Fibertex AM2 for Stress relieving

Similar documents
Hot to Hot the Whole Night Long

4.1. Foremen 4.2. Concrete plant manager 4.3. Concrete plant operator 4.4. Personnel performing saw cutting and joint sealing

RESULTS ACHIEVED BY TEAMWORK

VÖGELE SUPER with. SprayJet Module. SprayJet Module. Emulsion Tank 2,000 7,000 litres Spray Width m Rate of Spread

StreetPrint Templates Care and Maintenance Guide

Part 1. Introduction

SprayJet Module. VÖGELE SUPER with. SprayJet Module

The Shell Bitumen Handbook

A5EE-337 DURABILITY OF A BITUMEN IN A HOT MIX ASPHALT: CONSEQUENCES OF OVER-HEATING AT THE MIXING PLANT

INDEX TO CLAUSES PART 1 - GENERAL

Seal Coats and Surface Treatments Fred J. Benson, Dean of Engineering A. and M. College of Texas College Station, Texas The construction, as here

INTERNATIONAL JOURNAL OF CIVIL ENGINEERING AND TECHNOLOGY (IJCIET)

WORKING of nidaplast

PERFORM WITH PRECISION WELDED DOWEL ASSEMBLY LOAD TRANSFER PRODUCTS CONCRETE CONSTRUCTION SOLUTIONS BROCHURE

Pavement materials: Bitumen

EXPERIMENTAL STUDY ON PARTIAL REPLACEMENT OF BITUMEN BY RECYCLED RUBBER FROM TYRE ON ASPHALT PAVEMENT

Technical documentation. Sealoflex Color asphalt and Colorfalt V pigments

siegling belting Textiles Siegling total belting solutions

Geotextiles in pavement Overlay Applications: A Case Study

SOMEDAY ALL UNDERLAYMENT WILL BE LIKE RAPTOR

IMPROVEMENT OF SHEAR STRENGTH OF SOIL USING BITUMEN EMULSION

² TL Beton-StB 07 = German technical conditions for construction materials for concrete road pavements

AMENDMENTS Manual of STANDARD SPECIFICATIONS. Adopted by Standard Specifications Committee. Amendment. No. 6. Published by

SWARCO LIMBURGER LACKFABRIK GmbH Road Marking Systems. 1-comp. FLUOX daylight luminescent paint system TECHNICAL INFORMATION

SOLUTIONS, MACHINERY AND PLANTS FOR TEXTILE AND FOR NONWOVEN SINCE 1953

Roll Out Vinyl Installation Guide

Section 914. JOINT AND WATERPROOFING MATERIALS

Session 2. EMULSIONS: The COLAS DNA THE NEW EMULSION PLANT IN GALWAY An integrated business model

PEDESTAL INSTALLATION. Guidelines for installing adjustable height pedestals

PASARGAD OIL COMPANY. gas and power THE BIGGEST PRODUCER OF BITUMEN IN IRAN MISSION AND VALUES

PCCP Preservation Steps to Take to Extend Pavement Life and Performance of Your Concrete Pavements

EASY APPLICATION. Furniture Linoleum

Technical Data February, 2016

Astrid Bed -assembly instructions

A Study on Comparison of Plastic Bitumen and Crumb Rubber Bitumen

FURNITURE & BEDDING. Nonwovens

Performance Evaluation Of Recycled Bitumen Before And After The Addition Of Plastic Waste

BESSEY Training BESSEY Tools North America Alvin Products: Lab Metal, Lab Solvent

VÖGELE SUPER i. SprayJet. Special Class. Maximum Spray Width 6m Maximum Pave Width 9m Maximum Laydown Rate 700 tonnes/h.

Makrolon Solid Polycarbonate Sheets

Nondestructive measurement of layer thickness with the MIT-SCAN-T2

High-precision inch guide units Made in Germany

Textiles Nonwovens. belting. Siegling total belting solutions

ACRYLITE and EUROPLEX Films Always On Top

ADHEBIT Adhesion Promoters

Strip Tinning China & Asia. Strip Tinning Ltd UK. Listen, Research, Innovate, Design...

ROADMIX'S EXPERIENCE IN BITUMEN-RUBBER

4 x 2.2 m SLEEPING BARREL. health, beauty, peace of mind SPECIFICATIONS WINDOWS ROOF SHINGLES TRANSPORTATION MAINTENANCE

B. Installation Instructions. Provide installation instructions, including any special equipment, to address the following.

Design and Construction of Highway Pavement Joint Systems

3M Wrap Film Series 1080 Preparation of Substrates, Application, Maintenance and Removal

Session 8: Load Transfer Restoration. (Dowel Bar Retrofit, Cross-Stitching, and Slot Stitching)

For assistance with assembly, please contact Hayneedle Customer Care Center

Agenda. Interior Painting Exterior Painting Typical Problems Low VOC Paints

Rotary sizing of tube and pipe on the mill

ODEK shared 50% of Ukrainian plywood production in 2010, 48% in 2011 and 2012.

IJSER. Experimental Investigation of Increase The Strength of Bitumen By Using Plastic

KANSAS DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION TO THE STANDARD SPECIFICATIONS, 1990 EDITION

SILICONE RESIN PAINT FOR MASONRY FACADES

product manual H-1050 H-1050_man_1111 Ductility Machine

Novel Technique of Laying Bitumen Roads Using Light Detection and Ranging [LIDAR]

Innovative laboratory equipment. Preliminary testing to determine the mix quality.

AIRLESS TIPS A small part with great importance

Operating Instructions Guide to Paper

BIRCH PLYWOOD FOR CONCRETE FORMWORK

Precast Concrete Pavement Background Concepts. Project 1517 FHWA, CTR & TxDOT Gary Graham November 15, 2001

The Global Polypropylene Fiber Value Chain

* TP: +94(0)

USE OF GEOSYNTHETICS IN FLEXIBLE PAVEMENT

PROVEN WISA PLYWOOD FOR CONCRETE FORMING on time and on the spot to grow your business

1 SELECT suitable material. It takes time to cut a cab. Don t waste it on rubbish.

Artificial Grass. Fitting Guide

The City of Winnipeg SHINGLE ROOF REPLACEMENT Section Replacement of Shingle Roof - Louis Riel Library Page 1 of 5 Bid Opp. No.

TECHNICAL DATA SHEET PlastiRoute RP-2C All Colours

Installation instructions for co-extruded louver-board profiles

FOAMED BITUMEN STABILISATION PROJECT WARWICK, QLD

Maple Veneer. Learning

IGGA Guide Specification: Dowel Bar Retrofit (DBR) Introduction

Asphalt Emulsion Basics

... the reflective insulation!

Precast Bridge. in only Eight Days. profile. Minimizing construction-related traffic delays and improving workzone

HEICO FASTENING SYSTEMS. Simple Fast Reliable HEICO-TEC TENSION NUT

Fender Protectors. To ensure a successful installation, please read all of these instructions prior to starting.

**************************************************************************************************

For assistance with assembly, please contact Customer Care Center

Dr. Ingo Mählmann, Senior Manager Product Management Nonwoven. Hofer Vliesstofftage 2015 Spunbond Technology for Durable Nonwovens

Guidelines for working with

Study of Effects of Waste PVC on the Properties of Bituminous Mixes

STUDY OF PERFORMANCE OF BITUMINOUS CONCRETE WITH ADDITION OF COIR/COCONUT FIBER

STABILIZATION OF SANDY SOIL WITH USE OF BITUMEN EMULSION

SECTION MANHOLES

Glass beads surface dressing test section

Atelier Mediums. NEW Atelier Mediums All Have A Double Function

Maximising Durability and Performance of Marking Systems. NZRF Conference Rotorua Aug

> Appearance Factors > Health and Hygiene > Technical Specification > Sustainability

IMPROVEMENT OF BITUMEN PERFORMANCE USING CRUMB RUBBER AND RECYCLED GLASS POWDER

GEOTEXTILE INS TALL ATION GUIDE

Double Bar Plate Dowels for Saw-Cut Contraction Joints

ASPHALT PAVING FACTORS THAT AFFECT THE SCREED

Case Study: Roofing Shingle Scrap in Hot Mix Asphalt, TxDOT Dallas District. Project Overview

Transcription:

C O N S T R U C T I O N 210.02 Fibertex AM2 for Stress relieving

C O N S T R Fibertex AM2 for Stress relieving To avoid reflective cracking of new asphalt To protect the subsoil from water intrusion and thereby loss of bearing capacity Fibertex AM2 made from polypropylene fibres is a flexible pre-compressed needlepunched nonwoven fabric added thermal bonding on one side only. Designing asphalt overlays with Fibertex AM2 Paving fabrics are widely used in both new road constructions and in road maintenance to reduce reflective cracking in the pavement. The purpose is to distribute stresses originated from cracks in the lower part of the pavement by creating a stress relieving and/or waterproofing interlayer membrane system. The waterproofing function prevents surface water from entering the bearing courses, whereas the stress relieving function is defined as: Paving fabrics, properly installed in between an existing pavement surface and a new asphalt overlay, providing a stress relieving function, as the bitumen-saturated paving fabric allows for slight differential movements between the two layers. 2

U C T I O N Causes for reflective cracking in asphalt overlays Fig. 1. The paving fabric absorbs differential movements in the asphalt layers preventing reflective cracking. Additionally it forms a waterproof interlayer preventing surface water from entering the old asphalt layer. Fig. 2. Without paving fabric, reflective cracking of the new asphalt overlay will occur and surface water will enter the old asphalt layer. This will accelerate deterioration of the entire road construction. Selecting bituminous tack coat The tack coat should consist of pure bitumen or polymer-modified types of solventless bitumen. The use of a paving fabric should never be combined with the use of softening additives. These are often applied in traditional paving projects to extend the workability of the bituminous tack coat, but will cause the bitumen to penetrate the paving fabric too fast, with the result that vehicle tyres may pick up the bitumen, which could damage the fabric. Determining the penetration grade of the bituminous tack coat When calculating suitable penetration grade for the paving fabric, weather conditions must be taken into consideration. Penetration grade 300 240 180 120 60 Overcast and windy Sunshine 10 20 30 40 50 Degrees Celsius Fig. 3. Indication of suitable tack coat penetration grades for paving fabrics. 3

C O N S T R Fibertex AM2 for Stress relieving Determining the amount of bituminous tack coat The amount of bituminous tack coat should be sufficient to ensure the bitumen retention properties of the paving fabric and to bond the paving fabric and the new asphalt overlay to the existing pavement surface. The bitumen retention for Fibertex AM2, Q fabric, is 900 g/m 2. In order to account for the condition of the pavement surface, an additional quantity of retention bitumen, Q c, should be specified. Even though it is often estimated on site, indications of Q c can be read from fig. 4. The necessary amount of sprayed bituminous tack coat, Q, can now be calculated: Hot melted bitumen: Q = Q fabric + Q c [g/m 2 ] Thick liquid bitumen emulsions: (bitumen content E > 65%): Q = Q fabric + Q c 100 [g/m 2 ] E Q is the total amount of bituminous tack coat needed [g/m 2 ] Additional amount of retention bitumen g/m 2 250 200 150 100 50 Q c Dense Open After milling Fresh asphalt Fig 4. The amount of additional retention bitumen, Q c, required on different pavement surfaces. Q fabric Q c E is the amount of bituminous tack coat needed to saturate the fabric [g/m 2 ] is the additional amount of bituminous tack coat needed to take the condition of the existing pavement surface into account [g/m 2 ] is the percentage of bitumen in the bitumen emulsion [%] 4

U C T I O N Thin liquid bitumen emulsion: (bitumen content: 50 % E 65 %): The application of thin liquid bitumen emulsion, is a two step process: Step 1. The bitumen emulsion is sprayed onto the existing pavement surface to create a sticky surface for the unrolling of the paving fabric. The amount of bitumen emulsion is calculated as: Q 1 = 175 + Q c 100 [g/m 2 ] E Step 2. The bitumen emulsion is sprayed onto the paving fabric to create a waterproofing membrane. The amount of bitumen emulsion is calculated as: Unrolling of Fibertex AM2 If the bituminous tack coat consists of hot melted bitumen, the unrolling of paving fabric can begin shortly after the bitumen has cooled down. However, if the tack coat is a bitumen emulsion it has to break first (turn from brown to black as the water evaporates). The fabric can be unrolled both manually and mechanically, but mechanical unrolling is preferable as it is faster and minimises the number of wrinkles. For this purpose a custom-made tractor can be rented from Fibertex. Please note that Fibertex AM2 is for manual unrolling and Fibertex AM2 Special is for mechanical unrolling (for mechanical unrolling the fabric is inversely rolled up). Q 2 = 425 100 [g/m 2 ] E After the second spraying of emulsion, a thin layer of asphalt material is spread on the saturated fabric to prevent the emulsion from sticking to tyres and crawler tracks of the paving equipment. Installation procedure for Fibertex AM2 paving fabric Fig 5. When unrolling Fibertex AM2 manually, using a pushing tool makes it easier to keep the direction and avoid wrinkles. The existing pavement surface - concrete or asphalt - is cleaned thoroughly to remove dirt, oil, water and other impurities. If necessary, large holes and cracks are patched and levelled. Fig. 6. Mechanical unrolling of Fibertex AM2 Special is fast and minimises wrinkles even in soft curves. 5

C O N S T R Fibertex AM2 for Stress relieving Overlaps Longitudinal overlaps should be approx. 10 cm and transverse overlaps approx. 20 cm. Fig. 8. Manual unrolling of Fibertex AM2 can only be done in squares, demanding extra overlap in curves. Fig. 7. A sufficient overlap in both longitudinal and transverse direction is recommended. Transverse overlaps should be made in the paving direction to prevent edge pick-up by the asphalt paver. To ensure total saturation of the overlap, extra bituminous tack coat should be added between the two layers of paving fabric. 6

U C T I O N Paving with hot mixed asphalt material The retention heat of the hot asphalt material paved on top of the paving fabric must be sufficient to soften the underlying bitumen to ensure maximum saturation of the fabric. Standard hot mixed asphalt materials have plant temperatures varying between 140-170 o C, which are suitable temperatures for paving fabrics made from polypropylene. These temperatures allow a flexible behaviour of the paving fabric when it is in contact with the hot asphalt material (milled asphalt material containing polypropylene paving fabric is recyclable). If the temperature of the asphalt material exceeds 170 o C, a small quantity of the asphalt material should be spread manually before paving to protect the paving fabric. The thickness of the asphalt layer on top of the paving fabric should be 2½ -5 times larger than the diameter of the largest grain size. With a minimum of 3 cm on top of asphalt pavements and 4 cm on top of concrete slabs. Operation of paving machinery when using paving fabrics Unrolling of the paving fabric and distribution of asphalt material are often done simultaneously to allow for traffic on the fabric. If crawlers or vehicle tyres stick to the paving fabric they may damage the fabric. To avoid this, some asphalt material has to be spread in the wheel tracks. When backfilling asphalt material in front of the asphalt paver, the truck driver must not use the brakes and must avoid any unnecessary driving at longitudinal overlaps and in spots with plenty of bitumen. Furthermore, caution is required when changing direction. Weather Conditions When working with bitumen emulsion, the temperature should be above + 10 o C. If hot bitumen is used the temperature should be above + 5 o C. mm Grain size of the asphalt overlay 32 22 16 12 8 6 Minimum thickness Maximum thickness 50 100 150 200 1 2 3 4 5 6 7 8 9 10 Kg/m 2 cm Thickness of the asphalt overlay Fig 9. Thickness of hot mixed asphalt overlay on top of paving fabrics. 7

C O N S T R U C T I O N www.fibertex.com Visit our website for detailed information on Fibertex Geotextiles. Enter the Construction area. Here you will find our product range, datasheet, brochure downloads and contact information with e-mail addresses. Facts about Fibertex Fibertex A/S is a market leading manufacturer of needlepunch and spunmelt nonwovens. Fibertex is based in Aalborg, Denmark, with production facilities in Aalborg, Kuala Lumpur, Malaysia and in Svitavy in the Czech Republic. Since its foundation in 1968, Fibertex continuously expanded and today manufactures nonwovens for customers all over the world for many different applications. Our main application areas are Personal Care, Furniture and Bedding, Flooring, Construction, Automotive, Filtration, Horticulture and Do-it-Yourself. The information given in this publication is of an illustrative nature. The manner of use is the sole responsibility of the user and the user must assume all risk and liability in connection herewith. DS C E R T I F I E D Environmental Management System DS/EN ISO 9001 DS/EN ISO 14001 Close to our customers Our goal is to be local on the global market. Sales staff, distribution network and subsidiaries play a decisive role in helping us to achieve this. Worldwide technical service is offered near you. Distributor: B10 MARKETING A/S 031.379.01.GB/05.04 Fibertex A/S Box 8029 Svendborgvej 2 DK-9220 Aalborg Ø Denmark Tel. +45 96 35 35 35 Fax +45 98 15 85 55 E-mail fibertex@fibertex.com Web www.fibertex.com