Ammerman Campus Parking Lot Sign Project

Similar documents
PART 4 STANDARD DRAWINGS FOR CONSTRUCTION

DESIGN REVIEW BOARD APPLICATION EXTERIOR PLAN / LANDSCAPE PLAN

SECTION 58 PRECAST CONCRETE BOX CULVERT. This work consists of furnishing and installing Pre-cast Concrete Box Culverts.

APPLICATION FOR CERTIFICATE OF APPROPRIATENESS IN THE HISTORIC DESIGN REVIEW DISTRICT

CITY OF PITTSBURG ENGINEERING DEPARTMENT CONTRACT NO A WATER TREATEMENT PLANT CAPITAL IMPROVEMENTS PHASE 1A ADDENDUM #1 FENCE AND DITCH AUGUST

CITY OF MORRO BAY / CAYUCOS SANITARY DISTRICT

STATE UNIVERSITY CONSTRUCTION FUND

Design Documents for Wayfinding

Estimated Cost of Project Contractor License No. Contractor Qualifier No.

NEW SINGLE FAMILY HOMES

City of Waltham Purchasing Department Waltham, Massachusetts ADDENDUM NO. 2

PORT OF ST. HELENS SCAPPOOSE INDUSTRIAL AIRPARK PARALLEL TAXIWAY B RELOCATON AIP PROJECT ADDENDUM NO. 1

3. The PAC (Permit Application Center) will notify the design professional of plan review results.

Residential Room Additions

CITY OF MERCER ISLAND DEVELOPMENT SERVICES GROUP 9611 SE 36 th Street, Mercer Island, WA (206)

Operating Standards Attachment to Development Application

W 869 SN 303 S. Paterson Street, Ste. 1 Madison, WI ph Structural Engineering: /Users/paulcuta/Desktop/1603 Finals/1603

Proposal PROJECT MANUAL P R O P E R T Y M A N A G E M E N T F A L L O N C O U N T Y. Baker, MT P.O. Box 846

SECTION LIGHTING

BUILDING PLANS. BUILDING INSPECTIONS DEPARTMENT

Rustic Arbor #6919. Please open and inspect all items upon receipt. If you have any questions or concerns, please contact us immediately.

Large Scale CalArc Pavers for Sand-Set Pedestrian Use Installations

MAYOR/COUNCIL WORKSESSION SSP City Hall rd Avenue North. Monday, March 28, :00 p.m.

On-Site Sewage Disposal Application Packet

SPECIFICATIONS SPECIFICATION TYPES

CLARIFICATIONS 1. See attached meeting minutes from the Pre-Bid meeting on June 14, 2017.

B.2 MAJOR SUBDIVISION PRELIMINARY PLAN CHECKLIST

GRICE-TRIVERS JOINT VENTURE ARCHITECTS PAGE 1 PROJECT NO

MTJ Outdoor Baggage Claim

Plan Submittal and Review Checklist

SECTION SUBMITTAL PROCEDURES

SIGN PERMIT APPLICATION

City of Santa Paula Planning Department

EMMEGI ARCHITECTURAL FENCING MASTER SPECIFICATION SECTION METAL FENCING, GATES & RAILING SYSTEM PART 1 GENERAL

SECTION SLATE SHINGLES. 1.1 SUMMARY A. Section Includes: 1. Slate shingles over underlayment nailed to roof sheathing.

MADISON METROPOLITAN SEWERAGE DISTRICT MADISON, WISCONSIN PUMPING STATION 15 REHABILITATION CITY OF MADISON PLANNING COMMISION SUBMITTAL

TOWN of LAKESHORE SITE PLAN CHECKLIST

Sunjoy L-BG014PST Boulevard Living Arch Design Steel Bridge. Owner s Manual IMPORTANT

SECTION SITE FURNISHINGS FOR CFCRT. 1. American Society for Testing and Materials (ASTM).

RANDY SCHMELING INSPECTIONS HARDER ROAD THREE RIVERS, MI Home Mobile

*********************************************************************************************************

SECTION GPS WIRELESS CLOCK SYSTEMS

Ranch Rail Vinyl Fence

DEPARTMENT OF COMMUNITY DEVELOPMENT SITE PLAN INFORMATION

2018 PARKING LOT MAINTENANCE & REPAIR

St. Monica Food Pantry

Minor Site Plan Application and Checklist Land Disturbing Activities

A. Submit manufacturer's technical data and installation for each type of sign required.

Skamania County Community Development Department

PLANNING AND DEVELOPMENT

EXCAVATION AND BACKFILL

CITY OF BEVERLY HILLS Department of Public Works and Transportation Civil Engineering Division STORM DRAIN IMPROVEMENT PLAN REVIEW CHECKLIST

STREETSCAPE FEASIBILITY TERMS OF REFERENCE

SECTION CHAIN LINK FENCING AND GATES AND SOFTBALL BACKSTOP

INDEX OF SPECIFICATIONS SECTION F SPECIAL CONDITIONS DIVISION 1 - GENERAL REQUIREMENTS:

CITY OF LOMPOC DEVELOPMENT ASSISTANCE BROCHURE ENCROACHMENT PERMITS AND PUBLIC IMPROVEMENT PLANS

University of Houston Master Construction Specifications Insert Project Name SECTION MECHANICAL SCOPE OF WORK PART 1 - GENERAL

SPECIFICATIONS FOR THE MANUFACTURE AND DESIGN OF PRECAST THREE SIDED ARCH STRUCTURES, WINGWALLS AND HEADWALLS

StormTrap Guide Specification. StormTrap 2 SingleTrap on Aggregate Foundation Groundwater BELOW Invert Revised 11/30/17

RAIL PANEL AT TRANSITION SECTION PLAN - POST DETAIL PLAN - TUBE SPLICE. Colorado Department of Transportation. Staff Bridge Branch

CONSTRUCTION CERTIFICATION PACKAGE

Last Name: First Name: M.I:

submittals 1s e c t i o n

SECTION SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES

Subdivision Application Checklist

SECTION WOOD SHINGLES

INTENT An Administrative Site Plan is required for the following situations, excluding single-family detached development:

Anticipated schedule, Page 2. Change the Contract Term from 635 Days to be 1,127 Days.

ADDENDUM #2 September 12, 2018

Innovation Wireless KRONOsync GPS or NTP Wireless Clock System

HEAVY-DUTY BASKETBALL BACKSTOPS

1.1. Any deviance from the following requirements must be approved during design by WVU Facilities Management.

5.7 Plan Documentation and Supporting Information.

ADDENDUM NOTICE INTERIOR RENOVATIONS AT THE BATHURST CLARK RESOURCE LIBRARY, 900 CLARK AVENUE WEST, VAUGHAN, ON

CITY OF DES MOINES, IA PERMIT AND DEVELOPMENT CENTER 602 Robert D Ray Drive Des Moines, IA Phone:

ROWAN UNIVERSITY 201 MULLICA HILL ROAD GLASSBORO, NEW JERSEY 08028

CITY OF BEVERLY HILLS Department of Public Works and Transportation Civil Engineering Division SANITARY SEWER IMPROVEMENT PLAN REVIEW CHECKLIST

Checklist for Tentative Subdivision Map

Gate Installation Instructions

10930 W. Sam Houston Parkway N., Suite 900

TOWN OF NORTH BRANFORD

Fee: Received By: Date: Application #:

Town of Apex, North Carolina

CONTINUOUS COUNTERPOISE ON POLES

SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES

1.01 NOTICE TO BIDDERS

1. ANSI/ASME Standard B , Square and Hex Bolts and Screws, Inch Series

Section 808. FENCING

1.0. Aluminum Prebuilt Fence. Owner's Manual. Version. For Home, Haven, Select & Premier Series. Installation Instructions

Stantec Architecture Inc South Flores Street Suite 201 San Antonio TX Tel: (210) Fax: (210)

ADDENDUM #1. April 29, 2009

OWNER S BAY WINDOW GAZEBO

A. Deviation from this standard must be approved by the Project Architect.

City of Beaumont. Public Works Engineering. Street Improvement Plan Checklist REV 4/18/16

SUBMITTAL REQUIREMENTS FOR COMMERCIAL SIGNAGE PROJECTS

CHABOT-LAS POSITAS COMMUNITY COLLEGE DISTRICT CHABOT COLLEGE CAMPUS MASTER SIGN PROGRAM, PHASE 2 BID NO

Bovard Studios Inc. Section April 6, 2004 Page 1

Special Provision No. 999F29 March 2018 REQUIREMENTS FOR INSTALLATION OF METALLIC DOWELS INTO CONCRETE

PRIVACY FENCE WITH LATTICE INSTALLATION INSTRUCTIONS

BUILDING PLANS. BUILDING DEPARTMENT

Transcription:

Ammerman Campus Parking Lot Sign Project 1

General Notes: 1. Scope of work includes the installation of new post and panel custom parking lot and way finding signs. The work includes but is not limited to; underground utility mark out and each proposed sign location and the fabrication and installation of new signs, foundations, the removal and disposal of existing signs & foundations, finish grading, seeding, grass establishment and cleanup. 2. Underground utilities at all proposed sign locations are required to be marked-out by a private mark out company, call before you dig and 811 services provided by major utility companies are not acceptable. 3. All signs must be installed a minimum of 3 feet from the edge of the curb, unless directed by the owner. The final location of all signs will be determined in the field. The contractor is required to stake, mark and label the sign locations and final location will be verified by a representative of the Campus prior to installation. 4. All signs are to have the approved Campus logo ( see typical parking lot sign drawing attached)on the top of all signs, additional text panels below the logo are per the sign schedule attached. Blue color for the signs is PMS 287 C, all other colors are white and black. 5. Submit shop drawings with text for each sign for approval by the Campus before the production of the signs. Submit material, color samples, hardware and connection details to the Campus for approval. 6. Submit shop drawings for all required materials, including but not limited to, concrete, rebar, signs, seed, soil, etc. to the 7. Provide a minimum of 2 years warranty against manufacturers defects. 8. Prior to installation all signs are to be stored as per manufacturers recommendation at no additional cost to the College. The contractor is required to establish grass as per specifications. 9. Existing signs as designated under the demolition section of this document shall be fully removed including but not limited to the sign, posts, footings and support material. All materials shall be legally disposed of. Existing signs can only be removed after new signs are installed, unless a conflict in location exists and this will be determined by the Campus. All holes are to be filled and compacted final patch to match existing surfaces (concrete, asphalt and grass)flush. No open holes are allowed to be unprotected or left overnight. 10. All working areas shall be protected during construction, work is to be completed during normal hours of the college operations and all necessary OSHA and DOT standards should be enforced to protect workers, students, visitors and campus staff. 11. The Contractor is to provide two (2) additional complete sign assemblies including but not limited to two foundation systems, two posts, custom top with campus logo and 4 blank panel inserts (white), hardware and all accessories. Additional items to be turned over to the college sealed in protective packaging for future use. 2

1A 1 AU 5C 11 30 31 10 18A Key: Proposed Sign Location Numbering system Parking Lot Number (reference only) Security signs (Add Alternate) AMMERMAN CAMPUSE SUFFOLK COMMUNTY COLLEGE 5 College Road, Selden, N.Y. 11784 AM - AMMERMAN BUILDING BR - BROOKHAVEN GYMNASIUM BA - BABYLON STUDENT CENTER IS - ISLIP ARTS BUILDING HU - HUNTINGTON LIBRARY KR - KREILING HALL RI - RIVERHEAD TECHNOLOGY NFL - NORMAN F. LECHTERCKER SM - SMITHTOWN SCIENCE STP - SEWAGE TREATMENT PLANT AU - AUTOMOTIVE TECHTRECKER AN - ANNEX BUILDING ST - LIFE SCIENCE BUILDING SO - SOUTHAMPTON BUILDING STP 25 19 20 24 18B 17 3C 3B 3A 3F 3E 3D 29 4 26 28 27 IS 5B 2 3J 3H 3G BR 15 5 HU 14 6 9A 7D 9B AM BA RI ST 5 16 AN 1 1 1 1 SM 9B 7A 12A 12B 12 1A 32 KN SO NFL 11A 11B 2 7A 9A 1B 10A 10B 7B 8E 8D 8C 8B 8A 3 13A 13B 8 7 6 7C 4 5A 3 P R O P O S E D S I G N L O C A T I O N S

Typical Parking Lot Sign 4

5

SIGN SCHEDULE Note the * after the sign names on the schedule below, such as, Sign 1B* is for internal use only by the College. 6

Parking Lot 1 Staff/ Annex Life Science Building Riverhead Building Parking Lot 9B Faculty/Staff Foundation and Alumni Association Offices Parking Lot 8A Faculty/Staff NFL Building Southampton Building Sign 1A Sign 1B* Side B Text Above arrow opposite hand Sign 2 Sign 3 Side B Text Above arrow opposite hand Parking Lot 8B Faculty/Staff NFL Building Southampton Building Shea Theater Parking lots 3A-3F Display case see page 5 for details Parking Lot 8C Kreiling Hall Southampton Building Sign 4 Sign 5A* 5B* 5C* Sign 6 7

Parking Lot 8D Kreiling Hall Southampton Building Parking Lot 8E Kreiling Hall Southampton Building Parking Lot 7D Sign 7 Sign 8 Sign 9A* & 9B* Parking Lot 7B Parking Lot 7A Kreiling Hall Ammerman Building Babylon Student Center Parking Lot 7A Faculty/Staff Ammerman Building Kreiling Hall Smithtown Science Babylon Student Center Sign 10A* & 10B* Sign 11A* & 11B* Sign 12A & 12B* 8

Parking Lot 7C Kreiling Hall Smithtown Science Babylon Student Center Ammerman Building Sign 13A* & 13B* Motorcycle Parking Sign 16 Parking Lot 6 Kreiling Hall Smithtown Science Babylon Student Center Ammerman Building Sign 14 Side B Text Above arrow opposite hand Parking Lot 4 Ammerman Building Babylon Student Center Islip Arts Building Huntington Library Sign 17 Side B Text Above arrow opposite hand Parking Lot 5 Visitors/ Ammerman Building Admissions Office Sign 15 Side B Text Above arrow opposite hand Parking Lots 2-3 Islip Arts Shea Theater Huntington Library Athletic Fields Brookhaven Gym Child Care Sign 18A & 18B* 9

Parking Lot 3J Suffolk Center On The Holocaust, Diversity & Human Understanding Sign 19 Side B Text Above arrow opposite hand Parking Lot 3D-3F Babylon Student Center Huntington Library Islip Arts Building Shea Theater Sign 20 Side B Text Above arrow opposite hand Parking Lots 3B&3C Babylon Student Center Huntington Library Islip Arts Building Shea Theater Sign 23 Side B Text Above arrow opposite hand Sign 21 & 22 not in contract Parking Lot 3A Babylon Student Center Huntington Library Islip Arts Building Shea Theater Sign 24 Side B Text Above arrow opposite hand 10

Parking Lots 3G, 3H, 3J Faculty/Staff Parking Lot 3J Faculty/Staff Parking Lot 3G Faculty Babylon Student Center Huntington Library Islip Arts Building Shea Theater Sign 25 Sign 26 Sign 27 Parking Lot 3H Faculty Babylon Student Center Huntington Library Islip Arts Building Shea Theater Sign 28* Parking Lot 2 Faculty/Staff Brookhaven Gym Athletic Fields Child Care Sign 29 Parking Lots 10 &11 Automotive Technology Central Receiving / Mailroom Plant Operations Continuing Education North Building Wastewater Treatment Sign 30 11

Parking Lot 11 Automotive Technology Building Parking Lot 9A Administrative Sign 31 Sign 32* 12

Security Signs (Add Alternate) You are in parking LOT ### FOR IMMEDIATE RESPONSE FOR ALL EMERGENCIES CALL SCCC PUBLIC SAFETY at 631-451-4242 or DIAL 911 FOR SCPD 24/7 For Suspicious Activity Call: 631-451-4242 Sign Side B Text Above Note: Size for Security Signs are 36 wide and 72 tall and should meet all ADA standards, add guard bar between post at a maximum of 27 above grade. ###: Provide 21 Signs W/ Various Parking Lot Numbers 13

Foundation Details 14

Existing Conditions and Demolition 15

Key: 1 11 22 Parking Lot Numbers 21 20 19 18 10 23 25 26 27 28 29 24 3B 3F 3E 34 3A 3D 3C 37 32 4 30 31 38 39 2 3J 3H 3G 36 35 5 5 17 16 14 15 4 9B 7A 3 6 6 5 8E 8D 8C 8B 8A 13 12 7A 7B 7C 9A 7D 11 10 9 8 7 A M M E R M A N E X I S T I N G 1 Existing sign Location Numbering System 1 1 1 1 1 2 16 S I G N S

1 Sign not in contract 2 3 4 Sign not in contract 17

5 6 Sign not in contract 7 8 18

9 10 11 12 Sign not in contract 19

13 Sign not in contract 14 15 16 20

17 18 19 20 21

21 22 23 24 Sign not in contract 22

25 26 27 28 23

29 30 Sign not in contract 31 32 24

Sign not in contract 34 Sign not in contract 35 Sign not in contract 36 Sign not in contract 25

37 Sign not in contract 38 39 Sign not in contract 26