Installation Guide. Resysta Flooring. 15 Years Guarantee. swell-free crack-free splinter-free rot-free. Version 1 / July 2010 / English.

Similar documents
INSTALLATION GUIDE DECKING.

15 YEARS GUARANTEE no swelling no cracking no splintering no rotting

Cabonyx Installation Manual

INSTALLATION INSTRUCTIONS

Installation Guide. Deckorum. Composite Decking

WPC DECKING TERRACE BOARDS

INSTALLATION GUIDE DUOFUSE SLAT WALL SYSTEM

I N S TA L L AT I O N & M A I N T E N A N C E G U I D E

LOOKS AND FEELS LIKE TIMBER

Installation Guide. deckorum Composite Decking

LOG CABIN 40 ASSEMBLY INSTRUCTIONS

LOG CABIN 70 ASSEMBLY INSTRUCTIONS

Installation Guide (888)

Modular Gazebo Kit Series GardenHouse 12

SHIPLOCK CLADDING PRODUCT GUIDE INSTALLATION TECHNICAL SPECIFICATIONS CARE & MAINTENANCE

INSTALLATION INSTRUCTIONS MILLENNIUM DECKING Before Installing Millennium Decking, please read these instructions in their entirety.

installation care & maintenance instructions lifecycledecking.com 25-year limited residential warranty 20-year limited commercial warranty

Modular Gazebo Kit Series Victorian / Queen Anne 9

Installation Instructions

Modular Gazebo Kit Series Victorian or Queen Anne 12

index READ CAREFULLY BEFORE STARTING THE INSTALLATION

HALLMARK DECKING INSTALLATION MANUAL

DECKING INSTALLATION GUIDE

NewTech - CleverDeck Composite Decking Installation Guidelines

GAZEBO STRUCTURAL SYSTEM SERIES VKE- 14B MODEL (14 x 19, Double-Tier)

Leveling Foot RB210. Leg Extender RLT66

Installation Guide (888)

RELAZZO DECKING SYSTEMS. Installation guide

Robert Bosch GmbH. Minimalist washstand

PEDESTAL INSTALLATION. Guidelines for installing adjustable height pedestals

I N S T A L L A T I O N & M A I N T E N A N C E G U I D E

EASY INSTALLATION GUIDE WPC DECKING.

Installation Manual for Thermo Panel

Columbia Laminate Installation Instructions

Esthec. Terrace. Manual for Assembly and Installation

INSTALLATION INSTRUCTIONS FOR ELKALAMINATE. IN ORDER TO OBTAIN A GOOD RESULT, WE ADVISE TO FOLLOW ALL GIVEN INSTRUCTIONS CAREFULLY.

INSTALLATION INSTRUCTIONS FOR REPLACEMENT FORGENT WOOD GLASTRA WINDOWS RECOMMENDATIONS FOR COMMON INSTALLATION OF ALL REPLACEMENT WINDOWS.

EXPOSED FASTENING SYSTEM WITH SCREWS OR RIVETS

Indura Plank Installation Instructions

DECK 30 & DECK 30 XS DECKING BOARDS hollow and solid 30 cm boards

Engineered Hardwood Flooring Installation Instructions

Installation of HORIZONT and HORIZONT HIGH pool enclosures

Resysta 6 and 4 Flat Board Siding System Assembly Installation Guidelines

Instructions for Installation on a Pitched Roof LIGHTWAY optical tube LW 260, LW 320, LW 520, LW 760

SECTION FINISH CARPENTRY PART 1 GENERAL. 1.1 SECTION INCLUDES A. Interior Finish Carpentry Work: 1. Refer to schedule at end of Section.

WOOD WOOD

Wall mounting with holding profile

INSTRUCTIONS FOR: GALVANIZED STEEL SHED 3 x 3 x 2.1mtr. MODEL No: GSS3030

Small 45 Roof Houses 1 or 2 Story 1 /24 th Scale Patterns

INSTALLATION INSTRUCTIONS FOR QUICK-STEP LAMINATE.

Installation instructions for co-extruded louver-board profiles

Glass Systems. Technical Information on Pilkington Profilit Profiled Glass with System. - English Edition - Pilkington Profilit

GREEN WORLD LUMBER GENUINE MAHOGANY DECKING INSTALLATION GUIDE

Building Instructions Diva cabin boat

Trestle Table and Benches Materials List

Table and Furniture Base Fittings Plinth Adjusting Fittings

Fitted Furniture Installation and Aftercare Guide

INSTALLATIONS GUIDE.

wellington french patio doorset fitting & fixing guidelines

INSTALLATION MANUAL STORAGE

15mm Solid European Droploc Oak Fitting Guide & Warranty Information

Gluing windows with SABA Glasstack 760

Installation Guide. Guardian Slate Roof System. England, Scotland & Wales

Nanton Grain Mill Assembly

Instructions for Installation on a Flat Roof

Bird Feeder BUILD TIME

Please observe the maximum weight loads specified in our sales documentation. Tools required for installation are not supplied.

Installation Manual For ToddPod Outdoor Shower Enclosures

eb^sv=qfj_bo UNIVERSITY OF WISCONSIN - STOUT COLLEGE OF SCIENCE TECHNOLOGY ENGINEERING & MATHEMATICS Architectural Technology AEC 233

VEKA GROUP PATIO DOOR PATIO DOOR PATIO DOOR UNCONTROLLED DOCUMENT AUTHOR PHIL GREGORY VEKA _IMAGINE PATIO_INSTALLER AID

INSTALLATION GUIDE PermaTrak. Patented Product: U.S. Patent #5,906,084 #8,302,362 #8,522,505 #8,839,588 #9,096,975

For best results, it is essential that you follow the installation instructions exactly.

Connector Technology, Shelf Supports Connection Fittings

Technical Product Description

12ft Octagon Bayside Gazebo Assembly Manual

W L. Standard Sizes: 2.125m underside of gutters m total height m roof m roof m roof.

Pristine Precise Perfection

YUKON PATIO COVER INSTALLATION INSTRUCTIONS

RENOVATING WOOD. 2 - Planning your work

A Shell construction

INSTALLATION, STORAGE AND WALL CONSTRUCTION DETAILS

Mounting systems for solar technology

SHADOW SCREENINGS Sliding shutters screens balcony deviders & Facade elements. TECHNICAL DATA SHEET Ref SHFT 04/ EN

Assembly Instruction. 9,2 m² Grillkota

Installation Guide Simplicity 16. V2.9 Lu171117

Masterpiece Module Kits N T-trak Module Kit Assembly Instructions

WOODWORKS Walls. Installation Instructions WALL

Pryda Timber Connectors

Balustrade Systems / Installation Instructions

Beds may be put up or taken down quickly by use of a simple bolted connection at rails and uprights. MATERIALS LIST

INSTALLATION INSTRUCTIONS

INSTALLATION GUIDE HEALTH & SAFETY NATURAL VARIANCES & WEATHERING. Ekodeck Should Not: Warnings

Mounting systems for solar technology

lindab we simplify construction LindabSandwichPanels Installation instructions PIR Panels

DURABLE, STABLE AND LOW MAINTENANCE SIDING

INSTALLATION INSTRUCTIONS FOR QUICK-STEP LAMINATE WITH HYDROSEAL TECHNOLOGY.

Material Packing Brown Grey Pine Black White

Kentucky 4H Wood Science Plans Notebook. Plans Level 1

TruGrain 6 and 4 Flat Board Siding System Assembly Installation Guidelines

POOL ENCLOSURES LEIA & ALVA. Assembly manual

Transcription:

Installation Guide Flooring 15 Years Guarantee swell-free crack-free splinter-free rot-free Flooring Version 1 / July 2010 / English 1

The Latest Test Result Classification C, DIN 51097: offers best skid-resistance for wet barefoot areas! 1. Basics 2. Scope of Delivery 3. General Advice 4. Pre-Treatment 5. Installation 5.1. General Installation Advice 5.2. Possibilities of Installation 5.3. Substructure 5.4. Installation of the Planks 5.5. End Plates 6. Fixing 7. Completion 8. application of the Transparent Sealing (RFS) 2 3

1. Basics General overview of the most important points to be observed a Soil: Please ensure firm soil and adequate water drainage. b Joists: The joists should be fixed at max. 35 cm intervals into the ground. f c a c Expansion Joint: Owing to expansion due to heat, please allow for temperature-dependent linear expansion of 1 mm gap per running meter between the ends of the planks, e.g. 2,9 m plank = approx. 3 mm distance. If the planks are installed closed to a wall, the distance here should be 10 mm. b d d Placing of the Planks: A min. of 30 to 35 mm of the ends of the planks should lie upon the joists. When using the joist 38x25, two of them need to be installed. e Overhang: Adhere to a max. overhang of 25 mm. c e f Flooring Pattern: The flooring pattern should be determined in advance, since the substructure is depending on this. d max. 25 mm Do not cover the flooring with plastic foils or the like, neither in installed nor un-installed condition. Condensation or backwater can lead to stains. 4 basics basics 5

2. Scope of Delivery Flooring Profile End PlatE Stainless Steel Screw 3,5 x 35 mm Clip T4 Width x Height: Natural 125 x 21 mm Width x Height: Natural 70 x 20 mm Dimensions: 3,5 x 35 mm black bronzed Nylon black Note: Length upon request Note: Frames the decking on exposed sides. Can also be used as joist. Note: Only to be used for Flooring Joist 38 x 25 mm end Cap Screw for Terrace Construction 5,5 x 40 mm Width x Height: schwarz 38 x 25 mm Width x Height: Natural 10 x 10 mm Dimensions: 5,5 x 40 mm Steenless Steel (A2) Note: Quantity neede for one sqm flooring = approx. 4 running mts Used for firm, holohedral soil, e.g. concrete Hinweise: für seitlichen Abschluss oder Randabschluss Joist 70 x 38 mm Dübelstange Width x Height: schwarz 70 x 38 mm Diameter: Natural Ø 12 mm For further advice and information on Surface Treatment with Finish or 2K Sealer, please contact your authorized Note: Used to be fixed on punctual soil, e.g. exposed aggregate concrete Note: For finishing drill holes. dealer or go to www.resysta.de. 6 Scope of Delivery Scope of Delivery 7

3. General Advice Flooring should be installed by an authorized profession. 4. Pre-Treatment Application of the Surface Finish (FFS) We recommend to apply the finish before installation! Flooring can be processed with standard woodworking machines Only use sandpaper with a grit between 24 and max. 60 Only sand in longitudinal direction Flooring can be glued with standard PU glues (D3 or D4) owing to the special production and composition of, smaller air inclusion may appear. However, this does neither effect quality nor stability. In order to ensure a smooth and ideal result in colour, the Surface Finish should be applied during consistent conditions. Therefore, we recommend applying the finish plank by plank before installation. Temperature approx. 5 25, relative air humidity approx. 50 60 %. Do not apply under direct sun or in case of rain. Storage Please store Products on plain ground In case the planks are stored on bars, please ensure a max. distance of the bars of 30 cm Legal Advice: Decking and Joists have been especially developed for its named applications and are no structural material. The items have no general technical approval and are therefore not suitable for supportive construction purposes. Local building codes are to be considered as well as the installation instructions and technical information. Advice: Application should be effected with a broad brush (surface brush). If the surface finish is applied after installation, please adhere to the points mentioned above and paint a max. surface of 4-5 m 2 at once. In this case, we recommend to entrust an expert with the application of the surface finish. 8 General advice Pre-treatment 9

5. Installation 5. 1. General Installation Advice 5.2. b. Possibilities of Installation Please ensure a slope of approx. 2 degrees for adequate water drainage. If still water, around decking or joists, freezes it can cause damage. To avoid this, the exposed areas can be closed with an end plate. The flooring pattern should be determined in advance, since the substructure is depending on this. only use construction fastening material and hardware suitable for outdoor use (e.g. stainless steel screws) Examples: Please consider the expansion of, which depends only on the temperature and not, like in the case of wood on the air humidity. Per meter plank, you can calculate 1 mm expansion. Expansion Joint Advice: It is possible to apply a slight 45 bezel at the end of the planks which conceals the expansion joint. 10 Installation Installation 11

5. Installation 5.3. Substructure Joist 38 x 25 on firm, holohedral soil, e.g. concrete Joists 70 x 38 used to be fixed on punctual soil, e.g. exposed aggregate concrete Fixing with a distance of approx. 40 cm Fixing with a distance of approx. 50-60 cm Max. distance 35 cm (axial) Max. distance 40 cm Max. distance 40 cm (axial) General points to be observed for each substructure e.g. wood beams: Ensure firm soil and adequate water drainage Firmly connect joists with soil In case, the joists cannot be firmly screwed with the ground (e.g. roof coating), sufficient fixing of the whole flooring needs to be ensured (please clarify details with your architect) Basically, also other substructures, e.g. wooden beams, can be used. However, please adequacyfor intended use. 12 Installation Installation 13

5. Installation 5.4. Installation of the Planks Installation with non-visible screw and Clip Pre-drill the plank with a 2mm drill. Apply the clip. IMPORTANT: the Logo on the clip has to be in direction of the planks! Drill a hole of approx. 1 cm depth with a 12mm drill. Screw the clip CAUTION: avoid jiggering of the screw by setting torque accordingly. Turn in the stainless steel screw. Insert plank angular. Insert some glue into the hole, apply the dowel and cut smoothly. Press plank onto the joist. Subsequently, sand and then apply the glaze on the dowel. Tap thoroughly. 14 Installation Installation 15

5. Installation 5.4. Installation of the Planks Alternative fixing with screws for terrace construction 5.5. End Plates Fastening the End Plates Pre-drill the screw with a 2 mm drill. Cautiously turn in the screw for terrace construction. Directly fasten the end plate with the screw for terrace construction or hidden with a dowel with the joist. IMPORTANT: Please adhere to an expansion joint of 3 to 4 mm between end of the plank and end plate. Install further planks with desired distance (we recommend 1 to 4 mm) and fasten them. Please use adequate distance pieces, like plywood stripes. Fixing the end plate 1 Mill a groove in accordance with the size of the end plate. 2 Apply PU glue. 3 4 Firmly insert the end plate into the groove. Tap thoroughly. 5 Subsequently, finish off with sandpaper. 16 Installation Installation 17

6. Fixing 7. Completion In order to control the direction of expansion of the planks, each plank needs to be fixed. This can either be done at the end of a plank or axial. Alternative A = Pinning at the end Alternative B = Pinning at the centre Fixing two planks in longitudinal direction: Drill holes, dowels and cuts done after installation should be glazed afterwards as well. In this case we recommend to mix the finish at a ratio of 2 parts water : 1 part finish, dip a towel into it and rub the affected surface. 8. Application of the Transparent Sealing (RFS) The Transparent Sealing (RFS) can subsequently be applied on the glazed surface or the untreated material. For more information please see our Data Sheet for Finishes and Varnishes or go to www.resysta.de Fixing more than two planks in longitudinal direction: If required, the colour can be refreshed. Therefore, the finish shall be mixed at a ratio of 1:3 with water and consequently be applied with a mop. Please make sure to clean the surface beforehand. Refreshing the surface is only possible, if no transparent sealing (RFS) has been applied. For information to heavy damage or dirt please refer to the information sheet under www.resysta.de The fixing can be done concealed or with screws for terrace construction. When completely fixing the planks with screws for terrace construction instead of clips, the above mentioned points are unnecessary. 18 Fixing completion 19

The Future Formula is Called. Verwendete Rohstoffe: approx. 60% rice husk + approx. 22% common salt + approx. 18% mineral oil = All details provided apply to the installation according to this guide and the corresponding use during outdoor exposure Tolerances in dimension are subject to production. Please inform your authorized dealer about obvious defects before installation. This installation guide can be adapted to technical progress without giving notice. The current version can be downloaded from www.resysta.com Subject to alteration. Abberations to the original colours, images or graphics are based on printing techniques. 20 www.resysta.com