Fir and pine wood (52 %) Portland cement (38 %) made by firing limestone and clay Water (9 %) Wood mineralisation substances (1 %)

Similar documents
NATURA PRO Product Information Leaflet 1

pacific build supply ltd

March High performance building boards

Installation Manual for Thermo Panel

Installation Manual for M4-Exterior Sheathing

KEITH PANEL SYSTEMS FUNDERMAX- MAX EXTERIOR EXPOSED FASTENER PRESSURE EQUALIZED WALL SYSTEM

Makrolon Solid Polycarbonate Sheets

-ARBOREAL. Skanfas Ltd Rikkilän/e 993 FIN Simola

Installation instructions for co-extruded louver-board profiles

Installation Instructions

Cladding. Quick Installation Guide. HardiePlank Cladding with ColorPlus Technology. For façades that last longer. Simple. Reliable. Durable.

SHIPLOCK CLADDING PRODUCT GUIDE INSTALLATION TECHNICAL SPECIFICATIONS CARE & MAINTENANCE

KEITH PANEL SYSTEMS FUNDERMAX- MAX EXTERIOR CONCEALED FASTENERS PRESSURE EQUALIZED WALL SYSTEM

Masking: Each mirrored sheet is well protected by a durable paint backing and

Installation Instructions: Urbanline Alu Selekta Clad

Installation Guide. Pionite Decorative Surfaces One Pionite Road, Auburn, Maine PIONITE ( )

The Passive Fire Protection Handbook

EASY APPLICATION. Furniture Linoleum

Façade CUT-TO-SIZE FAÇADE STRIPS APPLICATION IN OVERLAP ON WOODEN SUPPORTING STRUCTURE APPLICATION INSTRUCTIONS 1 1. GENERAL

SIMPLY DIFFERENT! VISCOM SIGN the lightweight foam board

The Passive Fire Protection Handbook

The Passive Fire Protection Handbook

INSTALLATION GUIDE DECKING.

DULUX UNIVERSAL UNDERCOAT

Splashback Installation Instructions

VERSAROC CEMENT BONDED PARTICLE BOARD ROOF SHEATHING VERSAROC CEMENT BONDED PARTICLE BOARD ROOF SHEATHING

Ash Brook Golf Course Scotch Plains, New Jersey

Processing and design Solid Textile Board

Installation Instructions

GREEN WORLD LUMBER GENUINE MAHOGANY DECKING INSTALLATION GUIDE

Cembrit Patina. Cembrit Cover. Cembrit Solid. Cembrit Transparent

Data Sheet 5741 Englisch

CINTRALUX ALU BARREL VAULT EP 10/10

Knowledge about display stand wood materials. Fuyuan wood factory learning summary reporter:willian

WITH HEAT - NATURALLY

VIEWpanel Technical Manual

Five Star Panel Installation Instructions

Installation Instructions for Bifold Doors (JII103)

NOTE: This product can be used externally if UV Guard is added (BY REQUEST ONLY).

WET AREA PANELLING. Designer Walls. Fast

INSTALLATION GUIDE DUOFUSE SLAT WALL SYSTEM

Gluing windows with SABA Glasstack 760

EZYSTONE WORKSURFACES

SlipGrip Data Sheet & Installation Guide

Tape Measure Metal Clippers Screw Bit Set With Extensions

POWER VLIES STRETCH 160

COMPOSITE SIDING INSTALLATION GUIDE

STACKING MULTI-SLIDE DOOR SYSTEM INSTALLATION INSTRUCTIONS

FABRICATION MANUAL CCM Copper Composite You discover why ALPOLIC Copper composite material (CCM) is the building material of the future as soon as

Edgebanders AURIGA Compact and extremely high performance. Spezialmaschinen. With copy cutter unit

Wet Area Panelling. Linear Series

Ignitability Index Spread of Flame Index Heat Evolved Index Smoke Developed Index. Range 0-20 Range 0-10 Range 0-10 Range

PROVEN WISA PLYWOOD FOR CONCRETE FORMING on time and on the spot to grow your business

Glass Systems. Technical Information on Pilkington Profilit Profiled Glass with System. - English Edition - Pilkington Profilit

External cladding technical instructions

PAREFEU PANEL Environmentally Sustainable Product with High Fire Rating

miramondo Technical Informations 1/10 Hop Hop

Installation Guide (888)

1. PREPARATION OF THE SUBSTRATE CLIMATIC CONDITIONS MARKING THE POSITION CUTTING GLUING 17 18

Installing Digital Wallcoverings

Installation Instructions: Urbanline Valchromat MDF Panelling

10 YEAR GUARANTEE. Vistalux corrugated sheeting is the ideal general purpose PVC sheet for roofing and cladding PVC SHEET WITH HIGH LIGHT TRANSMISSION

Adorn Mortarless Stone Veneer Installation Natural Concrete Products

SECTION INTERIOR FINISH CARPENTRY

GOLDENEDGE MDF PANELBRACE WALL BRACING SYSTEMS. Product. Scope. Building Regulations. Appraisal No. 779 [2018] Logo

Installation guide. MS 9 & Metal Block Profile

GARDEN SHED BRIGHTOLN

Installation instructions: Elements Vulcan+ Newport Hector Cladding

LVL8 H1.2 GENERAL FRAMING. Eco Friendly Revolutionary H1.2 Treatment Azotek by Zelam

METHOD STATEMENT. Sika FloorJoint S

I N S TA L L AT I O N & M A I N T E N A N C E G U I D E

HM OUTDOOR TABLE:HM OUTDOOR TABLE 25/7/08 11:18 AM Page 30

INSTALLATION GUIDE INSTALLATION GUIDE EKODECK SHOULD NOT: IMPORTANT INFORMATION

SECTION COUNTERTOPS ecox PART 1 GENERAL

15 YEARS GUARANTEE no swelling no cracking no splintering no rotting

Rev. 05/16 01 ACRYLIC INSTALLATION GUIDE

Symbiosis of protection and beauty CETOL WF 771. Passion for wood NOW ALSO WITH METALLIC EFFECT!

Installation guide. MS 14 Metal Siding

Internal timber. Preservation. Timber preservation, fire retardants and coatings

Contents. Storage and Handling. 4. Usage. 5. Wood Moisture Content. Cutting and Machining. 6. Screws and Fasteners. 7. Gluing.. 8. Painting.

MAXISHINGLE LAP SIDING INSTALLATION GUIDE

terraza and structura Installation Instructions. Privacy Shield Systems

ODEK shared 50% of Ukrainian plywood production in 2010, 48% in 2011 and 2012.

Wall flashing profiles FP 60 WA 1 WA 150 WA 1 - ÜK WA 1 - Ü 150 E

BUILDING A TREE BENCH

INSTALLATION INSTRUCTIONS

Installation Instructions Palladium 3D Hi Impact Wall System, Partial Height with Color Matched Caulk Joints

SECTION INTERIOR FINISH CARPENTRY PART 1 - GENERAL 1.1 RELATED DOCUMENTS

Working with Wood and Wood Materials

WOODWORKS Walls. Installation Instructions WALL

Technical Documentation

Eaves Lining Installation Guide

User s manual. Proper handling and storage of panels will help you maintain the high performance level of Uniboard products.

SECTION CARPENTRY

miramondo Technical Informations 1/7 La Strada

QUARTZ FABRICATION MANUAL

Inteplast Trim Free Foam

TRANSFORMER MANUAL. Bérkel Acrylic Mirror

RENU PANELING SYSTEM Installation Guide PLEASE READ GUIDE COMPLETELY BEFORE ASSEMBLY. Version 1.0 ALL STATED SIZES ARE NOMINAL DIMENSIONS.

EWI Install Guide. Thin Coat Render

Transcription:

Duripanel Structura Product information sheet 1 1 Product composition Duripanel Structura fibre panels are made from: Fir and pine wood (52 %) Portland cement (38 %) made by firing limestone and clay Water (9 %) Wood mineralisation substances (1 %) 2 Production method Dispersion process, three-layer wood-cement panels Duripanel Structura facade panels have multiple layers of acrylate with Fillite, TopCoat surface sealing, and hot-filming The surface coating are fully covering, with environmentally-friendly UV-resistant pigmentation is delivered with undercoat for on-site final coating 3 Dimensions and tolerances Duripanel Structura Thickness: 12 mm Length and width: 2600 x 1250 mm; 3100 x 1250 mm with cutting edge : 12, 16 and 18 mm 4 Weight (air-dried) Thickness Weight per m² Weight per panel 1250 x 2600 mm Duripanel Structura 15.0 48.75 58.13 12 mm 15.0 48.75 58.13 12 mm 20.0 65.00 77.50 16 mm 22.5 73.13 87.19 18 mm Weight per panel 1250 x 3100 mm 1 This information sheet replaces all earlier versions. ETERNIT reserves the right to alter this information sheet without priot notification. Please make sure that you are consulting the most recent version.

Colour 2 Ready-to-use Duripanel Structura Multi-layer, hot-film acrylate coating with environmentally friendly pigments. Grainy, silkmatt surface. Reverse side with transparent sealing. The surface coating covers fully, and environmentally-friendly, UV-resistant colour pigments are used. Red P 305, Red P 304, Orange P 701, Yellow P 602, Yellow P 601, Beige P 803, Blue P 404, Blue P 205, Green P 504, Grey 203, Grey P 205, White P 205, Blue P 405, Grey P 207, Black P 001 Undercoat Front is finished with grey undercoat for final surface coating on site as required. The final coating should be weather and alkali resistant, and should have the necessary adhesion to the sub-surface. An acrylate-based dispersion paint with colour-fast inorganic pigments can be used, such as Disbocret 515 Concrete Paint (Disbon GmbH), StoColor Royal (Sto AG), or Algae Protection Paint 4055 (Rickert GmbH&Co). Technical specifications Fire resistance (DIN 4102) : Class B1 (fire resistant) Density (test value) : approx. 1.25 g / cm³ Dead weight (Certified value) : 15 kn / m 3 Bending strength (test value) : 9.0 N / mm² Elasticity modulus (test value) : 4500 N / mm² Diffusion resistance (Duripanel Structura) (DIN 52615) 0-50 % rel. humidity : μ = 200 50-100 % rel. humidity : μ = 60 Effect of heat exposure Thermal expansion : αt = 0.011 mm / mkelvin (These values are based on Test Certificate 821/83. and data of Eternit AG ) Advantages When used in accordance with the application guidelines, wood-cement panels from Eternit AG have the following general characteristics: Duripanel Structura is made from natural materials and is recommended both for health and environmental considerations. Duripanel Structura facade panels are certified for use as back-ventilated cladding on wooden sub-structures up to the limit for high-rise constructions ( No. Z-9.1-308) Duripanel Structura is as free from isocyanates and formaldehyde as natural wood. Resistant to moisture, frost and fungal attack - does not rot No chemical wood protective substances necessary Resistant to rodents and termites 2 See the most recent color chat for an illustration of the colours

(additional advantage for internal applications) Applications Large format facade panel on a wood sub-structure are certified for use as back-ventilated cladding, and can also be used as weather boarding on wooden support structures. Processing Data General: Duripanel Structura may be worked with the same tools as synthetic resin-bound chipboards. It can be sawn, drilled, milled, polished and planed. For economic reasons professionals should only use hard-tipped tools. Dust from working the panels contains no substances which might be health hazards. However, for reasons of work safety, dust extraction is important, and equipment should be rated to allow for the density of the dust. Fixings: The external wall cladding should be mounted with due care. Loads resulting from changes in shape should not cause damage at the connecting and fixing points. Best results are obtained with 6 mm drilled holes and Eternit Facade screws. The minimum spacing of the panel drilling is 25 or 80 mm. The wooden support structure must be protected in accordance with German standard DIN 68800, Parts 1, 2, 3 and 5. In order to avoid vertical wooden supports becoming water-logged, open joints near the wooden joists should have backing strips which do not allow the passage of water. Cutting: Hand sawing a hand saw with hardened teeth should be used Stationary sawing machines Duripanel Structura can be cut with vertical or horizontal sawing machines. - form cutters with moving tool - circular saws with contra-rotating, neutrally positioned tool Duripanel Structura panels can be cut both with contra-rotating and synchronous saw cutters (this means the feeding direction is identical with the rotating direction of the saw blade). Finishing centres with diamond-tipped tools for saw-cutting as well as planing represent a particularly economical solution. Electric circular hand saws with electronic speed control and dust collector. For the circular hand saws to produce clean cuts, they should be run along a support blade or gib. Positioning the saw on the rear side of the panel and the saw blade penetrating into it by not more than 5 mm will produce the cleanest chip-free cut, even with coated material, provided the other parameters such as saw blade, shape of saw-teeth and the cutting speed comply with instructions. Electric compass saws are particularly suited for curved cuts and adjusting work. We recommend compass saws with electronic controls, pendulum-lifting and dust-collector functions. Suitable saw blades have diamond-tipped saw-teeth, especially for long periods of operation. Cutting speed: The best cutting speed for Duripanel Structura is between 30 to 60 m/s. Drilling:

Any commercial electric hand drill can be used, preferably with electronic control and a good drill bit. Do not use the hammer drill function. Heavy-duty, hard-metal drill bits should be used for continuous operation. Health and safety considerations: Work on the panels produces dust which can irritate eyes and lungs. It is recommended that a dust mask and protective goggles are worn. When working in an enclosed space or using machines which produce large amounts of dust it is important that the dust is removed and that there is a supply of good air. Long-term exposure to the dust may result in health impairments. 10 Transport conditions The panels should be moved in stacks using a fork-lift truck or a crane. Individual panels should be moved vertically, and should not be set down on corners. Stacks should be transported under a waterproof cover. 11 Storage and handling Duripanel Structura should be stored and transported on a flat, dry surface which gives support over the entire area. Stack to a maximum height of 1.0 metre, preferably on the returnable palettes, or on dry wooden slats placed sufficiently close to avoid sagging. The panels should be covered, for example with a heavy-duty plastic sheeting, to protect against dampness, weather and dirt. The covering must remain in place at all times for stacked material. Individual panels should be stored on end with air circulation on both sides. If only one side of a panel dries out or becomes damp this can lead to warping. Store in a dry place protected from weather and on dry wooden slats. Sagging should be avoiding by including spacing slats in the stack where necessary. Panels should not be slid off the stack, but should be lifted. On site, the individual panels should be carried upright, and should not be set down on corners. Moisture: Stacked material should be covered with plastic sheeting or tarpaulin to protect against moisture and dust. The stack should remain covered at all times. Each panel should be lifted from the pile by two workers, removed without touching the other panels and then carried vertically. Duripanel Structura panels should always be carried upright. 12 Special comment Duripanel Structura with undercoat should be given the required final coating on site. 13 Commercial details Prices, delivery conditions, and delivery areas as specified by the supplier. 14 References A list of references can be requested from ETERNIT AG - Facade and Construction Sales - or accessed on the Website. 15 Specifications Detailed specifications can be requested from ETERNIT AG - Facade and Construction Sales - or accessed on the Website.

16 Availability Deliveries world-wide, ex works Availability from builder's merchants and construction companies, or directly from ETERNIT AG Germany Technical customer service our customer service department and the construction company in Germany Contractual and warranty conditions in accordance with VOB: 2 years on material ETERNIT AG Fassade und Ausbau Knesebeckstraße 59-61, D-10719 Berlin, Germany Tel. ++49 30 3485 500 * Fax. ++49 30 3485 501 e-mail: fassade@eternit.de