LETTER OF TRANSMITTAL

Similar documents
LETTER OF TRANSMITTAL

SUBMITTAL REVIEW Food Service Equipment Data Sheets GCAN. Notes: 1. See D-C Design comments. Submittal: No. 035.

SECTION SUBMITTALS. A. PART A and DIVISION 1 of PART B are hereby made a part of this SECTION.

SUBMITTAL REVIEW B Passenger Elevators Shop Drawings GCAN

Spec Section: , Complete Elec, Comm, and Fire Alarm , Complete Elec, Comm, and Fire Alarm Data Sheets RAN/GCAN

Section Meetings Section Material and Equipment. None Required

Spec Section: Concrete Mix Design psi - Review Form Concrete Mix Design psi Data Sheets GCAN

State of New Jersey BOARD OF PUBLIC UTILITIES 44 SO. CLINTON STREET 7 TH FLOOR P.O. BOX 350 TRENTON, NEW JERSEY

Working Drawing Manual

SUBMITTAL REVIEW Steel Reinforcement - Slab and Masonry Shop Drawings GCAN. Notes: 1. See comments on submittal.

JEFFERSON LAB TECHNICAL ENGINEERING & DEVELOPMENT FACILITY (TEDF ONE) Newport News, Virginia

Anticipated schedule, Page 2. Change the Contract Term from 635 Days to be 1,127 Days.

SECTION SUBMITTAL PROCEDURES

SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES

DIVISION 1 GENERAL REQUIREMENTS SECTION SUBMITTAL PROCEDURES

A. This section specifies procedural requirements for Shop Drawings, product data, samples, and other miscellaneous Work-related submittals.

SECTION SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES

DIVISION 1 - GENERAL REQUIREMENTS SECTION SUBMITTALS

SUBMITTAL REVIEW COVERSHEET

A. Action Submittals: Written and graphic information that requires Architect's responsive action.

City Plaza Energy Upgrades Timeline of Events Pella Window Cancellation

Submittal Review SW Macadam Ave Suite 200 ATTENTION: Riley Tobin. Portland, OR RE: BSD Sunset High School

SECTION SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES

MISSISSIPPI STATE UNIVERSITY Office of Planning Design and Construction Administration

A. Action Submittals: Written and graphic information that requires Engineer's responsive action.

The GMFI Process. Design Intent Document Preparation. Enroll in GMFI Program. Image Consultation. You are here. Design Intent Document.

SUBMITTAL LETTER Capital Renewal Scoates Hall, Texas A &M University, College Station, TX TAMUS Project

PROJECT TITLE PROJECT NO: CONTRACT TITLE UNIVERSITY OF CALIFORNIA, DAVIS CITY, CALIFORNIA

Taylor County July 2011 SECTION SHOP DRAWINGS, WORKING DRAWINGS AND SAMPLES

SECTION CONTRACTOR SUBMITTALS. A. All submittals by the CONTRACTOR shall be submitted to the ENGINEER.

SECTION SUBMITTALS PART 1 - GENERAL 1.01 RELATED DOCUMENTS

UCCS University Hall Fire Sprinkler System Upgrade March 1, 2011 RTA SECTION SUBMITTAL PROCEDURES PART 1 - GENERAL

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017

CITY OF BAYTOWN CENTRAL DISTRICT WASTEWATER TREATMENT PLANT GRIT, SECURITY, AND SCADA IMPROVEMENTS SCOPE OF SERVICES

East Central College

.2 Accompany all submissions with a transmittal letter, in duplicate, containing:.4 Specification Section number for each submittal

Submittal Transmittal

Working Drawing Procedure

SECTION 100 PRELIMINARY CONSIDERATIONS & INSTRUCTIONS

SECTION SUBMITTAL PROCEDURES

CITY OF BEVERLY HILLS Department of Public Works and Transportation Civil Engineering Division STORM DRAIN IMPROVEMENT PLAN REVIEW CHECKLIST

SECTION SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 RELATED DOCUMENTS

SECTION SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES

UNION COUNTY VOCATIONAL-TECHNICAL SCHOOLS West Hall Addition Project Raritan Road, Scotch Plains, NJ

2016 CDM Smith All Rights Reserved July 2016 SECTION PROJECT MEETINGS

Submittal Packages Detailed with Items and Reviewers

SECTION 2 GENERAL REQUIREMENTS

SECTION SUBMITTAL PROCEDURES

submittals 1s e c t i o n

TCC/SHORE TRANSIT BUS MAINTENANCE FACILITY - PHASE II

Drawings or Data are Submitted: For Approval For Information B Training Plan Polymer Make Down Units 01820

Anne Arundel County Dept. of Inspections and Permits Water Sewer Plan Checklist

Submittal Review Form

PROCEDURE FOR PROCESSING WORKING DRAWINGS

Waynetown Water Systems Improvements. Division A -New Water Treatment Plant Town of Waynetown, IN. Submittal Review Sheet

What Are Submittals?

SECTION SUBMITTALS

Jacksonville District Master

January, 2014 Page 1 of 5

SECTION 58 PRECAST CONCRETE BOX CULVERT. This work consists of furnishing and installing Pre-cast Concrete Box Culverts.

DIVISION 11 EQUIPMENT SECTION PHOTO DARKROOM FUME EXHAUST VENT-HOODS

SECTION ADMINISTRATIVE REQUIREMENTS SECTION ADMINISTRATIVE REQUIREMENTS

Designer CM/Owner s Rep Prime Contractor SubContractor Supplier Manufacturer

REMARKS: The A.F.F. dimension noted on the drawings to the bottom of the grid is 15 0, this dimension should be 16 0.

STANDARD SPECIFICATIONS SECTION SUBMITTAL PROCEDURES

SECTION A. RFI: Request from Contractor seeking interpretation, information, or clarification of the Contract Documents.

Chapter 1 General Design Information

SEPARATOR INTERNALS. jci-group.com. Filtration & Separation Solutions. JCI Filtration & Separation Inc. JCI Cyclonics Ltd. JCI Sand Separators Ltd.

StormTrap Guide Specification. StormTrap 2 SingleTrap on Aggregate Foundation Groundwater BELOW Invert Revised 11/30/17

SECTION CLOSEOUT SUBMITTALS SECTION CLOSEOUT SUBMITTALS

CHAPTER 10 MICHIGAN DESIGN MANUAL BRIDGE DESIGN (SI) SHOP DRAWING REVIEW TYPES OF SHOP DRAWINGS Structural Steel

835 Gil Harbin Industrial Blvd Valdosta, GA 31601

STATE OF OHIO DEPARTMENT OF TRANSPORTATION SUPPLEMENT 1073 PRECAST CONCRETE CERTIFICATION PROGRAM JULY 20, 2018

CITY OF RICHMOND SUBDIVISION PLAT AND PUBLIC INFRASTRUCTURE SUBMITTAL, REVIEW AND APPROVAL PROCEDURES

ADDENDUM NO. 3 PROJECT: COURTLAND PUMP STATION CONTRACT: IFB NO COM.00030

Answer: Qualification statement should be provided with the bid.

WTP FILTERS REHABILITATION (FILTERS 1, 2, 3, & 7) CITY OF CARTERSVILLE

APPLICATION FOR SITE PREPARATION PERMIT

Booster Pumping Station 115 Booster Pump Procurement

Submittal Transmittal

FTEV Repair Mezzanine Bldg Hurlburt Field, Florida SECTION DESIGN AFTER AWARD

B422 - PRECAST REINFORCED CONCRETE BOX CULVERTS AND BOX SEWERS - OPSS 422

LETTER OF TRANSMITTAL

Liquid ring vacuum pumps in compact design

SPECIAL SPECIFICATION 6609 Fiber Optic Color Video and Data Transmission Equipment

HUSSEY GAY BELL SAVANNAH, GEORGIA

SECTION PANELBOARDS

DS-CD-01 Rev 3

MEDIUM DUTY CAST IRON SLIDE GATES SERIES 20-10C

SUBMITTAL PROCEDURES

Submittal Packages Detailed with Items and Reviewers

WATERFLUX 3000 Quick Start

SUBMITTAL REVIEW Underground Natural Gas Piping Data Sheets GCAN. Notes: 1. See engineer s comments. Submittal: No. 016.

Regal Series Recessed Flatwalls

FLUOROPOLYMER COATED DUCT FOR CAUSTIC ENVIRONMENTS

Minor Site Plan Review Process

TAB B-9 RECORD DRAWINGS

LETTER OF TRANSMITTAL

September 6, 2018 CITY OF BERKELEY SHATTUCK RECONFIGURATION AND PEDESTRIAN SAFETY PROJECT SPECIFICATION NO C ADDENDUM NO.


Transcription:

LETTER OF TRANSMITTAL Max Foote Construction Company, LLC 225 Antibes West Mandeville, LA 70448 Telephone: (985)-624-8569 Fax: (985)-624-8580 Date: 08/29/2016 Job #: 289-11150 Submittal #: D-11235-001-A Spec Section: 11235 Attention: Ryan Asbury RE: Grit Removal System TO: SMITH AND LOVELESS,INC 14040 Santa Fe Trail Dr. Lenexa, KS 66215 Lake Charles WWTP B-C Lake Charles Capital Project: CP 3128 LDEQ Project Number CS221215-01 (913) 888-5201 WE ARE SENDING YOU: Shop Drawings/Submittal Attached VIA: E-Mail the following items: COPIES DATE Submittal No. Description 1 08/29/2016 D-11235-001-A Grit Removal System THESE ARE TRANSMITTED as noted below: Remarks: x See Remarks Code4: Approved as noted/resubmit. Please release for fabrication per the engineer s comments. Please return one electronic copy addressing the engineer s comments. This does not need to be a complete submittal but only the revisions required for approval. Once these comments are addressed we will need seven (7) hard copies and two (2) electronic disk of the final approved submittals for distribution. cc: File 289-11150 Job Site 289-11150 Affinity - Jared Brown Max Foote Construction Company, LLC Signed: If enclosures are not as noted, kindly notify us at once.

Submittal Review Transmittal TO: Max Foote Construction Co., LLC ATTN: Bill Hussey 225 Antibes St. West Mandeville, LA 70448 Submittal Number: D-11235-001-A Date of Response: Date Received: 8/9/16 Project # Project Name Client 5005.722 WWTP B/C Expansion & Rehabilitation - CP 3128 City of Lake Charles SPECIFICATION Section # 11235 Grit Removal System Section Name Grit Removal System PRODUCTS These submittals are transmitted as marked below; comments to follow on additional pages. SUBMITTAL REVIEW Review is for general compliance with contract documents. No responsibility is assumed by ng Group for correctness of quantities, dimensions, and details. No deviation or variation is approved unless specifically accepted in these review comments. The Contractor shall assume full responsibility for coordination with all other trades and deviations from contract requirements. Code 1 APPROVED No notations or comments on the submittal. Contractor may release the equipment and/or material for manufacture. Code 2 APPROVED AS NOTED Confirmation of the notations and comments IS NOT required by the Contractor. Contractor may release the equipment or material for manufacture; however, all notations and comments must be incorporated into the final product. Code 3 APPROVED AS NOTED/CONFIRM Confirmation of the notations and comments IS required by the Contractor. Code 4 APPROVED AS NOTED/RESUBMIT Resubmittal to address all comments, omissions and non-conforming items that were noted. Code 5 NOT APPROVED Contractor must resubmit the entire package revised to bring the submittal into conformance. Code 6 COMMENTS ATTACHED Code 7 RECEIPT ACKNOWLEDGED Not subject to the Engineer s review and approval; and, is being filed for informational purposes only. Signed: Chris LaCroix Date: 10542 S. GLENSTONE PLACE BATON ROUGE, LOUISIANA 70810 TEL (225) 448 3972 FAX (225) 454 6065 PAGE 1 OF 2

Submittal Number: D-11235-001-A Project # Project Name Client 5005.722 WWTP B/C Expansion & Rehabilitation - CP 3128 City of Lake Charles SPECIFICATION Section # 11235 Grit Removal System Section Name PRODUCTS Grit Removal System Comments: Enclosures need to be NEMA 4X Stainless Steel. They are located outdoors near the corrosive atmosphere of the Headworks. See Project Electrical Drawings E23, E26, and E31. 10542 S. GLENSTONE PLACE BATON ROUGE, LOUISIANA 70810 TEL (225) 448 3972 FAX (225) 454 6065 PAGE 2 OF 2

LAKE CHARLES WWTP B-C LAKE CHARLES PROJECT CP 3128 LDEQ PROJECT CS221215-01 SUBMITTAL FOR Grit Removal System D-11235-001-A 8/9/16 Bill Hussey Submittal Number Date Max Foote Construction Certification Statement: By this submittal, I hereby represent that I have determined and verified all field measurements, field construction criteria, materials, dimensions, catalog numbers and similar data and I have reviewed and approved this submittal and checked and coordinated each item with other applicable approved shop drawings and all contract requirements.

PISTA 360 with V-FORCE BAFFLE 95% Grit Removal Efficiency Down to 140 Mesh (105 Microns) Particle Size The PISTA 360 Grit Chamber is equipped with the patented V-Force Baffle, which is an integral flow control baffle for both the inlet and outlet of the main chamber. The V-Force Baffle directs the inlet flow into the chamber in a manner that ensures the proper vortex flow and prevents short-circuiting. The V-Force Baffle allows for a full 360 rotation from the inlet to the outlet, providing maximum flow travel for effective grit removal. The V-Force Baffle directs the flow out of the PISTA Grit Chamber and acts as a slice weir, controlling the water level in the main chamber and the inlet channel. No additional downstream flow control device is required to keep the velocity between 3.5 fps (1.06 m/s) at peak flow and 1.6 fps (0.48 m/s) at minimum flow with a 10:1 turn down. This most recent innovation further enhances the world s best grit removal scheme by providing engineering and cost saving considerations. By increasing chamber velocity during low flow periods, less grit is permitted to settle in upstream channels. The V-Force Baffle also extends the grit extraction path within the vortex grit chamber. This is a key feature because a longer grit path within the flow pattern dramatically increases the effectiveness of grit being captured on the chamber s flat-floor. Beyond this, the PISTA 360 with V-Force Baffle also permits design flexibility so that water elevations can be controlled. Water level control is important because it maintains the correct velocities approaching the grit chamber. Previously, the most common way to accomplish water level control in the chamber was to back up the flow with a downstream submerged weir. The PISTA 360 with V-Force Baffle has preset inlet and outlet openings that supplant the need for the submerged weir. With all of these improvements, the PISTA 360 with V-Force Baffle achieves 95% grit removal efficiency down to 140 mesh (105 microns). By integrating water elevation settings with the V-Force Baffle, the overall outlet footprint requirements decrease by as much as half the typical distance. The resulting smaller footprint provides significant construction cost savings. The PISTA 360 with V-Force Baffle represents the latest innovation that makes cents from Smith & Loveless. The PISTA 360 with V-Force Baffle is just one of many Smith & Loveless design innovations that make PISTA the world s leading grit removal system. Bulletin 960 Smith & Loveless Inc., 2012 O n l i n e : smithandloveless.com Phone: 913.888.5201 Fax: 913.888.2173

PISTA 360 with V-FORCE BAFFLE - Page 2 PISTA Grit Chamber Features and Benefits Coanda Ramp Engineered entry facilitates laminar flow so that it takes a steady tangential direction as it enters the grit chamber and properly conditions the grit for entrapment. Bull Gear Drive Provides minimum service 5.0 factor and trouble-free operation. PISTA TURBO Grit Pump [Top-Mounted & Remote-Mounted Options] Removes grit from storage hopper to washing and dewatering. Available in vacuum-primed and flooded suction arrangements. Now available with SONIC START prime sensing. Outlet Channel S&L can assist with design information for optimal performance. Inlet Channel Controls velocity of influent and draws grit to the grit chamber floor. Exclusive Flat-Bottom Basin Floor Facilitates the forced vortex flow pattern inside the chamber. Minimizes organic capture while hydraulically directing grit into lower hopper. Patented, 360-degree in-line design. PISTA V-FORCE BAFFLE New, patented innovation enhances removal efficiency for low-flow periods and offers design engineering benefits. PISTA Grit Fluidizer Patented blade exclusive to S&L design. Loosens collected grit, preventing compacting. Storage Hopper Stores removed grit prior to dewatering. Hopper Cover Plate Stationary and recessed, it removes for quick access to storage hopper. Axial-Flow Propeller Aids in directing organic-free grit into lower hopper by enhancing flow patterns. Rounded edges prevent solids build-up, thus ensuring high efficiency. V-Force Baffle Benefits PISTA Model Number Max. Flow (U.S. / Metric / LPS) 95% grit removal efficiency down to 140 mesh (105 microns) particle size. Construction cost savings due to decreased overall grit system footprint requirements. Increases grit chamber velocity during low-flow periods. Full 360 rotation in the chamber, lengthening grit extraction path. Eliminates the need for downstream level control devices. Designed to handle wide range of flows. 0.5 I 0.5A I 0.5B 1.0 I 1.0A I 1.0B 2.5 I 2.5A I 2.5B 4.0 I 4.0A I 4.0B 7.0 I 7.0A I 7.0B 12.0 I 12.0A I 12.0B 20.0 I 20.0A I 20.0B 30.0 I 30.0A I 30.0B 50.0 I 50.0A I 50.0B 70.0 I 70.0A I 70.0B 100.0 I 100.0A I 100.0B 0.5 MGD / 1,892 CMD / 22 LPS 1.0 MGD / 3,785 CMD / 44 LPS 2.5 MGD / 9,465 CMD / 110 LPS 4.0 MGD / 15,140 CMD / 175 LPS 7.0 MGD / 26,495 CMD / 307 LPS 12.0 MGD / 45,420 CMD / 526 LPS 20.0 MGD / 75,700 CMD / 876 LPS 30.0 MGD / 113,550 CMD / 1,314 LPS 50.0 MGD / 189,250 CMD / 2,190 LPS 70.0 MGD / 265,000 CMD / 3,067 LPS 100.0 MGD / 378,500 CMD / 4,381 LPS O n l i n e : smithandloveless.com Phone: 913.888.5201 Fax: 913.888.2173