The Application of Partial Discharge Measurement and Location on CGIS

Similar documents
Practical aspects of PD localization for long length Power Cables

Advancements in online partial discharge monitoring and assessment of MV through EHV Substation assets

THE PROPAGATION OF PARTIAL DISCHARGE PULSES IN A HIGH VOLTAGE CABLE

Power Frequency Withstand Voltage On-site testing of 400 kv GIS

PD Solutions. On-Line PD Measurement Devices

ON-LINE PARTIAL DISCHARGE TESTING OF SOME OF THE WORST PERFORMING CIRCUITS ON A UTILITY DISTRIBUTION SYSTEM

The University of New South Wales. School of Electrical Engineering and Telecommunications. High Voltage Systems ELEC9712. Appendix Partial Discharge

Sources of transient electromagnetic disturbance in medium voltage switchgear

Suppression of Pulse Interference in Partial Discharge Measurement Based on Phase Correlation and Waveform Characteristics

PD Testing Considerations for MV Plant Cables

Why partial discharge testing makes good sense

Diagnostic testing of cast resin transformers

On-line Partial Discharge Assessment and Monitoring of MV to EHV Cables

Africa Utility Week Focus Day Substation Condition Monitoring Benefits of Ultrasound

C I R E D 21 st International Conference on Electricity Distribution Frankfurt, 6-9 June 2011

Partial discharge diagnostics on very long and branched cable circuits

Coherence and time-frequency analysis of impulse voltage and current measurements

OMICRON Seminar on Partial Discharge Diagnostics on HV Assets. January 30, 2018 Beirut, Lebanon

KEYWORDS On-line diagnostics, cable termination, partial discharge (PD), ultra-high frequency (UHF), sensitivity check.

PARTIAL DISCHARGE DETECTION AND LOCATION IN TRANSFORMERS BY PERFORMING PARTIAL DISCHARGE TESTS IN OIL USING UHF SENSORS

Insulation Level and Test Technology of. 1000kV Power Transformer

THE POWER OF LIFE. WinTech Partial Discharge based Predictive Intelligence of insulation system to eliminate power failure risk.

Partial Discharge Detection of High Voltage Switchgear Using a Ultra High Frequency Sensor

NEW MV CABLE ACCESSORY WITH EMBEDDED SENSOR TO CHECK PARTIAL DISCHARGE ACTIVITY

Long lengths transmission power cables on-site testing up to 500 kv by damped AC voltages

UHF PARTIAL DISCHARGE DIAGNOSIS OF PLUG-IN CABLE TERMINATIONS

CHAPTER 2. v-t CHARACTERISTICS FOR STANDARD IMPULSE VOLTAGES

Partial Discharge Monitoring and Diagnosis of Power Generator

NOVEL METHOD FOR ON-SITE TESTING AND DIAGNOSIS OF TRANSMISSION CABELS UP TO 250KV

IRIS POWER PDTracII. Continuous On-line Partial Discharge Monitoring for Motors, Generators, Dry Type Transformers, and Air-Insulated Switchgear.

PD ANALYSIS OF GAS INSULATED MEDIUM VOLTAGE SWITCHGEAR DURING FACTORY ASSEMBLY AND SITE COMMISSIONING

PARTIAL DISCHARGE DETECTION - AN OVERVIEW

Partial Discharge, Survey or Monitor?

IRIS POWER TGA-B. Periodic Online Partial Discharge Monitoring Instrument for Turbine Generators and Motors

NETWORK INNOVATION COMPETITION ANGLE-DC PROJECT HOLISTIC CIRCUIT CONDITION MONITORING SYSTEM REPORT

GIS Instrument Transformers: EMC Conformity Tests for a Reliable Operation in an Upgraded Substation

Doble Solutions for Partial Discharge. Greg Topjian Solutions Manager

IRIS POWER PDTracII. Continuous On-line Partial Discharge Monitoring for Motors, Generators, Dry Type Transformers, and Air-Insulated Switchgear.

Partial Discharge Source Classification and De-Noising in Rotating Machines Using Discrete Wavelet Transform and Directional Coupling Capacitor

Equipment under Measurement: 6.6kV Alstom AIS Switchgear. Date of Measurement: 10 th August 2017

Characteristics of External Loop Sensor Located Near Bushing on Partial Discharge Induced Electromagnetic Wave Measurement

Parameters influencing Partial Discharge Measurements and their Impact on Diagnosis, Monitoring and Acceptance Tests of Power Transformers

Knowledge Is Power SM Apparatus Maintenance and Power Management for Energy Delivery. Application of EMI Diagnostics to Hydro Generators

Matz Ohlen Director Transformer Test Systems. Megger Sweden

Modeling and Analysis of a 3-Phase 132kv Gas Insulated Substation

SENSITIVITY ASPECTS OF ON-LINE PD DIAGNOSIS OF MV POWER CABLES

Non-intrusive Measurement of Partial Discharge and its Extraction Using Short Time Fourier Transform

APPLICATIONS OF ACOUSTIC LOCALIZATION TO ONLINE POWER TRANSFORMERS

Partial Discharge Measurements on 110kV Current Transformers. Case Study. Results

IEEE Transactions on Power Delivery. 15(2) P.467-P

Calculation of Transient Overvoltages by using EMTP software in a 2-Phase 132KV GIS

TD-106. HAEFELY HIPOTRONICS Technical Document. Partial Discharge Pulse Shape Analysis to Discriminate Near and Far End Failures for Cable Location

Pre location: Impulse-Current-Method (ICE)

Simulation and Analysis of Lightning on 345-kV Arrester Platform Ground-Leading Line Models

Protection of Electrical Networks. Christophe Prévé

Comparison of capacitive and inductive sensors designed for partial discharges measurements in electrical power apparatus

VFTO STUDIES DUO TO THE SWITCHING OPERATION IN GIS 132KV SUBSTATION AND EFFECTIVE FACTORS IN REDUCING THESE OVER VOLTAGES

EFFECT OF INTEGRATION ERROR ON PARTIAL DISCHARGE MEASUREMENTS ON CAST RESIN TRANSFORMERS. C. Ceretta, R. Gobbo, G. Pesavento

International Journal of Advance Engineering and Research Development. Comparison of Partial Discharge Detection Techniques of Transformer

Measurement of Partial Discharge inside Metal Enclosed Power Apparatus using Internal Sensor

PERMANENT ON-LINE MONITORING OF MV POWER CABLES BASED ON PARTIAL DISCHARGE DETECTION AND LOCALISATION AN UPDATE

10. DISTURBANCE VOLTAGE WITHSTAND CAPABILITY

Online Localisation of Partial Discharge Using Pulse Propagation Parameters in Medium Voltage Cable Network

USING DAMPED AC VOLTAGES

THE EVOLUTION OF NON-INTRUSIVE PARTIAL DISCHARGE TESTING OF MV SWITCHGEAR

Partial Discharge Measurement and Monitoring on High Voltage XLPE Cables

Comparison of measurement methods for partial discharge measurement in power cables

Design of Meander Antenna for UHF Partial Discharge Detection of Transformers

Gas-Insulated Medium-Voltage Switchgear siemens.com/8dab12

1409. Comparison study between acoustic and optical sensors for acoustic wave

Transmission Line Transient Overvoltages (Travelling Waves on Power Systems)

The importance of partial discharge testing throughout the development and operation of power transformers

IN HOUSE CALIBRATION OF PD DETECTOR SYSTEM FOR FIELD TEST RESULT RELIABILITY

Transient calibration of electric field sensors

Application of HFCT and UHF Sensors in On-Line Partial Discharge Measurements for Insulation Diagnosis of High Voltage Equipment

NOISE REDUCTION AND SOURCE RECOGNITION OF PARTIAL DISCHARGE SIGNALS IN GAS-INSULATED SUBSTATION

Alternative Coupling Method for Immunity Testing of Power Grid Protection Equipment

Study on the Transfer Functions for Detecting Windings Displacement of Power Transformers with Impulse Method

Antenna Array Layout for the Localization of Partial Discharges in Open-Air Substations

Practical Experience in On-Line Partial Discharge Measurements of MV Switchgear Systems

Testing and PD Diagnosis of MV Cable Systems with DAC Voltage Educational Session May St Pete Beach, Fl

WAVELET TRANSFORM ANALYSIS OF PARTIAL DISCHARGE SIGNALS. B.T. Phung, Z. Liu, T.R. Blackburn and R.E. James

Integrated Electro-optic Sensor based Transient Voltage Measuring System and its Applications

Gas-Insulated Metal-Clad Switchgears Express-Diagnostics Method on Partial Discharge Characteristics

SGMF(T) series. Onsite Mobile AC High Voltage Test System. Applications:

Onsite Mobile AC High Voltage Test System

International Conference on Information Sciences, Machinery, Materials and Energy (ICISMME 2015)

AC/DC Current Probe GCP-100 QUICK START GUIDE ISO-9001 CERTIFIED MANUFACTURER

Further Experience in the Use of Existing RTDs in Windings of Motors and Generators for the Measurement of Partial Discharges

PRODUCT PORTFOLIO TEST AND MEASURING SYSTEMS

A STUDY ON THE PERFORMANCE OF IMPEDANCE MATCHING CIRCUIT IN PARTIAL DISCHARGE MEASURING SYSTEM

MEDIUM & HIGH VOLTAGE

Prevention of transformers damage in HPP with double generating units connected to GIS via HV cables

Evaluation of Distribution Line Spacers through the Leakage Current Monitoring

Overview of EMC Regulations and Testing. Prof. Tzong-Lin Wu Department of Electrical Engineering National Taiwan University

Testing of 400 kv GIS

EVALUATION AND COMPARISON OF ON-LINE PD DETECTION METHODS FOR HIGH-VOLTAGE POWER CABLE

Open Access Application of Partial Discharge Online Monitoring Technology in ± 660kV Converter Transformer

Multi-Resolution Wavelet Analysis for Chopped Impulse Voltage Measurements

PARTIAL DISCHARGE MEASUREMENT AS A DIAGNOSTIC TOOL FOR CURRENT TRANSFORMER

Transcription:

International Journal on Electrical Engineering and Informatics Volume 4, Number 3, October 2012 The Application of Partial Discharge Measurement and Location on CGIS Min-Yen Chiu¹, Keng-Wei Liang¹, Chang-Hsing Lee¹, Chen-Li Fan², Chiang Cheng², Yu-Chih Lin³ 1 Power Diagnostic Service Co., Limited 2 Taiwan Power Research Institute, Taiwan Power Company ³National Synchrotron Radiation Research Center, Hsinchu, Taiwan javis@pdservice.com Abstract: While the demand of electric power increases and the installation space of power equipment is fixed in a factory, the cubical gas insulated switchgear (CGIS) is gradually applied to medium voltage system due to its small size and easy maintenance. However, it also takes longer time for the repair of CGIS accident. Therefore, the preventive maintenance (PDM) is very important and the most effective method is partial discharge measurement. Unfortunately, the metal-cladded GIS usually make PDM inconvenient, especially for the partial discharge location. This paper provides a fast and easy method for the location of partial discharge in GIS, it can locate the defect quickly and effectively, and the related strategy can be made in advance. Keywords: partial discharge measurement, cubical gas insulated switchgear, partial discharge location. 1. Introduction Gas insulated switchgear (GIS) is applied worldwide in extra-high-voltage (EHV) system due to its small size, good insulation ability, high safety, and easy maintenance. In last decades, due to the highly growing of power demand and the limited space in a semiconductor factory, a cubical gas insulated switchgear (CGIS) is developed to meet the requirement of high electric power demand density in medium voltage (MV) system. Like GIS, the CGIS costs longer duration for repair, and it means that longer planned outage period is required. Hence, the prevention maintenance (PM) of CGIS is very important. Now a day, partial discharge measurement (PDM) is an effective insulation diagnostics in many fields, and on-line PDM on GIS is also broadly adopted for routine test. Since all live parts of CGIS is in the grounded matel enclosure without spacers and hatches, which are both available for GIS, there is no accessible measuring points for the installation of partial discharge (PD) sensors. Therefore, there is a difficulty of on-line PDM on CGIS. For some customers having test socket for connecting CGIS to the testing leads, off-line PDM is an alternative method. For the customers having no such test sockets, the cable terminals are replaced by test terminals for off-line PDM. Both aforementioned conditions require planned outage, and the PDM becomes low cost-effective. This paper presents a novel method for online PDM on CGIS, which takes the cable terminals as an capacitive coupler to measure the PD signals (PDs). Once the on-line PDM on CGIS shows PDs inside the CGIS, the next step is to locate the PDs. Unlike GIS having many measuring points to locate PDs [1], only few measuring points of CGIS can be used for PD location, and the background noise level in MV system is usually high. Therefore, it is hard to identify the wavefront of PDs in the environment with high background noise level, and the PD location via the time flying method is impractical for PD location. This paper leads the correlation coefficient into the calculation of PD location via time flying method, and the PD location of CGIS becomes practicable. Received: February 29 th, 2012. Accepted: October 30 th, 2012 464

Min-Yen Chiu, et al. A real CGIS with PDs is illustrated as example to show on-line PDM on CGIS and PD location by the method addressed in this paper. The measured result shows that on-line PDM on CGIS is practicable and the accuracy of PD location is also good. This will help the field engineer to make relative strategy in advance and the impact of repair of CGIS is also minimized. 2. On-line PDM According to IEC 62271-203 [2], the PDM on GIS should be done to detect the possible material and manufacturing defects in advance. However, according to IEC 60270 [3], the method of PDM is a kind of off-line test and suits to the routine test and acceptance test in the manufactory. Due to the high level of background noise in MV system and the complex preliminary arrangements for the on-site off-line PDM on CGIS, the off-line PDM on CGIS becomes impractical for PM. In order to overcome such issues, this paper utilizes the capacitive voltage indicators and cable terminals, which are treated as capacitor, to coupling PDs, and the measuring frequency band is raised to ultra-high-frequency (UHF) to minimize the interference of background noise. A. Methodology Figure 1 shows the concept of PD propagation via the cable terminal. Once PDs are initiated by the defects insides CGIS, the PD pulse current travels along the conductor toward ground wire, and induces the transient disturbance of magnetic field. As indicated in Figure 1, cable terminal forms a capacitive path for PDs to pass through toward ground, and the PD sensor is attached to the ground wire. Figure 1. PDs propagation via cable terminal B. Measuring frequency band In MV system, because of the various types of loads, the background noise level is usually high, and makes the on-line PDM hard to be executed. Figure 3 shows the common background noise measured in MV substations in semiconductor manufactories [4]. The distribution of background noise disperses too wide to be filtered out by band rejection filter. Encountering such condition, the UHF PD sensor is used to raise the measuring frequency band to avoid the interference of background noise. Figure 4 shows a proper selection of measuring frequency band can increase signal to noise ratio (SNR) [4], and the on-line PDM becomes practical. 465

The Application of Partial Discharge Measurement and Location on CGIS Figure 3. Background noises measured at MV substations in semiconductor manufactories Figure 4. Spectrums of signals and PD sensors 3. PD location Because of all accessories being enclosed in metal enclosure of the CGIS, the PD location is required to point out where the defect is. This paper applies time flying method on PD location. Unfortunately, the accuracy of this method is easily affected by the high background noise due to the distorted waveform. Therefore, this paper leads correlation coefficient to calculate PD location to enhance the accuracy. A. Methodology Figure 5 shows the diagram of time flying method. As indicated in Figure 5, the known variables are section length (L) and the difference between arriving time of PDs, and there are two unknown variables: propagation velocity (v) and the location of PD (x), and it means that two different equations are required at least. Figure 5. Diagram of time flying method Fortunately, there are usually several feeders of a CGIS, and the amount of measuring points is enough for calculation of PD location. In CGIS, the calculation of PD location will be different according to the position of PDs, and the all possible PD positions should be checked. 466

Min-Yen Chiu, et al. PDs at the busbar Figure 6. PDs at busbar Assuming that PDs locate at the busbar section bc, and is x away from node b as shown in Figure 6. The measuring points are at nodes A, B, C, and D, and the relative time delay is t AB, t CB, t DB. Because the parts of CGIS are modular, the length of busbars (ab, bc, cd) are supposed to be equal to each other. The propagation velocity (µ bus ) of PDs in busbar can be calculated by (2), and then the distance bx can be calculated by (3). bus ab = μ Δt AB ab Δt bx = 1 2 Δt CB AB (2) (3) where µ bus is propagation velocity of signal in the busbar, ab is the length of busbar section ab, and bx are the distance between PDs and node b. PDs at the branch Assuming that PDs locate at the branch Bb, and is x away from node b as shown in Figure 7. The measuring points are at nodes A, B, C, and D, and the relative time delay is t AB, t CB, t DB. Because the parts of CGIS are modular, the length of busbars (ab, bc, cd) are supposed to be equal to each other. Because the branch is also busbar type of conductor, the propagation velocity of PDs in busbar and in branch are assumed to be the same (µ bus ). The relative distance and the time difference are shown in (4) and (5). Figure 7. PDs at branch 2 (4) 2 2 (5) where µ bus is propagation velocity of signal in the busbar, ab is the length of busbar section ab, and bx are the distance between PDs and node b in sequence. 467

The Application of Partial Discharge Measurement and Location on CGIS By solving (4) and (5), the PD location can be calculated according to (6). 1 (6) B. Correlation coefficient The calculation of PD location via time flying method requires the time difference between arriving time of PDs, and time difference is usually calculated by rise time or fall time to judge the time delay. However, in MV system, the waveform of PDs is usually distorted by the background noise, and the accuracy of time delay is hence insufficient. In order to get higher accuracy of time delay, the correlation coefficient is adopted. Correlation coefficient (ρ xy ) means the degree of signal s similarity, and can be get by (7). (7) where E[ ] denotes expectation, and and are standard deviation of signals X and Y, respectively. Assuming the PDs measured at node A and node B are X A (t) and X B (t), the time delay (k) of these signals is defined that ρ xy (k) will be maximum as shown in (8) 4. Field Measurement The on-line Partial Discharge Measurement (PDM) on the 24 kv CGIS is done by attaching TM (Transient Magnetic) sensor to ground parts of cable terminals of CGIS or by connecting the test leads to the voltage indicator of CGIS as shown in red lines in Figure 7. Figure 7. Diagram of on-site off-line/on-line PDM A. On-line PDM During periodic on-line PDM on CGIS, the phase-resolve patterns of PDs are shown in Figure 8, and the readings of R and T phases were 70 pc and 26 pc respectively. There was no PD activities detected in S phase. 468

Min-Yen Chiu, et al. Figure 8. Phase-resolved patterns of CGIS Moreover, the most frequency components of measured PDs were below 100 MHz that was classified as low risk signals based on authors experience. B. PD location The configuration of the CGIS under investigation is shown in Figure 9, and the measurement points A, B, C, and D were at feeder 426, 425, 424, and 423 in respective. However, feeder 424 was not energized and no measurement was taken at that C point. Figure 9. Configuration of interested CGIS feeder The waveforms of PDs at node A, node B, and node D were measured by Lecroy Wavefunner 64 xi with 5 GS/s, and are shown in Figure 10. The calculation results of correlation coefficient are shown in Figure 11. The calculation results of Δt AB and Δt DB are 3.2 ns and 4.8 ns. (a) waveforms at A/B points (b) waveforms at B/D points Figure 10. Time difference measurement 469

The Application of Partial Discharge Measurement and Location on CGIS (a) A/B (b) B/D Figure 11. Correlation coefficient If PD locates at busbar (suspect A), the propagation velocity is 125 ms/us (40 cm/3.2 ns), and bx is 10 cm (125 m/us x (3.2 ns 1.6 ns)/2). Therefore, the calculated PD location was at the right side of node b and 10cm away from it, which is at the middle position between 425 and 424. If PD locates at branch (suspect B), bx is 20 cm ( (40 cm/2) x (3.2 ns/(4.8 ns 3.2 ns) -1). This implies that PD source location is at the branch 20cm away from node b Figure 12. Suspected PD source location 470

Min-Yen Chiu, et al. Figure 12 shows the suspects of PDs. Due to the simple structure of the branch, it is less chance to have PDs and suspect B is supposed not to be the PD source. The suspect A is the busbar socket and is assembled in field. C. Repair Figure 13 is the busbar socket located by PDM, and there is some pollutants. After the replacement of busbar socket and insulating sleeve, the CGIS was re-energized in duration of 30 minutes. An alternative on-line PDM was carried out though the coupling capacitor and a 10 MHz high-pass filter, and the result was shown in Figure 14, which indicted that no PD activity existed. Hence the replacement of busbar socket was thought to be successful. Figure 13 busbar socket with pollutants Figure 14. Phase-resolved pattern of on-line PDM on CGIS 5. Conclusion This paper deal the method for PD source location in the MV GIS. For unknown propagation velocity of GIS, for getting the PD source location, it is necessary to assume the bus and branch are the same. The PD source location and the propagation velocity can be calculated with the width of GIS and the measurement of any three accurate data. When the PD signals are distorted by background noise, the time difference between the peaks of waveforms or the zero crossing of the waveforms can not be calculated accurately. Hence, this paper leads in the correlation coefficient to improve the accuracy of time delay calculation. The advantages of the correlation coefficience are the simple argorithm and easy implementation, and is suitable for the time delay calculation. 471

The Application of Partial Discharge Measurement and Location on CGIS According to the field experiences, on-line PDM on CGIS is an effective PM for insualtionn diagnostic. As combining with PD location, the repair cost and the outage time could be reduced. References [1] S. M. Hoek, U. Riechert, T. Strehl, S. Tenbohlen, K. Feser: A New Procedure for Partial Discharge Localization in Gas-insulated Switchgear in Frequency Domain 14th International Symposium on High Voltage Engineering, Beijing, China, 2005 [2] IEC 62271-203 High-voltage switchgear and controlgear Part 203: Gas-insulated metal- enclosed switchgear for rated voltages above 52 kv [3] IEC 60270 High-voltage test techniques Partial discharge measurements. [4] M. Y. Chiu, C. H. Lee, C. H. Huang, and S. S. Yen, The application of on-line PDM on in-service MV cable terminations, proceeding on CMD 2008. [5] CIGRE TF 15/33.03.05 Partial discharge detection system for GIS: Sensitivity verification for the UHF method and acousticc method, Electra No 183, April 1999 Min-Yen Chiu is managing of Power Diagnostic Service Co., LTD., Taiwan. He has a very good and long experience in testing and measuring power equipment. His specialist is researching in on-line PD measuring and PD location. Keng-Wefrom National ChiaoTung University in 2010.And now he is studying for PhD degree. Currently, he is working for Power Diagnostic Service Co., LTD., Liang received the B.S. degrees in electrical control engineeringg Taiwan. Chang-Hsing Lee received the B.S., M.S. and Ph. D. degrees in electricall engineering from National Tsinghua University in 1999, 2001, and 20111 respectively. His research interests include high-voltage system testing and simulation. Currently, he is working for Power Diagnostic Service Co., LTD., Taiwan. Chen-Ldegrees from National Taiwan University of science and technology in 19811 and 1985 respectively. He joined Taipower Research Institute(TPRI) of Taiwan Power Company since 1981. Currently, He is director of high voltage research Fan was born on 1 October 1953. He received the B.S and M. S. laboratory. 472

Min-Yen Chiu, et al. Chiang Cheng received the M.S. degrees in electrical engineering from National Taiwan University of Science and Technology in 2003. He joined the Taiwan Power Research Institute Hi-voltage Laboratory, in 2000. His work at the laboratory includes power system induced transient research and the field tests measurements in substation. Yu-Chih Lin received his M.S. degree in electrical engineering in 1999 from National Tsinghua University, Hsinchu, Taiwan. His areas of interest include power quality analysis and power system planning and design. He is currently working as professional engineer in National Synchrotron Radiation Research Center, Taiwan. 473