Z1035, Z1036, & Z1903 FLOOR DRAIN & CLEANOUT INSTALLATION STABILIZER

Similar documents
EZ1 TM CLEANOUT SERIES EZ1 TM FLOOR CLEANOUT INSTALLATION INSTRUCTIONS

EZ1 TM DRAINAGE SERIES EZ1 TM SLAB ON GRADE FLOOR DRAIN INSTALLATION INSTRUCTIONS

Product Guide Specification

INSTALLATION INSTRUCTIONS INSTALLATION INSTRUCTIONS

INSTALLATION INSTRUCTIONS

BASEBALL FOUL POLES GROUND SLEEVE MOUNTED

Riser Extension INSTALLATION GUIDE 40100AX35 / 40100AX18. Manual 40100X35-8

STEP 1 STEP 2 LEVELER KIT OPTION MOBILE CASTER KIT OPTION

Installation Instructions

3. Use base plate as template (see FIG. 4-1) to mark location for fasteners.

MM700R Recess Box Kit Addendum

FITS MUSTEE 32 X 32 SHOWER RECEPTOR

ProBuilder Linear CoolSmart TV (42PB - sku# )(54PB - sku# )(72PB - sku# )

MALEKO WALL-MOUNT FAUCET INSTALLATION

New Product Release: October 2014 Boone Racks

Installation Instruction

SERIES 4070-T GENERAL ASSEMBLY AND INSTALLATION INSTRUCTIONS

ProBuilder Series CoolSmart TV (42PB - sku# )(54PB - sku# )(72PB - sku# )

Pocket Door Kit PD1 / PD2 Installation Instructions. Kit Contents.

This product is designed for a water supply pressure range of 20 psi (137kPa) minimum to 80psi (550 kpa) maximum.

TYPHOON ASSEMBLY AND INSTALLATION INSTRUCTIONS

INGROUND COVER INSTALLATION GUIDE

Assembly Instructions

Vinyl Gazebo Instructions

Installation Instructions

Geberit Duofix. Installation Manual Montageanleitung Instructions de montage Istruzioni per il montaggio

Installation Instructions

TURBOTWISTER ASSEMBLY AND INSTALLATION INSTRUCTIONS

E N G L I S H GARDEN SHED. Assembly Instructions. Suitable for Models WITH VARYING DEPTHS

WILLIS WALL-MOUNT FAUCET INSTALLATION

WALL TO FABRICATED FLOOR

27693 Trend Podium Desk

Thank you for purchasing out product! *Please read these instructions and follow them step by step. *

Thru Wall Floor Seals For New Installation

BEST PRACTICE GUIDE. Socket Bases. Working with Concrete Slabs

Installation of Balustrade Systems

BARRIER FREE SHOWER PAN INSTALLATION INSTRUCTIONS

DURASTALL SHOWER STALL ASSEMBLY INSTALLATION REPAIR PARTS FOR ONE OF THE FOLLOWING MODELS:

P a r k c o n s o l e s i n k a s s e m b l y i n s t r u c t i o n s

ROTUNDA WALL-MOUNT FAUCET INSTALLATION

Installation Instructions

INSTALLATION GUIDE. StreamLine Linear Drain. Supply Drainage Support.

Installation Instructions for. Before You Begin TOOLS REQUIRED

General Information...SA1-SA4

INSTALLATION GUIDE StreamLine Linear Drain

INSTALLATION GUIDE 2009-CURRENT HUMMER H3T PRODUCT CODE:

Installation Instructions

READ BEFORE INSTALLING UNIT INSTALLATION WARNINGS AND CAUTION

Klamp Trak. Instructions (39052)

MobileTrak5 Installation Instructions

Installation Instructions For Heavy Duty (FAS Models) and Median (FAM Models) Air Conditioners

Vir Stil Console Lavatory INSTALLATION INSTRUCTIONS

MM540 Installation Instructions IMPORTANT SAFETY INSTRUCTIONS - SAVE THESE INSTRUCTIONS

Kai Installation Instructions

WADE 2-1. Universal Carrier. Exclusive Features of 400 Series Universal Carrier for Lavatories, Urinals, Drinking Fountains.

Leveling Feet, Base Plates and Casters

200A FLB VERTICAL 22113V LIFT W/CHAIN DRIVE WINCH

LOWLINE SINGLE FOLD DOWN WALL BEDS

Dura-Lock Roof System

TURBOTWISTER TM ASSEMBLY AND INSTALLATION INSTRUCTIONS

Installation Instructions

Installation Guidelines

TURBOTWISTER ASSEMBLY AND INSTALLATION INSTRUCTIONS

GLENBROOK/GLENGUARD VITREOUS CHINA DRINKING FOUNTAIN/CUSPIDOR

TREX POST MOUNT DECKING AND CONCRETE

Please read and understand all instructions before beginning. These instructions cover impact and non-impact aluminum French Door 650/750.

Privacy Wall & Glass Selections Pivot-Hinged Door (For products manufactured after September 14, 2009)

Lightplane 3.5 Recessed

caroma marc newson shower mixer

Industrial Contractors Supplies, Inc.

Assembly Instructions Nevins Phone Booth

Installation and Assembly: Flat Video Wall Mount For 40" to 65" Flat Panel Displays

RAILING R A IL ING 51

Beacon/Morris HEATER FLOOR KIT

7141 & NATIONAL POLE VAULT STANDARDS SPECIFICATIONS

One Piece LSD/Vector Pads from TIE DOWN ENGINEERING Easier installation with 70% fewer parts Lower cost with competitive pricing

Instructions and Parts List DR-12N Martin House

Joiner Kit Joiner bracket (x1) Biscuit aligners (x2) Trim Flange

INSTALLATION, OPERATION & MAINTENANCE. Adjustable Horizontal Water Closet Carrier

Cabinet is 90% assembled, all you need to do is to attach the legs, lay the glass top on the cabinet, connect the faucet, drains & ptrap.

Oxford Stalls Installation Instructions

MM340 Installation Instructions IMPORTANT SAFETY INSTRUCTIONS - SAVE THESE INSTRUCTIONS

400A 40113V, 401A 40120V, & 401AL 40120VL ALUMINUM VERTICAL 4000 LB LIFT INCLUDES SCREW LEG ASSEMBLY INSTRUCTIONS

KNOB LATCH. Specifications: Glass-To-Wall Installation CAT NO. LAT001 C.R. LAURENCE CO., INC. PROFESSIONAL QUALITY

INSTALLATION GUIDE. 5" Balustrade System

THANK YOU FOR PURCHASING FROM HERITAGE PATIOS

Thanks for shopping with Improvements! 8 ft. Retractable Window Awning Item # (Fits windows/doors from 73 to 96 wide)

Panel Installation Instructions


Door Canopy. PDL Building Products Industrial Parkway, N. Olmsted, OH Phone:

BALANTINE WALL-MOUNT FAUCET INSTALLATION

6 Foot/ 1800mm Aisle Width Net-Contain Aisle Containment for N-Type and S-Type Cabinets

a.k.a. casegoods instructions

Fixed Wall Arm. Installation Guide. Part number Rev E 2012 PolyVision Corporation All rights reserved

INSIDE PANEL NOT SHOWN TO DETAIL ANCHORING SYSTEM

ADJUSTABLE BASKETBALL SYSTEM ASSEMBLY INSTRUCTIONS AND OWNER'S MANUAL

TOOLS REQUIRED FOR ASSEMBLY. Rubber Mallet or Plastic Tip Hammer PARTS REQUIRED FOR ASSEMBLY OF SINGLE ENTRY STARTER.

Steel Strong-Wall Shearwall Installations

- 1 - P/N REV E 9/15

Installation Guide. Capped Cellular PVC Fencing. Table of Contents. Storage and Handling Tools Needed Fence Layout and Locating Posts

Transcription:

Z1035, Z1036, & Z1903 FLOOR DRAIN & CLEANOUT INSTALLATION STABILIZER The Zurn Drain Installation Stabilizer is a unique support plate designed to secure a drain in place and provide adjustment, rigidity, and strength during the drain installation process. The main objectives for the Drain Installation Stabilizer are as follows: (a) To provide a means of pre-assembling the drain to a known rough-in height. If the floor thickness is already known, the drain and Installation Stabilizer can be conveniently pre-assembled away from the job site, and quickly placed and leveled in the correct location at the job site, saving labor costs. (b) To locate and secure the drain in place and keep it in position prior to concrete pour. The Installation Stabilizer will help resist the drain from tipping, tilting, or being knocked over during construction and concrete pour. Z1035 (For 8-3/8 [213] dia. drain body) (c) To allow height and level adjustments of the drain to meet the finished floor. (d) To support any reasonable excess weight that may be placed on the drain before the concrete is poured. (e) To create an open pocket on the underside of the plate, allowing for attachment of the waste line piping after a concrete pour. (f) To use one part for multiple pipe sizes by way of removeable knockout(s). How to Use The Drain Installation Stabilizer Z1036 (For 12 [305] & 15 [381] dia. drain body) The installation stabilizer is constructed of galvanized steel plate and is designed to be used with 8-3/8 dia., 12 dia., 15 dia. drain bodies, Z1900, Z1901, & Z1902 Sani-Flor Receptors, Z1400-K cleanouts (2, 3, and 4 No-hub and Neo-Loc outlets). Four lengths of all-thread rod are attached to the body by inserting and tightening into the tapped holes located on the underside of the body. The stabilizer plate is then connected to the all-thread rod by use of flanged nuts, above and below the plate. Adjusting the placement of the nuts changes the rough-in height of the drain. Once the proper height is obtained, the nuts are tightened against the plate. Any excess rod is trimmed off and a stub of pipe is then connected to the body and allowed to extend through the center hole of the plate. The assembly is then nailed down to the concrete form. When concrete is poured around the drain, the plate creates a pocket on the underside of the slab. When the concrete is set and the forms are stripped away, the visible result is a stub of pipe protruding through the underside of the slab. The remaining drain line can then be connected to this stub of pipe. WARNING: Cancer and Reproductive Harm - www.p65warnings.ca.gov ADVERTENCIA: Cáncer y daño reproductivo - www.p65warnings.ca.gov AVERTISSEMENT: Cancer et effets néfastes sur la reproduction - www.p65warnings.ca.gov Page 1 of 6

Z1035 AND Z1036 Step1 Connect a shielded coupling to the drain body (No-Hub connection), or insert gasket into drain body (Neo-Loc connection). Step2 Step3 Remove the threaded studs from hardware bag (P.N. 66955-312-9) and screw into the tapped bosses on the underside of the drain body until tight. Screw one flanged nut onto each stud with the flange facing downward. FLANGED NUT SHIELDED COUPLING OR NEO-LOC GASKET STUD Step4 Step5 Determine pipe size and remove appropriate knockout if necessary. Insert the studs through the four holes of the plate with the plate cavity facing downward. Set the drain body at the required rough-in height and screw the flanged nuts down until they are flush against the top of plate. Screw a second flanged nut onto each stud with the flange facing upward. Tighten both nuts on each stud until the plate is secured to the studs. Step7 Step8 Step9 Step10 Trim the studs down so that they are flush with the bottom of the plate. Set the assembly onto a level surface and check to ensure that the drain body is level with the plate. The flanged nuts can be loosened and tightened to allow for any necessary adjustments. Once leveled, trim any studs that extend beyond the cavity of the plate. Insert a stub of drainage pipe into the shielded coupling (No-Hub connection) or gasket (Neo-Loc connection) and secure. It is important that there be at least 1¼ [32 mm] of pipe protruding through the cavity of the plate, in order to make a connection to the remaining drainage line. Once the assembly is complete and set at the proper rough-in height, place the assembly in the proper location prior to concrete pour. The assembly can be nailed down to the concrete forms by using the nail holes provided on the rim of the plate. Concrete pour. After the concrete is set and the forms are stripped away, the result will be a voided area on the underside of the floor with a stub of pipe protruding through it. Trim off any nails that are extending beyond the concrete floor. The remaining drainage line can now be connected to the drain assembly. PIPE STUB NAIL HOLE Page 2 of 6

Z1035 AND Z1036 Note: Some localities building codes- do not allow a shielded coupling or rubber gasket to be buried in concrete. For applications such as this, a section of 6 PVC pipe can be used to act as a barrier to keep concrete from coming in contact with the rubber materials. Each drain installation stabilizer is provided with a hardware bag (P.N. 66955-312-9) that consists of the following product: PART PART NUMBER QTY. 3/8-16 Flanged Locknut 56795-002 8 3/8-16 X 12 Stud 14861-046 4 The Zurn floor drain installation stabilizer is designed to be used with the following Zurn floor drains: 8-3/8 DIA. FLOOR DRAIN 6" PVC SLEEVE Z315, Z556 Z415 ZS415 TYPE B,BL,C,D,E,G,H,I,J, K,M,N,O,S,SC,SH,SL,T TYPE B & S 6-1/2 [165] 13-1/2 [343] 5-5/8 [143] 13-1/2 [343] 12 DIA. FLOOR DRAIN Z508,Z550,Z554,Z609,Z679 Z533 15 DIA. FLOOR DRAIN Z505,532,534,536,537,540,541, Z545,Z610,Z625,Z626,Z627 7-3/8 [187] 13-1/2 [343] 5-1/2 [140] 13-1/2 [343] 7-7/8 [200] 13-1/2 [343] 6-1/2 [165] 13-1/2 [343] 7-7/8 [200] 13-1/2 [343] 6-1/2 [165] 13-1/2 [343] NOTE: Rough-in heights shown are with use of 12 [305] long studs. ROUGH-IN HEIGHT MIN-MAX ROUGH-IN HEIGHT MIN-MAX No-Hub Neo-Loc Page 3 of 6

Z1035 AND Z1036 Z1400-K Cleanout (2,3,4 Sizes only) Z1400-K 6-5/8 [168] 13-1/8 [333] 5-7/8 [149] 13-1/8 [333] Page 4 of 6

Z1903 Step1 Step2 Step3 Connect a shielded coupling to the Sani-Flor Receptor (No-Hub connection), or insert gasket into Sani-Flor Receptor (Neo-Loc connection). Remove the threaded studs from hardware bag (P.N. 66955-312-9) and screw into the tapped bosses on the underside of the Sani-Flor Receptor until tight. Screw one flanged nut onto each stud with the flange facing downward. FLANGED NUT STUD SHIELDED COUPLING OR NEO-LOC GASKET Step4 Step5 Determine pipe size and remove appropriate knockout if necessary. Square knockout may also be removed to allow space for Sani-Flor Receptor in narrow floor applications. (See recessed sink instructions) Insert the studs through the four holes of the plate with the plate cavity facing downward. Set the Sani-Flor Receptor at the required rough-in height and screw the flanged nuts down until they are flush against the top of plate. Screw a second flanged nut onto each stud with the flange facing upward. Tighten both nuts on each stud until the plate is secured to the studs. Step7 Step8 Trim the studs down so that they are flush with the bottom of the plate. Set the assembly onto a level surface and check to ensure that the Sani-Flor Receptor is level with the plate. The flanged nuts can be loosened and tightened to allow for any necessary adjustments. Once leveled, trim any studs that extend beyond the cavity of the plate. Insert a stub of drainage pipe into the shielded coupling (No-Hub connection) or gasket (Neo-Loc connection) and secure. It is important that there be at least 1¼ [32mm] of pipe protruding through the cavity of the plate, in order to make a connection to the remaining drainage line. PIPE STUB Step9 Once the assembly is complete and set at the proper rough-in height, place the assembly in the proper location prior to concrete pour. The assembly can be nailed down to the concrete forms by using the nail holes provided on the rim of the plate. Step10 Step11 Concrete pour. After the concrete is set and the forms are stripped away, the result will be a voided area on the underside of the floor with a stub of pipe protruding through it. Trim off any nails that are extending beyond the concrete floor. The remaining drainage line can now be connected to the Sani-Flor Receptor assembly. NAIL HOLE Page 5 of 6

Z1903 (RECESSED FLOOR SINK) Step1 Step2 Remove the threaded studs from hardware bag (P.N. 66955-312-9) and screw into the tapped bosses on the underside of the Sani-Flor Receptor until tight. Screw one flanged nut onto each stud with the flange facing downward. FLANGED NUT STUD Step3 Step4 Step5 Remove square knockout to allow space for Sani-Flor Receptor in narrow floor applications. Insert the studs through the four holes of the plate with the plate cavity facing downward. Set the Sani-Flor Receptor at the required rough-in height and screw the flanged nuts down until they are flush against the top of plate. Screw a second flanged nut onto each stud with the flange facing upward. Tighten both nuts on each stud until the plate is secured to the studs. Step7 Cut a hole in the metal deck to allow the floor sink to fit through. Trim the studs down so that they are flush with the bottom of the plate. Set the assembly onto the deck and check to ensure that the Sani-Flor Receptor is level with the plate. The flanged nuts can be loosened and tightened to allow for any necessary adjustments. Once leveled, trim any studs that extend beyond the cavity of the plate. Step8 Once the assembly is complete and set at the proper rough-in height. The assembly can be secured to the deck by using the nail holes provided on the rim of the plate. Step9 Concrete pour. Step10 After the concrete is set, the result will be a recessed floor sink on the underside of the floor. Trim off any nails that are extending beyond the concrete floor. The remaining drainage line can now be connected to the Sani-Flor Receptor assembly. Page 6 of 6