Innovative solution of E-Beam System Dr. Yuwei Zhang Wuxi El Pont Radiation Technology Co. Ltd.,
Who We are EL PONT 40min from Shanghai by train
Who We are no.1 market share in China, approximately 200 in total sales first export enterprise from China to many countries (Korea, Russia, India, Turkey, Indonesia etc). High in customer loyalty, e.g. multiple purchase (e.g. 16, 13, 8) from our top clients Market Breakdown by Machine Type (*) E-Beam El Pont Market Breakdown by Manufacture Cobalt 60 Others (*) Information source from China Isotope & Radiation Association, Oct 2013
R&D Capacity The only research institute for E-beam technology in China Top R&D group, with research team from IHEP, Chinese Academy of Science and El Pont R&D center (15+ professors with 40+ years) the only research institute in China, dedicating to E-beam technology and winning governmental support Win governmental support in E-beam R&D center
Product Portfolio designing & manufacturing both HFHV type and Linac E-beam wider range of E-beam from 0.5MeV-10MeV Successful application of E-beam with x-ray Type AB0.5 AB0.8 AB1.0 AB1.5 AB2.0 AB2.5 AB3.0 AB4.0 AB5.0 AB10 Energy 0.5MeV 0.8MeV 1.0MeV 1.5MeV 2.0MeV 2.5MeV 3.0MeV 4.0MeV 5.0MeV 10MeV Beam current Max. beam current power 100mA 80mA 80mA 67mA 50mA 40mA 34mA 25mA 20mA 2mA, 4mA 50kW 64kW 80kW 100kW 100kW 100kW 100kW 100kW 100kW 20kW, 40kW Shielding Selfshielding Selfshielding Application Wire&Cabl e, Film, Tyre Wire&Cabl e, Film, Tyre Wire&Cable, Heatshrinking, Tyre Wire&Cable, Heatshrinking, Foamed plastics Wire&Cable,H eat-shrinking Wire&Cable, Heatshrinking Wire&Cable, Heatshrinking Wire&Cable, Heatshrinking Wire&Ca ble,heatshrinking, Sterilizati on Sterilization
New Product Development Mid- and highenergy electron accelerator Self shielding Twin-type self shielding 10Mev Linac electron accelerator (sand l-band)
New Product Development Self-shielded low energy electron accelerator I Sliding wall
New Product Development Twin-type Self-shielded low energy electron accelerator
New Product Development Mid-energy electron accelerator High-energy electron accelerator
X-Ray Target 1. 5MeV/120kW and 150kW with X-Ray is self-developed technology by Wuxi El Pont 2. 7 E-beam with El-Pont X-ray target in operation across China
New Product Development 10.0MeV-20kW s-band linac electron accelerator 10.0MeV-40kW L-band linac electron accelerator
Headline News in Science and Technology Daily (the most authoritative newspaper in China's science and technology area)
Published Book about E-Beam plus X-Ray technology in quarantine treatment
Selected Customers
Overseas Market APAR, India 3.0MeV-34mA & 1.5MeV-67mA 2011-6-14
Overseas Market Busan, Korea 1.5MeV-50mA, 2005-6-25
Overseas Market Indonesia Atomic Energy Institute, 1992 Visited by Then-President
Overseas Market Turkey, 3.0MeV-34mA 2014-8-29
Factors in choosing E-beam Vendor Top of Mind: product KPIs Product Cost Hidden need: other key factors influencing their decision but not raised up at the first place Total Financial investment and construction period Customer service after sales Machine reliability
Impact Factor of Total Financial Investment Building Area Building Height Cement cost Construction Period
Case study of our 3.0MeV HFHV Due to sophisticated design of the electric field, our machine room is 5m shorter than others.
Case study of our 3.0MeV HFHV El Pont Others Total Height 16.5m 22-23 m Radiation room height 2.1-2.3m 3.1-3.3m
Case study of our 3.0MeV HFHV (financial Implication) Impact Factor In-market Solution Building Area 120m 2 120m 2 Building Height 22m 16.5m Concrete 1400m 3 1200m 3 Total investment of shielding bunker El Pont Solution 310,000 USD 255,000 USD Note: numbers above quoted from 3.0MeV example
Case study of our 3.0MeV Height 3.0MeV : 16.5m Height 3.0MeV: 10.6m
Layout of the machine room 26m*17m 17m*13m
Occupied area Bunker area:26m*17m Bunker Area:26.5m*13.5m
Financial Implication of two methods In-market Solution El Pont Solution Total Building Area 242m 2 242m 2 First Floor Area 141m 2 140m 2 3.0MeV Building Height 16.5m 10.5m Cement 1000m 3 1200m 3 Total investment of shielding Bunker 315K,000 USD 230.000 USD
More cases in video
After sales service Product repair and maintenance Equipment operator training Consultancy service
Customer Training Programs Training course includes lectures, seminars and hand-on training etc.
Underbeam and Device Control System Underbeam systems for wires and cables Smart control system
Underbeam and Device Control System Car-go system Roller conveyor system
Improvement of processing technology Dosage control Processing technology
Long working life and reliability 22 years working life First visit in 1992 for installation Indonesia Re-visit in 2014
Recap and Conclusion El Pont, a leading supplier of E-beam machine, with 200+ machine sold across China and overseas Our E-Beam solution fulfills the normal need of product requirement and goes beyond Product KPI and cost Total Financial investment and construction period Customer service after sales Machine reliability