Glass Instalation Guide PRIVA-LITE. Updated v

Similar documents
Installation Instructions

EB/MM Upd.2_ CLIP-IN DOOR FOR SHOWERS FT

IMPORTANT INSTALLATION GUIDE VALENCIA SQUARE CORNER SHOWER READ ALL INSTRUCTIONS CAREFULLY BEFORE STARTING THE

ALLORA SWING PANEL INSTALLATION INSTRUCTIONS

Deauville Installation Guide

ENARC CONSULTANTS. M. G. ROAD, THRISSUR - 1 Ph. : &

Deauville Installation Guide

IMPORTANT INSTALLATION GUIDE VALENCIA ANGLE CORNER SHOWER READ ALL INSTRUCTIONS CAREFULLY BEFORE STARTING THE INSTALLATION

B A T H R O O M G L A S S

UNIT No FRAMELESS PIVOT SHOWER DOOR

Installation Instructions

Hardware Fitting Accessories Door Seals

Allora ALCOVE ENCLOSURE INSTALLATION BEFORE INSTALLATION CHECK THAT YOUR ALLORA SHOWER ENCLOSURE SYSTEM IS UNDAMAGED

Page 1 of Ch 6. A Lecture note on Building Technology By Kishor Thapa

Updates Interior compensation of varying infill thicknesses. THERM + V curtain walls

INSTALLATION INSTRUCTIONS

Cardo DOOR & RETURN SHOWER ENCLOSURE INSTALLATION PLEASE READ THESE INSTRUCTIONS CAREFULLY.

VALENCIA RONDO DOOR WITH RETURN

Portofino Installation Guide

Portofino Case2 Installation Guide

ASS 70 FD folding/sliding door installation guide

SLIDING MECHANISM TROLLEY CATCH TROLLEY ASSEMBLY FLOOR GUIDE

Architect: Daluz/González Architekten Photo: Peter Baracchi CP 155 SLIDING DOOR INSTALLATION GUIDE. Edition 15/21

An adjacent sauna must be well insulated and located to leave a gap of at least 10 cm (4 ) for air to circulate between the sauna and the steam room.

IF INSTALLING ANY OF THE PORTMAN SELF CLOSING SYSTEMS, PLEASE READ THE CORRESPONDING FITTING INSTRUCTIONS SUPPLIED WITH THE CLOSING SYSTEM FIRST

SLIDING MECHANISM TROLLEY CATCH TROLLEY ASSEMBLY FLOOR GUIDE

Acid etched float glass

In-line Patio Fabrication & Installation

Installation - Sub Cills

INOVO 2-LITE SLIDING PATIO DOOR

340 & 350 SERIES BATH ENCLOSURES

340 & 350 SERIES DELUXE FRAMELESS BYPASS

Side Light Frame Pack Assembly Instructions

INSTALLATION MANUAL 32273/1205 C C-403 GB - F - D - NL - ES - I - S - SLO

INSTALLATION INSTRUCTIONS DANUBE ACRYLIC NEO ANGLE

FIG. #1 - ASD-90 & USD-90 Shower Door Assembly

CINTRALUX ALU BARREL VAULT EP 10/10

1/4 FRAMELESS SLIDING DOOR FOR TUB OR SHOWER 4400A-4500A

Side Light Frame Pack Assembly Instructions

Method of Build 1. General

Platinum Swing Panel Installation Instructions

ASS 70 FD folding / sliding door. Installation Guide

IMPORTANT!!! ASSEMBLY ASSEMBLY INSTRUCTIONS. (Internal Dimensions)

SHOWERLUX HELPLINE: TEL: SHOWERLUX (UK) Ltd.

40mm Thermoclick. Type II Class 1 Clear Satin Anodize - 201R1 (Mid Grade Commercial)

Instructions for Installation on a Pitched Roof LIGHTWAY optical tube LW 260, LW 320, LW 520, LW 760

Prel-Lam LC-LTI Liquid Crystal Laminated Glass


Standard program overview Steel smoke-proof doors

1/4 FRAMELESS SLIDING DOOR FOR TUB OR SHOWER

FACTS ABOUT TP LITE FRAMELESS P

mistley PELE Installation Guide vapr16 Mistley Bathroom Glass Limited No 4 One Mistley Quayside, High Street, Mistley, Essex CO11 1AL England

FIG. #1 - ASD & USD 180/280 Shower Door Assembly

VALENCIA CORNER DOOR WITH RETURN

INSTALLATION GUIDE SLIMLINE ROOF LANTERN 4 PANE CONFIGURATION

Exploded View PAGE 2 OF 9

SLIDING DOOR for CORNER installation ONLY - this door closes to side panel -

Monaco Installation Guide - Surface Profiles

INSTALLATION INSTRUCTIONS

SMART SYSTEMS VISOGLIDE+ INSTALLTION GUIDE

How To Install Windows: Nail-Fin Application

INFINITE RANGE - CENTRE FOLDING DOOR

For Installer. Duration Windows. Assembly Guide Durafold 1000

Gluing windows with SABA Glasstack 760

Installation Guidelines For Quaker Window Products Aluminum flange fin sub sill & receptor system using a T mulled twin window unit.

PREMIUM GLASS BATH SCREEN

SEMI-FRAMELESS DOOR WITH GLASS PANEL & BENCH GLASS

1/4 FRAMELESS DOOR WITH INLINE PANEL 1413A-1713A-1813A

EXPOSED FASTENING SYSTEM WITH SCREWS OR RIVETS

Simplex Baseboard System Baseboard System

Semi-Frameless Hinged Door With Panel And Return

INOVO 4-LITE SLIDING PATIO DOOR ASSEMBLY AND INSTALLATION INSTRUCTIONS

Dura-Lock Roof System

How to Build Your Custom Teardrop Camper. 5 x 10 Trailer. 5 Tall Cabin

INSTALLATION MANUAL FORTRESS SERIES

1/4 FRAMELESS SLIDING DOOR FOR TUB OR SHOWER

Glues and mastics. SILICONE ADHESIVE SEALANT 42 Marine silicone SOROMAP...42 Silicone colour RAL...42 Glue mastic MS1000 TECHNIFIX...

Dubnium 11 Installation Instructions & Parts List


Unit No. 4400, 4500 Classic Frameless Sliding Tub/Shower Enclosure INSTALLATION INSTRUCTIONS

Table and Furniture Base Fittings Plinth Adjusting Fittings

CORNER ENTRY ENCLOSURE

Gallium 03 Installation Instructions & Parts List

Liniar Window. installation guide

PATIO INSTALLATION MANUAL

SLIDING TUB / SHOWER ENCLOSURE WITH STATIONARY 90º PANEL

28.00 Rmt sqm sqm

INFINITE RANGE - HINGE DOOR

SERIES 3070-T MULTI-SLIDE ASSEMBLY & INSTALLATION INSTRUCTIONS

Installation Guide. Evolve bi-fold. 8. Door restrictor- optional p9. 1. Before you start p2. 9. Adjustment. 2. Measuring and surveying p2

argenta opening doors

3/16 OR 1/4 FRAMELESS SWING DOOR WITH SINGLE INLINE PANEL OR TWO INLINE PANELS

Installation Instructions Student 101 Fume Cupboard

Side and rear window, assembly overview

TOYOTA MOTOR EUROPE CA Products Division Tel : Fax :

method of build Komfire-75 partitioning system 75mm Steel Stud & Plasterboard Partitioning System with Square Aluminium Cover Trims KOMFORT

Method of Build 1. Fire. Sound

Panel Installation Instructions

METL-VISION WINDOW SYSTEM FOR HORIZONTAL WALL PIONEERING INSULATED METAL PANEL TECHNOLOGY

INSTALLATION INSTRUCTIONS. Thermal Entrances AA 250/AA 425 THERMAL DOOR WITH TRIFAB 601/601T FRAMING

Transcription:

PRIVA-LITE Glass Instalation Guide Updated 25.10.2013 v 5.0 www.glassolutions.eu

PRIVA-LITE? T TABLE OF CONTENTS 1. Fixed frame application 2-8 2. Butt joint application 9 3. Door application 10-11 4. Bathroom application 12 5. Floor and ceiling application 13 1

1. FIXED FRAME APPLICATION Never expose the PRIVA-LITE to temperatures over 60 C Hot spots such as light spot, cooking table top may by consequence never be close to PRIVA-LITE panels. For external applications, PRIVA-LITE has to be assembled in DGU or TGU with low e glazing. It has to be assembled with solar control glazing in sunny countries or on South & West façades. 1.1 Frame characteristics PRIVA-LITE can be fixed in PVC, aluminium or timber frames. If the framing or the trimming are conductive (aluminium, lacquered or stainless steel, ), it is then necessary to ground it either on the earth of the building or on the earth terminals of the power supply unit. Make sure that allframing segments are interconnected. If not each segment must be independently connected to earth. Holes of 10mm of diameter have to be drilled in the frame to allow the female connectors of the glass cables to pass. The rebate height has to be min 18mm for PRIVA-LITE single glazing and min 20mm for PRIVA-LITE assembled in double glazing. When PRIVA-LITE is assembled in double glazing then please make sure that the frames are correctly drained and ventilated. Since PRIVA-LITE may not undergo a pressure of more than 10N/cm? make sure that the frame will be at least 4mm wider than the PRIVA-LITE panel. 2

1. FIXED FRAME APPLICATION 1.2 U Profile GLASS CABLE Length 100cm Diameter 5,5 mm +/-0.3mm + Molex female connector (8mm dia) EVA MOLDING MULTISIL SILICONE NON ACTIVE AREA 9mm GLASS LC FILM Top position MULTISIL SILCIONE U PROFILE SETTING BLOCK 3

1. FIXED FRAME APPLICATION 1.2 U Profile U PROFILE BottomPosition GLASS LC FILM NON ACTIVE AREA9mm MULTISIL SILICONE EVA MOLDING SETTING BLOCKS GLASS CABLE Length 100cm Diameter 5,5 mm +/-0.3mm + Molex female connector (8mm dia) 4

1. FIXED FRAME APPLICATION 1.3 U Profile + cavity GLASS CABLE Length 100cm Diameter 5,5 mm +/-0.3mm + Molex female connector (8mm dia) EVA MOLDING MULTISIL SILICONE NON ACTIVE AREA 9mm GLASS LC FILM Top position MULTISIL SILCIONE SETTING BLOCK 5

1. FIXED FRAME APPLICATION 1.3 U Profile + cavity GLASS LC FILM Bottomposition MULTISIL SILICONE NON ACTIVE AREA 9mm EVA MOLDING SETTING BLOCK GLASS CABLE Length 100cm Diameter 5,5 mm +/-0.3mm + Molex female connector (8mm dia) 6

1. FIXED FRAME APPLICATION 1.4 Installation in 5 steps Step 1 : Before fixing the PRIVA-LITE in its frame, make sure that the frame is clean and that a grommet has been fixed on each holes to prevent the damaging of the extension cable. Since PRIVA-LITE may not undergo a pressure of more than 10N/cm? make sure that the frame will be at least 4mm wider than the PRIVA-LITE panel. Step 2 : Pass the extension cables while making sure that the male connector of the cable is on the panel side Use only the extension cables delivered by Glassolutions Saint-Gobain between the power supply unit and the PRIVA-LITE panels. Step 3 : Connect the male connector of the extension cable to the female connector of the PRIVA-LITE panel. Make sure that connector is fully pushed in to get a good electrical insulation. Extension cable with Molex male connector Glass cable with Molex female connector 7

1. FIXED FRAME APPLICATION 1.4 Installation in 5 steps Step 4 : Place the PRIVA-LITE panel in its frame and wedge it with setting blocks. Only hard wood setting blocks may be used. Make sure that the thickness of the setting blocks is minimum 8mm to avoid crushing the EVA moulding, the connector and the cable. Step 5 : Sealing of the frame. Only the Multisil silicone delivered by Glassolutions Saint-Gobain and products approved by Saint-Gobain may come in to contact with the edges of the glass. Preformed sealing joints can be used unless they remain only in contact with the surface of the PRIVA-LITE. Step 5 : Sealing of the frame. In case of DGU, the outside sealing can be done with silicone DC993 and DC3362. But at the inner side, PRIVA-LITE s side, only the Multisil silicone delivered by Glassolutions Saint-Gobain can be used. EXTERIOR 0 6 1 3 ELECTRODE PRIVA -LITE INTERIOR 76 NON ACTIVE AREA EVA MOLDING 8

2. BUTT JOINT APPLICATION When PRIVA-LITE panels are used as a glass wall without any vertical profiles (butt jointed glasses) then only the Multisil silicone delivered by Glassolutions Saint-Gobain may be used for joints. Available colours: Translucent, black (RAL 9005), grey (RAL 7042), white and brown (RAL 8019). Prior to silicone application, preferably place masking tape on both sides to obtain a neat joint, especially when edge is sandblasted. Remove masking tape before full reticulation of the silicone. To achieve a smooth butt joint finish, only use soapy water spray (neutral washing up liquid + water). Only products approved by Saint-Gobain may come in to contact with the edge of the glass. No other product such as glue, adhesive, sealant, gasket, plastic strip primer and finisher liquid can be used in contact with the edge. A min of 4mm separation between the panels is recommended. In case of bow, place bow in same direction for side by side panel and use 2 wooden blocks with a screw to middle height of the glass to move closer together the adjacent panels. 9

3. DOOR APPLICATION Never expose the PRIVA-LITE to temperatures over 60 C Hot spots such as light spot, cooking table top may by consequence never be close to PRIVA-LITE panels. For external applications, PRIVA-LITE has to be assembled in DGU or TGU with low e glazing. It has to be assembled with solar control glazing in sunny countries or on South & West façades. 3.1 Swinging and pivoting door For door application, PRIVA-LITE panel is either fixed in a frame or in top and bottom profiles (swinging door). Frameless PRIVA-LITE doors are impossible. In both cases, extension cables delivered by Glassolutions Saint-Gobain will have to pass through a lead cover such as Assa Abloy EA280 or EA281 Door handle and lock have to be fixed on the frame. Rectangular notch for the handle and the lock can be cut in the glass (and LC film) on demand and under specific conditions. If the lock has to work as a switch (PRIVA-LITE switched OFF when the door is locked), then the use a specific relays, such as the RSB relay from Schneider, is recommended. Electrical diagram is available on demand. For toilet door, we recommend to use our High Privacy PRIVA-LITE version (higher hiding power). Since PRIVA-LITE panel could slightly bend, we recommend to frame twin doors. Door handle and lock have to be fixed on the frame. Rectangular notch for the handle and the lock can be cut in the glass (and LC film) on demand and under specific conditions. If the lock has to work as a switch (PRIVA-LITE switched OFF when the door is locked), then the use a specific relays, such as the RSB relay from Schneider, is recommended. Electrical diagram is available on demand. For toilet door, we recommend to use our High Privacy PRIVA-LITE version (higher hiding power). Since PRIVA-LITE panel could slightly bend, we recommend to frame twin doors. 10

3. DOOR APPLICATION Never expose the PRIVA-LITE to temperatures over 60 C Hot spots such as light spot, cooking table top may by consequence never be close to PRIVA-LITE panels. For external applications, PRIVA-LITE has to be assembled in DGU or TGU with low e glazing. It has to be assembled with solar control glazing in sunny countries or on South & West façades. 3.2 Sliding door When PRIVA-LITE is used as a sliding door it has to be framed on 4 sides. Door handle and lock have to be fixed on the frame. Rectangular notch for the handle and the lock can be cut in the glass (and LC film) on demand and under specific conditions For sliding door application, a specific extension cable is needed. Please contact Glassolutions Saint-Gobain for more information. Extension cables delivered by Glassolutions Saint-Gobain will have to pass through an Energy chain system. For correct installation, follow Igus E-ChainSystem - Installation Guide.. 11

4. BATHROOM APPLICATION Always refer to CEI 60364-7-701 and most of all to National Electric Code Zone 0 (shower tray) : no PRIVA-LITE. Zone 1 (<120cm from water source) : only embedded DGU PRIVA-LITE IPX7 (PRIVA-LITE on the opposite side of bathroom). Zone 2 (>120cm from water source) : single glazing PRIVA-LITE IPX7 possible only if it s fixed in a frame perfectly sealed In case of bath, single glazing PRIVA-LITE IPX7 is possible only if it is fixed aside and above the bath tub in a frame perfectly sealed. A continuous cable has to be used between the panel and the power supply unit fixed out of the zones 0, 1 and 2. 12

5. FLOOR AND CEILING APPLICATION As PRIVA-LITE may not undergo pressure higher than 10N/cm? it has by consequence to be fixed as a second skin of a LITE-FLOOR panels. See drawing hereunder. See national regulation to define the thickness of the LITE-FLOOR panel Support structure will be visible through these transparent areas SGG LITE FLOOR PRIVA LITE Support structure Support structurehas to be min = to 1,5 the thickness of the SGG LITE FLOOR or PRIVA -LITE Never expose the PRIVA-LITE to temperatures over 60 C Hot spots such as light spot, cooking table top may by consequence never be close to PRIVA-LITE panels. For external applications, the SGG LITE-FLOOR has to be laminated with a solar control glazing as external glass and the area between the SGG LITE-FLOOR and PRIVA-LITE has to be correctly ventilated to avoid any overheating of the PRIVA-LITE 13

This document contains all essential instructions for the electrical installation of PRIVA-LITE panels on the power supply unit PVL XL. All documents previously published by Glassolutions are replaced by the present document. Glassolutions has taken every reasonable measure to ensure that the information contained in the present leaflet was exact at the time of its publication. However, Glassolutions keeps the right to modify or add any information without previous notice 14