TABLE OF CONTENTS. Basic Textile Terms of Spinning 1. Sequence of Spinning process 2. Material Flow in Spinning 3

Similar documents
CONTENTS. Sr No Contents Page No.

TABLE OF CONTENTS. 1 Basics Basic Textile Terms of Spinning Sequence of spinning process Material Flow in Spinning 4

TABLE OF CONTENTS Sr no Contents Page No.

TABLE OF CONTENTS. Sr no Contents Page no. 1. Basic textiles terms Sizing Sequence of operations in weaving 2

TABLE OF CONTENTS. Sr No Contents Page no. 1. Textiles terms and definitions Weaving Identification of parts 2. 4.

Contents. Sr No Contents Page no. 1. Textiles terms and definitions Weaving Identification of parts 2. 4.

TABLE OF CONTENTS. Sr No

TABLE OF CONTENTS. SI No Contents Page No.

CHAPTER 5 CASE STUDY

TABLE OF CONTENTS. SI No Contents Page No.

TABLE OF CONTENTS. SI No Contents Page No.

INTRODUCTION. Q. What are the properties of cotton frbre considered by cotton spinners?* [Here, * = Reference of Moshiour Rahman]

Textiles Committee Govt. of India Ministry of Textiles. Course material under ISDS for Dobby Hand loom Weaver (Frame Loom)

Types of Yarns UNIT. Structure. Learning Objectives. Unit Preview

SHRI RAMALINGA MILLS LIMITED A UNIT

Spinning Calculations

TABLE OF CONTENTS. SI No Contents Page No.

Model Curriculum KNITING MACHINE OPERATOR - WARP KNITTING SECTOR: SUB-SECTOR: OCCUPATION: REF. ID: NSQF LEVEL: TEXTILE KNITTING KNITTING TSC/ Q4103 4

Yarn Testing. Table Of Contents. 1.0 Yarn Count 2.0 Yarn Twist 1.1 Yarn Count Variation 2.1 Twist Standards 1.2 Conversion Table For Yarn Counts

Model Curriculum KNITTING MACHINE OPERATOR CIRCULAR KNITTING SECTOR: SUB-SECTOR: OCCUPATION: REF. ID: NSQF LEVEL:

NMC Charkha: A Design Analysis from Technological Considerations

CHAPTER 6 TEXTILES. 6.1 A Spin Plan for Maximum Profit. A project was undertaken in a cotton-spinning mill processing the

LESSON 6 PRODUCTION OF FANCY YARNS STRUCTURE 6.0 OBJECTIVES 6.1 INTRODUCTION 6.2 STRUCTURE OF FANCY YARNS 6.3 SOME EXAMPLES OF FANCY YARNS

13. Fundamentals of Yarn Technology

9. Spinning. Errol Wood

Metric system: Metric count(nm) indicates the number of 1 kilometer(1000 meter) lengths per Kg.

The Infrastructure. Following is the general information about the infrastructure of the spinning mill.

Minimizing Thread Breakage and Skipped Stitches

International Journal on Textile Engineering and Processes ISSN Vol. 2, Issue 4 October 2016

DO NOT TURN OVER THE PAGE UNTIL YOU ARE TOLD TO DO SO

T E X T I L E Y A R N S T F

Yarn Formation 2/18/2010 OBJECTIVES CHAPTER 7 YARN BASED ON FIBER LENGTH FILAMENT YARNS

This place covers: Apparatuses and methods for warping, beaming and leasing of warp yarns in preparation of the weaving process.

Study on Material Wastes in Air-jet Weaving Mills. Md. Mahbubul Haque, Professor and Head, Department of Textile Engineering

Raw Silk Testing. Dr. Mahesha H B. Associate Professor and Head Department of Sericulture Yuvaraja s College, University of Mysore, Mysuru, India.

Yarn Processing 2/26/2008. Smooth filament yarns: Regular or conventional filament yarns.

What happens to my fleece? What products can I get from it?

TECHNICAL BULLETIN Weston Parkway, Cary, North Carolina, Telephone (919) INTRODUCTION TO OPEN-END SPINNING

INTRODUCTION THANK YOU FOR CHOOSING OUR OVERLOCK MACHINE FOR YOUR SAFETY BEFORE YOU USE - 1 -

USTER ZWEIGLE TWIST TESTER 5

A Study of Collapsed Balloon Spinning and Its Effect on Cotton Yarn Properties

USTER LABORATORY SYSTEMS

POLAR Multicone AUTOMATIC WINDER EN-CN

Yarn Thickness or Weight And How it Works...

TECHNICAL BULLETIN Weston Parkway, Cary, North Carolina, Telephone (919)

International Journal of Engineering & Technology IJET-IJENS Vol: 11 No: 06 75

Handloom Weaver(Carpets)

COURSE CODE : 5062 COURSE CATEGORY : A PERIODS/WEEK : 4 PERIODS/SEMESTER : 52 CREDITS : 4 TIME SCHEDULE COURSE OUTCOME SPECIFIC OUTCOME

POLAR I-Direct Link System

62nd Plenary Meeting of the INTERNATIONAL COTTON ADVISORY COMMITTEE in Gdansk - Poland September 7-12, 2003 By: Peter Stahlecker

TEXTILE ENGINEERING & FIBRE SCIENCE

The effect of short fibre and neps on Murata vortex spinning

Dorlastan in the Field of Warp Knitting

TECHNICAL BULLETIN Weston Parkway, Cary, North Carolina, Telephone (919)

ASSEMBLY WINDER PPW-A. PRECISION PROPELLER WINDING. STAPLE FIBRE YARNS.

Comparative Study of the Quality Parameters of Knitted Fabrics Produced from Sirospun, Single and Two-ply Yarns

USTER TESTER 5-S800 APPLICATION REPORT. The purpose of trash and dust measurement in spinning mills THE YARN INSPECTION SYSTEM

Standard Test Method for Grading Spun Yarns for Appearance 1

Standard Test Method for Yarn Number Based on Short-Length Specimens 1

Yarn Manufacture I : Principal of Carding & Drawing Prof. R. Chattopadhyay Department of Textile Technology Indian Institute of Technology, Delhi

Polyester staple fibers and its blends are found in various applications: Clothing Bedding Sportswear Home furnishings

Agricultural Mechanics and Technology Power Tool Safety Rules

Polar/M Shandong Automatic winder

International Journal on Textile Engineering and Processes ISSN Vol. 2, Issue 4 October 2016

The German Patent Classification, Class 86 Page

FUSION TWISTER. ALWAYS ONE STEP AHEAD. STAPLE FIBRE TWISTING.

Lab Project: Yarn Processing

Single Jersey Plain. Single Lacoste. Needle set out. Cam arrangement F K. Needle set out. Cam arrangement F1 F2 F3 F4 K T K K K K K T

STARTED! Get. Let s. Americana Series AMERICAN DENIM Model SA1100 Use This Guide First. Simplicity Sewing Machine Education Helpline:

Intro to the Sewing Machine

Course Title: Elements of Textile Technology (Code: )

STATIMAT 4U. Automatic Linear Density-, Twist-, and Tensile Tester for High-Tenacity Yarns

Properties of man-made fibre yarns spun on DREF-3 spinning system

DRAFT SYLLABUS FOR THE TRADE OF WEAVING OF SILK & WOOLEN FABRICS (SEMESTER PATTERN)UNDER CRAFTSMEN TRAINING SCHEME (CTS) GENERAL INFORMATION

To register your machine warranty and receive Baby Lock product updates and offers, go to If you have questions with

Study on Impacts of Spinning Process on Fiber Characteristics

EDICT ± OF GOVERNMENT

Volkmann CT with eco technology

Effect of Ring Machine Front Roller Rubber Cot Hardness on Properties of Coarser Yarn

Fibre to fabric. Gary Robinson Wool industry consultant

CURRENT AND FUTURE TRENDS IN YARN PRODUCTION 1. William Oxenham, Ph.D. College of Textiles, North Carolina State University ABSTRACT

TEXTILE YARNS. Printed on Re-Cycled Paper. Years of Progress. Save a tree.

Standard Test Method for Breaking Strength of Yarn in Skein Form 1

YARN SPLICER. & Code 115 CES COMPANY

CHARACTERISTICS OF COTTON FABRICS PRODUCED FROM SIROSPUN AND PLIED YARNS

Ch3- Fibre to Fabric. 1. List some popular fabrics from which our clothes, curtains, carpets, bags and towels are made.

Increase the Performance of Texturing Machine A Review

Be sure to oil your machine as instructed below. To avoid spotting on garments being embroidered, oil the machine sparingly.

Study & Evaluation Scheme with Syllabus for B.Tech. Second Year

Man-made staple fibres

International Journal on Textile Engineering and Processes Vol. 3, Issue 1 January 2017

THE QUALITY OF FANCY YARN: PART II: PRACTICAL EXPERIMENTS AND APPLICATION

COMPACT TWISTER. SETS NEW BENCHMARKS. STAPLE FIBRE YARNS.

Standard Practice for Designation of Yarn Construction 1

Polar Evolution AUTOMATIC WINDER POLAR EVOLUTION AUTOMATIC BOBBIN FEEDING TYPE

COMPARISON OF QUALITY PARAMETERS FOR RING AND OPEN-END ROTOR SPUN YARNS

Impact of Carding Parameters and Draw Frame Doubling on the Properties of Ring Spun Yarn

Superior s Titanium-coated Topstitch Needle

AIR JET SPINNING OF COTTON YARNS

The Fabric Processing Division of Masood Textiles has a capacity of dyeing 41,450 kgs per day. It is equipped with Thies, T.S.I, SCHOLL, Gaston dyeing

Transcription:

TABLE OF CONTENTS Contents Page No. Basic Textile Terms of Spinning 1 Sequence of Spinning process 2 Material Flow in Spinning 3 Functions of Propeller Winding Machine 5 Details of Propeller Winding Machine 6 Operating Propeller Winding Machine 10 Instructions during Shift Change 18 Importance of Health & Safety 19

1. Basic Textile Terms of Spinning: Fiber: The fundamental component used in making textile yarns and fabrics. Fibers are fine substances with a high ratio of length to thickness. They can be either natural (e.g. cotton, wool, silk etc.) or synthetic (e.g. polyester, nylon, acrylic etc.). Blow room Lap: The Loose strand, roughly parallel, untwisted fiber sheet produced in blow room. Chute feed system: It is a system of feeding small tufts of fibers directly from blow room to a series of cards, arranged in a circuit through pneumatic pipe. Sliver: The strand of loose, roughly parallel, untwisted fibers produced in Carding. Roving: The soft strand of carded/combed fibres that has been twisted, attenuated, and freed of foreign matter, which is a feed material to spinning. Yarn: A continuous strand of textile fibers that may be composed of endless filaments or shorter fibers twisted or otherwise held together. Spinning: The process of making yarns from the textile fiber is called spinning. Spinning is the twisting together of drawn out strands of fibers to form yarn. Yarn Count/Sliver Hank Yarn count is the numerical expression of yarn, which defines its fineness or coarseness. (Linear density). Yarn count systems Indirect system: English count (Ne), Worsted Count etc. i.e. Higher the yarn number, finer the yarn. Direct System: Tex, Denier i.e. Higher the yarn number, Coarser the yarn. Similarly numerical expression of fineness or coarseness of Lap, sliver & roving are called Hank. Note: English (Ne) count system is commonly followed in India. English Count: No. of Hanks of length 840 yds weighing in 1 pound 1yds: 0.9144mtrs 1lbs: 0.453 Kgs. e.g. 40 s Ne = 40 hanks of 840 yds weighs 1 lbs. 20 s Ne = 20 hanks of 840 yds weighs 1 lbs. Page No 1

2. Sequence of Spinning Process: Bale Opening Mixing Blow Room Carding Pre comber Lap Former Combing Post Comber Drawing Breaker Drawing Finisher Drawing OE Frame Speed Frame Ring Frame Auto coner or Cone Winding Propeller winding (For OE multi ply yarn) Two for one Twister Checking & Packing (For OE single Yarn) Page No 2

3. Material Flow in Spinning: Carded Yarn Manufacturing: TABLE-1 STAGE MACHINE INPUT MATERIAL OUT PUT MATERIAL PACKAGE FORM Opening & Blow Room machines Raw cotton Lap or chute - cleaning feed Carding Card Lap or chute Card sliver Slivers in Can feed 1 st drawing Breaker Draw frame Card sliver Drawn sliver Sliver can 2 nd drawing Finisher Draw frame Drawn sliver Drawn sliver Sliver can for Roving Roving Speed Frame Drawn sliver Roving Roving bobbin Spinning Ring spinning frame Roving Ring-spun yarn Spinning Cops Post- Spinning processes Winding(Auto Coner) Yarn in spinning cops Yarn package Cone, Cheese & Hank as required Doubling/ Plying Propeller winding Cone/cheese Plied yarn in cheese Cheese Twisting Two for one Twister Parallel yarn Cheese Plied & Twisted Yarn Cheese or cone Combed Yarn Manufacturing TABLE-2 STAGE MACHINE INPUT MATERIAL OUT PUT MATERIAL PACKAGE FORM Opening & Blow Room Raw cotton Lap or chute - cleaning machines feed Carding Carding machine Lap or chute feed Card sliver Carded Slivers in Cans Pre comber Drawing Breaker Draw Frame Carded Sliver Drawn Sliver Drawn slivers in cans Lap Formation Super Lap or Lap Former Drawn Slivers Lap Laps in spools Combing Comber Lap Combed Sliver Combed sliver in Cans Post comber Drawing Finisher Draw Frame Combed sliver Drawn sliver Post comber Draw frame slivers in cans Roving Speed Frame Post comber Roving Roving bobbin Draw frame sliver Spinning Ring spinning frame Roving Ring-spun yarn Spinning Cops Page No 3

Post- Spinning processes Doubling/ Winding(Auto Coner) Propeller winding Yarn in spinning cops Plying Twisting Two for one Twister Parallel yarn Cheese Yarn Cone/cheese Plied yarn in cheese Plied & Twisted Yarn Cone, Cheese & Hank as required Cheese Cheese or cone Various Package Form: Page No 4

4. Functions of Propeller Winding Machine: The purpose of propeller winding is to unite two or more Yarn on a package(cheese) prior to twisting It essentially is doing winding of two or more single yarns together on to a suitable package to be subsequently creeled on the doubling or twisting machine. To provide vibration free traversing and cross winding yarn on cheese To improve the strength of yarn. Page No 5

Details of Propeller Winding Machine Page No 6

Main Parts of Propeller Winding Machine: Cone Holder: It is a Spindle type holder with separators for keeping cones. In some machines platform type cone holders, hold the cones for unwinding. The cone holders functions are to hold the full cones for unwinding smoothly and feed to cheese as plied yarn.. Cone holder cones creeled on the machine Cone mounted on Cone holder Page No 7

Thread Guide: The Bottom Thread guide is to guide the yarn from single yarn cones for plying. The top thread guide is provided to guide the plied yarn to Cheese for final winding. The ceramic portion of thread guides ensures smooth passage of yarn. Thread guide Ceramic Thread guide EYC & Yarn tensioner unit: The EYC clears the yarn defects and Yarn tensioner provides sufficient tension to the yarn during unwinding from cone to winding on to cheese. Ceramic thread guide to guide plied yarn to cheese EYC and Yarn Tensioner unit Page No 8

Cradle: Its function is to hold Cheese on the winding head. It lies on the upper part of machine. Counter rotating Blades: In propeller winding the yarn traverse is facilitated by the two counter rotating blades beneath the winding rollers. The movement of the counter rotating blades traverses the yarn during winding. Cradle Crade to hold the Cheese during winding Counter rotating blades for traverse Schematic diagram of Counter rotating blades for yarn traverse Page No 9

Display Panel: It displays various operating machine parameters like speed, production, Count of yarn etc. Understand the details in the display panel and work accordingly. Signal Lamps: Signal lamps are provided on the machine to indicate the reason for stoppage of drums. Understand each signal lamp and their purpose in the machine. Stop motion signal lamp in machine 6. Operating Propeller Winding Machine: Creel the required number of cones in the cone holders. Operate the control switches for starting and stopping the machine. Follow the different signal lamps in the machines. View the display panel and identify the reasons for stoppages if any. Inform the supervisor in case of any break-downs. See that the tension weight on each head is as specified for the count running. Ensure that the EYC setting is as instructed. Ensure the functioning of stop motion for every individual winding head Follow instructions/direction of supervisors, during count changes. Attend to yarn breakage by using Knotter / Splicer Page No 10

Follow the instructions of the supervisor for knotting / Splicing After Knotting trim the knotted portion with scissor provided. Once the cheese reaches required size, doff the full Cheeses Identify and report the different package defects to the supervisor. Transport empty cones to winding department. Carryout cleaning activities in the Creel, thread guide, Tension weight and Cheese holder etc., Remove the suction waste from OHTC periodically & segregate the wastes collected and put them in the designated bins. Always keep machine area clean. Creeling of cones Taking yarn from cone after creeling Operating control switches Ensuring tension weight and functioning of EYC Page No 11

Importance of Colour coding: The details related to colour coding like cone tip colour, empty cheese colour and other relevant information like Count of yarn wound, no of plies etc, are normally displayed in respective machine s display board. It is the responsibility of the machine operator to understand them & work accordingly. Importance of no of ply: In propeller winding machine two or more single yarn are fed for plying and winding on to Cheese. It is the responsibility of the operator to understand the no of ply working in the machine or drums allotted to him /her. Identifying Defects: Defects in cones received for feeding like irregular shaped cones, soft or hard cones, stitches formation in cones, stains, Ribbon formation etc are to be identified and informed to supervisor for necessary action. Defects in the winding cheese (Paralleled yarn cheese) like damaged cheese, stitches, Singles, wrong ply, cuts in yarn etc, are to be identified and informed to supervisor for necessary action. Creeling the Cones Bring the correct colour coded cones in the trolley from storage area for creeling the Propeller winding machine Patrol around the machine and identify the cone exhaust. Replace the exhausting cones from the cone holder and place the full cones. Always make it a practice to creel with equal sized cones in feeding cone holders Check and ensure that the cones are properly creeled Check every individual spindle and ensure that the cheese is not idle due to feeding cones exhaust. Always take minimum time to creel the cones safely Page No 12

Identify the running out cones Creel with new cones Attending to breakage and restarting While attending to breaks or while replacing exhausted cones first lift the Cheese spindle from the surface of the roller Properly stop the cheese spindle before knotting. Take out the thread from the cheese first. Then take out the yarn from cones through Tension weight, EYC and thread guides of paralleled yarn. Knot / splice the thread from Cheese with paralleled yarn from cones. Adopt proper procedure as instructed for operating the knotters / splicer for knotting or splicing Knot / Splice the breakage with minimum loss of time and with minimum waste. After knotting trim the knotted portion using the scissor provided, to ensure quality of yarn Now press down the cheese holder lever for winding to continue Check whether the cheese is properly seated and the plied yarn is properly being wound on the cheese uniformly. Ensure that the traverse of yarn takes place properly Page No 13

Collect the hard waste while attending to breaks and put them in the hip bags or Apron pocket given Always ensure safety while knotting / Splicing the yarn Taking broken thread from cheese Taking broken thread from cones and passing through tension weight,eyc & thread guides Taking both threads from cheese and cones for Knotting Taking both threads from cheese and cone for Knotting Page No 14

Knotting the threads with knotter Trimming the knotted threads with scissor Doffing the Cheese package and restarting winding When the running cheese reaches specified size, prepare to doff the cheese. Patrol around the machine and ensure the winding stage is ready for doffing. Check the Cheese package is fully wound to the predetermined size and start doffing. Ensure the availability of correct colour coded empty cheese for doffing. Take the correct colour coded empty cheese in hand. First break the yarn from the full cheese Remove full Cheese package from cheese holder and keep them on the space provided in the machine. Insert the empty cheese for winding Take the thread to the empty cheese in hand and wind manually few rounds. Fix the cradle, operate the control switch and ensure that the winding takes place smoothly. Also ensure to check for proper yarn traverse through the movement of counter rotating blades. Place the doffed Cheese in the trolley and transport to the storage area as instructed. Reserve the correct colour coded empty Cheese in the reserve area in the machine for facilitating next round of doffing Page No 15

Keep the hard waste removed during doffing in separate waste collection boxes. Identifying full cheese Taking out the full wound Cheese Inserting empty cheese after doffing Winding thread on empty cheese Page No 16

Press the control switch and ensure winding Taking hard waste and put in apron or hip bags Cleaning of propeller wingding machine & Waste disposal Clean the different mechanisms in the machine at scheduled intervals as instructed. Ensure the yarn passage from cones to cheese are clean Periodically clean the thread guides, EYC and tension weight units. Always keep the entire yarn passages from cones to cheese being wound, free from dirt & fluff to ensure good yarn quality. Keep the wastes in waste bags, piecer bags, or in apron pockets. Properly handle full cones, empty cheese and full cheese Clean the waste accumulation from different parts of the machine from time to time. Use proper tools for cleaning. Ensure safety while carrying out cleaning activities. Clean the wastes in the propeller winding machine area. Ensure OHTC is running continuously. Collect waste from OHTC at periodical intervals. Page No 17

7. Instructions during Shift Change: Take Charge of the Shift Come at least 10-15 minutes earlier to the work spot. Meet the previous shift operator and discus regarding the issues faced by them with respect to the quality or production or spare or safety or any other specific instruction etc. Understand the count produced, No of Plies, colour coding followed in the propeller winding for his allocated number of drums or machines. Check the technical details are mentioned in the display board in Propeller Winding machine Check for the availability of the cones for feeding the machine. Check for the availability of the correct colour coded empty cheeses for the count running. Check all the cheeses are running properly, if any cheese is idle enquire for the reason and report to the supervisor. Check the cleanliness of the machines & the work area. Check whether any spare/ tool / cones/cheeses or any other material are thrown under the machines or in the other work areas. Check the Over Head Travelling Cleaner (OHTC) is working properly Page No 18

Handing over the Shift: Properly hand over the shift to the incoming shift operator. Provide the details regarding count produced, No of Plies, colour coding followed in the Propeller Winding for his allocated number of drums or machines. Provide all relevant information regarding idle winding head and damaged machine parts if any. Collect the wastes from waste collection bags weigh them and transport to storage area. Check for the cleanliness of the work place. Get clearance from the incoming counterpart before leaving the work spot, in case if the next shift operator does not come, report to shift supervisor. Report to the shift supervisor about the quality / production / safety issues/ any other issues faced in the shift and leave the department only after getting concurrence for the same from supervisor. 8. Importance of Health & Safety: Follow the work & safety instructions and adopt safe working practices like not opening the doors of the machine, not cleaning the interior parts & not taking any choked material when the machine is in running condition. Do not take your hands very close to counter rotating blades while it is working. Always use head cap, face mask and ear plug in the work spot. Do not carry any metallic parts during machine running as there are chances of fire and damage to machine parts. Take action based on instructions in the event of fire, emergencies or accidents, and participate in mock drills/ evacuation procedures organized at the workplace as per the organization procedures. Page No 19