Cablelink Plus Flush Technical

Similar documents
Flush Floor system LIMOGES Cedex. Phone : Fax :

Raised Floor system LIMOGES Cedex. Phone : Fax :

Pinnacle Technical. Bench and Shelf Trunking. cable management perimeter and distribution. Features.

OptiLine 45 Floor boxes

Cable Management Solutions with DLP TM

Floor Boxes. Concealed Service Floor Boxes. Engineering Data 663 Series. Faces Plates for 663 Floor Box. 663 Series Floor Box

Trunking Guide. Colour List... W White M Magnolia B Black. shape & size (wxh) colours available

Powerlink Plus Technical

7_Floor_Trunking_Layout 1 18/01/ :50 Page 53 FLOOR TRUNKING

Risk Assessment & Safe Working Practice

IP30 floor Box wooden floors

Our Marketing. Our Group. Our Mission. Our Quality Achievements

Marshall Tufflex. Cable Management. Steel Trunking Systems

INFINITE RANGE - HINGE DOOR

Aluminum Clad Wood Window 1/2 Reinforced Field Mulling and Stacking Supplement

Cable Cover Guide. Color List... W White B Black P Premium Wood (stainable Floor Trim only) shape & size (wxh) colors available

SECTION WIREWAYS FOR RADIOLOGY EQUIPMENT

DLPlus. Dado and Skirting trunking LIMOGES Cedex. Phone : Fax :

Dura-Lock Roof System

150mm to 200mm. With box in comp 2 2 = 1535mm² total area 2 = 691mm² 45% space factor. C. & C. Marshall Ltd.

Curium 19.4H Installation Instructions & Parts List

FRAMELESS DOOR / PANEL WITH WALL MOUNT HINGES QCI5274

Frameless Inline Door With Return QCI5263

Technical guide. The technical guide provides all the additional information you need on our cable management products.

* * 98/9950WDC. Fire-Rated Devices include these. additional components. 1-Point Latch (LBL)

Cardo DOOR & RETURN SHOWER ENCLOSURE INSTALLATION PLEASE READ THESE INSTRUCTIONS CAREFULLY.

Wanco Electric & Machinery Pte Ltd. Cable Management Systems. Cable Trunking

ASS 70 FD folding / sliding door. Installation Guide

Norwich Technical. Trunking PERIMETER AND DISTRIBUTION. Description CABLE MANAGEMENT. Colour: White only. Material: PVCu. mkelectric.co.

Workstation solutions

Life* Installation Instructions & User Care Instructions. (381kg) (60stone) (840lbs) (254kg) (40stone) (560lbs) (100kg) (220lb) (15stone)

Curium 19H Installation Instructions & Parts List

Frameless Heavy Glass Door with Wall Mount Hinges

GE Monogram. Installation. Instructions. 36" Vent Hood. Model ZV750. Call anywhere in the US and Canada -

Frameless Door QCI5284

International Tube & Conduit Company Ltd. BRITISH STANDARD STEEL CONDUITS & FITTINGS

Cable Management System. Metal Raceway Product Range

Prestige 2Com Technical

DLP mini trunking. DLP U-PVC trunking system mini-trunking system. DLP U-PVC trunking system and accessories 80 x 50. Comfortable implementation

ASS 70 FD folding/sliding door installation guide

Dubnium 11 Installation Instructions & Parts List

Double Frameless Swing Door QCI5247

Frameless Inline Door QCI5254

Warwick PVC Perimeter Trunking Systems

GENERAL CATALOGUE. Connectivity for workplaces

Piper GI Conduits. Heavy Gauge Welded GI Conduit, threaded

5/2 Introduction. Unequipped Distribution Boards 5/4 Modular distribution boards 5/5 Add-on parts

aluminium profile system


Ulltraclad Aluminium Cladding. Contents. 1.0 General Information Design Information Installation Information 7. 4.

S.NO Description Quantity Rate Amount

ALLORA SWING PANEL INSTALLATION INSTRUCTIONS

05 Pg A75-90.qxp 6/9/2008 9:36 AM Page A75 RACO Floor Boxes

Xenon 05 Installation Instructions & Parts List

Deluxe Continuous Hinge Framed Door & Inline Panel with Return Panel Shower Enclosure

A-935 RODA WALL MOUNT HINGES

INSTALLATION INSTRUCTIONS

FIXED PANEL SLIDER QCI5241

Busbar and Modular Wiring Systems

4256HM JAMES HARDIE MONOLITHIC CLADDING

Fold-A-Way Patio Door ASSEMBLY & INSTALLATION GUIDE

Steel Cable Management SECURITY AREAS TOTAL PROJECT SOLUTIONS

EKSPAN. Standard F Series Bearings. Description. Bearing types F series bearings are available in three forms - Typical 21F details.

Gallium 03 Installation Instructions & Parts List

4/2 Introduction. Marshaling Boxes 4/8 8GK1 surface-mounting distribution boards

NX7 SERIES 5-1/2 HANDRAIL

Radon 07 Installation Instructions & Parts List

DLP-S Trunking LIMOGES Cedex. Phone : Fax :

PRESTIGE 3D COMPACT RANGE INTRODUCTION PERIMETER AND DISTRIBUTION FEATURES & BENEFITS CABLE MANAGEMENT

INSTALLATION INSTRUCTIONS FRAMELESS CONTINUOUS HINGE SHOWER ENCLOSURE QCI5233

UNIT No FRAMELESS PIVOT SHOWER DOOR

- 2 JOINER ALIGNERS - 2 JOINING BRACKETS - 4 HEX BOLTS. Factory pre-installed mud flange TOOLS REQUIRED: Phillips screwdriver, 5/16 nut driver.

Installation Instructions Standalone or continuous run configurations - 2 JOINER ALIGNERS - 2 JOINING BRACKETS - 4 HEX BOLTS

Metal & Vinyl, Flush Mount and Recessed Fin Windows Recommended Installation Instructions

OXYGEN INSTALLATION. Revision date

Frameless Inline Door QCI5248

ICC INDUSTRIAL CHIMNEY COMPANY INC. ST-JEROME, QUÉBEC, CANADA, J7Y 4B7 TEL: (450) FAX: (450)

STACKING MULTI-SLIDE DOOR SYSTEM INSTALLATION INSTRUCTIONS

colour Choose your more information Snap-on dlp trunking Snap-on DLP trunking Mechanisms for snap-on DLP trunking

Acoustical Surfaces, Inc.

Installation Guide. Capped Cellular PVC Fencing. Table of Contents. Storage and Handling Tools Needed Fence Layout and Locating Posts

Customer Premise. Solutions for. Solutions for Customer Premise include products ranging from wall distribution to system distribution boxes.

Allora ALCOVE ENCLOSURE INSTALLATION BEFORE INSTALLATION CHECK THAT YOUR ALLORA SHOWER ENCLOSURE SYSTEM IS UNDAMAGED

SECTION ELECTRICAL IDENTIFICATION

ALL SEASON PATIO COVER

Floor Boxes. Flush Service Floor Boxes

WALL TO FABRICATED FLOOR

SLIDING DOOR SYSTEM_ S34 PRODUCT LIST. System description Accessories

Leveling Feet, Base Plates and Casters

6. FLOOR INSTALLATIONS. Flush floor trunking system

INSTALLATION, STORAGE AND WALL CONSTRUCTION DETAILS

Frameless Inline Door QCI5250

PORTA-FAB Cleanroom Wall Systems

CABLE TRUNKING & ACCESSORIES

T-GRID SYSTEM WIDE CLEANROOM CEILING GRID SYSTEM

ALPHA DIN Wall-Mounted. Distribution Boards

GE Monogram. Installation. Instructions. Microwave Oven. Under Cabinet Installation. and. JX827 Series Built-In Kit. Models.

SECTION CABLE TRAYS

REHAU PROFILA BENCH TRUNKING INSTALLATION GUIDELINES. Building Solutions Automotive Industry

Salter Industries Spiral Stair

Transcription:

Cablelink Plus Flush Technical 107 technical hotline +44 (0)1268 563720 screeded floor systems is designed to provide power and data distribution highways in screeded floors. The robust system offers a high degree of flexibility for applications requiring frequent maintenance or frequent layout changes. Simple and intuitive to install, the system comprises of four basic components Trunking, Service Outlet Boxes, Junction Boxes and Vertical Access Boxes. Feature Benefits l Tested to pr EN50085-2-2 to accept 5000N load l Designed to support Cat 6 structured cabling systems l Boxes simply drop in for fast and simple installation l Removable trunking section covers provide easy access l Floorboxes are IP2X rated in accordance with BS EN50085-1 l Choice of 2 or 3 compartments l Self Closing lid in accordance with draft IEC 61534-22 l Wide range of power and data accessories available to meet all requirements l Quality, reliability and safety come as standard l Provision of RCD protection supports compliance with the 17th Edition Wiring Regulations l 5 year guarantee Cablelink Plus Trunking System Standard widths for flush floor trunking are 200mm, 225mm, 300mm and 405mm. The slim trunking is available in a height of 28mm (200mm,225mm and 300mm widths only), with the standard heights available as 60mm (300mm width only) and 65mm (300mm and 405mm widths) The trunking base is supplied in 2440mm lengths with six modular covers of 406mm length. Standard Trunking 65mm Depth The Cablelink Plus Flush Trunking is equipped with removable covers providing access along the entire length of the trunking. Drop-in service outlet boxes can be installed along the length of the trunking by removing the covers and removable partitions. Trunking is laid on the floor and screeding is finished flush with the cover. The service outlet boxes are manufactured with 32.5mm space below the accessory plate in order that the cable capacity is maintained along the trunking length. This is for the 65mm deep trunking. For the 60mm deep then the space below is 28.5mm. Universal Junction Boxes are equipped with removable side blanks that allow it to be used for all applications such as Tee, Cross, Elbows etc. Note l Avoid service outlet boxes within the header run to maintain cable capacity in the trunking l The minimum screed requirement is 70mm 28mm Depth Trunking The 28mm depth Trunking is used for screeds as low as 38mm. During installation of the trunking, the floor slab has to be cut away to accommodate the extra space necessary for the service outlet box. Alternatively, polystyrene blocks could be used while the slab is cast to provide a cavity. Note l The 28mm Trunking lacks the flexibility that the Cablelink Plus Flush System can provide l The position of service outlet box is fixed RAL Colours Grey (GRY) = RAL 7011 Light Grey (LGY) = RAL 7046 Top Tips l It is recommended to use carpet tiles with flush floor trunking l Ceramic Tiles are not recommended to be laid over flush floor, as the tiles would crack when laid over the flush floor trunking l 28mm depth trunking is recommended only when site considerations require accessible trunking l The minimum screed requirement for this range is 38mm

108 Cablelink Plus Flush Technical screeded floor systems customer services +44 (0)1745 532343 Flush Floor Trunking Data Length of Body Length of Cover Body Thickness Cover Thickness 2440mm. 406mm (6 per trunking). 1.2mm. 2.5mm standard. Materials Pre-galvanized sheet steel to BS EN10327: 2004. Width Depth Cable capacity Standards Refer to component ranges. Standard is 65mm with 60mm option. Slim Trunking is 28mm. The complies with the requirements of the latest edition of the IEE Wiring Regulations (BS 7671) and to BS EN50085 Part 1 and draft EN50085 Part 2-2. Additionally the floorboxes also comply with IEC 60670 Parts 1 and 23. The table below shows the size required to be cut into carpet for Cablelink Plus Flush Floorbox installation. Where A is from left to right and B is from back to front. 265x265mm A Carpet Cut out 265mm 265mm The table below shows the size required to be cut into carpet for Cablelink Plus Flush Floorbox installation. Where A is from left to right and B is from back to front. 265x265mm A Carpet In fill 251mm 219mm B B Table A - Cable Factors Cable Type CSA Cable Factor Power Cables PVC Stranded 1.5mm² 8.6 2.5mm² 12.6 4mm² 16.6 6mm² 21.2 10mm² 35.3 16mm² 47.8 25mm² 73.9 Twin & Earth 2.5mm² 86 4mm² 99 6mm² 148 Data Cables Cat 5E UTP 5.5mm dia 30.2 Cat 5E STP 6.0mm dia 36 Cat 6 UTP 6.5mm dia 42.2 Cat 6 STP 7.0mm dia 49 TABLE B Flush Trunking Cabling Size (mm) 200x28 225x28 300x28 300x60 300x65 405x65 Compartment Size (mm) 100x28 (2 comp) 80x28 70x28 80x28 110x28 80x60 110x60 80x65 110x65 150x65 (2 comp) 80x65 162x65 135x65 (equal comp) 100% (45% fill) with Box (100%) with Box (45% fill) 2381 1071 2381 1071 1944 875 1944 875 1701 765 1701 765 1944 875 1944 875 2624 1181 2624 1181 4504 2027 1784 803 6052 2724 2839 1278 4904 2207 2184 983 6590 2965 3377 1520 9072 4083 4499 2025 4904 2207 2184 983 9808 4414 6595 2968 8128 3658

Cablelink Plus Flush Technical 109 technical hotline +44 (0)1268 563720 screeded floor systems Service Outlet Boxes Cablelink Plus Flush Service Outlet Boxes can be installed in the position of any cover. Manufactured from UL94 V2 rated nylon and feature a 2.5mm sheet steel load plate. The lid has an 8mm recess for carpet finishes. The lids are fully reversible without the need to remove the frame thereby allowing cable exit in both directions (alternatively the frame and lid assembly can be removed and rotated through 90º if desired). Accessory plates are manufactured from pre-galvanized sheet steel and are powder coated. The frame features a generous trim that covers unsightly carpet edges. The ratchet system allows for locking the frame for different carpet levels, self-adjusting to any normal floor finish thickness. The frame is secured by hand operated ratchets which provide for quick and efficient installation and removal without the need for tools. Cables are guided by cable retainers through generous cable outlets which open and lock automatically into position when cables are present. The cable retainers are detachable and can be mounted on either side of the frame. The accessory mounting plate has a staggered arrangement to provide plug strain relief clearance. Cablelink Plus Flush Trunking components l Trunking l Couplers l Service Boxes l Universal Junction Boxes l End Caps l Vertical Access Boxes l Reducers Trunking The trunking body is manufactured from 1.2mm pre-galvanised sheet steel to BS EN10327: 2004 while all covers are 2.5mm thick. Each length of trunking is supplied with two couplers and six modular covers that enable easy access. Partitions in the trunking are removable to facilitate installation of service outlet boxes. Plastic gaskets are used on partitions to cushion the covers, thus reducing transmission of noise when covers are walked on. Trunking Reducer Enables trunking to be reduced to a narrower width, i.e. from 405mm to 300mm or from 300mm to 225mm. All accessory plates are inter-changeable allowing any combinations to be prepared. Blank plates are also available for use when precise requirements are not available or future requirements cannot be determined in advance. Concealed Service Outlet Boxes Adapter These service outlet boxes are used in conjunction with 28mm depth trunking. They are semi-recessed into the slab during installation and then screeded to render the box flush with the floor. As a result, the boxes cannot be shifted after installation. However, as the trunking is flush with the finished floor, cables can be accessed at any point in time. Universal Junction Box Removable side plates facilitate adapting the unit for Elbow, Tee and Cross application. Junction Box Adaptor Junction boxes act as an interface in cases where the trunking system needs to combine with the underfloor metal ducting system or vice versa. Coupler Couplers are used to join two lengths of trunking. They also facilitate earth continuity. Couplers are standard for all trunking sizes. Vertical Access Box Vertical Access Boxes are normally recessed in the wall. Appropriate knockouts / openings are provided on top of the vertical access box through which cables are routed into the trunking. Fixing Bracket Fixing Brackets are used to secure the trunking body to the screed / slab. These can also serve the purpose of couplers. End Cap End caps are used to cover the ends of the trunking. Their sizes differ according to the size of the trunking.

110 Cablelink Plus Flush Technical screeded floor systems customer services +44 (0)1745 532343 Installation Guidelines l The structural floor slabs on which the trunking is to be laid, must be reasonably level and smooth. Humps and un-even structural floors must be hacked to ensure accurate levelling of the flush-floor system. l The location where the trunking is to be laid should be marked out. The levelling wires are to be strung across, parallel to a known base line of the location for the system. l It is recommended that a layer of green screed be laid on the structural slab to ensure the trunking is fully in contact with the structural floor by means of using the quick fixing brackets. The covers should be removed and fixing brackets should be fastened to the exterior of the trunking. l Lay the straight feeder trunking with the junction boxes first, followed by the distribution trunking. When set in position and levelled, they should be secured to the structural floor by means of using the floor fixing brackets. The covers should be removed and fixing brackets should be fastened to the exterior of the trunking. l Joints should be sealed with metal-to-metal sealant to prevent screed seepage into the system. The trunking lids should be covered with PVC film before screeding commences to prevent it from being stained. l While screeding, care should be taken to finish the screed beneath the external flange. This will need to be ensured in order to prevent screed cracking when covers are lifted off for laying cables. l When the system is screeded, service outlet boxes can be installed on any location of the trunking by removing any of the covers and changing the segmented partitions to those suitable. All lids and service outlet covers should be properly aligned on the trunking and screws tightened to prevent transmission of noise and ingress of dust. l Inspection and cleaning have to be carried out when the screed is thoroughly cured. Water in the system has to be pumped out with all the covers opened. The trunking system must be clean and dry before the covers can be closed, this is to prevent condensation and oxidation of the pregalvanising coating on the steel. Cold galvanised paint should be used for touch up if necessary. l Mark the trunking base where the service outlet boxes are to be installed by removing the covers before laying the cables. l When laying the cables, extra cable should be provided at these locations for the termination of the accessories. The concealed service outlet modules can be installed at the final stage of the installation. l All covers must be properly tightened. It is a good practice to check that the covers are sufficiently tight during routine maintenance. Note: the use of green screed/ribbon screed is recommended to prevent plate deflection. 1. Mark the start point from the installation layout plan. 2. Lay out all the main and branch trunking along with junction boxes. 3. Join two trunking bases using fixing brackets and then fasten it to the slab. Ensure trunking alignments are as per guideline. 4 The side plates are to be removed and the trunkings are to be fastened with the junction boxes using self tapping screws.

Cablelink Plus Flush Technical 111 technical hotline +44 (0)1268 563720 screeded floor systems 5. Remove all the necessary plates when needed for either branching off angle tee or crossing over between the trunking. 9. Ensure both sides are aligned and secured to prevent any gaps. 13. Remove the long partition within the section of the cover. 6. Connect the junction unit with the trunking. 10. Replace all covers and seal all the gaps on top using adhesive tapes before screeding. 14. Replace the long partitions with the short ones provided with the service outlet box. 7. Remove one cover if trunking is covered and on the extreme end nearest to the junction unit of the trunking. 11. Final check on alignment before screeding. After screeding peel off the adhesive tapes around the covers. 15. Place two pieces of short partitions on both ends for every partition. 8. Fasten the connection between the trunking base and the junction unit by self tapping screws. 12. Remove the covers of branch trunking where service outlet boxes are to be placed. 16. Replace the cover space with the service outlet box. Secure the service unit the same way as the covers using the similar screws.

112 Cablelink Plus Flush Technical screeded floor systems customer services +44 (0)1745 532343 Load Testing Load Testing of Flush Trunking to draft pr EN50085 Part 2-2 (Clauses 10.5.103 and 10.5.104). The trunking has been tested to and complies with the loading requirements of draft pr EN50085 Part 2-2 (Cable trunking systems and cable ducting systems for electrical installations Part 2-2: Particular requirements for cable trunking systems and cable ducting systems intended for mounting underfloor, flushfloor, or onfloor). 17. Complete installation and fit carpet. The frame and lid assembly can now be fitted. Ensure the ratchet release is set to the lock position and align these with the ratchets in the accessory tray. Apply gentle pressure until the frame is securely seated in the box and against the finished floor e.g. carpet or vinyl. There are two loading criteria for the trunking system one with point load to replicate stiletto heels passing over and one with a large plate to replicate the likes of fork trucks and heavier larger loads. For both these loading criteria the maximum allowable deflection under load is 6mm and the maximum permanent deflection after the load has been removed is 3.0mm. The loading graph shows that the maximum point loading classification achieved is 1.5kN and the maximum large plate loading classification achieved is 5kN. The permanent deflection graph shows the permanent deflection from the point loading at 1.5kN is well within the maximum allowable deflection of 3.0mm range. Flush Trunking Deflection Under Load Large Plate Deflection under load (mm) 6 5 4 3 2 1 Maximum Allowable Deflection Under Load (6mm) 225x28mm 300x65mm 405x65mm 18. If the frame and lid assembly requires to be removed or rotated to ease cable egress then the ratchet releases should be rotated to the unlock position and the frame can be lifted out of the floorbox. The assembly can then be rotated and fixed as before. 0 1 2 3 4 5 Load (kn) The permanent deflection graph shows the permanent deflection from the point loading at 1.5kN is well within the maximum allowable deflection of 3.0mm. Flush Trunking Permanent Deflection After Removal of Load Point Load 3.5 Permanent Deflection (mm) 3 2.5 2 1.5 1 0.5 Maximum Permissible Permanent Deflection 0 225x28mm 300x65mm 405x65mm Trunking Size