AFU 'A'AU WATERFALL P R O P O S E D T O I L E T B L O C K & G A T E GEF CLIMATE RESILIENCE PROJECT VAILOA, PALAULI, SAVAI'I, SAMOA

Similar documents
TAGA BLOWHOLES P R O P O S E D T O I L E T B L O C K & V I E W I N G P L A T F O R M GEF CLIMATE RESILIENCE PROJECT TAGA, SAVAI'I, SAMOA

SALE'AULA LAVA FIELD P R O P O S E D A T T R A C T I O N I M P R O V E M E N T S GEF CLIMATE RESILIENCE PROJECT SALE'AULA, SAVAI'I, SAMOA

How-To-build guide carport

C.00. Ullrich Aluminium Co. Ltd. Ulltraclad Aluminium Cladding September Wall Batten Elevation. Horizontal battens between verticals at soffit

DUTCH GABLE FREESTANDING CARPORT

Acceptable Standards of Domestic Construction

Dura-Lock Roof System

24 X32 3 CAR GARAGE POLE BARN STYLE FRAME

Typical Drawings for Schools

Fibre Cement G C. Batten Fixing Setout ST-01. Jan 2014 A4 PROFILE DATE SCALE DETAIL DETAIL NO. Plank joint. 600mm stud crs.

PROJECT: PROPOSED GARBAHAREY MEAT MARKET - GARBAHAREY DISTRICT - CONSULTANTS: GARBAHAREY MEAT MARKET GOVERNMENT. - GARBAHAREY DISTRICT -

PONDICHERRY UNIVERSITY ENGINEERING WING SCHEDULE OF WORK

SHED PACK. Sheds are commonly constructed using portal frames.

GLOSSARY. A useful collection of definitions for commonly used terms in tile roofing.

Chapter 17 - Porch Trim

TRADITIONAL GABLE ATTACHED PATIO AND CARPORT. Your complete guide to building an ATTACHED Outback TRADITIONAL GABLE PATIO or CARPORT

SHED PACK Step 1: Choose your shed type.

CURVED ROOF ASSEMBLY INSTRUCTIONS ATTACHED VERANDAH. Your supplementary guide to building an ATTACHED CURVED ROOF VERANDAH or PATIO BEFORE YOU START

HOME STRENGTHENING GUIDE HOW TO ECONOMICALLY STRENGTHEN YOUR HOUSE AGAINST EARTHQUAKES AND HURRICANES

INSTALLATION GUIDE. Flat Roof Homesheds TM. Onto Concrete BEFORE YOU START TOOLS REQUIRED

Joshua Woodsman

Technical Data Sheet Pergolas and Carports

NEW HOME WARRANTY A REFERENCE GUIDE FOR TYPICAL WALL AND WINDOW DETAILS (RAINSCREEN SYSTEM) SHOWN AS FIBRE CEMENT CLADDING

INSTALLATION GUIDE. Outback. Flat Attached BEFORE YOU START ADDITIONAL MATERIALS TOOLS REQUIRED. VERAnDAHS PATIOS CARPORTS

Gable HomeshedsTM INSTALLATION BEFORE YOU START TOOLS REQUIRED GUIDE LARGE SPAN. Council Approval. Before Starting

Safety Glasses Safety Gloves Ladders Measuring Tape Spirit Level String Line. Tin-Snips Rivet Gun Caulking Gun Silicone Socket Set

GLOSSARY OF TERMS SECTION 8

LE7000 Provincial Built-in (Zero Clearance) Kit Instructions.

10. Vents, Baffle Guard and Blocking

OUTBACK FLAT ATTACHED VERANDAH PATIO CARPORT - INSTALLATION GUIDE BEFORE YOU START TOOLS REQUIRED ADDITIONAL MATERIALS

SECTION R507 DECKS DECKING LEDGER BOARD BEAM. FOOTING BEAM SPAN CANTILEVER For SI: 1 inch = 25.4 mm FIGURE R507.2 DECK CONSTRUCTION

8 x 10 Timber-frame Garden Shed

INSTALLATION GUIDE. Flat Roof Homesheds TM BEFORE YOU START TOOLS REQUIRED

Queenslanders. Design + Documentation. A presentation on the structural elements in the style and how to document. Peter Latemore

DIY Shed Guide Planning your Project Easy Step by Step Guide Simple Illustrations Maintenance

Dave's Glossary of Construction Terms. by Dave Osborne (

A1-1 D O R S E T A V E N U E SITE PLAN SITE PLAN

System for 2+ Level Buildings

Material List for Log Complete Packages

With Illustrations, Drawings & Step By Step Details. Click Here To Download 12,000 Shed Plans. 1 P a g e Download 12,000 More Shed Plans

Timber to Timber - Timber to Concrete - Timber to Steel

TOLL FREE:(888) FAX:(941) ASSEMBLY of ProTEC CONCRETE STRUCTURAL INSULATED PANEL

Clopay Models 835/837 Sliding Door System Installation Guide

Garage Design Guide. October 2018

DETAIL CROFT FARM OUTBUILDING RESTORATION TOWNSHIP OF CHERRY HILL, NEW JERSEY

SECTION MANHOLES

ROOM smooth cement f.f FLOOR LAYOUT

Material Description Qty Units Cost Total SQUARE FOOTAGE TOTAL Area 1692 sqft

Ensure there is reasonable access for materials and working space, ensure the shed site is level and consider the disposal of run-off water.

10x12 FOUNDATION GUIDE 10x12 TRICO AND FLORA SHEDS

IMPORTANT -- SPECIAL INSTALLATION INSTRUCTIONS FOR AZTEC SHELTER

6x6 Shed Plans and Building Guide

MANHOLES PART I: GENERAL. A. Precast Concrete Manholes

DIY SHED GUIDE Planning your Project I Simple Illustrations I Hints

Sections & Details VOCABULARY

How-To-build guide Garden shed

10x10 Shed Plans and Building Guide

Property Line. House Type 4. 1,280 sf 6' - 0" 6' - 6" 10' - 0" 6' - 6" 10' - 0" 6' - 0" 6' - 6" 10' - 0" 6' - 6" House Type 5 1,088 sf 5' - 0"

Pryda Timber Connectors

Inclusions Brochure Stages 3 and 4

Best Barns USA. the Brookhaven 10' x 16' Assembly Book. revised March 23, 2016

APPLICATION FOR A BUILDING PERMIT

DESCRIPTION QTY UNIT RATE AMOUNT ELEMENT NO.1 SUBSTRUCTURES. Excavations

City of Regina Standard Construction Specification SECTION 2999 LISTING OF ROADWAY STANDARD DRAWINGS

MODERN PERGOLA INSTALLATION GUIDE. When only the best will do.

A101 CARVER, MINNESOTA S.P B C D E F G FLOOR PLAN CARVER PARK AND RIDE 1 FLOOR PLAN

Installation instructions: Elements Vulcan+ Newport Hector Cladding

Cabonyx Installation Manual

TENDER ISSUE GH GUARD HUT PLAN SCALE 1:25. Guard Hut RL = Driveway NOTES KEY FOR WALL REFERENCE KEY FOR FLOOR FINISHES

F-5-1a. Concrete Bollards (Detail 1 of 2) WEIGHT: 166kg. WEIGHT: 227kg. WEIGHT: 113kg. WEIGHT: 212kg

Ohlson Project Property Owner: Kathy Ohlson Property Address: Deer Lake Rd. Derwood MD 20855

E-Blueprints. Children s Backyard Playhouse 8 x sq. feet main 32 sq feet porch 2 x 4 Framed Walls 6' Ceiling Height

INSTALLATION SHOP DRAWINGS FOR MINNEAPOLIS, MN

YUKON PATIO COVER INSTALLATION INSTRUCTIONS

MH Table of Contents Standard Title/Scope Page Table of Contents SCE Public

CSI Section DMI Light Gage Structural Steel Framing Systems. Blocking Fire Rated Pre-cut (Proprietary) Furring Wall Preservative Treated

8x8 Shed Plans and Building Guide

TYPICAL PATIO COVERS. OWNER: ADDRESS: PHONE:

SHEET 1 OF 1 SCALE A1 A3 1: 200. SITE LAYOUT Scale 1:200 GLP TOTTENHAM ROAD

A Shell construction

Nepal Housing Reconstruction Programme

12x12 Shed Plans and Building Guide

BUILDING THE BASIC SHED. Step A: Build the Foundation & Floor Frame

STRATCO GABLE HOMESHED STRATCO GABLE HOMESHEDS STUBBIE INSTALLATION GUIDE

The Roofing Store TRS 9 35MM 78MM 150MM 78MM PRODUCT TECHNICAL DATA

INSTALLATION GUIDE. Outback Clearspan Gable BEFORE YOU START ADDITIONAL MATERIALS ADDITIONAL MATERIALS WITH COOLDEK ROOFING

BUILDING PLANS. BUILDING DEPARTMENT

BUILDING PLANS. BUILDING INSPECTIONS DEPARTMENT

GROWING BETTER THROUGH DESIGN. 6ft Lean-To LEAN-TO. Assembly Instructions 04/02

WHY YOU SHOULD USE TUFFLOOR. components

With Illustrations, Blueprints & Step By Step Details Brought To You By ShedPlansz.Com Click Here To Get More Shed Plans

DECKS. Stairway illumination Positive attachment of ledger Lateral load connection required board (R507.2) required (R ) (R311.7.

Manholes Table of Contents

Swerve Rack CUSTOM RACKS AVAILABLE

CFDTT-01. Control Joint Study (General)

Installation Manual For ToddPod Outdoor Shower Enclosures

Stratco Sanctuary INSTALLATION BEFORE YOU START TOOLS REQUIRED GUIDE

STEVE ENNIS ARCHITECT 1108 EAST JACKSON STREET MEDFORD, OREGON 97504

Pipe Product Catalog Table of Contents

COMPACT DECK. Compact Deck SOUTHERN FOREST PRODUCTS ASSOCIATION SOUTHEASTERN LUMBER MANUFACTURERS ASSOCIATION

Transcription:

AFU 'A'AU WATERFALL P R O P O S E D T O I L E T B L O C K & G A T E GEF CLIMATE RESILIENCE PROJECT VAILOA, PALAULI,, SAMOA Sheet Number A000 A00 A00 A00 A0 A0 A00 A0 A50 A50 A50 H0 H0 H0 Sheet List Sheet Name COVER SHEET GATE LAYOUT & DETAILS PLATFORM & RETAINING WALL FOUNDATION - TOILET BLOCK FLOOR - TOILET BLOCK ROOF PLANS - TOILET BLOCK ELEVATIONS - TOILET BLOCK SECTIONS - TOILET BLOCK CONSTRUCTION DETAILS - TOILET BLOCK DOOR & WINDOW SCHEDULE - TOILET BLOCK BATHROOM DETAILS - TOILET BLOCK INTERNAL ELEVATIONS - TOILET BLOCK HYDRAULIC DESIGN - TOILET BLOCK SEPTIC TANK PLANS SEPTIC TANK SECTIONS & DETAILS S //07 //07 AG AG //07 GEF TOURISM CLIMATE RESILIENCE PROJECT CSch //07 690W LW //07 KHL //07 PROPOSED TOILET BLOCK COVER SHEET KHL A000 LW CSch FULL SIZE A

POOL NEW RETAINING WALL, PLATFORM & STAIRS - --- POOL RIVER NORTH VAILOA LOCALITY : EXISTING INTERPRATIVE SIGN TO BE RELOCATED TO ENTRY GATE A00 NEW VEHICLE GATE & PEDESTRIAN ENTRY. PRECISE LOCATION TO BE CONFIRMED ON SITE EXISTING CARPARK EXISTING FEE COLLECTION FALE A C C E S S R O A D PROPOSED NEW TOILET CHANGING ROOM FACILITY NEW PLANTING OVER SEPTIC TANK LEACH FIELD NEW CONCRETE SEPTIC TANK EXISTING TOILET FACILITY SITE PLAN : 700 S GEF TOURISM CLIMATE RESILIENCE PROJECT 690W FULL SIZE A PROPOSED TOILET BLOCK PROPOSED SITE AG A00

600 000 600 F0 E0 00 600 000 600 50 00 000 GATE DETAILS : 0 PROPOSED GATE PLAN : 5 S GEF TOURISM CLIMATE RESILIENCE PROJECT 690W FULL SIZE A PROPOSED TOILET BLOCK GATE LAYOUT & DETAILS A00

A00 0 8000 TIMBER DECK PLATFORM. JOISTS ON BEARERS ON PILES IN CONCRETE FOOTING. STEEL STAIRS, 50MM TREAD, 70MM RISER. 75X SHS POST SUPPORTS, STEEL PIPE RAILING 00MM LAYER SCORIA WALKWAY 00 00 000 000 00MM LAYER SCORIA WATER 00MM LAYER GRANULAR ROCK FILL 000X GALMAC GABION BASKETS. FILLED WITH 00-50MM DIAMETER ROCK ROCK GABION BASKET RETAINING WALL TO EDGE OF RIVER A00 PLATFORM & RETAINING WALL PLAN : 50 50-00MM DIAMETER ROCK FILL 000 A00 TIMBER PLATFORM STEEL STAIRS. 75X SHS POST VERTICAL SUPPORTS 000 00 GABION BASKET RETAINING WALL RETAINING WALL SECTION : 50 FIX SHS TO ROCK FACE WITH M6 BOLTS DRILLED & EXPOXIED 00MM MIN EMBEDMENT ELEVATION : 50 A00 TIMBER DECK PLATFORM 00 900 5x5 H5 TIMBER PILE 900MM MIN EMBEDMENT IN CONC 00MM COVER ALL DIRECTIONS 0MPA CONCRETE FOOTING 00MM MIN COVER TO ALL DIRECTIONS 600 00 MIN 75X SHS POST 600 MIN EMBEDMENT IN CONC 00MM COVER ALL DIRECTIONS 0MPA CONCRETE FOOTING 00MM MIN COVER TO ALL DIRECTIONS 75X SHS POST SUPPORTS 5 min ROCK 5 PILE DETAIL : 0 6 SHS POST DETAIL : 0 ELEVATION : 50 S GEF TOURISM CLIMATE RESILIENCE PROJECT 690W FULL SIZE A PROPOSED TOILET BLOCK PLATFORM & RETAINING WALL A00

50MM H5 TIMBER POST MIN 900MM EMBEDMENT IN CONC 00MM COVER ALL DIRECTIONS A B C 900 75 0 0 0 0 0 75 50 00 0MPA CONCRETE FOOTING 00MM MIN COVER TO ALL DIRECTIONS 00 50 00 S0 50 min 50 50 00 50 80 0 00 00 S7 S0 50 00 50 S0 S5 S0 50 50 50 50 E0 50 50 S7 S7 A00 Sim 50 00 50 S0 S7 A0 Key Value E0 S0 S0 S7 S5 NOTES Keynote Text 5 SERIES MASONRY BLOCK FOUNDATION WALL D @ 00 CRS VERTICAL, D @ 600 CRS HORIZONTAL. PAINTED. 50MM DIAMETER MIN TIMBER POSTS (POUMULI OR H5 TREATED) 900MM MIN EMBEDMENT IN CONCRETE, 00MM COVER ALL DIRECTIONS. POLYURETHANE FINISH. NO CARVINGS PERMITTED. 50MM THICK REINFORCED INSITU CONCRETE WALL. D @ 00CRS BOTH DIRECTIONS. 'MUSHROOM' COLOURED OXIDE TO CONCRETE MIX. SEAL WITH PETER FELL CLEAR SEALER. 00X00 CONCRETE FOOTING. -D6 TOP AND BOTTOM. R6 STIRRUPS @ 00 CRS. 75MM MIN COVER TO REBAR. 75X GALVANISED SHS POST IN 600X75 0MPA CONCRETE FOOTING. TYPICAL POST FOOTING : 0 665 MESH TOP (0 COVER) D-00 00 00 0 5 SERIES MASONRY BLOCK D6 T&B R6-00 D-00 00 COG 75mm min concrete cover to all steel F.F.L. 50 00 665 MESH TOP (0 COVER) D-00 00 00 0 50MM THICK INSITU CONCRETE WALL. D @ 00 CRS BOTH DIRECTIONS D6 T&B R6-00 D-00 00 COG F.F.L. 50 75mm min concrete cover to all steel FOUNDATION PLAN : 0 MASONRY WALL FOOTING : 0 : 0 CONCRETE WALL FOOTING S GEF TOURISM CLIMATE RESILIENCE PROJECT 690W FULL SIZE A PROPOSED TOILET BLOCK FOUNDATION - TOILET BLOCK A00

75 0 0 0 0 0 0 600 00 R0 00 S0 S0 50 950 0 0 50 80 0 S0 S0 E09 H0 A0 S S0 E0 E0 E05 50 50 A0 50 000 A B C A B C NOTES NOTES FLOOR PLAN : 0 Key Value E0 E05 E09 H0 R0 Keynote Text 9MM FIBRE CEMENT CEILING/ SOFFIT LINING. SCREW FIXED TO TIMBER FRAMING. PAINT FINISH. BEVEL EDGES. COLORBOND TRIMDECK PROFILE CLADDING ON BUILDING WRAP ON 0X5 H. TIMBER STUDS @ 600MM MAX CRS, NOGS @ 800CRS.SURFMIST COLOUR. 600MM THICK GABION BASKET ROCK WALL. 50X50H. TIMBER SLATTED SHADES. CABBOTS KWILA STAIN FINISH. 00MM THICK CONCRETE FLOOR SLAB. SMOOTH TROWEL FINISH. APPLY PETER FELL BLACK OXIDE TO CONCRETE MIX AND CLEAR SEAL WITH PETER FELL SATIN CONCRETE SEALER. GALVANISED STEEL PIPE SHOWER. BLUE GATE VALVE. CUSTOM COLORBOND GUTTER. Key Value S0 S0 S Keynote Text COLORBOND BARGE FLASHING, TO MATCH ROOF SHEETING. 50MM DIAMETER MIN TIMBER POSTS (POUMULI OR H5 TREATED) 900MM MIN EMBEDMENT IN CONCRETE, 00MM COVER ALL DIRECTIONS. POLYURETHANE FINISH. NO CARVINGS PERMITTED. 50MM THICK REINFORCED INSITU CONCRETE WALL. D @ 00CRS BOTH DIRECTIONS. 'MUSHROOM' COLOURED OXIDE TO CONCRETE MIX. SEAL WITH PETER FELL CLEAR SEALER. 90X5 H. TIMBER BEAM. FIX WITH /STAINLESS STEEL M BOLTS TO POSTS. REFLECTED CEILING PLAN : 0 S GEF TOURISM CLIMATE RESILIENCE PROJECT 690W FULL SIZE A PROPOSED TOILET BLOCK FLOOR - TOILET BLOCK A0

S R0 60MM DIA. DP S8 A0 S A0 S 5 5 S S R05 NOTES Key Value Keynote Text ROOF FRAMING PLAN : 0 R0 R05 S8 S S S S CUSTOM COLORBOND GUTTER. COLORBOND BARGE FLASHING, TO MATCH ROOF SHEETING. COLORBOND TRIMDEK ROOFING. 0X5 H. TIMBER RAFTERS @ 600MM CRS, FULL DEPTH SOLID BLOCKING @ 50MM MAX CRS. FIX BLOCKING WITH JOIST HANGERS IN BETWEEN RAFTERS. STRAP BRACING. 90X5 H. TIMBER BEAM. FIX WITH /STAINLESS STEEL M BOLTS TO POSTS. 0X5 H. EDGE RAFTER. 0X5 H. TIMBER OUTRIGGER. A B ROOF PLAN : 0 C S GEF TOURISM CLIMATE RESILIENCE PROJECT 690W FULL SIZE A PROPOSED TOILET BLOCK ROOF PLANS - TOILET BLOCK A0

C B A R05 R0 00 RING BEAM R0 RING BEAM 00 E0 S0 50 E09 50 F.F.L. F.F.L. 50 00 RING BEAM A B N O R T H : 5 W0 600x00 C E0 S0 E A S T : 5 5 S R0 S0 RING BEAM 00 Key Value E0 E09 E0 R0 R05 S0 S0 S NOTES Keynote Text 5 SERIES MASONRY BLOCK FOUNDATION WALL D @ 00 CRS VERTICAL, D @ 600 CRS HORIZONTAL. PAINTED. 600MM THICK GABION BASKET ROCK WALL. 50X50H. TIMBER SLATTED SHADES. CABBOTS KWILA STAIN FINISH. GALVANISED PIPE VEHICLE GATE. CUSTOM COLORBOND GUTTER. COLORBOND BARGE FLASHING, TO MATCH ROOF SHEETING. COLORBOND TRIMDEK ROOFING. 50MM DIAMETER MIN TIMBER POSTS (POUMULI OR H5 TREATED) 900MM MIN EMBEDMENT IN CONCRETE, 00MM COVER ALL DIRECTIONS. POLYURETHANE FINISH. NO CARVINGS PERMITTED. 50MM THICK REINFORCED INSITU CONCRETE WALL. D @ 00CRS BOTH DIRECTIONS. 'MUSHROOM' COLOURED OXIDE TO CONCRETE MIX. SEAL WITH PETER FELL CLEAR SEALER. 90X5 H. TIMBER BEAM. FIX WITH /STAINLESS STEEL M BOLTS TO POSTS. E09 50 F.F.L. E0 E0 F.F.L. 50 W E S T : 5 S O U T H : 5 S GEF TOURISM CLIMATE RESILIENCE PROJECT 690W FULL SIZE A PROPOSED TOILET BLOCK ELEVATIONS - TOILET BLOCK A00

50 A B C A0 R05 S8 - Key Value NOTES Keynote Text 50 R05 50 50 BATHROOM E05 E0 S7 E07 E0 S7 E0 S0 5 A00 --- S RING BEAM 00 E0 F.F.L. 50 E0 E05 E07 H0 H0 R05 S0 S7 S8 S 5 SERIES MASONRY BLOCK FOUNDATION WALL D @ 00 CRS VERTICAL, D @ 600 CRS HORIZONTAL. PAINTED. 9MM FIBRE CEMENT CEILING/ SOFFIT LINING. SCREW FIXED TO TIMBER FRAMING. PAINT FINISH. BEVEL EDGES. COLORBOND TRIMDECK PROFILE CLADDING ON BUILDING WRAP ON 0X5 H. TIMBER STUDS @ 600MM MAX CRS, NOGS @ 800CRS.SURFMIST COLOUR. 600MM THICK GABION BASKET ROCK WALL. 0MM THICK H. TIMBER PLANK WALL LINING. CABBOTS CLEAR OIL FINISH. 00MM THICK CONCRETE FLOOR SLAB. SMOOTH TROWEL FINISH. APPLY PETER FELL BLACK OXIDE TO CONCRETE MIX AND CLEAR SEAL WITH PETER FELL SATIN CONCRETE SEALER. TOILET BOWL/CISTERN. WALL MOUNTED WASH BASIN. COLORBOND BARGE FLASHING, TO MATCH ROOF SHEETING. COLORBOND TRIMDEK ROOFING. 50MM THICK REINFORCED INSITU CONCRETE WALL. D @ 00CRS BOTH DIRECTIONS. 'MUSHROOM' COLOURED OXIDE TO CONCRETE MIX. SEAL WITH PETER FELL CLEAR SEALER. 00X00 CONCRETE FOOTING. -D6 TOP AND BOTTOM. R6 STIRRUPS @ 00 CRS. 75MM MIN COVER TO REBAR. 0X5 H. TIMBER RAFTERS @ 600MM CRS, FULL DEPTH SOLID BLOCKING @ 50MM MAX CRS. FIX BLOCKING WITH JOIST HANGERS IN BETWEEN RAFTERS. 90X5 H. TIMBER BEAM. FIX WITH /STAINLESS STEEL M BOLTS TO POSTS. 00 RING BEAM 0 A0 S8 H0 WC E07 S0 S7 SECTION A : 0 SECTION D : 0 S GEF TOURISM CLIMATE RESILIENCE PROJECT 690W FULL SIZE A PROPOSED TOILET BLOCK SECTIONS - TOILET BLOCK

A COLORBOND TRIMDEK ROOFING ON BUILDING WRAP 0X5 H. TIMBER OUTRIGGERS SOLID BLOCKING COLORBOND BARGE FLASHING WRAP UNDER BOTTOM EDGE OF BARGE BOARD EX50X0 H BARGE BOARD 9MM FIBRE CEMENT SOFFIT LINING. DIRECT FIX TO BOTTOM EDGE OF RAFTERS. PAINT FINISH CUSTOM COLORBOND FLASHING TO COVER TIMBER TOP PLATE CRESTS 00 C CRESTS 0MM THICK TIMBER PLANK WALL CLADDING CUSTOM COLORBOND FLASHING TO COVER TIMBER TOP PLATE 9MM FIBRE CEMENT SOFFIT LINING. DIRECT FIX TO BOTTOM EDGE OF RAFTERS. PAINT FINISH COLORBOND BARGE FLASHING TO MATCH ROOF BARGE FLASHING DIMENSIONS 0X5 H. TIMBER STUDS @ 600MM CRS, NOGS @ 800MM CRS COLORBOND TRIMDEK WALL CLADDING TO MATCH ROOF 0x5 SG8 TOP PLATE ON DPC -.0 DIA SCREW NAILS M JBOLT +50mm WASHER @ 900c/c 50MM THICK INSITU CONCRETE WALL CUT TRUSS RAFTER (BIRDSMOUTH) TO SUIT 0.9g00 STEEL STRAP LOOP UNDER TOP PLATE 6-.5x0/LEG 0 0 70 80 60 COLORBOND ROOFING ON BUILDING WRAP. OVERLAP WRAP INTO GUTTER 60X0 H. TIMBER FASCIA CUSTOM COLORBOND GUTTER FULL DEPTH SOLID BLOCKING CUT TO SUIT 9MM FIBRE CEMENT SOFFIT LINING. BEVELLED SHEET JOINTS. PAINTED BARGE DETAIL TIMBER WALL OVERHANG DETAIL (PLAN) 0 : 0 : 0 : 0 WALL TO ROOF JUNCTION 7 TYPICAL EAVES DETAIL : 0 C 00 RING BEAM COLROBOND TRIMDEK METAL ROOFING ON BUILDING WRAP COLORBOND BARGE FLASHING 0X5 H. TIMBER RAFTER LOOP OVER RAFTER & FIXED TO BEAM 0.9 STEEL STRAP 6-.5x5/LEG 0X5 H. TIMBER RAFTER PRYDA CPC 0 CLEAT 90X5 H. TIMBER BEAM SOLID TIMBER BLOCKING EX50X50 TIMBER SLATTED SCREEN. NOTCH TOP TO SUIT CONNECTION WITH BEAM 6MM VILLABOARD CEILING LINING PAINTED. EDGES BEVELLED, NO PLASTER/STOPPING. 0MM THICK TIMBER PLANK WALL LINING 0X5 H. TIMBER STUDS @600MM CRS RING BEAM 00 90x5 H. SG8 TIMBER BEAM 50X50 H5 TIMBER POST 90x5 H. SG8 TIMBER BEAM, FIX WITH STAINLESS STEEL M BOLTS WITH 50MM WASHERS 50X50 H5 TIMBER POST 50MM NOTCH AT TOP FOR BEAM 0 50X50 TIMBER SLATTED SCREEN. NOTCH OUT BOTTOM PORTION FOR BEAM CONNECTION PRYDA CPC 0 CLEAT 0X5 H. TIMBER BOTTOM PLATE. FIX WITH M BOLTS @ 800MM CRS COLORBOND TRIMDEK STEEL CLADDING ON BUILDING WRAP. SURFMIST COLOUR RAFTER TO BEAM DETAIL : 0 5 POST TO BEAM DETAIL : 0 50 F.F.L. 00 90X5 H. TIMBER BEAM 90 50 5 SERIES MASONRY BLOCK FOUNDATION WALL F.F.L. 50 TIMBER SLAT DETAIL : 0 6 TIMBER WALL SECTION : 0 S GEF TOURISM CLIMATE RESILIENCE PROJECT 690W FULL SIZE A PROPOSED TOILET BLOCK CONSTRUCTION DETAILS - TOILET BLOCK A0

900 0 80 0 75 90 90 000 960 9000 90 0 0 90 5 90 0 0 0 0 0 HOROZONTAL VERTICAL BOARDS INTERIOR VERTICAL BOARDS EXTERIOR HOROZONTAL 600 00 F.F.L. 0 HOROZONTAL F.F.L. EXTERIOR ELEVATION INTERIOR ELEVATION SECTION DOOR FINISHES KEY CABOT'S EXTERIOR OIL STAIN - KWILA CABOT'S EXTERIOR OIL STAIN - PUKA S CABOT'S EXTERIOR OIL STAIN - SILVER BEECH DOOR NO. D0 SOLID CORE TIMBER DOOR IN ALUMINUM FRAME. LOCAKBLE. EX5MM THICK TIMBER BOARDS. OIL STAIN FINISH. SCHLAGE VERTA SERIES DOOR LEVER. STAINLESS STEEL. WIN. NO. W0 ANODISED ALUMINUM FRAME AWNING WINDOW. OPAQUE GLASS NOTE:.ALL OPENING DIMENSIONS ROUGH OPENING DIMENSIONS ONLY. ENSURE ALL TIMBER BOARDS ARE FITTED AND BONDED TIGHTLY. 5.00 TOP 5.00 ARRIS BOTTOM AND TOP EDGES OF HORIZONTAL BOARDS PROTECT FROM WATER PENETRATION 5.00 5.00 BOTTOM HORIZONTAL BOARD DETAIL : 5 S GEF TOURISM CLIMATE RESILIENCE PROJECT 690W FULL SIZE A PROPOSED TOILET BLOCK DOOR & WINDOW SCHEDULE - TOILET BLOCK A50

75 90 DEG ELBOW SHOWER ROSE 0MM GALVANISED PIPE 00 BRACKETS AS NEEDED GATE VALVE FOR TAP/SHOWER : 0 BRASS GATE VALVE. BLUE COLOUR 90 DEG ELBOW FLANGE MOUNTED ON MASONRY WALL. BASIN MOUNTED ON BENHCTOP X750X50MM LOCAL TIMBER BENCH TOP ON STEEL BRACKETS. CABOT'S NATURAL OIL FINISH TO BENCH TOP. STEEL BRACKETS TO BE PAINTED BLACK 0MM DIA. GALVANISED PIPE CUSTOM BASIN TAP WITH GATE VALVE. COAT GALVANISED PIPE WITH EPOXY PRIMER PRIOR TO PAINTING BLACK. 0MM DIA. GALVANISED STEEL TAP. COAT WITH EPOXY PRIMER PRIOR TO PAINTING BLACK WITH MATT FINISH SYSTEM. GATE VALVE IN STEM SELECTED BENCHTOP MOUNTED BASIN 50 75X5 SHS POST GABION WALL CONCRETE PAVING 885 850 700XX50 LOCAL TIMBER BENCHTOP. CABBOT'S NATURAL OIL FINISH STEEL BRACKETS TO SUPPORT TIMBER BENCHTOP. FIX TO WALL WITH /M DYNA BOLTS. 70X SHS POST IN 600X00X00 CONCRETE FOOTING. 00MM COVER ALL DIRECTIONS PERSPECTIVE BASIN DETAIL - PERSPECTIVE BASIN DETAILS - SECTION : 0 : 0 : 0 SHOWER SIDE ELEVATION S GEF TOURISM CLIMATE RESILIENCE PROJECT 690W FULL SIZE A PROPOSED TOILET BLOCK BATHROOM DETAILS - TOILET BLOCK A50

00 RING BEAM S0 H0 D0 H0 E0 NOTES Key Value Keynote Text C INTERNAL ELEVATION : 0 : 0 E07 A INTERNAL ELEVATION E0 E07 E08 H0 H0 S0 5 SERIES MASONRY BLOCK FOUNDATION WALL D @ 00 CRS VERTICAL, D @ 600 CRS HORIZONTAL. PAINTED. 0MM THICK H. TIMBER PLANK WALL LINING. CABBOTS CLEAR OIL FINISH. CIRCULAR MIRROR. 00MM THICK CONCRETE FLOOR SLAB. SMOOTH TROWEL FINISH. APPLY PETER FELL BLACK OXIDE TO CONCRETE MIX AND CLEAR SEAL WITH PETER FELL SATIN CONCRETE SEALER. TOILET BOWL/CISTERN. WALL MOUNTED WASH BASIN. 50MM THICK REINFORCED INSITU CONCRETE WALL. D @ 00CRS BOTH DIRECTIONS. 'MUSHROOM' COLOURED OXIDE TO CONCRETE MIX. SEAL WITH PETER FELL CLEAR SEALER. E08 H0 H0 S0 H0 INTERNAL ELEVATION : 0 : 0 INTENRAL ELEVATION S GEF TOURISM CLIMATE RESILIENCE PROJECT 690W FULL SIZE A PROPOSED TOILET BLOCK INTERNAL ELEVATIONS - TOILET BLOCK A50

FROM TOWN WATER SUPPLY 00 COVER - WEBFORGE MPG ON 5 X 5 'L' + R0 ANCHORS EACH SIDE, GALVANISE AFTER FABRICATION STANDARD PIT 00mm THK TOP SOIL COVER 00 DIA PERFORATED P.V.C. PIPES IV 5MM DIA SOLATION VALVE 00MM ABOVE C.G.L. 00 0-50mm GRAVEL OR BROKEN ROCK ROOF OVERHANG NEW MXM SOAKPIT 50MM DIA. PVC 80MM DIA. DP SECTION - SOAKAGE PIT (SP-A) NTS SH W=D+50 TO NEW SEPTIC TANK IO WC 00M PVC :60 H0 BAS 50MM DIA. PVC 5LITRE PVC GULLEY TRAP, LIP 00MM MIN ABOVE C.G.L. DEPTH VARIES 50 75 75 APPROVED EXCAVATED MATERIAL BACKFILL WITH 0mm SUB BASE MATERIAL 5MM DIA PVC D 8 PARTS 6mm AGGREGATE: PARTS COARSE SAND: PART CEMENT 75 D/ 900 MIN. GEOTEX FABRIC LAYER MAINTAIN SIDES DURING EXCAVATION 00/50 ROCKS HYDRAULICS LEGEND IO INSPECTION OPENING IOS INSPECTION OPENING TO SURFACE 000 X 000 ORG OVERFLOW RELIEF GULLY IV WC SH BAS ISOLATION VALVE TO BUILDING WATER CLOSET SHOWER BASIN SOAKAGE PIT DETAIL : 0 DIRECT CONNECT WATER SUPPLY STOMRWATER/ GREY WATER SEWAGE PIPING (BLACK WATER) PLUMBING/HYDRAULICS LAYOUT : 5 STORMWATER PIPE BEDDING DETAIL UNDER GROUND NTS PIPE BEDDING DETAIL : 0 S GEF TOURISM CLIMATE RESILIENCE PROJECT 690W FULL SIZE A PROPOSED TOILET BLOCK HYDRAULIC DESIGN - TOILET BLOCK H0

A A0.6c 00 00 00 00 00 00 PLAN - SEPTIC TANKN TYPE Scale :0 600 00 00 00 50 50 50 50 B A0.6a C A0.6c 800 00 00 00 800 00 PLAN - SEPTIC TANK TYPE Scale :0 00 00 000 00 50 50 50 50 D A0.6b S GEF TOURISM CLIMATE RESILIENCE PROJECT 690W FULL SIZE A PROPOSED TOILET BLOCK SEPTIC TANK PLANS H0

D AT 00 CTS BOTH WAYS 50 00 50 D AT 00 CTS BOTH WAYS CENTRAL BARS BEYOND OPENING CONT. x ACESS HATCH WITH R0 HANDLES CAST IN 600 LAP 5 50 0mm THICK RENDER D HORIZONTAL BARS IN BOND BEAM BLOCKS & AT EVERY rd COURSE (TYP) D6 VERT. BARS AT 600 CTS (TYP.) D AT 00 CTS CENTRAL BOTH WAYS 00 5 00 INLET 50 MIN 50 600 50 MIN D6 VERT. BARS AT 600 CTS (TYP.) D AT 00 CTS BOTH WAYS D D HOOKS AT 00 CTS D 0 BLOCK WORK 5 D AT 00 0 800 50 00.58 0mm THICK RENDER 00 00 OUTLET D HORIZONTAL BARS IN BOND BEAM BLOCKS AT EVERY rd COURSE (TYP) COMPACTED SAND (TYP) -COAT FLINTCOTE WATER PROOFING (TYPICAL) COMPOUND TO CMU + WATERPROOFING MEMBRANE ONTOP FOR PROTECTION 00 LEG (TYP.) 00 LEG (TYP.) WATER PROOF MEMBRANE 90 000 COMPACTED SAND 90 90 990 0 80 90 00 THK COMPACTED HARD CORE 50 WIDE x 00 HIGH x 00 THK REINFORCED CONCRETE BAFFLE 00 PVC PIPE FROM SEPTIC TANK 00 00 -R0 LIFT HANDLES D0 CONT 50 60 00 50 50 F7 MESH 00 COMMON BACKFILL PLACED AND COMPACTED IN 50 LIFTS GEOTEX FABRIC BARRIER 900 LEAVE SURFACE SLIGHTLY MOUNDED 00 50 650 min 00 PVC PIPE TYP 00 PVC PIPES TO ABSORPTION FIELD, TYP. PLAN - DISTRIBUTION BOX 00 -D EACH SIDE (ALTERNATIVE F7 MESH) D U BAR 00 00 PVC PIPE DRILLED WITH 5 No. HOLES AT 00 CTS FULL LENGTH SLOPE = 0.0-0.0% ABSORPTION FIELD TRENCH SECTION :0 0-50mm GRAVEL OR BROKEN ROCK 0 HOLE AT 00 CTRS S GEF TOURISM CLIMATE RESILIENCE PROJECT 690W FULL SIZE A PROPOSED TOILET BLOCK SEPTIC TANK SECTIONS & DETAILS H0