R-TECCISYSTEM R-TECCIBRACKET. R-TEC The One-Step Engineered Solution for. ASHRAE 90.1 Continuous Insulation. American Fiber Cement Corporation

Similar documents
MaxLite LED Self-Driven LiteBars

THANK YOU FOR PURCHASING OUR STUDIO RTA CREATION STATION

INSTALLATION MANUAL SONANCE SOUNDBARS SB46 M AND SB46 L. Introduction. Box Contents. Wall Mount Installations

AM95 Installation Guide

Installation and Assembly: Recessed Cable Management and Power Storage Accessory Box

Instruction Sheet D-CPU. Secure CPU Holder

RITE-HITE RAINGUARD TM

Single Flex and Double Flex Couplings (i)

Unirac Flat Flashing INSTALLATION MANUAL

Tilting & Swiveling Flat Panel Wall Mount Installation Guide Model: AXS2040

RV 10 Interior Panels

orientation Conergy SunTop Instructions for professional installation

Horizontal Mezzanine Gate

AM500-U Installation Guide

GENERAL INSTALLATION GUIDE: WARRANTY: PRODUCT INFORMATION T F

Installation and Assembly: Recessed Cable Management and Power Storage Accessory Box

CUTTING THE PIPE: BLUE DUCT Pipe can be easily cut using a Circular Saw or Reciprocal Saw. Trim all edges as necessary.

THANK YOU FOR PURCHASING OUR STUDIO RTA PROJECT STATION

Grounding and Utility Enclosure

Installation Instructions for. Hy-dit. Toilet Plunger Storage. English. Patent # 7,156,476 B2. Manufactured by:

INSTALLATION INSTRUCTIONS FOR BALCO, INC SERIES GYMNASIUM FLOOR JOINT COVERS

INSTALLATION INSTRUCTIONS FOR BALCO, INC. 75FCA SERIES ACOUSTICAL CEILING JOINT COVER SYSTEMS

INSTALLATION INSTRUCTIONS FOR RETROFIT STAIR NOSINGS FOR RENOVATION

Instruction Sheet. VRS Series. Vertical Rackmount system for multiple cable/satellite receivers

Auto Dot. Pro. IMPORTANT: Read and understand the Operations Manual before operating the Auto Dot Pro.

By SP Partners, LLC. INSTALLATION GUIDE. Star

Safety Awareness Barriers

INSTALLATION INSTRUCTIONS FOR BALCO, INC. TYPES ACWC CEILING JOINT COVER SYSTEMS

Grounding and Utility Enclosure

IMPACT DOOR 3000 SERIES. This Manual Covers All Doors Shipped To Date, Except For Revised Jamb Guards.

Single-Sliding Header Mount INSTALLATION INSTRUCTIONS

WallAccess - No Door

Installation Manual Roof Zone Ladder Rack

694 SERIES NEO-ANGLE PIVOT SHOWER ENCLOSURE

Instruction Sheet REB SERIES. Rotating Sliding Base REB18

3M Air and Vapour Barrier 3015 Technical guide

Dual Purpose Projection Screen

INSTALLATION INSTRUCTIONS FOR BALCO, INC. NBR SERIES EXPANSION JOINT COVER SYSTEMS

Assembly Instructions

CRD 410 MANUAL FITTING INSERTER

FIXED-POSITION WALL MOUNT FOR TVs in.

INSTALLATION INSTRUCTIONS: DISC SANDER SHIELDS UPPER BELT SANDER SHIELDS LOWER BELT SANDER SHIELDS

Ignitability Index Spread of Flame Index Heat Evolved Index Smoke Developed Index. Range 0-20 Range 0-10 Range 0-10 Range

Installation and Assembly: Articulating Swivel Arm for 37" - 60" Flat Panel Displays

The Balustrade Collection

for Magna-Matic Stands & Accessories Covering: MAG & MAG / / / /

One Shelf, Wall Mounted A/V Component Stand Installation Guide Model: EX101SS

Line 6 L I M I T E D R E F URBISH E D (B-ST O C K) W A RR ANT Y

Installation Instructions Lower Cargo Rack Bracket

Aquatic Specialties Manufacturing. Cover Butler Installation & Use Manual

PRC-LA Installation Guide

Full Extension Soft-Close Undermount Drawer Slide

Tilting Flat Panel Wall Mount Installation Guide

ImPortant InformatIon. Parts IdentIfIcatIon. Assembly Instructions for Model Number 138T-BK

INSTALLATION INSTRUCTIONS

3 Light Fiber Products

Putsch Meniconi Vertical Scale Instructions

Tilting, Swiveling & Rotating Flat Panel Wall Mount

INSTALLATION INSTRUCTIONS FOR BALCO, INC. TYPES ACVS 6" & WIDER CEILING JOINT COVER SYSTEMS

HowtoPlans..org. 6'x8' Storage Shed Plan

SNAP-FAN INSTALLATION

INSTALLATION INSTRUCTIONS

P4263TP. Installation Guide. Low-Profile Tilting Portrait Mount for Flat-Panels

By SP Partners, LLC. INSTALLATION GUIDE. ProTech

Installation Manual for Thermo Panel

Gypsy Statement of Limited Warranty. Part 1 General Terms

Installation Guide. Model VLS-TM1540. Universal Tilt/Pivot Wall Mount for use with Flat Panel Displays

Vinyl Fence Gates. Assembly and Installation Instructions PLEASE READ OWNER'S MANUAL COMPLETELY BEFORE ASSEMBLING YOUR FENCE.

PA Watt Compact Two Zone Amplifier to Drive up to 60 Paging Speakers. 60 Watt / 2 Zone Power Amplifier. Features. Applications.

Tension Control Clutch Model TCC-7

Wenger Corporation 2010 Printed in China 02/10 Part #148H Wenger Corporation, 555 Park Drive, P.O. Box 448, Owatonna, Minnesota

Telescopic Screw Gun Bracket & Accessories

NOVA-EXT Versatile Projector Mount Model: NOVA-EXT

BASE & WALL CABINET SETUP GUIDE BY SUNSTONE

Model DB Disc Caliper Brake AIR CHAMP PRODUCTS. User Manual. (i) MTY (81)

Loading Dock Safety Gate

Installation Instructions

Questions? Call Toll-Free

INSTRUCTION BOOK FOR. IDEA Screen & Panoramic for Nureva Span

HowtoPlans. 24'x8' Walk In Chicken Coop Plan. Designed for up to 50 chickens. .org

MaxLite Linear Strip ECO Series

ASSEMBLY INSTRUCTIONS Last Updated

PLM CABINET AND MTL LIGHT INSTRUCTIONS

Installation Instructions

INSTALLATION INSTRUCTIONS

PATRIOT DOCKS ASSEMBLY INSTRUCTIONS

25-A Shawnee Way Bozeman, MT Fed ID PH FAX

INSTALLATION INSTRUCTIONS

Installation Instructions/Operation and Maintenance Manual. PS DOORS Contact Information. Website psdoors.com

HowtoPlans..org. 10'x16' Storage Shed Plan

DRIVEWAY SERIES D554 D560

HowtoPlans..org. 8'x10' Storage Shed Plan

Radio Remote Controls Manual K Series

OPERATORS MANUAL WEEKENDER STEEL LADDER RACK

INSTALLATION MANUAL VERANDA ENCLAVE RAILING. Model # SEC17 EW R15 PRE W/H SEC17 EW R15 KD W/HW SEC17 EWS R13 KD W/H

HowtoPlans..org. 8'x12' Storage Shed Plan

MICHAEL RIZZA COMPANY Premium Silicone Systems

Ready-To-Assemble VersaRail INSTALLATION INSTRUCTIONS

Single Arm Pole Mount. Installation Manual Edition v1.01. For models: UNI-SA/14 UNI-SA/21.5 UNI-SA/26 UNI-SA01-MAN

Spa & Hot Tub Necessities. Cover Butler Cover Lifter Installation & Use Manual

Transcription:

R-TECCISYSTEM R-TEC The One-Step Engineered Solution for ASHRAE 90. Continuous Insulation Horizontal Bracket Vertical Bracket R-TECCIBRACKET The R-TEC CI System for ventilated rain screen constructions is an engineered solution to enable today s design professional to meet the ASHRAE 90. definition for continuous insulation. Additionally, the R-TEC CI Bracket is designed to facilitate the use of all types of exterior cladding whether that be metal panels, fiber cement façades or terra cotta tiles. The versatility of the patented R-TEC CI Bracket affords the flexibility to specify a wide range of exterior insulating materials from mineral wool and lower density foam up to the higher density foams. The R-TEC CI System and R-TEC CI Bracket give the architect the solution for meeting the new performance standards while at the same time controlling costs. American Fiber Cement Corporation

Vertical Systems High Density Foam Vertical System High Density Foam Insulation. Vertical R-TEC CI Bracket with alignment holes corresponding. Horizontal screws (). Diagonal screw (). L Bracket attached with screws provided. Screws for attaching profiles. Aluminum L or T profile. For open joint cladding systems: Black self-adhered UV-resistant membrane Mineral Wool Exterior Sheathing Vertical System Building Wrap Mineral wool or low density insulation. Vertical R-TEC CI Bracket with alignment holes corresponding. Horizontal screws (). Diagonal screw (). L Bracket attached with screws provided. Screws for attaching profiles. Aluminum L or T profile American Fiber Cement Corporation 0/0

Horizontal Systems Single Profile High Density Foam Horizontal System High Density Foam Insulation. Horizontal R-TEC CI Bracket. Horizontal screws (). Diagonal screw (). Aluminum L profile. Screws for attaching profiles. Alignment holes corresponding. For open joint cladding systems: Black self-adhered UV-resistant membrane Mineral Wool Exterior Sheathing Building Wrap Horizontal System Mineral wool or low density insulation. Horizontal R-TEC CI Bracket. Horizontal screws (). Diagonal screw (). Aluminum L profile. Screws for attaching profiles. Alignment holes corresponding to insulation thickness for drilling pilot hole in metal stud American Fiber Cement Corporation 0/0

Horizontal Systems Double Profile Foam Horizontal System High Density Foam Insulation 8. Horizontal R-TEC CI Bracket. Horizontal screws (). Diagonal screw (). Aluminum L profile. Screws for attaching profiles. Alignment holes corresponding. For open joint cladding systems: Black self-adhered UV-resistant membrane 8. Aluminum Hat or Z profile Mineral Wool Exterior Sheathing Building Wrap Horizontal System Mineral wool or low density insulation. Horizontal R-TEC CI Bracket. Horizontal screws (). Diagonal screw (). Aluminum L profile. Screws for attaching profiles. Alignment holes corresponding to insulation thickness for drilling pilot hole in metal stud. Aluminum Hat or Z profile American Fiber Cement Corporation 0/0

R-TECCIBRACKET Installation Procedure. Locate studs behind the exterior insulation.. Per the wall layout drawing provided, fasten the R-TEC Bracket (No. ) at the specified spacing, both horizontally and vertically. Be careful to ensure the brackets are plumb.. Fasten the two horizontal screws (No. ). Top screw first, then the bottom screw.. Locate the correct alignment hole for the insulation thickness specified and drill a pilot hole through the insulation into the wall stud.. Install the diagonal screw (No. ).. For vertical systems, attach the "L" bracket (No. on Vertical System illustrations) with two short screws provided.. For vertical or horizontal system, attach the remaining specified profiles with the screws/ rivets provided. Ensure the profiles are square and plumb. This is easily accomplished utilizing the vertical and horizontal adjustments built into the system design. 8. Attach exterior cladding to the aluminum profiles per the manufacturer's installation instructions Horizontal Profile AFC Cladding Vertical Profile Wallboard Typical Cross-section Horizontal System With " High Density Foam Insulation. Horizontal R-TEC CI Bracket. Horizontal screws (). Diagonal screw (). Screws to attach horizontal profile. Rivet/screw to attach vertical profile. Alignment holes corresponding to insulation thickness for drilling pilot hole in metal stud (Alignment holes accommodate insulation of various thicknesses). Exterior insulation Vertical Profile AFC Cladding Wallboard Typical Cross-section Vertical System With " High Density Foam Insulation. Vertical R-TEC CI Bracket. Horizontal screws (). Diagonal screw (). L Bracket attached with screws provided. Screws to attach vertical profile. Alignment holes corresponding to insulation thickness to drill pilot hole in metal stud (Alignment holes accommodate insulation of various thicknesses). Exterior insulation American Fiber Cement Corporation 0/0

R-TECCIBRACKET Features and Benefits Patented Attachment Device n Meets the literal definition for ASHRAE 90. continuous insulation u Only fasteners penetrate the insulation for minimal thermal bridging n Accommodates all types of exterior insulation, i.e. mineral wool, low density foam or high density foam u Insulation thicknesses can range from " to." n Accommodates all types of façades u Phenolic Fiber Cement Terracotta Brick n Aluminum Attachment System for maximum corrosion resistance n The three design systems provide maximum versatility to control the cost of the building envelope n Price competitive with all other comparable systems n The R-TEC CI System includes all of the following elements: u Engineered design for each job u Static calculations u Wall layout drawings for bracket locations and details u Brackets u Aluminum profiles u Screws and rivets n Easily plumbed and leveled due to the alignment features incorporated into the bracket designs n On-site job assistance is available n Allows for façades to be either face fastened, glued or back fastened n CSI -PART architectural specs on ARCAT can be downloaded and customized to each project Limited Warranty Limitation of Liability American Fiber Cement Corporation (AFCC) warrants that its products are manufactured in accordance with its applicable material specifications and are free from defects in materials and workmanship using AFCC s specifications as a standard. Only products which are installed and used in accordance with applicable AFCC instructions and specifications are in any way warranted by AFCC. This warranty is applicable only to claims made in writing and received by AFCC within thirty (0) days after the defect was discovered and within ten (0) years after the date of the shipment of the product by AFCC. All other claims are waived. If a claim is made, you must allow reason able in vestigation of the pro duct you claim is defective and you must supply samples that adequately demonstrate the pro blem you claim for testing by AFCC. AFCC DISCLAIMS ALL IMPLIED WARRANTIES INCLUDING THE WARRANTY OF MERCHANTABILITY AND THE WARRANTY OF FIT NESS FOR A PARTICULAR PUR POSE. THIS LIMITED WAR RANTY PROVIDES YOUR EXCLU SIVE REMEDY AS A PURCHASER OF AFCC PRODUCTS. THIS LIMIT- ED WARRANTY MAY BE MOD IFIED OR AMENDED ONLY BY A WRIT TEN INSTRUMENT SIGNED BY A DULY AUTHORIZED REPRE SEN TATIVE OF AFCC. WITHOUT AN EXPRESS, WRITTEN AUTHORIZATION FROM AFCC, NO RETAIL ER OR DISTRIBUTOR OF AFCC PRO DUCTS HAS THE AUTHORITY TO MODIFY OR AMEND THIS LIMITED WARRANTY. This limited warranty is your sole and exclusive remedy. It is expressly understood and agreed that the limit of liability will be, at AFCC s option, repair, re supply of a like quantity of non-defective product, or re fund of purchase price of the material. All labor and service charges which may be incur red with respect to either the original or replacement pro duct are excluded. AFCC shall have no liability except where the claim results solely from breach of AFCC s limited warranty. AFCC SHALL NOT BE LIABLE FOR ANY INCIDENTAL OR CON SEQUENTIAL DAMAGES. FUR THERMORE, AFCC SHALL NOT BE LIABLE FOR DAMAGE TO THE PROPERTY TO WHICH THE PRO DUCT IS APPLIED OR ITS CON- TENTS, LOSS OF TIME, PROFITS, OR ANY INCONVENIENCE ARISING OUT OF ANY BREACH OF THIS LIMITED WARRANTY OR OBLIGATIONS UNDER THIS LIMITED WARRANTY. AFCC SHALL NOT BE LIABLE FOR ANY DAM AGES WHICH ARE BASED UPON NEGLIGENCE, BREACH OF WAR RANTY, STRICT LIABILITY, OR ANY OTHER THEORY EXCEPT THE LIMITED WARRANTY SET FORTH ABOVE. INCIDENTAL AND CONSEQUENTIAL DAM AGES SHALL NOT BE RECOVERABLE EVEN IF THE REPLACEMENT REMEDY FAILS OF ITS PURPOSE OR FOR ANY OTHER REASON. Distributed exclusively by: American Fiber Cement Corporation 90 South Pierce Street, Suite 0 Littleton, CO 808 U.S.A. Phone: 0-98-99 800-88-8 Fax: 0-98-008 www.americanfibercement.com AFCC 0/0 0- American Fiber Cement Corp. Printed in USA