Chapter 1 General Design Information

Similar documents
Section Meetings Section Material and Equipment. None Required

JEFFERSON LAB TECHNICAL ENGINEERING & DEVELOPMENT FACILITY (TEDF ONE) Newport News, Virginia

A. Action Submittals: Written and graphic information that requires Architect's responsive action.

SECTION SUBMITTAL PROCEDURES

Quality Control and Quality Assurance Guide

SECTION SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 RELATED DOCUMENTS

MISSISSIPPI STATE UNIVERSITY Office of Planning Design and Construction Administration

DIVISION 1 - GENERAL REQUIREMENTS SECTION SUBMITTALS

UCCS University Hall Fire Sprinkler System Upgrade March 1, 2011 RTA SECTION SUBMITTAL PROCEDURES PART 1 - GENERAL

A. Action Submittals: Written and graphic information that requires Engineer's responsive action.

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017

SECTION SUBMITTAL PROCEDURES

PROCEDURE FOR PROCESSING WORKING DRAWINGS

UNION COUNTY VOCATIONAL-TECHNICAL SCHOOLS West Hall Addition Project Raritan Road, Scotch Plains, NJ

TCC/SHORE TRANSIT BUS MAINTENANCE FACILITY - PHASE II

SECTION SUBMITTAL PROCEDURES

East Central College

Working Drawing Manual

SECTION SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES

Working Drawing Procedure

A. Section includes administrative provisions for coordinating construction operations on Project including, but not limited to, the following:

SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES

Taylor County July 2011 SECTION SHOP DRAWINGS, WORKING DRAWINGS AND SAMPLES

CHAPTER 10 MICHIGAN DESIGN MANUAL BRIDGE DESIGN (SI) SHOP DRAWING REVIEW TYPES OF SHOP DRAWINGS Structural Steel

SECTION SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES

SECTION ADMINISTRATIVE REQUIREMENTS SECTION ADMINISTRATIVE REQUIREMENTS

PROJECT TITLE PROJECT NO: CONTRACT TITLE UNIVERSITY OF CALIFORNIA, DAVIS CITY, CALIFORNIA

Update: July 20, 2012

Brad Luke. Director Peddle Thorp Auckland

.2 Accompany all submissions with a transmittal letter, in duplicate, containing:.4 Specification Section number for each submittal

STATE OF OHIO DEPARTMENT OF TRANSPORTATION SUPPLEMENT 1073 PRECAST CONCRETE CERTIFICATION PROGRAM JULY 20, 2018

SECTION SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES

SECTION PROJECT MANAGEMENT AND COORDINATION

SECTION SUBMITTALS. A. PART A and DIVISION 1 of PART B are hereby made a part of this SECTION.

SECTION A. RFI: Request from Contractor seeking interpretation, information, or clarification of the Contract Documents.

SECTION SUBMITTALS PART 1 - GENERAL 1.01 RELATED DOCUMENTS

Jacksonville District Master

KINGS COUNTY JAIL EXPANSION PHASE III COUNTY OF KINGS

SECTION CONTRACTOR SUBMITTALS. A. All submittals by the CONTRACTOR shall be submitted to the ENGINEER.

Ohio Department of Transportation Division of Production Management Office of Geotechnical Engineering. Geotechnical Bulletin

SUGGESTIONS FOR IMPROVING THE STRUCTURAL STEEL SHOP DRAWING PROCESS

submittals 1s e c t i o n

This specification describes the general requirements for Engineering Services provided to Vale.

Answer: Qualification statement should be provided with the bid.

City of Lompoc Building & Safety Services Section 100 Civic Center Plaza Lompoc, CA Phone: Fax:

9 LAND SURVEYING. 9.1 General. 9.2 Administrative Requirements Standards Meetings Survey Data Provided to the Design-Builder

A. This section specifies procedural requirements for Shop Drawings, product data, samples, and other miscellaneous Work-related submittals.

CHAPTER 2C - PRELIMINARY DESIGN. General... 2C-1. Review of Work Load... 2C-2 Establishing Priorities... 2C-2

STANDARD SPECIFICATIONS SECTION SUBMITTAL PROCEDURES

SECTION III SUBMITTALS AND APPROVALS

Maintenance of Traffic sequence of operations including any phasing and detour maps;

SANITARY SEWER SYSTEM ADMINISTRATIVE STANDARDS A.1 SANITARY SEWER SYSTEM PLAN SUBMITTAL PROCEDURES AND GENERAL REQUIREMENTS

CHAPTER 2 SUBMITTAL AND REVIEW PROCEDURES TABLE OF CONTENTS

SITE PLAN REVIEW GUIDELINES Rev. 2016

CHAPTER 1: TITLE SHEET and GENERAL LAYOUT

WATER MAIN ALONG ENTRANCE TO ENCINO PS / HWY 281 TO ENCINO TANK Solicitation Number: CO Job No.:

DWG, Inc. Coastal Carolina University State Project No. Consulting Engineers HTC Arena Lighting H17-N112-JM

DIVISION 1 GENERAL REQUIREMENTS SECTION SUBMITTAL PROCEDURES

SITE PLAN Application Packet (Required For All Non-Residential Development Projects)

APPLICATION FOR SITE PREPARATION PERMIT

SECTION PROJECT COORDINATION VIA BIM

Appendix D Answers To Chapter Review Questions

AIA Continuing Education

SECTION OPERATION AND MAINTENANCE DATA

1. Land survey Work. 2. Civil and Structural engineering services.

SEI Certification Program Manual

APPLICATION FOR SITE PLAN REVIEW

What Are Submittals?

TAB B-9 RECORD DRAWINGS

Detail Design For Pavement Rehabilitation on Trunk Highway 14 From Tracy to Revere

CITY OF RICHMOND SUBDIVISION PLAT AND PUBLIC INFRASTRUCTURE SUBMITTAL, REVIEW AND APPROVAL PROCEDURES

Proposal PROJECT MANUAL P R O P E R T Y M A N A G E M E N T F A L L O N C O U N T Y. Baker, MT P.O. Box 846

835 Gil Harbin Industrial Blvd Valdosta, GA 31601

CHAPTER 14: TRAFFIC SIGNAL STANDARDS Introduction and Goals Administration Standards Standard Attachments 14.

2016 CDM Smith All Rights Reserved July 2016 SECTION PROJECT MEETINGS

CHAPTER 11 PRELIMINARY SITE PLAN APPROVAL PROCESS

00-General Drawings. Doc. no.: NA-00-STS002

SECTION SUBMITTAL PROCEDURES

The GMFI Process. Design Intent Document Preparation. Enroll in GMFI Program. Image Consultation. You are here. Design Intent Document.

Cloud Based Plan Review Process (Applicant)

INDEX OF SPECIFICATIONS SECTION F SPECIAL CONDITIONS DIVISION 1 - GENERAL REQUIREMENTS:

Survey Data and TOPO Checklist

Engineering Drawing System

Anticipated schedule, Page 2. Change the Contract Term from 635 Days to be 1,127 Days.

KANSAS DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION TO THE STANDARD SPECIFICATIONS, 1990 EDITION

SUBDIVISION PLAT APPLICATION

NEVADA DEPARTMENT OF TRANSPORTATION Addendum 3 to RFP July 28, 2017

Work Type Definition and Submittal Requirements Work Type: Subsurface Utility Engineering (SUE)

Engineering Drawing System

SECTION ADMINISTRATIVE REQUIREMENTS

CITY OF BEVERLY HILLS Department of Public Works and Transportation Civil Engineering Division STORM DRAIN IMPROVEMENT PLAN REVIEW CHECKLIST

CITY OF BEVERLY HILLS Department of Public Works and Transportation Civil Engineering Division SANITARY SEWER IMPROVEMENT PLAN REVIEW CHECKLIST

2017 CDM Smith All Rights Reserved November 2016 SECTION PROJECT MANAGEMENT INFORMATION SYSTEM (PMIS)

MATERIALS DIVISION MEMORANDUM

PROJECT TITLE PROJECT NO: CONTRACT TITLE UNIVERSITY OF CALIFORNIA, DAVIS CITY, CALIFORNIA

DEVELOPMENT REVIEW COMMENTS LAND DISTURBANCE PERMIT (LDP) CLEARING CLEARING & GRUBBING GRADING. Date Reviewed by. Project Name

UNIFIED FACILITIES GUIDE SPECIFICATIONS

Scope of Services. Project management tasks are estimated based upon anticipated project duration of 52 weeks.

Booster Pumping Station 115 Booster Pump Procurement

Promontory Architectural Review Committee

Transcription:

Chapter 1 General Information Introduction The primary aim in both designing and checking is to produce a structure that will safely carry the anticipated loads. The design team, consisting of the designers, checkers, and structural detailers, is responsible for developing a set of practical, clear, and concise design notes, plans, and specifications by the assigned due date with the allotted manpower. This section provides information on the personnel involved and their responsibilities for the design, design check, and structural details. All electronic files (designs, details, quantities, etc.) will need to be placed in the project directory on the WYDOT servers. This includes all files from consultant designed projects Calculations The design calculations shall be prepared on 8½ x11 sheets. The cover sheet for the final design notes of record shall be stamped by the designer, and shall be indexed with numbered pages. The final stamped design calculations of record and quantities shall be stored within the Bridge Program until construction is complete. At that time they will be sent to the Records Program to be microfilmed. If the designer of record does not have a PE, but the checker does, the checker shall stamp the cover sheet. If the designer and checker both do not have a PE, the design squad leader shall stamp the cover sheet. All design computations must be checked by an engineer and references verified. All check marks and notes shall be precise and legible. The checker shall use yellow for correct computations; incorrect computations shall be circled and the checker s corrections and notes marked in red. The checker shall initial and date the check print when the check is complete. The checker shall not carry through minor corrections which do not appreciably affect the final result, but may note that the error is there and is disregarded. The checker is responsible for the accuracy of the 1.01-1

design, but no checker shall discard a reasonable design arrived at by suitable methods. Structural Details When checking a design that used a BRASS program, the input shall be checked and hand calculations performed to verify loads, section properties, capacities, and required specification checks. The structural details or plans shall be completed in accordance with the Bridge Applications Manual (BAM). The details should be thoroughly checked using the examples and checklists located in the BAM. Conformance of grades, alignments, and other data between roadway and bridge plans should be checked. Plans should be reviewed for completeness, constructability, compliance with current bridge program standards, and good engineering practices. All details must be checked by an engineer or a technician with experience with the structure being detailed, and references verified. All check marks and notes shall be precise and legible. The checker shall use yellow for correct details; incorrect details shall be circled and the checker s corrections and notes marked in red. The checker shall initial and date the check print when the check is complete. The original detailer will back check the corrected sheet, make the appropriate changes and have the checker verify the work. This process will continue until the sheet is acceptable to both the detailer and checker. er The designer s primary responsibilities include: Use approved Structure Selection Report and Preliminary Layout as basis for design concept and layout Structural design sketches Preparing complete and legible calculations Load rating new/replacement bridges using BRASS Calculating quantities as directed Checking details as directed The Squad Leader should advise and get concurrence from the Assistant State Bridge Engineer, whenever deviating from approved office standards and practices. 1.01-2

The initial load rating may be based upon the details shown in the contract plans for the PS&E submittal. The final load rating shall reflect the changes made during construction (fabrication change, field adjustment, contractor change, etc.) if they affect the load carrying capacity of the bridge. The designer should inform the Squad Leader of any areas of the design that should receive special attention during checking and review. The designer s responsibilities also include the following project planning activities: Preparing a Time Estimate Identifying tasks and planning order of work Preparing design criteria for inclusion in the front of the design calculations Checker The primary purpose of a design check is to insure that the designer has not, through an error in mathematics, misunderstanding of the specifications, or other cause, produced an unsafe design. The design checker s primary responsibilities include: Verifying the design theory and correct interpretation of the design code Accuracy and completeness of the design calculations to confirm the structural adequacy of the components Independent check of major controlling geometry Working with er to prepare the Time Estimate Calculating quantities as directed Checking details as directed Structural Detailer The structural detailer s primary responsibilities include: Preparing neat, correct, and easy to follow plan sheets conforming to the Bridge Applications Manual and the design. Drawing details to scale when applicable Determining dimensions and elevations as required by the designer/checker Calculating quantities as directed Checking details as directed 1.01-3

Squad Leader Assistant State Bridge Engineer - The Squad Leader should work closely with the designer, design checker, and structural detailer during the design and plan preparation phases to help avoid major changes late in the design process. The Squad Leader s primary responsibilities include: Recommend through the Structure Selection or Structure Rehabilitation Report the most cost-effective and appropriate structure for each particular site Coordinate the completion of the Preliminary Layout based on the Structure Selection Report Coordinating design and design check ensuring work is appropriate based on experience and project complexity Producing a complete set of plans and specifications Resolving construction problems Checking the number and titles of plan sheets Coordinating plan sheet detailing Coordinating computation of quantities Coordinating the preparation of the Cost Estimates and Special Provisions Preparing time estimates for design, detailing, and quantity calculation activities Compatibility of design and details within the project Approving the design criteria prepared by the designer before start of design Monitoring the design and detailing process and providing guidance and assistance as required Reviewing the design calculations for completeness and for agreement with office criteria and practices Reviewing the plans for completeness, constructability, and agreement with office criteria and practices The Assistant State Bridge Engineer provides guidance and support to assure that the bridge design and structural details meet program and department standards. The Assistant State Bridge Engineer s primary responsibilities include: Review and comment on hydraulic reports Working with the Squad Leader in the structure selection to assure that the most cost-effective and appropriate structure type is selected for a particular bridge site 1.01-4

Work with the Squad Leader and Hydraulic Engineer to resolve hydraulic issues Reviewing Preliminary Layout and recommending approval by the State Bridge Engineer Reviewing and approving project reports Developing and maintaining Bridge Program design and detailing standards as documented in the Bridge Applications Manual and Bridge Manual Approving the design criteria prepared by the designer and squad leader before start of design Reviewing final structure plans for conformance with the Bridge Applications Manual and project requirements and recommending approval by the State Bridge Engineer Recommend design standards, detailing standards, and LRFD specification interpretations to the State Bridge Engineer for approval Work with other design programs and district staff on project design issues Performing a structural/constructability review of the plans Reviewing the project special provisions and Supplemental Specifications Monitoring design and detailing time requirements Resolving construction problems State Bridge Engineer The State Bridge Engineer provides leadership and support to assure quality for structural designs and details. The State Bridge Engineer s primary responsibilities include: Reviewing and approving the Structure Selection Report and Preliminary Layout to assure that the most costeffective and appropriate structure type is selected for a particular bridge site. Approving design and detailing standards Performing a structural/constructability review of the plans Reviewing and approving final structural plans Facilitating resolution of major project design issues Resolving construction problems Consultant Projects Consultant designs and details will be completed in accordance with the Bridge Applications Manual and the Bridge Manual. 1.01-5

The consultant shall apply his own seal and signature to the plans, and thereby assumes full responsibility for their correctness and general conformance with good engineering practice. The following indicates the degree and type of checking to be performed by the Bridge Program: Project Reports (Hydraulic, Structure Selection, etc.) and Layouts All reports will be thoroughly reviewed to ensure adequate evaluation of: Structure types that are compatible to the site conditions Preliminary cost estimates Advantages/disadvantages of each structure type Economy, feasibility, and constructability Structure types recommended for additional study or final design A review of the preliminary layouts will be made to ensure that span lengths, clearances, and all site conditions are adequately addressed. Review s should be reviewed for completeness, constructability, compliance with current WYDOT standards, and good engineering practices. A review of major structural elements should be performed. A BRASS load rating should be run to verify girder capacity for the design vehicle. calculations shall be on 8.5"x11" paper with a proper heading and placed in a binder with an index. The signature, date, and Wyoming seal of a registered professional engineer of the consulting firm shall be on a title sheet. Plan Review Plans will be checked for all changes required by the Final Review. Plans should be thoroughly checked by using the checklists located in the BAM. Conformance of grades, alignments, and other data between roadway and bridge plans should be checked. Pay items and Special Provisions should be reviewed for conformance with the Standard Specifications. Quantity 1.01-6

calculations and rebar schedules are generally not checked in detail. The signature, date, and Wyoming seal of a registered professional engineer of the consulting firm, and the name of the designer and checker shall be on the title sheet of each drawing. Construction Documents Working drawings shall be submitted by the contractor in accordance with the Standard Specifications for Road and Bridge Construction. Checking of shop drawings is a normal duty of the Fabrication Inspector. The Bridge Section responsible for the project design and details will typically check fabricator designs, false work drawings, and erection drawings. For consultant designs, the consultant should do the checking as provided for in the Consultant Agreement. Checking must be thorough, accurate, and complete. If information is incomplete, the checker shall request that the additional data be submitted in writing and shall not approve the shop drawings until the information has been received and reviewed. No verbal approval shall be given to a contractor, supplier, or fabricator. All written approvals will include a copy to the Resident Engineer. Construction drawings will be checked promptly upon receipt of complete information and at a speed consistent with thoroughness and accuracy. The approved shop drawings for all elements that become a permanent part of the structure shall be submitted by the Contractor and shall be retained with the contract plans for the structure for permanent archives. 1.01-7