from servicing. Servicing events considered under case (ii) are those that can be achieved with no more robotic technology than that required for rendezvous and docking without damage to the target. These are listed in Table 3-1 together with their probability of occurrence per geostationary mission as determined from [5]. The motivation for servicing case (ii) events is to use the same rendezvous and capture technology and possibly even the same spacecraft to provide revenue with which to support the capital cost of the hardware required for the re-orbiting missions. Event type Probability per GEO mission Catastrophic premature fuel exhaustion or AOCS failure 2.9% Deployment failure, e.g. stuck in GTO 0.8% Uncontrolled spin-up, i.e. unsuccessful ESR 0.4% Table 3-1 Case (ii) servicing event types (derived from [5]) Each of these event types has a well-known precedent. Orbital Recovery has been in the news recently for their programme for extending the life of GEO communications satellites. The Artemis and Astra 1K satellites were both victims of deployment failures, though with rather different final outcomes. The Olympus spacecraft suffered an uncontrolled spin-up in As indicated in the table the probability of events with a Page 14 of 42

25 similarity to the Olympus case, and yet not finally being recovered by the operator, is actually quite low. Servicing events for case (iii) are those listed in Table 3-2 and all require manipulation of some mechanical feature of the target spacecraft after capture. The motivation for case (iii) is to take advantage of a larger number of events. Event type Probability per GEO mission Antenna or Solar Array Release 3.3% Other mechanical or thermal alignment problems 0.6% Other mechanisms, in service problems 1.3% Table 3-2 Case (iii) servicing event types (derived from [5]) The value of correcting such events with a servicing intervention mission varies from case to case. A review of reported insurance payments from [5] suggests that typically those events resulting in whole mission loss could imply a value for correction of the order of M. Lesser events such as stuck antennas could still imply a value of M depending on the degree of services lost. It was considered in early reviews of these event types that the basic appendage release category may itself not be particularly demanding from a robotic point of view. Typical actions could be the application of torques or cutting of release cables, if accessible. As a result this event type was thereafter considered to be potentially viable within the case (ii) near term servicing concept. This obviously puts an optimistic scenario on the case (ii) concept given the high probability and value of such events. 3.2 Technical Constraints and Solutions The technical challenges implied by the intervention cases have been addressed to determine plausible solutions and establish any fundamental limits to that which may be achieved. In this section both robotic and non-robotic solutions are identified for certain cases together with the identification of system issues and generation of ROM costs. An exhaustive review of technical constraints and potential solutions has been carried out for each phase in the mission of each of the intervention cases and event types identified in section 3.1. This concluded that there are only a few technical constraints and a few key design drivers and critical technologies identified for a GEO intervention mission. The most significant issues are the following: 3. the ability to safely capture a target satellite is constrained by the target satellite's dynamic behaviour, its shape and structure and the availability of solid capture and docking points, 4. the number of target satellites within a multiple target mission is technically limited by the OCS capability in terms of propellant mass and reasonable spacecraft reliability during mission design lifetime. Consideration should be given to the trade-off of transfer time and propellant mass for high Isp electric propulsion systems, 5. the ACS of ROGER has to be capable to control both the ROGER satellite and the tandem "ROGER plus target satellite" within all mission phases, 6. the ability to perform the intervention case (iii) and the related event types are constrained by the availability and capability of dextrous robotics, Page 15 of 42

26 7. the supervision, control and eventually tele-manipulation of ROGER from ground, especially during the close approach, capture and docking, taking into account the data turn-around latency for communication with GEO Capture Beginning with the capture, for at least intervention case (i): the target will be non co-operative, e.g. abandoned spacecraft, upper stages or other debris, given the premise from section 3-1 the target objects can be limited to low inclination satellites reaching the end of their operational lifetime, the attitude and the dynamic behaviour (residual spin rate, spin axis) of the target is not controlled. the capturing approach is assumed to differ for re-orbiting compared to the other cases in respect of the risk of damage to the target satellite. Whilst an in-orbit collision must be avoided at all times it is clear that a re-orbiting only mission could tolerate a more severe capture than a servicing mission. i.e. a capture process that resulted in physical contact with delicate surfaces on the target such as second surface mirrors and thermal blankets should be acceptable for re-orbiting purposes. The guiding principle should be no new debris generation. for the servicing cases (ii) and (iii) either some special manoeuvring with the target or some manipulation of mechanical fixtures will be necessary. Both of these activities can be assumed to diverge from the re-orbiting manoeuvre required for case (i). A number of non-robotic and robotic schemes have been reviewed for the capture phase. The non-robotic methods are the result of a deliberate exercise to generate some novel solutions and have in common the greater risk of damage to the target and have thus been excluded at the outset from case (i)b, (ii) and (iii). All solutions require considerable stand-off between the chaser and target to allow access past appendages on a possibly rotating target whilst still maintaining a safe separation of the target from the chaser body. Table 3-3 lists the basic capture options. Page 16 of 42

27 Mission type; Distinguishing features Constraint Case i) re-orbiting mission only Shooting Net, Expanding net directed at target with weights to wrap around the Bolas or a target and snare on barbs on the weight cords or net. Requires a combination new net for each target. Non rigid connection between chaser and target and with dynamic control problem for chaser. Modest cost, mass and volume. Difficult to test in 1g. Potentially complex ejection mechanism. Hinged hands or Inflatable hands or mechanical rakes hinged at shoulder on chaser rakes spacecraft. See Figure 3-1. The closing torque is applied from the shoulder and the inflatable structure or rakes are simply intended to grasp the target making use of uneven surfaces for grip. Many variants possible. Maybe difficult to guarantee retraction of arms at mission completion. Modest cost, low stowage volume. Octopus-tentacles Several rigid and articulated, or semi-rigid, tentacles to encircle the body of the target; see Figure 3-2. Requires surveillance to control alignment of tentacles away from target appendages. Simple joints without precise control requirements. A semi-rigid capture that allows for pushing or towing during re-orbiting. Modest cost. Mechanism testable in 1g, low mass. Robot arm with Highly mobile arm with a capture tool; see Figure 3-3. Must be simple endeffector access the apogee engine grappling point. similar scale to ERA, i.e. multi-jointed and 11m reach in order to Case ii) restoring service and Case iii) sophisticated servicing level Manipulator arm Robot arm with capture tool and additional tool set. Probably + universal heavier than ERA, capable to perform additional services. capturing tool Table 3-3 Summary of capture methods All solutions have some challenge concerning the motion of the target spacecraft after first contact by the capture equipment. The apogee engine expanding nozzle clamp appears to be relatively certain though requires precise initial alignment. The octopus solution should avoid divergence of the target position as the first contact will be from the tentacle tips and thus result in motion contained within the cage of the tentacles. Figure 3-1 Large inflatable hands or mechnical rakes Page 17 of 42

28 Jointed tentacles Deployed Boom Target Object Roger Space craft Figure 3-2 Capture of target using the Octopus tentacle solution Figure 3-3 Apogee engine coupling tool of ESS/T [9] The target object is most likely to be a satellite having previously adopted an Earth pointing mission and will also most likely have utilised some form of momentum bias for attitude stability. This presents an extra challenge for the capture phase, as this momentum bias will transfer into a body rate as the satellite becomes uncontrolled. This will result in a uniform rotation about the target s axis of greatest moment of inertia, i.e. a flat spin, with any nutation having been naturally damped by flexible modes in the target. The residual spin rate of a number of plausible targets has been assessed and is generally expected to be less than 1º/s. The implication for all forms of capture equipment is that spin rate matching between the chaser and the target will probably be necessary. Trade-off of the non-robotic and robotic capture concepts considered cost, maturity, development time, ease of testing and operational features such as appllicability to Page 18 of 42

29 different target types. The final selection favoured a non-robotic solution, the octopus tentacles, for the re-orbiting only case (i) on grounds of cost and simplicity. The baseline choice of an ERA scaled manipulator arm was made for cases (i)b, (ii) and (iii). The latter cases (ii) and (iii) are then distinguished, as far as the payload is concerned, by the need for more complex end effectors to perform the various servicing activities Mission profile The next most dominant trade-off is to define how many re-orbiting or servicing missions should be undertaken by a single ROGER spacecraft. This includes parameters such as the time and propellant required to perform the intervention and how rapidly the system can respond to a new requirement to re-orbit or service a client satellite. Within this assessment some assumptions must be made over the orbital distribution of targets. It is reasonable to assume that the target could be located anywhere in longitude terms although the finer distribution will approximate to that suggested in Figure 2-2. Given that the re-orbiting action will cause the longitude of the ROGER spacecraft to drift it is reasonable to assume a worst case need for longitude harmonisation between re-orbiting events of 180º. The rate at which longitude changes are accomplished will drive the propellant budget. The inclination of satellites requiring servicing are most likely to be low given that the majority of modern satellites are North South Station Kept missions. Uncontrolled objects however initially adopt an increasing inclination with time. Re-orbiting of objects with significant inclinations would be very costly for a ROGER spacecraft in propellant mass terms due to the plane changes involved. It has been noted in section 3-1 however, as a product of the hazard analysis that a workable strategy would be to limit re-orbiting to those targets just becoming uncontrolled at the end of their operational lives. In this case these objects are also likely to have a low inclination. Thus it is probable that a typical intervention mission will be required to make a combination of a longitude change and a small inclination harmonisation. The mass of propellant required over a multi-target mission and the time taken to perform such a mission can then be determined for a given propulsion system. A propellant mass efficient electric propulsion system such as an ion thruster will generally require longer transfer times than an impulsive bi-propellant system. This is illustrated in Table 3-4. Type and Number of Targets Mission duration (years, months) Monoprop Bi-prop Arcjet Ion thruster Valid for all intervention Concepts/ solutions non-robotic solution robotic solution First Target 3 m 4 m 4.5 m Each additional 2 m 3 m 3.5 m 10 Targets 1y 9m 2y 10m 3y 3m 20 Targets 3y 5m 5y 4m 6y 2m 30 Targets 5y 1m 7y 10m 9y 1m 40 Targets 6y 9m 10y 4m 12y Table 3-4 Estimated mission duration and repeat rates There is a strong cost advantage in selecting a high specific impulse electric propulsion system. Figure 3-4 shows the dependency of the ROGER mission costs of the number Page 19 of 42

30 of re-orbited target spacecraft. Trade-studies have also looked at the relative merits of Arcjets, ion thrusters and stationary plasma thrusters (SPT), some details of which are given in section 4. Figure 3-4 also usefully indicates the difference in system costs due to choice of payload type. The non-robotic Octopus tentacle solution is expected to be less expensive than a robotic manipulator and also considerably lighter, compounding the cost impacts. This result can readily be applied to distinguish case (i)a from cases (i)b, (ii) and (iii). Recurring Mission Cost [Mio. Euros] Bi-Propellant 300 Robotic Solution Ion Thrusters 200 Bi-Propellant Non-Robotic Solution Ion Thrusters Number of Targets Figure 3-4 Dependency of ROGER mission costs of the number of re-orbited target S/C Servicing specific topics The servicing missions comprise two broad categories: case (ii), those requiring docking and manoeuvring permanent docking, such as deployment from GTO or re-provision of AOCS facilities; case (iii), those requiring docking and manipulation of mechanical features on the target spacecraft. It is presumed, given the current maturity of robotic technology, that case (ii) missions are within reach of current mature technology and case (iii) are necessarily require significant technology development. Recall however the possibility that some relatively simple mechanical manipulations may be possible in the case (ii) timeframe. Costs and system architectures for case (ii) missions are in the first instance assumed to correspond well with the robotic solution for re-orbiting outlined in the previous section. Divergence is likely however for the following reasons: provision of permanent 3-axis control and station-keeping to remedy premature fuel exhaustion or AOCS failure is likely to be a single target mission; Page 20 of 42

31 recovery of a satellite from a failed deployment is likely to be very demanding in propulsion terms. This event category has been labelled transfer from GTO for convenience but this statistic in Table 3-1 is actually combined from launcher under-performance and spacecraft failures. Thus the design must be capable of a potentially very high delta V and also, to be useful, must be capable of delivery to orbit rapidly, requiring a dedicated launch and spacecraft available in ground storage; both of these mission categories are likely to require a rather stiffer connection between the servicing vehicle and target than can be afforded by a robotic manipulator and some form of semi-permanent coupling will be required; it is difficult to project total system costs for case (iii) missions though it is reasonable to assume that the potentially larger range of treatable event types may be of benefit in finding a cost effective application scenario System costs and summary Table 3-5 indicates the effective cost per target visited for non-robotic and robotic capture solutions. These missions correspond to cases (i)a and (i)b respectively and the robotic costs also apply as a lower bound first estimate to the costs of the case (ii) servicing missions. General characteristics of the spacecraft assumed in this solution are given in section 4. No. of ROM Cost per Target [Meuro] Targets Monoprop Bi-prop Arcjet Ion Non-robotic solution 20 First: 10.7 Recurring: First: 9.5 Recurring: 7.6 First: 7.4 Recurring: First: 8.5 Recurring: 6.7 First: 6.7 Recurring: 5.3 First: 8.3 Recurring: 6.4 First: 6.1 Recurring: First: 5.1 Recurring: First: 17.0 Recurring: Robotic solution First: 15.0 Recurring: 12.6 First: 11.9 Recurring: 10.2 First: 14.8 Recurring: 12.3 First: 10.4 Recurring: 8.7 no solution with launch mass within bounds of dedicated Ariane 5 launch to GTO Table 3-5 ROGER ROM cost per target To summarise the key points of this part of the study: 1. all re-orbiting and servicing missions appear to be basically technically plausible 2. the basic choice between deployable bulk grappling structures and local grappling device attached to a robotic arm basically relates to the cost and mass implications of the latter. It appears that non-robotic devices can offer a plausible means of capture and thus are the preferred solution for a re-orbiting mission where the consequences of superficial damage to the target object are minor; 3. case (ii) servicing missions will require a robotic manipulator 4. the propellant fraction of system mass is a significant design driver. The main trade off in propulsion technology is that of propellant mass against time to complete Page 21 of 42

32 each re-orbiting transfer and there are factors such as thruster lifetime and technology readiness to consider. Further significant issues include: 5. total system life is a significant issue limiting the cost effectiveness of any individual ROGER spacecraft. 6. generic GNC for ROGER is more complicated than typical space missions so inorbit validation for concepts and system elements is required. 7. generalised spacecraft designs attempting to meet many mission types such as for case (ii) and case (iii) may become over-designed for any one given task, thus reducing their cost-effectiveness. 3.3 Benefits Analysis An assessment has been made of the willingness to pay of various entities for each of the intervention concepts. These are compared with the event rates that drive the cases for re-orbiting and servicing. The potential costs of intervention missions suggested in the previous technical investigation are reflected in the plausibility arguments Concepts of beneficiaries, losses and willingness to pay The direct beneficiaries of a re-orbiting mission are primarily mission owners, whether private or public. Users, insurers and general public represent significant direct and indirect beneficiaries. The primary benefit being supplied is immunity against collision and thus the probability and magnitude of this loss are key factors. The probability of the loss has been given in section 2-5. The magnitude of loss can be expressed in terms of the asset costs, typically in the range M at launch or in terms of lost revenue. At the current time a review of the turnover of the 10 leading GEO satellite operators [10] suggests that the mean revenue per satellite is approximately 42M per annum per telecom satellite. It is believed that satellite operators in general regard the risk of in-orbit collision as low, at least in respect of the evidence of Table 2-1. The insurance industry does not appear to have taken much interest in this field and on the basis of the above estimates for probability and impact of a collision insurance premiums could be expected to be low. Presently there is no legal compulsion for satellite owners to re-orbit their satellites when no longer in use. There is no means of enforcement for the current IADC guideline that would create a market for a re-orbiting service such as ROGER. As a natural resource, governments have an interest in the management of GEO however the public, i.e. governments, are unlikely to pay for re-orbiting as the hazard is not sufficient to pose a significant threat to individual businesses or global trade in the time-scale studied. This assumes that until a collision actually occurs the likely-hood will be perceived low. It may actually take a collision resulting in litigation, perhaps because of one of the objects being owned by a commercial entity, to really stir public or government concern. The polluter pays principle could be seen as reason enough to strengthen re-orbiting guideline into an enforceable regulation. It is believed however that such a change is not likely in the foreseeable future and so a remaining option is for government investment to generate improved conditions for commercial market Page 22 of 42

33 3.3.2 Voluntary re-orbiting practice On the basis of Table 2-1 there are between 8 and 21 end of operational life events per annum, of which 30% may result in successful re-orbiting and perhaps an additional 30% at least attempted a re-orbiting manoeuvre. A re-orbiting manoeuvre to 300km above GEO requires energy equivalent to an 11ms -1 impulsive delta-v. On the basis that a typical North-South Station Keeping mission requires an annual delta-v budget of 45ms -1 per year just for inclination control it may be assumed that the re-orbiting manoeuvre costs the operator about a quarter of a year s revenue. When combined with mean revenue values this suggests that an operator sacrifices about 10M revenue to re-orbit each satellite. It is then a simple step to propose that a commercial re-orbiting service would be viable if it could price each re-orbiting mission at less than this value. A number of questions may be raised against such an argument, such as over the revenue estimate, the uncertainties in remaining propellant and the propulsion technology in use though this value is believed to be a reasonable benchmark at present and perhaps also for the foreseeable future. As a precaution the nature of the satellites recently being re-orbited was reviewed as a first estimate to future behaviour. For example, if a satellite suffered a major payload failure the operator could perform the re-orbiting at no further loss of revenue yet that case would bias the Table 2-1 statistics. Conversely a manoeuvring failure would prevent re-orbiting even if the operator could be supposed, through its track record, to have intended a re-orbiting. Finally, some operators who actually perform re-orbiting themselves at present are government organisations rather than commercial and thus may not have commercial pressures to continue revenue earning operation to the last possible moment. This review considered each end-of life event for the satellites contributing to the data in Table 2-1 and attempted to assess, by cross checking [4] and [5], whether there really had been a conscious sacrifice of station-keeping propellant in order to perform the reorbiting. This review concluded that between 16% and 44% of recent end of life events could be associated with a will to pay for re-orbiting. This is equivalent to between 2 and 6 opportunities for a ROGER mission per year. Recurring costs for a re-orbiting only mission are in the region of M for the hardware, launch and operations of a mission capable of re-orbiting targets. Consequently the cost per re-orbiting event, not including a margin for amortisation of development or the cost of capital, will be about 5-6M. The distribution of opportunities suggests that a single ROGER spacecraft could meet the demand Servicing The case (ii) intervention, near term servicing, is characterised by events that will very likely require a new ROGER spacecraft for each event. The most attractive servicing case appears to be replacement provision of attitude and orbit control functions on the basis of the frequency of events and the value of the remedy. Remedy of the type of failures that would allow the same servicing spacecraft to perform several missions appears limited, with current technology, due to the low number of such events. Page 23 of 42

34 The timeliness of response will improve the value of the single event type of mission and thus a joint re-orbiting and servicing mission could be considered. In this case a ROGER spacecraft would be launched into a re-orbiting role until such a time as an operating satellite suffered a manoeuvre related failure and then the ROGER spacecraft would be re-directed to remedy the situation. However there would only be a benefit to the re-orbiting programme if sufficient profits could be generated from the servicing mission to pay for the capital cost of the ROGER spacecraft, thus subsidising the fee to be charged for re-orbiting. It appears however that the cost of a servicing mission could be as much as 250M, given that a robotic payload is required. Thus the profit margin compared to the likely total loss value of the failed satellite will be quite slender, if at all positive. Thus it does not appear that there is a compelling argument for this form of servicing in its own right, particularly given the technical and commercial risks. The situation would improve slightly if many appendage release events could be solved with a general purpose manipulator and a small number of tools though it would be difficult to assess the proportion that was genuinely achievable. Thus the attraction of the Case (ii) servicing concept to assist in the operation of a re-orbiting programme is also not great. The case (iii) intervention, longer term servicing, is characterised by frequent and high value opportunities. If it may be reasonably assumed that all appendage release failures may be remedied by such a mission then there could be as many as 2 events per annum associated with insurance payments of the order of M. Thereafter the business model for case (iii) servicing are similar to case (ii) though there is a greater confidence in the availability of clients at a cost of higher technical risk and development effort. The possibility of more advanced servicing concepts such as refuelling and ORU exchange has been considered but not specifically evaluated, being outside the scope of the study and there being a lack of information on which to base a market size. Such concepts also suffer from the circular problem that it is difficult to assess the market size because it doesn t yet exist. There are however government initiatives in Europe, the US and Japan to progress the concept of in-orbit servicing and so this appears to be an area that should be monitored for developments Cost effectiveness of intervention for voluntary re-orbiting The only plausible commercial model appears to be that based on operators that already voluntarily re-orbit as a policy. The benchmark of effectiveness has been assumed to be that an operator sacrifices 10M in revenue in the act of a voluntary reorbiting. A key point is that there is considerable risk in this assumption, i.e. re-orbiting will be a high-risk business because of uncertainties over market depth. An entirely commercially funded mission must use this revenue to pay for the development of the technology and spacecraft design, the recurring costs of manufacturing successive ROGER spacecraft and the interest on the capital used to fund the venture. Thus it appears that the recurring cost per re-orbiting must actually be significantly lower than 10M and maybe rather lower than 5M after accounting for interest payments. The commercial model will thus only be plausible on the basis of revenue covering the cost of manufacture of successive ROGER spacecraft rather than the technology development and design activities that will precede the first commercial flight. The risks Page 24 of 42

35 in the commercial and technical aspects are also such that private investment is unlikely until the technology and business cases are better quantified. Government support is therefore required for development yet the public good case for re-orbiting is extremely long term. Some form of joint funding may be applicable in order to encourage private investment as the development programme gathers pace and interest is awakened amongst the operator community. 3.4 Summary and implications for an operational mission To summarise: 1. the plausibility of non-robotic capture methods and their apparent cost effectiveness suggests that this would be a desirable basis for a re-orbiting mission. It is assumed that a risk of modest, non debris-producing, damage exists; 2. the concept of using a servicing mission to generate greater revenues with which to subsidise re-orbiting appears limited by the higher cost of the servicing missions, driven in part by the need to use a robotic capture method; 3. operationally re-orbiting and servicing functions may be conveniently combined though significant engineering challenges present in servicing missions may also cause them to diverge technically from a pure re-orbiting mission; 4. the recommended way forward for the design of a reference mission is re-orbiting only based on a non-robotic capture method. Such a mission will re-orbit several expired satellites for which the owner is willing to pay a fee for the service. It appears that there is a small market for this activity though there is significant commercial risk in estimating the number of opportunities and fee that may be levied. It is important to note that this market is based on the observed trend of satellite operators to re-orbit satellites on a good citizen basis without the pressure of regulation and despite the apparently large financial sacrifice incurred. Current estimates suggest that this market has a chance of supporting the recurring hardware, launch and operating cost of a re-orbiting mission but not the development cost. It is therefore proposed that government sponsorship be sought for the development of the programme with commercial partners being encouraged later to join in investment in anticipation of the first operational mission The details of the transition from government development to commercial exploitation may be complex, particularly if there is no tidy boundary between orbital assets for the former or latter purposes, and some early consideration should be given to the appropriate form of Public Private Partnership for the implementation. Page 25 of 42

36 The following major assumptions and requirements were identified for the system design: Operational lifetime: up to 10 years Number of targets: approximately 30 Type of targets: GEO satellites having recently become uncontrolled Distribution of the targets: any longitude, low inclination Graveyard orbit: GEO + ~300 km Launcher compatibility: ARIANE 5 shared launch (baseline) Launch compatibility : GTO injection (7 inclination) Ground segment: Global coverage required. The mission profile is expected to comprise a deployment phase and then a mission cycle of 2-3 months for each target depending on the propulsion solution adopted. Each re-orbiting mission then consists of a ground guided phase a target acquired homing phase a final approach the grappling manoeuvre the transfer to graveyard orbit the return to GEO to begin a new ground guided phase. The translation of these requirements and assumptions into a reference solution is undertaken in the following section. Page 26 of 42

37 4 ROGER definition and development plan The aim of the third major study activity is to determine a reference solution, taking account of development issues, for a ROGER system meeting the requirements and scenario developed in section 3. The trade studies affecting critical items such as the grappling equipment, orbit transfer strategy and propulsion are described together with system budgets. The development cycle leading to the system implementation is described. 4.1 ROGER System Design Overview The ROGER spacecraft bus design is based on a new design rather than a current commercial GEO spacecraft bus primarily for ease of payload accommodation. It is shaped as an octagonal prism, with the telescopic payload boom mounted on the centre axis of the spacecraft. The solar generators are folded flat onto opposing surfaces of the bus, as are the tentacles of the octopus grappling equipment. The high specific impulse electric thrusters of the OCS system are mounted on the top surface of the bus. The launch configuration of the ROGER spacecraft design outside view is shown in Figure 4- Figure 4-1 ROGER spaceacraft configuration outside view Page 27 of 42

38 Stereo Cameras Star Trackers Gyro Assembly Tentacles TM/TC Hydrazine Tanks Battery Package PCDUs AOCS Control OBDHs Xenon Tanks Video TM/TC Figure 4-2 ROGER spacecraft configuration (cutaway view) In Figure 4-2 a cutaway view of the ROGER S/C configuration is depicted. It shows: hydrazine tanks for the ACS thrusters Xenon tanks for high specific impulse electric thrusters AOCS and OBDH command processing unit star trackers and the gyro sensors PCDU units and the battery packages video and command TMTC processing units stereo cameras Grappling Equipment Payload The principal payload element is the grappling equipment. The trade off for grappling equipment has lead to the adoption of a novel bulk capturing device dubbed the octopus tentacle solution, depicted in Figure 3-2. As a result of further design trades this is now defined by two main structural subsystems: telescopic boom subsystem tentacle subsystem The telescopic boom is mounted on the Roger spacecraft and supports the tentacles, which perform the grappling action. At the end of the deployment the tubular segments of the boom are locked to make the joints stiff and to eliminate all undesired play. The end section of the boom is not locked, but spring loaded and allowed to be pushed back into the larger section to guarantee a soft contact with the target-object. The baseline for the telescopic boom is a telescopic aluminium mast with spring-assisted deployment. Page 28 of 42

39 There are four tentacles of sufficient reach to encircle any potential target-object and they can be operated simultaneously or independently. The tentacles consist of tapered articulated fingers with a soft surface on the contact side. In the hinges, springs have been added to provide the required local grappling torque, while a number of redundant memory metal wires, which contract when heated electrically, provide the opening torque. In this way loss of contact (grip) during a power drop is prevented and no power is needed during the long towing phase. The example of grappling depicted in Figure 3-2 shows a target symbolically reduced to a sphere for clarity. It should be clear that the strength of this conceptual approach is that the tentacles may be orientated so as to close around the target body between appendages such as solar arrays and antennas. Storage of the Octopus tentacle system during launch is illustrated in Figure 4-3. The telescopic boom is shown collapsed within the body of the spacecraft and the tentacles are wrapped around the spacecraft body with extra joints used only for deployment. Joint 4 Joint 1 Joint 2 Envisaged hold-down point Joint Rendezvous and Capture concept Figure 4-3 ROGER Stowed configuration The worst case situation for the approach sequence of the ROGER S/C to its target is the flat spin condition of the target. As the operational momentum vector of momentum biased GEO spacecraft is orbit normal (see Figure 4-4), the final orientation of the spin axis of the object after attitude control has ceased is an orbit normal flat spin. Page 29 of 42

40 Figure 4-4 Transition of target from controlled status to flat spin The approach for rendezvous thus has to take place from northern or southern directions. This is illustrated in Figure 4-5. Prior to the grappling of the target, a kinematic synchronisation of the two spacecraft s motions must also be performed. Figure 4-5 Approach to a target in a flat spin Ranging, Guidance, Navigation and control There are two principal GNC problems to solve: gross acquisition of the target and manoeuvring in close proximity to the target. Page 30 of 42

41 The first problem is solved with the use of a sequence of absolute and relative position determination sensors for both the chaser and target satellites. Figure 4-6 illustrates the necessity of handing over from one sensor suite to another as the range closes. G/S Tracking (Range-R-R ate, NORAD)- intervall / absolute GPS GEO Position Sensor continuous / absolute Medium Range Cam era intervall / relative Medium Range Laser ToF Sensor continuous / relative Grappling Stereo Video System continuous / relative Short Range Laser Triangulation Sensor continuous / relative 873m 100m (TBC) 2m Target 1cm 10cm 5mm 10,000 1, log distance / [m] Figure 4-6 ROGER Position determination and data properties Operations close to the target will be supported by a video system. The video system is essential for the ground-based teleoperation of the grappling equipment. It allows for close proximity distance estimations by the operator. In the last phase of approach, the human operator on the ground will not be able to interact, because of the time delay in the communication between the ground station and the ROGER spacecraft. Therefore, the automatic short-range distance detection system has to be included. The focussing system for the camera lenses and for the adjustment of the two optical axes has to rely on an additional distance measurement system. The relative position sensors are laser based. Both signals are filtered and fed into the Guidance Controller, which commands the thruster controller of the AOCS system Propulsion issues The trade-off for the primary re-orbiting propulsion system is further refined leading to the preferred option of the use of a high thrust electric propulsion system. A high specific impulse electric propulsion system is the baseline with the dual purpose of initial deployment of the ROGER spacecraft from GTO to GEO, see figure 4-8 for the example of the SNECMA patented transfer method, in addition to the function of re-orbiting. The motivation for this choice is to reduce overall system mass and cost. An outstanding area of this trade-off to re-visit in the detailed design phase is that of the radiation environment experienced during the transfer phase. Page 31 of 42

42 Figure 4-7 SNECMA continuous thrust transfer strategy [11] The delta-v budget of the ROGER spacecraft is based on the following components: a worst case phasing capability of 180 in order to provide global service coverage, or an inclination harmonisation capability of approximately 0.7, which includes the NSSK per target, plus additional altitude manoeuvre capability during homing & final approach, plus the transfer to graveyard orbit with an assumed value of 11 m/s. And thus leaves scope for optimisation of target ordering according to inclination and longitude Other spacecraft details Other characteristics of the preferred reference solution are given in Table 4-1. Launch mass: 1,450 kg into GTO In-Orbit mass: 1,250 kg wet GEO, 920 kg dry GEO Launch dimensions: 2.7 x 2.7 x 2.9 m3 Deployed width: 17 m Launcher: Ariane 5 shared launch compatible Power: 4,300 W EoL from 32 m2 GaAs Solar Array TT&C: S Band Data downlink: S Band (2 Mbit/s) ACS: 24 mono-propellant hydrazine thrusters OCS: 4 electric thrusters for GTO - GEO transfer and re-orbiting Table 4-1 Key spacecraft parameters The high level mass breakdown is given in Table 4-2 Item mass (kg) Spacecraft bus (inc. margin) 800 Payload - grappling hardware (Inc margin) 100 Payload sensors and electronics 20 Propellant ACS Hydrazine 120 Propellant Re-orbiting Xenon 210 Propellant GTO-GEO transfer Xenon 200 Total 1450 Table 4-2 High level mass breakdown for the ROGER spacecraft Page 32 of 42

Space Debris Mitigation Status of China s Launch Vehicle

Space Debris Mitigation Status of China s Launch Vehicle Space Debris Mitigation Status of China s Launch Vehicle SONG Qiang (Beijing Institute of Aerospace Systems Engineering) Abstract: China s launch vehicle has being developed for more than 40 years. Various

More information

Miguel A. Aguirre. Introduction to Space. Systems. Design and Synthesis. ) Springer

Miguel A. Aguirre. Introduction to Space. Systems. Design and Synthesis. ) Springer Miguel A. Aguirre Introduction to Space Systems Design and Synthesis ) Springer Contents Foreword Acknowledgments v vii 1 Introduction 1 1.1. Aim of the book 2 1.2. Roles in the architecture definition

More information

Clean Space. A new cross-cutting initiative of ESA. The Clean Space Team 15/04/2013. ESA UNCLASSIFIED For Official Use

Clean Space. A new cross-cutting initiative of ESA. The Clean Space Team 15/04/2013. ESA UNCLASSIFIED For Official Use Clean Space A new cross-cutting initiative of ESA The Clean Space Team 15/04/2013 Index Introduction Clean Space Branch 3 Space debris mitigation Branch 4 Space debris remediation Implementation Conclusions

More information

CubeSat Integration into the Space Situational Awareness Architecture

CubeSat Integration into the Space Situational Awareness Architecture CubeSat Integration into the Space Situational Awareness Architecture Keith Morris, Chris Rice, Mark Wolfson Lockheed Martin Space Systems Company 12257 S. Wadsworth Blvd. Mailstop S6040 Littleton, CO

More information

Inter-Agency Space Debris Coordination Committee Space Debris Mitigation Guidelines Update

Inter-Agency Space Debris Coordination Committee Space Debris Mitigation Guidelines Update Inter-Agency Space Debris Coordination Committee (IADC) Inter-Agency Space Debris Coordination Committee Update 45 th Session of the Scientific and Technical Subcommittee United Nations Committee on the

More information

RECOMMENDATION ITU-R M.1167 * Framework for the satellite component of International Mobile Telecommunications-2000 (IMT-2000)

RECOMMENDATION ITU-R M.1167 * Framework for the satellite component of International Mobile Telecommunications-2000 (IMT-2000) Rec. ITU-R M.1167 1 RECOMMENDATION ITU-R M.1167 * Framework for the satellite component of International Mobile Telecommunications-2000 (IMT-2000) (1995) CONTENTS 1 Introduction... 2 Page 2 Scope... 2

More information

Agent Model of On-Orbit Servicing Based on Orbital Transfers

Agent Model of On-Orbit Servicing Based on Orbital Transfers Agent Model of On-Orbit Servicing Based on Orbital Transfers September 20, 2007 M. Richards, N. Shah, and D. Hastings Massachusetts Institute of Technology Agenda On-Orbit Servicing (OOS) Overview Model

More information

Design for Removal. Executive Summary Report

Design for Removal. Executive Summary Report ISSUE : 1 Page : 1/15 Design for Removal Executive Summary Report ESA STUDY CONTRACT REPORT ESA Contract No: 4000116081/15/NL/GL C/as SUBJECT: Design for Removal CONTRACTOR: Thales Alenia Space NAME OF

More information

This document is a preview generated by EVS

This document is a preview generated by EVS INTERNATIONAL STANDARD ISO 16164 First edition 2015-07-01 Space systems Disposal of satellites operating in or crossing Low Earth Orbit Systèmes spatiaux Disposition des satellites opérant dans ou à cheval

More information

Question 1: Do you have any comments on our approach to this review?:

Question 1: Do you have any comments on our approach to this review?: Question 1: Do you have any comments on our approach to this review?: Iridium supports Ofcom to take a long-term strategic approach to spectrum planning for space services. As operator of a global satellite

More information

Robotic Capture and De-Orbit of a Tumbling and Heavy Target from Low Earth Orbit

Robotic Capture and De-Orbit of a Tumbling and Heavy Target from Low Earth Orbit www.dlr.de Chart 1 Robotic Capture and De-Orbit of a Tumbling and Heavy Target from Low Earth Orbit Steffen Jaekel, R. Lampariello, G. Panin, M. Sagardia, B. Brunner, O. Porges, and E. Kraemer (1) M. Wieser,

More information

Relative Cost and Performance Comparison of GEO Space Situational Awareness Architectures

Relative Cost and Performance Comparison of GEO Space Situational Awareness Architectures Relative Cost and Performance Comparison of GEO Space Situational Awareness Architectures Background Keith Morris Lockheed Martin Space Systems Company Chris Rice Lockheed Martin Space Systems Company

More information

Leveraging Commercial Communication Satellites to support the Space Situational Awareness Mission Area. Timothy L. Deaver Americom Government Services

Leveraging Commercial Communication Satellites to support the Space Situational Awareness Mission Area. Timothy L. Deaver Americom Government Services Leveraging Commercial Communication Satellites to support the Space Situational Awareness Mission Area Timothy L. Deaver Americom Government Services ABSTRACT The majority of USSTRATCOM detect and track

More information

RFP No. 794/18/10/2017. Research Design and Implementation Requirements: Centres of Competence Research Project

RFP No. 794/18/10/2017. Research Design and Implementation Requirements: Centres of Competence Research Project RFP No. 794/18/10/2017 Research Design and Implementation Requirements: Centres of Competence Research Project 1 Table of Contents 1. BACKGROUND AND CONTEXT... 4 2. BACKGROUND TO THE DST CoC CONCEPT...

More information

Joint Industry Programme on E&P Sound and Marine Life - Phase III

Joint Industry Programme on E&P Sound and Marine Life - Phase III Joint Industry Programme on E&P Sound and Marine Life - Phase III Request for Proposals Number: JIP III-15-03 Long Term Fixed Acoustic Monitoring of Marine Mammals throughout the Life Cycle of an Offshore

More information

NEO Science and Human Space Activity. Mark V. Sykes Director, Planetary Science Institute Chair, NASA Small Bodies Assessment Group

NEO Science and Human Space Activity. Mark V. Sykes Director, Planetary Science Institute Chair, NASA Small Bodies Assessment Group 1 NEO Science and Human Space Activity Mark V. Sykes Director, Planetary Science Institute Chair, NASA Small Bodies Assessment Group Near-Earth Objects q

More information

Cover. DLR-ESA Workshop on ARTES-11. SGEO: Implementation of of Artes-11. Dr. Andreas Winkler

Cover. DLR-ESA Workshop on ARTES-11. SGEO: Implementation of of Artes-11. Dr. Andreas Winkler Cover DLR-ESA Workshop on ARTES-11 SGEO: Implementation of of Artes-11 Dr. Andreas Winkler June June29, 29, 2006 2006 Tegernsee, Tegernsee, Germany Germany Slide 1 Table Table of of Contents - Introduction

More information

Report of the Inter-Agency Space Debris Coordination Committee Activities on IADC Space Debris Mitigation Guidelines & Supporting Document

Report of the Inter-Agency Space Debris Coordination Committee Activities on IADC Space Debris Mitigation Guidelines & Supporting Document Inter-Agency Space Debris Coordination Committee Report of the Inter-Agency Space Debris Coordination Committee Activities on IADC Space Debris Mitigation Guidelines & Supporting Document Presented to:

More information

Strategic Research Cluster on Electric Propulsion H2020 Space call text 2016 & related Guidelines document

Strategic Research Cluster on Electric Propulsion H2020 Space call text 2016 & related Guidelines document Strategic Research Cluster on Electric Propulsion H2020 Space call text 2016 & related Guidelines document J. Gonzalez del Amo ESA - EPIC Coordinator H2020 International Space Information Day Warsaw, 29

More information

Airbus DS ESA Phase-0 L5 Spacecraft/Orbital Concept Overview. Emanuele Monchieri 6 th March 2017

Airbus DS ESA Phase-0 L5 Spacecraft/Orbital Concept Overview. Emanuele Monchieri 6 th March 2017 Airbus DS ESA Phase-0 L5 Spacecraft/Orbital Concept Overview Emanuele Monchieri 6 th March 2017 Airbus DS ESA Phase-0 L5 Spacecraft/Orbital Concept Overview Contents L5 Mission Outline Mission Concept

More information

EGS-CC. System Engineering Team. Commonality of Ground Systems. Executive Summary

EGS-CC. System Engineering Team. Commonality of Ground Systems. Executive Summary System Engineering Team Prepared: System Engineering Team Date: Approved: System Engineering Team Leader Date: Authorized: Steering Board Date: Restriction of Disclosure: The copyright of this document

More information

ACTIVITY OF RUSSIAN FEDERATION ON SPACE DEBRIS PROBLEM

ACTIVITY OF RUSSIAN FEDERATION ON SPACE DEBRIS PROBLEM FEDERAL SPACE AGENCY OF RUSSIA CENTRAL RESEARCH INSTITUTE OF MACHINE BUILDING ACTIVITY OF RUSSIAN FEDERATION ON SPACE DEBRIS PROBLEM 46-th session of the Scientific and Technical Subcommittee of the UN

More information

ISO INTERNATIONAL STANDARD. Space systems Space debris mitigation requirements. Systèmes spatiaux Exigences de mitigation des débris spatiaux

ISO INTERNATIONAL STANDARD. Space systems Space debris mitigation requirements. Systèmes spatiaux Exigences de mitigation des débris spatiaux INTERNATIONAL STANDARD ISO 24113 Second edition 2011-05-15 Space systems Space debris mitigation requirements Systèmes spatiaux Exigences de mitigation des débris spatiaux Reference number ISO 24113:2011(E)

More information

ARTES Competitiveness & Growth Full Proposal. Requirements for the Content of the Technical Proposal. Part 3B Product Development Plan

ARTES Competitiveness & Growth Full Proposal. Requirements for the Content of the Technical Proposal. Part 3B Product Development Plan ARTES Competitiveness & Growth Full Proposal Requirements for the Content of the Technical Proposal Part 3B Statement of Applicability and Proposal Submission Requirements Applicable Domain(s) Space Segment

More information

ESA PREPARATION FOR HUMAN LUNAR EXPLORATION. Scott Hovland European Space Agency, HME-HFH, ESTEC,

ESA PREPARATION FOR HUMAN LUNAR EXPLORATION. Scott Hovland European Space Agency, HME-HFH, ESTEC, ESA PREPARATION FOR HUMAN LUNAR EXPLORATION Scott Hovland European Space Agency, HME-HFH, ESTEC, Scott.Hovland@esa.int 1 Aurora Core Programme Outline Main goals of Core Programme: To establish set of

More information

ESA Human Spaceflight Capability Development and Future Perspectives International Lunar Conference September Toronto, Canada

ESA Human Spaceflight Capability Development and Future Perspectives International Lunar Conference September Toronto, Canada ESA Human Spaceflight Capability Development and Future Perspectives International Lunar Conference 2005 19-23 September Toronto, Canada Scott Hovland Head of Systems Unit, System and Strategy Division,

More information

Well Control Contingency Plan Guidance Note (version 2) 02 December 2015

Well Control Contingency Plan Guidance Note (version 2) 02 December 2015 Well Control Contingency Plan Guidance Note (version 2) 02 December 2015 Prepared by Maritime NZ Contents Introduction... 3 Purpose... 3 Definitions... 4 Contents of a Well Control Contingency Plan (WCCP)...

More information

Asteroid Redirect Mission and Human Exploration. William H. Gerstenmaier NASA Associate Administrator for Human Exploration and Operations

Asteroid Redirect Mission and Human Exploration. William H. Gerstenmaier NASA Associate Administrator for Human Exploration and Operations Asteroid Redirect Mission and Human Exploration William H. Gerstenmaier NASA Associate Administrator for Human Exploration and Operations Leveraging Capabilities for an Asteroid Mission NASA is aligning

More information

FIRST ACQUISITION OF THE SKYBRIDGE CONSTELLATION SATELLITES

FIRST ACQUISITION OF THE SKYBRIDGE CONSTELLATION SATELLITES FIRST ACQUISITION OF THE SKYBRIDGE CONSTELLATION SATELLITES Christine FERNANDEZ-MARTIN Pascal BROUSSE Eric FRAYSSINHES christine.fernandez-martin@cisi.fr pascal.brousse@cnes.fr eric.frayssinhes@space.alcatel.fr

More information

Space Debris Related Activities -Japanese Case-

Space Debris Related Activities -Japanese Case- 2013.02.11 IAF Workshop, UN/COPUOS Space Debris Related Activities -Japanese Case- Tetsuo Yasaka Kyushu University, Prof. Emeritus QPS Institute Notable Features Japan- 1. No significant fragmentation

More information

Flexibility for in Space Propulsion Technology Investment. Jonathan Battat ESD.71 Engineering Systems Analysis for Design Application Portfolio

Flexibility for in Space Propulsion Technology Investment. Jonathan Battat ESD.71 Engineering Systems Analysis for Design Application Portfolio Flexibility for in Space Propulsion Technology Investment Jonathan Battat ESD.71 Engineering Systems Analysis for Design Application Portfolio Executive Summary This project looks at options for investment

More information

world leader in capacity, performance and costefficiency.

world leader in capacity, performance and costefficiency. Boeing 702 Fleet 01PR 01507 High resolution image available here Satellite operators have responded enthusiastically to the vastly increased capabilities represented by the Boeing 702. Boeing Satellite

More information

Satellite collocation control strategy in COMS

Satellite collocation control strategy in COMS SpaceOps Conferences 16-20 May 2016, Daejeon, Korea SpaceOps 2016 Conference 10.2514/6.2016-2452 Satellite collocation control strategy in COMS Yoola Hwang *1 Electronics and Telecommunications Research

More information

Two Different Views of the Engineering Problem Space Station

Two Different Views of the Engineering Problem Space Station 1 Introduction The idea of a space station, i.e. a permanently habitable orbital structure, has existed since the very early ideas of spaceflight itself were conceived. As early as 1903 the father of cosmonautics,

More information

Understand that technology has different levels of maturity and that lower maturity levels come with higher risks.

Understand that technology has different levels of maturity and that lower maturity levels come with higher risks. Technology 1 Agenda Understand that technology has different levels of maturity and that lower maturity levels come with higher risks. Introduce the Technology Readiness Level (TRL) scale used to assess

More information

National Aeronautics and Space Administration Jet Propulsion Laboratory California Institute of Technology

National Aeronautics and Space Administration Jet Propulsion Laboratory California Institute of Technology QuikSCAT Mission Status QuikSCAT Follow-on Mission 2 QuikSCAT instrument and spacecraft are healthy, but aging June 19, 2009 will be the 10 year launch anniversary We ve had two significant anomalies during

More information

Technologies and Prospects of the H-IIB Launch Vehicle

Technologies and Prospects of the H-IIB Launch Vehicle 63 Technologies and Prospects of the H-IIB Launch Vehicle KOKI NIMURA *1 KATSUHIKO AKIYAMA *2 KENJI EGAWA *3 TAKUMI UJINO *4 TOSHIAKI SATO *5 YOUICHI OOWADA *6 The Flight No. 3 H-IIB launch vehicle carrying

More information

EXPLORATION DEVELOPMENT OPERATION CLOSURE

EXPLORATION DEVELOPMENT OPERATION CLOSURE i ABOUT THE INFOGRAPHIC THE MINERAL DEVELOPMENT CYCLE This is an interactive infographic that highlights key findings regarding risks and opportunities for building public confidence through the mineral

More information

SPACE. (Some space topics are also listed under Mechatronic topics)

SPACE. (Some space topics are also listed under Mechatronic topics) SPACE (Some space topics are also listed under Mechatronic topics) Dr Xiaofeng Wu Rm N314, Bldg J11; ph. 9036 7053, Xiaofeng.wu@sydney.edu.au Part I SPACE ENGINEERING 1. Vision based satellite formation

More information

Space Situational Awareness 2015: GPS Applications in Space

Space Situational Awareness 2015: GPS Applications in Space Space Situational Awareness 2015: GPS Applications in Space James J. Miller, Deputy Director Policy & Strategic Communications Division May 13, 2015 GPS Extends the Reach of NASA Networks to Enable New

More information

TECHNICAL AND OPERATIONAL NOTE ON CHANGE MANAGEMENT OF GAMBLING TECHNICAL SYSTEMS AND APPROVAL OF THE SUBSTANTIAL CHANGES TO CRITICAL COMPONENTS.

TECHNICAL AND OPERATIONAL NOTE ON CHANGE MANAGEMENT OF GAMBLING TECHNICAL SYSTEMS AND APPROVAL OF THE SUBSTANTIAL CHANGES TO CRITICAL COMPONENTS. TECHNICAL AND OPERATIONAL NOTE ON CHANGE MANAGEMENT OF GAMBLING TECHNICAL SYSTEMS AND APPROVAL OF THE SUBSTANTIAL CHANGES TO CRITICAL COMPONENTS. 1. Document objective This note presents a help guide for

More information

The Response of Motorola Ltd. to the. Consultation on Spectrum Commons Classes for Licence Exemption

The Response of Motorola Ltd. to the. Consultation on Spectrum Commons Classes for Licence Exemption The Response of Motorola Ltd to the Consultation on Spectrum Commons Classes for Licence Exemption Motorola is grateful for the opportunity to contribute to the consultation on Spectrum Commons Classes

More information

INCREASING NETWORK CAPACITY BY OPTIMISING VOLTAGE REGULATION ON MEDIUM AND LOW VOLTAGE FEEDERS

INCREASING NETWORK CAPACITY BY OPTIMISING VOLTAGE REGULATION ON MEDIUM AND LOW VOLTAGE FEEDERS INCREASING NETWORK CAPACITY BY OPTIMISING VOLTAGE REGULATION ON MEDIUM AND LOW VOLTAGE FEEDERS Carter-Brown Clinton Eskom Distribution - South Africa cartercg@eskom.co.za Gaunt CT University of Cape Town

More information

Nanosat Deorbit and Recovery System to Enable New Missions

Nanosat Deorbit and Recovery System to Enable New Missions SSC11-X-3 Nanosat Deorbit and Recovery System to Enable New Missions Jason Andrews, Krissa Watry, Kevin Brown Andrews Space, Inc. 3415 S. 116th Street, Ste 123, Tukwila, WA 98168, (206) 342-9934 jandrews@andrews-space.com,

More information

Design for Affordability in Complex Systems and Programs Using Tradespace-based Affordability Analysis

Design for Affordability in Complex Systems and Programs Using Tradespace-based Affordability Analysis Design for Affordability in Complex Systems and Programs Using Tradespace-based Affordability Analysis Marcus S. Wu, Adam M. Ross, and Donna H. Rhodes Massachusetts Institute of Technology March 21 22,

More information

launch probability of success

launch probability of success Using Architecture Models to Understand Policy Impacts Utility 1 0.995 0.99 Policy increases cost B C D 10 of B-TOS architectures have cost increase under restrictive launch policy for a minimum cost decision

More information

Official Journal of the European Union L 21/15 COMMISSION

Official Journal of the European Union L 21/15 COMMISSION 25.1.2005 Official Journal of the European Union L 21/15 COMMISSION COMMISSION DECISION of 17 January 2005 on the harmonisation of the 24 GHz range radio spectrum band for the time-limited use by automotive

More information

Mission Applications for Space A&R - G.Visentin 1. Automation and Robotics Section (TEC-MMA)

Mission Applications for Space A&R - G.Visentin 1. Automation and Robotics Section (TEC-MMA) In the proceedings of the 8th ESA Workshop on Advanced Space Technologies for Robotics and Automation 'ASTRA 2004' ESTEC, Noordwijk, The Netherlands, November 2-4, 2004 Gianfranco Visentin Head, Automation

More information

Response of Boeing UK Limited. UK Ofcom Call for Input 3.8 GHz to 4.2 GHz Band: Opportunities for Innovation 9 June 2016

Response of Boeing UK Limited. UK Ofcom Call for Input 3.8 GHz to 4.2 GHz Band: Opportunities for Innovation 9 June 2016 Response of Boeing UK Limited UK Ofcom Call for Input 3.8 GHz to 4.2 GHz Band: Opportunities for Innovation 9 June 2016 Introduction Boeing UK Limited (Boeing) is pleased to respond to Ofcom s Call for

More information

Electronic Communications Committee (ECC) within the European Conference of Postal and Telecommunications Administrations (CEPT)

Electronic Communications Committee (ECC) within the European Conference of Postal and Telecommunications Administrations (CEPT) Page 1 Electronic Communications Committee (ECC) within the European Conference of Postal and Telecommunications Administrations (CEPT) ECC RECOMMENDATION (06)04 USE OF THE BAND 5 725-5 875 MHz FOR BROADBAND

More information

Large Deployable Reflector on Engineering Test Satellite VIII

Large Deployable Reflector on Engineering Test Satellite VIII Large Deployable Reflector on Engineering Test Satellite VIII Japan Aerospace Exploration Agency Space Applications Mission Directorate Satoru OZAWA 1 Today s Talk Large Deployable Reflector (LDR) What

More information

Perspectives of development of satellite constellations for EO and connectivity

Perspectives of development of satellite constellations for EO and connectivity Perspectives of development of satellite constellations for EO and connectivity Gianluca Palermo Sapienza - Università di Roma Paolo Gaudenzi Sapienza - Università di Roma Introduction - Interest in LEO

More information

General Support Technology Programme (GSTP) Period 6 Element 3: Technology Flight Opportunities (TFO)

General Support Technology Programme (GSTP) Period 6 Element 3: Technology Flight Opportunities (TFO) General Support Technology Programme (GSTP) Period 6 Element 3: Technology Flight Opportunities (TFO) Open Call for Technology Flight Demonstrators and Carrier Flight Opportunities Introduction The Agency

More information

Gerald G. Boyd, Tom D. Anderson, David W. Geiser

Gerald G. Boyd, Tom D. Anderson, David W. Geiser THE ENVIRONMENTAL MANAGEMENT PROGRAM USES PERFORMANCE MEASURES FOR SCIENCE AND TECHNOLOGY TO: FOCUS INVESTMENTS ON ACHIEVING CLEANUP GOALS; IMPROVE THE MANAGEMENT OF SCIENCE AND TECHNOLOGY; AND, EVALUATE

More information

WHAT IS A CUBESAT? DragonSat-1 (1U CubeSat)

WHAT IS A CUBESAT? DragonSat-1 (1U CubeSat) 1 WHAT IS A CUBESAT? Miniaturized satellites classified according to height (10-30 cm) Purpose is to perform small spacecraft experiments. Use has increased due to relatively low cost DragonSat-1 (1U CubeSat)

More information

Extract of Advance copy of the Report of the International Conference on Chemicals Management on the work of its second session

Extract of Advance copy of the Report of the International Conference on Chemicals Management on the work of its second session Extract of Advance copy of the Report of the International Conference on Chemicals Management on the work of its second session Resolution II/4 on Emerging policy issues A Introduction Recognizing the

More information

STRATEGIC CHOICES FOR SMALL AND MIDDLE POWERS

STRATEGIC CHOICES FOR SMALL AND MIDDLE POWERS Chapter Five STRATEGIC CHOICES FOR SMALL AND MIDDLE POWERS SPACE DEVELOPMENT IN KOREA Hong-Yul Paik, Director, Satellite Operation Center, Korea Aerospace Research Institute, South Korea Korea is a young

More information

GALILEO Research and Development Activities. Second Call. Area 1B. Interference Detection Mitigation and Isolation.

GALILEO Research and Development Activities. Second Call. Area 1B. Interference Detection Mitigation and Isolation. GALILEO Research and Development Activities Second Call Area 1B Interference Detection Mitigation and Isolation Statement of Work Rue du Luxembourg, 3 B 1000 Brussels Tel +32 2 507 80 00 Fax +32 2 507

More information

Launchers. News from. Europe s Spaceport. 70 esa bulletin november

Launchers. News from. Europe s Spaceport. 70 esa bulletin november Launchers News from 70 esa bulletin 112 - november 2002 www.esa.int Fernando Doblas Head of the Kourou Office, ESA Directorate of Launchers, French Guiana Introduction Since 1975, the availability of an

More information

Dream Chaser for European Utilization (DC 4 EU):

Dream Chaser for European Utilization (DC 4 EU): 54th European Space Science Committee Plenary Meeting 22-24 November 2017 German Aerospace Centre DLR Obepfaffenhofen, Germany Presenter: Dr. Marco Berg Dream Chaser for European Utilization (DC 4 EU):

More information

Focusing Software Education on Engineering

Focusing Software Education on Engineering Introduction Focusing Software Education on Engineering John C. Knight Department of Computer Science University of Virginia We must decide we want to be engineers not blacksmiths. Peter Amey, Praxis Critical

More information

UNECE Comments to the draft 2007 Petroleum Reserves and Resources Classification, Definitions and Guidelines.

UNECE Comments to the draft 2007 Petroleum Reserves and Resources Classification, Definitions and Guidelines. UNECE Comments to the draft 2007 Petroleum Reserves and Resources Classification, Definitions and Guidelines. Page 1 of 13 The Bureau of the UNECE Ad Hoc Group of Experts (AHGE) has carefully and with

More information

RRS-17 Africa Forum Emerging Innovative Technologies

RRS-17 Africa Forum Emerging Innovative Technologies RRS-17 Africa Forum Emerging Innovative Technologies Ababacar Gaye Intelsat, Principal Customer Solutions Engineer March 31, 2017 Dakar, Senegal 1 2 A growing and innovative satellite industry Launchers

More information

Comments of Shared Spectrum Company

Comments of Shared Spectrum Company Before the DEPARTMENT OF COMMERCE NATIONAL TELECOMMUNICATIONS AND INFORMATION ADMINISTRATION Washington, D.C. 20230 In the Matter of ) ) Developing a Sustainable Spectrum ) Docket No. 181130999 8999 01

More information

OWA Floating LiDAR Roadmap Supplementary Guidance Note

OWA Floating LiDAR Roadmap Supplementary Guidance Note OWA Floating LiDAR Roadmap Supplementary Guidance Note List of abbreviations Abbreviation FLS IEA FL Recommended Practices KPI OEM OPDACA OSACA OWA OWA FL Roadmap Meaning Floating LiDAR System IEA Wind

More information

End-to-End Simulation and Verification of Rendezvous and Docking/Berthing Systems using Robotics

End-to-End Simulation and Verification of Rendezvous and Docking/Berthing Systems using Robotics Session 9 Special Test End-to-End Simulation and Verification of Rendezvous and Docking/Berthing Systems using Robotics Author(s): H. Benninghoff, F. Rems, M. Gnat, R. Faller, R. Krenn, M. Stelzer, B.

More information

ARTES Competitiveness & Growth Full Proposal. Requirements for the Content of the Technical Proposal

ARTES Competitiveness & Growth Full Proposal. Requirements for the Content of the Technical Proposal ARTES Competitiveness & Growth Full Proposal Requirements for the Content of the Technical Proposal Part 3C (DDVP) Statement of Applicability and Proposal Submission Requirements Applicable Domain(s) Space

More information

Electric Solar Wind Sail tether payloads onboard CubeSats

Electric Solar Wind Sail tether payloads onboard CubeSats Electric Solar Wind Sail tether payloads onboard CubeSats Jouni Envall, Petri Toivanen, Pekka Janhunen Finnish Meteorological Institute, Helsinki, Finland (jouni.envall@fmi.fi) Outline E-sail & Coulomb

More information

Geoff Brown & Associates Ltd

Geoff Brown & Associates Ltd Geoff Brown & Associates Ltd REVIEW OF WESTERN POWER S APPLICATION FOR A TECHNICAL RULES EXEMPTION FOR NEWMONT MINING SERVICES Prepared for ECONOMIC REGULATION AUTHORITY Final 20 August 2015 Report prepared

More information

UNIT-III LIFE-CYCLE PHASES

UNIT-III LIFE-CYCLE PHASES INTRODUCTION: UNIT-III LIFE-CYCLE PHASES - If there is a well defined separation between research and development activities and production activities then the software is said to be in successful development

More information

Solar Power Satellite, Space Elevator, and Reusable Launch

Solar Power Satellite, Space Elevator, and Reusable Launch AIAA-2010-791690 Solar Power Satellite, Space Elevator, and Reusable Launch Dr. James A. Martin Consultant, Associate Editor JSR Space 2010 Conference Anaheim, CA August 30, 2010 Solar Power Satellites

More information

Implementing the International Safety Framework for Space Nuclear Power Sources at ESA Options and Open Questions

Implementing the International Safety Framework for Space Nuclear Power Sources at ESA Options and Open Questions Implementing the International Safety Framework for Space Nuclear Power Sources at ESA Options and Open Questions Leopold Summerer, Ulrike Bohlmann European Space Agency European Space Agency (ESA) International

More information

Systematic space debris collection using Cubesat constellation

Systematic space debris collection using Cubesat constellation EUCASS 2017 Systematic space debris collection using Cubesat constellation Romain Lucken Co-founder of Share My Space PhD student at LPP, CNRS/Ecole polytechnique Damien Giolito July 4th 2017, Politecnico

More information

The Response from Motorola Ltd. to the Consultation on The Licence-Exemption Framework Review

The Response from Motorola Ltd. to the Consultation on The Licence-Exemption Framework Review The Response from Motorola Ltd. to the Consultation on The Licence-Exemption Framework Review June 21 st 2007. Key Points 1. The introduction of the concept of a version of Commons in which the possible

More information

Satellite Fleet Operations Using a Global Ground Station Network

Satellite Fleet Operations Using a Global Ground Station Network Satellite Fleet Operations Using a Global Ground Station Network Naomi Kurahara Infostellar, naomi@istellar.jp ABSTRACT Satellite operation policy and ground system architecture are changing due to the

More information

SPACE. DG GROW Internal Market, Industry Entrepreneurship and SMEs GROW/I1 - Space Policy and Research Unit

SPACE. DG GROW Internal Market, Industry Entrepreneurship and SMEs GROW/I1 - Space Policy and Research Unit 1 SPACE DG GROW Internal Market, Industry Entrepreneurship and SMEs GROW/I1 - Policy and Research Unit mario.amaral@ec.europa.eu Lisbon, 14-15 September 2016 2017 call topics Competitiveness of the European

More information

Response to Ofcom s Consultation on Administrative Incentive Pricing

Response to Ofcom s Consultation on Administrative Incentive Pricing Response to Ofcom s Consultation on Administrative Incentive Pricing Background 1. The RadioCentre formed in July 2006 from the merger of the Radio Advertising Bureau (RAB) and the Commercial Radio Companies

More information

Workshop on Intelligent System and Applications (ISA 17)

Workshop on Intelligent System and Applications (ISA 17) Telemetry Mining for Space System Sara Abdelghafar Ahmed PhD student, Al-Azhar University Member of SRGE Workshop on Intelligent System and Applications (ISA 17) 13 May 2017 Workshop on Intelligent System

More information

NEW TECHNOLOGIES. Philippe Francken. WSRF 2012, Dubai 1

NEW TECHNOLOGIES. Philippe Francken. WSRF 2012, Dubai 1 NEW TECHNOLOGIES Philippe Francken 1 Introduction Insertion of new technologies in space systems is not a goal in itself, but needs to be viewed within the broader context of innovation the ultimate objective

More information

Is housing really ready to go digital? A manifesto for change

Is housing really ready to go digital? A manifesto for change Is housing really ready to go digital? A manifesto for change December 2016 The UK housing sector is stuck in a technology rut. Ubiquitous connectivity, machine learning and automation are transforming

More information

35th AIAA ICSSC Colloquium: High Throughput Satellite (HTS) Broadband Opportunities: Orbits, Architectures, Interference and Markets

35th AIAA ICSSC Colloquium: High Throughput Satellite (HTS) Broadband Opportunities: Orbits, Architectures, Interference and Markets 35th AIAA ICSSC Colloquium: High Throughput Satellite (HTS) Broadband Opportunities: Orbits, Architectures, Interference and Markets Trieste, October 16, 2017 What are the Challenges? 30min Talk Glyn Thomas

More information

SHTG primary submission process

SHTG primary submission process Meeting date: 24 April 2014 Agenda item: 8 Paper number: SHTG 14-16 Title: Purpose: SHTG primary submission process FOR INFORMATION Background The purpose of this paper is to update SHTG members on developments

More information

Air Force Institute of Technology. A CubeSat Mission for Locating and Mapping Spot Beams of GEO Comm-Satellites

Air Force Institute of Technology. A CubeSat Mission for Locating and Mapping Spot Beams of GEO Comm-Satellites Air Force Institute of Technology A CubeSat Mission for Locating and Mapping Spot Beams of GEO Comm-Satellites Lt. Jake LaSarge PI: Dr. Jonathan Black Dr. Brad King Dr. Gary Duke August 9, 2015 1 Outline

More information

Intermediate Systems Acquisition Course. Lesson 2.2 Selecting the Best Technical Alternative. Selecting the Best Technical Alternative

Intermediate Systems Acquisition Course. Lesson 2.2 Selecting the Best Technical Alternative. Selecting the Best Technical Alternative Selecting the Best Technical Alternative Science and technology (S&T) play a critical role in protecting our nation from terrorist attacks and natural disasters, as well as recovering from those catastrophic

More information

The Preliminary Risk Analysis Approach: Merging Space and Aeronautics Methods

The Preliminary Risk Analysis Approach: Merging Space and Aeronautics Methods The Preliminary Risk Approach: Merging Space and Aeronautics Methods J. Faure, A. Cabarbaye & R. Laulheret CNES, Toulouse,France ABSTRACT: Based on space industry but also on aeronautics methods, we will

More information

INTELLECTUAL PROPERTY (IP) SME SCOREBOARD 2016

INTELLECTUAL PROPERTY (IP) SME SCOREBOARD 2016 www.euipo.europa.eu INTELLECTUAL PROPERTY (IP) SME SCOREBOARD 2016 Executive Summary JUNE 2016 www.euipo.europa.eu INTELLECTUAL PROPERTY (IP) SME SCOREBOARD 2016 Commissioned to GfK Belgium by the European

More information

INTELLECTUAL PROPERTY (IP) SME SCOREBOARD 2016

INTELLECTUAL PROPERTY (IP) SME SCOREBOARD 2016 www.euipo.europa.eu INTELLECTUAL PROPERTY (IP) SME SCOREBOARD 2016 Executive Summary JUNE 2016 www.euipo.europa.eu INTELLECTUAL PROPERTY (IP) SME SCOREBOARD 2016 Commissioned to GfK Belgium by the European

More information

OVERVIEW ON 2010 SPACE DEBRIS ACTIVITIES IN FRANCE F.ALBY

OVERVIEW ON 2010 SPACE DEBRIS ACTIVITIES IN FRANCE F.ALBY OVERVIEW ON 2010 SPACE DEBRIS ACTIVITIES IN FRANCE F.ALBY SUMMARY Atmospheric reentries End of life operations Collision risk monitoring French Space Act Space debris measurements Important meetings 1-ATMOSPHERIC

More information

APPENDIX B. Anti-satellite Weapons Geoffrey Forden. Laser Attacks against Satellites

APPENDIX B. Anti-satellite Weapons Geoffrey Forden. Laser Attacks against Satellites Appendices 75 APPENDIX B Anti-satellite Weapons Geoffrey Forden Laser Attacks against Satellites In the past, both the United States and Russia have considered using lasers in missile defense systems.

More information

CCTF Working Group on coordination of the development of advanced time and frequency transfer techniques (WG ATFT)

CCTF Working Group on coordination of the development of advanced time and frequency transfer techniques (WG ATFT) CCTF/12-43 CCTF Working Group on coordination of the development of advanced time and frequency transfer techniques (WG ATFT) Report to the19th meeting of the Consultative Committee for Time and Frequency,

More information

Tropnet: The First Large Small-Satellite Mission

Tropnet: The First Large Small-Satellite Mission Tropnet: The First Large Small-Satellite Mission SSC01-II4 J. Smith One Stop Satellite Solutions 1805 University Circle Ogden Utah, 84408-1805 (801) 626-7272 jay.smith@osss.com Abstract. Every small-satellite

More information

NASA Ground and Launch Systems Processing Technology Area Roadmap

NASA Ground and Launch Systems Processing Technology Area Roadmap The Space Congress Proceedings 2012 (42nd) A New Beginning Dec 7th, 8:30 AM NASA Ground and Launch Systems Processing Technology Area Roadmap Nancy Zeitlin presenter Gregory Clements KSC Barbara Brown

More information

PLATO Preliminary Requirements Review Technical Report

PLATO Preliminary Requirements Review Technical Report PLATO Preliminary Requirements Review Technical Report Prepared by Review Team Reference SRE-F/2013.075/ Issue 1 Revision 1 Date of Issue 16/12/2013 Status Issued Document Type Distribution Title Issue

More information

INTRODUCTION The validity of dissertation Object of investigation Subject of investigation The purpose: of the tasks The novelty:

INTRODUCTION The validity of dissertation Object of investigation Subject of investigation The purpose: of the tasks The novelty: INTRODUCTION The validity of dissertation. According to the federal target program "Maintenance, development and use of the GLONASS system for 2012-2020 years the following challenges were determined:

More information

A Systems Approach to Select a Deployment Scheme to Minimize Re-contact When Deploying Many Satellites During One Launch Mission

A Systems Approach to Select a Deployment Scheme to Minimize Re-contact When Deploying Many Satellites During One Launch Mission A Systems Approach to Select a Deployment Scheme to Minimize Re-contact When Deploying Many Satellites During One Launch Mission Steven J. Buckley, Volunteer Emeritus, Air Force Research Laboratory Bucklesjs@aol.com,

More information

Predictive Assessment for Phased Array Antenna Scheduling

Predictive Assessment for Phased Array Antenna Scheduling Predictive Assessment for Phased Array Antenna Scheduling Randy Jensen 1, Richard Stottler 2, David Breeden 3, Bart Presnell 4, Kyle Mahan 5 Stottler Henke Associates, Inc., San Mateo, CA 94404 and Gary

More information

An Evaluation of CubeSat Orbital Decay

An Evaluation of CubeSat Orbital Decay SSC11-VII-2 An Evaluation of CubeSat Orbital Decay AGI s Center for Space Stds &Innovation CEO, 1Earth Research Dan Oltrogge SRI International, Inc. Kyle Leveque Contents The CubeSat Historical Manifest

More information

debris manoeuvre by photon pressure

debris manoeuvre by photon pressure Satellite target for demonstration of space debris manoeuvre by photon pressure Benjamin Sheard EOS Space Systems Pty. Ltd. / Space Environment Research Centre Space Environment Research Centre (SERC):

More information

The largest satellite, the largest threat:

The largest satellite, the largest threat: The largest satellite, the largest threat: potential fault liability in the collision with Envisat. China University of Politic a l Science and Law Sh a n g We iw e i Cyclone Nargis: captured by Envisat

More information

ARGUING THE SAFETY OF MACHINE LEARNING FOR HIGHLY AUTOMATED DRIVING USING ASSURANCE CASES LYDIA GAUERHOF BOSCH CORPORATE RESEARCH

ARGUING THE SAFETY OF MACHINE LEARNING FOR HIGHLY AUTOMATED DRIVING USING ASSURANCE CASES LYDIA GAUERHOF BOSCH CORPORATE RESEARCH ARGUING THE SAFETY OF MACHINE LEARNING FOR HIGHLY AUTOMATED DRIVING USING ASSURANCE CASES 14.12.2017 LYDIA GAUERHOF BOSCH CORPORATE RESEARCH Arguing Safety of Machine Learning for Highly Automated Driving

More information