Accelerator Complex U70 of IHEP: Status and Upgrades

Similar documents
Accelerator Complex U70 of IHEP-Protvino: Status and Upgrade Plans

TECHNIQUE AND INSTRUMENTATION FOR BUNCH SHAPE MEASUREMENTS

Acceleration of High-Intensity Protons in the J-PARC Synchrotrons. KEK/J-PARC M. Yoshii

Present and future beams for SHE research at GSI W. Barth, GSI - Darmstadt

LHC TRANSVERSE FEEDBACK SYSTEM: FIRST RESULTS OF COMMISSIONING. V.M. Zhabitsky XXI Russian Particle Accelerator Conference

200 MHz 350 MHz 750 MHz Linac2 RFQ2 202 MHz 0.5 MeV /m Weight : 1000 kg/m Ext. diameter : 45 cm

Maurizio Vretenar Linac4 Project Leader EuCARD-2 Coordinator

Analogue electronics for BPMs at GSI - Performance and limitations

FLASH at DESY. FLASH. Free-Electron Laser in Hamburg. The first soft X-ray FEL operating two undulator beamlines simultaneously

Re-commissioning the Recycler Storage Ring at Fermilab

New Tracking Gantry-Synchrotron Idea. G H Rees, ASTeC, RAL, U.K,

Demonstration of exponential growth and saturation at VUV wavelengths at the TESLA Test Facility Free-Electron Laser. P. Castro for the TTF-FEL team

Linear Particle Accelerator Control Performance

JUAS 2018 LINACS. Jean-Baptiste Lallement, Veliko Dimov BE/ABP CERN.

Non-invasive Beam Profile Measurements using an Electron-Beam Scanner

HITACHI Proton Therapy System with Spot Scanning

DESIGN AND BEAM DYNAMICS STUDIES OF A MULTI-ION LINAC INJECTOR FOR THE JLEIC ION COMPLEX

The impedance budget of the CERN Proton Synchrotron (PS)

Norbert Meyners, DESY. LCTW 09 Orsay, Nov. 2009

cyclotron RF systems sb/cas10061/1

LINAC EXPERIENCE IN THE FIRST TWO YEARS OF CNAO (CENTRO NAZIONALE ADROTERAPIA ONCOLOGICA)

ReA3 Marc Doleans (On behalf of the ReA3 team)

THz Pump Beam for LCLS. Henrik Loos. LCLS Hard X-Ray Upgrade Workshop July 29-31, 2009

PROJECT X: A MULTI-MW PROTON SOURCE AT FERMILAB *

Status and Future Perspective of the HIE-ISOLDE Project

THE ORION PHOTOINJECTOR: STATUS and RESULTS

Nonintercepting Diagnostics for Transverse Beam Properties: from Rings to ERLs

REVIEW OF FAST BEAM CHOPPING F. Caspers CERN AB-RF-FB

The VARIAN 250 MeV Superconducting Compact Proton Cyclotron

The European Spallation Source. Dave McGinnis Chief Engineer ESS\Accelerator Division IVEC 2013

Tutorial on Design of RF system for Indus Accelerator. Maherdra Lad Head, Radio Frequency Systems Division RRCAT, Indore

Status SIS100. Peter Spiller 1. Pre-Collaboration Meeting Peter Spiller, 1. Pre-Collaboration Meeting,

CHAPTER 6 BOOSTER RF SYSTEMS

DEVELOPMENT OF CAPACITIVE LINEAR-CUT BEAM POSITION MONITOR FOR HEAVY-ION SYNCHROTRON OF KHIMA PROJECT

Note on the LCLS Laser Heater Review Report

Main Injector Cavity Simulation and Optimization for Project X

Status of the 1.5 GeV Synchrotron Light Source DELTA and Related Accelerator Physics Activities

The design of a radio frequency quadrupole LINAC for the RIB project at VECC Kolkata

Design of ESS-Bilbao RFQ Linear Accelerator

Triple-spoke compared with Elliptical-cell Cavities

CEBAF Overview June 4, 2010

Design and performance of LLRF system for CSNS/RCS *

Automatic phase calibration for RF cavities using beam-loading signals. Jonathan Edelen LLRF 2017 Workshop (Barcelona) 18 Oct 2017

A HIGH EFFICIENCY 17GHz TW CHOPPERTRON

Beam Diagnostics, Low Level RF and Feedback for Room Temperature FELs. Josef Frisch Pohang, March 14, 2011

Single Bunch Impurity Measurement at SPring-8 8 Storage Ring

Lattice Design for PRISM-FFAG. A. Sato Osaka University for the PRISM working group

Progress in High Gradient Accelerator Research at MIT

Normal-Conducting Photoinjector for High Power CW FEL

Beam Infrared Detection with Resolution in Time

version 7.6 RF separator

Low-beta Structures. Maurizio Vretenar CERN BE/RF CAS RF Ebeltoft 2010

Using Higher Order Modes in the Superconducting TESLA Cavities for Diagnostics at DESY

The Current Cyclotron Development Activities at CIAE. Current acyclotron

Project X Cavity RF and mechanical design. T. Khabiboulline, FNAL/TD/SRF

BEPCII-THE SECOND PHASE CONSTRUCTION OF BEIJING ELECTRON POSITRON COLLIDER

Workshop,, Nov , Hirschberg. DITANET-Workshop

ITk silicon strips detector test beam at DESY

Recent studies of the electron cloud-induced beam instability at the Los Alamos PSR

ACCELERATION TECHNIQUES

Design of control network and survey for CSNS. Accelerator center of IHEP Wang tong, Li bo

Recent Experimental Studies of the Electron Cloud at the Los Alamos PSR

JEDI. Status of the commissioning of the waveguide RF Wien Filter

1.8 MW Upgrade of the PSI Proton Accelerator Facility

2008 JINST 3 S The RF systems and beam feedback. Chapter Introduction

Status of the ESS Accelerator Workpackage

Beam Loss Monitoring (BLM) System for ESS

FAST RF KICKER DESIGN

NIRS accelerator present and future activities

Status of Proton Beam Commissioning at MedAustron Ion Beam Therapy Center

Position of the LHC luminous region

Introduction to Synchrotron Radio Frequency System

Development of Superconducting CH-Cavities for the EUROTRANS and IFMIF Project 1

A High Gradient Coreless Induction Method of Acceleration

Physics Requirements Document Document Title: SCRF 1.3 GHz Cryomodule Document Number: LCLSII-4.1-PR-0146-R0 Page 1 of 7

Mul$- bunch accelera$on in FFAG. Takeichiro Yokoi(JAI)

Converters for Cycling Machines

Physics Design and Technology. Development of CSNS Accelerator

SIMULATION OF A SIGNAL IN THE BEAM LOSS

Measurement Setup for Bunched Beam Echoes in the HERA Proton Storage Ring

Coherent Synchrotron Radiation in the ANKA Storage Ring

The Superconducting Radio Frequency Quadrupole Structures Review

ACCELERATOR PHYSICS OF HIGH INTENSITY PROTON LINACS

Advances in CW Ion Linacs

Longitudinal bunch shape Overview of processing electronics for Beam Position Monitor (BPM) Measurements:

SARAF commissioning & safety issues. L. Weissman on behalf of the SARAF team SPIRAL week 2010

VEPP-2000 COLLIDER CONTROL SYSTEM*

ALICE SRF SYSTEM COMMISSIONING EXPERIENCE A. Wheelhouse ASTeC, STFC Daresbury Laboratory

EMMA the World's First Non-Scaling FFAG Accelerator

Mapping of the New IBA Superconducting Synchrocyclotron (S2C2) for Proton Therapy

Resonance project and active experiments

Superconducting RF System. Heung-Sik Kang

CURRENT INDUSTRIAL SRF CAPABILITIES AND FUTURE PLANS

CRYOGENIC CURRENT COMPARATOR FOR STORAGE RINGS AND ACCELERATORS

Review on Progress in RF Control Systems. Cornell University. Matthias Liepe. M. Liepe, Cornell U. SRF 2005, July 14

Current Industrial SRF Capabilities and Future Plans

THE U. S. RIA PROJECT SRF LINAC*

Digital Signal Processing in RF Applications

Jørgen S. Nielsen Center for Storage Ring Facilities (ISA) Aarhus University Denmark. ESLS-RF 22 (8/ ), ASTRID2 RF system 1

NanoBPM tests in the ATF extraction line

Transcription:

INSTITUTE FOR HIGH ENERGY PHYSICS () Protvino, Moscow Region, 142281, Russia Accelerator Complex U70 of : Status and Upgrades (invited oral WEYCH01) Sergey Ivanov XXIII Russian Particle Accelerator Conference RuPAC-2012 September 24-28, 2012, St-Petersburg, Russia

Outlook Generalities Routine operation Machine development Light-ion program (+ elsewhere, oral rep. WECCH01) Conclusion Emphasis on a progress since RuPAC-2010 September 24-28, 2012 RuPAC-2012, St-Petersburg 2of 19

Layout 4 machines (since Oct 2007): 2 linacs 2 synchrotrons Modes: proton (default) URAL30-U1.5-U70 light-ion (d, C) I100(2 of 3)-U1.5-U70 to note: OKA (#21), FODS (#22), stretcher (#25) Light-ion: high energy intermediate energy 24.1-34.1 GeV/u 453-455 MeV/u In a SIS-18, SIS-100 name convention: LIS-233 [T m] LIS-6.9 [T m] September 24-28, 2012 RuPAC-2012, St-Petersburg 3of 19

Photo album of machines RFQ DTL URAL30 Alvarez DTL I100 RC PS U1.5 Main PS U70 September 24-28, 2012 RuPAC-2012, St-Petersburg 4of 19

Statistics 2 runs (7/24) per year: short (XPh 10 days ca) long (XPh 30 days ca) 2 MD(p) + ions 3 MD(p) + ions 1 10 13 ppp 3 hr, 1000 cycles September 24-28, 2012 RuPAC-2012, St-Petersburg 5of 19

Extraction (fixed target) 2 nd ½ of flattop, IT & CD 1 st ½ of flattop, SSE Inventory: 1-turn FE SRE (Q38 & SSE) IT Si-CD SE flat-bottom (S)SE duty factor Ф 2 / Ф 2 = 0.94. No lines of mains harmonics September 24-28, 2012 RuPAC-2012, St-Petersburg 6of 19

Machine development 4 machines: Planned maintenance Emergency maintenance Development (p- and i-modes) September 24-28, 2012 RuPAC-2012, St-Petersburg 7of 19

Machine development (1) new Local Control Center for U1.5 ring magnet PS 10 kv, 6 halls в 5 buildings, external 2 transformer stations, 3 switchovers 16 2/3 Hz September 24-28, 2012 RuPAC-2012, St-Petersburg 8of 19

40 ferrite loaded RF cavities: 2010 20 cavities 2011 10, 30 of 40 in total Machine development (2) new Control (amplitude, phase) and Interlock System for the U70 RF accelerating system Катодные токи ВЧ сигналы ВЧ Сетка ВЧ ЛЗ Входные диф-ные усилители Амплитудные детекторы Входные аналоговые сигналы Фазовый дискриминатор Последовательный код от Шкафа Контроля Аналоговые коммутаторы 16х1 1 Аналог. сигнал Код адреса сигнала 2 Код адреса сигнала Схема блокировки ВЧ и формирования адреса сигнала (ПЛМ) Буфферные усилители АЦП Клавиатура Индикатор Индикация на блоке Блокир. АРА ПУ "НСВЧ" Аналоговый сигнал на шкаф контроля ПУ "Тракт закрыт" Процессор Мультиметр Фаза ЛЗ-С Фаза А-С Аналоговые компараторы Опорн АРА U резон. September 24-28, 2012 RuPAC-2012, St-Petersburg 9of 19

Machine development (3) Plan = 120 = No. of CF magnets 2010 4 test channels Beam Loss Monitoring System in the U70 2011 30 operational channels Soft- and hard-ware complex (32-channel counters with control programs) SS# 22-34, 42-57, 106 September 24-28, 2012 RuPAC-2012, St-Petersburg 10 of 19

Machine development (4) Stand-alone runs of I100 43 m long 4 dipoles 8 quads 3 H/V-correctors Beam diagnostics InfraLight SP, PhIC GPhI RAS, Troitsk 2 modules, CO2, N2 и He, λ=9.6 11 μm 2 Hz, 4.5 J, almost, COTS 10 12 ma 4000 cycles (former 800), i.e. >8 hr. September 24-28, 2012 RuPAC-2012, St-Petersburg 11 of 19

Machine development (5) Upgrade of RC PS U1.5 RF sustem V f RF df RF /dt T P RF P APhC 0.1-10 kv 0.75-2.8 and 0.56-2.3 MHz 170 and 110 MHz/s 60 ms 60 kw 130 kv A AFC wide-band A Dynamic range 15 Transient time 1/5 Overshoot 1/10 September 24-28, 2012 RuPAC-2012, St-Petersburg 12 of 19

Machine development (6) New digital MO in RF of the U70 2 Phase-plane portrait of a bunch π π Momentum, normalized 1 0 1 0 2 4 3 2 1 0 1 2 3 4 RF phase September 24-28, 2012 RuPAC-2012, St-Petersburg 13 of 19

DDS RF MO and Fbcks September 24-28, 2012 RuPAC-2012, St-Petersburg 14 of 19

Digital transverse Fbck z N z N z N FIR-3 & FIR-4 options September 24-28, 2012 RuPAC-2012, St-Petersburg 15 of 19

Instabilities Back to factory default freq range of RF system, 2.6 (4.5)-6.1 MHz instead of о 5.5-6.1 MHz Z ( kω ) k < 0 1 Λ β 2 ηe ej 0 Δ p p 2 Cures: momentum spread, RF gymnastics Distribution function [momentum spread] RF noise September 24-28, 2012 RuPAC-2012, St-Petersburg 16 of 19

Flat-bottom S(S)E 352 Gs, 1.32 GeV (p, test beam) 455 MeV/u (C) Graphite 30 mm (p 1.32 GeV) Be 4 mm (С 455 MeV/u) September 24-28, 2012 RuPAC-2012, St-Petersburg 17 of 19

Ion program d: q=1, A=2, q/a=1/2 C: q=6, A=12, q/a=1/2 Deuterons 2 H 1+ Carbon 12 C 6+ U1.5 16.7 448.6 MeV/u 16.7 455.4 MeV/u March 30, 2008 December 08, 2010 U70 23.6 GeV/u 34.1 GeV/u April 27, 2010 April 24, 2011 SE @ 455 MeV/u April 24, 2011 24.1 GeV/u in BTL#22 & FODS April 27, 2012 September 24-28, 2012 RuPAC-2012, St-Petersburg 18 of 19

Conclusion Accelerator Complex U70 of -Protvino: comprises 4 machines (URAL30, I100, U1.5, and U70 itself), readily ensures running the fixed-target physics program, is subject to ongoing upgrade program, has noticeably improved quality of proton beam, is on a way towards routine acceleration of light-ions to 24-34 GeV per nucleon for high-energy nuclear physics now has slow extraction of 455 MeV per nucleon of 12 C 6+ beam U1.5 and U70 now belong to PS and (L)IS categories September 24-28, 2012 RuPAC-2012, St-Petersburg 19 of 19