One Piece LSD/Vector Pads from TIE DOWN ENGINEERING Easier installation with 70% fewer parts Lower cost with competitive pricing

Similar documents
INDEX PAGE RELEASE SECTION NUMBER DATE

Technologies, Inc. Installation Instructions for Anchors & Components. Rev PAGE 1 / 11

Manufactured Housing Installation Instructions TIE DOWN ENGINEERING

User Instructions Multiline Otter Scoreboard Caddy Assembly

Offering a full range of anchoring and tie down systems including:

ULTRA SPACE SAVER SQUARED Installation Instructions

Assembly Instructions

STEP 1 STEP 2 LEVELER KIT OPTION MOBILE CASTER KIT OPTION

The Queen Quilter Professional Quilters Kit Frame

ASSEMBLY INSTRUCTIONS

INSIDE PANEL NOT SHOWN TO DETAIL ANCHORING SYSTEM

Rayport G Eco Dealer Kit

UPM 6X. UPM 6X Standard stock Tee socket sized for 5" schedule 40 or 80 Pipe. Page 1 of 8

Classic Roll Tarp. Installation Instructions. Attention Dealers: Please give this owners manual to the customer when the product is delivered.

Heavy Duty Ceiling Tilt Mount Installation Manual

Pickup Box Utility Rack Package Installation (Instruction ID: )

Classic Roll Tarp. Installation Instructions. Attention Dealers: Please give this owners manual to the customer when the product is delivered.

ULTRA SPACE SAVER Installation Instructions

Outdoor Water Solutions, Inc. 9 Backyard Windmill. Installation Manual

Range height adjustable assembly

MSP-WRTIDSKY1 Light Weight Suspended Ceiling Kit for use with Island Display Skybox

Thanks for shopping with Improvements! 8 ft. Retractable Window Awning Item # (Fits windows/doors from 73 to 96 wide)

PATRIOT DOCKS ASSEMBLY INSTRUCTIONS

BEST PRACTICE GUIDE. Socket Bases. Working with Concrete Slabs

Outdoor Water Solutions, Inc. Small Backyard Windmill. Installation Manual

Clopay Models 835/837 Sliding Door System Installation Guide

400A 40113V, 401A 40120V, & 401AL 40120VL ALUMINUM VERTICAL 4000 LB LIFT INCLUDES SCREW LEG ASSEMBLY INSTRUCTIONS

Real Life Ninja Starter Pack 1 Assembly Instructions

Real Life Ninja Complete Starter Pack (14ft. Warped Wall) Assembly Instructions

ASSEMBLY AND CARE INSTRUCTIONS JUST FOR KIDS 355

General Guidelines:

PORTABLE ADJUSTABLE BASKETBALL SYSTEM

M2 Assembly. M2 Sub-Assemblies mm Belt Sub-Assembly mm Belt Sub-Assembly Spider Sub-Assembly... 4

Lab Style Table Frame Part No Assembly Guide Automation Technology

TABLE OF CONTENTS REQUIRED TOOLS

Pack Mount Instructions:

3,500/4,500lb. Vertical Cable Feighner Lift

1: profile cross section. FD- profile. for sidewalls + backwalls. eaves profile. curved roof profile. Z - profile (alongside frame) L 60 x 60

UPM 6X Custom. UPM 6X CUSTOM Standard stock Tee socket sized for 5" schedule 40 or 80 Pipe. Page 1 of 8

STRATUS SHELTER. Take bike parking to new heights

Hardware and Components:

CONTENTS TOOL LIST U P S I D E I N N O V A T I O N S, L L C RAMP AND STEP SYSTEM ASSEMBLY INSTRUCTIONS. Revised: June 2013

.84M Ku-Band Rx/O Antenna System

Roll In W/L Dock PAGE 1

Track Rack. * Track Racks are not lockable

Installation and Assembly - Universal Articulating Swivel Double-Arm for 42" - 60" Plasma Screens

Kwik-Lock. Installation Instructions. Attention Dealers: Please give this owners manual to the customer when the product is delivered.

MPA-9000 Universal Ceiling Projector Mount Kit

SAVVY OFF ROAD GAS TANK SKID INSTALLATION INSTRUCTIONS

Sales & Service. JFK - Just For Kids. sasportonline.com. 135 Forestview Road 7879 Will Rogers Blvd.

SS1062, SS10621 & SS10621E Free Standing PWC & Fishing Boat Hoist SS1062 SS10621 SS10621E


KIT ASSEMBLY INSTRUCTIONS

INSTRUCTION BOOKLET #C21. For Wallbed models: KING SIZE

Installation and Assembly - Universal Articulating Swivel Double-Arm for 42" - 60" Plasma Screens

C4 Fabrication Rock Slider Installation 14+ 5th Gen 4Runner w/o KDSS

CSS Central Mount System

Instruction Sheet For: SCM-2

Steel Strong-Wall Shearwall Installations

19 to 39 TV WALL MOUNT - FULL MOTION

PRO / PL SHOE REPLACEMENT & CONVERSION INSTRUCTIONS

Horse Shelter 12 x

RIDGE MAST MOUNT (RMM)

UPM 10X and 10XHD A. TEE SOCKET: 7 O.D. PIPE SOCKET TO FIT OVER 6 SCHEDULE 40 OR 80 STEEL PIPE

Side Mount INSTRUCTION BOOKLET #C122 BED STYLE: PARK CITY

INSTALLATION INSTRUCTIONS

TOYOTA TUNDRA CARGO DIVIDER Preparation. Part Number: PT

INSTRUCTION BOOKLET #C20

Football Goal Posts MODEL SERIES: FGP400 and FGP600 series

BBF Series Blower Base Frame Assembly Instructions Rev.: BFA-9105


Top Closure Kit Accessory for Music Library System

Rayport G Eco Dealer Kit

Installation Instruction

THE ROGUE TM FUNSLIDE TM

RANGE DIGITAL HANDSET OPERATION. 1. Panel. 2. Initialization Procedure. 3. Move Up & Down. 4. Set Memory Positions. 5. Move to the Memorized Positions

FLOE quick attach & standard sectional dock and leg kits

FLIP TARP SINGLE & DOUBLE UNDERBODY TRAILERS


Thank you for purchasing out product! *Please read these instructions and follow them step by step. *

Installation Instructions

Trak-Slider Instructions

BABY WOLF LOOM. Assembly Instructions for Knocked-Down Looms

MONKEY BARS OVERHEAD RACK INSTALLATION

1. Layout. Step 1. Step 2. Step 3. Fig. 1

Installation Instructions for. Before You Begin TOOLS REQUIRED

Installation Instructions for Solar Snow Pad (SSP-T-3)

INS A KSCR INSTALLATION INSTRUCTIONS STANDARD PROCEDURE. 1. Unpacking the KSCR Splicing the KSCR (If Required)...

IN 578. Tools Required. Torque Specification: 10mm Socket 7/16 Socket 1/2 Socket 1/2 Wrench 7/16 Wrench 1/8 Allen Wrench.


Boat Lift Canopy Frame Assembly Instructions

E-Z GROW HOBBY GREENHOUSE. I n s t r u c t i o n M a n u a l & D i s c l a i m e r s

6a. Eight Steps to Chain-Link Fence Installation

Index Pipe Hangers and Straps


SWAY BRACE PIPE ATTACHMENT FIG. 010

INS A KSR INSTALLATION INSTRUCTIONS STANDARD PROCEDURE. 1. Verify Curb Installation Required Installation Tools...

GROWING BETTER THROUGH DESIGN. 6ft Lean-To LEAN-TO. Assembly Instructions 04/02

Plug-n-Show Stake Down Pixel Tree Kit 16 strips of 25 pixels Assembly Instructions

S OLAR RADIATION S HIELD MANUAL

Transcription:

NEW! One Piece SD/ector Pads from TIE DOWN ENGINEERING Easier installation with 70% fewer parts ower cost with competitive pricing Do the Math! Compare material and labor cost with the New SD and ector ateral System Combination. Never a 5 Ft. Perimeter Anchor No Stabilizer Plates No Frame Ties or Beam Clamps No ongitudinal Anchors Revised Instructions Fewer Systems Required! 10-10-2001 Exceeds Wind Zone III HUD Code wind load requirements by more than 50% 120701,193

Florida Set-Up Instructions for the ector Dynamics Foundation System 1. SET ECTOR FOUNDATION PADS Clear all loose vegetation from the immediate area where the ector foundation pads will rest. Place a long U-bolt on the ector pads as shown. Press or hammer pads into the ground. ector pads are placed parallel and centered under I-beam. Tip: Place a 3/8" nut on each U-bolt to keep it in place while you position the ector pads. SD/ector Combination Shown TIP: After centering 1st block(s) over ector pads, place wood cap on top of first block and use hydraulic jack between pad and I-beam to force pads into the ground. Higher pier sets may require extra block prior to using hydraulic jack. ong U-bolt 1 2 Position 1st block(s) on pad as shown. 2. SET BOCKS (OR PIERS) ON ECTOR FOUNDATION PADS Center the foundation blocks over the ector pads. 3. INSIDE CONNECTIONS Insert 1/2" carriage bolt into square hole on top flange of the PC adaptor. Place the swivel connector bracket that is attached to one end of the 1-1/4" galvanized strap and thread 1/2" hex nut onto carriage bolt (finger tight). Insert 4" PC schedule 40 pipe into PC pipe adaptor and insert over inside long U-bolt (through slotted holes). Attach 3/8" hex nuts to u-bolt and finger tighten. Repeat the procedure to opposite side of PC pipe. 4. TIGHTEN INSIDE HARDWARE Tighten all previously finger tightened hex nuts (1/2" carriage bolts & 3/8" inside U-bolts). 5. OUTSIDE TENSION BRACKETS Attach an outside tension bracket on the outside of the foundation blocks and ector pads. As shown right. 6. TENSIONING - ECTOR STRAPS Pull strap past slotted bolt. Cut strap 10-12 inches past bolt, insert the strap into the slotted bolt until flush with opposite side of bolt. Wind strap a minimum of five (5) complete revolutions around the bolt. Continue tightening the slotted tension bolt until all slack has been removed and the galvanized strap is tight. 3 4 120701,193

ateral Stabilization for Concrete, Slabs & Runners for Single & Double Block Piers Tie Down Marked & Certified G120 Strap w/swivel Connector Part # ength 59732 12' 59734 14' 59736 16' Picture shows single and double block for illustration purposes only Concrete ector System Part # 59008 (for single stack blocks) Slotted Bolt Part # 59135 To add longitudinal stabilization to single or double stack blocks: 1 P/N 59023 - ongitudinal Hardware Kit for 59006 or 59008 2 Struts for ongitudinal Systems Parts required for the Single Block ector System: 1 P/N 59008 - Concrete ector System (for single block piers) 2 P/N 59135 - Slotted Bolts 2 Swivel Strap Connectors ongitudinal Stabilization Hardware Kit for Concrete Part # 59023 Concrete ector System Part # 59006 (for double stack blocks) Parts required for the Double Block ector System: 1 P/N 59006 - ector ateral System for Concrete (double block stack) 2 Strap w/ Swivel Connector 2 P/N 59135 - Slotted Bolt Struts for ongitudinal Systems Part No. Strut ength Pier Height 59016 30 up to 2 Blocks 59012 39 up to 3 Blocks 59013 44 up to 4 Blocks 59014 53 up to 5 Blocks 59015 65 up to 6 Blocks 112701,240

Combine TIE DOWN's ongitudinal ( 2 SD) and ector Systems and SAE! Home 2SD* ector SD/ector ector Stabilizer Frame Beam ongitudinal ength Systems Systems Pads Straps Plates Ties Clamps Anchors in Ft. #59026 #59024 #59271 20' - 32' 2* 2 4 4-0- -0- -0- -0-33' - 48' 2* 3 6 6-0- -0- -0- -0-49' - 64' 2* 4 8 8-0- -0- -0- -0-65' - 76' 2* 5 10 10-0- -0- -0- -0-77' - 90' 2* 6 12 12-0- -0- -0- -0- * Strut lengths are purchased separately (2 per system) Example of a 72 Ft. Single Section Home 8 ft. Side Wall Up to 16 ft. wide with 12" eaves Follow the chart above for Part #'s and quantities for each home set. 5' 4" No Frame Ties No Torque Probe No Stabilizer Plates No ongitudinal Anchors No Beam Clamps No 5 Ft. perimeter anchors Deduct Foundation Pad Cost for Each Pier Set with ector Pads 2' Max. 2' Max. Required Anchor Spacing in Florida (48" Anchor ength Approved for all Soil Classes) ector / 2SD Combination (two 59271 Pads, 2 SD kits & 1 ector kit shown) Note: Some manufacturers may require (5 ft.) anchors for higher loads at shear walls and/or marriage line supports. See manufacturers installation manual for specifics. ector System (two pads & one hardware kit shown)

Combine TIE DOWN's ongitudinal ( 2 SD) and ector Systems and SAE! (Double Section Home) Home 2SD* ector SD/ector ector Stabilizer Frame Beam ongitudinal ength Systems Systems Pads Straps Plates Ties Clamps Anchors in Ft. #59026 #59024 #59271 0' - 38' 4* 2 6 4-0- -0- -0- -0-39' - 57' 4* 3 6 6-0- -0- -0- -0-58' - 76' 4* 4 8 8-0- -0- -0- -0-76' - 91' 4* 5 10 10-0- -0- -0- -0- * Strut lengths are purchased separately (2 per system) Follow the above chart for Double Section Homes

ongitudinal Stabilization Devices for Florida As an alternate to installing longitudinal anchors and stabilizer plates, the installer may use longitudinal stabilizing devices approved by the state, including Tie Down's SD (ongitudinal Stabilization Device). The use of two SD systems on a single section home replaces all eight longitudinal anchors, stabilizer plates and straps. Four SD systems on a double section home replaces sixteen longitudinal anchors, stabilizer plates and straps. 2 Note: SD pads provide 3 sq. ft. of bearing support per system. 3 1 4 NEW One Piece Pad 1. ongitudinal Foundation Pad 2. Beam Clamp (2 per system) 3. ongitudinal Strut (2 per system) 4. Tie Bracket (2 per system) Example of Possible Placement: Part # Description Single Section Home up to 18 feet in width. Double Section Home up to 36 feet in width. 1. Determine where the longitudinal Stabilizing Device will be installed on the home. 2. Place one 2 SD pad centered under the beam. NOTE: Press pad into the ground so that the cleats are below ground level. 3. Slide tie brackets into pad. 59271 SD Pad. 59026 SD Hardware Kit Includes: 2 tie brackets & 2 beam clamps. 59016 ongitudinal Strut 30" for use up to 18" high piers (two block piers) 59012 ongitudinal Strut 39" for use up to 24" high piers (three block piers) 59013 ongitudinal Strut 44" for use up to 32" high piers (four block piers) 59014 ongitudinal Strut 53" for use up to 40" high piers (five block piers) 59015 ongitudinal Strut 65" for use up to 48" high piers (six block piers) 4. Build pier on 2 SD pads between tie brackets. 5. Install beam clamps on either side of pier. Attach 2 SD braces to beam clamps and tighten all bolts. 120701,193