Products for fixing to Steelwork and Decking

Similar documents
Simotec. 13.i

Notes. Modifications and constructional corrections arising particularly from technological development excepted.

BEST PRACTICE GUIDE. Socket Bases. Working with Concrete Slabs

MEFA mounting accessories

PUSH-PULL-PROPS. and accessories ROBUSTA-GAUKEL GMBH MOUNTING TECHNOLOGY &CO.KG

HPD Aerated concrete anchor. Approvals / certificates. Basic loading data (for a single anchor)

Tel: +44 (0)

Swifts cable ladder supports

SWAY BRACE PIPE ATTACHMENT FIG. 010

Installation of Balustrade Systems

Fig. 2 DORMA-Glas Stand/Issue 02/03 Seite/Page 1/7

On-Roof Mounting Sets for Flat-Plate Collectors

Adjustable Feet Castors Accessories for Floor Elements

Copper Tubing Hangers Clevis Hangers. Copper Tubing Hangers

Meva Guided Screens MGS Technical Instruction Manual

Index Pipe Hangers and Straps

TITAN2-EDGE Public Access Computer Station Dual Track

REVIEW ALL INSTRUCTIONS COMPLETELY BEFORE ATTEMPTING INSTALLATION

Clopay Models 835/837 Sliding Door System Installation Guide

Wash basin and urinal fixings Complete fixing sets.

Clamping devices 521

Big expertise. Real convenience. Concrete commitment. stem

1. Enumerate the most commonly used engineering materials and state some important properties and their engineering applications.

AUXILIARY FRAMING AND ACCESSORIES

Spring Loaded All Season Roll-Up Doors

Fitting instructions for (Read instructions fully, before installing the door)

Timber to Timber - Timber to Concrete - Timber to Steel

WADE 2-1. Universal Carrier. Exclusive Features of 400 Series Universal Carrier for Lavatories, Urinals, Drinking Fountains.

PLAYLAND 72 SPIRAL SLIDE 3.5 Posts, 3.5 Posts / 48 Grid and 5 Posts

INSTALLATION TORSION SPRING FRONT OR REAR MOUNT LOW HEADROOM. 1 Cutting Vertical Track. 2 Fully Adjustable Jamb Brackets

CEILING-MOUNTED MONORAIL ANCHOR TRACK SYSTEM Assembly and Operation Instruction Manual

ALDoor DOUBLE DOOR INSTALLATION

CONTENTS TOOL LIST U P S I D E I N N O V A T I O N S, L L C RAMP AND STEP SYSTEM ASSEMBLY INSTRUCTIONS. Revised: June 2013

DobyGrip Accessories. Wire with Loop. Wire with Closed M6 & *M8 Eye Bolt. Wire with Carabina

5-axis clamping system compact

Real Life Ninja Complete Starter Pack (14ft. Warped Wall) Assembly Instructions

Pipe fasteners for metal roof

aluminium profile system

ALL SEASON PATIO COVER

FABA. Installation Instructions. Conductor Bar System. Publication #FABA-03 3/1/04 Part Number: Copyright 2004 Electromotive Systems

Framo 80. Siconnect Framo 80 Beam Section TP F 80 Group: A410

Experience the Hi-Lite Advantage

INSTALLATION MANUAL IOWA MOLD TOOLING CO., INC. BOX 189, GARNER, IA MANUAL PART NUMBER:

Gared Pro-S Portable Backstop

APPLICATION FOR A BUILDING PERMIT

Assembly Instructions 10 X 10 Aluminum Frame Building

Double Beam Freestanding Pergola Installation Guide

Fastener Type Chart. Fastener Categories. Sheet Metal Screws Fully threaded screws with a point for use in sheet metal. Abbreviated SMS.

TREX ENHANCE RAILING (Also Applies to Trex Select Railing) Installation Instructions

Dura-Lock Roof System

Available from. Established Technical Innovation in Steelwork Connections

Installation Instructions

Face Mount to Through-the-Post Mount

Operating Manual. for CUTTING, PERFORATING, BENDING SLB120

Technical Data Sheet. T E C H N I C A L D A T A S H E E T Superprop. Mass 25 Mass 50 M AT 125 Superprop. MU Bridging

WPS crew Doors Installation instructions

Leveling Feet, Base Plates and Casters

CAM SYSTEM. Eccentric self-locking clamping devices. Set. CAM SYSTEM t. CAM SYSTEM t. Set. CAM SYSTEM s pag CAM SYSTEM s pag.

SS1062, SS10621 & SS10621E Free Standing PWC & Fishing Boat Hoist SS1062 SS10621 SS10621E

MOUNTING INSTRUCTIONS CONCRETE PURLIN BRACKET

AWNING / PATIO COVER INSTALLATION INSTRUCTIONS

96 (Standard Length)

Real Life Ninja Starter Pack 1 Assembly Instructions

SINGLE TRACK BYPASS (patent pending) barn door hardware

Track Rack. * Track Racks are not lockable

Installation Instructions

Bracket guide. LK Pipe Pole. LK Radiator fixture Uni

System 3000 specifications

INSTALLATION INSTRUCTIONS

Technical Innovation in Steelwork Connections

ALUMINUM PIPE GUIDERAIL 01/01/

THE GATE COACHAll Rights Reserved 28, Jia Sarai N.Delhi ,-9998

Ready To Go SimpleSpec tm. Installation Manual. For more information, please visit 3-form.com or call

southpaw enterprises, inc.

STEEL PIPE GUIDERAIL 01/01/

INSTALLATION INSTRUCTION RRU DOUBLE LIGHT POLE MOUNT

Support systems Assembling instruction

Bulk Storage Rack Assembly Instructions

Fixings & Fastenings. Bright Zinc Plated, Galvanised & Stainless Steel. Lockinex. ea i, ea u i

BIKE FILE (301)

Installation Instructions for Solar Snow Pad (SSP-T-3)

Spring Loaded SCREEN-PRO. All Season Roll-Up Doors IN-JAMB MOUNTING METHOD INSTALLATION INSTRUCTIONS READ THIS FIRST

VINYL CLASSIC FREESTANDING PERGOLA ASSEMBLY INSTRUCTIONS

HD installation guide

INSIDE PANEL NOT SHOWN TO DETAIL ANCHORING SYSTEM

6.1. PUSH-PULL-PROPS and accessories

Pole Mount Installation Manual

INSTALLATION INSTRUCTIONS

CRYSTEEL S. this manual must be included with the vehicle after completing the installation.

Interior Equipment/Shop Fittings

Copyright 2005 Valmont Industries, Inc.

adaptivemechanical adaptive

Vertical Offset Base and Safety Rail System Installation Instructions

Model POA-CHB-XL50. Assembly and Installation Manual. Projector Bracket. Contents. Be sure to consult with a qualified installation specialist

Installation Instruction

PIPE/CONDUIT SUPPORTS

APPLICATION NOTE. Mounting instructions for EasyPIM / EasyPACK modules with screw clamps. 1. General information

TREX POST MOUNT DECKING AND CONCRETE

ALUMINIUM SOLAR MOUNTING SYSTEM. Components catalogue FOR ALL TYPES OF ROOFS AND SITES

3.1 General Provisions

Transcription:

Products 8.0 Beam Clamp - Single Support 8.1 Universal Joint for any variable Angle Adjustment 8.2 Beam Clamp TCS for Header Rails 8.3 Beam Clip for Cross Support/ Dimensioning of Bolts 8.4 Beam Clip for Cross Member Support 8.5 Beam Clip for Cantilever Support 8.6 Beam Clip for Supports on Building Structures 8.7 U-Holder SB 41 8.8 Threaded Hooks GH for Cross Supports 8.9 Hook Sleves SP and Bulb Flat Steel Beam Clamp for single supports 8.10 Hook Sleeves and Bulb Flat Beam Clamp for bracket installation 8.11 Clamping End set SKL for Installation to I-beam and C-section profiles between flanges 8.12 Toggle Stud KD for Installation to profiled Metal Decks 8.13 Roof Hangers TRH for Installation to Profiled Metal Decking 8.14 Fixing to Holorib and Cofrastra composite floors 8.15 8.i

Products Beam clamp TCS 0 Beam clamp TCS 1/ TCS 2 Beam clamp TCS 41 Universal Joint UG Beam Clip P U-Holder SB 41 Threaded Hook GH Hook Sleeve SP Bulb Flat Steel Beam Clamp Clamping End SKL Toggle Stud KD Hole Saw LS Roof Hanger TRH Piercing Tool LOT Wedge Bolt Clamp KB VBO C 40 8.0

Beam Clamp - Single Support Basic application Application with Safety Strap a According to VdS-directive the use of the Safety Strap is specified for pipes from DN 80 onwards! Counter Nut Recommendation: Use Safety Strap also, when vibrations are expected. The safety strap is bent on site to the form of the beam, so that it securely encompasses the edge of the beam flange. Inverted application Standing arrangement Projecting length of rod not to exceed 10 x rod diameter diameter a This arrangement is allowed for parallel-flange beams only a Take note of the torque: TCS 0: Rotate 1 revolution TCS 1 and TCS 2: Rotate min. 1 up to max. 1 1/2 revolutions. Then tighten locking nut. 1 2 8.1

Universal Joint for any variable Angle Adjustment Application as a brace Braces can be installed with variable angles to their supporting surfaces. The combination with adapters allows for bracing arms with cross-sections up to Threaded Tube G1". Application on an inclinded beam The pivot head in the Universal Joint can rotate freely, allowing adjustment to any angle. Tightening the locking nut against the adapter plate locks the position. Application on an inclined beam a In cases of dynamic loads it is necessary to secure the Beam Clamp TCS using a Safety Strap, possible in connection with another Beam Clamp TCS. A B Figure A: Figure B: Type: UG M8 UG M10 Type: UG M12 UG M16 UG FP M12 UG FP M16 During installation, make sure the correct side of the adapter plate faces towards the body of the Universal Joint. UG M8 - M16 UG FP M12 and M16 a The Threaded Rod must be clearly visible after being screwed into the pivot head. a Refer to VdS CEA directives for the recommendation of supporting thread sizes for Sprinkler pipes. Nominal size Thread (NW) DN 50 M 8 > DN 50 - DN 100 M10 > DN 100 - DN 150 M12 > DN 150 - DN 200 M16 8.2

Beam Clamp TCS for Header Rails with Beam ClampTCS 41 with Beam Clamp TCS 0; 1; 2 Beam clamps can attach into either the open face or rear slots of the channel, leaving the channel unobstructed for further installations. Cantilever arrangement with Beam Clamp TCS 1 F = = 5 m a In cantilever arrangements, the permissible bending moment of the beam must not be exceeded. Channel from size 41/21/2.0 onwards Fzul a = M b -------- a σ perm 160 N/mm² f perm 2 mm Sample: Beam shape IPB 160 and distance A = 50 cm Beam permissible bending moment M b [Nm] IPB 100 50 IPB 140 115 IPB 160 180 IPB 200 310 IPB 240 540 IPB 300 970 IPB 340 1350 Fperm 180 Nm = ------------------- = 05m, 360N Vertical pipe on vertical beam -single support- a T-Head Bolt and Holding Bracket must be used! This arrangement requires Sikla Channel 41/21 or larger. Check permissible loadings by referring to the catalogue! Horizontal pipe -twin mounting- 8.3

Beam Clip for Cross Support/ Dimensioning of Bolts Installation within the flange width on thick flanges Sliding connection using Slide Set 41 (alternatively, if necessary, rigid connection using Blockset CC 41). When dealing with very thick flanges, use shim plates. Shim plates exceeding 10 mm height must be tack welded to the crossmember! A B Installation Determination of the required bolt length Lmin: Arrangement A (with Hexagon Bolt) Arrangement B (with T-Head Bolt) P1: Lmin = a + b + 37 [mm] P1: Lmin = b + 40 [mm] P2: Lmin = a + b + 43 [mm] P2: Lmin = b + 45 [mm] P3: Lmin = a + b + 48 [mm] P3: Lmin = b + 50 [mm] P4: Lmin = a + b + 55 [mm] P4: Lmin = b + 60 [mm] Bolts used with Beam Clip: P1: M 8 or M 10 P2: M 12 P3: M 16 P4: M 16 8.4

Beam Clip for Cross Member Support Tandem cross support using Channel 41-75/65/3.0 D Cross member supported by opposing web faces of 2 beams Installation of a duct -suspended arrangement- Installation of a duct -directly below the beam- a When using Beam Clips, always make sure that - the wider side is located at the Channel and - the smaller side at the beam. 8.5

Beam Clip for Cantilever Support Arrangement with U Bolt a Use U Bolts only as guides. If they have to bear some vertical loads, U Bolts type DIN 3570 must be used. a The permissible bending moment of the beam must not be exceeded! Double-sided cantilever crossmember Combination of Support Bracket and Channel with horizontal pipes running parallel to the IPB beam. When using this arrangement, make sure that no axial forces from the pipes exist, which may cause the supporting frame to twist. 8.6

Beam Clip for Supports on Building Structures Installation to cast-in channel Installation with anchors Installation on a timber support Fixing of a timber joist to a steel beam Fixing two beams crossing each other Pipe running directly below the beam Simotec Base Plate GPL can be used between the two beams. 8.7

U-Holder SB 41 Arrangement above or below the beam In all arrangements, the loading capacity of the beam has to be considered. In cantilever arrangements especially the torsional stiffness has to be considered Direct installation of all rectangular single and double channels system 41 on steel beams with flange height up to max. 16 mm. a U-Holder SB should always be used in pairs. Loading capacity per U-Holder SB 41 M10 on horizontal beam up to max. 5kN. For secure support a minimal overhang of 50 mm is necessary. Calculation of loading capacity for horizontal beam with Sikla Structural Analysis Software SiPlan. Lateral arrangement on the beam Due to the geometry of the U-Holder, it is also possible to install Channels MS 41/41 and 41/21 D 90 rotated. Type 41 D for profiles as of 41/41 D. a In lateral arrangement secure U-Holders against slipping (e.g. with 2 x TCS). 8.8

Threaded Hooks GH for Cross Supports... hooked onto angle irons... hooked onto steel C-sections Flange Nut NT Threaded Hook Beam Clip Channel MS Holding Bracket HK 8.9

Hook Sleves SP and Bulb Flat Steel Beam Clamp for single supports Hook sleeves may be attached to flanges of C-section or Ibeam steelwork in cases when the beam is rotated through 90 The Threaded Hook has a hole Ø13mm and is therefore suitable for Threaded Rods GST M8, M10, M12. If used with a M8 Threaded Rod, a Flange Nut NT is required. The load values stated in the catalogue refer only to the Hook Sleeves. The load capacities of the supporting beam or building structure must be checked separately. Installation to Bulb Flat steel (HP-profile) M10 The Bulb Flat Beam Clamp is a solid connection element to fix pipework and electrical containment services to bulb flats HP (80 x 6 up to 160 x 6). Combined arrangement as a base plate to a vertical cantilever down post. 8.10

Hook Sleeves and Bulb Flat Beam Clamp for bracket installation Arrangements to C-section steelwork mounted above or below the beam Cantilevers to C-section steelwork or angle irons a In cantilever arrangements, the permissible bending moment of the supporting beam must not be exceeded. Suspended header rail to bulb flat steel (HP-profile). 8.11

Clamping End set SKL for Installation to I-beam and C-section profiles between flanges Vertical beam and horizontal pipe run Pipe run parallel to the beam A a Each Clamping End set SKL consists of two identical clamping plates. The support Channel between the end plates has to be cut to length on site. Fix the SKL set as deep as possible within the beam profile. a Bolting torque: min. 1 up to max. 1 1/2 rotations Lock after tightening! a Excess tightening of the point screws may result in deformation of the beam. Cutting length of the Channel = A - 25 mm A = clearance between the flanges Suitable for beams with A = 150... 800 mm To be used in combination with Channels 41/41/2.5 or 41/45/2.5 and Holding Brackets HK 41. Cross-member support from webs between two opposing beam faces 8.12

Toggle Stud KD for Installation to profiled Metal Decks Hole Saw LS with Centre Drill The Toggle Stud KD is completely pre-assembled, making installation safer and faster. 1 2 Single support Crossmember mounting Height adjustment Weatherproof gasket and large washer reliably seals the opening a Excerpt from DIN 1988, part 2: only pipes up to DN 50 may be fixed to trapezoidal steel roof panels, aerated concrete and pumice stone concrete slabs. 8.13

Roof Hangers TRH for Installation to Profiled Metal Decking After piercing, ejector springs ensure a safe return stroke of the hole punches a Excerpt from DIN 1988, part 2: only pipes up to DN 50 may be fixed to trapezoidal steel roof panels, aerated concrete and pumice stone concrete slabs. Type M Piercing Tool LOT 3 Adjustable cutting width 40... 100 mm Adjustable height stopper Height of perforation does not affect the loading capacity of the Roof Hanger TRH. The greater the distance between the perforation and the bottom edge of the profile, the greater the stability of the Metal Decking Sheet. Type RM only 2.5 kg Type MS (with sound absorption) not allowed for sprinkler installations a According to the VdS guidelines for sprinkler installations, all bolting has to be locked, e.g. with a locking nut at the horizontal bolt. Hexagon Bolt SKT e.g. M8 x 100 Locking nut Roof Hanger TRH RM with knurled nut for height adjustment 8.14

Fixing to Holorib and Cofrastra composite floors Wedge Bolt KB Single support Crossmember mounting Clamp VBO C 40 Single support Header Rail Installation 8.15