Spec Section: , Complete Elec, Comm, and Fire Alarm , Complete Elec, Comm, and Fire Alarm Data Sheets RAN/GCAN

Similar documents
Spec Section: Concrete Mix Design psi - Review Form Concrete Mix Design psi Data Sheets GCAN

SUBMITTAL REVIEW Steel Reinforcement - Slab and Masonry Shop Drawings GCAN. Notes: 1. See comments on submittal.

SUBMITTAL REVIEW B Passenger Elevators Shop Drawings GCAN

SUBMITTAL REVIEW Food Service Equipment Data Sheets GCAN. Notes: 1. See D-C Design comments. Submittal: No. 035.

SUBMITTAL REVIEW Underground Natural Gas Piping Data Sheets GCAN. Notes: 1. See engineer s comments. Submittal: No. 016.

SECTION SUBMITTALS. A. PART A and DIVISION 1 of PART B are hereby made a part of this SECTION.

SECTION SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES

Taylor County July 2011 SECTION SHOP DRAWINGS, WORKING DRAWINGS AND SAMPLES

ADDENDUM NO. 3. Ellis County Elections Building

Section Meetings Section Material and Equipment. None Required

SECTION PANELBOARDS

B. Division-16 Basic Materials and Methods section apply to work specified in this section.

03/7/12 Issuance UTD Section Page 1 of 5 Electrical General

JEFFERSON LAB TECHNICAL ENGINEERING & DEVELOPMENT FACILITY (TEDF ONE) Newport News, Virginia

SECTION SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES

SECTION SUBMITTAL PROCEDURES

ELECTRICAL GENERAL DESIGN AND CONSTRUCTION STANDARD PART 1: GENERAL Electrical/Telecommunications Design

2. Electrical rooms shall be centrally located and stacked so that feeder conduits and bus duct are run as straight and short as possible.

4. Special Systems Design: including Fire Alarm and Security. C. Electrical and Telecommunications Ductbanks: Refer to Section 16118

City Plaza Energy Upgrades Timeline of Events Pella Window Cancellation

SECTION PROJECT COORDINATION VIA BIM

PROJECT LOCATION BOZEMAN HIGH SCHOOL. ELECTRICAL ENGINEER: Van Dykken Engineering 37 Spanish Peak Drive Bozeman, MT Phone:

SECTION WIREWAYS FOR RADIOLOGY EQUIPMENT

SECTION SUBMITTALS PART 1 - GENERAL 1.01 RELATED DOCUMENTS

REMARKS: The A.F.F. dimension noted on the drawings to the bottom of the grid is 15 0, this dimension should be 16 0.

DESIGN CHECKLIST INTRODUCTION

.2 Accompany all submissions with a transmittal letter, in duplicate, containing:.4 Specification Section number for each submittal

Submittal Review Form

SECTION LIGHTING PART 1- GENERAL

ALL PLAN HOLDERS NANCY MAGER, NPSR ARCHITECTS, INC. DATE: November 29, Lea County General Service Building PROJECT NO: ADDENDUM NO: 1

HOENER ASSOCIATES INC. ARCHITECTS

MISSISSIPPI STATE UNIVERSITY Office of Planning Design and Construction Administration

UNION COUNTY VOCATIONAL-TECHNICAL SCHOOLS West Hall Addition Project Raritan Road, Scotch Plains, NJ

January, 2014 Page 1 of 5

LETTER OF TRANSMITTAL

St. Monica Food Pantry

SECTION CLOSEOUT SUBMITTALS SECTION CLOSEOUT SUBMITTALS

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017

Residential Construction Checklist Single and Two Family Construction

Quality Control Checklist - Design Drawings

B. Manufacturers: Square-D, G.E. or Westinghosue.

SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES

A. Action Submittals: Written and graphic information that requires Engineer's responsive action.

SECTION COMMUNICATIONS ELECTRICAL POWER DISTRIBUTION

National BIM Standard - United States Version 3

HAYES VALLEY PLAYGROUND AND CLUBHOUSE PROJECT NO.: SAN FRANCISCO PARKS AND RECREATIONS SAN FRANCISCO, CA

LETTER OF TRANSMITTAL

SUBMITTAL REVIEW COVERSHEET

SECTION EQUIPMENT WIRING

A. Section includes administrative provisions for coordinating construction operations on Project including, but not limited to, the following:

December 31, 2015 A. THE BID OPENING DATE IS UNCHANGED. B. Questions, Additions, and Deletions

TCC/SHORE TRANSIT BUS MAINTENANCE FACILITY - PHASE II

SECTION SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 RELATED DOCUMENTS

REVISION #1. Section. fire alarm B. C. the hot. intent of. required. manufacturer. materials. C. Warranty

DIVISION 1 GENERAL REQUIREMENTS SECTION SUBMITTAL PROCEDURES

Chapter 25. Lighting Plans

UCCS University Hall Fire Sprinkler System Upgrade March 1, 2011 RTA SECTION SUBMITTAL PROCEDURES PART 1 - GENERAL

Letter of Transmittal

SUBMITTAL LETTER Capital Renewal Scoates Hall, Texas A &M University, College Station, TX TAMUS Project

DOCUMENT ADDENDUM NO. 4. Issued to all Bidders: Date: October 14, Contract Name: Electrical Installation. Contract Number: C8410

State of New Jersey BOARD OF PUBLIC UTILITIES 44 SO. CLINTON STREET 7 TH FLOOR P.O. BOX 350 TRENTON, NEW JERSEY

SECTION D BIM COORDINATION DRAWINGS - CONTRACTORS

Single-Family Dwelling Submittal Requirements

A. Product Data: For each electrical identification product indicated.

KidsAbility Guelph Hub Renovation ADDENDUM #2 Project No.:

Regal Series Recessed Flatwalls

BID ADDENDUM NO. 4 ITB/004/16/KL CITY OF WINTER SPRINGS WTP NO. 1 WATER QUALITY IMPROVEMENTS

LETTER OF TRANSMITTAL

SECTION ADMINISTRATIVE REQUIREMENTS SECTION ADMINISTRATIVE REQUIREMENTS

Submittal Review SW Macadam Ave Suite 200 ATTENTION: Riley Tobin. Portland, OR RE: BSD Sunset High School

The GMFI Process. Design Intent Document Preparation. Enroll in GMFI Program. Image Consultation. You are here. Design Intent Document.

FTEV Repair Mezzanine Bldg Hurlburt Field, Florida SECTION DESIGN AFTER AWARD

ADDENDUM NO. TWO. To the Plans and Specifications for: PALM COAST READINESS CENTER PALM COAST, FL For FLORIDA DEPT. OF MILITARY AFFAIRS

SECTION PROJECT MANAGEMENT AND COORDINATION

A. This section specifies procedural requirements for Shop Drawings, product data, samples, and other miscellaneous Work-related submittals.

Answer: Only to ChurchWoods, LLC.

East Central College

Addendum. Windsor Hall Renovations Date: October 12, 2017 Addendum No: 3 GENERAL. 1! Addendum #4 will be issued 2:00 PM Tuesday October 17, 2017.

DIVISION 11 EQUIPMENT SECTION PHOTO DARKROOM FUME EXHAUST VENT-HOODS

Designer CM/Owner s Rep Prime Contractor SubContractor Supplier Manufacturer

A. Deviation from this standard must be approved by the Project Architect.

BAPTIST HOSPITAL BEAUMONT 3080 College Street

SECTION SUBMITTAL PROCEDURES

KINGS COUNTY JAIL EXPANSION PHASE III COUNTY OF KINGS

ADDENDUM NO. 02 July 31, 2012

SECTION SUBMITTAL PROCEDURES

SECTION TRANSFORMERS

Facility Services Subgroup Preface for Divisions 21` through 28

ADDENDUM #2 September 12, 2018

September 6, 2018 CITY OF BERKELEY SHATTUCK RECONFIGURATION AND PEDESTRIAN SAFETY PROJECT SPECIFICATION NO C ADDENDUM NO.

PLAN SUBMITTAL REQUIREMENTS

Information for Digital Antenna System (DAS)/ Bi-Directional Amplification (BDA) Systems

Submittal Packages Detailed with Items and Reviewers

ADDENDUM No. 4 Page 1 of 8 (includes attachment)

INDEX OF SPECIFICATIONS SECTION F SPECIAL CONDITIONS DIVISION 1 - GENERAL REQUIREMENTS:

HAMMEL ASSOCIATES ARCHITECTS, LLC 2 5 E A S T G R A N T S T R E E T, S U I T E L A N C A S T E R, P E N N S Y L V A N I A

1. All electrical switches and outlets used shall be equal to Hubbell heavy duty, specification grade or equivalent quality.

ADDENDUM NOTICE INTERIOR RENOVATIONS AT THE BATHURST CLARK RESOURCE LIBRARY, 900 CLARK AVENUE WEST, VAUGHAN, ON

UNIFIED FACILITIES GUIDE SPECIFICATIONS

FAB GSE Remodel ITB Solicitation #1538 Invitation to Bid (ITB) for General Contracting Services. ADDENDUM #4 December 5, 2014

Transcription:

SUBMITTAL REVIEW Submittal: No. 019.00 Spec Section: 26 0000, 28 0000 Complete Elec, Comm, and Fire Alarm Reviewed By: Laura Landon, Comma-Q Architecture Date: June 29, 2012 Project: BPS Belgrade Elementary School Location: Belgrade, MT Job Number: 11-03 Copy to: File, Owner This review is only for general conformance with the design concept of the project and general compliance with the information given in the Contract Documents. Corrections or comments made on the submittals during this review do not relieve the CONTRACTOR from compliance with the requirements of the plans and specifications. An opinion of equivalence of a specific item shall not be interpreted as an opinion of equivalence of an assembly of which the item is a component. Submittal review comments have been made within this format and not on the submittal sheets according to the following: NEN No Exceptions Noted GCAN Generally Conforms as Noted RAN Rejected for Reason as Noted IAS Incomplete as Submitted 1. 19.00-26 0000, 28 0000 Complete Elec, Comm, and Fire Alarm Data Sheets RAN/GCAN Notes: 1. Please see engineer s notes. 2. Resubmit only on rejected items; see engineer s notes. 3. Submittal item #10 - All devices to be Grey and face plates to be Stainless Steel ; 4. Submit manufacturer s color chart (original, do not e-mail) for light fixture G1E color selection and exterior light fixture color selection. 5. No notes were made on the original submittal. Because of its un-e-mailable file size, the original submittal is not attached to this review form. END OF REVIEW

12 N. Broadway Belgrade, MT 59714 406.388.3320 (phone) 406.388.3389 (fax) SUBMITTAL REVIEW To: Laura Landon From: Scott Elders Date In: 6 12 12 Date Reviewed: 6 26 12 Job: New Belgrade Elementary School Number of Copies Returned: One (1) CD Job #11BZ3758 Retained: One (1) CD Submittal Title: Electrical Submittals ASSOCIATED CONSTRUCTION ENGINEERING, INC. Change as noted No re submittal required Revise & Resubmit per comments No Exception Taken Reviewed By: Scott Elders Date: 6 26 12 Review is for conformance with design concept & compliance with contract documents only. Contractor shall check & verify all quantities, field measurements & shall be responsible for all errors in shop drawings. Contractor shall be responsible for deviations from contract documents unless he has called attention to such deviation and secured written approval. All in accordance with the general conditions. COMMENTS/REMARKS: Submittal Item #1: 260519 ELECTRICAL POWER CONDUCTORS & CABLES Submittal Item #2: 260526 GROUNDING & BONDING FOR ELECTRICAL SYSTEMS Page 1

Submittal Item #3: 260529 HANGERS & SUPPORTS FOR ELECTRICAL SYSTEMS Submittal Item #4: 260533 RACEWAY AND BOXES FOR ELECTRICAL SYSTEMS a. Provide receptacle cover Hubbell S3825 instead of S2825 per construction documents. Submittal Item #5: 260536 CABLE TRAYS FOR ELECTRICAL SYSTEMS Submittal Item #6: 260548 VIBRATION & SEISMIC CONTROLS FOR ELECTRICAL SYSTEMS Submittal Item #7: 260553 IDENTIFICATION FOR ELECTRICAL SYSTEMS Submittal Item #8: 262200 LOW VOLTAGE TRANSFORMERS Page 2

Submittal Item #9: 262416 PANELBOARDS a. Panel 1L3 : Provide an additional 30A/2P breaker at poles 37 and 39 per Addendum 3.0 b. Panel 1K1 : Remove the 70A/3P breaker provided at poles 38, 40 and 42. Replace with three (3) 20A/1P spare breakers. c. Panel 2L1 : The 20A/2P breaker provide at poles 15 and 17 shall be revised to a 30A/2P breaker. The load on the respective piece of mechanical equipment has increased upon reviewing submittals. Submittal Item #10: 262726 WIRING DEVICES a. All wiring device colors shall be selected by Architect. b. All receptacles are specified as Screw Terminal type. Do not use the Plugtail type of receptacles submitted. c. Electrical contractor to provide receptacle within the Segment Manager Enclosure utilizing circuit 1L3 10. Submittal Item #11: 262813 FUSES a. 1200A fuses were submitted as Class L. Provide Class J fuses as specified for service entrances. Submittal Item #12: 262816 ENCLOSED SWITCHES & CIRCUIT BREAKERS a. Elevator control switch does not meet the required elevator control switch specified on the drawings. No prior approval was submitted on this piece of equipment. Provide specified equipment. Review Status: Revise and Resubmit. Page 3

Submittal Item #13: 260519 ELECTRICAL POWER CONDUCTORS & CABLES a. Lift Station VFD does not meet the required ABB VFD specified on the drawings. No prior approval was submitted on this piece of equipment. Provide specified equipment. Review Status: Revise and Resubmit. Submittal Item #14: 263213 GENERATOR SYSTEM a. Verify two (2) 30A/3P breakers and one (1) 60A/3P breaker are to be provided within the generator. b. Electrical contractor shall provide fuel consumption rates to Montana Energy Alliance. Montana Energy Alliance shall be responsible for providing adequate piping from tank to generator to run on propane at 100% load. Review Status: Revise and Resubmit. Submittal Item #15: 265100 INTERIOR LIGHTING a. General Note: Where light fixtures are shown end to end on the plans, contractor shall provide the respective light fixtures in continuous runs at the length shown on the plans. b. Light Fixture A1E : No emergency battery ballast required. c. Light Fixture A6 : Coordinate hard ceiling flange kit dimensions with general contractor and hard ceiling construction methods. d. Light Fixture F2E : Provide integral 1400 lumen emergency egress battery ballast per Luminaire Schedule. e. Light Fixture G1E : Architect shall select light fixture color. f. Light Fixtures M1 and M1E : Contractor shall review Architectural Elevations and ceiling construction and provide the light fixture pendant at the correct length to mount the respective light fixture at the height specified on the plans. Submittal Item #16: 265600 EXTERIOR LIGHTING a. Architect to select all exterior light fixture colors. Page 4

Submittal Item #17: 271500 DATA VOICE INFRASTRUCTURE a. All data cable shall be plenum rated or provided in conduit. b. Provide a submittal for the 6 pair multi mode fiber optic cable to be run from the Main Level I.T. Room to the Second Level I.T. room. Review Status: Revise and Resubmit. Submittal Item #18: 275123.50 EDUCATIONAL INTERCOMMUNICATIONS & PROGRAM SYSTEMS Submittal Item #19: 280513 CONDUCTORS & CABLES FOR ELECTRONIC SAFETY AND SECURITY Submittal Item #20: 283111 DIGITAL, ADDRESSABLE FIRE ALARM SYSTEM a. Contractor responsible for coordinating remote power supply panels and providing 120V as needed to the locations. b. Fire alarm devices shall be white with RED letters as specified. END OF REVIEW Page 5

MARTEL CONSTRUCTION, INC. 1203 South Church Avenue Bozeman, MT 59715-5801 LETTER OF TRANSMITTAL Telephone: (406) 586-8585 Facsimile: (406) 586-8646 DATE 06/11/12 JOB NO. 12-001 TRANSMITTAL/SUBMITTAL NO. 19.00 TO: Comma Q Architects RE: Divisions 26-28 Complete Submittals 109 North Rouse Ave #1 Bozeman, MT 59715 ATTENTION: Laura Landon BELGRADE ELEMENTARY SCHOOL We are hand delivering X We are sending via Email X ATTACHED UNDER SEPARATE COVER TheThe following items: X Shop drawings Prints Plans Samples Specifications Copy of letter Change order X Product Data COPIES DATE DWG NO. DESCRIPTION 1 6/6/12 Divisions 26-28 Complete Submittals and Shop Drawings PDF on CD THESE ARE TRANSMITTED as checked below: X For approval Approved as Submitted Resubmit Copies for Approval For your use Approved as Noted Submit Copies for Distribution As requested Returned for Corrections Return Corrected Prints For review and comment REMARKS: FOR BIDS DUE PRINTS RETURNED AFTER LOAN TO US 2 CD's will be delivered 1 to ACE and 1 to CQ for review COPY TO File Scott- ACE SIGNED: Mike Wilkinson - Project Engineer If enclosures are not as noted, kindly notify us at once.