TP Series - Triple PV Top of Pole Solr LED Lighting System Instlltion Mnul MKTG-TP34-02-EN-1113
Instlltion Mnul TP Series Importnt Notes nd Wrnings This instlltion nd instruction mnul provides instlltion instructions for the Sol TP Series solr LED lighting systems. The entire contents of this mnul should be thoroughly reviewed nd understood prior to instlling this equipment. Do not discrd this mnul, s it contins complete instlltion instructions. To insure proper opertion of this equipment, it is importnt tht the equipment be utilized for its intended use. Any use of this equipment for purposes other thn those intended will void ll wrrnties. Instlltion nd/or troubleshooting should be performed only by qulified personnel. Follow locl codes t ll times during instlltion of the Sol TP Series. Consult contrctor for proper instlltion of poles. Be very creful when working with btteries. Do not llow bre ends of the wires to touch ech other or grounded metl prts while connected to the controller. This will dmge the controller. This product must be instlled in ccordnce with the pplicble instlltion code by person fmilir with the construction nd opertion of the product nd the hzrds involved. 3 MKTG-IM-TP34-02-EN-1113
Instlltion Mnul TP Series Prts Provided Fixture Assembly -Cobrhed or Shoebox Solr Pnels - 3 or 4 Z Rils Top of Pole Triple/ Qud Brcket Bttery Enclosure (dditonl boxes my be supplied) Bttery Enclosure Chnnel (dditionl my be sipplied) Tenon Adptor Light Fixture Hrness (1 or more) TPM Mount Fstener Set A (4-8) Controller Tenon Fstener Set B (3) Tenon Fstener Set C (3) Bttery Cbles (1 per bttery) PV Pnel Hrness Bttery Hrness Btteries (3 or 4) Bttery Enclosure Chnnel Fstener Set D (2) Bttery Enclosure Chnnel Fstener Set E (4) Fstener Set F (2) Ground Wire Fstener Set 1/4-20 x 3/4 4 MKTG-IM-TP34-02-EN-1113
Instlltion Mnul TP Series 1.0 Positioning the Light 2.0 Assembling 2.1 PV Pnel Assembly - Triple or Qud Pnels. Ly PV pnels side by side on crdbord pckging to protect surfce. TP Mounting Brcket Kit 410016-100 6X Note: Keep bolts loosely fstened until PV pnels re secured. 5 MKTG-IM-TP34-02-EN-1113
Instlltion Mnul TP Series Orienttion of PV J-boxes should be t top end of pnel b 16X TP Mounting Brcket Kit 410016-100 2.2 Connect PV Hrness ( if pnels hve pnel pn, hrness will lredy be connected). Fctory ttched hrnesss 6 MKTG-IM-TP34-02-EN-1113
Instlltion Mnul TP Series b 7 MKTG-IM-TP34-02-EN-1113
Instlltion Mnul TP Series 2.3 Attch the Tenon Adptor, Tilted to 30 Tenon Adptor Kit 320004-005 60 45 30 8 MKTG-IM-TP34-02-EN-1113 15
Instlltion Mnul TP Series 2.4 Plce Solr Pnel Assembly on the Pre-Buried Pole - Mximum Pole Height should be 4 feet bove ground PV Modules lwys fce EQUATOR (South in Northern Hemisphere) EQUATOR 2.5 Mtch Drill Hole in Tenon with Tenon Adptor nd Secure. 9 MKTG-IM-TP34-02-EN-1113
Instlltion Mnul TP Series 2.6 Drill Bttery Mounting & Access Holes; Route PV Hrness 6 Min. from top of pole 4.25 below Access hole for PV Hrness. Drill thru one side @ 1.25 Di. For dul Bttery Enclosures drill thru pole. 28 Bttery Enclosure Chnnel holes: Drill thru @.87 Di. Note: Bttery enclosure my be mounted lower thn shown. 10 MKTG-IM-TP34-02-EN-1113
Instlltion Mnul TP Series 2.7 Drill Arm Mounting & Access Holes; Route Fixture Hrness Arm Mounting Hole. Drill thru 2x @.75 Di. Access hole for Luminire hrness. Drill thru one side @ 1.25 Di. Note: If mounting two rm mounts, connect both using the sme bolts. Longer threded rods will be provided. 11 MKTG-IM-TP34-02-EN-1113
Instlltion Mnul TP Series 2.8 Secure Bttery Enclosure Chnnel to Pole PV Hrness Fstener Set D 2x 3/4-10 x 12 bolts Fstener Set E 4x 1/4 20 x 1/2 hex hed bolts/wshers Note: Before ttching Bttery Enclosure Chnnel, fish Luminire Hrness down pole through ccess hole for rm. If mounting two bttery enclosures, connect both Chnnel brs using the provided bolts - longer threded rods will be provided. 2.9 Mount Bttery Enclosure Luminire Hrness 12 MKTG-IM-TP34-02-EN-1113
Instlltion Mnul TP Series 2.10 Mount Arm on the Pole Note: Fish Luminire Hrness through rm before ttching. 2.11 Mount the Light Fixture on the Arm-Cobrhed 13 MKTG-IM-TP34-02-EN-1113
Instlltion Mnul TP Series 2.12 Mount the Light Fixture on the Arm-Shoebox b Hex key nd screws 2.13 Instll the Controller Note: Controller mounting screws re supplied with controller 14 MKTG-IM-TP34-02-EN-1113
Instlltion Mnul TP Series 2.14 Instll the Bttery Cbles nd Bttery(s) b 15 MKTG-IM-TP34-02-EN-1113
Instlltion Mnul TP Series 2.15 Connect the Cbles Solr Pnels (3-4) Fixture Lod Hrness PV Hrness Light Fixture(s) 1-2 Green Wire (to Ground) secured to upper shelf Wiring Hrness EternO 4 Controller Fuse Bttery Hrness Btteries (2-4) 16 MKTG-IM-TP34-02-EN-1113
Instlltion Mnul TP Series 2.16 Test 2.17 Close Bttery Enclosure Cover 17 MKTG-IM-TP34-02-EN-1113
In-Wrrnty Service Instructions Instlltion Mnul TP Series A Returned Merchndise Authoriztion (RMA) number must be obtined from Sol Inc. before equipment cn be returned for repir or replcement under wrrnty. We require the following informtion before we cn issue n RMA number: Work Order Number (locted inside the bttery box) A description of the problem The ddress to which the repired or replced product is to be shipped Equipment being returned must be properly pckged to protect it from dmge during shipment. Shipping costs nd insurnce to Sol Inc. re the responsibility of customer. Upon verifiction of filure due to defects in mterils or workmnship, we will either repir or replce the product t our discretion. The customer will be responsible for ll shipping nd hndling chrges for ny equipment tht is sent to Sol Inc. in error (no definble problems). 18 MKTG-IM-TP34-02-EN-1113