Sheet Metal Brake Plans for a 6' Sheet Metal Brake

Similar documents
Precision Steel Car s 100 T Steel Coil Car

INSTALLING YOUR NEW SPRING LIFT ARM KIT

Ford Pick Up Rear leaf Spring Kit Installation Instructions

Part# 85200, 86200, 85095, 86095, TC200,TT200,TC095,TT095

BIFOLD FUTON FRAME TRINITY ARM. Seat Rails and Slats x 1. *Note: Use 4pc of 100mm Bolts and 4pc of 60mm Bolts to attach the arms to the Stretchers.

1949 to 1954 Chevrolet Dual Master Cylinder Conversion

CONTENTS TOOL LIST U P S I D E I N N O V A T I O N S, L L C RAMP AND STEP SYSTEM ASSEMBLY INSTRUCTIONS. Revised: June 2013

CV1B Sliding Table Installation and Setup Guide

Cabinet Mount Lifter Instructions

Steel Framed Miter Saw Bench

Roll In W/L Dock PAGE 1

Assembly Instructions for model: VMPR1

`48-`56 Ford Pickup Rear leaf Spring Kit Installation Instructions Tech Line:

INSPECTION AND CORRECTION OF BELLHOUSING TO CRANKSHAFT ALIGNMENT

Make a Safe. Description. Lesson Objectives. Assumptions. Terminology

FLIP TARP SINGLE & DOUBLE UNDERBODY TRAILERS

METAL BENDER OPERATING & MAINTENANCE INSTRUCTIONS Model Nos: CCB1 & CCB2 Part Nos: & CCB2 CCB1

Tail Vise. Installation Instructions. (revised 10/11/2017)

Grade 8 Enriched Math Catapult Project 2012 Step by Step Instructions to building a catapult

Sit Down Table Assembly Instructions

Race Splitter Upgrade Kit Installation Instructions

Please Do Not Return Your Item to the Retailer

woodworkersjournal.com MATERIAL LIST

SE5a Instrument Board part 2 - rev 1.1

Make a Portable Hibachi

Clayton Off Road COR COR COR

OPERATION, PARTS & MAINTENANCE MANUAL MODELS HB73-16 HB97-18 HB97-16 HB97-12 HB HB HB HB145-18

Why are we giving this guidebook as a FREE download?

Build a Drill Press Vise

400A 40113V, 401A 40120V, & 401AL 40120VL ALUMINUM VERTICAL 4000 LB LIFT INCLUDES SCREW LEG ASSEMBLY INSTRUCTIONS

TOOL LIST FOR TAILGATE HIDDEN LATCH & LINK ASSY FOR FORD FLARESIDE TRUCKS

BHJ Products, Inc. Parts List & Instructions

Clocking a TD-04 Turbo Compressor Housing. Appendix A : AWIC Silicone and Tubing Fitting

Note - the nose ribs and are thinner than the main ribs. These nose ribs will use a thinner rib cap than the ribs. This is per design.

END FRAMES. End frames built using pressure treated 2x4 (1 1/2" x 3 1/2") 36" 34" 7/16" pilot hole. 5 1/2" x 1/2" lag bolt 8" wheel 23"

Queen Wingback Bed King Wingback Bed

BABY WOLF LOOM. Assembly Instructions for Knocked-Down Looms

BUMP GATE FITTING INSTRUCTIONS.

Important Note. Tools Required: Welder capable of fully welding 10 GA.135 steel

Therma-Tru Door Gallery Setup Instructions Swing Unit with Hardware Kit - Hardware Part # MADGSWU15 (Swing Unit) Part # MADGHKSU10 (Hardware Kit)

BHJ Products, Inc. Parts List & Instructions

IIHS Side Impact Outrigger

IMPULSE G2/PULSE STATIC BRIDGE & RETURN MODULE. Drill. Desk Connecting. Outside by fastening the supplied wood screws from the HK-67 kit through the

XJ Coil Conversion Rear 4 Link Instructions

Rugged Ridge Engine Transmission Skid Plate JK

Ratcheting and Angled Leg Vises. Ratcheting Parallel Guide

Large Wood Windmill Assembly Instructions

CAB END BEDTRAX (SIDE VIEW)


STAGE PAGE. 6 The left front door interior The right front wheel The right front seat back The right front wheel 37

Kai Installation Instructions

SOCCER TABLE. Assembly Instructions

EllisSaw.com. EllisSaw.com P.O. Box Verona, WI

Clearview Railing System Installation Instructions

8.5 Ton Assembly Instructions

ALL SEASON PATIO COVER

Norman's Grizzly G0602 Reverse Tumbler Plans

CEB Main Frame: Assemble U-Channel

Sunrise Deck Assembly Instructions for Kingston Left

Hardware and Components:

Installation Instructions

JK TrailGate JK TrailGate

AWNING / PATIO COVER INSTALLATION INSTRUCTIONS

Important Note. Tools Required: Welder capable of fully welding 10 GA.135 steel

HQ Precision-Glide Track Upgrade 2 Extension Kit for HQ Studio Frame Part# QF09750

Coil Winder Instructions.

SECTION 2: INSTALLATION

Retractable Screen Installation Instructions For Vinyl and Aluminum Clad and Wood In-Swing Hinged Doors (See separate instructions for sliding doors)

JK Rear Inner Fenders


Barricade Trail Force HD Rear Bumper w/ Tire Carrier installation (07-16 Wrangler JK)

Locker Pedestal Installation Instructions

Installation Instructions Universal Crossmember Kit - 60 Track Width BEFORE Measure Twice, Weld Once! II

======================================================================================== ( DR / DR) JK WRANGLER MOD RACK

18000 HDL FOUR POST LIFT LB CAPACITY INSTALLATION AND OWNER'S MANUAL

Quick Hoops Seedling and Micro Green Bench Instruction Manual

Lumber Smith. Assembly Manual. If you are having problems assembling the saw and need assistance, please contact us at:

Assembly Instructions for 12x16 Floating Dock

MAG-CONV Basic, 48, 48R & Midline Front Mount

Post-Paint>Fuselage>Interior>Controls>Fit rudder pedals

User Instructions Multiline Otter Scoreboard Caddy Assembly

Hardware and Components:

Adjustable Hammered Dulcimer Stand

For additional assistance call

55000/55010 Installation Instructions

The following instructions will guide you through the installation of your new vinyl railing stair kit.

INSTALLATION INSTRUCTIONS

You should have received the following contents in the package:

Model: SCD430 SCD640. Installation & Operation Guide P/N SCD640-95

12ft X 12ft Attached Breeze Pergola Assembly Manual. Outdoor Living Today. (For Both 9 and 12 High Posts) June 1st/2012 Version #4

No. 412, 414, 416 Operations Manual

Thank you for purchasing our product! *Please read these instructions and follow them step by step.*

Installation Instructions

FRAME BRACKET. Doing Our Best to Provide You the Best. Ford. Page 1. BOlT TORQUE SPECIFICATIONS HJ31000,Rev 0

Uni-Cross Universal Transmission Crossmember

IN 578. Tools Required. Torque Specification: 10mm Socket 7/16 Socket 1/2 Socket 1/2 Wrench 7/16 Wrench 1/8 Allen Wrench.

1. Begin by rolling your window up all the way 2. Remove your door and window handles by unscrewing the flat head set screws behind each handle.

PRO CYC PRO CYC, INC. SYSTEM SUPER 1.5QS

INSTALLATION INSTRUCTIONS FOR SL-LB MANUAL LIFT BARRIER GATE ARMS

Installation Instructions - Model V4JSD 1

Transcription:

Sheet Metal Brake Plans for a 6' Sheet Metal Brake,1752'8&7,21 Thank you for purchasing the sheet metal brake plans. The plans include a complete list of material needed and easy to follow steps to build a successful working sheet metal brake. Here is a quick run down of how to build the sheet metal brake. The rest of the e-book will guide you step by step with easy to follow photos. The first step is to purchase the needed steel from your local steel distributor. It is important to use straight material. Next you will need to cut all the pieces required before you begin assembly. Prepare the hinges needed before you start assembling the brake. With all the parts cut and ready you can finish building the brake in a couple of hours. The hinges are made from 1 square solid stock and need to be drilled and machined before building your brake. The area of the hinge that requires milling can be done by any machine shop for a very small cost. lf you cant get them machined at a machine shop you can use a grinder to finish out the hinges. After you cut steel the next step is to mark and drill the necessary holes in each piece. The main base piece will need to be tapped to fit 3/8 20 round bolts. 1 use allen head cap bolts for ease of use with a allen wrench. The allen ahead bolts will last for years without wearing out the head. Now that ali pieces are cut, drilled and tapped you are ready to fit and assemble the main part of the brake. First bolt the clamp bar to the main base and install bolts in all three holes. Tighten bolts down. This will help prevent warping during welding on the brake parts. Next lay the bottom piece on its back on two or three bricks and lay the front bending bar on top of the front side of the base. Position this piece so that the top face is flush with the top face of the main base. Clamp the bending bar into place once it is positioned correctly. On each end of the bottom piece you need to weld on the ends. This is the most critical step in building your new brake. The key point is to align the ends so that the pivot point is in the center. Use 90 degree magnet clamps to hold the ends in place to allow you to spot weld them to the base. Spot weld all pieces and recheck alignment before finish welding. After the ends have been spot welded to the base we are ready to fit the bending bar with the hinges to the main base. Install the 1 steel dowels thru the hinges and then put the hinges on the ends by inserting the dowel in the hole at the pivot point on the ends. Position the hinges in line with the bending bar and tack weld both sides. The final step is to weld on the top and bottom braces to reinforce the center of the brake. Now that all pieces are spot welded together and everything looks good you can finish welding the pieces together. It is best to allow parts to cool during the welding process to prevent warping. The last step is to fit the mounting brackets with 3/8 bolts to allow the sheet metal brake to be bolted down to a table. With a little extra metal, legs can easily be made and attached to the sheet metal brake. These instructions are a preliminary refresher on the basic construction and the rest of the book shows you step by step each part of construction.

3$576/,67 0HWDO/LVW 15 feet 3 X 3 x 1/4 Angle Iron 7 feet 2 1/2 x 2 1/2 x 1/4 angle iron 14 feet 3/8 cold rolled steel 5 1/2 inches 1 x 1 solid steel square stock 30 inches 5/8 stress proof rolled steel 2 inches 1/2 solid round cold rolled )DVWHQHUV 3-3/8 20 round Allen Cap Bolts 8-3/8 Course Thread Bolts with w/ 8 nuts and washers &XWVWHHOWRWKHVHVL]HV

(1'3,(&(67$%/(028176+,1*(6'5,//63(&6 The bottom side of each end piece needs to be drilled the same as the table mounts. Two holes 3/4" in from edges and 2 1/2 inches apart. The table mounts will bolt directly to the end pieces. Both sides of the angle iron need to be drilled the same pattern. You will need four of these pieces to mount sheet metal brake to table. Be sure and drill same pattern on bottom of end pieces.

&/$03 '5,//%27720$1'&/$03%$5 First mark the center of the bottom piece. Center should be 38" from the ends. Sit the bottom piece on three bricks to support it level on table. Next position top clamp piece on the bottom piece with equal amounts on each end and the front edge flush with the front edge of the bottom piece. Each end of the top clamp piece should be 1/2" shorter than the bottom piece on each end. If not split the difference. Clamp the two pieces together on each end with two C clamps or vise grips. Mark the top piece in the center and each end to center punch and drill pilot holes.

'5,//3,/27+2/(67+58723&/$03$1'%27720 Drill 1/8 pilot holes thru the top clamp and bottom piece in the center and on each end. Remove the top piece and enlarge the holes with a 3/8" drill bit. The top piece needs to be sanded on the bottom side to prevent burst. Sheet metal when loading sheet metal in the brake to bend.

'5,//$1'7$3+2/(6,1%277203,(&( Drill 21/64 size holes in the bottom piece to be tapped 3/8" 20 round threads. Use a 3/8" 20 round tap to thread the holes. Be sure and tap straight down and work tap back and forth to create nice threads. Use oil to lubricate tap when using. When all holes are drilled to final size and tapped, replace the top clamp piece together with the bottom piece and bolt together with the three 3/8" 20 round allen head cap bolts. (one on each end and one in the center) By bolting these two pieces together we will reduce the risk of warping the metal when we begin welding.

&/$0372*(7+(5%$6($66(0%/<$1'%(1',1*%$5 Lay main assembly on its back on bricks and position the bending bar with the ends as well as the front edge flush with the main bottom piece. 3RVLWLRQ7KH(QG3LHFHV&HQWHUHG Position the end pieces square and centered to the 1/2" pivot hole drilled in the end pieces. This is the most important part to building a successful working sheet metal brake. By centering the ends as shown in the photo this will allow the bending bar to pivot evenly across the full length of the brake. Use magnetic clamps to secure the ends in position to be spot welded.

6327:(/'(1'672%27720%$6( Lightly spot weld ends to base as shown in the photo. Spot weld ends on the bottom side of the bottom piece. Remove magnetic clamps and weld bottom to end pieces with a full bead on the underneath side.

,167$//+,1*(6 Be sure and check the alignment of bending bar to base as clamped in step 4. The top surface of the bending bar must be level with the top surface of the bottom base. Add extra clamp to center to hold bending bar to prevent warping during welding. Fit 1" steel dowel pins made from 1/2" cold roll thru hinges and into 1/2 holes in the end pieces. Align hinges with bending bar and spot weld top and bottom. Finish welding hinges on top and bottom side.

$''6833257%5$&(6 Bend the two 75" pieces of 3/8" cold roll in the center slightly. Spot weld the support brace to the bottom side of the bending bar with the 3" piece of 3/8" cold roll in the center. Tack weld each end in the corners of the angle iron. Attach the support brace to the top clamp bar as shown in the photos. When welding braces to top clamp bar be sure bolts are tightened down first The photos above show the bolts loose. That is incorrect. After support braces are fitted and spot welded go back and finish welding all spot weld areas.

$''7$%/(02817%5$&.(76 Your New Sheet metal Brake can now be bolted to a table and used. Put sheet metal under top clamp and tighten down bolts to hold securely. Use only two of the bolt holes according to the length of your material. Insert 5/8" handle in the hinge and lift upward to create bend. Congratulations you have successfully built your own sheet metal brake.