Installation Manual for Thermo Panel
|
|
- Lee Spencer
- 5 years ago
- Views:
Transcription
1 Installation Manual for Thermo Panel 1
2 About Thermo Panel is a building wrap, insulation, air and water barrier, mold inhibitor and cold bridge eliminator all-in-one. Delivering an R-value of up to 5 on the exterior sheathing. Having insulation outside moves the dew point further to the exterior wall which helps prevent moisture buildup inside the walls. This enhances a wall s ability to prevent water vapor from condensing inside the wall, and adds to a structure s internal energy efficiency. Applications Simply install directly onto exterior sheathing, such as traditional OSB, with roofing nails, 1 crown width staples or screws with washer. (Fasteners system depending on wind load and weight of the siding). This product serves a multitude of uses including flashing, flooring, roofing and decking underlayment. Its rigid surface allows direct installation of siding products. Simply screw, thinset or glue directly to its surface. Or apply one step, single layer stucco directly to the surface. Materials Thermo Panel is a water resistive barrier, consisting of a closed cell extruded polystyrene foam and reinforced by a rigid front surface of 1/8" layer non-combustible M4 composite Magnesium Sulphate board. Installation After the exterior wall sheathing is installed, such as OSB or our M4 board, apply Thermo Panels as follows: Thermo Panel must be installed in accordance with the instructions in this installation manual. The panel can be attached horizontally or vertically and the white rigid surface must always face outward. Install the panels with no gapping (ends and edges of the panels should fit tightly). Install panels so joints do NOT align with underlying sheathing. For OSB sheathing: tape Thermo Panels seams with waterproof adhesive tape as 3M All Weather Flashing Tape 8067 with minimum 2 width (or comparable). For M4 sheathing: taping of seams is not needed (Unless joints align. If joints align, then use the above flashing tape on the aligned joints). The panels shall not be less than 6 from the finish grade. Fasteners Nails with min 3/8 head, 1 width crown Staples or Screws with 2 washer as described herein may be used to attach the Thermo Panels. Fasteners must always attach completely through both the Thermo Panel and underlying sheathing and into the framing itself for a secure connection. Fasteners must be at least Hot-Dip Galvanized ASTM A153 Compliant and must penetrate the wood framing by 1.5 which typically means they must be 3 times (3x) the thickness of the Thermo Panel board. Locate the fasteners a maximum distance of 8 apart. Drive fasteners so heads are flush with the panel to ensure firm contact 2
3 with the panel (Do not countersink the fasteners). The Thermo Panels are not to be used alone as a base for nailing or screwing. Fasteners used to secure outer materials, such as finishing siding or cladding, must go through the Thermo Panel board and into the framing system. Light load use (nothing directly attached to the Thermo panel): Nails with min 3/8 head, 1 width crown Staples can be used, place nails or staples minimum ½ from perimeter of the board. Heavy load use (Stucco; or thinset with Fiber cement): Screws with 2 washer, at the board perimeter place the fasteners between the two boards. Application Types: Application 1 Wood Framing: OSB Sheathing + Thermo Panel + Fiber Cement. Fig 1. B Insulation C Wood Framing D Multi-Panels Thermo-Panel (Pink outer E Fiber Cement Siding F Flashing and Weeps H OSB / Plywood Sheathing X 3 Double Hot-Dip Galvanized ASTM A153 Compliant with washer diameter of 2 1. Fasten Thermo Panel with Double Hot-Dip Galvanized ASTM A153 Compliant fasteners with 2 diameter washer and appropriate length on top of OSB Sheathing with no less than 2 x4 wood studs. Stud spacing no greater than 24 o.c. Fastener distance as explained under Nails, Staples or Screws above. 2. Attach Multi-Panels Fiber Cement with thinset, glue, or screws directly to the Thermo Panel. IMPORTANT: Multi-Panels Fiber Cement has thermal movement of 0.12% so spacing of ¼ between boards is recommended (if the Fiber Cement board is 8 long). If using screws, follow above protocol for Thermo Panel along with the fiber cement s installation manual. Remember, if using screws then each screw must fasten to the structure s framing. Wind load must be considered when selecting the appropriate fastening mechanism (the project s Engineer must approve). 3
4 Application 2 Steel Framing: M4 Sheathing + Thermo Panel + Multi-Panels Fiber Cement Fig 2. A C D E F H W Multi-Panels M4 Exterior Sheathing Wood Framing Multi-Panels Thermo-Panel (Pink outer Fiber Cement Siding Flashing and Weeps OSB / Plywood Sheathing Fasteners with washer diameter 2" -- Self- Tapping for Steel Framing 1. Fasten Thermo Panel with self-tapping fasteners for steel framing with 2 diameter washer and appropriate length on top of M4 Sheating with no less than No. 18-gauge steel studs. Stud spacing no greater than 24 o.c. Fastener distance as explained under Nails, Staples or Screws above. 2. Attach Multi-Panels Fiber Cement with thinset, glue, or screws directly to the Thermo Panel. IMPORTANT: Multi-Panels Fiber Cement has thermal movement of 0.12% so spacing of ¼ between boards is recommended (if the Fiber Cement board is 8 long). If using screws, follow above protocol for Thermo Panel along with the fiber cement s installation manual. Remember, if using screws then each screw must fasten to the structure s framing. Wind load must be considered when selecting the appropriate fastening mechanism (the project s Engineer must approve). 4
5 Application 3 Steel Framing: M4 Sheathing + Thermo Panel + Stucco Fig 3. A D T U W Multi-Panels M4 Exterior Sheathing Multi-Panels Thermo-Panel (Pink outer Stucco Base Coat Fasteners with washer diameter 2 Self Tapping for Steel Framing 1. Fasten Thermo Panel with self-tapping fasteners for steel framing with 2 diameter washer and appropriate length on top of M4 Sheathing with no less than No. 18-gauge steel studs. Stud spacing no greater than 24 o.c. Fastener distance as explained under Nails, Staples or Screws above. 2. U Base coat for two-coat stucco system. Applied directly to Thermo Panel. 3. T Final coat for two-coat stucco system. 5
6 Application 4 Wood Framing: M4 Sheathing + Thermo Panel + Stucco Fig 4. A B C D T U X Multi-Panels M4 Sheathing Insulation Wood Framing Multi-Panels Thermo-Panel (Pink outer Stucco Base Coat 3 Double Hot-Dip Galvanized ASTM A153 Compliant with washer diameter of 2 1. Fasten Thermo Panel with Double Hot-Dip Galvanized ASTM A153 Compliant fasteners with 2 diameter washer and appropriate length on top of M4 Sheathing with no less than 2 x4 wood studs. Stud spacing no greater than 24 o.c. Fastener distance as explained under Nails, Staples or Screws above. 2. U Base coat for two-coat stucco system. Applied directly to Thermo Panel. 3. T Final coat for two-coat stucco system. 6
7 Application 5 Wood Framing: M4 Sheathing + Thermo Panel + Stucco Fig Fasten Thermo Panel with self-tapping fasteners for steel framing with 2 diameter washer and appropriate length on top of M4 Sheathing with no less than No. 18-gauge steel studs. Stud spacing no greater than 24 o.c. Fastener distance as explained under Nails, Staples or Screws above. 2. O Install latches as per manufacturer s guidelines for the brick or stone veneer. 3. G Install brick or stone veneer as per manufacturer s guidelines. A Multi-Panels M4 Sheathing B Insulation C SteelFraming D Multi-Panels Thermo-Panel (Pink outer F Flashing and Weeps G Brick Masonry or Stone Veneer O Latch 1 x2 / 1 x4 Spruce or high impregnated W Fasteners with washer diameter 2 Self Tapping for Steel Framing 7
8 Application 6 Wood Framing: M4 Sheathing + Thermo Panel + TBD Exterior Material Fig 6. A Multi-Panels M4 Exterior Sheathing B Insulation C Wood Framing D Multi-Panels Thermo-Panel (Pink outer F Flashing and Weeps I Staples Gauge 16 for wood framing J Metal Siding or Vinyl Siding K Wood Siding L Multi-Panels Cedar / Smooth Plank M Wood Shingles or Shakes X Roofing nails with min 3/8" head or 1" width crown staples (1) Fasten Thermo Panel with roofing nails with min 3/8" head or 1" width crown staples and appropriate length on top of M4 Sheathing with no less than 2 x4 wood studs. Stud spacing no greater than 24 o.c. Fastener distance as explained under Nails, Staples or Screws above. (2) Attach any of the illustrated siding materials. Remember, penetrating fasteners must enter framing as explained under Nails, Staples or Screws above. Cutting: Simply score and snap the panel with a utility knife from the front (white) side. Alternatively, it may be cut with a circular saw or jigsaw equipped with a diamond tipped blade. Sharp edges are made with fast running diamond tipped tools. Cutting to size may be done with normal slow or fast running hand tools or stationary equipment. When using fast running tools, dust exhaustion must be employed. Note: Using stationary saw equipment, cut the panels back side up (pink side) the saw blade must always attack the board from the back-side. Cutouts: Cutouts may be made with a jigsaw, a keyhole saw equipped with bi-metal, or diamond tipped blade. It is recommended to drill a min 7/16 (8mm) hole before cutting in the inside corner. In order to avoid creating a notch at the inside corner, cut edges should be sanded. 8
9 General Information Safety As for all other building materials, safety precautions must be taken into account and local laws and regulations must be observed. Cutting and drilling are subject to dust development, and proper precautions must be taken by using appropriate dust extraction equipment. Dust from panels is characterized as mineral dust and a prolonged exposure to this may cause lung disease. Fast running electrical equipment such as hand held circular saws leave a fine and sharp edge on the panels and provide fine dust. Due to the speed of the blade the dust is dispersed over a larger area. Therefore, it is necessary to establish sufficient exhaustion and it is recommended the operator carry personal safety equipment (for further information please check the MSDS for the product). Service If you have any questions regarding the Multi-Panels panels, our dedicated service team is ready to assist you with advice and guidance. Please visit our website for more information. Application conditions The board temperature and ambient temperature should be + 44 F (+7 C) - 86 F (+30 C) and relative humidity <85 % (optimally 60 %). Process temperature must be min +44 F (+7 C). Storing and proper handling Multi-Panels products are delivered with plastic protection cover on the pallet. If undamaged, the plastic cover protects against weather conditions during transportation. The plastic cover is for dust protection only and should be removed upon arrival at the building site. Hereafter the pallets should be kept under a roof, leaving the possibility of ventilation around the panels. Multi-Panels must be stored on a flat and dry level surface on pallets or sleepers with a minimum distance of 12 between the stacks on all sides. Note: Max. 5 pallets in a stack at the warehouse and on the building site max. 2 pallets in a stack. The board must be turned and lifted vertical up and off the pallet and not drawn over the next board. Lift pallet crosswise and set forks apart to minimize bending of pallet. Fork length must support pallet entirely; if required, use fork extensions. Impact by Pollution and Nature Weather and nearby vegetation may affect the appearance of the panels. Take caution to avoid pollution and leaves from trees, bushes, and flowers to not impact the integrity of the panels. 9
10 Warranty This warranty covers: The warranty covers the ASTM certification scope according to the datasheet for the product. Multi-Panels Corporation offers a warranty for a period of 10 years, beginning on date of delivery, provided that, the panels were cut/drilled/installed/used per the prescribed system components etc. according to the Installation Manual. The warranty does not cover: color fading, environmental impact on the panels such as pollution, etc. Replacement: Any panels which do not comply with the certification scope is replaced free of charge, ex works Los Angeles, on condition that Multi-Panels Corporation is notified within a period of 4 weeks of delivery and the claim is accepted by Multi-Panels Corporation. In particular, the warranty covers neither the transport costs nor labor expenses for dismantling and dumping defective panels and installing new panels. Multi-Panels Corporation shall not be liable for failure of performance hereunder due to force majeure. Disclaimer The information contained in this manual is based on Multi-Panels general experience, best knowledge and belief; however, because of factors that fall beyond Multi-Panels knowledge and control, which can affect the use and function of the products, no warranty is given or implied with respect to the information. Multi-Panels policy is one of continuous improvement and therefore reserves the right to alter specifications at any time and without notice. In case of doubt, please contact your local Multi-Panels representative. 10
Installation Manual for M4-Exterior Sheathing
Installation Manual for M4-Exterior Sheathing 1 Application Area - Testing M4 complying with: 2015 and 2012 International Building Code (IBC) and 2015 and 2012 International Residential Code (IRC). The
More informationCOMPOSITE SIDING INSTALLATION GUIDE
CENTURY HOME LIVING COMPOSITE SIDING INSTALLATION GUIDE Read all instructions prior to installing any siding product. Failure to install and finish this product in accordance with all local building codes,
More informationKuraStone TM Installation Guide
Installation Guide Read these installation guidelines completely and thoroughly before beginning installation. Construction Requirements KuraStone pieces can be installed on braced wood or steel stud (18
More informationForceField Air & Water Barrier System. installation instructions
ForceField Air & Water Barrier System installation instructions Protection and Performance inside and out The ForceField air and water barrier system consists of engineered wood sheathing panels laminated
More informationFlashing Materials. Rough Opening Preparation
Installation Instructions for CertainTeed New Construction Windows Handling vinyl windows CAUTION: Always store vinyl windows and doors in an upright position on a slight angle. Never lay them flat or
More informationAdorn Mortarless Stone Veneer Installation Natural Concrete Products
Adorn Mortarless Stone Veneer Installation Adorn Mortarless Stone Veneer can be used on new or existing construction. Adorn is nailed or screwed onto the wall; therefore no brick ledge is required. Adorn
More informationINSTALLATION INSTRUCTIONS
CERBER FIBER CEMENT SIDING - SIERRA PREMIUM SHAKE Construction Requirements Sierra Premium Shake boards must be installed over vertical wood framing spaced no greater than 16 oc. with an APA rated 7/16
More informationInstallation Guide - Evolution Series Wood Siding
Installation Guide - Evolution Series Wood Siding The following instructions pertain to the installation of Fraser Wood Siding Evolution Series on a typical wood frame construction allowing for nail penetration
More informationMAXISHINGLE LAP SIDING INSTALLATION GUIDE
MAXISHINGLE LAP SIDING INSTALLATION GUIDE Read all instructions prior to installing any siding product. Failure to install and finish this product in accordance with all local building codes, regulations
More informationInstallation Instructions for Standard Lap and Self-Aligning Lap Siding
Installation Instructions for Standard Lap and Self-Aligning Lap Siding 7/16 in. Standard Laps Include: All Old Mill Widths, Cedar Shake Lap and Smooth Lap 1/2 in. Self-Aligning Include: 8 in. and 12 in.
More informationInstallation Instructions
Installation Instructions SLICKER CLASSIC RAINSCREEN Page List of Approved Compatible Products 2 Nail Selection Guide 3 General Installation 4 Insulation Board Installation 5 EIFS Installation 6 Top of
More informationTYPAR WEATHER PROTECTION SYSTEM TABLE OF CONTENTS. SPECIAL INSTALLATION CONSIDERATIONS Stucco** Brick** Stone Veneer** Wood Siding**
TYPAR WEATHER PROTECTION SYSTEM INSTALLATION GUIDE TABLE OF CONTENTS Table of Contents...01 Special Installation Considerations...01 Code Requirements...02 Approvals and Reports...02 Recommended Materials...02
More informationPANEL INSTALLATION GUIDE
GUIDE The Manufacturer has provided these instructions as installation guidelines in accordance with ASTM E-330. The manufacturer, however neither installs the panels nor has any control over the installation.
More informationCONTENTS. Transitions Board and Batten Vertical Installation... 10,11
INSTALLATION MANUAL CONTENTS Important Notes... 2-4 Weather Protective Barriers... 2 Storage and Transportation... 2 Tools and Equipment... 2 Fastener Choices... 3 Wall Preparation... 3,4 Flashing... 4
More informationInstallation Guide. Shingles. Classical. Shingles. Warning. Storage. Cutting Shingles. Touch-Up. Eastern White Cedar
Installation Guide Before you begin, take the time to read this entire guide to clearly understand the requirements and steps to follow for proper installation. The Fastening Make shingle fastening simpler
More informationSECTION LAP SIDING. A. Fiber cement lap siding, panels, single, trim, fascia, moulding and accessories.
SECTION 07460 LAP SIDING PART 1 GENERAL 1.1 SECTION INCLUDES A. Fiber cement lap siding, panels, single, trim, fascia, moulding and accessories. B. Factory-finished fiber cement lap siding, panels, single,
More informationTools required by installer: Materials required by installer:
Installation Guidelines For Quaker Window Products Vinyl product line (Single Hung, Double Hung, Sliding Window, Fixed Window, Casement, Awning, and Hopper) Installer: Read these instructions completely
More informationInstallation Manual SOLID CORE SIDING
Installation Manual SOLID CORE SIDING SOLID CORE SIDING Installation Information contained in this manual can be viewed in video form at: www.youtube.com/epbc CONTENTS Important Notes...2-4 Weather Protective
More informationInstallation Instructions for Panel Siding and Soffit
Installation Instructions for Panel Siding and Soffit 7/16 in. Panels Include: Sturdy Panel, Square Edge, 3/4 in. Channel and Reverse Board and Batten (RB&B) 1/2 in. Panels Include: Adobe Shiplap and 808
More informationThe City of Winnipeg SHINGLE ROOF REPLACEMENT Section Replacement of Shingle Roof - Louis Riel Library Page 1 of 5 Bid Opp. No.
Replacement of Shingle Roof - Louis Riel Library Page 1 of 5 PART 1 GENERAL 1.1 SCOPE OF WORK.1 Total roof area approximately 1,312 m 2. The Work includes, but is not limited to:.1 Removal and disposal
More informationInstallation Instructions for Old Mill Shingle and Designer Shake Lap Siding
Installation Instructions for Old Mill Shingle and Designer Shake Lap Siding Includes: Cove, Craftsmen Staggered, Diamond, Fish Scale, Octagon, Round and Old Mill Shingle Lap Important: Read and understand
More informationSECTION PVC THATCH SHINGLE ROOFING SYSTEM PART 1 GENERAL 1.01 SUMMARY
SECTION 07312 PVC THATCH SHINGLE ROOFING SYSTEM PART 1 GENERAL 1.01 SUMMARY A. This Section Includes the following: 1. Endureed Dominica PVC thatch shingles. 2. Self- adhering sheet underlayment. B. Related
More informationShapes Siding. Perfection Shingles. Chalk Line
Snap a Chalk Line Shapes Siding Perfection Shingles Chalk Line To establish a straight reference line to guide the positioning of the starter strip and the first course of siding, snap a chalk line. starter
More informationPRIMED STRAND REVERSIBLE SHAKE
PRIMED STRAND REVERSIBLE SHAKE PRIOR TO INSTALLATION Inspect product for any issues before installing (breakage, surface defects, foreign objects). Do not install questionable product. Report any problems
More informationLP SmartSide Soffit ON SITE STORAGE PREPARATION. Application Instructions Vented and Non-Vented Smooth Finish or Cedar Texture. General Information
Application Instructions Vented and Non-Vented Smooth Finish or Cedar Texture A B A - Open / Closed (Page 5) B - Vented (Page 6) ON SITE STORAGE Store off the ground well supported, on a flat well-drained
More informationDIVISION 6 WOOD AND PLASTICS
DIVISION 6 WOOD AND PLASTICS PART 1 - GENERAL 1.01 SUMMARY A. This Section includes the following: 1. Wood framing. 2. Wood supports. 3. Wood blocking. 4. Wood cants. 5. Wood nailers. 6. Wood furring.
More informationTechnical Note No. 026
Technical Note No. 026 Strand Substrate Installed Vertically for Board & or Board-on-Board Applications This Technical Note is an addendum to the Strand Substrate Application Instructions and Trim and
More informationInstallation Guidelines For Quaker Window Products Aluminum flange fin sub sill & receptor system using a T mulled twin window unit.
Installation Guidelines For Quaker Window Products Aluminum flange fin sub sill & receptor system using a T mulled twin window unit. Installer: Read these instructions completely before starting any installation.
More informationInstallation Instructions for Siding
Smart-Shingle TM System "The new smart way to install cedar shingles." - This Old House Installation Instructions for Siding V3.2 INSTALLATION GUIDE MARKS Shingle-Strip 0 1 2 3 4 5 6 7 8 9 10 11 12 13
More informationInstallation Instructions
Installation Instructions SLICKER MAX RAINSCREEN Page List of Approved Compatible Products 2 Nail Selection Guide 3 General Installation 4 Top of Wall Detail 5 Bottom of Wall Detail 6 Wall Corner Detail
More informationHow To Install Windows: Nail-Fin Application
How To Install Windows: Nail-Fin Application Required Tools & Materials: Materials: 1 3/4" galvanized roofing nails. Nails must penetrate at least 1" into framing For mulled and/or DP50 or above units:
More informationMIAMI-DADE COUNTY PRODUCT CONTROL SECTION DEPARTMENT OF REGULATORY AND ECONOMIC RESOURCES (RER)
MIAMI-DADE COUNTY PRODUCT CONTROL SECTION DEPARTMENT OF REGULATORY AND ECONOMIC RESOURCES (RER) 11805 SW 26 Street, Room 208 BOARD AND CODE ADMINISTRATION DIVISION Miami, Florida 33175-2474 T (786) 315-2590
More informationMULTISHAKE LAP SIDING INSTALLATION GUIDE STORAGE AND HANDLING: PACKAGING:
MULTISHAKE LAP SIDING INSTALLATION GUIDE Read all instructions prior to installing any siding product. Failure to install and finish this product in accordance with all local building codes, regulations
More informationTapersawn Shake Installation Instructions
Smart-Shingle TM System Tapersawn Shake Installation Instructions INSTALLATION GUIDE MARKS Shake-Strip 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35
More informationROOFING APPLICATION STANDARD (RAS) No. 115 STANDARD PROCEDURES FOR ASPHALTIC SHINGLE INSTALLATION
ROOFING APPLICATION STANDARD (RAS) No. 115 STANDARD PROCEDURES FOR ASPHALTIC SHINGLE INSTALLATION 1. Scope 4. Underlayment 2. 1.1 This roofing application standard has been developed to provide a responsive
More informationROOFING APPLICATION STANDARD (RAS) No. 115 STANDARD PROCEDURES FOR ASPHALTIC SHINGLE INSTALLATION
ROOFING APPLICATION STANDARD (RAS) No. 115 STANDARD PROCEDURES FOR ASPHALTIC SHINGLE INSTALLATION 1. Scope 4. Underlayment 2. 1.1 This roofing application standard has been developed to provide a responsive
More informationapplication instructions
application instructions architectural collection cedar shake 76 series lap siding General At the time of manufacture, siding meets or exceeds the performance standards set forth in Composite Panel Association
More informationTechnical Note No. 028
Technical Note No. 028 38 Series Strand Substrate for Board & Batten Applications This Technical Note provides guidance for the application of 38 Series Strand Substrate for Board & Batten Applications.
More informationLAP SIDING INSTALLATION GUIDE
MAXIPANEL LAP SIDING INSTALLATION GUIDE Read all instructions prior to installing any siding product. Failure to install and finish this product in accordance with all local building codes, regulations
More informationInspire Aledora Slate Application Guidelines
July 2014 Inspire Aledora Slate Application Guidelines Only Basic Roofing Tools Required Hand fastened or fastened with a pneumatic nail gun Utility knife or a standard circular saw Tape measure, pry bar,
More informationInstallation Guidelines For ALUMINUM M-SERIES 3 PANEL SLIDING DOOR
www.quakerwindows.comv www.quakercommercialwindows.com PO Box 128 504 Highway 63 South Freeburg, MO 65035 800-347-0438 573-469-4151 (fax) Installation Guidelines For ALUMINUM M-SERIES 3 PANEL SLIDING DOOR
More informationEngineered Hardwood Flooring Installation Instructions
Engineered Hardwood Flooring Installation Instructions 1 Important Information before You Begin 1.1 Installer/Owner Responsibility Carefully inspect all materials before installation. Materials installed
More informationA. All trim that has been damages, broken, or missing shall be repaired or replaced with material of the same size, shape, and type.
SECTION 062000 - FINISH CARPENTRY PART 1 - GENERAL 1.1 SECTION REQUIREMENTS A. All trim that has been damages, broken, or missing shall be repaired or replaced with material of the same size, shape, and
More informationGREEN WORLD LUMBER GENUINE MAHOGANY DECKING INSTALLATION GUIDE
GREEN WORLD LUMBER GENUINE MAHOGANY DECKING INSTALLATION GUIDE Genuine Mahogany is among the most durable natural wood decking available. When properly installed and maintained, you should have a beautiful
More informationINSTALLATION GUIDE SAVANNAH SMOOTH & SIERRA PREMIUM SHAKE
INSTALLATION GUIDE SAVANNAH SMOOTH & 1 NICHIHA INSTALLATION GUIDE FOR SAVANNAH SMOOTH & GENERAL INSTRUCTIONS FOR SAVANNAH SMOOTH & CONSTRUCTION REQUIREMENTS Savannah Smooth and Sierra Premium Shake boards
More informationInstallation Guidelines
Installation Guidelines Tando Building Products provides these instructions as general guidelines only. Tando Building Products neither installs exterior cladding nor has any control over any installation.
More informationStormMaster Slate General Instructions 1.) GENERAL INSTRUCTIONS 2.) ROOF DECK VENTILATION 3.) ROOF DECK
StormMaster Slate General Instructions IMPORTANT: THE STATEMENTS EXPRESSED ON THIS PAGE ARE THE RECOMMENDATIONS FOR THE APPLICATION OF THE ROOFING PRODUCTS AS OUTLINED AND ILLUSTRATED. ANY DEVIATION FROM
More informationInstallation Guide Classic Series Wood Siding
Installation Guide Classic Series Wood Siding Please read the following instructions prior to beginning your installation. The following installation guidelines have been produced in accordance with the
More informationBest Materials LLC distributes backer rod, caulking and sealants for all types of EIFS joints and penetration sealing applications.
Best Materials LLC distributes backer rod, caulking and sealants for all types of EIFS joints and penetration sealing applications. EXTERIOR INSULATION & FINISH SYSTEM CONSTRUCTION Data Published Courtesy
More informationSun Windows General Information New Construction Sliding Door Installation Instructions H F
A G B D C H F H E H A. Apply Weather Resistive Barrier B. Apply Bottom Flashing Tape C. Install Sill Pan End Caps & Pan D. Caulk Sides & Top Nailing Surface, Set Door, Fasten E. Apply Side Flashing Tape
More informationINSTALLATION INSTRUCTIONS IMPERVIA SLIDING PATIO DOOR WITH FINS
2008 Pella Corporation Part Number: 803V0101 INSTALLATION INSTRUCTIONS IMPERVIA SLIDING PATIO DOOR WITH FINS Installation Instructions for Typical Wood Frame Construction. These instructions were developed
More informationSECTION CARPENTRY
SECTION 06100 CARPENTRY PART 1 GENERAL 1.01 SUMMARY A. Section Includes: Carpentry work including grounds, nailers, blocking, miscellaneous framing, plywood backing panels, plywood sheathing, preservative
More informationThe better way to build TM. Installation Manual ROOF SIPs
The better way to build TM Installation Manual ROOF SIPs August 2017 ROOF SIPs Installation Manual Table of Contents Topics General Requirements.................................... 3 Materials..............................................
More informationFASTENERS BUILDING DEPARTMENT
FASTENERS BUILDING DEPARTMENT 952-446-1660 WWW.CITYOFMINNETRISTA.COM This handout is intended only as a guide and is based in part on the 2015 Minnesota Residential Code, Minnetrista City ordinances, and
More informationInstallation Instructions for TruWood Reversible Trim
Installation Instructions for TruWood Reversible Trim Important: Read and understand all pages of the installation instructions before starting the trim application. For TruWood care and maintenance information,
More informationInstallation Guide. for E-Series/Eagle Clad Hinged Inswing French Door
Installation Guide for E-Series/Eagle Clad Hinged Inswing French Door Thank you for choosing Andersen. Instructions are for typical, new wood-framed wall construction with weather protection in place.
More informationEffective February, 2015
Effective February, 2015 Table of Contents Ensuring System Performance 1 Components 2 Frequently Asked Questions 3 List of Tools 3 Before you Begin Preparation 3 Quality Tips 4 Cold Weather Tips 4 Cleaning
More informationTECHNICAL GUIDE BEONSTONE PANELIZED STONE SIDING
TECHNICAL GUIDE BEONSTONE PANELIZED STONE SIDING TABLE OF CONTENTS This installation guide provides detailed step-by-step instructions for do-it-yourself projects. We invite you to read it carefully and
More informationAIA Specification. Section Slate Shingles PART 1 GENERAL
AIA Specification Section 07315 Slate Shingles PART 1 GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification
More informationSelf-Adhering Reflective Sheet Membrane
application instructions preparation All surfaces must be dry and clean. Dirt, dust and any other foreign matter must be removed. TW Flash-n-wrap 40 must be applied when air, substrate, and membrane temperatures
More informationGlassMaster General Instructions - Ardmore, OK & Hampton, GA <br /> Atlas Roofing
GlassMaster General Instructions - Ardmore, OK & Hampton, GA (For Metric Size Franklin, OH Instructions Click Here) IMPORTANT: THE STATEMENTS EXPRESSED ON THIS WRAPPER ARE THE RECOMMENDATIONS FOR THE APPLICATION
More informationInstallation Instructions Split Shake, Staggered Shake, Shingle, Perfection Shingle, and Shapes
Installation Instructions Split Shake, Staggered Shake, Shingle, Perfection Shingle, and Shapes General Guidelines These instructions show one type of installation and are intended for the professional
More informationBalustrade Systems / Installation Instructions
A. PARTS AND SUPPLIES NEEDED FOR INSTALLATION Hardware included for each 10 section of rail: 2 3 x 1-1/2 L-brackets 4 1-3/4 x 3/16 Blue hex-head screws for anchoring the L-brackets to the newel cap, column
More informationNEW HOME WARRANTY A REFERENCE GUIDE FOR TYPICAL WALL AND WINDOW DETAILS (RAINSCREEN SYSTEM) SHOWN AS FIBRE CEMENT CLADDING
NEW HOME WARRANTY A REFERENCE GUIDE FOR TYPICAL WALL AND WINDOW DETAILS (RAINSCREEN SYSTEM) SHOWN AS Reference Guide 0.1 GENERAL 0.1 Reference Guide 0.2 Index 0.3 Disclaimer & Limitations 0.4 General Notes
More informationSun Windows General Information New Construction Hinged Door Installation Instructions
A G H F H H A. Apply Weather Resistive Barrier B. Apply Bottom Flashing Tape C. Install Sill Pan End Caps & Pan D. Caulk Sides & Top Nailing Surface, Set Door, Fasten E. Apply Side Flashing Tape F. Apply
More informationI 2. Installation of Omega-Flex Panels over Plywood Sheathing. Installation over Plywood:
Tech Support: 800.523.2347 LaminatorsInc.com Installation of Omega-Flex Panels over Plywood Sheathing This installation supplement is to be used in conjunction with the Laminators 1-Piece, Tight-Fit Installation
More informationICC-ES Evaluation Report Reissued September 1, 2012 This report is subject to renewal September 1, 2013.
ICC-ES Evaluation Report www.icc-es.org (800) 423-6587 (562) 699-0543 ESR-1790 Reissued September 1, 2012 This report is subject to renewal September 1, 2013. A Subsidiary of the International Code Council
More informationPROJECT INSTRUCTIONS Roofing
PROJECT INSTRUCTIONS Roofing This handout outlines some basic regulations contained within the 2015 Minnesota State Building Code, as well as other good building practices. However, this handout is not
More informationFive Star Panel Installation Instructions
Five Star Panel Installation Instructions How to Store Five Star Panels You will need to store FIVE STAR PANELS in dry place to prevent staining, deterioration and possibly void all warranties. Stand the
More informationeco-shake INSTALLATION INSTRUCTION
1 eco-shake INSTALLATION INSTRUCTION NOTE: Shuffling the eco-shakes during installation may be necessary to obtain a uniform color throughout the roof. Due to the natural wood content in the ecoshakes,
More informationROOFING APPLICATION STANDARD (RAS) No. 130 INSTALLATION CRITERIA FOR WOOD SHINGLES AND SHAKES APPLICATION
ROOFING APPLICATION STANDARD (RAS) No. 130 INSTALLATION CRITERIA FOR WOOD SHINGLES AND SHAKES APPLICATION 1. 2. 3. Scope 1.1 This application standard provides the minimum installation criteria for wood
More informationROOFING APPLICATION STANDARD (RAS) No. 130
ROOFING APPLICATION STANDARD (RAS) No. 130 1. Scope 1.1 This application Standard provides the minimum installation criteria for wood shingles and shakes. 2. Definitions 2.1 For definitions of terms used
More informationpacific build supply ltd
Product Information ETERPAN is a medium density fibre cement sheet that is used for external cladding, plastered finish, base for stone and brick slips, rigid air barrier, weatherboards, soffits, louvres,
More informationHERITAGE LAMINATED ASPHALT SHINGLES Frederick, MD
Application Instructions for FORMERLY 30 THESE ARE THE MANUFACTURER S APPLICATION INSTRUCTIONS FOR THE ROOFING CONDITIONS DESCRIBED. TAMKO BUILDING PRODUCTS, INC. ASSUMES NO RESPONSIBILITY FOR LEAKS OR
More informationInstallation Guidelines
Installation Guidelines Exteria Building Products provides these instructions as general guidelines only. Exteria Building Products neither installs siding nor has any control over any installation. The
More informationSIDING-MASTER VINYL SIDING ATTACHMENT & ALIGNMENT SYSTEM & OVERHANG ATTACHMENT & ALIGNMENT SYSTEM INSTALLATION INSTRUCTIONS
Patent Pending SIDING-MASTER & OVERHANG ATTACHMENT & ALIGNMENT SYSTEM INSTALLATION INSTRUCTIONS Overview... SIDING-MASTER Strip Diagram... How to cut strips for length... Accessory Diagrams... How to (and
More informationPREMIUM LAMINATED ASPHALT SHINGLES Dallas, TX Tuscaloosa, AL Phillipsburg, KS
Application Instructions for FORMERLY 50 THESE ARE THE MANUFACTURER S APPLICATION INSTRUCTIONS FOR THE ROOFING CONDITIONS DESCRIBED. TAMKO BUILDING PRODUCTS, INC. ASSUMES NO RESPONSIBILITY FOR LEAKS OR
More informationEagle clad double-hung window installation instructions
Eagle clad double-hung window installation instructions These instructions are for typical installation in new typical wood frame wall construction. These instructions and methods are not intended for
More informationPanel Installation Instructions
EXTREMELY IMPORTANT INFORMATION PLEASE READ ENTIRE PACKET! Warranty Is Void If Panels Not Installed According to Instructions 1. WARNINGS & SPECIAL NOTES 1.1 Keep panels 24 from Heaters and shield Radiant
More informationPANELTEK ENGINEERED SIDING/PANELLING INSTRUCTIONS
PANELTEK ENGINEERED SIDING/PANELLING INSTRUCTIONS This product can be used for interior and exterior installations. Much of this guide refers to exterior installation, however, many of the construction
More informationA. Rough carpentry includes but is not limited to the following:
SECTION 06100 ROUGH CARPENTRY PART 1 - GENERAL 1.01 RELATED DOCUMENTS A. Drawings and general provisions of Contract, including General and Supplementary Conditions and Division-1 Specification Sections,
More informationVERSAROC CEMENT BONDED PARTICLE BOARD ROOF SHEATHING VERSAROC CEMENT BONDED PARTICLE BOARD ROOF SHEATHING
PRODUCT SUBMITTAL SHEET CEMENT BONDED PARTICLE BOARD ROOF SHEATHING A cement bonded particle board roof sheathing that can be combined with other fire resistant materials to create fire-rated roof assemblies.
More informationRead guide from beginning to end before starting installation. Read all warnings and cautions during unit installation.
Installation Guide for E-Series/Eagle High-Performance Mullion Windows with LVL Reinforcement and Installed Using Type B Clips Thank you for choosing Andersen. Instructions are for typical, new wood-framed
More informationMetal & Vinyl, Flush Mount and Recessed Fin Windows Recommended Installation Instructions
PO Box 480 Ph: 417-235-7821 Monett, MO 65708 Fax: 417-737-7140 Metal & Vinyl, Flush Mount and Recessed Fin Windows Recommended Installation Instructions These installation instructions are recommendations
More informationInspire Slate Starter Piece Hip and Ridge. 13 1/2" Height: 13 ½" Width: 12" Squares/ Pallet. Bundles/ Square
December 2017 Classic Slate Application Guidelines Only Basic Roofing Tools Required Hand fastened or fastened with a pneumatic nail gun Utility knife or a standard circular saw Tape measure, pry bar,
More informationwoodworkersjournal.com MATERIAL LIST
MATERIAL LIST T x W x L 1 Legs (2) 1 1 2" x 3 1 2" x 36 7 16" 2 End Uprights (2) 1 1 2" x 3 1 2" x 32 1 2" 3 Stringers (4) 1 1 2" x 3 1 2" x 42" 4 Top Cladding, Long (2) 3/4" x 7 1 4" x 65 3 4" 5 Side
More informationBARRELL VAULT BATTENLESS
i BARRELL VAULT BATTENLESS INSTALLATION GUIDE INSTALLATION NOTIFICATION The installation procedures demonstrated in this manual are recommended methods for the installation of the Gerard Barrel Vault battenless
More informationProduct Information & Installation Instructions
Product Information & Installation Instructions TUFF-STRAND TM OSB Sheathing OSB Structural Panels from MARTCO Installation Instructions: Site-Built and Modular Construction Important Notice to Buyers
More informationSIDING INSTALLATION GUIDE
READ THIS ENTIRE GUIDE CAREFULLY BEFORE INSTALLING NOBELIA SIDING. This installation guide applies to all NOBELIA siding profiles, including SPF tongue-and-groove and exposed nail siding. IMPORTANT: FAILURE
More informationCambridge English Application Instructions
Cambridge English Application Instructions ROOF SLOPE: Never apply asphalt shingles to roof slopes less than 2:12. For slopes 2:12 to 4:12 (LOW SLOPE), see special underlayment requirements outlined below.
More informationNATURA PRO Product Information Leaflet 1
NATURA PRO Product Information Leaflet 1 1. Product composition NATURA PRO sheets consist of the following: Portland cement Mineral fillers Organic reinforcing fibers Additives Semi-transparent water-based
More informationUlltraclad Aluminium Cladding. Contents. 1.0 General Information Design Information Installation Information 7. 4.
Ulltraclad Aluminium Cladding Contents 1.0 General Information 2 2.0 Design Information 4 3.0 Installation Information 7 4.0 Maintenance 10 5.0 Health & Safety 10 1 1.0 General Information 1.1 Introduction
More informationWindows Installed into Walls with Polyiso and Wood Framing. Installation Instructions Standard Method Revised 10/24/2016
Windows Installed into Walls with Polyiso and Wood Framing Installation Instructions Standard Method Revised 10/24/2016 Background There are many acceptable ways to mount and detail windows for support
More informationLAMINATED SHINGLES CERTAINTEED SHINGLE APPLICATOR S MANUAL SUPPLEMENT
15 CERTAINTEED SHINGLE APPLICATOR S MANUAL SUPPLEMENT LAMINATED SHINGLES 90 YOUR OBJECTIVE: To learn the correct procedure for installing Laminated shingles. ENGLISH DIMENSIONS LANDMARK SERIES WOODSCAPE
More informationEXTERIOR NEW WALL CONSTRUCTION
EXTERIOR NEW WALL CONSTRUCTION 4 Design and Application Details The instructions given here are not meant to supercede local code requirements. Check with your local building official for their preference
More informationTurada Hardwood Shingles and Shakes Installation instructions
1. General 1.1 Maximum Exposure: Maximum exposure for wood shingles and shakes shall comply with Table 1 herein, unless specifically specified in the roof assemblies Product Approval. 1.2 Solid and Spaced
More informationSTORMMASTER SHAKE GENERAL INSTRUCTIONS
STORMMASTER SHAKE GENERAL INSTRUCTIONS IMPORTANT: THE STATEMENTS EXPRESSED ON THIS PAGE ARE THE RECOMMENDATIONS FOR THE APPLICATION OF THE ROOFING PRODUCTS AS OUTLINED AND ILLUSTRATED. ANY DEVIATION FROM
More informationCFDTT-01. Control Joint Study (General)
Trim Method Classic Method Notes: Control joints are required and should be located by the designer at the following locations on the construction documents: 144 sf (13.4 sm) is the maximum overall area
More informationMake every component count.
Make every component count. Technical Bulletin Installation Instructions ABOUT THE MATERIAL The frame and material have been thoroughly tested for strength, durability and low maintenance, offering a never
More informationInstallation Guidelines. Next Dimension. Single Hung / Single Hung Fixed / Double Hung / Sliding Window / Fixed Window
Installation Guidelines Next Dimension Single Hung / Single Hung Fixed / Double Hung / Sliding Window / Fixed Window Windsor Windows & Doors Windsor Windows & Doors 900 S. 19 th St. 2210 Stafford St. Extn
More information