Multi-layer Insulation Blanket for Roofs, Walls & Floors The Highest Performing Certificated MultiFoil on the Market

Similar documents
Multi-layer Insulation Blanket for Roofs

To Order Superquilt direct at Lowest prices in the UK or Europe UK Customers Call From outside the UK Call

Multi-layer Insulation Blanket for

Multi-layer Insulation Blanket for

Multi-layer Insulation Blanket for use in Roofs

SuperFOIL Insulation. Solutions Guide. Pitched Roof - Under Rafter

August 2008: Issue 1. Non - Residential New Build Pitched Roofs - Rafter Level

Pitched roofs rafter level

June Residential Refurbishment Pitched roofs - rafter level

June Non - Residential Refurbishment Pitched roofs - rafter level

TRISO-SUPER 10 Installation Guidelines

Installation. Openings: Valley: Installation on timber roofs (new buildings) 1. Fit a support (noggins) around the opening.

manthorpe Roll-Out Dry Fix Ridge System building products Fixing Instructions MBP 8265e

Certificate No: EW560

NEW equinox INSTALLATION GUIDE Issue

GV Standard Pitchglaze

SUPER-UNDERLAY SHEET

Roll-Fix Kit The complete dry hip kit RFIG

NEW equinox INSTALLATION GUIDE Issue

Installation Guide. Please read before installing SIPs Kit. 1 Method Statement for the erection of a SIPS Industries Kit Materials...

REDLAND DRY VALLEY. Installation Instructions for Redland Dry Valley. Version: 6. Date: May Redland Technical Solutions

Contents. Stage 1. Preparation of the aperture 9. Interior finishing 25

Acceptable Standards of Domestic Construction

GV Standard PitchVent

INSTALL IN 2 DAYS. *Assumes 3-man fitting team. equinox. Tiled roof system. Installation guide ISSUE 1

Attic Installation Tips:

Installation Manual. This installation is for the Odyssey H1800 Series Ventilation System.

SpeedDeck. Fixing and Handling Guide

The Leka System Installation Guide

SPECIFICATION FOR. BRANZ Appraisal Certificate # 621 (2008)

AS TESTED TBA FIREFLY TBA FIREFLY BAL-FZ BUSHFIRE ROOF SYSTEM INSTALLATION GUIDE EASY TO INSTALL EASY TO CARRY EASY TO TRANSPORT

Installation guide. Step-by-step instructions

1. Tile Roof Installation:!

Guardian warm roof conversion system. Installation Guide

SANERI 3 º. Self-adhesive SBS-elastomer bitumen cap sheet

Instructions for Installation on a Pitched Roof LIGHTWAY optical tube LW 260, LW 320, LW 520, LW 760

Installation guide for 20/20

Installation Guide. Guardian Slate Roof System. England, Scotland & Wales

Egger Roofing Board Fast, Easy, Safe: With this board you can reach the top.

COMPONENTS OF THE CLICKFAST FASCIA AND GUTTER SYSTEM 5: INTERNAL MITRE

GROWING BETTER THROUGH DESIGN. 6ft Lean-To LEAN-TO. Assembly Instructions 04/02

PROFESSIONAL PITCHED ROOFING ANCILLARIES

Instructions for Installation on a Flat Roof

INSTALLATION INSTRUCTIONS for TB6.2,TB7.0, TB7.8 & TB8.4

Installation Guidelines

Inspire Aledora Slate Application Guidelines

DETAILS KOMPROMENT DANISH BUILDING DESIGN ZAPPA

... the reflective insulation!

Verge Flashing. Verge Flashing. Only use if flashings requirements can be site measured before ordering. Verge Clip

NAIMA. Insulation Between (filling) Purlins and Over Purlins. What Does Metal Building Insulation Do? Installation Instructions for New Construction

OptiLiner Banded Liner System Bi-Directional Banding

How-To-build guide Garden shed

Inspire Slate Starter Piece Hip and Ridge. 13 1/2" Height: 13 ½" Width: 12" Squares/ Pallet. Bundles/ Square

Insuvent Designed to ensure ventilation in existing roofs when insulation quilts are installed

A Shell construction

TEKTON WEATHERIZATION SYSTEM SPECIFICATION

Installation Instructions

ROOFING DESIGN AND FIXING GUIDE

Installation Instructions for New Construction. Installation Instructions for New Construction

The Firestone QuickSeam Reinforced Perimeter Fastening Strip needs to be installed with appropriate fasteners at maximum centres of 300 mm.

IMAGINATION SOLAR LTD. Installation Guide A1. Planning The Collector Installation

ROOF FRAMING INFORMATION BATTEN INSTALLATION CORONA SHAKE INSTALLATION ACCESSORY INSTALLATION ESTIMATING DATA GENERAL INFORMATION

OptiLiner Banded Liner System Bi-Directional Banding

Installation Instructions

technical bulletin Roofline Installation Details No.7 Fascia Installation Details Typical Eaves Details K16 Fascia & 9mm Vented Soffit

Shingle Installation Guide

Universal Installation Instructions. Preparation and Safety Information. Natural Lighting by Monodraught. Dust. Scaffolding

equinox INSTALLATION GUIDE Issue CONTENTS If in doubt at any stage BE SAFE WHEN WORKING AT HEIGHT

This installation guide has been created to assist in constructing a Liniar conservatory roof from a kit format.

Dry Verge System. For more information on CEMEX visit

TECHNICAL BULLETIN 28

Inclined Roof System Trimoterm SNV

CROSSBAR RAFTER ISOMETRIC

technical bulletin Roofline Installation Details No.7 Fascia Installation Details Typical Eaves Details K16 Fascia & 9mm Vented Soffit

Timber joist. Timber joist ceilings and separating / compartment floors. Timber joist.

Item Checklist & Additional Tools Required For Installation

Base : (1 - batten spacing, 2 - bottom row batten spacing, 3 - ECOTILE, 4 - batten, 5 - rafter, 6 - fixing method)

YWY M08 The new VELUX solution

PRODUCT INFORMATION FOR ARCHITECTS, ENGINEERS AND INSTALLERS Insulation spacers for commercial metal roofing

4 Position the Suntile to the x tile s position and mark the felt around the square box flange. Then remove the Suntile

Installation Manual for Thermo Panel

FIXING GUIDE. Designed for Garages & Sheds, Houses, DIY, Flat Roofs, Industrial & Agricultural Buildings etc. IS THE LONG TERM ROOFING SOLUTION

COLORBOND steel clad. Details for bushfire-prone AS BAL-FZ sites

AQUAGARD EPDM FLAT ROOFING SYSTEMS INSTALLATION GUIDE THE MECHANICALLY FIXED SYSTEM

10. Vents, Baffle Guard and Blocking

for Rigid Sun Lite Planning the layout

NEW HOME WARRANTY A REFERENCE GUIDE FOR TYPICAL WALL AND WINDOW DETAILS (RAINSCREEN SYSTEM) SHOWN AS FIBRE CEMENT CLADDING

16ft Polytunnel Assembly Instructions

installation guide Villa

for Flexi Sun Lite Planning the layout

Three layer Felt Roofing using cold applied adhesive

Joshua Woodsman

Table of Contents. Fasteners... 4 Venting Preparation Installation with Battens - DECRA Tile & DECRA Shake 1

FS 5800 EXPANSION JOINT EJ FIRE BARRIER* Installation Instructions

Clearly Solar Solar Thermal Flat Plate Collector Installation Instructions Horizontal In-roof mounting SRH 2.3

SIM. Mass Loaded Vinyl

The better way to build TM. Installation Manual ROOF SIPs

15 YEAR GUARANTEE. Tough and long lasting Guaranteed waterproof for 15 years Economical and easy to fix AVAILABLE IN A RANGE OF COLOURS

12ft Ultra Polytunnel Assembly Instructions

Capella Gutter & Soffit

Transcription:

Multilayer Insulation Blanket for Roofs, Walls & Floors e The Highest Performing Certificated MultiFoil on the Market MultifoilInsulation.com UK and European Distributors Specialising in Multifoil Insulation Solutions

Insulation for use in Roofs General NHBC Acceptance Meets r equirements of L1A and L1B 2010 addition In accor dance with BR443 Thermally tested in accor dance with EN16012 High thermal r esistance of 2.50m²K/W Effective solar overheating barrier Effective in summer and winter Fast and simple installation Tear Resistant For pitched roofs between 20 O and 70 O insulation thermally tested in accordance with EN16012 achieving a high thermal resistance of 2.50m²K/W for accompanied by a 25mm air cavity either side of the material. Installation of for pitched roof applications and additional insulation products should be in accordance with the building practice. must be installed with a 50mm overlap with all joints taped with ThermaSeal 75mm foil tape. can be cut with a craft knife or a sharp pair of scissors. vals. Minimum 14mm stainless steel or galvanised staples are recommended. is most effective with a minimum 25mm air gap on either side. Battens can be used to create this gap. No protective clothing/handling required. How does Work? Due to the special composition of multilayers of insula tion, effectively deals with all forms of energy transfer (i.e. conduction, convection and radiation). radiation. This means that not only is effecand cold out, but also in summer, is a very effective barrier to solar overheating which reduces the accumulation of heat within the building.

Under Rafter Pitch Roof Installation of for under rafter applications and additional insulation products should be in accordance with UValue Combined Method (W/m 2 K) 0.18 (W/mK) (m 2 K/W) good building practice. Outside Surface 0.040 is applied directly from the roll either vertically or horizontally depending on the rafter height, pulled tight and stapled onto the rafters at minimum 300mm centres. 10.00 should be overlapped at each joint by approx. 50mm and stapled onto the rafters, the joints should be sealed using ThermaSeal Foil Tape. Additionally, at the eaves is cut around the rafters and sealed to the Cavity wall insulation or wall plate. 30.00 70.00 0.022 0.340 3.182 Fix 25mm by 38mm battens at right angel to rafters. Battens 12.50 0.190 0.066 0.100 battens in the usual manner. Total 6.292 When installed below rafters will perform as a vapour barrier. Outside Surface See our HowTo Videos please vist www.multifoilinsulation.com UValue table All calculations are based on 50mm rafters and include the e 0114 323 0012 Description (rafters at 400mm centres) UValue and 75mm (0.022 W/mk) 0.18 W/m 2 k and 130mm Glasswool (0.040 W/mK) 0.18 W/m 2 k and 110mm (0.022 W/mk) 0.15 W/m 2 k and 140mm (0.022 W/mK) 0.13 W/m 2 k Description (rafters at 600mm centres) UValue and 70mm (0.022 W/mk) 0.18 W/m 2 k and 120mm Glasswool (0.040 W/mK) 0.18 W/m 2 k and 95mm (0.022 W/mk) 0.15 W/m 2 k and 125mm (0.022 W/mK) 0.13 W/m 2 k 5

Over Rafter Pitch Roof Installation of for over rafter applications and additional insulation products should be in accordance with UValue Combined Method (W/m 2 K) 0.18 (W/mK) (m 2 K/W) good building practice. Outside Surface 0.040 is applied directly from the roll either vertically or horizontally depending on the rafter height, pulled tight and stapled onto the rafters at minimum 300mm centres. 10.00 should be overlapped at each joint by approx. 50mm and stapled onto the rafters, the joints should be sealed using ThermaSeal Foil Tape. Additionally, at the eaves is cut around the rafters and sealed to the Cavity wall insulation or wall plate. 38.00 70.00 40.00 0.022 3.182 0.340 Vapour Control perimeter of windows. 12.50 0.190 0.066 0.100 Total 6.292 battens and tiles. A vapour control layer should be condensation. Outside Surface Vapour Control Calculated to include timber bridging UValue table All calculations are based on 50mm rafters and include the effect of cold bridging. For individual calculation please contact the technical team on 0114 323 0012 Description (rafters at 400mm centres) UValue and 80mm (0.022 W/mk) 0.18 W/m 2 k and 135mm Glasswool (0.040 W/mK) 0.18 W/m 2 k and 115mm (0.022 W/mk) 0.15 W/m 2 k and 145mm (0.022 W/mk) 0.13 W/m 2 k Description (rafters at 600mm centres) UValue and 70mm (0.022 W/mk) 0.18 W/m 2 k and 125mm Glasswool (0.040 W/mK) 0.18 W/m 2 k and 100mm (0.022 W/mk) 0.15 W/m 2 k and 130mm (0.022 W/mk) 0.13 W/m 2 k

Two Layer Pitch Roof Installation of for under rafter applications and additional insulation pr oducts should be in accordance with UValue Combined Method (W/m 2 K) 0.18 (W/mK) (m 2 K/W) good building practice. Outside Surface 0.040 For recessed installation please see page 12. 10.00 instructions. When installing two layers of a 38mm air space should be maintained between layers at all times. 38.00 38.00 Phenolic 32.50 0.630 0.100 See our HowTo Videos at www.multifoilinsulation.com Total 5.784 Roof Covering Slate/Tiling Batten Outside Surface Rafters Batten or Staple Insulated Perpendicular batten Insulated Calculated to include timber bridging UValue table All calculations are based on 50mm rafters and include the effect of cold bridging. For individual calculation please contact the technical team on 0114 323 0012 Description (rafters at 400mm centres) UValue (2 Layers) with 40mm insulated (XPS) (1.070 m 2 K/W) 0.18 W/m 2 k (2 Layers) and 50mm (0.022 W/mK) 0.15 W/m 2 k (2 Layers) and 57.5mm Insulated () (2.2 m 2 K/W) 0.15 W/m 2 k (2 Layers) and 80mm (0.022 W/mK) 0.13 W/m 2 k Description (rafters at 600mm centres) UV alue (2 Layers) with 40mm insulated (XPS) (1.070 m 2 K/W) 0.18 W/m 2 k (2 Layers) and 45mm (0.022 W/mK) 0.15 W/m 2 k (2 Layers) and 57.5mm Insulated () (2.2 m 2 K/W) 0.15 W/m 2 k (2 Layers) and 70mm (0.022 W/mK) 0.13 W/m 2 k

Three Layer MultiFoil System Roof Covering Slate/Tiling Batten Air Space/Batten BreatherQuilt Fitting Instructions: BreatherQuilt is stapled directly to the aluminium foil facing downwards. Start at the edge of the roof and work horizontally. Tape a line of ThermaSeal Double Sided tape along the top edge of the material. Install the next layer of BreatherQuilt using a 100mm overlap. Once the roof is fully covered are 75mm or less you will need a vertical batten first. install both layers of. Recessing the Once stapled, fully tape and seal using True Aluminium ThermaSeal Foil Joining Tape. Once the first layer has been installed, staple a second layer of directly through the first layer using 14mm staples. Pull this Fully tape and seal the second layer to ensure the product works as a high performing Vapour Control layer. You can now install 25mm battens before plasterboard finish. No Requirement for Rigid Boards or Mineral Wool! Can be installed in little as Airspace/Recess Air Space/Batten UValue Combined Method (W/m2K) 0.18 (W/m2K) (m2k/w) Outside Surface 0.040 10.00 BreatherQuilt 10.00 1.00 1.100 38.00 12.50 0.190 0.066 0.100 Total 5.784 Outside Surface BreatherQuilt Insulated Free Next Working Day Delivery on orders over 100+Vat Calculated to include timber bridging To Order BreatherQuilt or for anymore Information Visit MultiFoilInsulation.com Or Call our dedicated team on 0114 323 0012

Under Joist Flat Roof UValue Combined Method (W/m 2 K) 0.18 and additional insulation products should be in accordance (W/mK) (m 2 K/W) current good building practice. should be overlapped at each joint by approx. 50mm and stapled onto the joists, the joints should be sealed using ThermaSeal Foil Foil Tape when is cut to fit around openings or connections, gaps must be minimized and any exposed cut edges should be sealed with YBS Foil Tape to prevent condensation. should be cut equal to the width of the roof section plus 100mm. Installation should start from the external wall with being unrolled perpendicular to the joists, after which it is stapled, nailed or screwed using saddle clips. Cavity (ventilated) Total 50.00 100.00 12.50 0.022 0.190 0.170 4.545 0.066 0.100 6.891 should be held in place using timber battens or by other means as shown, in such a way that there is a nominal 25mm air cavity above the product (if applicable) and a nominal 25mm air cavity below. To minimize the effect of thermal bridging cross battening is advised. Cavity (ventilated) When installed below joists will perform as a vapour barrier. UValue table All calculations are based on 50mm joists and include the effect of cold bridging. For individual calculation please contact the technical team on 0871 917 0044 Description (rafters at 400mm centres) UValue and 160mm Mineral Wool (0.040 W/mk) 0.18 W/m 2 k and 140mm Mineral Wool (0.033 W/mk) 0.18 W/m 2 k and 180mm Mineral Wool (0.033 W/mk) 0.15 W/m 2 k and 100mm (0.022 W/mk) 0.18 W/m 2 k and 135mm (0.022 W/mk) 0.15 W/m 2 k and 165mm (0.022 W/mk) 0.13 W/m 2 k Description (rafters at 600mm centres) UValue and 150mm Mineral Wool (0.040 W/mk) 0.18 W/m 2 k and 125mm Mineral Wool (0.033 W/mk) 0.18 W/m 2 k and 170mm Mineral Wool (0.033 W/mk) 0.15 W/m 2 k and 90mm (0.022 W/mk) 0.18 W/m 2 k and 120mm (0.022 W/mk) 0.15 W/m 2 k and 145mm (0.022 W/mk) 0.13 W/m 2 k

Under Joist Flat Roof UValue Combined Method (W/m 2 K) 0.18 and additional insulation products should be in accordance (W/mK) (m 2 K/W) current good building practice. should be overlapped at each joint by approx. 50mm and stapled onto the joists, the joints should be sealed using ThermaSeal Foil Tape when is cut to fit around openings or connections, gaps must be minimized and any exposed cut edges should be sealed with YBS Foil Tape to prevent condensation. should be cut equal to the width of the roof section plus 100mm. Installation should start from the external wall with being unrolled perpendicular to the rafters, after which it is fixed using staples, nails or saddle clips. should be held in place using timber battens or by other means as shown, in such a way that there is a nominal 25mm air cavity above the product (if applicable) and a nominal 25mm air cavity below. To minimize the effect of thermal bridging cross battening is advised. Cavity (ventilated) Cavity (nonventilated) Total Cavity ventilated 50.00 90.00 12.50 0.022 0.170 4.091 0.066 0.100 6.927 When installed below joists will perform as a vapour barrier. NonVentilated Cavity UValue table All calculations are based on 50mm joists and include the effect of cold bridging. For individual calculation please contact the technical team on 0114 323 0012 Description (rafters at 400mm centres) UValue and 140mm Mineral Wool (0.040 W/mk) 0.18 W/m 2 k and 120mm Mineral Wool (0.033 W/mk) 0.18 W/m 2 k and 170mm Mineral Wool (0.033 W/mk) 0.15 W/m 2 k and 90mm (0.022 W/mk) 0.18 W/m 2 k and 120mm (0.022 W/mk) 0.15 W/m 2 k and 150mm (0.022 W/mk) 0.13 W/m 2 k Description (rafters at 600mm centres) UValue and 130mm Mineral Wool (0.040 W/mk) 0.18 W/m 2 k and 110mm Mineral Wool (0.033 W/mk) 0.18 W/m 2 k and 150mm Mineral Wool (0.033 W/mk) 0.15 W/m 2 k and 80mm (0.022 W/mk) 0.18 W/m 2 k and 110mm (0.022 W/mk) 0.15 W/m 2 k and 135mm (0.022 W/mk) 0.13 W/m 2 k

Over Joist Flat Roof UValue Combined Method (W/m 2 K) 0.18 and additional insulation products should be in accordance (W/mK) (m 2 K/W) current good building practice. 0.040 should be overlapped at each joint by approx. 50mm and stapled onto the joists, the joints should be sealed using ThermaSeal Foil Tape when is cut to fit around openings or connections, gaps must be minimized and any exposed cut edges should be sealed with YBS Foil Tape to prevent condensation. should be cut equal to the width if the roof section plus 100mm. Installation should start from the external wall with being unrolled perpendicular to the rafters, NonVentilated Cavity NonVentilated Cavity Total 65.00 18.00 75.00 12.50 0.022 0.130 0.190 2.955 0.138 0.066 0.100 5.799 clips. should be held in place using timber battens or by other means as shown, in such a way that there is a nominal 25mm air cavity above the product (if applicable) and a nominal 25mm air cavity below. To minimize the effect of thermal bridging cross battening is advised. NonVentilated Cavity Additional insulation should be installed above the. When installed below rafters will perform as a vapour barrier. NonVentilated Cavity UValue table All calculations are based on 50mm joists and include the effect of cold bridging. For individual calculation please contact the technical team on 0114 323 0012 Description (rafters at 400mm centres) UValue and 65mm (0.022 W/mk) 0.18 W/m 2 k and 90mm (0.022 W/mk) 0.15 W/m 2 k and 105mm (0.022 W/mk) 0.13 W/m 2 k and 85mm XPS (0.029 W/mk) 0.18 W/m 2 k and 120mm XPS (0.029 W/mk) 0.15 W/m 2 k and 140mm XPS (0.029 W/mk) 0.13 W/m 2 k Description (rafters at 600mm centres) UValue and 65mm (0.022 W/mk) 0.18 W/m 2 k and 90mm (0.022 W/mk) 0.15 W/m 2 k and 105mm (0.022 W/mk) 0.15 W/m 2 k and 85mm XPS (0.029 W/mk) 0.18 W/m 2 k and 120mm XPS (0.029 W/mk) 0.15 W/m 2 k and 135mm XPS (0.029 W/mk) 0.13 W/m 2 k

Two Layer Flat Roof UValue Combined Method (W/m 2 K) 0.18 roof applications with additional insulation should be (W/mK) (m 2 K/W) instructions and current good building practice. 0.040 should be overlapped at each joint by approx. 50mm and stapled onto the rafters, the joints should be using ThermaSeal Foil Tape when is cut to fit around openings or connections, gaps must be minimized and any exposed cut edges should be sealed with YBS Foil Tape to prevent condensation. should be cut equal to the width of the roof section plus 100mm. Installation should start from the external wall with being unrolled perpendicular to the joists after which it is fixed using staples, nails or saddle clips. NonVentilated Cavity NonVentilated Cavity Total 18.00 12.50 0.130 0.022 0.190 0.138 1.136 0.066 0.100 5.990 should be held in place using timber battens or by other means as shown, in such a way that there is a nominal 25mm air cavity above the product (if applicable) and a nominal 25mm air cavity below. To minimize the effect of thermal bridging cross battening is advised. NonVentilated Cavity When installed below joists will perform as a vapour barrier. NonVentilated Cavity UValue table All calculations are based on 50mm joists and include the effect of cold bridging. For individual calculation please contact the technical team on 0114 323 0012 Description (rafters at 400mm centres) UValue and 50mm Mineral Wool (0.040 W/mk) 0.18 W/m 2 k and 100mm Mineral Wool (0.040 W/mk) 0.15 W/m 2 k and 40mm Mineral Wool (0.033 W/mk) 0.18 W/m 2 k and 30mm (0.022 W/mk) 0.18 W/m 2 k and 65mm (0.022 W/mk) 0.15 W/m 2 k and 75mm (0.022 W/mk) 0.13 W/m 2 k Description (rafters at 600mm centres) UValue and 50mm Mineral Wool (0.040 W/mk) 0.18 W/m 2 k and 90mm Mineral Wool (0.040 W/mk) 0.15 W/m 2 k and 40mm Mineral Wool (0.033 W/mk) 0.18 W/m 2 k and 25mm (0.022 W/mk) 0.18 W/m 2 k and 55mm (0.022 W/mk) 0.15 W/m 2 k and 65mm (0.022 W/mk) 0.13 W/m 2 k

Recessed Detail Over Rafter Application Under Rafter Application Where roof height is critical can be recessed between the rafters. 1.. Ensure that there is an airspace above the at all times. 1.. 2. staples or with battens. 2. staples or with battens. 3. instruction 2. 3. instruction 2. 4. is then wrapped around the rafter and the procedure starts again. 4. is then wrapped around the rafter and the procedure starts again. using ThermaSeal Foil Tape. using ThermaSeal Foil tape. the rafters below the. Over Rafter Under Rafter Roof Covering Slate/Tiling Batten Batten or Staple Roof Covering Slate/Tiling Batten Batten or Staple 1 3 4 2 4 3 1 2 & Finish & Finish Insulation joints ThermSeal Foil Taped Insulation joints ThermaSeal Foil Taped To see an easy way to recess, please see our HowTo Video (Superquilt Double Layer) at www.multifoilinsulation Call us on 0114 323 0012 for more Technical Information or to Order

Purlin Details Between Purlins Application Around Purlins Application the underside of the the rafters. At the purlins the is turned up and stapled in place. the underside of the the rafters. At the purlins the is cut and pushed behind the purlins then taped to the next piece at the opposite side of the purlin. rafters crushing the tightly against the purlins. the rafters. Between Purlins Around Purlins Roo Roo Slate/Tiling Batten Slate/Tiling Batten Between Rafters Rafters Between Rafters Rafters Insulation joints ThermaSeal Foil Taped Insulation joints ThermaSeal Foil Taped & Finish & Finish Perpendicular 25mm battens Perpendicular 25mm battens Purlin Purlin See our Free to use Online UValue Calculator at MultifoilInsulation.com

Detailing Vents / Light Pipes Collar/Flashing Tiles/Slate Tiles/Slate Batten Counter Batten turned up at the vent/wall/rooflight and sealed with ThermaSeal Foil Tape. Battens are placed on the rafters above the Super battens and then tiles. Rafter Flashing Flashing Tiles/Slate Tiles/Slate Batten Counter Batten Rafter Rooflight Flashing Tiles/Slate Tiles/Slate Batten Counter Batten Rafter Bespoke UValue Calculations avaliable from MultifoilInsulation.com

Detailing Over Rafter Fixing Details Eaves is stapled to the rafters. At the eaves the is cut and taken down between the rafters to the cavity wall insulation or the wall plate. The needs to be sealed with staples and taped to the rafters and the cavity wall insulation or wall plate to create an airtight envelope. Under Rafter Fixing Details Tiles Battens Counter Battens Foil Taped Joints Rafter Timber Wallplate is stapled to the underside of the rafters. At the eaves the is cut and taken down between the joists to the cavity wall insulation or the wall plate. The staples and taped to the joists and cavity wall insulation or wall plate so that an airtight envelope is created. ThermaSeal Foil taped joins Valleys Tiles Tile Battens Felt Membrane Counter Battens should be overlapped at each joint by approx. 50mm and stapled onto the battens, the joints should be sealed using Genuine ThermaSeal 75mm Foil Tape. Lead Gutter Mortar Pointing Rafters Vapour control layer When all joints are sealed using ThermaSeal foil tape also works as a vapour control layer. Downlighters Perpendicular Battens Fitting Equipment At MultiFoilInsulation.com we supply a range of fitting equipment such as Genuine ThermaSeal Foil Tape, Double Sided Tape, Pipe and Saddle Clips, Staple Gun Kits, Knifes and Scissors. Ideal for all Multifoil installation projects. We Recommend using Fire Hoods when installing downlighters A circular hole is cut in the to create a minimum 25mm clearance from the downlighter. The cut edge must be completely sealed using ThermaSeal Foil Tape.

MultiFoilInsulation.com have a range of HowTo Videos. We also have Data Sheets for Walls and Floors. For more Technical Information Please call us on 0114 323 0012. Product Description 19 Components Technical Properties 40mm appr ox. Weight 800g/m 2 Mechanical Properties Value Refer ence Standard Thermal performance Cor e 1.52m 2 K/W BS EN 16012 Roof 2.50m 2 K/W BS EN 6946 Wall 3.00m 2 K/W BS EN 6946 Floor 4.45m 2 K/W BS EN 6946 Flammability Class E BS EN 135011 Water vapour resistance 1569MNs/g BS EN 12572 0.02 BS EN 16012 Tensile strength 142KP A BS EN 1608 Packaging 15m 2 7.5m 2 Width 1.5m 1.5m Length 10m 5m Weight 12.5Kg 6.25Kg MultifoilInsulation.com UK and European Distributors Specialising in Multifoil Insulation Solutions Tel: 0114 323 0012 Email: sales@multifoilinsulation.com Try our Free and Easy To Use Online UValue Calculator!