Status Report on Survey and Alignment Efforts at DESY

Similar documents
Using Higher Order Modes in the Superconducting TESLA Cavities for Diagnostics at DESY

3 General layout of the XFEL Facility

FLASH at DESY. FLASH. Free-Electron Laser in Hamburg. The first soft X-ray FEL operating two undulator beamlines simultaneously

SUPERKEKB MAIN RING TUNNEL MOTION

Status Report on the Survey and Alignment Activities at Fermilab

Status of the European XFEL Accelerator Construction Project. Reinhard Brinkmann, DESY

FLASH II. FLASH II: a second undulator line and future test bed for FEL development.

Introduction to High-Resolution Accelerator Alignment Using X-ray Optics

An Overview of MAX IV Insertion Devices & Magnetic Measurement System. Hamed Tarawneh On behalf of Insertion Devices Team

Scanning X-ray microscopy with a single photon counting 2D detector

Available online at ScienceDirect. Physics Procedia 84 (2016 )

NETWORK MEASUREMENTS AT THE HEAVY ION SYNCHROTRON SIS AT GSI

Does the short pulse mode need energy recovery?

VIBRATING WIRE SENSORS FOR BEAM INSTRUMENTATION Suren Arutunian

Calibrating the Cavity Voltage. Presentation of an idea

Status, perspectives, and lessons from FLASH and European XFEL

SURVEY AND ALIGNMENT FOR THE SWISS LIGHT SOURCE

ITk silicon strips detector test beam at DESY

Grounding for EMC at the European XFEL

H. Weise, Deutsches Elektronen-Synchrotron, Hamburg, Germany for the XFEL Group

FLASH Upgrade. Decrease wavelength and/or increase brilliance

GROUND MOTION IN THE INTERACTION. ensured that the final focus quadrupoles on both. rms amplitudes higher than some fraction of the

The ILC Accelerator Complex

Proposal of test setup

FLASH II: an Overview

CALICE Software. Data handling, prototype reconstruction, and physics analysis. Niels Meyer, DESY DESY DV Seminar June 29, 2009

ANALYSIS OF 3RD OCTAVE BAND GROUND MOTIONS TRANSMISSION IN SYNCHROTRON RADIATION FACILITY SOLARIS Daniel Ziemianski, Marek Kozien

Diamond X-ray Rocking Curve and Topograph Measurements at CHESS

Vibration studies of a superconducting accelerating

Fast Kickers at DESY

The Potential for the Development of the X-Ray Free Electron Laser

XFEL Cryo System. Project X Collaboration Meeting, FNAL September 8-9, 2010 Bernd Petersen DESY MKS (XFEL WP10 & WP13) 1 st stage. Possible extension

BEAM DIAGNOSTICS AT THE VUV-FEL FACILITY

CEBAF Overview June 4, 2010

Behavior of the TTF2 RF Gun with long pulses and high repetition rates

FLASH: Status and upgrade

3.1 Introduction, design of HERA B

2 TTF/FLASH in the XFEL context

Status of the Electron Beam Transverse Diagnostics with Optical Diffraction Radiation at FLASH

Lattice Design for PRISM-FFAG. A. Sato Osaka University for the PRISM working group

Short-Pulse X-ray at the Advanced Photon Source Overview

Herwig Schopper CERN 1211 Geneva 23, Switzerland. Introduction

Set Up and Test Results for a Vibrating Wire System for Quadrupole Fiducialization

Infrared Single Shot Diagnostics for the Longitudinal. Profile of the Electron Bunches at FLASH. Disputation

New Tracking Gantry-Synchrotron Idea. G H Rees, ASTeC, RAL, U.K,

Laser Alignment System for LumiCal

Experience with Insertion Device Photon Beam Position Monitors at the APS

Today s Outline - January 25, C. Segre (IIT) PHYS Spring 2018 January 25, / 26

Fiducialization of Superconducting Radio Frequency Cryomodules at Jefferson Lab

Undulator K-Parameter Measurements at LCLS

INSTALLATION AND FIRST COMMISSIONING OF THE LLRF SYSTEM

HIGH MAGNETIC FIELD SUPERCONDUCTING MAGNETS FABRICATED IN BUDKER INP FOR SR GENERATION

The CMS Outer HCAL SiPM Upgrade.

VIBRATION MEASUREMENTS IN THE KEKB TUNNEL. Mika Masuzawa, Yasunobu Ohsawa, Ryuhei Sugahara and Hiroshi Yamaoka. KEK, OHO 1-1 Tsukuba, Japan

Supporting Planning and Engineering Processes at XFEL Examples, Benefits and Experience

A GENERAL VIEW OF IDs TO BE INSTALLED AT ALBA FOR SECOND AND THIRD PHASE BEAM-LINES

MEASUREMENT OF BEAM LOSSES USING OPTICAL FIBRES AT THE AUSTRALIAN SYNCHROTRON

The HERA-B Ring Imaging Cerenkov ˇ Detector

Demonstration of exponential growth and saturation at VUV wavelengths at the TESLA Test Facility Free-Electron Laser. P. Castro for the TTF-FEL team

BPMs with Precise Alignment for TTF2

pcvd diamond beam position monitors for PETRA III

Design of Photon Beamlines at the European XFEL

Study of gain fluctuations with InGrid and TimePix

Circumference 187 m (bending radius = 8.66 m)

GROUPCODE NEN : ANSI : STEEL BS : STEEL

Alignment of the 12 GeV CEBAF Accelerator

Beam Infrared Detection with Resolution in Time

Femtosecond-stability delivery of synchronized RFsignals to the klystron gallery over 1-km optical fibers

VUV-FEL User workshop, August 23-24, 2004

The MUSE experiment. Technical Overview. Guy Ron (for the MUSE collaboration) Hebrew University of Jerusalem

Specification of APS Corrector Magnet Power Supplies from Closed Orbit Feedback Considerations.

Introduction to Radio Astronomy!

European XFEL Project overall status & accelerator complex

Design of the magnets for the MAX IV project. Martin Johansson, Beam Dynamics meets Magnets-II workshop, Bad Zurzach, Dec.

Precision RF Beam Position Monitors for Measuring Beam Position and Tilt Progress Report

LCLS project update. John Arthur. LCLS Photon Systems Manager

TECHNICAL CHALLENGES OF THE LCLS-II CW X-RAY FEL *

FLASH Operation at DESY From a Test Accelerator to a User Facility

Avalanche statistics and single electron counting with a Timepix-InGrid detector

End-of-Chapter Exercises

Activities on Beam Orbit Stabilization at BESSY II

System Integration of the TPS. J.R. Chen NSRRC, Hsinchu

FLASH performance after the upgrade. Josef Feldhaus

Status Report on the Survey and Alignment Activities at Fermilab

THE CRYOGENIC SYSTEM OF TESLA

Pixel Array Detectors: Counting and Integrating

Characterisation of a novel super-polished bimorph mirror

Nonintercepting Diagnostics for Transverse Beam Properties: from Rings to ERLs

The road to the European XFEL

Design considerations for the RF phase reference distribution system for X-ray FEL and TESLA

IR introduction + Beam BG simulation /12/11 M. Iwasaki (Univ. of Tokyo)

PY106 Assignment 7 ( )

LONG-TERM RESULTS OF THE HYDROSTATIC LEVELLING SYSTEM AT THE SWISS LIGHT SOURCE (SLS)

Performance of Superconducting Cavities for the European XFEL. Detlef Reschke DESY for the EU-XFEL Accelerator Consortium

Photon Diagnostics. FLASH User Workshop 08.

Results from Diamond Detector tests at ELETTRA

Wisconsin FEL Initiative

Roman Pots. Marco Oriunno SLAC, PPA. M.Oriunno, SLAC

Illinois. Speculations About a Fourier Series Kicker for the TESLA Damping Rings. Physics

Status of the PRad Experiment (E )

Transcription:

Status Report on Survey and Alignment Efforts at DESY Markus Schlösser Johannes Prenting

Contents PETRA III Overview Network design Foundation soil R & D DESY - HLS LiCAS XFEL legal procedure Instrumentation FARO trackers

Accelerator structure at DESY HERA has its final shutdown in June 2007 PETRA is not used as a pre-accelerator any more PETRA will be converted into a Synchrotron Light Source (PETRA III)

Picture of P3 FLASH-crossing new P3 hall

PETRA III hall (fotomontage)

reference network PETRA has no reference network machine bears the reference information install new reference points in the tunnel transfer information to reference points transfer external coordinates into tunnel remove machine completely during rebuilt new reference points ready }history } present } future

GPS-network pillar on PETRA wall plumbing instrument inside tunnel

tunnel network rectangular tunnel shape target marks magnets reference points

tunnel network (adjusted) 3/8 of the ring measured during shutdown 2005 circular sections 3D view straight sections top view RMS = 0,08mm?

Soil of the new Hall depth of clay layer under the surface Question: Could impound water on the clay cause deformations of the new hall? Solution: Measure relative deformations of the existing tunnel with a HLS

distribution of HLS in PETRA N 20 13,12 9,8 5,4 1 18,17 15,14 11,10 7,6 3,2 16 19

Comparison with Distance-Sensor HLS-12/13 distance sensor construction joint ring magnet

Results of HLS heigth difference 12-13 fourier spectrum

displacements in construction joints N maximum displacements [µm] 100 10 50 30 10

XC between sensors HLS 12-13 distance sensor cross correlation

XC with machine energy HLS 10-11 machine energy cross correlation lag of ~ 1h

XC with rainfall HLS 10-11 rainfall cross correlation

results HLS movements confirmed no correlation between tunnel movement and rainfall strong correlation between tunnel movement and machine energy with a lag of ~ 1h mechanism is not fully understood yet

XFEL Greetings from Johannes Prenting Approval statement was published on August 9, 2006!

Technical vertical shape of tunnel has been fixed XFEL- Linac equipotential surfaces 0.11 m 0.20 mrad 0.16 mrad 0.08 m photon beam

Alignment concept shaft XS1 main linac SLRS reference marks cross cut photon tunnels reference marks cross cut SLRS is connecting the arriving with the straight outgoing tunnel Other tunnels are attached via cross cuts works for all shafts

LiCAS project ILC / TESLA easy and fast survey of large linear reference systems First prototype should be ready in the DESY test tunnel by the end of 2006

Geodetic Instruments Two FARO SI/SI2 trackers bought in 2002 and 2004 Both have errors in Interferometer distance measurement (even directly after service!) Errors happen from once a week to several times a day Size of error from some 0.1 mm up to 433mm (so far) Don t know how to provoke the error

Measurement results Target Time Azimut [gon] Vertical [gon] Distance [m] 6-B4 18:34:05-35.5287 102.2880 7.485031 da [mgon] dv [mgon] dd [mm] 6-B4 18:57:48-35.5294 102.2872 7.051910 0.1 0.0-433.1 6-B4 18:59:02-35.5295 102.2871 7.051918-0.1-0.2-433.1 6-B4 19:02:21-35.5295 102.2873 7.485069 Error happens with brand new SMR and normal conditions Error happens even direcly after homing Workaround: measure all points twice! Not applicable for scanning surfaces etc.

Beam loss After Service, error seems to happen less frequently but: beam loss rate increased dramatically Test setup: Tracker looks at slowly moving target v = 10cm / 30s Tracker looses beam within 2 min (repeatable) FARO was not able to solve the problem for nearly one year now

and finally for something completely different this has been our company christmas party 2005

Thanks foryourattention!

details of PETRA III Start of Conceptual Design: 2002 Final approval: May 2005 Reconstruction begins: July, 1st, 2007 User operation: 2009 Costs 225 Million 90% German federal government 10% City of Hamburg

technical details of PETRA III new 280 m long experimental hall 14 beamlines with up to 30 experimental stations highest brilliance and flux broad photon energy range (about 0.2keV to 3keV) Energy 6GeV Current 100mA 200mA Emittance 1nmrad

GPS-network Pillars on DESY site Bolts in the tunnel (with plumbing tube to the surface)

Installation of HLS PETRA tunnel view measurement pots HLS two tube crossing

results magnitude of displacement depends on position largest displacement in middle of octant smallest displacement at joint between hall and tunnel -> physicists refused to accept this -> installation of an independent measurement system

comparison of HLS and direct distance HLS 12-13 Spikes distance sensor Drift