Integrating Design Through 3D Technology Why do Contractor s have all the fun?

Similar documents
3D DESIGN IN ALTERNATIVE DELIVERY Innovation, Savings, and Supplementing TxDOT Resources

TABLE OF CONTENTS 1200 PLAN PREPARATION

Old School Thinking 6/4/2014. Kentucky Transportation Cabinet s 3D Model Pilot Project. Which files are currently submitted? 2D Plans in a 3D world

Maintenance of Traffic sequence of operations including any phasing and detour maps;

CITY OF LOMPOC DEVELOPMENT ASSISTANCE BROCHURE ENCROACHMENT PERMITS AND PUBLIC IMPROVEMENT PLANS

Automated Machine Guidance

.2 Accompany all submissions with a transmittal letter, in duplicate, containing:.4 Specification Section number for each submittal

SANITARY SEWER SYSTEM ADMINISTRATIVE STANDARDS A.1 SANITARY SEWER SYSTEM PLAN SUBMITTAL PROCEDURES AND GENERAL REQUIREMENTS

Washington County Road Engineering Plan Submittal/Review Checklist

GNSS CONSTRUCTION INSPECTION EQUIPMENT

SECTION 2 GENERAL REQUIREMENTS

BIM Workflow for Roads and Highways Using the Autodesk Portfolio

Detail Design For Pavement Rehabilitation on Trunk Highway 14 From Tracy to Revere

DRAFTING STANDARDS 9.00 DRAFTING STANDARDS

What s New in Bentley Civil SELECTseries 3

National BIM Standard - United States Version 3

MnDOT Contract Exhibit A - Scope of Services

CHAPTER 11 PRELIMINARY SITE PLAN APPROVAL PROCESS

CHAPTER 14: TRAFFIC SIGNAL STANDARDS Introduction and Goals Administration Standards Standard Attachments 14.

Florida's Turnpike Enterprise Roadway Phase III (90%) & Phase IV (100%) Check List Per FDM and TDH Part 3

670 10/26/17 SSD: 07/14/16, 09/16/17 Page 1 of 6

Attachment #2 PPW133-07

CHAPTER 10 MICHIGAN DESIGN MANUAL BRIDGE DESIGN (SI) SHOP DRAWING REVIEW TYPES OF SHOP DRAWINGS Structural Steel

ADDENDUM #2 September 12, 2018

Construction Plan Reading Basics & Applications

Architectural Design Process

CITY OF RICHMOND SUBDIVISION PLAT AND PUBLIC INFRASTRUCTURE SUBMITTAL, REVIEW AND APPROVAL PROCEDURES

SECTION SUBMITTAL PROCEDURES

James Luebke, PE Structural Development Engineer WisDOT Bureau of Structures

West Virginia DOT Designers Conference

For crossing under a railroad, contact the specific railroad company's engineering department.

MISSISSIPPI STATE UNIVERSITY Office of Planning Design and Construction Administration

Developments in BIM Infrastructure Design. Barry Blake 3 rd June 2014

Efficient Tactics of Project Management

INFORMATION SHEET. : Properties Subject to the Slope and Seismic Hazard Zone Protection Act (SSPA) Ordinance

SECTION 3 SUBMISSION REQUIREMENTS

APPLICATION FOR SITE PREPARATION PERMIT

APPENDIX D: DRAWING SUBMISSION STANDARDS

REQUEST FOR PROPOSAL

Update: July 20, 2012

580 - NOISE BARRIERS OPSS 580 INDEX

CHAPTER 1: TITLE SHEET and GENERAL LAYOUT

2016 Specification Treads, Base, Stringers and other Amenities Wausau Tile Precast Epoxy Terrazzo

Work Type Definition and Submittal Requirements Work Type: Subsurface Utility Engineering (SUE)

Survey Data and TOPO Checklist

Ohio Department of Transportation Division of Production Management Office of Geotechnical Engineering. Geotechnical Bulletin

PORT OF ST. HELENS SCAPPOOSE INDUSTRIAL AIRPARK PARALLEL TAXIWAY B RELOCATON AIP PROJECT ADDENDUM NO. 1

A. Action Submittals: Written and graphic information that requires Architect's responsive action.

SECTION SUBMITTAL PROCEDURES

B422 - PRECAST REINFORCED CONCRETE BOX CULVERTS AND BOX SEWERS - OPSS 422

TYPICAL SECTIONS TYPICAL NO. 1 (MAINLINE) STA TO STA STA TO STA ROUNDING DETAIL TYPICAL NO.

WORKSHOP- 892 INNOVATIONS IN CIM FOR DIGITAL PROJECT DELIVERY TRB 96 th ANNUAL MEETING, JANUARY 2017, WASHINGTON, DC. BIM for Infrastructure

Design of Roundabouts using Corridor Models (Part 1 of 2)

Chapter 23. Signing and Pavement Marking Plans

SECTION 6A ROADWAY PLAN PREPARATION

DIGITAL DATA SUBMISSION STANDARDS Procedures and Guidelines

SECTION SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 RELATED DOCUMENTS

CHAPTER 2C - PRELIMINARY DESIGN. General... 2C-1. Review of Work Load... 2C-2 Establishing Priorities... 2C-2

STATE OF OHIO DEPARTMENT OF TRANSPORTATION SUPPLEMENT 1073 PRECAST CONCRETE CERTIFICATION PROGRAM JULY 20, 2018

WATER MAIN ALONG ENTRANCE TO ENCINO PS / HWY 281 TO ENCINO TANK Solicitation Number: CO Job No.:

Chapter 1 General Design Information

Quality Control and Quality Assurance Guide

Legal Aspects of Identity Management and Trust Services

A. Action Submittals: Written and graphic information that requires Engineer's responsive action.

SECTION SUBMITTALS PART 1 - GENERAL 1.01 RELATED DOCUMENTS

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017

A. This section specifies procedural requirements for Shop Drawings, product data, samples, and other miscellaneous Work-related submittals.

September 6, 2018 CITY OF BERKELEY SHATTUCK RECONFIGURATION AND PEDESTRIAN SAFETY PROJECT SPECIFICATION NO C ADDENDUM NO.

REQUIREMENTS. for ENGINEERING SERVICES PUBLIC CONSTRUCTION PROJECTS

State College Area School District

JEFFERSON LAB TECHNICAL ENGINEERING & DEVELOPMENT FACILITY (TEDF ONE) Newport News, Virginia

Section Meetings Section Material and Equipment. None Required

RHODE ISLAND TURNPIKE AND BRIDGE AUTHORITY P.O. Box East Shore Road Jamestown, Rhode Island Invitation to Bid Request for Proposals

Exhibit A Project Identification. Exhibit B Project Charter / Project Intent. Exhibit C Project Scope. Exhibit C Project Schedule

MnDOT Contract Exhibit A- Scope of Services. Project Information -

Moving to Model-Based Design

ESA Iris Programme Analysis & definition of the Satellite System Operations. Briefing 28 July

BIM/VDC on TAA Projects:

Clear Roads Overview. National Winter Maintenance Peer Exchange September 12-13, 2017 Pittsburgh, PA

Guidelines for the Preparation of ITS & Signal Plans by Private Engineering Firms

MICHIGAN DESIGN MANUAL ROAD DESIGN CHAPTER

CONVEYANCE PIPELINE AND PUMP STATION

DIVISION 1 - GENERAL REQUIREMENTS SECTION SUBMITTALS

SECTION SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES

Lincoln County Public Works Water and Sewer Submittal Application

SECTION PROJECT COORDINATION VIA BIM

UNION COUNTY VOCATIONAL-TECHNICAL SCHOOLS West Hall Addition Project Raritan Road, Scotch Plains, NJ

East Central College

Increasing Pace of Utility Accommodations

Guidelines for the Preparation of Traffic Signal & Intelligent Transportation System Plans on Design-Build Projects August 2007

Designing with BIM for Infrastructure on Large Transportation Projects

BG6 Design Framework for Building Services

Augmented Reality in Transportation Construction

Guidelines and Checklist For SAWS Sanitary Sewer. Developmental Engineering Division

STATE OF NORTH CAROLINA

TCC/SHORE TRANSIT BUS MAINTENANCE FACILITY - PHASE II

A. Section includes administrative and procedural requirements for project record documents, including the following:

SECTION SUBMITTALS. A. PART A and DIVISION 1 of PART B are hereby made a part of this SECTION.

City of Massillon Site Plan Checklist

DIVISION 1 GENERAL REQUIREMENTS SECTION SUBMITTAL PROCEDURES

Transcription:

Integrating Design Through 3D Technology Why do Contractor s have all the fun? Oregon APWA Fall 2017 Conference Presented by: Tony Roos & Fred Wismer

SESSION OBJECTIVE Current Buzz Words Construction Focused BIM E Construction 3D Construction Models Design Process and Team Communications can also capitalize on the value provided by advancing technologies

SESSION OBJECTIVE E Construction The e Construction system has the potential to increase the quality, efficiency, environmental sustainability and productivity of the construction industry at large the highway industry is ready to reap the benefits of program level implementation. FHWA Every day Counts

SESSION OBJECTIVE GOAL: Spark Ideas and Discussion Improve efficiency and value in design process by implementing innovative technologies Technology in survey, design and construction can change how we deliver projects by integrating teams and workflows.

DISCUSSION TOPICS 6 TOPICS TO GUIDE THE CONVERSATION: 1. Observations of the current design process 2. Integrated design process using 3D Technology 3. Examples and Benefits of 3D Technology in Design 4. Challenges, Constraints & Benefits to Integrating 3D Technology 5. Risk Management 6. Public Involvement

DISCUSSION TOPICS TOPIC 1: OBSERVATIONS OF THE CURRENT DESIGN PROCESS Linear Approach to Design Elements: Horizontal Alignment Vertical Profile Cross Section Drainage Details Utilities Estimate Documentation Horizontal Alignment Vertical Profile Drainage Details Documentation Documentation Documentation Final Documentation

DISCUSSION TOPICS TOPIC 1: OBSERVATIONS OF THE CURRENT DESIGN PROCESS Linear Workflows Increased Complexity Increased Design Detail Needs Funding and Budgets Plan Sheet Focus Plan Sheet Clarity/Ease of Understanding Unused Modeling Detail Misunderstanding of Design Intent Stakeholder Engagement Review and Approval Process Accuracy and Efficiency Team Coordination

DISCUSSION TOPICS TOPIC 2: INTEGRATED DESIGN PROCESS USING 3D TECHNOLOGY Collect and Use Data as needed Connect Workflows Focus on Design First Model / Surface Based Design Identify Key Value/Cost Elements Higher Level of Detail Earlier Increased Estimate Confidence Real Time / Active Review and Decisions Earlier Stakeholder Engagement Plan Documentation Follows Design Completion

Traditional vs 3D Technology Delivery

Integrated Design Elements Utilities Horizontal Details Documentation Technology Vertical Quantities Design Intent Drainage Cross Section

Design Life Cycle We create 3D model Share with Contractor Used for construction Design (3D Model) Survey Construction & As Built Sharing Data Plan Maintenance

DISCUSSION TOPICS TOPIC 3: EXAMPLES AND BENEFITS OF 3D TECHNOLOGY IN DESIGN Quality of Data Collection Integrated Element Workflows Increased Detail on Specific Elements 3D details vs 2D details Conflict Identification Earthwork Calculations Dynamic Plan Production Review Process Reduced Contract Modifications Increase Bidding/Estimates Accuracy Utilize Design Detail in Construction Better Understanding of Design Intent

Survey Data

Survey Data

Final Product

Detailed Model Development

Detailed Model Development

Detailed Model Development

Detailed Model Development

Detailed Model Development

Detailed Model Development

Detailed Model Development

Detailed Model Development

Detailed Model Development

Detailed Model Development

Detailed Model Development

Detailed Utility Conflict Analysis

Detailed Utility Conflict Analysis

Detailed Utility Conflict Analysis

DISCUSSION TOPICS TOPIC 4: CHALLENGES, CONSTRAINTS, & BENEFITS TO INTEGRATING 3D TECHNOLOGY Challenges Constraints QA/QC Review Process Benefits

DISCUSSION TOPICS QA/QC Review Process: CHALLENGES & CONSTRAINTS Resistance to change Time and effort to develop skills Time and effort to develop detail Checking 3D Modeling and Plans

DISCUSSION TOPICS QA/QC Review Process: CHALLENGES & CONSTRAINTS Team buy in and communication Effectively conveying information in unfamiliar methods Constraints of standard formats and file types Lack of documented Standards and Processes

DISCUSSION TOPICS QA/QC Review Process: BENEFITS QA/QC is a continuous process Check input to model Model is the driver and plans the output Plan comments to be updated in models QA/QC integrated and measuring performance continuously Not just at key submittals, but throughout! Better understanding of project constraints and funding needs early in process

DISCUSSION TOPICS TOPIC 5: Risk Management Digital Delivery vs OSBEELS Specifications Construction Survey Specifications Inspection without Hub & Lathe Document Ownership/Control and Relationships

DISCUSSION TOPICS Stamped Plans vs Digital Models OAR 820 025 015 (1) All final Documents.must bear the seal and signature of the registrant

DISCUSSION TOPICS Specifications: Bid Specifications: 00120.10 Are contractors given the CAD/MicroStation files to aid their bid preparation? Construction Specifications: 00305 Limited Liability of Agency and Engineer for Contractors use of CAD/MicroStation files? Update to Section 00305 in 2018 special provisions references the ODOT Construction Surveying Manual for Contractors.

DISCUSSION TOPICS Eugene s Solution: Please be aware that pursuant to your contract with the City, your construction of XYZ must be based upon survey grades and lines provided in the Specifications, and any Supplemental Specifications and Special Provisions for the Project. The finished grade surface information being provided to you at your request in no way modifies, amends or supplements the terms of the contract entered into by you and the City regarding construction of XYZ.Project XYZ must be constructed in accordance with the contract between you and the City, any use of the City s finished grade surface information by you during the construction of Project XYZ is done solely at your own risk.

DISCUSSION TOPICS Construction Survey / Inspection

DISCUSSION TOPICS Contractual Relationships * Image courtesy of BIMtoFIELD.com

DISCUSSION TOPICS TOPIC 6: Public Involvement 3D Renderings Fly Through videos

Public Involvement Steese/Chena Interchange, Fairbanks AK

Public Involvement Steese/Chena Interchange, Fairbanks AK

Public Involvement Commercial Street Concept, Tigard OR

Public Involvement Cornelius Pass Road at Rock Creek * Images courtesy of Cardno, Inc.

Public Involvement Cornelius Pass Road at Rock Creek * Images courtesy of Fred Wismer

Public Involvement Butler Road Roundabout, Hillsboro OR * Images courtesy of Cardno, Inc.

Public Involvement Butler Road Roundabout, Hillsboro OR * Images courtesy of Cardno, Inc.

Public Involvement 10 th Avenue & OR8, Cornelius, OR

Public Involvement Baseline Road, Hillsboro OR * Images courtesy of Cardno, Inc.

Public Involvement * Images courtesy of Cardno, Inc.

Public Involvement * Images courtesy of Cardno, Inc.

Questions? Tony Roos, troos@kittelson.com, (503) 535 7444 Fred Wismer, fwismer@kittelson.com, (503) 535 7440 * Images courtesy of Cardno, Inc.