Description shoulder bolt type page: 1/5 Stabilization anchors must be installed in buildings over 130 (150 or 45m in Canada), with the first on being no more then 50 from the top of the building. The vertical distance between anchors below 50 must be no more then 50 or 3 floors whichever is less. The suspension rope is placed through the lanyard loop before the rope is attached to the building. Lanyard can be removed only when the suspension rope is detached from the building. Length of the lanyard from suspension rope to the building is adjusted for tautness by sliding the adjustment plate along the lanyard cable towards the building. Tension on the lanyard then locks the adjustment plate firmly in position. Shoulder Bolt - Weld to Angle Shoulder Bolt - Double Nut to Angle Shoulder Bolt - Embedded Cantilevered Shoulder Bolt - Mullion Type Shoulder Bolt - Embedded
shoulder bolt type page: 2/5 SHOULDER BOLT - WELD TO ANGLE SECURE NUT SECURE TOTAL LENGTH OF ISA TO BE DETER- MINED SET LENGTH AS REQUIRED PER JOB 13/16 REF ING SHOULDER BOLT - DOUBLE NUT TO ANGLE 1 1/8 REF TOTAL LENGTH OF ISA TO BE DETERMINED SET ING SHOULDER BOLT - EMBEDDED CANTILEVERED SHOULDER BOLT - HILTI ADHESIVE CANTILEVERED 5 MIN DEPTH 7 MIN DEPTH DRILL Ø TBA 13/16 REF 13/16 REF SHOULDER BOLT - EMBEDDED OR HILTI ADHESIVE 5 MIN CONCRETE DEPTH (REF) - EMBEDDED INTERMITTENT STABILIZATION ANCHOR 6 MIN CONCRETE DEPTH (REF) - HILTI ANCHOR 1-8 UNC INSTALLED ø 1/2 DIA SHOULDER SHOULDER BOLT - MULLION TYPE #10-24 UNC SS304 HEX BOLT COMPLETE WITH SS304 WASHER AND NYLOCK WITH EXPOSED ISA S 4 REF CONCRETE STRUCTURE TO WITHSTAND APPLIED LOADING FACTOR OF 4-2 3/16 REF CURTAIN WALL OR OTHER ATTACH- MENT POINT CAPABLE OF WITH- STANDING 600 LBS REQUIRED LOADING FOR ISA 2005 Tractel. All rights reserved.
Description detent pin type page: 3/5 Stabilization anchors must be installed in buildings over 130 (150 or 45m in Canada), with the first on being no more then 50 from the top of the building. The vertical distance between anchors below 50 must be no more then 50 or 3 floors whichever is less. The suspension rope is placed through the lanyard loop before the rope is attached to the building. Lanyard can be removed only when the suspension rope is detached from the building. Length of the lanyard from suspension rope to the building is adjusted for tautness by sliding the adjustment plate along the lanyard cable towards the building. Tension on the lanyard then locks the adjustment plate firmly in position. Detent Pin - Weld to Angle primary and secondary suspension wire ropes Detent Pin - Double Nut to Angle stabilization anchor point upper limit switch building face roller hoisting machine Detent Pin - Embedded Cantilevered Detent Pin - Mullion Type Detent Pin - Embedded
detent pin type page: 4/5 DETENT PIN - WELD TO ANGLE DETENT PIN - DOUBLE NUT TO ANGLE SECURE NUT ING SS304 THREADED ING SECURE TOTAL LENGTH OF ISA TO BE DETER- MINED SET LENGTH AS REQUIRED PER JOB 1 1/8 REF TOTAL LENGTH OF ISA TO BE DETERMINED SET DETENT PIN - EMBEDDED CANTILEVERED DETENT PIN - HILTI ADHESIVE CANTILEVERED 5 MIN DEPTH 7 MIN DEPTH DRILL Ø TBA DETENT PIN - EMBEDDED OR HILTI ADHESIVE 5 MIN CONCRETE DEPTH (REF) - EMBEDDED INTERMITTENT STABILIZATION ANCHOR 6 MIN CONCRETE DEPTH (REF) - HILTI ANCHOR 1-8 UNC INSTALLED DETENT PIN - MULLION TYPE #10-24 UNC SS304 HEX BOLT COMPLETE WITH SS304 WASHER AND NYLOCK WITH EXPOSED ISA S CONCRETE STRUCTURE TO WITHSTAND APPLIED LOADING FACTOR OF 4-4 REF 2 3/16 REF CURTAIN WALL OR OTHER ATTACH- MENT POINT CAPABLE OF WITH- STANDING 600 LBS REQUIRED LOADING FOR ISA 2005 Tractel. All rights reserved.
mullion guide system page: 5/5 A more effective system is to fit the building with a mullion guide system. Continuous descent of the building is done by guide rollers fitted to the platform, which run in guide rails along the length of the building. These guide rails are generally made of an open extruded aluminum profile, which is fixed, to the façade. The mullion guide rails must be able to withstand a 600lb. ultimate pull in any direction. The distance between the guide rails may vary depending on the stage platform length being used. primary and secondary suspension wire ropes indented mullion guide upper limit switch guide rollers engaged to indented mullion track A A hoisting machine