Cloud Based Plan Review Process (Applicant)

Similar documents
Electronic Document Review (EDR)

Electronic Plan Check (EPC) Building Permit Submittal Requirements

Electronic Plan Check (EPC) Building Permit Submittal Requirements

Harris County Capital Projects Electronic Submittal Guidelines for Consultants

MISSISSIPPI STATE UNIVERSITY Office of Planning Design and Construction Administration

DIVISION 1 GENERAL REQUIREMENTS SECTION SUBMITTAL PROCEDURES

Electronic Plan Review. City of Mesquite, TX. eplan Review Standards Document

SECTION SUBMITTAL PROCEDURES

Submittal Exchange Design Team User Guide

TCC/SHORE TRANSIT BUS MAINTENANCE FACILITY - PHASE II

CITY OF RICHMOND SUBDIVISION PLAT AND PUBLIC INFRASTRUCTURE SUBMITTAL, REVIEW AND APPROVAL PROCEDURES

SECTION SUBMITTAL PROCEDURES

Working Drawing Manual

SCOPE: This procedure is applicable to construction projects and is an alternate method of submitting documentation for plan review and permitting.

PLA Planner Student Handbook

SECTION SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES

SECTION SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 RELATED DOCUMENTS

SECTION A. RFI: Request from Contractor seeking interpretation, information, or clarification of the Contract Documents.

UCCS University Hall Fire Sprinkler System Upgrade March 1, 2011 RTA SECTION SUBMITTAL PROCEDURES PART 1 - GENERAL

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017

SECTION SUBMITTALS. A. PART A and DIVISION 1 of PART B are hereby made a part of this SECTION.

***************************************************************************** DRAFT UFGS- 01 XX XX (FEB 2014)

PROCEDURE FOR PROCESSING WORKING DRAWINGS

Electronic Plans Management Training. Submitting a Revision to Approved Plans (RTAP) Application & Uploading Drawings

JEFFERSON LAB TECHNICAL ENGINEERING & DEVELOPMENT FACILITY (TEDF ONE) Newport News, Virginia

DWG Register User Guide October Adding Drawings... 2 Statuses... 2 Archive... 4 Change Requests... 5 Transmittals... 5 Admin...

UNION COUNTY VOCATIONAL-TECHNICAL SCHOOLS West Hall Addition Project Raritan Road, Scotch Plains, NJ

Digital Drawings Submittal Process

EXECUTIVE SUMMARY of DESIGN REVIEW

This specification describes the general requirements for Engineering Services provided to Vale.

SECTION SUBMITTAL PROCEDURES

DocuSign Setup Admin. DocuSign User Setup Process Overview. Setting up a new DocuSign user

Working Drawing Procedure

City of Aspen Water Review for Pitkin County Permits Submission Packet

Author Instructions FPIN Editorial Manager

DIGITAL DATA SUBMISSION STANDARDS Procedures and Guidelines

Section Meetings Section Material and Equipment. None Required

Electronic Plans Management Training. Upload Drawings

Applicant User Guide City of Venice 401 W. Venice Avenue Venice, Florida 34285

pg. 1 JMS Editors Guide

SECTION 2 GENERAL REQUIREMENTS

1. Signing In. *Note: You must have a Guest Editor role. Fig (1)

PITKIN COUNTY STANDARDS for ELECTRONIC DRAWINGS and DOCUMENTS SUBMISSION

Jacksonville District Master

City of Aspen Electronic File Preparation Standards September 2018

Building Standards Department. Markham eplan Submission Standards For Building Permits, Sign Permits and Zoning Preliminary Review

ENGINEERING DRAWINGS MANAGEMENT POLICY (IFC/AS BUILTS)

CHAPTER 2 SUBMITTAL AND REVIEW PROCEDURES TABLE OF CONTENTS

SITE PLAN Application Packet (Required For All Non-Residential Development Projects)

CHAPTER 11 PRELIMINARY SITE PLAN APPROVAL PROCESS

MINOR DEVELOPMENT PERMIT SUBMITTAL REQUIREMENTS

To extend a Tier 4 visa or make a PBS Dependants visa application in the UK you must begin the process online. This guide will show you how.

SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES

Author Tutorial for OPTE Editorial Manager System

APPLICATION FOR SITE PLAN REVIEW

BERKELEY COUNTY ENGINEERING AND

SECTION ADMINISTRATIVE REQUIREMENTS SECTION ADMINISTRATIVE REQUIREMENTS

How To Handbook For Learners

SPECIFICATIONS FOR NEW UNDERGROUND RESIDENTIAL DISTRIBUTION SYSTEMS

AP Studio Art. Demo: Digital Submission.

PEAK VIEW RANCH HOMEOWNERS ASSOCIATION Architectural & Design Review Request Form

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 12/12/2018

SSMP ELEMENT 4 O & M Program APPENDIX 4.1. AutoCAD Standards

APPLICATION FOR PLANNED UNIT DEVELOPMENT (PUD) DEVELOPMENT PLAN

Answer: Qualification statement should be provided with the bid.

INFORMATION SHEET. : Properties Subject to the Slope and Seismic Hazard Zone Protection Act (SSPA) Ordinance

BIM/VDC on TAA Projects:

GOSYSTEM TAX 2016 RS E-FILE GUIDE LAST UPDATED: DECEMBER 22, 2016 TAX.THOMSONREUTERS.COM

Chapter 1 General Design Information

SECTION PROJECT MANAGEMENT AND COORDINATION

City of Lompoc Building & Safety Services Section 100 Civic Center Plaza Lompoc, CA Phone: Fax:

Photo Contest New Jersey Press Association. The Complete Guide. New Jersey Press Association

Projects Connector User Guide

January, 2014 Page 1 of 5

TAB B-9 RECORD DRAWINGS

HOW TO APPLY DETAILED GUIDELINES/PROCEDURES FOR A. APPLICATION REGISTRATION B. PAYMENT OF FEES C. PHOTOGRAPH & SIGNATURE SCAN AND UPLOAD

C I T Y O F M c K I N N E Y PLANNING

NEVADA DEPARTMENT OF TRANSPORTATION Addendum 3 to RFP July 28, 2017

East Central College

A. Action Submittals: Written and graphic information that requires Engineer's responsive action.

Step By Step Instructions for Registering Students Online In Skyward

11.0 INSTRUMENTATION LOOP DIAGRAMS

PRELIMINARY PLAT / CONSTRUCTION PLAN APPLICATION SUBMITTAL PACKAGE REQUIREMENTS

DNVGL-CP-0338 Edition October 2015

For the purposes of this document, the Engineering Consultant shall be referred to as the Engineer.

STATE OF OHIO DEPARTMENT OF TRANSPORTATION SUPPLEMENT SUBMITTAL AND APPLICATION REQUIREMENTS FOR ProVAL PAVEMENT SMOOTHNESS SOFTWARE

SECTION SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES

A. This section specifies procedural requirements for Shop Drawings, product data, samples, and other miscellaneous Work-related submittals.

SECTION CLOSEOUT SUBMITTALS SECTION CLOSEOUT SUBMITTALS

Taylor County July 2011 SECTION SHOP DRAWINGS, WORKING DRAWINGS AND SAMPLES

2017 CDM Smith All Rights Reserved November 2016 SECTION PROJECT MANAGEMENT INFORMATION SYSTEM (PMIS)

Adding work to your TaskStream Portfolio (DRF)

all editorial writing.

MULTIPLE ORGANISATION ( MULTI ORG )

Estates Development & Projects

Engineering Drawing System

SIGN PERMIT CHECKLIST AND APPLICATION

WSSC eplan Review DSD Applicant Guide 2 Revised

SITE PLAN REVIEW GUIDELINES Rev. 2016

Town of Skowhegan Application For Development Review

Transcription:

1 Cloud Based Plan Review Process (Applicant) Organize Documentation Process Overview Upload Documents To Mercer Island FTP Site No Initial Submittal? Yes Intake Screening Approved? CST will inform you by email of the acceptance or denial of your project within 5 working days. If denied, a checklist of the missing information will be provided. No Yes Cloud Based Review Begins Each Review Discipline Uploads Comments To The Cloud Depending on the scope of the project, the number of review disciplines can range from one to five. Each discipline will publish their comments to the Cloud based file in real time Permit Approved? Yes No Reply To Comments On The Cloud Generate A Revised And Complete Set Of Drawings And Supplementary Documentation As Required Pick Up Permit! City of Mercer Island Applicant Submittal Overview

The City of Mercer Island eplan review process is a greener, more economical and streamlined plan review process that helps reduce turnaround times and misunderstandings during the plan review process. This user guide for the Customer Service Team is a compilation of the steps required for submittal. If you have any questions on the process, please contact Paul Skidmore at extension 7718. EPLAN PREPARATION STAGE To ensure a complete submittal and minimize potential file confusion and loss, a submittal process is necessary. This section itemizes the eplan file naming and file consolidation requirements, as well as the document organization and legibility requirements. Complete the applicable Permit Forms Plan Submittal Form Permit Application Single Family Plan Cover Sheet Site Development Worksheet Prepare your drawings and all supplemental documents as described in the eplan Requirements for Electronic Plans Correct document orientation. Minimum resolution and text size for legibility. Bookmark all drawing sheets. Create an Acrobat portfolio of all the supplementary documentation. Alternatively, a zipped file containing each supplemental document may be submitted. Do not combine all of the supplementary information into one pdf file. Name the drawings using the following format: <project address>-<plans> i.e. 9611 SE 36 th ST-PLANS Name the supplemental documentation using the following format: <project address>-<supp>, i.e. 9611 SE 36 th ST-SUPP. If the street is unknown or currently unassigned, the parcel number for the site may be substituted for project address, i.e. PN83002001-PLANS. Login to the City of Mercer Island web site here: http://sftp.mercergov.org User Name is guest. Password is eplan. Navigate to the Inbox and create a folder with the project address (or parcel number if the address is unavailable). Upload the two files (PLANS and SUPP) into the newly created folder. The City of Mercer Island will be automatically notified of the submission and you will receive an email notification within one working day that confirms receipt of the submission and will include your assigned permit application number and permit application fees due. Submit payment in person or by mail to: Mercer Island City Hall ATTN: CST eplan Review 9611 SE 36 th Street Mercer Island, WA 98040 Reference your Permit Application Number on your check. Payment must be received within 10 working days or the application will be suspended. Once payment has been received, an email receipt for fees paid will be sent. 1 eplan Preparation Stage

EPLAN SUBMITTAL STAGE Below are the steps to for an initial submittal. The Intake Screening process is intended to shorten the overall permit review process by reducing or eliminating the number of review rounds. The best way to ensure a speedy plan review and approval is to ensure all the information necessary for a complete plan review has been included in the submittal. More information is better than too little.. Depending on the size and complexity of the submittal, an Intake Screening by City staff to verify whether submitted drawings and supplemental information are sufficient to perform a complete eplan review may be required. Greater than 500 square feet of additional floor area. $100,000 permit valuation or greater. If an Intake Screening is required, City staff will perform an electronic Intake Screening the Tuesday following receipt of submittal. An email notification stating whether your submittal is complete or incomplete will be sent once the Intake Screening has been performed. Incomplete submittals: You will receive an email that itemizes the submittal deficiencies. This information must be resolved and incorporated into a new submission (including supplemental information if applicable) and uploaded to the City of Mercer Island FTP site. A complete set of drawings is required. Individual or separate drawing sheets are not be acceptable and will be rejected. All submitted documents must conform to the requirements in the eplan Preparation Stage previously outlined. Name the resubmitted eplan drawings using the following format: <permit application number>- <intake round>-<plans> 1301-001-INTAKE2-PLANS 1301-001-INTAKE3-PLANS Name the resubmitted eplan drawings using the following format: <permit application number>- <intake round>-<plans> 1301-001-INTAKE2-SUPP 1301-001-INTAKE3-SUPP As previously described, upload the completed file(s) to the "Inbox" of the City of Mercer Island FTP site at https://sftp.mercergov.org. The Intake Screening process repeats until City staff determines that the submittal is complete. Complete submittals: You will receive an email when your application is complete and has been accepted for review. Plans are not officially accepted until the Intake Screening has determined the submission comprises a complete application. See Plan Review Target Times for the estimated time frame between a complete application and your receipt of the initial eplan Review comments. 2 eplan Submittal Stage

EPLAN FORMAL REVIEW STAGE The eplan Review process begins once your application is determined to be complete. The eplans are reviewed for conformance with regulations pertaining to five separate disciplines as applicable to the scope of the project: Tree review, Fire review, Land Use review, Civil review, and Building review. The plans are uploaded to the MIePlan website where each discipline publishes review comments for your perusal and response. After each review discipline has completed their respective reviews, you will then reply to the published comments indicating how the issue has been resolved and make any necessary changes the eplans. Upon completion, upload a new, revised set of drawings and any supplemental information to the City of Mercer Island FTP site for further review. After Intake Screening acceptance, you will receive an email from the City with a link to the eplan location. Clicking on the emailed link will take you directly to the MIePlan website where your eplan is located. This link can be emailed to anyone for their input or replies, i.e. consultants, contractors, etc. The initial use of the Adobe web site will require you to create an account. Provide a valid email address and password to access the eplan set. Each eplan review discipline will publish their comments directly onto the eplan set located on the Adobe Cloud. Each review discipline will send you an email notification when the eplan review for their respective review discipline is complete. Do not expect any response to your replies until a complete, corrected set of drawings have been uploaded to the Mercer Island FTP site and all of the correction comments on the eplan have replies. You can track the status of your plan review within the "Status" section at MyBuildingPermit.com as well as with the Acrobat tracker. Reply to the comments directly by right clicking on each comment, selecting Reply and enter your response in dialog box that appears. 3 eplan Formal Review Stage

EPLAN REPLY AND RESUBMITTAL STAGE The eplan Response and Resubmittal Stage allows you to reply to each of the review discipline s comments directly to the cloud stored eplan drawings. After all of the comments have been resolved, you will submit a new, complete set of eplan drawings along with any additional supplementary information (if required) to the City of Mercer Island FTP site, at which time the resubmittal timeline begins. The commented and replied eplans remain on the Adobe Cloud and is an ongoing record of the review process. Review and reply to each City comment by using the Adobe Reply functionality. Please note that you will need to select Publish to upload your replies to the eplan on the Adobe Cloud. Update and make all the required corrections to the previously submitted eplan set of drawings. Prepare your drawings and all supplemental documents as described in the eplan Requirements for Electronic Plans. All revisions and changes between each successive submittal shall be clearly indicated and clouded. A complete set of the corrected eplan drawings that contains all of the sheets is required. A partial submittal of individual sheets is not permitted unless each affected review discipline has provided prior approval. Complete the Plan Submittal Form and include within the supplementary information file as described in the next step. Create an Acrobat portfolio of all the supplementary documentation if required. Alternatively, a zipped file containing each supplemental document may be submitted. Do not combine all of the supplementary information into one pdf file. Name the eplan drawings using the following format: <permit application number>-<submittal round>- <PLANS> 1301-001-SUB1-PLANS 1301-001-SUB2-PLANS Name the supplementary information using the following format: <permit application number>- <submittal round>-<supp> 1301-001-SUB1-SUPP 1301-001-SUB2-SUPP Upload the new eplan drawing set and supplementary information to the City of Mercer Island FTP web site here: https://sftp.mercergov.org. After the drawings have been uploaded, the City will verify the submittal is complete. Incomplete resubmittal: You will receive an email stating the submittal is incomplete, and give the reasons for the rejected submittal that will need to be resolved prior to resubmittal. Correct the deficiencies and resubmit. Complete resubmittal: The project timeline starts from receipt of submittal. See Plan Review Target Times for the estimated time frame between a complete application and the receipt of the eplan Review comments. The resubmitted eplan is uploaded to Adobe Cloud for review. The previously submitted eplan file remains on the cloud for reference by the reviewers. The eplan Review and Response and Resubmittal stages repeat until all City comments are satisfactorily resolved and the project is approved. 4 eplan Reply and Resubmittal Stage

EPLAN APPROVAL AND PERMIT ISSUANCE STAGE Congratulations! Construction is almost ready to begin. You have successfully navigated your way through the permitting process. Just a few more steps and the permit will be in your hand. You will receive an email notification that your project has been approved with attachments containing permit document and the invoice for remaining fees due. Sign and return the permit document. Submit payment in person or by mail to: Mercer Island City Hall ATTN: CST eplan Review 9611 SE 36 th Street Mercer Island, WA 98040 Reference your Permit Application Number on your check. Once payment has been received, an email receipt for fees paid will be sent as well as instructions for downloading the approved drawings from the City of Mercer Island FTP site. Your will receive instructions on how to download the approved set of eplans. Each sheet of the approved drawings will bear a City approval stamp. Any changes to the drawings, insertions or deletions may require you to apply for a revision to the permit. You are required to print at least one copy of the approved eplan drawings that must be kept onsite at all times. The approved eplans must be printed in water resistant ink. The printed set of approved eplans must be protected and maintained in good condition. 5 eplan Approval and Permit Issuance Stage

The City of Mercer Island eplan review process is a greener, more economical and streamlined plan review process that helps reduce turnaround times and misunderstandings during the plan review process. This user guide for the applicant is a compilation of the steps required for submittal. It may appear somewhat daunting at first glance but is really a relatively straightforward process. If you have any questions on the process, please contact Paul Skidmore at 206.275.7718. EPLAN PREPARATION STAGE To ensure a complete submittal as well as to control and track eplan documents, a submittal process is necessary. This section itemizes the Initial eplan file naming and file consolidation requirements, as well as the document organization and legibility requirements. Complete the applicable Permit Forms Plan Submittal Form. Permit Application. Single Family Plan Cover Sheet. Site Development Worksheet. Others as necessary. Prepare your drawings and all supplemental documents as described in the eplan Requirements for Electronic Plans Correct document orientation. Minimum resolution and text size for legibility. Bookmark all drawing sheets. Create an Acrobat portfolio of all the supplementary documentation. Alternatively, a zipped file containing each supplemental document may be submitted. Do not combine all of the supplementary information into one pdf file. Name the drawings using the following format: <project address>-<plans> i.e. 9611 SE 36 th ST-PLANS. Refer eplan File Naming Convention. Name the supplemental documentation using the following format: <project address>-<supp>, i.e. 9611 SE 36 th ST-SUPP. Refer eplan File Naming Convention. If the street is unknown or currently unassigned, the parcel number for the site may be substituted for project address, i.e. PN83002001-PLANS. Login to the City of Mercer Island web site here: http://sftp.mercergov.org User Name is guest. Password is eplan. Navigate to the Inbox and create a folder with the project address (or parcel number if the address is unavailable). Upload the two files (PLANS and SUPP) into the newly created folder. The City of Mercer Island will be automatically notified of the submission and you will receive an email notification within one working day that confirms receipt of the submission and will include your assigned permit application number and permit application fees due. Submit payment in person or by mail to: Mercer Island City Hall ATTN: CST eplan Review 9611 SE 36 th Street Mercer Island, WA 98040 Reference your Permit Application Number on your check. Payment must be received within 10 working days or the application will be suspended. Once payment has been received, an email receipt for fees paid will be sent. 1 eplan Preparation Stage

EPLAN SUBMITTAL STAGE Below are the steps to for an initial submittal. The Intake Screening process is intended to shorten the overall permit review process by reducing or eliminating the number of review rounds. The best way to ensure a speedy plan review and approval is to ensure all the information necessary for a complete plan review has been included in the submittal. More information is better than too little. Depending on the size and complexity of the submittal, an Intake Screening by City staff to verify whether submitted drawings and supplemental information are sufficient to perform a complete eplan review may be required. Greater than 500 square feet of additional floor area. $100,000 permit valuation or greater. If an Intake Screening is required, City staff will perform an electronic Intake Screening the Tuesday following receipt of submittal. An email notification stating whether your submittal is complete or incomplete will be sent once the Intake Screening has been performed. Incomplete submittals: You will receive an email that itemizes the submittal deficiencies. This information must be resolved and incorporated into a new submission (including any supplemental information as applicable) and uploaded to the City of Mercer Island FTP site. A complete set of drawings is required. Individual or separate drawing sheets are not be acceptable and will be rejected. All submitted documents must conform to the requirements in the eplan Preparation Stage previously outlined. Name the resubmitted eplan drawings using the following format: <permit application number>- <intake round>-<plans>. Refer eplan File Naming Convention. 1301-001-INTAKE2-PLANS 1301-001-INTAKE3-PLANS Name the resubmitted eplan drawings using the following format: <permit application number>- <intake round>-<plans>. Refer eplan File Naming Convention. 1301-001-INTAKE2-SUPP 1301-001-INTAKE3-SUPP As previously described, upload the completed file(s) to the "Inbox" of the City of Mercer Island FTP site at https://sftp.mercergov.org. The Intake Screening process repeats until City staff determines that the submittal is complete. Complete submittals: You will receive an email that your application is complete and has been accepted for review. Plans are not officially accepted until the Intake Screening has determined the submission comprises a complete application. See Plan Review Target Times for the estimated time frame between a complete application and your receipt of the initial eplan Review comments. 2 eplan Submittal Stage

EPLAN FORMAL REVIEW STAGE The eplan Review process begins once your application is determined to be complete. The eplans are reviewed for conformance with regulations pertaining to five separate disciplines as applicable to the scope of the project: Tree review, Fire review, Land Use review, Civil Engineering review, and Building review. The plans are uploaded to MIePlan Cloud where each discipline publishes review comments for your perusal and response. After each review discipline has completed their respective reviews, reply to each of the published comments indicating how the issue has been resolved and make any necessary changes the eplans. Upon completion, upload the new, revised set of drawings as well as any supplemental information to the City of Mercer Island FTP site for further review. After Intake Screening acceptance, you will receive an email from the City with a link to the eplan location. Clicking on the emailed link will take you directly to the MIePlan Cloud where your eplan is located. This link can be emailed to anyone for their input or replies, i.e. consultants, contractors, etc. The initial use of the MIePlan Cloud will require you to enter a User Name and Password. Enter eguest for the User Name, and @mercer123 for the Password. Each eplan review discipline will publish their comments directly onto the eplan set located on the MIePlan Cloud. Each review discipline will send you an email notification when the eplan review for their respective review discipline is complete. Do not expect any response to your replies until a complete, corrected set of drawings have been uploaded to the Mercer Island FTP site and all of the correction comments on the eplan have been replied to. You can track the status of your plan review within the "Status" section at MyBuildingPermit.com as well as with the Acrobat tracker. Reply to the comments directly by right clicking on each comment, selecting Reply and enter your response in dialog box that appears. 3 eplan Formal Review Stage

EPLAN REPLY AND RESUBMITTAL STAGE The eplan Response and Resubmittal Stage allows you to reply to each of the review discipline s comments directly to the eplan drawings stored on the MIePlan Cloud. After all of the comments have been resolved, a new, complete set of eplan drawings and any additional supplementary information (if required) is uploaded to the City of Mercer Island FTP site, at which time the resubmittal timeline begins. The previous eplan with the City comments and your replies remains on the MIePlan Cloud and is an ongoing record of the previous correction rounds. Review and reply to each City comment by using the Adobe software Reply functionality. Please note that you will need to select Publish button located in the upper right hand corner of the screen to upload your replies to the eplan on the MIePlan Cloud. Update and make all the required corrections to the previously submitted eplan set of drawings. Prepare your drawings and all supplemental documents as described in the eplan Requirements for Electronic Plans. All revisions and changes between each successive submittal shall be clearly indicated and clouded. A complete set of the corrected eplan drawings that contains all of the sheets is required. A partial submittal of individual sheets is not permitted unless each affected review discipline has provided prior approval. Complete the Plan Submittal Form and include within the supplementary information file as described in the below. Create an Acrobat portfolio of all the supplementary documentation. Alternatively, a zipped file containing each supplemental document may be submitted. Do not combine all of the supplementary information into one pdf file. Name the eplan drawings using the following format: <permit application number>-<submittal round>- <PLANS>. Refer eplan File Naming Convention. 1301-001-SUB1-PLANS 1301-001-SUB2-PLANS Name the supplementary information using the following format: <permit application number>-<submittal round>-<supp>. Refer eplan File Naming Convention. 1301-001-SUB1-SUPP 1301-001-SUB2-SUPP Upload the new eplan drawing set and supplementary information to the City of Mercer Island FTP web site here: https://sftp.mercergov.org. After the drawings have been uploaded, the City will review the submittal for completeness within two working days and a acceptance or rejection email to the designated contact. If you do not receive this email please contact CST. Incomplete resubmittal: You will receive an email from CST stating the submittal is incomplete, and give the reasons for the rejected submittal that will need to be resolved prior to resubmittal. Correct the deficiencies and resubmit. Complete resubmittal: You will receive an email from CST stating the submittal is complete The project timeline starts from receipt of submittal. See Plan Review Target Times for the estimated time frame between a complete application and the receipt of the eplan Review comments. The resubmitted eplan is uploaded to MIePlan Cloud for review. The previously submitted eplan file remains on the cloud for reference by the reviewers. The eplan Review and Response and Resubmittal stages repeat until all City comments are satisfactorily resolved and the project is approved. 4 eplan Reply and Resubmittal Stage

EPLAN APPROVAL AND PERMIT ISSUANCE STAGE Congratulations! Construction is almost ready to begin. You have successfully navigated your way through the permitting process. Just a few more steps and the permit will be in your hand. You will receive an email notification that the plans have been approved with attachments containing permit document and the invoice for remaining fees due. Sign and return the permit document. Submit payment in person or by mail to: Mercer Island City Hall ATTN: CST eplan Review 9611 SE 36 th Street Mercer Island, WA 9804 Reference your Permit Application Number on your check. Once payment has been received, you will be sent an email receipt for fees paid as well as instructions for downloading the approved drawings from the City of Mercer Island FTP site. Each sheet of the approved drawings will bear a City approval stamp. Any changes to the drawings, insertions or deletions may require you to apply for a revision to the permit. You are required to print at least one copy of the approved eplan drawings that must be kept onsite at all times. The approved eplans must be printed in water resistant ink. The printed set of approved eplans must be protected and maintained in good condition 5 eplan Approval and Permit Issuance Stage

EPLAN POST PERMIT REVISION STAGE After a permit has been issued, any revisions to the approved to the of eplan documents must adhere to the following guidelines. Please note that except for very minor revisions and deferred submittals, all eplan permitted projects with revisions must be submitted electronically. No mixing and matching of paper and electronic plan reviews is permitted. Prepare a completed set of REVISED drawings and identify all changes with revision clouds and/or markers. Prepare other revised supplemental documents Plan Submittal Form REVISED Plans REVISED calculations REVISED geotechnical reports Other REVISED permit documents as necessary to fully describe the scope of work. Name the eplan drawings using the following format: <permit application number>-<submittal round>- <PLANS>. Refer eplan File Naming Convention. 1301-001-REV1-SUB1-PLANS 1301-001-REV2-SUB1-PLANS Name the supplementary information using the following format: <permit application number>-<submittal round>-<supp>. Refer eplan File Naming Convention. 1301-001-REV1-SUB1-SUPP 1301-001-REV2-SUB2-SUPP Follow the procedure set forth in the eplan Permit Review and eplan Reply and Resubmittal Stages outlined above. 6 eplan Post Permit Revision Stage

EPLAN FILE FORMAT REQUIREMENTS To ensure a speedy and accurate review, minimum document formatting requirements are necessary and outlined below. If the submittal does not meet these minimum requirements, your project may be returned and no review will be performed. Please call DSG if you have any questions regarding these formatting requirements. EPLAN PREPARATION STAGE To meet state requirements and ensure an accurate review and legible documents are submitted, the following details the minimum eplan file format requirements. Complete all applicable Permit Forms Plan Submittal Form. Permit Application. Single Family Plan Cover Sheet. Site Development Worksheet. Others as necessary. Combine all Permit Forms, Structural Calculations, Geotechnical Information, etc. into a single Acrobat Portfolio. Alternatively, all supplemental information can be archived into a single zip file readable by Microsoft Windows. Prepare drawing sheets to the following specifications: Create full size PDF drawings. Do not reduce a D size sheet to a letter size document for instance. Minimum sheet size is ANSI B (11 x 17 ). Maximum sheet size is ARCH E (36 x 42 ). The minimum document resolution is 200 dots per inch (DPI) and the submittal will be rejected if submitted below this threshold. The suggested resolution for eplan drawings is 300 dots per inch (DPI). All fonts used shall be legible with a minimal font size of 10 point. Though not a requirement, retaining the CAD layering system during the creation of the PDF is suggested. This helps streamline the review process. And of course, drawings shall be complete and clearly define the scope of work for the project. This includes complete and accurate dimensioning, coordinated drawings between disciplines, and fully detailed drawings, etc. Standard details that are not applicable to the project must be removed from the set or otherwise noted as not applicable. 1 eplan Preparation Stage City of Mercer Island

EPLAN FILE FORMAT REQUIREMENTS EPLAN PREPARATION STAGE (CONTINUED) Combine all drawings sheets into one Portable Document Format (PDF) eplan file compatible with Adobe Acrobat v9.0 or earlier. All sheets shall be oriented that the top of the page is always at the top of the computer monitor. The sheets shall be organized and numbered following typical CSI construction document standards. Ensure that no Acrobat security settings (password, signatures and certificate policies) are applied to the document(s). Reviewers must have the ability to create mark-ups and notes, insert, remove and relocate sheets, and have full control over the documents. At permit issuance, the approved drawings will be password secured prior to issuance. All sheets shall be bookmarked with sheet number and sheet description for every required submission. See Figure 1 below. FIGURE 1 Scanned Documents: Documents which are only available in a paper format should be scanned at a resolution which ensures the pages are legible on both a computer screen and when printed. Scanned documents shall be a minimum of 200 DPI and a maximum of 300 DPI to balance legibility and file size. Refer to guidelines above for additional requirements. Name the drawings using the following format: <project address>-<plans> i.e. 9611 SE 36 th ST-PLANS. Refer eplan File Naming Convention. Name the supplemental documentation using the following format: <project address>-<supp>, i.e. 9611 SE 36 th ST-SUPP. Refer eplan File Naming Convention. If the street is unknown or currently unassigned, the parcel number for the site may be substituted for project address, i.e. PN83002001-PLANS. Upon submittal, the City of Mercer Island staff shall verify all required permit information has been submitted in the proper format. An application will not be formally accepted until this process has been completed. 2 eplan Preparation Stage (continued) City of Mercer Island

File Naming Convention for the Applicant An efficient and consistent file naming convention is necessary to correctly categorize and track cloud based projects. Storage, retention and archive retrieval is relies on a standard File Naming Convention. INITIAL SUBMITTAL When you initially upload the eplan drawings and supplementary information to the Mercer Island FTP site, no permit number is yet assigned to the project. The uploaded files use the project address or the parcel number to differentiate between submittals. For a complete overview of the Cloud based review process, see the Cloud Review Process for the Applicant. Only two (2) files should be uploaded: eplan Drawings. Contains all the information for all the disciplines as necessary to fully describe the project scope and code compliance. For larger, commercial level projects, the disciplines may be combined into an Acrobat Portfolio with permission from CST. Supplemental Information. All of the permit forms, calculations, worksheets, reports are included in one supplemental file. Each file shall be incorporated into a single Acrobat Portfolio or zip file. Each file is required to have a descriptive file name. Naming convention for the initial submittal: <project address>-plans 9611 SE 36TH ST-PLANS <project address>-supp 9611 SE 36TH ST-SUPP Provide parcel number in lieu of the project address where address is unknown. Prepend the file name with <PN> <PN><parcel number>-plans PN12239991-PLANS <PN><parcel number>-supp PN12239991-SUPP 1 Initial Submittal City of Mercer Island

INTAKE SCREENING RESUBMITTAL EPLAN REVIEW PROCESS ON THE CLOUD File Naming Convention for the Applicant Once the documents have been received by the City, your project will be issued a permit application number and may be routed for an Intake Screening to ensure submittal completeness. If any information required for a complete review is missing, you will be informed by CST, and you may need to resubmit a complete set of eplans, Supplemental Information, or both following the naming convention below. The eplan drawing files are named with following the convention of <permit application number>- INTAKE<submittal#>-PLANS The second submittal: 1309-001-INTAKE2-PLANS. The third submittal: 1309-001-INTAKE3-PLANS. The nth submittal: 1309-001-INTAKEn-PLANS. The supplemental files are named with following the convention of <permit application number>- INTAKE<submittal#>-SUPP The second submittal: 1309-001-INTAKE2-SUPP. The third submittal: 1309-001-INTAKE3-SUPP. The nth submittal: 1309-001-INTAKEn-SUPP. 2 Intake Screening Resubmittal City of Mercer Island

File Naming Convention for the Applicant FORMAL REVIEW RESUBMITTAL Once the drawings have been accepted for intake, the Formal Review process begins. If any corrections require a resubmittal, please follow the naming convention below. The eplan drawing files are named with following the convention of <permit application number>- SUB<submittal#>-PLANS The second submittal: 1309-001-SUB2-PLANS. The third submittal: 1309-001-SUB3-PLANS. The nth submittal: 1309-001-SUBn-PLANS. The supplemental files are named with following the convention of <permit application number>- SUB<submittal#>-SUPP The second submittal: 1309-001-SUB2-SUPP. The third submittal: 1309-001-SUB3-SUPP. The nth submittal: 1309-001-SUBn-SUPP. 3 Formal Review Resubmittal City of Mercer Island

File Naming Convention for the Applicant REVISION SUBMITTAL After permit issuance, upload revisions to the eplan project to the Mercer Island FTP site as described in Cloud Review Process for the Applicant using the following naming convention: Each revision to the eplan drawing files are named following the convention of <permit application number>-rev<revision#>-sub1-plans The first revision: 1309-001-REV1-SUB1-PLANS. The second revision: 1309-001-REV2-SUB1-PLANS. The nth revision: 1309-001-REVn-SUB1-PLANS. Each revision to the initial supplemental files are named with following the convention of <permit application number>-sub1-supp The first revision: 1309-001-REV1-SUB1-SUPP. The second revision: 1309-001-REV2-SUB1-SUPP. The nth revision: 1309-001-REVn-SUB1-SUPP. Include review due date in the body of the text Each revision is subject to a Formal Review, and if any corrections require a resubmittal, the following naming convention applies. Please note, the initial revision is used as an example below. Additional revisions would be incremented as described above: The resubmitted eplan drawing files are named following the convention of <permit application number>-rev<revision#>-sub<submittal#>-plans The second submittal: 1309-001-REV1-SUB2-PLANS. The third submittal: 1309-001-REV1-SUB3-PLANS. The nth submittal: 1309-001-REV1-SUBn-PLANS. The supplemental files are named with following the convention of <permit application number>- INTAKE<submittal#>-SUPP The second submittal: 1309-001-REV1-SUB2-SUPP. The third submittal: 1309-001-REV1-SUB3-SUPP. The nth submittal: 1309-001-REV1-SUBn-SUPP. 4 Revision submittal City of Mercer Island