Glass Front Sauna Room Assembly Manual

Similar documents
A Generic Sauna Room Assembly Manual

TOOLS REQUIRED: HARDWARE INCLUDED: 13MM FLAT WRENCH FOR LEVELING THE STRUCTURE RATCHET WITH 5MM HEX BIT FOR CORNER SCREWS ON TOP TRAVERSE BEAMS

6MM ALLEN KEY FOR ROOF CLIPS PHILLIPS HEAD BIT FOR SCREWS FOR DOOR FRAME SPIRIT/LASER LEVEL TO LEVEL THE UNIT

13MM FLAT WRENCH FOR LEVELING THE GLIDES OF STRUCTURE 6MM ALLEN KEY FOR ROOF CLIPS PHILLIPS HEAD BIT FOR SCREWS FOR DOOR FRAME

Qwik-Fence Installation Instructions

Rim-Lock Door Set Installation Instructions

XL-GC03 Sliding Door Lock Installation Manual PAT XL-GC06 Sliding Door Hanger Installation Manual XL-GC08 Sliding Door Lock Guide Installation Manual

installation guide ICON classic benching

101B, 210X, ELM, VSTB Installation Manual

Wooden Frame Type Instruction Manual

Privacy Wall Glass Selections - Polished Edge Slider Door

Barnside Pantry IMPORTANT NOTE Carefully remove all the parts from the carton and put them individually on a soft cloth to prevent scratch

Pedestal Desk IMPORTANT NOTE Carefully remove all the parts from the carton and put them individually on a soft cloth to prevent scratches

HYDRO-TOWER INSTALLATION INSTRUCTIONS

Sit Down Table Assembly Instructions

PATIO INSTALLATION MANUAL

Merloni Elettrodomestici. Technical Fitting Manual FRIDGE. Language Issue/Edition Page GB /

TRUE TECHNICAL SERVICE MANUAL - ALL MODELS. DOORS/DRAWERS/LIDS

Agave Standard Series

Almost Heaven Saunas THE AUTHENTIC SAUNA EXPERIENCE. Patterson Sauna Installation & Owner s Manual

Installing Your Electronic Deadbolt

Almost Heaven Saunas THE AUTHENTIC SAUNA EXPERIENCE. Worthington Sauna Installation & Owner s Manual

3-LITE PATIO DOOR INSTALLATION INSTRUCTIONS

Installation Instructions for Vista Air Vertically Folding Walls

Shetland Stalls Installation Instructions

Fig. 2 DORMA-Glas Stand/Issue 02/03 Seite/Page 1/7

Installation Instructions

This instruction manual is an in-depth look and explanation of how to assemble and install the Murphy Bed properly and efficiently.

VisioGlide 100 System W4F Four doors 2 fixed, 2 sliding

INSTALLATION INSTRUCTIONS FOR INSTALLING T-SERIES EXTRA HEAVY DUTY LEVER LOCKSET

Portofino Installation Guide

compile system INSTALLATION GUIDE Updated January 2019

ATTENTION: PLEASE READ AND UNDERSTAND ALL INSTRUCTIONS AND WARNINGS BEFORE ASSEMBLING, INSTALLING OR USING THIS PRODUCT.

Step-by-Step Installation Instructions for

Metro Series Sauna. installation instructions

INSTRUCTIONS FOR ASSEMBLY. 110x110 h TRADITIONAL SAUNACABIN

M. Door 1 Pc. 1 Pc. Door 1 Pc. 1 Pc. M3x20 Wood Screw (long) 8 Pcs. (+1 extra) M3x10 Wood Screw for Magnet 8 Pcs. (+1 extra)

INSTALLATION INSTRUCTIONS

#916 CLASSIC 16 GUN CABINET ASSEMBLY INSTRUCTIONS

MantelMount. TM1A Installation Instructions IMPORTANT SAFETY INSTRUCTIONS - SAVE THESE INSTRUCTIONS

Monaco Installation Guide - Surface Profiles

Kawasaki Teryx 750 Cab Kit* Caution: Before using this product, read this manual and follow all Safety Instructions.

Assembly instructions. NL2320 Deco outdoor sauna

Joiner Kit For Models N388, C450, E402B, E411T, E415H, E440T, E442B, E521T and E522B

ASS 70 FD folding / sliding door. Installation Guide

Important Loading Information. Tools Required. Meridian Lateral Files Instructions

Assembly Instructions

SLIDING GLASS DOOR ASSEMBLY INSTRUCTION Series 680/780

Installers guide Deadbolt 02.

OWNER S MANUAL CLEARLIGHT SANCTUARY FULL SPECTRUM SAUNAS. Superior Quality and Service

Installation Instructions - Model V4JSD 1

Vinyl Sliding Glass Door Assembly Instructions

4-lite Patio Door. Installation Instructions

PAK Drum Roll Top Assembly Instructions. Note: 2 people will be required to assemble roll top

INSTALLATION INSTRUCTIONS

Assembly Instructions Nevins Phone Booth

Aluminum Frame Type Instruction Manual

SAM. Model: STV-C65 LCD Mobile Visualized Stand Instruction Manual. Weight Capacity: 1251bs / 56.7kg Suits LCD Flat Panel Display: 42"-55" Page 20

Elite Home-Attached Greenhouse

C-Series & S-Series Classic Frame with Transom (Single or Pair)

HYDRO-TOWER INSTALLATION INSTRUCTIONS

modular/panel-built sauna kit

Colonial Classic Bar

Deauville Installation Guide

modular/panel-built sauna kit

INSTALLATION INSTRUCTIONS FOR PLASCORE NARROW STILE DOORS

1: profile cross section. FD- profile. for sidewalls + backwalls. eaves profile. curved roof profile. Z - profile (alongside frame) L 60 x 60

NEPAL Installation procedure

TRUE TECHNICAL SERVICE MANUAL - ALL MODELS. DOORS/DRAWERS/LIDS

PL-91. Frameless Door with Panel. 202 Anderson Ave., Belvue, KS Phone: Fax:

SECURITECH GROUP, INC. MP POLICE LOCK. MODEL 4840B-TTBG_HG-3_ or 4840B-TTBG_HG-4_. Packing List. Documentation: Items: Fasteners:

INSTALLATION INSTRUCTIONS VENETIAN 84" SLIDING SHOWER DOOR SYSTEM (180º INSTALLATION)

Deauville Installation Guide

RangerWare Fiberglass Door System Installation Instructions P/N

Framing & Electrical Rough-in for Recess Mount IS Panel System

TOYOTA MOTOR EUROPE CA Products Division Tel : Fax :

Custom Wood Frame Overlay for Glass Doors Installation Instructions

98/ Customer Service # Dogging Key (use to lock down pushbar)

33/3547A. Special tools needed: #10-24 tap Drill bits: #25, 5/16, 13/32, 1/2

2. Connect driver to power source leads. After connections are made, place driver above ceiling. SEE MINIMUM SPACE REQUIREMENTS BELOW.

INSTALLATION INSTRUCTION

Assembly Instructions

Dublin Stalls Installation Instructions

Stage 2: Preparing the door (read in conjunction with Hole Drilling Options on back of Template).

Assembly Instructions Nevins Phone Booth

Leafy Greens Spinner Construction Manual

ASOLA - THETA ISTRUZIONI DI MONTAGGIO FITTING INSTRUCTIONS INSTRUCTIONS DE MONTAGE INSTRUCCIONES DE MONTAJE MONTAGEANLEITUNG. IMPBAT Rev.

Assembly instructions. Instructions de montage. Instrucciones de montaje

INSTALLATION INSTRUCTIONS

LAWN AND GARDEN GREENHOUSE

Wellington Wallbed 700 Series Assembly Instructions

Dry Toilet, Version 2.0 June 17, 2015

VACUSEAL MODEL 200. HOT TUB PRODUCTS 233 Carrington Road Bethany CT

ASS 70 FD folding/sliding door installation guide

M10 x 75mm Sockethead Cap Screws. 5mm Fender Washer (12) Included - (8) Required. #10 x 2.5" PH Wood Screws. (30) Included - (24) Required

INSTRUCTION BOOKLET #34. For Wallbed models: KING SIZE SIERRA WITH STORAGE HEADBOARD

B A T H R O O M G L A S S

Chain Drive Vise. Installation Instructions. (revised 05/04/2016)

Installation Instructions

INSTALLATION INSTRUCTIONS FOR HAND OPERATED SILENT STEEL ADC HEAVY DUTY CURTAIN TRACK MODELS: 280, 281, 282, 280-A, 283-N, 283-R

Transcription:

Glass Front Sauna Room Assembly Manual Classic Bench Version: 1.3 Note: Above images are for illustrative reference only and may differ from actual item.

Parts List Exterior *For room with full glass wall 1 16 4 14 12 9 11 8 17 13 6 12 10 15 12 Parts List Interior 7 11 3 2 3 5 1. Ceiling Assembly 2. Wall Elements 3. Exterior Mouldings 4. Top Exterior Mouldings 5. Bottom Exterior Mouldings 6. Main Base Frame 7. Bolt Leveler 8. Door Set 9. Glass Wall (no holes) 10. Glass Window (with holes for hinges) 11. Front Outer L Mouldings 12. Front Solid Mouldings 13. Front Bottom Outermost Moulding 14. Front Top Outermost Moulding 15. Glass Hinge 16. Glass top frame 17. Glass Door Installation Spacers 1 2 1 5 6 9 7 3 10 13 8 12 4 4 1. Backrest 2. Top Bench Cover 3. Lower Bench Cover 4. Bench Cover frame 5. Bench Cover Support 6. Bench Siding Small 7. Bench Siding Medium 8. Bench Siding Large 9. Legs large 10. Legs H 11. Legs medium 12. Legs small 13. Flooring 11 2 Note: Above images are for illustrative reference only and may differ from actual item.

Screws for Room Exterior Vertical Moulding 42mm thick Bolt Leveler Twist to adjust height 6RM08-109 L Molding Screw Horizontal Moulding 75mm wide Screws for Room Interior 6RM17-002 Cam Lock Bolt Corner Moulding 6RM08-036 Back Rest 4SR35-002 Screw Cap for Back Rest 6RM08-125 Upper and Lower Bench Frame 6RM08-032 Bench Siding 6RM08-036 Base Frame/Glass frame (top) Vertical Moulding 42mm thick 3 Note: Above images are for illustrative reference only and may differ from actual item.

Wall Assembly Frames, Cam Lock 01 Connect base frames according to their corresponding numbers. Leveler 2 No. 1 is underneath the glass walls and door and numbers increase clockwise 3 6RM08-036 Screw 1 4 Use a Leveler to make the frame level to the floor Twist BOLT to adjust height Do not seal the gap underneath the base frame. The gap is the passage way of the fresh air inside the sauna room. Make sure that the fi nish fl ooring where the sauna room will be placed is water proof and is incline towards the drain. Optional. After the base frame is leveled, place the ceiling assembly on the base frames to check if it fi ts nicely and leveled (great help after wall assembly) 2A Insert Cam Lock Bolts on Wall Panels. Shown on opposite side Cam Lock Bolt Cam Lock Bolt Location 6RM17-002 Cam Lock Bolt 4 Note: Above images are for illustrative reference only and may differ from actual item.

Wall Assembly Wall Attachments and Sequence Attach wall panels from the fi rst corner (for easy installation). Take note of the 2B grooves direction (groove facing left). Start from this corner Wall 3 Wall4 Wall5 Wall 3 Wall 4 Wall2 Wall6 Wall1 Wall7 Tongue and groove Wall 2 Plan View Wall 1 04 Secure walls with cam locks. Side View Isometric View Cam Lock Open Make sure cam lock is in open position Allen Wrench Cam Lock Location Cam Lock Close 05 Attached Glass Top Frame Before moving on to securing the next wall element, make sure that both cam locks are properly secured 6RM08-036 5 Note: Above images are for illustrative reference only and may differ from actual item.

Ceiling Assembly 06 Attach Ceiling Assembly via tongue to Groove. Ceiling to ceiling connection side view Interior ceiling moulding Vertical Moulding 42mm thick Check that the ventilation hole is in the right position (refer to plan drawing for ventilation location) 07 Attach all mouldings except Front top/bottom outermost molding and Outer L mouldings (only after front glass is installed) Horizontal Moulding 75mm wide Vertical Moulding Small 22mm thick Vertical Moulding 42mm thick At this stage make sure all internal mouldings are attached as it will be hard to do once the benches are installed 6 Note: Above images are for illustrative reference only and may differ from actual item.

Interior Furnishes Assembly 1420ML Sauna Room 08 Attach Bench Support at suggested height with screws,then place over the Bench Frame Assembly and screw to wall. 09 Attach back rest to wall, attach leg support to bench frame. 810 6RM08-125 Upper and Lower Bench Support Height dimensions should be taken in reference to the base frame. There are markers as well on the wall panels as reference for bench support mounting 6RM08-036 Screw Screw Cap 10 Install sidings, bench covers and fl ooring 11 Interior layout are all reversible, as shown on the illustration 6RM08-032 Bench Siding 7 Note: Above images are for illustrative reference only and may differ from actual item.

Interior Furnishes Assembly 1414 LS/RS Sauna Room A Attach bench support at designated height (reference markers on the wall) B Attach back rest to wall then attach leg support to bench frame before attaching the frames to the wall 810 360 6RM08-125 Upper and Lower Bench Support Height dimensions should be taken in reference to the base frame. There are markers as well on the wall panels as reference for bench support mounting 6RM08-036 Screw Screw Cap C Attach top/lower bench covers,fl ooring and siding. D The heater layout are all reversible, as shown on the illustration 6RM08-032 Bench Siding Flooring is a 2 piece set. (For reverse interior layout) 8 Note: Above images are for illustrative reference only and may differ from actual item.

A Interior Furnishes Assembly 2020 ML Sauna Room Attach bench support at designated height (reference markers on the wall) B Attach back rest to wall, attach leg support to bench frame before attaching the bench support frames to the wall 810 360 6RM08-125 Upper and Lower Bench Support Height dimensions should be taken in reference to the base frame. There are markers as well on the wall panels as reference for bench support mounting 6RM08-036 Screw Screw Cap C Attach top/lower bench covers,fl ooring and siding. D Interior layout are all reversible, as shown on the illustration 6RM08-032 Bench Siding Flooring is a 2 piece set. (For reverse interior layout) 9 Note: Above images are for illustrative reference only and may differ from actual item.

Glass Wall Assembly Glass Hinge components Faceplate Back L Plastic gaskets Plastic shield Plastic divider Faceplate Front Hexagonal Screw Faceplate Back R Plastic Bushings Allen Wrench Annoying sounds can be heard from improper hinge assembly, ensure correct assembly along with the plastic spacers. 12 Attach the glass walls where the glass frames ridges are located Glass walls are heavy and require two persons (minimum) to install. 13 Then secure it with outermost solid molding with a screw. Horizontal Moulding 75mm wide The opening direction of the door is also reversible 10 Note: Above images are for illustrative reference only and may differ from actual item.

Glass Wall Assembly Glass Door Installation and Alignment 14 Attach the Faceplate Front to the glass wall and secure with Faceplate Back L with screws. Faceplate Front Faceplate Back Glass Wall from inside Install from the inside 15 Loosely install the glass door then secure with Faceplate Back R. Faceplate Back R Glass Wall Glass Door Take note of the holes. The glass wall holes has a square cutout in the middle. Don t forget to insert the plastic gasket and plastic divider. 11 Note: Above images are for illustrative reference only and may differ from actual item.

Glass Wall Assembly Glass Door Installation and Alignment 16 Insert the 3mm wooden spacers underneath the glass door as well as the sides of the door. Then tighten the door hinges screws when glass door has even spacing all around. The glass door installation spacers are for easy installation of the glass door while keeping a 3mm even gap from the door jam. Remove the installation spacers after installing the door. 12 Note: Above images are for illustrative reference only and may differ from actual item.

Glass Wall Assembly Glass Door Installation and Alignment 18 Attached remaining Front outer L Moulding Refer to door handle assembly manual 6RM08-109 L Molding Screw Tips After the installation and there is still uneven gaps on glass door, align it by rotating the abs bolt leveler until the glass wall swings freely. Bolt Leveler 13 Note: Above images are for illustrative reference only and may differ from actual item.

Glass Wall Assembly (1414 LS/RS) A Attach the glass wall where the glass frames ridges are located B Secure the glass wall with solid molding with a screw and insert top/bottom glass fi ller. C Follow glass door installation from Fig 14-16. Glass fi ller fi lls the small gap on top and below the glass door. Its reversible depends on the interior layout orientation. E Then attached remaining Front outer L Moulding. Refer to door handle assembly manual Allen Wrench 14 Note: Above images are for illustrative reference only and may differ from actual item.

Electrical Layout 15 Electrical/Wiring Locations C Conduit Sauna Light Ventilation Conduits are on both sides for light, controls and heater A Conduit Heater & Sensor Junction Box Conduit B Light Switch/ Heater Control Electrical Conduit Locations: For heater and regulating sensor For sauna light switch and heater control For sauna light Wire Installation: 1. Install junction / utility box into the ceiling roof as indicated. 2. Insert wires into the electrical conduit designated for the sauna light switch (for NB heaters) or sauna control unit (for NS heaters). 3. Insert wires into the electrical conduit designated for the heater (see technical detail).extra wire jacket is provided for hooking up single wires to the heater. Disregard the extra wire jacket if you are using a rubber cable that is specifi ed in the heater s manual. 4. Tapping of wires will be done at the junction box. 15 Note: Above images are for illustrative reference only and may differ from actual item.

Electrical Layout 16 Separate Control Installation (NS model heaters only) Conduit to control unit Conduit location Control A conduit pipe is provided for the control unit. If wanting to fl ush the control unit into the wall, cut a hole according to your control unit s specifi cations. See heater control manual Control unit must not be flushed to the wall, near or on the wall where the heater is installed. Use control unit interface holder if necessary Power Controller You can hide the power controller on the top of the sauna room. Refer to heater control instruction manual for wiring connections 17 Sensor Installation 18 Light Installation Note: Sensor installation is for Separate control heater models only. A pre-drilled hole for the sensor is provided for separate control heaters. Sensor is placed directly above the heater. Refer to the heater control instruction manual for the sensor installation. The wall has a pre-drilled hole(s) for the lights. Insert wire(s) to the conduit(s) provided for the lights. When ordering sauna room with NB heater, a dimmer switch is provided for the light(s). When using NS heater, refer to the heater control instruction manual for the light installation. 16 Note: Above images are for illustrative reference only and may differ from actual item.