The Weidmann Conference The Aging of America s Transformers

Similar documents
SAMPLE. Determining the health of your power transformer begins with Transformer Clinic s SAMPLE testing programs.

Load growth coupled with aging transform ers is a disaster wait ing to happen

Condition Assessment of High Voltage Insulation in Power System Equipment. R.E. James and Q. Su. The Institution of Engineering and Technology

ABB Power Products Service

Best Practice Reducing The Risk of Arc Flash Cross Over

Acoustic Emission in power transformers. Ajusco 15, Colonia Portales, Delegación Benito Juárez, C.P , México, D.F.

Benefits of SFRA - Case Studies

Africa Utility Week Focus Day Substation Condition Monitoring Benefits of Ultrasound

APPLICATIONS OF ACOUSTIC LOCALIZATION TO ONLINE POWER TRANSFORMERS

Hands-On Transformer Testing and Maintenance

MOBILE SUBSTATIONS 2015 MINNESOTA POWER SYSTEMS CONFERENCE

Notes 1: Introduction to Distribution Systems

Improving Distribution Circuit Performance without Circuit Rebuilds. John Lauletta, CEO

Monitoring Solutions For Power Transformers, Reactors, Bushings and Instrument Transformers

VACUTAP VVS COMPACT ON-LOAD TAP-CHANGER FOR GRID APPLICATIONS.

Application Note. Detection of Partial Discharge Using Ultrasound. Detection of Partial Discharge Using Ultrasound. Problem. iriss.

DEFERRING REPLACEMENT OF A 600 MVA, 345GRD Y/138GRD Y/ 13.8 kv SHELL TYPE WESTINGHOUSE AUTOTRANSFORMER

Substation Preventive Maintenance

RESIDUAL LIFE ASSESSMENT OF GENERATOR TRANSFORMERS IN OLD HYDRO POWER PLANTS

Knowledge Is Power SM Apparatus Maintenance and Power Management for Energy Delivery. Application of EMI Diagnostics to Hydro Generators

TECHIMP Power Transformer Monitoring

Electrical Equipment Condition Assessment

Operational Management of Grid Transformers An Experience of POWERGRID

OMICRON Seminar on Substation Testing and Diagnosis. October 23, 2017 Dubai, United Arab Emirates. October 24, 2017 Abu Dhabi, United Arab Emirates

Decreasing Substation Failures with Ultrasound Technology

Modern transformer relays include a comprehensive set of protective elements to protect transformers from faults and abnormal operating conditions

Case Studies of Electric Power Equipment Diagnostics Using Acoustic Emission

PD Diagnostic Applications and TechImp solutions

FINDINGS AND REPAIR OF WESTINGHOUSE UTT AND McGRAW 550 TAP CHANGERS

Partial Discharge Monitoring and Diagnosis of Power Generator

The Multi-Technology Approach to Motor Diagnostics

Advancements in online partial discharge monitoring and assessment of MV through EHV Substation assets

7. INSPECTION AND TEST PROCEDURES

PARTIAL DISCHARGE MEASUREMENT

IN ELECTRICAL ENGINEERING - I C M E T CRAIOVA

TECHIMP Technologies & Services for Diagnostics and Monitoring of High Voltage Assets

Advanced, accurate and intelligent monitoring for your transformer

PD Solutions. On-Line PD Measurement Devices

EPS AUSTRALIA SERVICES HV TESTING & COMMISSIONING CAPABILITY

Report on investigation of failure of 315 MVA Auto transformer at 400 kv Bawana Substation of Delhi Transco Ltd.(DTL)

Transformer Shunt Fault Detection using Two Techniques

ON-LINE PARTIAL DISCHARGE DETECTION ON TRANSFORMERS

Power Transformer Ratings' Calculation and Analysis - IEEE C

Phase Shifting Transformers. Presented by

Revision of C Guide for Application of Monitoring Equipment to Liquid Immersed Transformers and Components. Mike Spurlock Chairman

REPORT ON INVESTIGATION OF FAILURE OF 100 MVA, 220/66-33/11 KV POWER TRANSFORMER AT 220KV GEETA COLONY SUBSTATION OF DELHI TRANSCO LTD.

Understanding the Value of Electrical Testing for Power Transformers. Charles Sweetser - OMICRON

Understanding and Extracting Valuable Information from Basic and Advanced Power Transformer Testing Techniques

TRANSFORMERS FAULT ANALYSIS - A MULTIDISCIPLINARY APPROACH

Maintenance & Diagnosis Strategies. for. High Voltage Substations

Use of On and Offline Oil Analysis on the ESB, Distribution and Generation Networks

Power transformer failure management on the Eskom distribution network in Limpopo

Welcome to the Session on. HT Distribution Network

MV, HV AND EHV SWITCHGEAR TESTING & COMMISSIONING

CASE STUDY- FAULT IN POWER TRANSFORMER AT LOKTAK POWER STATION. - S K Mishra & S K Das NHPC Ltd O&M Division

Onsite Mobile AC High Voltage Test System

Training Fees 3,300$ per participant including Materials/Handouts, Tea/Coffee Refreshments & International Buffet Lunch.

TRANSFORMER SERVICES OUR KNOWLEDGE. YOUR EXPERTS.

SGMF(T) series. Onsite Mobile AC High Voltage Test System. Applications:

TRANSFORMERS. Table of Contents

The importance of partial discharge testing throughout the development and operation of power transformers

CHAPTER 3 REVIEW OF POWER TRANSFORMER PROTECTION SCHEMES

Transformer Testing & Maintenance Fundamentals. AVO Training Institute, Inc. 2018

The measurement of winding resistance is useful in detecting a number of types of fault in a transformer. Malfunctioning tap changer mechanisms

SERVICE OFFERINGS FOR POWER SYSTEM STUDY & CONDITION MONITORING FOR STATIC EQUIPMENT

OMICRON Seminar on Partial Discharge Diagnostics on HV Assets. January 30, 2018 Beirut, Lebanon

Dispersing the clouds gain clear insight into your bushings using advanced diagnostic methods

TRANSFORMER OPERATIONAL PRINCIPLES, SELECTION & TROUBLESHOOTING

Transformer Design: Economics & Reliability

- Continuous real-time measurement and PD trend analysis; not multiplexed data collection.

Life Cycle Management of Station Equipment & Apparatus Interest Group (LCMSEA) Getting Started with an Asset Management Program (Continued)

Mindfulness: The Key to Health and Wellness. John Orr, MA, LPCC-S Mindful Youth Cincinnati, OH

FIELD ELECTRICAL TESTING SPX TRANSFORMER SOLUTIONS, INC.

We can classify test failure modes in power transformers according to transformer components

PDS100 Application Note: The use of High Frequency Current Transformer as sensor for Transformer diagnostics

Improve asset protection and utilization

Xu Xiao Ming, AP Services, March 2010 Machine services Life expectance analysis program (LEAP)

Power Measurements and Basic Electrical Diagnostic Tests

HOLISTIC APPROACH TO ON-LINE TRANSFORMER MONITORING: KNOWLEDGE MANAGEMENT FIRST!

MONTRANO. Continuous monitoring system for power transformers

Progress Report on Failures of High Voltage Bushings with Draw Leads By Jim McBride and Larry Coffeen, JMX Services / NEETRAC 7/26/2010

Autotransformer Condition Monitoring Systems

EI HIGH VOLTAGE INSULATION TESTING POLICY

Substation Design Volume IV

A Comparative Diagnosis Approach on Transformer s Insulating Oil Ming-Jong Lin

Dynamic Testing for On Load Tap Changer Condition Assessment

Insulator Testers Frequently Asked Questions. September Version: 1.1

ELECTRICAL EQUIPMENT. Inspection. H.H. Sheik Sultan Tower (0) Floor Corniche Street Abu Dhabi U.A.E

Life Prediction of Mold Transformer for Urban Rail

C I R E D 21 st International Conference on Electricity Distribution Frankfurt, 6-9 June 2011

EE223D: Distribution Power Transformer

Cholla T809 Condition Assessment Report Provided by students of Northern Arizona University with the support of Arizona Public Service

TECHNIQUES AND STANDARD

Insulation Level and Test Technology of. 1000kV Power Transformer

Modeling Distribution Component Deterioration: An application to Transformer Insulation. A.U. Adoghe 1, a, C.O.A. Awosope 2,b and S.A.

Tap Changer Condition Assessment Using Dynamic Resistance Measurement

Software System for Finding the Incipient Faults in Power Transformers

Power Quality Monitoring and Analytics for Transmission and Distribution Systems

THE POWER OF LIFE. WinTech Partial Discharge based Predictive Intelligence of insulation system to eliminate power failure risk.

Doble Solutions for Partial Discharge. Greg Topjian Solutions Manager

Transcription:

The Weidmann Conference 2006 The Aging of America s Transformers by Jon L. Giesecke, Director, (610) 518-1615 jlgassociatesllc@yahoo.com

How Old is Old? The aging of the electrical infrastructure in the United States is a serious problem!! Until recently this problem has slipped thru the cracks. A new level of awareness is needed as these aging transformers are failing.

Average Age As of today, our transformer population has an average age of 40 years The published life expectancy of many of our transformers is 40-50 years TIME S UP..NOW WHAT?

WE MUST BE PRO-ACTIVE WHAT S NEEDED? The best asset management program using condition monitoring. HOW?

WE MUST BE PRO-ACTIVE I have dedicated the past decade in search of the optimal tests for condition assessment of Oil Filled Power Transformers and their Sub-Systems.

WE MUST BE PRO-ACTIVE During that time, I helped develop a program using the newest technologies and the very best equipment, methods and techniques for condition assessments.

WE MUST BE PRO-ACTIVE Infrared, Vibration Analysis, DGA, Oil Quality and Functional Testing of the cooling systems and load tap changers was the backbone of the process. What was needed was an easy and reliable test method for Partial Discharge.

WE MUST BE PRO-ACTIVE USING THE NEWEST TECHNOLOGY A Partial Discharge (PD) testing method using acoustic sensors and a high frequency current transducer is now available This increases the protection factor for these utility industry assets: Transformers, LTC s, Lightning Arrestors, Pumps, OCB s, GIS, etc.

WE MUST BE PRO-ACTIVE This presentation will describe the process for PD detection / location and answer many key questions that may arise.

However, before we start.. One Question..What do Oil Circuit Breakers, Load Tap Changers and Voltage Regulators have in common? Anybody??????

Ahaa! Answer.. They all have contacts which arc under insulating oil!

Abnormal Arcing (bad ju-ju) Something that shouldn't arc under oil ANYBODY????

Abnormal Arcing (bad ju-ju) OIL FILLED POWER TRANSFORMERS

LET S TAKE A WALK DOWN MEMORY LANE The Date..1969 The Viet Nam War Peace & Love DGA My Discharge from the Navy Hippies & Flower Power Bell Bottoms

Let s take a walk down memory lane. Did he just say DGA???

Back in the OLD DAYS I was a maintenance electrician high volt group. The high volt group was responsible for OCB, LTC and Regulator maintenance. Everything was based on time and operations / fault trippings

Back in the OLD DAYS The most high tech device we all used was the Cincinnati Analyzer for breaker timing. Like many of you, I licked many charts until they came out with self stick. (new technologies)

Back in the OLD DAYS Then a brand new technology came into existence.dga on Transformer Oil. By the way it was slow to catch on. And yes, we were still using the old Cincinnati Analyzer And doing overhauls based on time and operations

Back in the OLD DAYS I was threatened with bodily harm when I suggested doing DGA on an LTC I imagine I would have been institutionalized if I had suggested doing DGA on OCB s

BACK TO THE FUTURE BUT, as most of you know and are probably doing; both LTC and OCB problems are easily detected by DGA What about voltage regulators? Aren t they in the same family? Arcing Contacts under oil, exhibit much of the same characteristics.

Back to the Future And of course there came into major use in our industry, Infrared Thermography Everyone is doing IR OCB and LTC infrared is very telling and useful for diagnosing problems A full set of functional tests on LTC S saved many costly failures

Back to the Future Then along came Ultrasonic Analysis Computerized motion analysis and capture of 1 st trip. Wave Shape analysis, Etc., Etc.

A combination of ultrasonics and electrical capture of an arc is being done. And with it, the ability to analyze Source Locate Trend And make the big dollar decision on when to say when.

Today, we are able to capture and analyze a burst of acoustic energy BUT, HOW MANY DO???

And Expand a selected Portion for a closer look

And Expand even more to measure the Frequency Content.

Technology today is able to capture the acoustic signal from the operation of an LTC. BUT, HOW MANY DO???

Then expand and analyze the acoustic signal!

Technology today is able to capture the Arcing from the operation of an LTC.

Then Expand and Analyze the Arc B C

Expand again to show the arcing contact and the follow-thru. (B Phase) B

Then Expand C Phase for analysis. (C Phase) C

AND BY THE WAY. Did you realize??? This was a VACUUM TYPE LTC!

I NOW HAVE THE ABILITY TO INSPECT VACUUM CONTACTS IN AN LTC DURING AN OPERATION.ALSO MECHANICAL LTC S OCB s VOLTAGE REGULATORS

ALSO THE ABILITY TO INSPECT OIL FILLED TRANSFORMERS AND SUPPORT EQUIPMENT DURING NORMAL OPERATION CORE, WINDING, BUSHING LEADS PUMPS LA S LTC S DETECTING PD AND ARCING IS FAST AND EASY

The Rest of the Story When you look at the next few slides Remember the top screen is acoustic energy.. The bottom screen is electrical energy..

THE COMPLETE LTC PICTURE FROM PREVIOUS SLIDES

PARTIAL DISCHARGE IN MPT/GSU

Cursors measure difference, PD is confirmed in this GSU

Expand 1 Burst for a closer look.

Expanding more shows #3 is closest (notice the spike shape)

The fault Location Screen (front view) Pink Ball shows location of PD.

The fault Location (top down view)

BAD LIGHTNING ARRESTOR (bottom screen only)

ONE SPIKE FROM THE LA

ONE SPIKE FROM PD (flip back and forth)

Combining Data, a Holistic Approach Partial Discharge Detection Infrared Thermography Vibration Analysis (main tank and pumps) Functional Testing of Cooling System & LTC DGA & Oil Quality Review Furan Analysis Review of Transformer Loading History All done on energized, loaded transformers

Combining Data, a Holistic Approach We only talked about one of the technologies from the list. Many times two or more methods point to the problem. Don t short change yourself. This knowledge is available, learn to do a complete condition assessment.

THANK YOU QUESTIONS PLEASE